CN116418064A - Charging control method, system, electronic device and computer readable storage medium - Google Patents

Charging control method, system, electronic device and computer readable storage medium Download PDF

Info

Publication number
CN116418064A
CN116418064A CN202111659141.0A CN202111659141A CN116418064A CN 116418064 A CN116418064 A CN 116418064A CN 202111659141 A CN202111659141 A CN 202111659141A CN 116418064 A CN116418064 A CN 116418064A
Authority
CN
China
Prior art keywords
battery
batteries
charging
charged
target
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111659141.0A
Other languages
Chinese (zh)
Inventor
吴俊婵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aulton New Energy Automotive Technology Co Ltd
Original Assignee
Aulton New Energy Automotive Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aulton New Energy Automotive Technology Co Ltd filed Critical Aulton New Energy Automotive Technology Co Ltd
Priority to CN202111659141.0A priority Critical patent/CN116418064A/en
Priority to PCT/CN2022/142715 priority patent/WO2023125637A1/en
Publication of CN116418064A publication Critical patent/CN116418064A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/007Regulation of charging or discharging current or voltage
    • H02J7/007188Regulation of charging or discharging current or voltage the charge cycle being controlled or terminated in response to non-electric parameters
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/80Exchanging energy storage elements, e.g. removable batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/007Regulation of charging or discharging current or voltage
    • H02J7/00712Regulation of charging or discharging current or voltage the cycle being controlled or terminated in response to electric parameters
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The invention discloses a charging control method, a charging control system, electronic equipment and a computer readable storage medium, wherein the charging control method comprises the following steps: predicting a battery supply state and a battery replacement demand of a target battery replacement station in a first time period; and controlling the battery of the target battery exchange station to charge according to the battery supply state and the battery exchange requirement. The invention can predict the battery supply state and the battery replacement demand of the target battery replacement station in the first time period in the future, and control the charging of the target battery replacement station according to the prediction result in the future. Different from a charging mode that the battery is charged when the battery is replaced by the battery replacement station, charging resources can be reasonably distributed, for example, the battery can be charged in advance according to future requirements, the condition that the battery which is replaced in a concentrated mode is required to be charged in a peak period of the battery replacement is avoided, and the charging pressure of the battery replacement station is reduced. And on the premise of meeting the requirement of future power conversion, additional charging is not needed, so that the charging resource of the target power conversion station can be saved.

Description

Charging control method, system, electronic device and computer readable storage medium
Technical Field
The invention relates to the field of vehicle battery replacement, in particular to a charging control method, a charging control system, electronic equipment and a computer readable storage medium.
Background
The quick-change electric automobile can meet the power supply requirement of the quick-change electric automobile by changing the battery pack at the battery changing station. In the current power exchange station, a charging mode of 'down-charging' is generally implemented, namely when a battery is down from a power exchange vehicle, the power exchange equipment immediately sends the down battery to an idle charging bin to start charging.
Under this kind of charging mode, can't carry out rational utilization to the charge resource of trading the power station, be difficult to guarantee that the quantity of the available battery of each period trading the power station can both satisfy the electricity demand of trading to, at the peak period of trading the electricity probably because the quantity of waiting to charge battery under trading is too much, caused very big charge pressure for trading the power station.
Disclosure of Invention
The invention aims to overcome the defect that in the prior art, a power exchange station is difficult to meet the power exchange requirements of a power exchange vehicle at all times and save the charging resources of the power exchange station, and provides a charging control method, a charging control system, electronic equipment and a computer readable storage medium which can meet the power exchange requirements of the power exchange vehicle at all times and save the charging resources of the power exchange station.
The invention solves the technical problems by the following technical scheme:
the invention provides a charging control method, which comprises the following steps:
predicting a battery supply state and a battery replacement demand of a target battery replacement station in a first time period;
and controlling the battery of the target battery replacement station to charge according to the battery supply state and the battery replacement requirement.
In the invention, unlike the charging mode that the battery is charged immediately after the battery is replaced, the invention can predict the battery supply state and the battery replacement requirement of the target battery in the first time period in the future and control the charging of the target battery according to the prediction result in the future. On the one hand, the charging resources can be reasonably distributed under the condition of meeting the battery supply requirement, and on the other hand, the condition that the batteries which are intensively replaced in the power conversion peak period are required to be charged can be avoided, so that the charging pressure of the power conversion station is reduced.
Preferably, the step of predicting the battery supply status and the battery replacement demand of the target power exchange station in the first time period specifically includes the steps of:
acquiring a battery supply state and a battery replacement requirement of the target battery replacement station in a second time period;
predicting the battery supply state and the battery replacement demand of the target battery replacement station in the first time period according to the battery supply state and the battery replacement demand of the second time period;
wherein the second time period is a time period before the first time period.
In the invention, future data (namely, the battery supply state and the battery replacement requirement in the first time period) can be predicted according to the historical data (namely, the battery supply state and the battery replacement requirement in the second time period) of the target battery exchange station, so that the accuracy of prediction is improved while the self resources are fully utilized.
Preferably, the target battery replacement station comprises an available battery and a battery to be charged, wherein the available battery is a battery with residual electric quantity reaching an electric quantity threshold, and the battery to be charged is a battery with residual electric quantity not reaching the electric quantity threshold; the step of controlling the charging of the battery of the target battery exchange station comprises the following steps:
and determining the charging start time and/or the charging speed of the battery to be charged in the target battery exchange station.
In the invention, the charging start time and/or the charging speed of the battery to be charged in the target battery replacement station are determined based on the prediction of the battery supply state and the battery replacement requirement in the first time period, so as to control the time for converting the charging of the battery to be charged into the available battery, thereby ensuring that the number of the available batteries in the first time period can meet the battery replacement requirement in the first time period.
Preferably, the battery replacement requirement includes: the number of cells to be replaced; the battery supply state includes: the number of available batteries;
the step of controlling the charging of the battery of the target battery exchange station according to the battery supply state and the battery exchange requirement comprises the following steps:
and when the number of the available batteries does not meet the number of the batteries to be replaced, charging the batteries to be charged in advance to enable the batteries to be charged to be converted into the available batteries until the number of the available batteries meets the number of the batteries to be replaced.
According to the invention, the number of the batteries to be replaced and the number of the available batteries in the first time period are predicted specifically, based on the number of the batteries to be replaced, if the number of the available batteries cannot meet the number of the batteries to be replaced, the batteries to be charged can be charged in advance, so that the number of the available batteries in the first time period can meet the number of the batteries required to be replaced in the first time period.
Preferably, the step of controlling the charging of the battery of the target battery exchange station according to the battery supply state and the battery exchange requirement includes:
when the number of available batteries meets the number of batteries to be replaced, the batteries to be charged do not need to be charged in advance.
In the invention, the battery to be charged is required to be charged in advance only when the number of the available batteries is predicted to be incapable of meeting the number of the batteries to be replaced, so that the power supply requirement in the future is met, and meanwhile, the charging resource is further saved.
Preferably, the step of controlling the charging of the battery of the target battery exchange station according to the battery supply state and the battery exchange requirement further comprises at least one of the following steps:
when the number of the available batteries is greater than or equal to the sum of the number of the batteries to be replaced and a preset additional number, confirming that the number of the available batteries meets the number of the batteries to be replaced;
and when the number of the available batteries is smaller than the sum of the number of the batteries to be replaced and the preset additional number, confirming that the number of the available batteries does not meet the number of the batteries to be replaced.
In the invention, when the number of the available batteries meets the number of the batteries to be replaced, a certain number of batteries need to be additionally charged in advance, namely, the additional number of batteries are preset, so that under the emergency conditions, such as battery damage, additional battery requirements and the like, the number of the available batteries of the target battery replacement station can still meet the battery replacement requirements, and the situation that a user waits for battery charging during battery replacement is avoided.
Preferably, the battery supply state further includes a remaining power of the battery to be charged;
the step of charging the battery to be charged in advance comprises the following steps:
determining the number of the batteries to be charged in advance according to the number of the available batteries and the number of the batteries to be replaced;
calculating the required electric quantity converted into the usable battery according to the residual electric quantity of the battery to be charged;
and calculating the early charge starting time and/or the charge speed according to the required electric quantity.
In the invention, the battery supply state further comprises the residual electric quantity of the battery to be charged, when the number of the available batteries does not meet the number of the batteries to be replaced, the required electric quantity for converting the battery to be charged into the available batteries can be calculated based on the residual electric quantity of the battery to be charged, so that the charging start time and/or the charging speed required for charging the battery to be charged in advance can be calculated, and the charging is carried out at the corresponding charging start time and the corresponding speed, thereby ensuring that the number of the available batteries of the target battery to be replaced can meet the power changing requirement in the first time period.
Preferably, the charging control method further includes:
acquiring the actual power change condition of a target power change station in a first time period in real time;
and adjusting the charging control according to the actual power change condition.
According to the invention, the actual power change condition in the first time period can be obtained, and the future charge of the target power change station can be further adjusted based on the actual power change condition, so that the influence on the power change of a user when the prediction of the battery change demand is inaccurate is prevented, the charge control of the power change station is more in line with the actual demand, and the practicability is improved.
Preferably, the target battery exchange station includes batteries of different types, and the step of controlling charging of the battery of the target battery exchange station according to the battery supply state and the battery exchange requirement specifically includes:
and respectively controlling the charging of the batteries of different types in the target battery exchange station according to the battery supply states and the battery exchange requirements of the batteries of different types.
In the invention, the target battery exchange station further comprises batteries of different types, and for each type of battery, the charging control can be performed according to the predicted corresponding battery supply state and the corresponding battery exchange requirement, so that the target battery exchange station can meet the requirements of battery exchange vehicles using batteries of different types.
The invention also provides a charging control system, which comprises: the prediction module and the control module;
the prediction module is used for predicting the battery supply state and the battery replacement requirement of the target battery replacement station in a first time period;
the control module is used for controlling the battery of the target battery replacement station to be charged according to the battery supply state and the battery replacement requirement.
Preferably, the prediction module comprises a historical data acquisition unit and a prediction unit;
the historical data acquisition unit is used for acquiring a battery supply state and a battery replacement requirement of the target battery replacement station in a second time period;
the prediction unit is used for predicting the battery supply state and the battery replacement requirement of the target battery replacement station in the first time period according to the battery supply state and the battery replacement requirement in the second time period;
wherein the second time period is a time period before the first time period.
Preferably, the target battery replacement station comprises an available battery and a battery to be charged, wherein the available battery is a battery with residual electric quantity reaching an electric quantity threshold, and the battery to be charged is a battery with residual electric quantity not reaching the electric quantity threshold; the step of controlling the charging of the battery of the target battery exchange station comprises the following steps:
and the control unit control module is used for determining the charging start time and/or the charging speed of the battery to be charged in the target battery exchange station.
Preferably, the battery replacement requirement includes: the number of cells to be replaced; the battery supply state includes: the number of available batteries;
and the control module is used for charging the battery to be charged in advance when the number of the available batteries does not meet the number of the batteries to be replaced so that the battery to be charged is converted into the available batteries until the number of the available batteries meets the number of the batteries to be replaced.
Preferably, the control module is further configured to, when the number of available batteries satisfies the number of batteries to be replaced, dispense with pre-charging the batteries to be charged.
Preferably, the control module is specifically configured to perform charging control by one of the following manners:
when the number of the available batteries is greater than or equal to the sum of the number of the batteries to be replaced and a preset additional number, confirming that the number of the available batteries meets the number of the batteries to be replaced;
and when the number of the available batteries is smaller than the sum of the number of the batteries to be replaced and the preset additional number, confirming that the number of the available batteries does not meet the number of the batteries to be replaced.
Preferably, the battery supply state further includes a remaining power of the battery to be charged; the control module is used for carrying out advanced charging control on the battery to be charged in the following manner:
determining the number of the batteries to be charged in advance according to the number of the available batteries and the number of the batteries to be replaced;
calculating the required electric quantity converted into the usable battery according to the residual electric quantity of the battery to be charged;
and calculating the early charge starting time and/or the charge speed according to the required electric quantity.
Preferably, the charging control system further comprises a real-time data acquisition module and a charging control adjustment module;
the real-time data acquisition module is used for acquiring the actual power exchange condition of the target power exchange station in the first time period in real time;
the charging control adjustment module is used for adjusting the charging control according to the actual power change condition.
Preferably, the target battery exchange station comprises batteries of different types, and the control module is specifically configured to perform charging control on the batteries of different types in the target battery exchange station according to the battery supply states and the battery exchange requirements of the batteries of different types.
The invention also provides an electronic device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, the processor implementing the charge control method as described above when executing the computer program.
The present invention also provides a computer-readable storage medium having stored thereon a computer program which, when executed by a processor, implements the charge control method as set forth in any one of the above.
The invention has the positive progress effects that: the invention can predict the battery supply state and the battery replacement demand of the target battery replacement station in the first time period in the future, and control the charging of the target battery replacement station according to the prediction result in the future. Different from a charging mode that the battery is charged when the battery is replaced by the battery replacement station, charging resources can be reasonably distributed, for example, the battery can be charged in advance according to future requirements, the condition that the battery which is replaced in a concentrated mode is required to be charged in a peak period of the battery replacement is avoided, and the charging pressure of the battery replacement station is reduced. And on the premise of meeting the requirement of future power conversion, the additional charging is not performed, so that the charging resource of the target power conversion station can be saved.
Drawings
Fig. 1 is a flowchart of a charging control method in embodiment 1 of the present invention.
Fig. 2 is a flowchart showing a specific implementation of predicting the battery supply status and the battery replacement demand of the target power exchange station in the first time period according to the step of embodiment 1 of the present invention.
Fig. 3 is a flowchart of a specific implementation of the step of embodiment 1 of the present invention for controlling the charging of the battery of the target battery exchange station according to the battery supply status and the battery exchange requirement.
Fig. 4 is a flowchart for adjusting the charge control method in embodiment 1 of the present invention.
Fig. 5 is a schematic block diagram of a charge control system in embodiment 2 of the present invention.
Fig. 6 is a schematic block diagram of an electronic device in embodiment 3 of the present invention.
Detailed Description
For ease of understanding, the terms commonly found in the examples are explained below:
the terms "having," "may have," "including," or "may include," as used herein, indicate the presence of a corresponding function, operation, element, etc. of the disclosure, and are not limited by the presence of other one or more functions, operations, elements, etc. Furthermore, it should be understood that the terms "comprises" or "comprising," as used herein, are intended to specify the presence of stated features, integers, steps, operations, elements, components, or groups thereof, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, or groups thereof.
The term "a or B", "at least one of a and/or B" or "one or more of a and/or B" as used herein includes any and all combinations of words listed therewith. For example, "a or B", "at least one of a and B" or "at least one of a or B" means (1) including at least one a, (2) including at least one B, or (3) including both at least one a and at least one B.
First, second, etc. descriptions in the embodiments of the present application are provided for illustration and distinction of description objects, and no order division, nor does it represent a particular limitation on the number of devices in the embodiments of the present application, and should not constitute any limitation on the embodiments of the present application. For example, a first element could be termed a second element, and, similarly, a second element could be termed a first element, without departing from the scope of the present disclosure.
The invention is further illustrated by means of the following examples, which are not intended to limit the scope of the invention.
Example 1
The present embodiment provides a charge control method, as shown in fig. 1, including:
step 101, predicting a battery supply state and a battery replacement demand of the target battery replacement station in a first time period.
The first time period is a future preset time period, and the range of the first time period may be determined according to actual requirements, for example, the first time period may be a day specifically, or the first time period may also be a business time period of the target battery exchange station in a day. In this embodiment, future power change data may be predicted specifically based on historical power change data of the target power change station, or power change data in a period after a current or future period may be predicted based on power change data in the period. In a specific implementation, as shown in fig. 2, step 101 may specifically predict by:
step 1011, obtaining a battery supply state and a battery replacement requirement of a target battery replacement station in a second time period;
step 1012, predicting the battery supply status and the battery replacement demand of the target battery replacement station in the first time period according to the battery supply status and the battery replacement demand in the second time period.
Wherein the second time period is a time period before the first time period.
In this embodiment, future data (i.e., the battery supply state and the battery replacement requirement in the first time period) may be predicted according to historical data (i.e., the battery supply state and the battery replacement requirement in the second time period) of the target battery exchange station, where the historical data may be obtained by data such as a battery exchange log of the target battery exchange station, and the second time period may be the same as or longer than the first time period. For example, if it is desired to predict the predicted data for the next day, historical data for a week prior to the next day may be obtained, averaged, or other predetermined calculation method to obtain the predicted data for the next day. The historical data of the target power exchange station can be used for fully utilizing the self resources, and the prediction accuracy is improved. In other alternative embodiments, in the absence of historical data for the target station, etc., historical data for other types or locations of nearby stations may also be selected for predicting battery replacement needs for the target station.
And 102, performing charging control on the battery of the target battery replacement station according to the battery supply state and the battery replacement requirement.
When the battery supply state of the first time period is predicted to meet the battery replacement requirement, the battery can not be charged in advance, and when the battery supply state of the first time period is predicted to not meet the battery replacement requirement, the battery of the target battery replacement station is charged in advance, so that the battery supply state meets the battery replacement requirement.
In this embodiment, unlike the passive charging mode in which the battery of the battery exchange station is charged immediately after the battery exchange, the present embodiment performs active charging control on the battery of the battery exchange station according to the future battery exchange requirement, specifically predicts the battery supply state and the battery exchange requirement of the target battery exchange station in the first time period in the future, and performs charging control on the target battery exchange station according to the prediction result in the future. On the one hand, the charging resource can be saved under the condition of meeting the battery supply requirement, and on the other hand, the condition that the batteries which are replaced in a concentrated mode are required to be charged in the power conversion peak period can be avoided, and the charging pressure of the power conversion station is reduced.
Specifically, in this embodiment, the batteries in the target battery exchange station include an available battery and a battery to be charged, where the available battery is a battery whose remaining capacity reaches a capacity threshold, and the battery to be charged is a battery whose remaining capacity does not reach the capacity threshold, and the specific value of the capacity threshold may be determined according to the actual situation, for example, 98% of the full capacity of the battery may be generally used as the capacity threshold. The battery replacement requirements of the target power exchange station include: the number of batteries to be replaced, the battery supply state includes: the number of available batteries, in step 102, it may be determined whether the battery supply status satisfies the battery replacement requirement by comparing the number of available batteries and the number of batteries to be replaced, specifically:
when the number of available batteries does not meet the number of batteries to be replaced (at this time, the battery supply state does not meet the battery replacement requirement), the batteries to be charged are charged in advance so that the batteries to be charged are converted into available batteries until the number of available batteries meets the number of batteries to be replaced (at this time, the battery supply state can meet the battery replacement requirement). When the number of available batteries satisfies the number of batteries to be replaced (the battery supply state can satisfy the battery replacement requirement at this time), the batteries to be charged do not need to be charged in advance.
The determining whether the number of available batteries satisfies the number of batteries to be replaced may determine that the number of available batteries satisfies the number of batteries to be replaced when the number of available batteries is greater than or equal to the number of batteries to be replaced. And when the number of available batteries is smaller than the number of batteries to be replaced, confirming that the number of available batteries does not satisfy the number of batteries to be replaced.
However, since the predicted battery replacement requirement and the battery supply status are not necessarily identical to the actual battery replacement requirement, in a preferred embodiment, when the number of available batteries is greater than or equal to the sum of the number of batteries to be replaced and the preset additional number, the number of available batteries is confirmed to satisfy the number of batteries to be replaced, that is, the battery supply status is confirmed to be able to satisfy the battery replacement requirement in step 102. And when the number of the available batteries is smaller than the sum of the number of the batteries to be replaced and the preset additional number, confirming that the number of the available batteries does not meet the number of the batteries to be replaced, namely, confirming that the battery supply state cannot meet the battery replacement requirement.
Through setting up extra quantity battery and charging in advance, can lead to when prediction data and actual data disagree like battery damage, have emergency such as extra battery demand, the target battery that trades can have extra available battery to satisfy the requirement of changing electricity, avoid the user to wait for battery charging when changing the electricity, improve user's the experience of changing electricity. The preset additional quantity can be set according to actual requirements, for example, the data of the historical emergency of the target power exchange station can be calculated in a statistics mode.
In this embodiment, the number of batteries to be replaced and the number of available batteries in the first time period are specifically predicted, based on this, if the number of available batteries cannot meet the number of batteries to be replaced, the battery to be charged can be charged in advance, so as to ensure that the number of available batteries in the first time period can meet the number of batteries to be replaced in the first time period, thereby meeting the battery supply requirement in the first time period.
In this embodiment, only when the number of available batteries is predicted to be unable to meet the number of batteries to be replaced, the batteries to be charged need to be charged in advance, so that the power supply requirement of the first time period is met, and meanwhile, charging resources are further saved.
In step 102, the battery of the target battery exchange station may be controlled by determining the charging start time and/or the charging speed of the battery to be charged in the target battery exchange station, so as to control the time for converting the charging of the battery to be charged into the available battery, so as to meet the available battery requirement at each time point in the first time period.
Specifically, the battery supply state further includes a remaining power of the battery to be charged, and as shown in fig. 3, step 102 specifically includes the following steps to calculate a charging start time and/or a charging speed of the battery to be charged:
step 1021, determining the number of the batteries to be charged in advance according to the number of the available batteries and the number of the batteries to be replaced;
step 1022, calculating the required electric quantity converted into the usable battery according to the residual electric quantity of the battery to be charged;
step 1023, calculating the early charge start time and/or the charge speed according to the required electric quantity.
Steps 1021-1023 are described below by way of a specific example to facilitate understanding:
if it is determined in step 101 that the number of available batteries is 2 and the number of batteries to be replaced is 4, it may be determined in step 1021 that 2 batteries need to be charged in advance, assuming that the target battery exchange station has a total of 3 batteries to be charged at that time, wherein the remaining power of the first battery is 20%, the remaining power of the second battery is 50%, the remaining power of the third battery is 80%, and the remaining power of the available battery is 90%, whereby it may be calculated in step 1022 that the required power of the first battery is 70%, the required power of the second battery is 40%, and the required power of the third battery is 10%. The two batteries can be randomly selected for pre-charging, and can be selected according to a preset rule, such as the preferential charging of the battery with low required electric quantity. The embodiment specifically adopts a mode of preferential charging of the battery with low required electric quantity to exemplify that the second battery and the third battery in the three batteries are selected for advanced charging.
In step 1023, the charging start time and/or the charging speed are calculated according to the respective required amounts of the two batteries, and the required amount of the second battery is 40% as an example. If only the charging start time is considered, the time T1 required by 40% to 90% of the electric quantity can be calculated based on the preset charging speed, and the second battery can be charged in advance by T1 with the time at which the first time period starts as a node; if only the charging speed is considered, the time when the second battery is replaced can be taken as the time when charging starts, the time when the first time period starts can be taken as the time when charging ends, the charging time can be obtained by subtracting the two times, and the required average charging speed can be calculated according to the required 50% of the electric quantity and the charging time. If the charging start time and the charging speed are considered at the same time, the busy condition of the power exchange station can be comprehensively considered, for example, the charging is controlled to be carried out at a lower charging speed (for example, lower power is output) in a period of busy charging, or the charging is not carried out in a period of busy charging; as another example, the battery is not charged or is not charged enough in a time period in which the electricity price is high.
In this embodiment, the battery supply state further includes a remaining capacity of the battery to be charged, and when the number of available batteries does not satisfy the number of batteries to be replaced, a required electric capacity for converting the remaining capacity of the battery to be charged into the available battery can be calculated based on the remaining capacity of the battery to be charged, so that a charging start time and/or a charging speed required to charge the battery to be charged in advance can be calculated, and charging is performed at a corresponding speed at the corresponding charging start time, so as to ensure that the number of available batteries of the target battery to be replaced in the first time period can satisfy the battery replacement requirement.
In this embodiment, based on the prediction of the battery supply state and the battery replacement requirement in the first time period, the charging start time and/or the charging speed of the battery to be charged in the target battery replacement station are determined so as to perform charging control on the battery to be charged, thereby ensuring that the available battery in the first time period can meet the battery replacement requirement in the first time period.
In a preferred embodiment, as shown in fig. 4, the charge control method may further include the steps of:
step 103, acquiring the actual power change condition of the target power change station in the first time period in real time;
and 104, adjusting the charging control according to the actual power change condition.
In this embodiment, the actual power change condition in the first time period may be obtained, and the charging control mode of the target power change station may be further adjusted based on the actual power change condition, so as to prevent the user from being affected when the prediction of the battery replacement requirement is inaccurate. The actual power change condition may include the actual available battery number, the actual battery to be changed, and the like. And the actual power change condition of the first time period can be used as the second time period of the time period after the first time period, so that the charging control mode can be further adjusted according to the actual power change condition and the predicted power change condition, and the charging control of the power change station is more in accordance with the actual requirement and has practicability.
In a preferred embodiment, the target battery exchange station includes batteries of different types, and step 101 specifically predicts battery supply states and battery replacement requirements corresponding to the batteries of different types of the target battery exchange station in the first time period.
Step 102 specifically includes: and respectively controlling the charging of the batteries of different types in the target battery exchange station according to the battery supply states and the battery exchange requirements of the batteries of different types.
In this embodiment, since the target power exchange station may include batteries of different types in actual situations, in this embodiment, for each type of battery, the corresponding battery supply state and the corresponding battery replacement requirement can be predicted, and based on this, charging control is performed for the batteries of different types, so as to ensure that the target power exchange station can meet the requirements of the power exchange vehicle using the batteries of different types.
Example 2
The present invention also provides a charge control system, as shown in fig. 5, which includes: the prediction module 201 and the control module 202.
The prediction module 201 is configured to predict a battery supply state and a battery replacement demand of the target battery replacement station in a first time period; the control module 202 is configured to control charging of the battery of the target battery exchange station according to the battery supply status and the battery exchange requirement.
In a specific embodiment, the charging control system may further include a real-time data acquisition module 203 and a charging control adjustment module 304.
The real-time data acquisition module 203 is configured to acquire an actual power conversion situation of the target power conversion station in the first time period in real time; the charging control adjustment module 204 is configured to adjust charging control according to an actual power change condition.
In this embodiment, the implementation manner and the technical effect of each module may refer to the corresponding implementation manner and the technical effect in embodiment 1, and will not be described herein.
Example 3
The present embodiment provides an electronic device, which may be expressed in the form of a computing device (for example, may be a server device), including a memory, a processor, and a computer program stored on the memory and executable on the processor, where the processor may implement the charging control method in embodiment 1 when executing the computer program.
Fig. 6 shows a schematic diagram of the hardware structure of the present embodiment, and as shown in fig. 6, the electronic device 9 specifically includes:
at least one processor 91, at least one memory 92, and a bus 93 for connecting the different system components (including the processor 91 and the memory 92), wherein:
the bus 93 includes a data bus, an address bus, and a control bus.
The memory 92 includes volatile memory such as Random Access Memory (RAM) 921 and/or cache memory 922, and may further include Read Only Memory (ROM) 923.
Memory 92 also includes a program/utility 925 having a set (at least one) of program modules 924, such program modules 924 including, but not limited to: an operating system, one or more application programs, other program modules, and program data, each or some combination of which may include an implementation of a network environment.
The processor 91 executes various functional applications and data processing, such as the charge control method in embodiment 1 of the present invention, by running a computer program stored in the memory 92.
The electronic device 9 may further communicate with one or more external devices 94 (e.g., keyboard, pointing device, etc.). Such communication may occur through an input/output (I/O) interface 95. Also, the electronic device 9 may communicate with one or more networks such as a Local Area Network (LAN), a Wide Area Network (WAN) and/or a public network, such as the Internet, through a network adapter 96. The network adapter 96 communicates with other modules of the electronic device 9 via the bus 93. It should be appreciated that although not shown in the figures, other hardware and/or software modules may be used in connection with the electronic device 9, including but not limited to: microcode, device drivers, redundant processors, external disk drive arrays, RAID (disk array) systems, tape drives, data backup storage systems, and the like.
It should be noted that although several units/modules or sub-units/modules of an electronic device are mentioned in the above detailed description, such a division is merely exemplary and not mandatory. Indeed, the features and functionality of two or more units/modules described above may be embodied in one unit/module according to embodiments of the present application. Conversely, the features and functions of one unit/module described above may be further divided into ones that are embodied by a plurality of units/modules.
Example 4
The present embodiment provides a computer-readable storage medium having stored thereon a computer program which, when executed by a processor, implements the charge control method in embodiment 1.
More specifically, among others, readable storage media may be employed including, but not limited to: portable disk, hard disk, random access memory, read only memory, erasable programmable read only memory, optical storage device, magnetic storage device, or any suitable combination of the foregoing.
In a possible embodiment, the invention may also be implemented in the form of a program product comprising program code for causing a terminal device to carry out the method of implementing the charge control method of embodiment 1, when said program product is run on the terminal device.
Wherein the program code for carrying out the invention may be written in any combination of one or more programming languages, which program code may execute entirely on the user device, partly on the user device, as a stand-alone software package, partly on the user device and partly on the remote device or entirely on the remote device.
While specific embodiments of the invention have been described above, it will be appreciated by those skilled in the art that this is by way of example only, and the scope of the invention is defined by the appended claims. Various changes and modifications to these embodiments may be made by those skilled in the art without departing from the principles and spirit of the invention, but such changes and modifications fall within the scope of the invention.

Claims (12)

1. A charge control method, characterized by comprising:
predicting a battery supply state and a battery replacement demand of a target battery replacement station in a first time period;
and controlling the battery of the target battery replacement station to charge according to the battery supply state and the battery replacement requirement.
2. The method of claim 1, wherein the step of predicting the battery supply status and the battery replacement demand of the target battery replacement station during the first time period comprises the steps of:
acquiring a battery supply state and a battery replacement requirement of the target battery replacement station in a second time period;
predicting the battery supply state and the battery replacement demand of the target battery replacement station in the first time period according to the battery supply state and the battery replacement demand of the second time period;
wherein the second time period is a time period before the first time period.
3. The charge control method according to claim 1, wherein the target battery exchange station includes an available battery and a battery to be charged, the available battery being a battery whose remaining capacity reaches a capacity threshold, the battery to be charged being a battery whose remaining capacity does not reach the capacity threshold; the step of controlling the charging of the battery of the target battery exchange station comprises the following steps:
and determining the charging start time and/or the charging speed of the battery to be charged in the target battery exchange station.
4. The charge control method as set forth in claim 3, wherein said battery replacement requirement includes: the number of cells to be replaced; the battery supply state includes: the number of available batteries;
the step of controlling the charging of the battery of the target battery exchange station according to the battery supply state and the battery exchange requirement comprises the following steps:
and when the number of the available batteries does not meet the number of the batteries to be replaced, charging the batteries to be charged in advance to enable the batteries to be charged to be converted into the available batteries until the number of the available batteries meets the number of the batteries to be replaced.
5. The charge control method according to claim 4, wherein,
the step of controlling the charging of the battery of the target battery exchange station according to the battery supply state and the battery exchange requirement comprises the following steps:
when the number of available batteries meets the number of batteries to be replaced, the batteries to be charged do not need to be charged in advance.
6. The charge control method according to claim 4 or 5, wherein the step of charge controlling the battery of the target battery exchange station according to the battery supply state and the battery exchange demand further comprises at least one of the steps of:
when the number of the available batteries is greater than or equal to the sum of the number of the batteries to be replaced and a preset additional number, confirming that the number of the available batteries meets the number of the batteries to be replaced;
and when the number of the available batteries is smaller than the sum of the number of the batteries to be replaced and the preset additional number, confirming that the number of the available batteries does not meet the number of the batteries to be replaced.
7. The charge control method according to claim 4, wherein the battery supply state further includes a remaining amount of the battery to be charged;
the step of charging the battery to be charged in advance comprises the following steps:
determining the number of the batteries to be charged in advance according to the number of the available batteries and the number of the batteries to be replaced;
calculating the required electric quantity converted into the usable battery according to the residual electric quantity of the battery to be charged;
and calculating the early charge starting time and/or the charge speed according to the required electric quantity.
8. The charge control method according to claim 1, characterized in that the charge control method further comprises:
acquiring the actual power change condition of a target power change station in a first time period in real time;
and adjusting the charging control according to the actual power change condition.
9. The charge control method according to claim 1, wherein the target battery exchange station includes batteries of different models, and the step of charge controlling the battery of the target battery exchange station according to the battery supply state and the battery exchange demand specifically includes:
and respectively controlling the charging of the batteries of different types in the target battery exchange station according to the battery supply states and the battery exchange requirements of the batteries of different types.
10. A charge control system, characterized in that the charge control system comprises: the prediction module and the control module;
the prediction module is used for predicting the battery supply state and the battery replacement requirement of the target battery replacement station in a first time period;
the control module is used for controlling the battery of the target battery replacement station to be charged according to the battery supply state and the battery replacement requirement.
11. An electronic device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, characterized in that the processor implements the charge control method according to any one of claims 1 to 9 when executing the computer program.
12. A computer-readable storage medium, on which a computer program is stored, characterized in that the computer program, when executed by a processor, implements the charge control method according to any one of claims 1 to 9.
CN202111659141.0A 2021-12-30 2021-12-30 Charging control method, system, electronic device and computer readable storage medium Pending CN116418064A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202111659141.0A CN116418064A (en) 2021-12-30 2021-12-30 Charging control method, system, electronic device and computer readable storage medium
PCT/CN2022/142715 WO2023125637A1 (en) 2021-12-30 2022-12-28 Charging control method and system, electronic device, and computer-readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111659141.0A CN116418064A (en) 2021-12-30 2021-12-30 Charging control method, system, electronic device and computer readable storage medium

Publications (1)

Publication Number Publication Date
CN116418064A true CN116418064A (en) 2023-07-11

Family

ID=86997986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111659141.0A Pending CN116418064A (en) 2021-12-30 2021-12-30 Charging control method, system, electronic device and computer readable storage medium

Country Status (2)

Country Link
CN (1) CN116418064A (en)
WO (1) WO2023125637A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116826932A (en) * 2023-08-29 2023-09-29 阿尔飞思(昆山)智能物联科技有限公司 Outdoor garbage collection robot charging system and robot thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117375181A (en) * 2023-11-15 2024-01-09 山东华芙新能源科技有限公司 Method, device and storage medium for controlling battery charge of battery-changing cabinet

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9442548B1 (en) * 2014-03-18 2016-09-13 Amazon Technologies, Inc. Device charging system
CN106356922B (en) * 2016-08-31 2018-09-25 南方电网科学研究院有限责任公司 The charge control method and system of charging station
CN110588430B (en) * 2019-08-21 2021-06-08 深圳易马达科技有限公司 Charging method and charging equipment
CN113459871B (en) * 2021-05-21 2023-06-30 蓝谷智慧(北京)能源科技有限公司 Battery charging method and device of battery replacement station, storage medium and electronic equipment
CN113452056B (en) * 2021-07-26 2022-11-08 北京市腾河智慧能源科技有限公司 Charging control method and system of battery exchange cabinet, equipment and storage medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116826932A (en) * 2023-08-29 2023-09-29 阿尔飞思(昆山)智能物联科技有限公司 Outdoor garbage collection robot charging system and robot thereof
CN116826932B (en) * 2023-08-29 2023-11-24 阿尔飞思(昆山)智能物联科技有限公司 Outdoor garbage collection robot charging system and robot thereof

Also Published As

Publication number Publication date
WO2023125637A1 (en) 2023-07-06

Similar Documents

Publication Publication Date Title
CN116418064A (en) Charging control method, system, electronic device and computer readable storage medium
US20240079881A1 (en) Power system and power system control method
KR20190140296A (en) Operation system and method for virtual power plant using risk analysis
CN116418061A (en) Charging control method, system, electronic device and computer readable storage medium
CN116826815B (en) Charging management method based on battery module, energy manager and related medium
CN111008909A (en) Anti-reflux protection method, device, equipment and storage medium of energy storage system
CN116404683B (en) Energy regulation and control method, device, terminal and medium of flexible-direct interconnection system
WO2023125538A1 (en) Charging control method and system, electronic device and storage medium
US20230148201A1 (en) Method and system for supplying power to device, and related device
CN117293878A (en) Micro-grid-based energy scheduling method and device, electronic equipment and storage medium
CN115940166B (en) Base station scheduling method, base station scheduling device, electronic equipment and readable storage medium
US20200174429A1 (en) Predictive operational planning in a microgrid with power exchange between the microgrid and a primary grid
CN114683908B (en) Method, system, electronic equipment and medium for evaluating power exchange capacity of power exchange station
CN114971113A (en) Configuration method, system, equipment and medium for battery number of battery replacement station
CN116454883B (en) Power dynamic management method and terminal of online power taking equipment
CN114325394B (en) Method, system, equipment and medium for estimating battery stack SOC
CN114825407B (en) Charging and discharging switching method, device, system and medium of bidirectional converter
CN116227793A (en) Battery distribution method, system, electronic device and storage medium
CN117117843A (en) Power grid optimization control method and system based on power big data analysis
CN116415703A (en) Method and device for adjusting operation state of power exchange station, electronic equipment and medium
CN117901690A (en) Method, system, equipment and storage medium for controlling charging of battery exchange station
CN116961038A (en) Energy storage control method and device for micro-grid, computer equipment and storage medium
CN118040658A (en) Electric bus optimal scheduling strategy-based power grid toughness improving method and device
CN117526519A (en) Energy storage system and maintenance method thereof
CN113541172A (en) Battery swapping method, battery swapping system, electronic device and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination