CN116366355A - Intelligent scheduling method and system for hardware resources of network equipment - Google Patents

Intelligent scheduling method and system for hardware resources of network equipment Download PDF

Info

Publication number
CN116366355A
CN116366355A CN202310396187.0A CN202310396187A CN116366355A CN 116366355 A CN116366355 A CN 116366355A CN 202310396187 A CN202310396187 A CN 202310396187A CN 116366355 A CN116366355 A CN 116366355A
Authority
CN
China
Prior art keywords
scheduling
equipment
determining
hardware resources
network equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310396187.0A
Other languages
Chinese (zh)
Inventor
王佳
杨毅
徐洪超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhixiangjia Network Information Technology Co ltd
Original Assignee
Beijing Zhixiangjia Network Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhixiangjia Network Information Technology Co ltd filed Critical Beijing Zhixiangjia Network Information Technology Co ltd
Priority to CN202310396187.0A priority Critical patent/CN116366355A/en
Publication of CN116366355A publication Critical patent/CN116366355A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/08Network architectures or network communication protocols for network security for authentication of entities
    • H04L63/0861Network architectures or network communication protocols for network security for authentication of entities using biometrical features, e.g. fingerprint, retina-scan
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0893Assignment of logical groups to network elements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L47/00Traffic control in data switching networks
    • H04L47/70Admission control; Resource allocation
    • H04L47/78Architectures of resource allocation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • H04L67/104Peer-to-peer [P2P] networks
    • H04L67/1074Peer-to-peer [P2P] networks for supporting data block transmission mechanisms
    • H04L67/1078Resource delivery mechanisms
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • General Health & Medical Sciences (AREA)
  • Computer Hardware Design (AREA)
  • Computer Security & Cryptography (AREA)
  • Computing Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention relates to the technical field of hardware scheduling, and particularly discloses an intelligent scheduling method and system for network equipment hardware resources. The invention determines personnel level through identity verification and acquires the use authority; performing equipment scheduling analysis; performing scheduling resource analysis; carrying out scheduling requirement analysis on the network equipment to generate scheduling requirement information; and carrying out scheduling processing of related scheduling hardware resources on the plurality of scheduling network devices according to the scheduling demand information. The scheduling analysis and scheduling resource analysis of the equipment can be carried out, a plurality of scheduling network equipment and a plurality of scheduling hardware resources are predetermined, scheduling processing is carried out according to scheduling demand information, so that the scheduling use of the hardware resources of other computer equipment is carried out according to the identity of a user when the network equipment is used and has the computer hardware limit, the problems of operation blocking and slow processing are avoided, the computer equipment in an idle state can be effectively utilized, and the leakage of working confidentiality can be avoided.

Description

Intelligent scheduling method and system for hardware resources of network equipment
Technical Field
The invention belongs to the technical field of hardware scheduling, and particularly relates to an intelligent scheduling method and system for network equipment hardware resources.
Background
The network equipment is special hardware equipment for connecting various servers, PCs, application terminals and other nodes to form an information communication network, and comprises information network equipment, communication network equipment, network security equipment and the like. Common network devices are: computer devices, switches, routers, firewalls, bridges, hubs, gateways, VPN servers, network Interface Cards (NIC), wireless Access Points (WAP), modems, 5G base stations, optical modems, fiber transceivers, fiber optic cables, and the like.
The network equipment commonly used in enterprises is computer equipment, and because different computer equipment in the enterprises use different time and different computer equipment use different intensity, in the use of high intensity, probably because the restriction of computer hardware, the problem such as operation card is put on, processing is slow appears easily, and other computer equipment is in idle state, can not fine utilization.
Disclosure of Invention
The embodiment of the invention aims to provide an intelligent scheduling method and system for network equipment hardware resources, and aims to solve the problems in the background technology.
In order to achieve the above object, the embodiment of the present invention provides the following technical solutions:
a network equipment hardware resource intelligent scheduling method specifically comprises the following steps:
determining to use network equipment, performing identity verification on a user, determining a person level, and acquiring a use right;
according to the personnel level, performing equipment scheduling analysis to determine a plurality of scheduling network equipment;
according to the use permission, carrying out scheduling resource analysis and determining a plurality of scheduling hardware resources;
carrying out scheduling requirement analysis on the network equipment to generate scheduling requirement information;
and carrying out scheduling processing of related scheduling hardware resources on a plurality of scheduling network devices according to the scheduling demand information.
As a further limitation of the technical solution of the embodiment of the present invention, the determining uses network equipment to perform authentication on a user, determines a person level, and obtains a use right, which specifically includes the following steps:
performing use monitoring to determine the currently used network equipment;
through the network equipment, the identity of the user is verified, and a verification result is generated;
judging whether the verification is successful or not according to the verification result;
and when the verification is successful, determining the personnel level of the user and acquiring the use permission.
As a further limitation of the technical solution of the embodiment of the present invention, performing device scheduling analysis according to the personnel level, and determining a plurality of scheduling network devices specifically includes the following steps:
performing equipment record updating to obtain equipment level data;
according to the personnel level, carrying out scheduling matching in the equipment level data to generate a scheduling matching result;
and determining a plurality of scheduling network devices according to the scheduling matching result.
As a further limitation of the technical solution of the embodiment of the present invention, the performing the scheduling resource analysis according to the usage rights, and determining a plurality of scheduling hardware resources specifically includes the following steps:
determining a plurality of use resource types according to the use rights;
determining a scheduling proportion according to the use permission;
and according to the scheduling proportion and the plurality of the used resource types, performing scheduling resource analysis on the plurality of scheduling network devices to determine a plurality of scheduling hardware resources.
As a further limitation of the technical solution of the embodiment of the present invention, the performing the scheduling requirement analysis on the network device to generate scheduling requirement information specifically includes the following steps:
performing hardware use monitoring on the network equipment to obtain hardware monitoring data;
and carrying out scheduling demand analysis according to the hardware monitoring data to generate scheduling demand information.
As a further limitation of the technical solution of the embodiment of the present invention, the scheduling processing for performing related scheduling on the scheduling hardware resources for the plurality of scheduling network devices according to the scheduling requirement information specifically includes the following steps:
selecting and marking target scheduling equipment from a plurality of scheduling network equipment according to the scheduling demand information;
constructing a temporary resource channel of the using network equipment and the target scheduling equipment;
and carrying out scheduling use of corresponding scheduling hardware resources on the target scheduling equipment through the temporary resource channel.
The system comprises an identity verification processing unit, a device scheduling analysis unit, a scheduling resource analysis unit, a scheduling demand analysis unit and a related scheduling processing unit, wherein:
the authentication processing unit is used for determining to use the network equipment, authenticating the user, determining the level of the user and acquiring the use permission;
the equipment scheduling analysis unit is used for carrying out equipment scheduling analysis according to the personnel level and determining a plurality of scheduling network equipment;
the scheduling resource analysis unit is used for performing scheduling resource analysis according to the use permission to determine a plurality of scheduling hardware resources;
the scheduling demand analysis unit is used for performing scheduling demand analysis on the network equipment to generate scheduling demand information;
and the related scheduling processing unit is used for performing scheduling processing of related scheduling hardware resources on the plurality of scheduling network devices according to the scheduling demand information.
As a further limitation of the technical solution of the embodiment of the present invention, the authentication processing unit specifically includes:
the use monitoring module is used for carrying out use monitoring and determining the currently used network equipment;
the identity verification module is used for carrying out identity verification on a user through the network equipment to generate a verification result;
the verification judging module is used for judging whether verification is successful or not according to the verification result;
and the success processing module is used for determining the personnel level of the user and acquiring the use permission when the verification is successful.
As a further limitation of the technical solution of the embodiment of the present invention, the device scheduling analysis unit specifically includes:
the record updating module is used for carrying out equipment record updating and acquiring equipment level data;
the scheduling matching module is used for performing scheduling matching in the equipment level data according to the personnel level to generate a scheduling matching result;
and the equipment determining module is used for determining a plurality of scheduling network equipment according to the scheduling matching result.
As a further limitation of the technical solution of the embodiment of the present invention, the scheduling resource analysis unit specifically includes:
the type determining module is used for determining a plurality of types of used resources according to the use permission;
the proportion determining module is used for determining a scheduling proportion according to the use permission;
and the resource analysis module is used for carrying out scheduling resource analysis on the plurality of scheduling network devices according to the scheduling proportion and the plurality of the used resource types and determining a plurality of scheduling hardware resources.
Compared with the prior art, the invention has the beneficial effects that:
the embodiment of the invention determines the personnel level through identity verification and acquires the use authority; performing equipment scheduling analysis; performing scheduling resource analysis; carrying out scheduling requirement analysis on the network equipment to generate scheduling requirement information; and carrying out scheduling processing of related scheduling hardware resources on the plurality of scheduling network devices according to the scheduling demand information. The scheduling analysis and scheduling resource analysis of the equipment can be carried out, a plurality of scheduling network equipment and a plurality of scheduling hardware resources are predetermined, scheduling processing is carried out according to scheduling demand information, so that the scheduling use of the hardware resources of other computer equipment is carried out according to the identity of a user when the network equipment is used and has the computer hardware limit, the problems of operation blocking and slow processing are avoided, the computer equipment in an idle state can be effectively utilized, and the leakage of working confidentiality can be avoided.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following description will briefly introduce the drawings that are needed in the embodiments or the description of the prior art, and it is obvious that the drawings in the following description are only some embodiments of the present invention.
Fig. 1 shows a flowchart of a method provided by an embodiment of the present invention.
Fig. 2 shows a flowchart of a method for using person authentication in the method according to the embodiment of the present invention.
Fig. 3 shows a flowchart of performing device scheduling analysis in the method provided by the embodiment of the invention.
Fig. 4 shows a flowchart of performing scheduling resource analysis in the method provided by the embodiment of the invention.
Fig. 5 shows a flowchart of scheduling requirement analysis in the method provided by the embodiment of the invention.
Fig. 6 shows a flowchart of a device resource scheduling process in the method provided by the embodiment of the present invention.
Fig. 7 shows an application architecture diagram of a system provided by an embodiment of the present invention.
Fig. 8 is a block diagram of an authentication processing unit in the system according to an embodiment of the present invention.
Fig. 9 shows a block diagram of a device scheduling analysis unit in the system according to an embodiment of the present invention.
Fig. 10 shows a block diagram of a scheduling resource analysis unit in the system according to an embodiment of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present invention more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the invention.
It can be understood that the network equipment commonly used in the enterprise is computer equipment, in the prior art, because different computer equipment in the enterprise uses different time and different intensity that computer equipment used, and in the use of high strength, probably because the restriction of computer hardware, the problem such as operation card is ton, processing is slow appears easily, and other computer equipment is in idle state, can not fine utilization.
In order to solve the problems, the embodiment of the invention performs identity verification by determining to use network equipment, determines personnel level and acquires the use authority; performing equipment scheduling analysis; performing scheduling resource analysis; carrying out scheduling requirement analysis on the network equipment to generate scheduling requirement information; and carrying out scheduling processing of related scheduling hardware resources on the plurality of scheduling network devices according to the scheduling demand information. The scheduling analysis and scheduling resource analysis of the equipment can be carried out, a plurality of scheduling network equipment and a plurality of scheduling hardware resources are predetermined, scheduling processing is carried out according to scheduling demand information, so that the scheduling use of the hardware resources of other computer equipment is carried out according to the identity of a user when the network equipment is used and has the computer hardware limit, the problems of operation blocking and slow processing are avoided, the computer equipment in an idle state can be effectively utilized, and the leakage of working confidentiality can be avoided.
Fig. 1 shows a flowchart of a method provided by an embodiment of the present invention.
Specifically, in a preferred embodiment provided by the present invention, a method for intelligently scheduling hardware resources of a network device, the method specifically includes the following steps:
step S101, determining to use the network equipment, carrying out identity verification on a user, determining a person level, and acquiring the use permission.
In the embodiment of the invention, through carrying out use monitoring on all computer equipment in an enterprise, when the computer equipment is started for use, the currently used computer equipment is marked as the network equipment, the network equipment is used for carrying out face shooting on a user to obtain a face shooting video, then the face shooting video is used for carrying out identity verification on the user to generate a verification result, and further according to the verification result, whether the user passes the verification is judged, if the verification passes, the user is allowed to operate the network equipment, the identity information of the user is obtained, the personnel level of the user is determined according to the identity information, and the use authority is obtained; if the verification is not passed, the using operation of the using network equipment by the user is not allowed.
Specifically, fig. 2 shows a flowchart of user authentication in the method provided by the embodiment of the present invention.
In the preferred embodiment provided by the invention, the determining uses network equipment to perform identity verification on the user, determines the level of the user, and obtains the use permission, which specifically comprises the following steps:
in step S1011, usage monitoring is performed to determine the currently used network device.
Step S1012, performing authentication on the user by using the network device, and generating an authentication result.
Step S1013, according to the verification result, judging whether the verification is successful.
Step S1014, when the verification is successful, determining the personnel level of the user and acquiring the use authority.
Further, the intelligent scheduling method for the hardware resources of the network equipment further comprises the following steps:
and step S102, performing equipment scheduling analysis according to the personnel level to determine a plurality of scheduling network equipment.
In the embodiment of the invention, when computer equipment in an enterprise is changed, equipment record updating is carried out, each computer equipment has a corresponding level according to users corresponding to different computer equipment, scheduling matching is carried out in the equipment level data based on personnel levels of users by acquiring the latest equipment level data, a scheduling matching result is generated, computer equipment below the personnel levels is screened according to the scheduling matching result, and the computer equipment is marked as scheduling network equipment.
Specifically, fig. 3 shows a flowchart of performing device scheduling analysis in the method provided by the embodiment of the present invention.
In a preferred embodiment of the present invention, the device scheduling analysis is performed according to the personnel level, and the determining a plurality of scheduling network devices specifically includes the following steps:
step S1021, device record updating is performed to acquire device level data.
Step S1022, performing scheduling matching in the equipment level data according to the personnel level, and generating a scheduling matching result.
Step S1023, determining a plurality of dispatching network devices according to the dispatching matching result.
Further, the intelligent scheduling method for the hardware resources of the network equipment further comprises the following steps:
and step S103, carrying out scheduling resource analysis according to the use authority to determine a plurality of scheduling hardware resources.
In the embodiment of the invention, a plurality of use resource types capable of carrying out resource scheduling on the user are determined according to the use authority of the user, the scheduling proportion capable of carrying out resource scheduling on the user is determined according to the use authority of the user, and the scheduling hardware resources capable of carrying out hardware resource scheduling on the plurality of scheduling network devices are determined by analyzing the scheduling proportion and the plurality of use resource types of the plurality of scheduling network devices.
Specifically, fig. 4 shows a flowchart of performing scheduling resource analysis in the method provided by the embodiment of the present invention.
In the preferred embodiment provided by the invention, the scheduling resource analysis is performed according to the use permission, and the determination of the plurality of scheduling hardware resources specifically comprises the following steps:
step S1031, determining a plurality of usage resource types according to the usage rights.
Step S1032, determining the scheduling proportion according to the use authority.
And step S1033, carrying out scheduling resource analysis on the plurality of scheduling network devices according to the scheduling proportion and the plurality of the used resource types, and determining a plurality of scheduling hardware resources.
Further, the intelligent scheduling method for the hardware resources of the network equipment further comprises the following steps:
step S104, carrying out scheduling requirement analysis on the network equipment to generate scheduling requirement information.
In the embodiment of the invention, in the process of using the network equipment by a user, continuous hardware use monitoring is carried out on the network equipment to obtain hardware monitoring data, the hardware occupation condition of the network equipment is determined by analyzing the hardware monitoring data, whether the network equipment has scheduling requirements or not is predicted according to the change trend of the hardware occupation, and when the scheduling requirements are determined, the quantized value of the hardware requirements is predicted to generate scheduling requirement information.
Specifically, fig. 5 shows a flowchart of performing scheduling requirement analysis in the method provided by the embodiment of the present invention.
In a preferred embodiment of the present invention, the scheduling requirement analysis performed on the network device, and the generating scheduling requirement information specifically includes the following steps:
step S1041, performing hardware usage monitoring on the network device to obtain hardware monitoring data.
And step S1042, carrying out scheduling requirement analysis according to the hardware monitoring data to generate scheduling requirement information.
Further, the intelligent scheduling method for the hardware resources of the network equipment further comprises the following steps:
step S105, performing a scheduling process of the related scheduling hardware resources on the plurality of scheduling network devices according to the scheduling requirement information.
According to the embodiment of the invention, a plurality of scheduling network devices are matched with corresponding scheduling hardware resources according to scheduling requirement information, a matching result is generated, the scheduling network devices meeting the hardware scheduling requirement of the using network device are selected from the scheduling network devices according to the matching result, the scheduling network devices are marked as target scheduling devices, a temporary resource channel between the using network devices and the target scheduling devices is further constructed, and scheduling hardware resources of the target scheduling devices are called for cooperative use in the running and using process of the using network devices through the temporary resource channel, so that the problems of operation blocking and slow processing of the using network devices are avoided, the target scheduling devices in an idle state can be effectively utilized, and the cooperative use of the target scheduling devices is called without causing the leakage of working confidentiality.
Specifically, fig. 6 shows a flowchart of a device resource scheduling process in the method provided by the embodiment of the present invention.
In the preferred embodiment of the present invention, the scheduling processing for performing relevant scheduling on the scheduling hardware resources for the plurality of scheduling network devices according to the scheduling requirement information specifically includes the following steps:
step S1051, selecting and marking a target scheduling device from a plurality of scheduling network devices according to the scheduling requirement information.
Step S1052, constructing a temporary resource channel between the network device and the target scheduling device.
And step S1053, performing scheduling use of corresponding scheduling hardware resources on the target scheduling equipment through the temporary resource channel.
Further, fig. 7 shows an application architecture diagram of the system provided by the embodiment of the present invention.
In another preferred embodiment of the present invention, a system for intelligently scheduling hardware resources of a network device includes:
the authentication processing unit 101 is configured to determine to use the network device, perform authentication on a user, determine a person level, and acquire a use right.
In the embodiment of the invention, the identity verification processing unit 101 marks the currently used computer equipment as the network equipment when the computer equipment is started for use by monitoring the use of all the computer equipment in an enterprise, and performs face shooting on the user by using the network equipment to acquire face shooting video, then performs identity verification on the user by the face shooting video to generate a verification result, further judges whether the user passes the verification result, and allows the user to operate the network equipment and acquire the identity information of the user if the user passes the verification, determines the personnel level of the user according to the identity information, and acquires the use authority; if the verification is not passed, the using operation of the using network equipment by the user is not allowed.
Specifically, fig. 8 shows a block diagram of the authentication processing unit 101 in the system according to the embodiment of the present invention.
In a preferred embodiment of the present invention, the authentication processing unit 101 specifically includes:
the usage monitoring module 1011 is configured to perform usage monitoring to determine a currently used usage network device.
And the identity verification module 1012 is used for carrying out identity verification on the user through the network equipment to generate a verification result.
And the verification judging module 1013 is configured to judge whether the verification is successful according to the verification result.
A success processing module 1014 is configured to determine a personnel level of the user and obtain a usage right when the verification is successful.
Further, the intelligent scheduling system for the hardware resources of the network equipment further comprises:
and the device scheduling analysis unit 102 is configured to perform device scheduling analysis according to the personnel level, and determine a plurality of scheduling network devices.
In the embodiment of the present invention, when there is a change in computer equipment in an enterprise, equipment record update is performed, and according to users corresponding to different computer equipment, each computer equipment has a corresponding level, and by acquiring the latest equipment level data, the equipment scheduling analysis unit 102 performs scheduling matching in the equipment level data based on the personnel level of the user, generates a scheduling matching result, screens computer equipment below the personnel level according to the scheduling matching result, and marks these computer equipment as scheduling network equipment.
Specifically, fig. 9 shows a block diagram of a device scheduling analysis unit 102 in the system according to an embodiment of the present invention.
In a preferred embodiment of the present invention, the device schedule analysis unit 102 specifically includes:
the record updating module 1021 is configured to perform device record updating, and obtain device level data.
And the scheduling matching module 1022 is configured to perform scheduling matching in the device level data according to the personnel level, and generate a scheduling matching result.
The device determining module 1023 is configured to determine a plurality of scheduling network devices according to the scheduling matching result.
Further, the intelligent scheduling system for the hardware resources of the network equipment further comprises:
and the scheduling resource analysis unit 103 is configured to perform scheduling resource analysis according to the usage rights, and determine a plurality of scheduling hardware resources.
In the embodiment of the present invention, the scheduling resource analysis unit 103 determines, according to the usage rights of the user, a plurality of usage resource types capable of performing resource scheduling on the user, and determines, according to the usage rights of the user, a scheduling proportion capable of performing resource scheduling on the user, and determines, by performing analysis on the scheduling proportion and the plurality of usage resource types on the plurality of scheduling network devices, scheduling hardware resources capable of performing hardware resource scheduling on the plurality of scheduling network devices, respectively.
Specifically, fig. 10 shows a block diagram of the structure of the scheduling resource analysis unit 103 in the system according to the embodiment of the present invention.
In a preferred embodiment of the present invention, the scheduling resource analyzing unit 103 specifically includes:
the type determining module 1031 is configured to determine a plurality of usage resource types according to the usage rights.
And the proportion determining module 1032 is used for determining a scheduling proportion according to the use authority.
And a resource analysis module 1033, configured to perform scheduling resource analysis on the plurality of scheduling network devices according to the scheduling proportion and the plurality of usage resource types, and determine a plurality of scheduling hardware resources.
Further, the intelligent scheduling system for the hardware resources of the network equipment further comprises:
and the scheduling requirement analysis unit 104 is configured to perform scheduling requirement analysis on the network device to generate scheduling requirement information.
In the embodiment of the present invention, the scheduling requirement analysis unit 104 performs continuous hardware usage monitoring on the network device during the usage of the network device by the user, so as to obtain hardware monitoring data, determines the hardware occupation condition of the network device by analyzing the hardware monitoring data, predicts whether the network device has a scheduling requirement according to the variation trend of the hardware occupation, and predicts the quantized value of the hardware requirement when determining that the network device has the scheduling requirement, so as to generate scheduling requirement information.
And the relevant scheduling processing unit 105 is configured to perform scheduling processing of relevant scheduling hardware resources on the plurality of scheduling network devices according to the scheduling requirement information.
In the embodiment of the present invention, the relevant scheduling processing unit 105 performs matching of a plurality of corresponding scheduling hardware resources on a plurality of scheduling network devices according to scheduling requirement information, generates a matching result, selects a scheduling network device meeting the hardware scheduling requirement of the using network device from the plurality of scheduling network devices according to the matching result, marks the scheduling network device as a target scheduling device, and further constructs a temporary resource channel between the using network device and the target scheduling device, and invokes the scheduling hardware resource of the target scheduling device to cooperatively use in the running and using process of the using network device through the temporary resource channel, thereby avoiding the problems of operation jamming and slow processing of the using network device, effectively utilizing the target scheduling device in an idle state, and invoking the target scheduling device to cooperatively use without causing leakage of working secrets.
It should be understood that, although the steps in the flowcharts of the embodiments of the present invention are shown in order as indicated by the arrows, these steps are not necessarily performed in order as indicated by the arrows. The steps are not strictly limited to the order of execution unless explicitly recited herein, and the steps may be executed in other orders. Moreover, at least some of the steps in various embodiments may include multiple sub-steps or stages that are not necessarily performed at the same time, but may be performed at different times, nor do the order in which the sub-steps or stages are performed necessarily performed in sequence, but may be performed alternately or alternately with at least a portion of the sub-steps or stages of other steps or other steps.
Those skilled in the art will appreciate that all or part of the processes in the methods of the above embodiments may be implemented by a computer program for instructing relevant hardware, where the program may be stored in a non-volatile computer readable storage medium, and where the program, when executed, may include processes in the embodiments of the methods described above. Any reference to memory, storage, database, or other medium used in the various embodiments provided herein may include non-volatile and/or volatile memory. The nonvolatile memory can include Read Only Memory (ROM), programmable ROM (PROM), electrically Programmable ROM (EPROM), electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double Data Rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous Link DRAM (SLDRAM), memory bus direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), among others.
The technical features of the above-described embodiments may be arbitrarily combined, and all possible combinations of the technical features in the above-described embodiments are not described for brevity of description, however, as long as there is no contradiction between the combinations of the technical features, they should be considered as the scope of the description.
The foregoing examples illustrate only a few embodiments of the invention and are described in detail herein without thereby limiting the scope of the invention. It should be noted that it will be apparent to those skilled in the art that several variations and modifications can be made without departing from the spirit of the invention, which are all within the scope of the invention. Accordingly, the scope of protection of the present invention is to be determined by the appended claims.
The foregoing description of the preferred embodiments of the invention is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and principles of the invention.

Claims (10)

1. The intelligent scheduling method for the hardware resources of the network equipment is characterized by comprising the following steps of:
determining to use network equipment, performing identity verification on a user, determining a person level, and acquiring a use right;
according to the personnel level, performing equipment scheduling analysis to determine a plurality of scheduling network equipment;
according to the use permission, carrying out scheduling resource analysis and determining a plurality of scheduling hardware resources;
carrying out scheduling requirement analysis on the network equipment to generate scheduling requirement information;
and carrying out scheduling processing of related scheduling hardware resources on a plurality of scheduling network devices according to the scheduling demand information.
2. The intelligent scheduling method for hardware resources of a network device according to claim 1, wherein the determining uses the network device, performing authentication on a user, determining a person level, and acquiring the usage rights specifically includes the following steps:
performing use monitoring to determine the currently used network equipment;
through the network equipment, the identity of the user is verified, and a verification result is generated;
judging whether the verification is successful or not according to the verification result;
and when the verification is successful, determining the personnel level of the user and acquiring the use permission.
3. The intelligent scheduling method for hardware resources of a network device according to claim 1, wherein the performing device scheduling analysis according to the personnel level, determining a plurality of scheduling network devices specifically includes the following steps:
performing equipment record updating to obtain equipment level data;
according to the personnel level, carrying out scheduling matching in the equipment level data to generate a scheduling matching result;
and determining a plurality of scheduling network devices according to the scheduling matching result.
4. The intelligent scheduling method for hardware resources of a network device according to claim 1, wherein the performing scheduling resource analysis according to the usage rights, determining a plurality of scheduling hardware resources specifically includes the following steps:
determining a plurality of use resource types according to the use rights;
determining a scheduling proportion according to the use permission;
and according to the scheduling proportion and the plurality of the used resource types, performing scheduling resource analysis on the plurality of scheduling network devices to determine a plurality of scheduling hardware resources.
5. The intelligent scheduling method for hardware resources of a network device according to claim 1, wherein the performing scheduling requirement analysis on the network device to generate scheduling requirement information specifically includes the following steps:
performing hardware use monitoring on the network equipment to obtain hardware monitoring data;
and carrying out scheduling demand analysis according to the hardware monitoring data to generate scheduling demand information.
6. The intelligent scheduling method for hardware resources of network equipment according to claim 1, wherein the scheduling processing for performing relevant scheduling processing for hardware resources of a plurality of scheduling network equipment according to the scheduling requirement information specifically comprises the following steps:
selecting and marking target scheduling equipment from a plurality of scheduling network equipment according to the scheduling demand information;
constructing a temporary resource channel of the using network equipment and the target scheduling equipment;
and carrying out scheduling use of corresponding scheduling hardware resources on the target scheduling equipment through the temporary resource channel.
7. The intelligent scheduling system for the hardware resources of the network equipment is characterized by comprising an identity verification processing unit, an equipment scheduling analysis unit, a scheduling resource analysis unit, a scheduling demand analysis unit and a related scheduling processing unit, wherein:
the authentication processing unit is used for determining to use the network equipment, authenticating the user, determining the level of the user and acquiring the use permission;
the equipment scheduling analysis unit is used for carrying out equipment scheduling analysis according to the personnel level and determining a plurality of scheduling network equipment;
the scheduling resource analysis unit is used for performing scheduling resource analysis according to the use permission to determine a plurality of scheduling hardware resources;
the scheduling demand analysis unit is used for performing scheduling demand analysis on the network equipment to generate scheduling demand information;
and the related scheduling processing unit is used for performing scheduling processing of related scheduling hardware resources on the plurality of scheduling network devices according to the scheduling demand information.
8. The intelligent scheduling system for network equipment hardware resources according to claim 7, wherein the authentication processing unit specifically comprises:
the use monitoring module is used for carrying out use monitoring and determining the currently used network equipment;
the identity verification module is used for carrying out identity verification on a user through the network equipment to generate a verification result;
the verification judging module is used for judging whether verification is successful or not according to the verification result;
and the success processing module is used for determining the personnel level of the user and acquiring the use permission when the verification is successful.
9. The intelligent scheduling system for network equipment hardware resources according to claim 7, wherein the equipment scheduling analysis unit specifically comprises:
the record updating module is used for carrying out equipment record updating and acquiring equipment level data;
the scheduling matching module is used for performing scheduling matching in the equipment level data according to the personnel level to generate a scheduling matching result;
and the equipment determining module is used for determining a plurality of scheduling network equipment according to the scheduling matching result.
10. The intelligent scheduling system for hardware resources of a network device according to claim 7, wherein the scheduling resource analysis unit specifically includes:
the type determining module is used for determining a plurality of types of used resources according to the use permission;
the proportion determining module is used for determining a scheduling proportion according to the use permission;
and the resource analysis module is used for carrying out scheduling resource analysis on the plurality of scheduling network devices according to the scheduling proportion and the plurality of the used resource types and determining a plurality of scheduling hardware resources.
CN202310396187.0A 2023-04-14 2023-04-14 Intelligent scheduling method and system for hardware resources of network equipment Pending CN116366355A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310396187.0A CN116366355A (en) 2023-04-14 2023-04-14 Intelligent scheduling method and system for hardware resources of network equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310396187.0A CN116366355A (en) 2023-04-14 2023-04-14 Intelligent scheduling method and system for hardware resources of network equipment

Publications (1)

Publication Number Publication Date
CN116366355A true CN116366355A (en) 2023-06-30

Family

ID=86908315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310396187.0A Pending CN116366355A (en) 2023-04-14 2023-04-14 Intelligent scheduling method and system for hardware resources of network equipment

Country Status (1)

Country Link
CN (1) CN116366355A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014094495A1 (en) * 2012-12-22 2014-06-26 深圳先进技术研究院 Cloud scheduling method and system thereof
CN111553699A (en) * 2020-05-06 2020-08-18 支付宝(杭州)信息技术有限公司 Resource scheduling method and device
CN112995332A (en) * 2021-03-26 2021-06-18 成都海地云信息技术有限公司 Enterprise resource cloud management method and system based on cloud computing and big data technology
CN114363414A (en) * 2020-09-29 2022-04-15 华为云计算技术有限公司 Method, device and system for scheduling calculation examples
CN114595053A (en) * 2021-10-18 2022-06-07 徐州医科大学 MNSS-oriented safety dynamic resource management system
CN115499443A (en) * 2022-11-16 2022-12-20 江苏迈步信息科技有限公司 High-availability system and method based on super-fusion infrastructure
CN115633034A (en) * 2022-10-08 2023-01-20 北京八分量信息科技有限公司 Cross-cluster resource scheduling method, device, equipment and storage medium

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014094495A1 (en) * 2012-12-22 2014-06-26 深圳先进技术研究院 Cloud scheduling method and system thereof
CN111553699A (en) * 2020-05-06 2020-08-18 支付宝(杭州)信息技术有限公司 Resource scheduling method and device
CN114363414A (en) * 2020-09-29 2022-04-15 华为云计算技术有限公司 Method, device and system for scheduling calculation examples
CN112995332A (en) * 2021-03-26 2021-06-18 成都海地云信息技术有限公司 Enterprise resource cloud management method and system based on cloud computing and big data technology
CN114595053A (en) * 2021-10-18 2022-06-07 徐州医科大学 MNSS-oriented safety dynamic resource management system
CN115633034A (en) * 2022-10-08 2023-01-20 北京八分量信息科技有限公司 Cross-cluster resource scheduling method, device, equipment and storage medium
CN115499443A (en) * 2022-11-16 2022-12-20 江苏迈步信息科技有限公司 High-availability system and method based on super-fusion infrastructure

Similar Documents

Publication Publication Date Title
JP7213334B2 (en) Blockchain-based quality tracking method and system for prefabricated parts in lifetime
CN110351357B (en) Server current limiting method, device, computer equipment and storage medium
US20070162890A1 (en) Security engineering and the application life cycle
CN110944046B (en) Control method of consensus mechanism and related equipment
CN110222535B (en) Processing device, method and storage medium for block chain configuration file
CN112910723B (en) Edge terminal management method, device, equipment and storage medium
CN112866282B (en) Method and device for verifying time information in block chain
CN112685682A (en) Method, device, equipment and medium for identifying forbidden object of attack event
CN112769871B (en) Cross-chain access control method and device
CN108282484B (en) Password acquisition method and device, computer equipment and storage medium
CN109831521B (en) Cache instance management method and device, computer equipment and storage medium
CN113377668A (en) Automatic testing method and device for service interface and computer equipment
CN114244568B (en) Security access control method, device and equipment based on terminal access behavior
CN109446762A (en) Cloud platform access method, device, computer equipment and storage medium
CN106330580A (en) Method and device for controlling monitoring equipment
CN116366355A (en) Intelligent scheduling method and system for hardware resources of network equipment
CN109726187B (en) Hadoop-oriented adaptive permission control method and device
CN106254375B (en) A kind of recognition methods of hotspot equipment and device
CN112364307B (en) Software authorization method and related equipment
CN114567678A (en) Resource calling method and device of cloud security service and electronic equipment
Railkar et al. Policy-aware distributed and dynamic trust-based access control scheme for internet of things
CN111708795B (en) Object identification generation method, object identification updating device, computer equipment and medium
CN114978651A (en) Privacy calculation evidence storage method and device, electronic equipment and storage medium
CN113076531A (en) Identity authentication method and device, computer equipment and storage medium
CN111984996A (en) Human resource information sharing processing method, device, computer and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20230630