CN115760272A CN202211352662.6A CN202211352662A CN115760272A CN 115760272 A CN115760272 A CN 115760272A CN 202211352662 A CN202211352662 A CN 202211352662A CN 115760272 A CN115760272 A CN 115760272A
Authority
CN
China
Prior art keywords
building material
vehicle
information
goods
material order
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211352662.6A
Other languages
Chinese (zh)
Inventor
刘超
刘志宸
朱立宇
罗兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Handshang Building Materials Technology Co ltd
Original Assignee
Guizhou Handshang Building Materials Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Handshang Building Materials Technology Co ltd filed Critical Guizhou Handshang Building Materials Technology Co ltd
Priority to CN202211352662.6A priority Critical patent/CN115760272A/en
Publication of CN115760272A publication Critical patent/CN115760272A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application discloses a processing method and a processing device for building material orders and a computer storage medium, which are used for improving the success rate of building material suggestions. The method comprises the following steps: obtaining building material order information and distribution mode information; judging whether the distribution mode of the building material order is entrusted distribution according to the distribution mode information; if the order is consigned for delivery, matching the first goods picking vehicle according to the building material order information; generating building material transportation cost information according to the transportation unit price information and the building material order information of the first delivery vehicle; generating first payment information according to the building material transportation cost information and the building material order information; if the target user is confirmed to finish payment according to the first payment information, acquiring a receiving address in the building material order information; if the delivery is not the entrusted delivery, vehicle information of the second delivery vehicle input by the target user is acquired and recorded; and generating second payment information according to the building material order information so that the target user can pay the cost of the building material order according to the second payment information.

Description

Building material order processing method, processing device and computer storage medium
Technical Field
The present application relates to the field of logistics technology, and in particular, to a method, an apparatus, and a computer storage medium for processing a building material order.
Background
Bulk commodity transaction in the building material supply chain is different from a conventional E-commerce transaction mode, and a conventional E-commerce platform can select express delivery, and a merchant contacts an express delivery company for delivery and can also select to independently go to a store for goods taking. The transaction flow of the building material supply chain is as follows: the customer orders through the supply chain platform, the supply chain platform sends the building material order information of the customer to the building material manufacturer, and the customer orders the vehicle to the building material manufacturer for goods delivery. The information of the goods-picking vehicle and the information of a driver need to be verified in the goods-picking process, building material manufacturers usually identify building material orders according to license plate information, and open goods-picking orders, and workers carry goods out of the factory according to the goods-picking orders.
However, in the building material transaction process, a customer may not be able to entrust the vehicle to the building material manufacturer for picking up goods, and at this time, if the supply chain platform does not have vehicle resources matched with the customer, the building material transaction may not be completed, thereby reducing the success rate of the building material transaction.
Disclosure of Invention
The application provides a processing method and a processing device for a building material order and a computer storage medium, which are used for improving the success rate of building material transaction.
The application provides in a first aspect a method for processing a building material order, comprising:
obtaining building material order information and distribution mode information;
judging whether the distribution mode of the building material order is entrusted distribution according to the distribution mode information;
if the order is entrusted for delivery, matching a first goods picking vehicle according to the building material order information;
generating building material transportation cost information according to the transportation unit price information of the first delivery vehicle and the building material order information;
generating first payment information according to the building material transportation cost information and the building material order information, so that the target user can pay the building material order cost and the building material transportation cost according to the first payment information;
if the target user is confirmed to complete payment according to the first payment information, a receiving address in the building material order information is obtained, so that the first delivery vehicle transports the building material order to the receiving address;
if the order delivery is not consigned, vehicle information of a second goods delivery vehicle input by a target user is obtained and recorded, so that target equipment of a target plant can release the second goods delivery vehicle to enter the target plant according to the vehicle information, and the second goods delivery vehicle can extract and transport building material goods to a goods receiving address according to the building material order information;
and generating second payment information according to the building material order information so that the target user can pay the cost of the building material order according to the second payment information.
Optionally, the matching the first delivery vehicle according to the building material order information includes:
acquiring the weight and the transportation distance of the building material goods in the building material order information;
screening a goods picking vehicle with the vehicle-mounted weight larger than the building material goods weight;
determining a unit transportation price of the delivery vehicle;
determining the goods picking vehicle with the lowest transportation cost as a first goods picking vehicle through a transportation cost formula according to the transportation unit price;
the transportation cost formula is as follows:
M=W×S×P;
wherein M is the transportation cost, W is the weight of the building material cargo, S is the transportation distance of the building material cargo, and P is the transportation unit price of the goods-taking vehicle.
Optionally, the matching the first goods-taking vehicle according to the building material order information includes:
acquiring a pick-up address of a building material order and the weight of building material goods in the building material order information;
screening a goods delivery vehicle with the vehicle-mounted weight larger than the weight of the building material goods;
acquiring a first longitude and a first latitude of the goods picking address, and acquiring a second longitude and a second latitude of the position of the goods picking vehicle;
determining a goods picking vehicle closest to the goods picking address as a first goods picking vehicle through a distance algorithm according to the first longitude, the first latitude, the second longitude and the second latitude;
the distance algorithm is as follows:
S=R×arcos[cosY 1 ×cosY 2 ×cos(X 1 -X 2 )+sinY 1 +sinY 2 ];
wherein, X 1 Is a first longitude, Y 1 Is the first latitude, X 2 Is the second longitude, Y 2 Is the second latitude, R is the radius of the earth, S is the distance between the pick-up vehicle and the pick-up address.
Optionally, the matching the first goods-taking vehicle according to the building material order information includes:
acquiring the weight of building material goods in the building material order information;
screening a goods picking vehicle with the vehicle-mounted weight larger than the building material goods weight;
determining a goods picking vehicle with the minimum free weight as a first goods picking vehicle according to the weight of the building material goods and the vehicle-mounted weight through a vehicle loading capacity matching formula;
the vehicle load matching formula is as follows:
W 3 =W 2 -W 1
wherein, W 3 Is free weight, W 2 Is the vehicle weight, W 1 The weight of the building material goods.
Optionally, after the first payment information is generated according to the freight information and the building material order information, the processing method further includes:
judging whether the target user completes payment according to the first payment information within preset time;
if the target user does not finish payment according to the first payment information within the preset time, canceling the first goods picking vehicle matched according to the building material order information;
if it is determined that the target user completes payment according to the first payment information, acquiring a receiving address in the building material order information, so that the transportation of the building material order to the receiving address by the first delivery vehicle comprises:
and if the target user is determined to finish payment according to the first payment information within the preset time, acquiring a receiving address in the building material order information, so that the first delivery vehicle transports the building material order to the receiving address.
Optionally, after the obtaining a receiving address in the building material order information to enable the first picking vehicle to transport the building material order to the receiving address, the processing method further includes:
acquiring a goods picking address in the building material order information;
acquiring a vehicle flow image set of at least two driving routes between the goods pick-up address and the goods receiving address in a first preset time period;
inputting the vehicle flow image set into a target vehicle flow prediction model, wherein the target vehicle flow prediction model is a trained vehicle flow prediction model;
outputting, by the target vehicle flow prediction model, predicted vehicle flow conditions of the at least two driving routes within a second preset time period based on the set of vehicle flow images;
and determining a target driving route according to the predicted vehicle flow condition, wherein the target driving route is the driving route with the least vehicle flow in the second preset time period, so that the first goods picking vehicle can drive from the goods picking address to the goods receiving address according to the target driving route.
The second aspect of the present application provides a processing apparatus for a building material order, comprising:
the first acquisition unit is used for acquiring building material order information and distribution mode information;
a first judgment unit for judging whether the delivery mode of the building material order is entrusted delivery according to the delivery mode information;
the matching unit is used for matching the first goods picking vehicle according to the building material order information if the entrusted delivery is carried out;
the first generation unit is used for generating building material transportation cost information according to the transportation unit price information of the first delivery vehicle and the building material order information;
a second generating unit, configured to generate first payment information according to the building material transportation cost information and the building material order information, so that the target user pays the building material order fee and the building material transportation cost according to the first payment information;
and the second acquisition unit is used for acquiring a receiving address in the building material order information if the target user is confirmed to complete payment according to the first payment information, so that the first delivery vehicle transports the building material order to the receiving address.
The third acquisition unit is used for acquiring and recording vehicle information of a second goods picking vehicle input by a target user if the delivery is not consigned, so that target equipment of a target plant can release the second goods picking vehicle to enter the target plant according to the vehicle information, and the second goods picking vehicle can extract and transport building material goods to a goods receiving address according to the building material order information;
and the third generating unit is used for generating second payment information according to the building material order information so that the target user can pay the building material order fee according to the second payment information.
Optionally, the matching unit is specifically configured to:
acquiring the weight and the transportation distance of the building material goods in the building material order information;
screening a goods picking vehicle with the vehicle-mounted weight larger than the building material goods weight;
determining a unit transportation price of the delivery vehicle;
determining the goods picking vehicle with the lowest transportation cost as a first goods picking vehicle according to the transportation unit price through a transportation cost formula;
the transportation cost formula is as follows:
M=W×S×P;
wherein M is the transportation cost, W is the weight of the building material goods, S is the transportation distance of the building material goods, and P is the transportation unit price of the goods-taking vehicle.
Optionally, the matching unit is specifically configured to:
acquiring a pick-up address of a building material order and the weight of building material goods in the building material order information;
screening a goods picking vehicle with the vehicle-mounted weight larger than the building material goods weight;
acquiring a first longitude and a first latitude of the goods picking address, and acquiring a second longitude and a second latitude of the position of the goods picking vehicle;
determining a cargo picking vehicle closest to the cargo picking address as a first cargo picking vehicle through a distance algorithm according to the first longitude, the first latitude, the second longitude and the second latitude;
the distance algorithm is as follows:
S=R×arcos[cosY 1 ×cosY 2 ×cos(X 1 -X 2 )+sinY 1 +sinY 2 ];
wherein, X 1 Is a first longitude, Y 1 Is the first latitude, X 2 Is a second longitude, Y 2 Is the second latitude, R is the radius of the earth, S is the distance between the pick-up vehicle and the pick-up address.
Optionally, the matching unit is specifically configured to:
acquiring the weight of building material goods in the building material order information;
screening a goods picking vehicle with the vehicle-mounted weight larger than the building material goods weight;
determining a goods picking vehicle with the minimum free weight as a first goods picking vehicle according to the weight of the building material goods and the vehicle-mounted weight through a vehicle loading capacity matching formula;
the vehicle load matching formula is as follows:
W 3 =W 2 -W 1
wherein, W 3 Is free weight, W 2 Is the vehicle weight, W 1 The weight of the building material goods.
Optionally, the processing apparatus further comprises:
the second judgment unit is used for judging whether the target user completes payment according to the first payment information within preset time;
the canceling unit is used for canceling the first goods picking vehicle matched according to the building material order information if the target user does not finish payment according to the first payment information within the preset time;
the second obtaining unit is specifically configured to:
and if the target user is determined to finish payment according to the first payment information within the preset time, acquiring a receiving address in the building material order information, so that the first delivery vehicle transports the building material order to the receiving address.
Optionally, the processing apparatus further comprises:
the fourth acquisition unit is used for acquiring the goods picking address in the building material order information;
the fifth acquisition unit is used for acquiring a vehicle moving image set of at least two driving routes between the goods picking address and the goods receiving address in a first preset time period;
the input unit is used for inputting the vehicle flow image set into a target vehicle flow prediction model, and the target vehicle flow prediction model is a trained vehicle flow prediction model;
an output unit, configured to output, by the target vehicle flow prediction model, predicted vehicle flow conditions of the at least two driving routes within a second preset time period based on the set of vehicle flow images;
and the determining unit is used for determining a target driving route according to the predicted vehicle flowing condition, wherein the target driving route is the driving route with the least vehicle flowing in the second preset time period, so that the first goods picking vehicle can drive from the goods picking address to the goods receiving address according to the target driving route.
A third aspect of the present application provides a processing apparatus for a building material order, the processing apparatus comprising:
the device comprises a processor, a memory, an input and output unit and a bus;
the processor is connected with the memory, the input and output unit and the bus;
the memory stores a program, and the processor calls the program to execute the method for processing a building material order according to any one of the first aspect and the second aspect.
A fourth aspect of the present application provides a computer-readable storage medium having a program stored thereon, where the program is executed on a computer to perform the method for processing a building material order according to any one of the first aspect and the first aspect.
According to the technical scheme, the method has the following advantages: building material order information and distribution mode information are obtained, whether the distribution mode of the building material order is entrusted distribution or not is judged according to the distribution mode information, and if entrusted distribution is realized, a first goods picking vehicle is matched according to the building material order information; generating building material transportation cost information according to the transportation unit price information and the building material order information of the first delivery vehicle; generating first payment information according to the building material transportation cost information and the building material order information, so that a target user can pay the building material order cost and the building material transportation cost according to the first payment information; and when the target user finishes payment according to the first payment information, determining a receiving address according to the building material order information, so that the first delivery vehicle transports the building material order to the receiving address. By the method, when the target user selects to consign delivery, the first goods-picking vehicle is matched according to the building material information, so that the first goods-picking vehicle transports the building material order to the receiving address, the situation that building material transaction cannot be completed due to the fact that the target user cannot consign the vehicle to a building material manufacturer to pick up goods is avoided, and the success rate of the building material transaction is effectively improved.
Drawings
In order to more clearly illustrate the technical solutions in the present application, the drawings needed to be used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
FIG. 1 is a schematic flow chart diagram illustrating one embodiment of a method for processing a building material order according to the present disclosure;
FIG. 2 is a schematic flow chart illustrating a method for processing a building material order according to another embodiment of the present disclosure;
FIG. 3 is a schematic structural view of an embodiment of a building material order processing apparatus provided in the present application;
FIG. 4 is a schematic structural view of another embodiment of a building material order processing apparatus according to the present disclosure;
fig. 5 is a schematic structural diagram of an embodiment of a building material order processing apparatus provided in the present application.
Detailed Description
The application provides a processing method and a processing device for a building material order and a computer storage medium, which are used for improving the success rate of building material transaction.
The method for processing the building material order provided by the application can be applied to a terminal and can also be applied to a server, for example, the terminal can be a fixed terminal such as a smart phone or a computer, a tablet computer, a smart television, a smart watch, a portable computer terminal and a desktop computer. For convenience of explanation, the terminal is taken as an execution subject in the present application for illustration.
Referring to fig. 1, fig. 1 is a diagram illustrating an embodiment of a method for processing a building material order according to the present application, the method comprising:
101. the terminal acquires building material order information and distribution mode information;
in this embodiment, a target user selects a building material commodity, clicks to purchase the building material commodity and enters an order confirmation interface, the target user selects a delivery mode on the order confirmation interface, the delivery mode includes self-delivery or consignment delivery, a terminal acquires building material order information and delivery mode information input by the target user, the building material order information includes information such as a delivery address, a receiving address, building material cargo weight and building material cargo transportation distance, the delivery mode information includes delivery mode and delivery vehicle information, and the delivery mode includes: an autonomous pick-up mode or a consignment and drag delivery mode.
102. The terminal judges whether the distribution mode of the building material order is entrusted distribution according to the distribution mode information;
in this embodiment, the terminal determines whether the distribution method of the building material order is delivery request based on the distribution method information, and if so, the terminal executes step 103.
103. If the order is consigned for delivery, the terminal matches the first goods picking vehicle according to the building material order information;
in this embodiment, the matching of the first delivery vehicle by the terminal according to the building material order information includes: the terminal matches the goods picking vehicle with the lowest transportation cost as a first goods picking vehicle according to the building material order information; or the terminal matches the goods picking vehicle closest to the goods picking address as a first goods picking vehicle according to the building material order information; or the terminal matches the goods picking vehicle with the minimum empty weight as a first goods picking vehicle according to the building material order information; the specific matching process will be described in detail in the next embodiment, and will not be described herein again.
104. The terminal generates building material transportation cost information according to the transportation unit price information and the building material order information of the first goods-taking vehicle;
in this embodiment, the terminal generates the building material transportation cost information according to the transportation unit price information of the first delivery vehicle and the building material cargo weight information and the building material cargo transportation distance information in the building material order information.
105. The terminal generates first payment information according to the building material transportation cost information and the building material order information, so that a target user can pay the building material order cost and the building material transportation cost according to the first payment information;
in this embodiment, the terminal generates the first payment information according to the building material transportation cost information and the building material expense information in the building material order information, and the first payment information can be pushed to the terminal of the target user in the form of the two-dimensional code, so that the target user can pay the building material order expense and the building material transportation cost according to the first payment information.
106. And when the target user is confirmed to finish payment according to the first payment information, the terminal acquires the receiving address in the building material order information, so that the first delivery vehicle transports the building material order to the receiving address.
In this embodiment, when the target user completes payment according to the first payment information, for example, when the target user completes payment through a payment link pushed by the terminal, the terminal acquires a receiving address in the building material order information, so that the first delivery vehicle transports the building material order from the delivery address to the receiving address.
107. If the order delivery is not consigned, the terminal acquires and records the vehicle information of the second goods-picking vehicle input by the target user, so that the target equipment of the target plant can release the second goods-picking vehicle to enter the target plant according to the vehicle information, and the second goods-picking vehicle can extract and transport the building material goods to a goods-receiving address according to the building material order information;
in this embodiment, if the delivery is not a consignment, the terminal obtains and records the vehicle information of the second delivery vehicle input by the target user, where the vehicle information includes license plate number information, driver list information, driver identification number information, driver mobile phone number information, and driver license information. The second vehicle may be one vehicle or a plurality of vehicles, and is not limited herein. And the target equipment of the target plant releases the second goods picking vehicle into the target plant according to the vehicle information, so that the second goods picking vehicle extracts the building material goods for cloud transportation to a goods receiving address according to the building material order information.
108. The terminal generates second payment information according to the building material order information, so that the target user can pay the cost of the building material order according to the second payment information;
in this embodiment, the terminal generates second payment information according to the unit price and the weight of the building material order in the building material order information, so that the target user pays the cost of the building material order according to the second payment information.
In the embodiment, the terminal acquires the building material order information and the distribution mode information, judges whether the distribution mode of the building material order is delivery entrusted according to the distribution mode information, and matches the first goods picking vehicle according to the building material order information if the distribution mode is delivery entrusted; generating building material transportation cost information according to the transportation unit price information and the building material order information of the first delivery vehicle; generating first payment information according to the building material transportation cost information and the building material order information, so that a target user can pay the building material order cost and the building material transportation cost according to the first payment information; and when the target user finishes payment according to the first payment information, determining a receiving address according to the building material order information, so that the first delivery vehicle transports the building material order to the receiving address. By the method, when the target user selects to consign delivery, the terminal matches the first goods-picking vehicle according to the building material information, so that the first goods-picking vehicle transports the building material order to the receiving address, the situation that building material transaction cannot be completed due to the fact that the target user cannot consign the vehicle to a building material manufacturer to pick up goods is avoided, and the success rate of the building material transaction is effectively improved.
In order to make the processing method of the building material order provided by the present application more obvious and understandable, the following is a detailed description of the processing method of the building material order provided by the present application:
referring to fig. 2, fig. 2 is a schematic diagram illustrating another embodiment of a method for processing a building material order according to the present application, the method comprising:
201. the terminal acquires building material order information and distribution mode information;
step 201 in this embodiment is similar to step 101 in the embodiment of fig. 1, and details are not repeated here.
202. The terminal judges whether the distribution mode of the building material order is entrusted distribution according to the distribution mode information;
in this embodiment, the terminal determines whether the distribution method of the building material order is delivery entrusted according to the distribution method information, if yes, the terminal performs step 203; if not, the terminal performs step 214.
203. If the order is consigned for delivery, the terminal matches a first goods picking vehicle according to the building material order information;
in this embodiment, if the order is consigned, the terminal matches the first delivery vehicle according to the building material order information, and the specific matching method includes the following three types:
1. the terminal matches the goods picking vehicle with the lowest transportation cost as a first goods picking vehicle according to the building material order information;
the terminal matches the lowest freight vehicle of cost of transportation according to building materials order information and includes for first freight vehicle: the terminal acquires the weight of the building material goods and the transportation distance of the building material goods in the building material order information; the terminal screens the goods-taking vehicles with the vehicle-mounted weight larger than the weight of the building material goods; the terminal determines the transportation unit price of the goods-taking vehicle; the terminal determines the goods picking vehicle with the lowest transportation cost as a first goods picking vehicle according to the transportation unit price through a transportation cost formula, wherein the transportation cost formula is as follows: m = W × S × P; wherein M is the transportation cost, W is the weight of the building material cargo, S is the transportation distance of the building material cargo, and P is the transportation unit price of the goods-taking vehicle. For example: the vehicle-mounted goods picking vehicles with the weight larger than that of building material goods are three, namely a goods picking vehicle A, a goods picking vehicle B and a goods picking vehicle C, wherein the transportation cost of the goods picking vehicle A is 1000, the transportation cost of the goods picking vehicle B is 1500, and the transportation cost of the goods picking vehicle C is 800; then the C pick-up vehicle is determined to be the first pick-up vehicle at this time.
2. The terminal matches a goods picking vehicle closest to the goods picking address as a first goods picking vehicle according to the building material order information;
the terminal matches the goods picking vehicle closest to the goods picking address according to the building material order information to be a first goods picking vehicle, and the method comprises the following steps: the terminal acquires the goods picking address and the weight of the building material goods of the building material order in the building material order information; screening a goods picking vehicle with the vehicle weight larger than the weight of building material goods by a terminal; the terminal acquires a first longitude and a first latitude of the goods picking address, and acquires a second longitude and a second latitude of the position of the goods picking vehicle; the terminal determines the goods picking vehicle closest to the goods picking address as a first goods picking vehicle through an example algorithm according to the first longitude, the first latitude, the second longitude and the second latitude; the distance algorithm is as follows: s = R × arcos [ cosY ] 1 ×cosY 2 ×cos(X 1 -X 2 )+sinY 1 +sinY 2 ](ii) a Wherein, X 1 Is a first longitude, Y 1 Is the first latitude, X 2 Is the second longitude, Y 2 Is the second latitude, R is the radius of the earth,And S is the distance between the goods picking vehicle and the goods picking address.
3. The terminal matches the goods picking vehicle with the minimum free weight as a first goods picking vehicle according to the building material order information;
the terminal matches the least cargo lift vehicle of vacant weight as first cargo lift vehicle according to building materials order information and includes: the terminal acquires the weight of building material goods in the building material order information; the terminal screens the goods-taking vehicles with the vehicle-mounted weight larger than the weight of the building material goods; the terminal determines a goods picking vehicle with the lowest free weight as a first goods picking vehicle through a vehicle loading capacity matching formula according to the weight of the building material goods and the vehicle-mounted weight; the vehicle load matching formula is as follows: w 3 =W 2 -W 1 (ii) a Wherein, W 3 Is free weight, W 2 Is the vehicle weight, W 1 The weight of the building material goods. For example: and the vehicle A has the vehicle-mounted weight of 2 tons, the vehicle B has the vehicle-mounted weight of 1.5 tons, and the building material cargo has the weight of 1.3 tons, so that the vehicle B is determined to be the first cargo carrying vehicle.
204. The terminal generates building material transportation cost information according to the transportation unit price information and the building material order information of the first delivery vehicle;
205. the terminal generates first payment information according to the building material transportation cost information and the building material order information, so that a target user can pay the building material order cost and the building material order cost according to the first payment information;
steps 204 to 205 in this embodiment are similar to steps 104 to 105 in the embodiment of fig. 1, and are not described herein again.
206. The terminal judges whether the target user completes payment according to the first payment information within preset time;
in this embodiment, the terminal determines whether the target user completes payment according to the first payment information within a preset time, and if not, the terminal performs step 207; if yes, the terminal performs step 208.
207. If the target user does not finish payment according to the first payment information within the preset time, the terminal cancels the first goods picking vehicle matched according to the building material order information;
in this embodiment, if the target user does not complete payment according to the first payment information within the preset time, the terminal cancels the first delivery vehicle matched according to the building material order information. For example: the preset time is 60 minutes, and if the user does not complete payment according to the first payment information within 60 minutes, the terminal cancels the first goods picking vehicle matched according to the building material order information, so that the first goods picking vehicle can be matched with other building material order information again, and the resource waste of the goods picking vehicle is avoided.
208. If the target user is confirmed to complete payment according to the first payment information within the preset time, the terminal obtains a receiving address in the building material order information, so that the first delivery vehicle transports the building material order to the receiving address;
step 208 in this embodiment is similar to step 106 in the embodiment of fig. 1, and is not described herein again.
209. The terminal acquires goods picking address information in the building material order information;
in this embodiment, the terminal obtains the pickup address information in the building material order information, that is, obtains the address information of the building material manufacturer.
210. The method comprises the steps that a terminal obtains a vehicle moving image set of at least two driving routes between a goods picking address and a goods receiving address in a first preset time period;
in this embodiment, the terminal determines at least two driving routes between the delivery address and the receiving address, and obtains a vehicle moving image set of the at least two driving routes in a first preset time period. For example, the terminal determines three driving routes A, B and C between the goods picking address and the harvesting address, and acquires a vehicle flow image set of the three driving routes A, B and C in the last month.
211. The terminal inputs the vehicle flow image set into a target vehicle flow prediction model, and the target vehicle flow prediction model is a trained vehicle flow prediction model;
in the embodiment, the original neural network model of the vehicle flow prediction model is a VGG-16 convolutional neural network model, and the convolutional neural network model comprises a pooling layer, a convolutional layer, a full connection layer and a softmax layer; in softmax layer, loss is mainly compensated through target loss functionAnd calculating the loss value. Wherein the target loss function is:
Figure BDA0003918067620000121
S i is the loss value in the ith time period,
Figure BDA0003918067620000122
The vehicle density value in the ith time period,
Figure BDA0003918067620000123
The moving speed of the vehicle in the ith time period is within the range of [0,1 ] in the range of the compensation parameter]. And when the loss value is smaller than the preset threshold value, determining that the training of the vehicle flow prediction model is completed, so as to obtain a target vehicle flow prediction model capable of presetting the vehicle flow condition in a second preset time period.
212. The terminal outputs the predicted vehicle flow conditions of the at least two driving routes in a second preset time period on the basis of the vehicle flow image set through the target vehicle flow prediction model;
in this embodiment, the terminal outputs the predicted vehicle flow conditions of at least two driving routes within a second preset time period based on the vehicle flow image set through the trained target vehicle flow model, wherein the second preset time period is the preset departure time of the first delivery vehicle.
213. The terminal determines a target driving route according to the predicted vehicle flow condition, wherein the target driving route is the driving route with the least vehicle flow in a second preset time period, so that the first goods picking vehicle can drive from the goods picking address to the goods receiving address according to the target driving route;
in this embodiment, the terminal determines a target driving route based on the vehicle flow image set through the target vehicle flow prediction model, and the target driving route is the driving route in which the vehicle flows the least in the second preset time period, so that the first delivery vehicle drives from the delivery address to the delivery address according to the target driving route, and the transportation efficiency of the first delivery vehicle is improved.
214. If the delivery is not entrusted, the terminal acquires and records the vehicle information of the second delivery vehicle input by the target user, so that the target equipment of the target plant can release the second delivery vehicle to enter the target plant according to the vehicle information, and the second delivery vehicle can extract and transport the building material goods to a receiving address according to the building material order information;
215. the terminal generates second payment information according to the building material order information, so that the target user can pay the cost of the building material order according to the second payment information;
steps 241 to 215 in this embodiment are similar to steps 107 to 108 in the embodiment of fig. 1, and detailed description thereof is omitted here.
The above description is directed to a method for processing a building material order provided by the present application, and the following description is directed to an apparatus for processing a building material order provided by the present application:
referring to fig. 3, fig. 3 is a diagram illustrating an embodiment of a processing apparatus for a building material order according to the present application, the processing apparatus includes:
a first obtaining unit 301, configured to obtain building material order information and distribution mode information;
a first judgment unit 302 for judging whether the distribution method of the building material order is entrusted distribution according to the distribution method information;
a matching unit 303, configured to match the first delivery vehicle according to the building material order information if the delivery is consigned;
a first generating unit 304, configured to generate building material transportation cost information according to the transportation unit price information of the first delivery vehicle and the building material order information;
a second generating unit 305 configured to generate first payment information according to the building material transportation cost information and the building material order information, so that the target user pays the building material order fee and the building material transportation cost according to the first payment information;
a second obtaining unit 306, configured to obtain a receiving address in the building material order information if it is determined that the target user completes payment according to the first payment information, so that the first delivery vehicle transports the building material order to the receiving address;
a third obtaining unit 307, configured to obtain and record vehicle information of a second pickup vehicle input by a target user if the delivery is not consigned, so that a target device of a target plant releases the second pickup vehicle into the target plant according to the vehicle information, and the second pickup vehicle extracts and transports building material goods to a receiving address according to the building material order information;
a third generating unit 308, configured to generate second payment information according to the building material order information, so that the target user pays the building material order fee according to the second payment information.
In the system of this embodiment, the functions executed by each unit correspond to the steps in the method embodiment shown in fig. 1, and are not described herein again.
Referring to fig. 4, fig. 4 is a schematic view of another embodiment of a processing apparatus for a building material order according to the present application, the processing apparatus includes:
a first obtaining unit 401, configured to obtain building material order information and distribution mode information;
a first judging unit 402, configured to judge whether the distribution manner of the building material order is delivery entrusted according to the distribution manner information;
a matching unit 403, configured to match a first delivery vehicle according to the building material order information if the delivery is consignment delivery;
a first generating unit 404, configured to generate building material transportation cost information according to the transportation unit price information of the first delivery vehicle and the building material order information;
a second generating unit 405, configured to generate first payment information according to the building material transportation cost information and the building material order information, so that the target user pays the building material order cost and the building material transportation cost according to the first payment information;
a second obtaining unit 406, configured to obtain a receiving address in the building material order information if it is determined that the target user completes payment according to the first payment information, so that the first delivery vehicle transports the building material order to the receiving address;
a third obtaining unit 407, configured to obtain and record vehicle information of a second pickup vehicle input by a target user if the delivery is not consigned, so that a target device of a target plant releases the second pickup vehicle into the target plant according to the vehicle information, and the second pickup vehicle extracts and transports building material goods to a receiving address according to the building material order information;
a third generating unit 408, configured to generate second payment information according to the building material order information, so that the target user pays the building material order fee according to the second payment information.
Optionally, the matching unit 403 is specifically configured to:
acquiring the weight and the transportation distance of the building material goods in the building material order information;
screening a goods delivery vehicle with the vehicle-mounted weight larger than the weight of the building material goods;
determining a unit transportation price of the delivery vehicle;
determining the goods picking vehicle with the lowest transportation cost as a first goods picking vehicle through a transportation cost formula according to the transportation unit price;
the transportation cost formula is as follows:
M=W×S×P;
wherein M is the transportation cost, W is the weight of the building material goods, S is the transportation distance of the building material goods, and P is the transportation unit price of the goods-taking vehicle.
Optionally, the matching unit 403 is specifically configured to:
acquiring a pick-up address of a building material order and the weight of building material goods in the building material order information;
screening a goods picking vehicle with the vehicle-mounted weight larger than the building material goods weight;
acquiring a first longitude and a first latitude of the goods picking address, and acquiring a second longitude and a second latitude of the position of the goods picking vehicle;
determining a goods picking vehicle closest to the goods picking address as a first goods picking vehicle through a distance algorithm according to the first longitude, the first latitude, the second longitude and the second latitude;
the distance algorithm is as follows:
S=R×arcos[cosY 1 ×cosY 2 ×cos(X 1 -X 2 )+sinY 1 +sinY 2 ];
wherein X 1 Is a first longitude, Y 1 Is the first latitude, X 2 Is a second longitude, Y 2 Is the second latitude, R is the radius of the earth, S is the distance between the pick-up vehicle and the pick-up address.
Optionally, the matching unit 403 is specifically configured to:
acquiring the weight of building material goods in the building material order information;
screening a goods picking vehicle with the vehicle-mounted weight larger than the building material goods weight;
determining a goods picking vehicle with the minimum free weight as a first goods picking vehicle according to the weight of the building material goods and the vehicle-mounted weight through a vehicle loading capacity matching formula;
the vehicle load matching formula is as follows:
W 3 =W 2 -W 1
wherein, W 3 Is free weight, W 2 Is the vehicle weight, W 1 The weight of the building material goods.
Optionally, the processing apparatus further comprises:
a second determining unit 409, configured to determine whether the target user completes payment according to the first payment information within a preset time;
a canceling unit 410, configured to cancel the first delivery vehicle matched according to the building material order information if the target user does not complete payment according to the first payment information within the preset time;
the second obtaining unit 406 is specifically configured to:
and if the target user is confirmed to complete payment according to the first payment information within the preset time, acquiring a receiving address in the building material order information, so that the first delivery vehicle transports the building material order to the receiving address.
Optionally, the processing apparatus further comprises:
a fourth obtaining unit 411, configured to obtain a pickup address in the building material order information;
a fifth obtaining unit 412, configured to obtain a vehicle flow image set of at least two driving routes between the pickup address and the receiving address within a first preset time period;
an input unit 413, configured to input the set of vehicle flow images into a target vehicle flow prediction model, where the target vehicle flow prediction model is a trained vehicle flow prediction model;
an output unit 414, configured to output, by the target vehicle flow prediction model, predicted vehicle flow conditions of the at least two driving routes in a second preset time period based on the vehicle flow image set;
a determining unit 415, configured to determine a target driving route according to the predicted vehicle flow condition, where the target driving route is a driving route in which vehicles flow the least in the second preset time period, so that the first delivery vehicle travels from the delivery address to the delivery address according to the target driving route.
In the system of this embodiment, the functions executed by each unit correspond to the steps in the method embodiment shown in fig. 2, and detailed description thereof is omitted here.
Referring to fig. 5, fig. 5 is a view illustrating an embodiment of a processing apparatus for a building material order according to the present application, the processing apparatus includes:
a processor 501, a memory 502, an input/output unit 503, and a bus 504;
the processor 501 is connected with the memory 502, the input/output unit 503 and the bus 504;
the memory 502 stores a program, and the processor 501 calls the program to execute any one of the above methods for processing a building material order.
The present application also relates to a computer-readable storage medium having a program stored thereon, which, when run on a computer, causes the computer to perform a method of processing a building material order as described above.
It can be clearly understood by those skilled in the art that, for convenience and simplicity of description, the specific working processes of the above-described systems, apparatuses and units may refer to the corresponding processes in the foregoing method embodiments, and are not described herein again.
In the several embodiments provided in the present application, it should be understood that the disclosed system, apparatus and method may be implemented in other ways. For example, the above-described apparatus embodiments are merely illustrative, and for example, a division of a unit is merely a logical division, and an actual implementation may have another division, for example, a plurality of units or components may be combined or integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, devices or units, and may be in an electrical, mechanical or other form.
Units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, functional units in the embodiments of the present application may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit. The integrated unit may be implemented in the form of hardware, or may also be implemented in the form of a software functional unit.
The integrated unit, if implemented in the form of a software functional unit and sold or used as a separate product, may be stored in a computer readable storage medium. Based on such understanding, the technical solutions of the present application, which are essential or part of the technical solutions contributing to the prior art, or all or part of the technical solutions, may be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute all or part of the steps of the methods of the embodiments of the present application. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a read-only memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and the like.

Claims (10)

1. A method for processing a building material order, the method comprising:
obtaining building material order information and distribution mode information;
judging whether the distribution mode of the building material order is entrusted distribution according to the distribution mode information;
if the order is entrusted for delivery, matching a first goods picking vehicle according to the building material order information;
generating building material transportation cost information according to the transportation unit price information of the first delivery vehicle and the building material order information;
generating first payment information according to the building material transportation cost information and the building material order information, so that the target user can pay building material order cost and building material transportation cost according to the first payment information;
if the target user is confirmed to complete payment according to the first payment information, a receiving address in the building material order information is obtained, so that the first delivery vehicle transports the building material order to the receiving address;
if the order delivery is not consigned, vehicle information of a second goods delivery vehicle input by a target user is obtained and recorded, so that target equipment of a target plant can release the second goods delivery vehicle to enter the target plant according to the vehicle information, and the second goods delivery vehicle can extract and transport building material goods to a goods receiving address according to the building material order information;
and generating second payment information according to the building material order information so that the target user can pay the cost of the building material order according to the second payment information.
2. The process of claim 1, wherein said matching a first delivery vehicle based on building material order information comprises:
acquiring the weight and the transportation distance of the building material goods in the building material order information;
screening a goods delivery vehicle with the vehicle-mounted weight larger than the weight of the building material goods;
determining a unit transportation price of the delivery vehicle;
determining the goods picking vehicle with the lowest transportation cost as a first goods picking vehicle according to the transportation unit price through a transportation cost formula;
the transportation cost formula is as follows:
M=W×S×P;
wherein M is the transportation cost, W is the weight of the building material cargo, S is the transportation distance of the building material cargo, and P is the transportation unit price of the goods-taking vehicle.
3. The process of claim 1, wherein said matching a first delivery vehicle based on building material order information comprises:
acquiring a pick-up address of a building material order and the weight of building material goods in the building material order information;
screening a goods delivery vehicle with the vehicle-mounted weight larger than the weight of the building material goods;
acquiring a first longitude and a first latitude of the goods picking address, and acquiring a second longitude and a second latitude of the position of the goods picking vehicle;
determining a goods picking vehicle closest to the goods picking address as a first goods picking vehicle through a distance algorithm according to the first longitude, the first latitude, the second longitude and the second latitude;
the distance algorithm is as follows:
S=R×arcos[cosY 1 ×cosY 2 ×cos(X 1 -X 2 )+sinY 1 +sinY 2 ];
wherein, X 1 Is a first longitude, Y 1 Is the first latitude, X 2 Is a second longitude, Y 2 Is the second latitude, R is the radius of the earth, S is the distance between the pick-up vehicle and the pick-up address.
4. The process of claim 1, wherein said matching a first delivery vehicle based on building material order information comprises:
acquiring the weight of building material goods in the building material order information;
screening a goods delivery vehicle with the vehicle-mounted weight larger than the weight of the building material goods;
determining a goods picking vehicle with the minimum free weight as a first goods picking vehicle according to the weight of the building material goods and the vehicle-mounted weight through a vehicle loading capacity matching formula;
the vehicle load matching formula is as follows:
W 3 =W 2 -W 1
wherein, W 3 Is free weight, W 2 Is the vehicle weight, W 1 The weight of the building material goods.
5. The process of any one of claims 1 to 4, wherein after said generating first payment information from said shipping cost information and said building material order information, said process further comprises:
judging whether the target user completes payment according to the first payment information within preset time;
if the target user does not finish payment according to the first payment information within the preset time, canceling the first goods delivery vehicle matched according to the building material order information;
if it is determined that the target user completes payment according to the first payment information, acquiring a receiving address in the building material order information, so that the transportation of the building material order to the receiving address by the first delivery vehicle comprises:
and if the target user is confirmed to complete payment according to the first payment information within the preset time, acquiring a receiving address in the building material order information, so that the first delivery vehicle transports the building material order to the receiving address.
6. The process of any one of claims 1 to 4, wherein after said obtaining a shipping address in said building material order information to cause said first delivery vehicle to transport said building material order to said shipping address, said process further comprises:
acquiring a goods picking address in the building material order information;
acquiring a vehicle flow image set of at least two driving routes between the goods pick-up address and the goods receiving address in a first preset time period;
inputting the vehicle flow image set into a target vehicle flow prediction model, wherein the target vehicle flow prediction model is a trained vehicle flow prediction model;
outputting, by the target vehicle flow prediction model, predicted vehicle flow conditions of the at least two driving routes within a second preset time period based on the set of vehicle flow images;
and determining a target driving route according to the predicted vehicle flow condition, wherein the target driving route is the driving route with the least vehicle flow in the second preset time period, so that the first goods picking vehicle can drive from the goods picking address to the goods receiving address according to the target driving route.
7. A building material order processing apparatus, comprising:
the first acquisition unit is used for acquiring building material order information and distribution mode information;
the first judging unit is used for judging whether the distribution mode of the building material order is entrusted distribution according to the distribution mode information;
the matching unit is used for matching the first goods picking vehicle according to the building material order information if the entrusting delivery is carried out;
the first generation unit is used for generating building material transportation cost information according to the transportation unit price information of the first delivery vehicle and the building material order information;
the second generation unit is used for generating first payment information according to the building material transportation cost information and the building material order information so that the target user can pay the building material order cost and the building material transportation cost according to the first payment information;
the second obtaining unit is used for obtaining a receiving address in the building material order information if the target user is determined to finish payment according to the first payment information, so that the first goods picking vehicle transports the building material order to the receiving address;
the third obtaining unit is used for obtaining and recording the vehicle information of the second goods picking vehicle input by the target user if the delivery is not consigned, so that the target equipment of the target plant can release the second goods picking vehicle to enter the target plant according to the vehicle information, and the second goods picking vehicle can extract and transport the building material goods to a receiving address according to the building material order information;
and the third generating unit is used for generating second payment information according to the building material order information so that the target user can pay for the building material order according to the second payment information.
8. The processing apparatus according to claim 7, wherein the matching unit is specifically configured to:
acquiring the weight and the transportation distance of the building material goods in the building material order information;
screening a goods picking vehicle with the vehicle-mounted weight larger than the building material goods weight;
determining a unit transportation price of the delivery vehicle;
determining the goods picking vehicle with the lowest transportation cost as a first goods picking vehicle through a transportation cost formula according to the transportation unit price;
the transportation cost formula is as follows:
M=W×S×P;
wherein M is the transportation cost, W is the weight of the building material cargo, S is the transportation distance of the building material cargo, and P is the transportation unit price of the goods-taking vehicle.
9. A building material order processing apparatus, comprising:
the device comprises a processor, a memory, an input and output unit and a bus;
the processor is connected with the memory, the input and output unit and the bus;
the memory holds a program that the processor calls to perform the method of any one of claims 1 to 6.
10. A computer-readable storage medium having a program stored thereon, the program, when executed on a computer, performing the method of any one of claims 1 to 6.
CN202211352662.6A 2022-10-31 2022-10-31 Building material order processing method, processing device and computer storage medium Pending CN115760272A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211352662.6A CN115760272A (en) 2022-10-31 2022-10-31 Building material order processing method, processing device and computer storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211352662.6A CN115760272A (en) 2022-10-31 2022-10-31 Building material order processing method, processing device and computer storage medium

Publications (1)

Publication Number Publication Date
CN115760272A true CN115760272A (en) 2023-03-07

Family

ID=85354828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211352662.6A Pending CN115760272A (en) 2022-10-31 2022-10-31 Building material order processing method, processing device and computer storage medium

Country Status (1)

Country Link
CN (1) CN115760272A (en)

Similar Documents

Publication Publication Date Title
CN107871175B (en) Vehicle and goods matching order dispatching method and device
US11836806B2 (en) Insurance claim capitation and predictive payment modeling
WO2020191225A1 (en) Securitized and encrypted data for vehicle service concierge (sc) devices and systems that provide and predict improved operations and outcomes
US20230289413A1 (en) Automated authentication systems and methods including automated waste management system with automated weight ticket and authentication
KR102124529B1 (en) Platform system for trade brokerage of cars, method for trade brokerage of cars and computer program for the same
CN109740909A (en) A kind of part load intelligent goods dispatch method and system based on freight logistics platform
JP7341587B2 (en) Electronic device for managing unloading from a distribution warehouse and its control method
US20230351316A1 (en) Method and system for automated vehicle transportation
US20220335368A1 (en) Method for Evaluating a Freight Order by Means of a Freight Order Evaluation System, and Freight Order Evaluation System
CN110728506B (en) Transaction data processing method and device
CN112613765A (en) Order processing method, system and computer readable storage medium
CN115760272A (en) Building material order processing method, processing device and computer storage medium
KR102010786B1 (en) Apparatus and method for calculating shipping costs for car products and computer program for the same
CN114742503B (en) Intelligent logistics car sharing method and device based on deep learning
CN116128397A (en) Method, system and device for managing allocation of waybills
WO2022101863A1 (en) System and method for freight management
CN112053087A (en) Complaint work order processing method, device, equipment and storage medium
KR102486187B1 (en) Mediation System for Electronic Commerce of Construction and Building Materials Based on Multi Council
US20230054733A1 (en) Automobile trade brokerage platform system, automobile trade brokerage method, and computer program therefor
US20210383322A1 (en) Computerized applications for coordinating delivery data with mobile computing devices
KR102602099B1 (en) Method and system to manage shipping fees
US20230297953A1 (en) Devices, systems, and methods for freight logistics and asset management
CN110796417B (en) Goods source value determination method, device, equipment and storage medium
CN115953091A (en) Logistics vehicle intelligent scheduling method, device, equipment and storage medium
CN118037383A (en) Transaction system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination