CN116011834A - Project planning management system, project planning management method, electronic equipment and storage medium - Google Patents

Project planning management system, project planning management method, electronic equipment and storage medium Download PDF

Info

Publication number
CN116011834A
CN116011834A CN202211737869.5A CN202211737869A CN116011834A CN 116011834 A CN116011834 A CN 116011834A CN 202211737869 A CN202211737869 A CN 202211737869A CN 116011834 A CN116011834 A CN 116011834A
Authority
CN
China
Prior art keywords
node
project
responsible person
user
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211737869.5A
Other languages
Chinese (zh)
Inventor
刘晨虎
李灿强
丁磊
张许梁
靳优
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Yishi Technology Co ltd
Original Assignee
Beijing Yishi Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Yishi Technology Co ltd filed Critical Beijing Yishi Technology Co ltd
Priority to CN202211737869.5A priority Critical patent/CN116011834A/en
Publication of CN116011834A publication Critical patent/CN116011834A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a project planning management system, a project planning management method, electronic equipment and a storage medium, and relates to the technical field of project management, wherein the project planning management system comprises: the project management subsystem is used for storing a plurality of plans added by the plan responsible person node, associating and storing a target event added by the manager node, a plan of the target event and an event responsible person node of the target event, associating and storing a target project added by the manager node, a plan and a flow chart of the target project and the project responsible person node of the target project, and realizing information query operation of the plan responsible person node, the manager node, the event responsible person node and the project responsible person node; a flow management subsystem for managing the flow chart; and the system management subsystem is used for managing the user information, the role information and the menu authority of each user node. The invention can make the work command and execution more efficient in project management.

Description

Project planning management system, project planning management method, electronic equipment and storage medium
Technical Field
The present invention relates to the field of project management technologies, and in particular, to a project planning management system, a project planning management method, an electronic device, and a storage medium.
Background
Currently, in project management, workers are required to handle various subtasks and various events of a project. For example: emergency events are encountered during the processing of an activity event, and related staff needs to deal with in time and have related solutions. In general, when a worker encounters an emergency event of an activity event, the worker reports the emergency event to a superior and related stadium or related work group to provide related solution templates and plans. Project planning management by manual means can lead to inefficiency in processing.
Disclosure of Invention
The invention provides a project planning management system, a project planning management method, electronic equipment and a storage medium, which are used for solving the defect that project planning management is performed manually in the prior art and achieving the purpose of enabling work command and execution to be more efficient during project management.
The invention provides a project planning management system, comprising:
the project management subsystem is used for storing a plurality of plans added by a plan responsible person node, associating and storing a target event added by an administrator node, a plan of the target event and an event responsible person node of the target event, associating and storing a target project added by the administrator node, a plan and a flow chart of the target project and a project responsible person node of the target project, and realizing information query operation of the plan responsible person node, the administrator node, the event responsible person node and the project responsible person node;
the flow management subsystem is used for providing functional elements for drawing the flow chart and realizing editing, inquiring and storing of icons and patterns of the flow chart by a flow responsible person node;
and the system management subsystem is used for storing the user information, the role information and the menu authority of each user node added by the user manager node, and displaying the interface of each user node according to the role information and the menu authority of each user node.
According to the present invention, there is provided a project plan management system, the project management subsystem comprising:
the plan maintenance module is used for encrypting and storing a plurality of plans added by a plan responsible person node, decrypting the encrypted plans when the plan responsible person node inquires the plans, and deriving information of the decrypted plans;
the event maintenance module is used for associating and storing the target event added by the manager node, the plan of the target event and the event responsible person node of the target event, searching the target event in a fuzzy manner according to the keyword input by the event responsible person node and deriving the information of the target event;
and the project maintenance module is used for associating and storing the plans, the flowcharts and the project responsible person nodes of all the subtasks of the target project added by the manager node and inquiring the information of the corresponding subtasks of the target project according to the inquiring operation of the project responsible person nodes.
According to the project planning management system provided by the invention, the project maintenance module is further used for: and storing the accessory added by the manager node and the unique name of the accessory into an object storage server, and inquiring the accessory according to the unique name input by the manager node.
According to the project planning management system provided by the invention, the flow management subsystem comprises:
the icon management module is used for storing each icon of the flow chart added by the flow responsible person node;
a style management module, configured to provide a function element for drawing the flowchart, and store a style of the flowchart drawn by the flow responsible person node based on the function element and each icon of the flowchart;
and the flow management module is used for adding the flow chart based on the style codes input by the flow responsible person node and modifying the style of the flow chart based on the modification operation of the flow responsible person node.
According to the present invention, there is provided a project plan management system, the system management subsystem comprising:
the user management module is used for encrypting and storing account information and password information of each user node added by the user manager node, verifying the account information and the password information of the user node, and determining that the user node is successfully logged in after verification is passed;
the role management module is used for storing the role information and the role unique codes distributed by the user manager node for each user node and inquiring the role information according to the role unique codes input by the user manager node;
and the menu management module is used for storing the menu permission allocated by the user manager node to the role information of each user node, determining a menu path of the user node according to the role information corresponding to the user node, and displaying the menu of the user node according to the menu path and the menu permission.
According to the project planning management system provided by the invention, the system management subsystem further comprises:
the log management module is used for storing log information of the user node, and the log information comprises at least one of the following items: IP address at each operation, operation information at each operation, interface operation information, and operation error cause.
According to the project planning management system provided by the invention, the project planning management system further comprises:
and the information backup subsystem is used for periodically backing up each data of the project planning management system into the Redis internal database.
The invention also provides a project planning management method, which comprises the following steps:
storing user information, role information and menu authority of each user node added by a user manager node, and displaying an interface of each user node according to the role information and the menu authority of each user node;
providing functional elements for drawing a flow chart, and realizing editing, inquiring and storing icons and styles of the flow chart on a corresponding interface by a flow responsible person node;
storing a plurality of plans added by a plan responsible person node on a corresponding interface, associating and storing a target event added by an administrator node on the corresponding interface, the plan of the target event and an event responsible person node of the target event, associating and storing a target item added by the administrator node on the corresponding interface, the plan of the target item, the flow chart and the item responsible person node of the target item, and realizing information query operation of the plan responsible person node, the administrator node, the event responsible person node and the item responsible person node on the corresponding interface.
The invention also provides an electronic device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, the processor implementing the steps of the project plan management method as described above when executing the program.
The present invention also provides a non-transitory computer readable storage medium having stored thereon a computer program which, when executed by a processor, implements the steps of the project plan management method as described above.
The invention provides a project planning management system, a project planning management method, electronic equipment and a storage medium, wherein the project planning management system comprises the following components: project management subsystem, flow management subsystem and system management subsystem; the system management subsystem is used for storing the user information, the role information and the menu authority of each user node added by the user manager node, displaying the interface of each user node according to the role information and the menu authority of each user node, and carrying out role allocation and role menu authority management on each user node; the flow management subsystem is used for providing functional elements for drawing a flow chart, realizing the editing, inquiring and storing of icons and patterns of the flow chart by a flow responsible person node, drawing the flow chart and managing the flow chart; the project management subsystem is used for storing a plurality of projects added by the project manager node, associating and storing the target events added by the manager node, the projects of the target events and the event manager node of the target events, associating and storing the target projects added by the manager node, the projects and flowcharts of the target projects and the project manager node of the target projects, and realizing information query operation of the project manager node, the event manager node and the project manager node, and can define the projects or the events to be managed by each user node, related projects and related processes, so that each user node can orderly complete own tasks. Thus, the present invention can make job command and execution more efficient at project management.
Drawings
In order to more clearly illustrate the invention or the technical solutions of the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described, and it is obvious that the drawings in the description below are some embodiments of the invention, and other drawings can be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a system diagram of a project planning management system according to an embodiment of the present invention;
FIG. 2 is a schematic diagram of the module components of a project management subsystem according to an embodiment of the present invention;
FIG. 3 is a schematic diagram of the module components of a flow management subsystem according to an embodiment of the present invention;
FIG. 4 is a schematic diagram of the module components of a system management subsystem according to an embodiment of the present invention;
FIG. 5 is a flowchart of a project planning management method according to an embodiment of the present invention;
fig. 6 is a schematic structural diagram of an electronic device provided by the present invention.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the present invention more apparent, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings, and it is apparent that the described embodiments are some embodiments of the present invention, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
The project plan management system of the present invention is described below in connection with fig. 1 to 4.
Referring to fig. 1, fig. 1 is a system schematic diagram of a project planning management system according to an embodiment of the invention. As shown in fig. 1, the system may include:
the project management subsystem 10 is configured to store a plurality of plans added by the plan responsible person node, associate and store a target event added by the administrator node, a plan of the target event, and an event responsible person node of the target event, associate and store a target project added by the administrator node, a plan and a flowchart of the target project, and a project responsible person node of the target project, and implement information query operations of the plan responsible person node, the administrator node, the event responsible person node, and the project responsible person node;
the flow management subsystem 20 is used for providing functional elements for drawing a flow chart and realizing editing, inquiring and storing of icons and patterns of the flow chart by a flow responsible person node;
the system management subsystem 30 is configured to store user information, role information and menu authority of each user node added by the user manager node, and display an interface of the user node according to the role information and menu authority of each user node.
With respect to the project management subsystem 10, pre-stored protocols may include: a project plan of a different item and a project plan of a different event, the project plan of a different item may include: the project of each subtask of different activity event purpose, the project of different event can include: a plan of emergency events for different events.
When the target item is an activity event item of a venue, the responsible person of the plan responsible person node may be the responsible person of the venue.
Displaying a user interface of a plan responsible person node, adding a plurality of plans from pre-stored plans according to the adding operation of the plan responsible person node, and storing the plans in a database. The information of the plan can be queried according to the query operation of the plan responsible person node.
Displaying a user interface of an administrator node, adding a target event according to the adding operation of the administrator node, selecting a plan of the target event and an event responsible person node according to the selecting operation of the administrator node, associating the target event added by the administrator node, the plan of the target event and the event responsible person node of the target event, and storing the target event, the plan of the target event and the event responsible person node into a database. The assigned target event can be queried according to the query operation of the event responsible person node.
Adding a target item according to the adding operation of the manager node, selecting a plan, a flow chart and an item responsible person node of the target item according to the selecting operation of the manager node, associating the target item added by the manager node, the plan and the flow chart of the target item and the item responsible person node of the target item, and storing the target item, the plan, the flow chart and the item responsible person node of the target item in a database. The assigned target item can be queried according to the query operation of the item responsible person node.
With respect to flow management subsystem 20, providing functional elements that draw a flow chart, the functional elements may include: functional components and custom components necessary for flow chart interaction and editing.
Displaying a user interface of the flow responsible person node, adding the icon of the flow chart according to the adding operation of the flow responsible person node, and inquiring the icon of the flow chart according to the inquiring operation of the flow responsible person node.
Adding the style of the flow chart according to the adding operation of the flow responsible person node, and editing the style of the flow chart according to the editing operation of the flow responsible person node.
And storing the icons and the styles of the flow charts added by the flow responsible person nodes into a database.
Regarding the system management subsystem 30, a user interface of a user administrator node is displayed, role information of users of each user node and each user node is added according to an adding operation of the user administrator node, and menu rights associated with the role information are allocated for page display when the role information is added.
The project planning management system provided in this embodiment includes: project management subsystem, flow management subsystem and system management subsystem; the system management subsystem is used for storing the user information, the role information and the menu authority of each user node added by the user manager node, displaying the interface of the user node according to the role information and the menu authority of each user node, and carrying out role allocation and role menu authority management on each user node; the flow management subsystem is used for providing functional elements for drawing a flow chart, realizing the editing, inquiring and storing of icons and patterns of the flow chart by a flow responsible person node, drawing the flow chart and managing the flow chart; the project management subsystem is used for storing a plurality of projects added by the project manager node, associating and storing the target events added by the manager node, the projects of the target events and the event manager node of the target events, associating and storing the target projects added by the manager node, the projects and flowcharts of the target projects and the project manager node of the target projects, and realizing information query operation of the project manager node, the event manager node and the project manager node, and can define the projects or the events to be managed by each user node, related projects and related processes, so that each user node can orderly complete own tasks. Thus, the present embodiment can make job command and execution more efficient at project management.
In one embodiment, as shown in FIG. 2, the project management subsystem 10 includes:
the plan maintenance module 101 is configured to encrypt and store a plurality of plans added by a plan responsible person node, decrypt the encrypted plan when the plan responsible person node queries the plan, and derive information of the decrypted plan;
the event maintenance module 102 is configured to associate and store a target event added by an administrator node, a plan of the target event, and an event responsible node of the target event, and perform fuzzy search on the target event according to a keyword input by the event responsible node, and derive information of the target event;
the project maintenance module 103 is configured to associate and store a plan, a flowchart, and a project manager node of each subtask of the target project added by the manager node, and query information of a corresponding subtask of the target project according to a query operation of the project manager node.
Specifically, regarding the plan maintenance module 101, a user interface of a plan responsible person node is displayed, and a plurality of plans are added according to an addition operation of the plan responsible person node and stored in the database in an encrypted manner. Inquiring information of the plan according to inquiry operation of the plan responsible person node, decrypting the encrypted plan during inquiry, and deriving information of the decrypted plan. Specific implementations of export plans may include: creating a workbook object, obtaining a worksheet object, traversing the worksheet object to obtain a row object, traversing the row object to obtain a cell (column) object, obtaining the plan data, and then exporting the plan data into a table-form document.
Regarding the event maintenance module 102, a user interface of an administrator node is displayed, a target event is added according to an adding operation of the administrator node, a plan of the target event is selected according to a selecting operation of the administrator node, the plan of the selected target event is associated with the target event, then an event responsible person node is selected according to the selecting operation of the administrator node, the event responsible person node is associated with the target event, and after the selection is completed, relevant information of the target event filled in by the administrator node is added according to the adding operation of the administrator node and stored in a database.
And displaying a user interface of the event responsible person node, searching for the target event according to the keyword input by the event responsible person node in a fuzzy manner, and deriving information of the target event. Specific ways of deriving information of the target event may include: creating a workbook object, obtaining a worksheet object, traversing the worksheet object to obtain a row object, traversing the row object to obtain a cell (column) object, obtaining data of a target event, and then exporting the data into a tabular form document.
Regarding the project maintenance module 103, a user interface of an administrator node is displayed, a target project is added according to an addition operation of the administrator node, a plan and a flowchart of each subtask of the target project are selected according to a selection operation of the administrator node, the plan and the flowchart of each subtask of the target project are associated with the target project, a project responsible person node of each subtask of the target project is selected according to a selection operation of the administrator node, and the project responsible person node of each subtask of the target project is associated with the target project and stored in a database.
And displaying a user interface of the project responsible person node, and inquiring the distributed target project and the information of the subtasks of the target project according to the inquiring operation of the project responsible person node.
In this embodiment, the items or events to be responsible, related plans and related flows of each user node may be specified, so that each user node may complete its own tasks in order.
In one embodiment, the project maintenance module 103 is further configured to: the unique names of the attachments added by the manager node and the attachments are stored in the object storage server, and the attachments are queried according to the unique names input by the manager node.
Specifically, a user interface of the administrator node is displayed, an accessory is added according to the adding operation of the administrator node, the accessory can be a picture and/or a document, and the accessory added by the administrator node is stored in the object storage server. And performing unique name operation on the name of the accessory according to the name operation of the manager node, and storing the unique name operation in the object storage server. And acquiring the attachment from the object storage server for viewing according to the unique name input by the manager node.
In this embodiment, the object storage server is used to store the object for the attachment, so that the loss of the attachment data can be avoided.
In one embodiment, as shown in FIG. 3, the flow management subsystem 20 includes:
an icon management module 201, configured to store each icon of the flow chart added by the flow responsible person node;
a style management module 202, configured to provide functional elements for drawing a flowchart, and store a style of the flowchart drawn by the flow leader node based on the functional elements and each icon of the flowchart;
the flow management module 203 is configured to add a flow chart based on the style code input by the flow leader node, and modify the style of the flow chart based on the modification operation of the flow leader node.
Specifically, regarding the icon management module 201, a user interface of the flow leader node is displayed, and description information of each icon of the flow chart is added according to the adding operation of the flow leader node, and is stored in the database. Each icon has a corresponding code, and the corresponding icon of the flow chart can be obtained and displayed according to the codes input by the flow responsible person nodes.
Regarding the style management module 202, a user interface of the flow leader node is shown, and functional elements for drawing the flow chart are provided on the user interface of the flow leader node, where the functional elements may include: functional components and custom components necessary for flow chart interaction and editing can also provide flexible node custom and other expansion mechanisms. The flow responsible person node can design the flow chart, and can draw the style of the flow chart based on the functional elements and the icons of the flow chart. And adding the patterns of the flow chart according to the adding operation of the flow responsible person node, and storing the patterns into a database.
Regarding the flow management module 203, a user interface of the flow leader node is shown, the user interface is associated with the flow chart, the detailed information of the flow chart is queried according to the query operation of the flow leader node, the flow chart is added according to the style code input by the flow leader node, and the style of the flow chart is modified according to the modification operation of the flow leader node.
In this embodiment, a flowchart may be drawn and managed.
In one embodiment, as shown in FIG. 4, the system management subsystem 30 includes:
the user management module 301 is configured to encrypt and store account information and password information of each user node added by a user administrator node, verify the account information and password information of the user node, and determine that the user node login is successful after verification is passed;
the role management module 302 is configured to store role information and a role unique code allocated to each user node by a user administrator node, and query the role information according to the role unique code input by the user administrator node;
and the menu management module 303 is configured to store menu permissions allocated to the role information of each user node by the user manager node, determine a menu path of the user node according to the role information corresponding to the user node, and display a menu of the user node according to the menu path and the menu permissions.
Specifically, regarding the user management module 301, a user interface of a user administrator node is displayed, the password information of each user node is encrypted and put in storage, and account information of each user node is uniquely added according to an adding operation of the user administrator node. When the user node logs in, the account information and the password information of the user node are verified, and after verification is passed, the user node is determined to be successfully logged in. And acquiring account information and password information of the user node according to the searching operation of the user manager node, and displaying.
Regarding the role management module 302, a user interface of the user manager node is displayed, role information of each user node is added according to an adding operation of the user manager node, unique addition is performed on a unique role code of the role information of each user node, and the role information is queried according to the unique role code input by the user manager node.
Regarding the menu management module 303, a user interface of the user manager node is presented, and menu rights are added according to an add operation of the user manager node, for example: whether to show, whether to lock, etc., and stored in a database. And determining a menu path of the user node according to the role information corresponding to the user node, and displaying a menu used by the user node according to the menu path and the menu authority.
In this embodiment, the user nodes may be assigned roles and the menu rights management of the roles may be performed.
In one embodiment, the system management subsystem 30 further comprises:
the log management module 304 is configured to store log information of the user node, where the log information includes at least one of the following: IP address at each operation, operation information at each operation, interface operation information, and operation error cause.
Specifically, the interface operation information may include information whether the interface is successfully operated, and the operation error cause may include an error cause when the interface is operated in error.
In this embodiment, the log management module automatically stores the IP address of the user node during each operation, the operation information during each operation, the interface operation information, the operation error cause, and other log information, so as to facilitate the system maintenance work.
In one embodiment, the project plan management system further comprises:
and the information backup subsystem is used for periodically backing up each data of the project planning management system to the Redis internal database.
Specifically, the period may be one day, and all data of the project planning management system is automatically backed up to the Redis internal database every day, so as to prevent data loss.
The project planning management method provided by the invention is described below, and the project planning management method described below and the project planning management system described above can be correspondingly referred to each other.
Referring to fig. 5, fig. 5 is a flowchart illustrating a project planning management method according to an embodiment of the invention. As shown in fig. 5, the method may include the steps of:
step 501, storing user information, role information and menu authority of each user node added by a user manager node, and displaying an interface of each user node according to the role information and menu authority of each user node;
step 502, providing functional elements for drawing a flow chart, and realizing editing, inquiring and storing icons and styles of the flow chart on a corresponding interface by a flow responsible person node;
step 503, storing a plurality of plans added by a plan responsible person node on a corresponding interface, associating and storing a target event added by an administrator node on the corresponding interface, a plan of the target event and an event responsible person node of the target event, associating and storing a target item added by the administrator node on the corresponding interface, a plan of the target item, the flow chart and an item responsible person node of the target item, and realizing information query operations of the plan responsible person node, the administrator node, the event responsible person node and the item responsible person node on the corresponding interface.
Fig. 6 illustrates a physical schematic diagram of an electronic device, as shown in fig. 6, which may include: processor 810, communication interface (Communications Interface) 820, memory 830, and communication bus 840, wherein processor 810, communication interface 820, memory 830 accomplish communication with each other through communication bus 840. The processor 810 may invoke logic instructions in the memory 830 to perform a project plan management method comprising:
the project management subsystem is used for storing a plurality of plans added by a plan responsible person node, associating and storing a target event added by an administrator node, a plan of the target event and an event responsible person node of the target event, associating and storing a target project added by the administrator node, a plan and a flow chart of the target project and a project responsible person node of the target project, and realizing information query operation of the plan responsible person node, the administrator node, the event responsible person node and the project responsible person node;
the flow management subsystem is used for providing functional elements for drawing the flow chart and realizing editing, inquiring and storing of icons and patterns of the flow chart by a flow responsible person node;
and the system management subsystem is used for storing the user information, the role information and the menu authority of each user node added by the user manager node, and displaying the interface of each user node according to the role information and the menu authority of each user node.
Further, the logic instructions in the memory 830 described above may be implemented in the form of software functional units and may be stored in a computer-readable storage medium when sold or used as a stand-alone product. Based on this understanding, the technical solution of the present invention may be embodied essentially or in a part contributing to the prior art or in a part of the technical solution, in the form of a software product stored in a storage medium, comprising several instructions for causing a computer device (which may be a personal computer, a server, a network device, etc.) to perform all or part of the steps of the method according to the embodiments of the present invention. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a random access Memory (RAM, random Access Memory), a magnetic disk, or an optical disk, or other various media capable of storing program codes.
In another aspect, the present invention also provides a computer program product comprising a computer program stored on a non-transitory computer readable storage medium, the computer program comprising program instructions which, when executed by a computer, enable the computer to perform the project plan management method provided by the methods described above, the method comprising:
the project management subsystem is used for storing a plurality of plans added by a plan responsible person node, associating and storing a target event added by an administrator node, a plan of the target event and an event responsible person node of the target event, associating and storing a target project added by the administrator node, a plan and a flow chart of the target project and a project responsible person node of the target project, and realizing information query operation of the plan responsible person node, the administrator node, the event responsible person node and the project responsible person node;
the flow management subsystem is used for providing functional elements for drawing the flow chart and realizing editing, inquiring and storing of icons and patterns of the flow chart by a flow responsible person node;
and the system management subsystem is used for storing the user information, the role information and the menu authority of each user node added by the user manager node, and displaying the interface of each user node according to the role information and the menu authority of each user node.
In yet another aspect, the present invention also provides a non-transitory computer readable storage medium having stored thereon a computer program which, when executed by a processor, is implemented to perform the project plan management methods provided above, the method comprising:
the project management subsystem is used for storing a plurality of plans added by a plan responsible person node, associating and storing a target event added by an administrator node, a plan of the target event and an event responsible person node of the target event, associating and storing a target project added by the administrator node, a plan and a flow chart of the target project and a project responsible person node of the target project, and realizing information query operation of the plan responsible person node, the administrator node, the event responsible person node and the project responsible person node;
the flow management subsystem is used for providing functional elements for drawing the flow chart and realizing editing, inquiring and storing of icons and patterns of the flow chart by a flow responsible person node;
and the system management subsystem is used for storing the user information, the role information and the menu authority of each user node added by the user manager node, and displaying the interface of each user node according to the role information and the menu authority of each user node.
The apparatus embodiments described above are merely illustrative, wherein the elements illustrated as separate elements may or may not be physically separate, and the elements shown as elements may or may not be physical elements, may be located in one place, or may be distributed over a plurality of network elements. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment. Those of ordinary skill in the art will understand and implement the present invention without undue burden.
From the above description of the embodiments, it will be apparent to those skilled in the art that the embodiments may be implemented by means of software plus necessary general hardware platforms, or of course may be implemented by means of hardware. Based on this understanding, the foregoing technical solution may be embodied essentially or in a part contributing to the prior art in the form of a software product, which may be stored in a computer readable storage medium, such as ROM/RAM, a magnetic disk, an optical disk, etc., including several instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute the method described in the respective embodiments or some parts of the embodiments.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solution of the present invention, and are not limiting; although the invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical scheme described in the foregoing embodiments can be modified or some technical features thereof can be replaced by equivalents; such modifications and substitutions do not depart from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims (10)

1. A project plan management system, comprising:
the project management subsystem is used for storing a plurality of plans added by a plan responsible person node, associating and storing a target event added by an administrator node, a plan of the target event and an event responsible person node of the target event, associating and storing a target project added by the administrator node, a plan and a flow chart of the target project and a project responsible person node of the target project, and realizing information query operation of the plan responsible person node, the administrator node, the event responsible person node and the project responsible person node;
the flow management subsystem is used for providing functional elements for drawing the flow chart and realizing editing, inquiring and storing of icons and patterns of the flow chart by a flow responsible person node;
and the system management subsystem is used for storing the user information, the role information and the menu authority of each user node added by the user manager node, and displaying the interface of each user node according to the role information and the menu authority of each user node.
2. The project plan management system of claim 1, wherein the project management subsystem comprises:
the plan maintenance module is used for encrypting and storing a plurality of plans added by a plan responsible person node, decrypting the encrypted plans when the plan responsible person node inquires the plans, and deriving information of the decrypted plans;
the event maintenance module is used for associating and storing the target event added by the manager node, the plan of the target event and the event responsible person node of the target event, searching the target event in a fuzzy manner according to the keyword input by the event responsible person node and deriving the information of the target event;
and the project maintenance module is used for associating and storing the plans, the flowcharts and the project responsible person nodes of all the subtasks of the target project added by the manager node and inquiring the information of the corresponding subtasks of the target project according to the inquiring operation of the project responsible person nodes.
3. The project plan management system of claim 2, wherein the project maintenance module is further configured to: and storing the accessory added by the manager node and the unique name of the accessory into an object storage server, and inquiring the accessory according to the unique name input by the manager node.
4. The project plan management system of claim 1, wherein the flow management subsystem comprises:
the icon management module is used for storing each icon of the flow chart added by the flow responsible person node;
a style management module, configured to provide a function element for drawing the flowchart, and store a style of the flowchart drawn by the flow responsible person node based on the function element and each icon of the flowchart;
and the flow management module is used for adding the flow chart based on the style codes input by the flow responsible person node and modifying the style of the flow chart based on the modification operation of the flow responsible person node.
5. The project plan management system of claim 1, wherein the system management subsystem comprises:
the user management module is used for encrypting and storing account information and password information of each user node added by the user manager node, verifying the account information and the password information of the user node, and determining that the user node is successfully logged in after verification is passed;
the role management module is used for storing the role information and the role unique codes distributed by the user manager node for each user node and inquiring the role information according to the role unique codes input by the user manager node;
and the menu management module is used for storing the menu permission allocated by the user manager node to the role information of each user node, determining a menu path of the user node according to the role information corresponding to the user node, and displaying the menu of the user node according to the menu path and the menu permission.
6. The project plan management system of claim 5, wherein the system management subsystem further comprises:
the log management module is used for storing log information of the user node, and the log information comprises at least one of the following items: IP address at each operation, operation information at each operation, interface operation information, and operation error cause.
7. The project plan management system of any one of claims 1 to 6, further comprising:
and the information backup subsystem is used for periodically backing up each data of the project planning management system into the Redis internal database.
8. A project plan management method, comprising:
storing user information, role information and menu authority of each user node added by a user manager node, and displaying an interface of each user node according to the role information and the menu authority of each user node;
providing functional elements for drawing a flow chart, and realizing editing, inquiring and storing icons and styles of the flow chart on a corresponding interface by a flow responsible person node;
storing a plurality of plans added by a plan responsible person node on a corresponding interface, associating and storing a target event added by an administrator node on the corresponding interface, the plan of the target event and an event responsible person node of the target event, associating and storing a target item added by the administrator node on the corresponding interface, the plan of the target item, the flow chart and the item responsible person node of the target item, and realizing information query operation of the plan responsible person node, the administrator node, the event responsible person node and the item responsible person node on the corresponding interface.
9. An electronic device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, characterized in that the processor implements the steps of the project plan management method of claim 8 when the program is executed by the processor.
10. A non-transitory computer readable storage medium, on which a computer program is stored, characterized in that the computer program, when being executed by a processor, implements the steps of the project plan management method of claim 8.
CN202211737869.5A 2022-12-30 2022-12-30 Project planning management system, project planning management method, electronic equipment and storage medium Pending CN116011834A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211737869.5A CN116011834A (en) 2022-12-30 2022-12-30 Project planning management system, project planning management method, electronic equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211737869.5A CN116011834A (en) 2022-12-30 2022-12-30 Project planning management system, project planning management method, electronic equipment and storage medium

Publications (1)

Publication Number Publication Date
CN116011834A true CN116011834A (en) 2023-04-25

Family

ID=86035196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211737869.5A Pending CN116011834A (en) 2022-12-30 2022-12-30 Project planning management system, project planning management method, electronic equipment and storage medium

Country Status (1)

Country Link
CN (1) CN116011834A (en)

Similar Documents

Publication Publication Date Title
US10205729B2 (en) Automation tool for providing users with security access to an electronic system
US10824758B2 (en) System and method for managing enterprise data
US8646093B2 (en) Method and system for configuration management database software license compliance
US7610512B2 (en) System and method for automated and assisted resolution of it incidents
US11989540B2 (en) Systems and methods for non-disruptive continuous software delivery
US11740897B2 (en) Methods for software development and operation process analytics and devices thereof
RU2345411C2 (en) Method of document-oriented adaptive guidance of safety
US11907262B2 (en) System and method for data pruning via dynamic partition management
CN112288400A (en) Multi-system data interaction method and device, computer equipment and storage medium
CN108932432A (en) Data guard method and host server system
CN112686580B (en) Workflow definition method and system capable of customizing flow
US20080004991A1 (en) Methods and apparatus for global service management of configuration management databases
CN116011834A (en) Project planning management system, project planning management method, electronic equipment and storage medium
US11120155B2 (en) Extensibility tools for defining custom restriction rules in access control
US20230195792A1 (en) Database management methods and associated apparatus
CN114417311A (en) Role authority management method and device, computer equipment and storage medium
JP5854745B2 (en) DATA INTERFACE DEVICE, DATA INTERFACE METHOD, DATA INTERFACE PROGRAM, AND PROCESS MANAGEMENT SYSTEM FOR PROCESS MANAGEMENT TOOL
US20130166342A1 (en) Method and Apparatus for Computer Based Process Monitoring and Control
JP4348770B2 (en) Design drawing editing history management system
US20220327534A1 (en) Security system and method that allows users to securely setup and maintain system security for all business systems
US11301558B2 (en) Automatic secure storage of credentials within a managed configuration model
US11803569B2 (en) Computer system and method for accessing user data that is distributed within a multi-zone computing platform
US20240143809A1 (en) Service and system integration
WO2020124294A1 (en) Permission configuration method
JP2021128395A (en) Business processing device, information processing method, and program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination