CN115577930A - Digital quality supervision and management system - Google Patents

Digital quality supervision and management system Download PDF

Info

Publication number
CN115577930A
CN115577930A CN202211212083.1A CN202211212083A CN115577930A CN 115577930 A CN115577930 A CN 115577930A CN 202211212083 A CN202211212083 A CN 202211212083A CN 115577930 A CN115577930 A CN 115577930A
Authority
CN
China
Prior art keywords
project
module
information
personnel
mobile equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202211212083.1A
Other languages
Chinese (zh)
Inventor
钱钢
虞晗波
王凯翔
方君安
夏兰强
范年斌
虞舟东
李志良
张来栋
王乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Power Installation Co Of Zhejiang Qiming Power Group Co ltd
Supervision Branch Of Zhoushan Qiming Electric Power Design Institute Co ltd
Original Assignee
Power Installation Co Of Zhejiang Qiming Power Group Co ltd
Supervision Branch Of Zhoushan Qiming Electric Power Design Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Power Installation Co Of Zhejiang Qiming Power Group Co ltd, Supervision Branch Of Zhoushan Qiming Electric Power Design Institute Co ltd filed Critical Power Installation Co Of Zhejiang Qiming Power Group Co ltd
Priority to CN202211212083.1A priority Critical patent/CN115577930A/en
Publication of CN115577930A publication Critical patent/CN115577930A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a digital quality supervision and management system, comprising: the mobile terminal comprises a cloud management platform, a first mobile device terminal and a second mobile device terminal. The cloud management platform comprises: the user management module is used for configuring the identity information of the user, and the identity information comprises the project authority of the user; the flow creating module is used for creating a plurality of corresponding supervision flow templates according to different project categories; the system comprises a process establishing module, a monitoring process module and a monitoring process module, wherein the process establishing module is used for enabling project personnel to select a corresponding monitoring process template from a plurality of monitoring process templates according to the current project type so as to establish a new process, and the process module determines whether to respond to the establishing request of the project personnel according to the project authority corresponding to the project personnel; and the process operation module is used for operating a new process and receiving the information to be approved uploaded by the project personnel and the auditing opinions of the manager on the information to be approved. The digital quality supervision and management system provided by the invention enables project quality supervision and management work to be more intelligent and simpler.

Description

Digital quality supervision and management system
Technical Field
The invention belongs to the field of digital supervision and management, and particularly relates to a digital quality supervision and management system.
Background
With the continuous progress of science and technology, the automation degree of the current society is continuously improved, and the project quality management mode based on the traditional mode cannot keep up with the wave of the times. With the continuous application of devices and networks such as computers, electronic commerce, the internet and the like to enterprise management, enterprise management gradually enters a brand new concept of 'digital enterprises' through deep research on theories and applications of related problems such as enterprise informatization, digitization, e-digitization and the like.
Most of the existing project quality supervision and management adopt an offline mode, and the efficiency of the whole quality supervision and management process is low.
Disclosure of Invention
The invention provides a digital quality supervision and management system for solving the technical problems, which specifically adopts the following technical scheme:
a digital quality supervision management system, comprising:
a cloud management platform;
the first mobile equipment terminal is used for connecting project personnel to the cloud management platform and uploading the information to be approved to the cloud management platform;
the second mobile equipment terminal is used for the manager to connect to the cloud management platform and to verify the information to be verified uploaded by the project personnel;
the cloud management platform comprises:
the user management module is used for configuring the identity information of the user, the identity information comprises the project authority of the user, and the user management module is used for automatically setting the project authority of project personnel according to qualification information uploaded by the project personnel;
the process creation module is used for creating a plurality of corresponding supervision process templates according to different project categories;
the system comprises a process establishing module, a monitoring process module and a monitoring process module, wherein the process establishing module is used for enabling project personnel to select a corresponding monitoring process template from a plurality of monitoring process templates according to the current project type so as to establish a new process, and the process module determines whether to respond to the establishing request of the project personnel according to the project authority corresponding to the project personnel;
and the process operation module is used for operating a new process and receiving the information to be approved uploaded by the project personnel and the auditing opinions of the manager on the information to be approved.
Further, when the number of project sites is 1, a specific method for creating a new flow is:
after the project personnel arrive at the project site, the project personnel are connected to the cloud management platform through the first mobile device terminal, the corresponding monitoring flow template is selected through the flow establishing module, and the flow establishing module establishes a new flow marked with the position information after receiving the position information of the project site acquired by the first mobile device terminal.
Further, when the number of project sites is 2, a specific method for creating a new flow is:
after a project person arrives at a first project place, the project person is connected to a cloud management platform through a first mobile device end, a corresponding monitoring flow template is selected through a flow establishing module, the flow establishing module receives position information of the first project place acquired by the first mobile device end and establishes a prepared flow marked with the position information, after the project person arrives at a second project place, the project person is connected to the cloud management platform through the first mobile device end, a previously established prepared flow is selected through the flow establishing module, the flow establishing module receives position information of the second project place acquired by the first mobile device end, and the flow establishing module converts the previously established prepared flow into a new flow marked with the position information of the two project places according to the received position information of the second project place;
or the like, or, alternatively,
after a first project person arrives at a first project place, a first mobile device end operated by the first project person is connected to a cloud management platform, after a second project person arrives at a second project place, another first mobile device end operated by the second project person is connected to the cloud management platform, the first project person and the second project person establish matching connection between the two first mobile device ends operated by the first project person and the second project person, the first project person selects a corresponding monitoring process template through a process newly-built module, and the process newly-built module simultaneously receives position information of the first project place acquired by the first mobile device end of the first project person and position information of the second project place acquired by the first mobile device end of the second project person and then creates a new process simultaneously marked with the position information of the two project places.
Further, when the project personnel upload the information to be examined through the first mobile equipment terminal, the first mobile equipment terminal also acquires current position information and sends the information to the cloud management platform, the process operation module analyzes the position information when receiving the uploading request, judges whether the project personnel are in the project site, and receives the information to be examined uploaded by the project personnel when judging that the project personnel are in the project site.
Further, the cloud management platform further comprises:
the data storage module is used for storing data;
the data query module is used for a user to query data;
the safety area setting module is used for setting a safety area;
the data query module acquires the position information of the user when receiving a query request sent by the user, judges whether the user is in a safe area or not according to the position information, and responds to the query request of the user to acquire corresponding data from the data storage module when judging that the user is in the safe area.
Further, the cloud management platform further comprises:
and the authority application module is used for the project personnel to apply for the auxiliary security area, the project personnel sends an application request containing the auxiliary security area to the authority application module through the first mobile equipment terminal, and the project personnel can inquire data in the auxiliary security area after the corresponding manager approves the application request.
Further, the cloud management platform further comprises:
the risk word configuration module is used for configuring a primary risk word bank and a high-level risk word bank;
the risk word setting module is used for sending the set primary risk word bank and the set high-level risk word bank to the first mobile equipment end and the second mobile equipment end;
the first mobile equipment end is provided with a first monitoring and intercepting module, and the second mobile equipment end is provided with a second monitoring and intercepting module;
when the first mobile equipment terminal sends information outwards, the first monitor carries out monitoring interception according to the identity of an information receiver;
and when the second mobile equipment terminal sends information outwards, the second listener carries out monitoring interception according to the identity of the information receiver.
Further, when the first mobile equipment terminal sends information to the outside, if the information receiver is a project worker or a manager, risk judgment is not carried out, if the information receiver is an external worker, risk investigation is carried out on the information through a primary risk word bank, and if risk words exist, the information is intercepted and reported;
when the second mobile equipment terminal sends information outwards, if the information receiver is a manager, risk judgment is not carried out, if the information receiver is a project worker, risk investigation is carried out on the information through the high-level risk word bank, if risk words exist, the information is intercepted and reported, if the information receiver is an external worker, risk investigation is carried out on the information through the primary risk word bank, and if the risk words exist, the information is intercepted and reported.
Further, the method for the process creation module to create the supervision process template is as follows:
a first user obtains flow charts of all processes including a project category through a first mobile terminal and sends the flow charts to a cloud management platform;
the flow creation module identifies the flow diagram and automatically generates a corresponding supervisory flow template according to the flow diagram.
Further, the digital quality supervision and management system further comprises:
the third mobile equipment terminal is used for allowing the supervisor to connect to the cloud management platform to assist project personnel in uploading the information to be approved;
in a process link needing participation of a supervisor, a project worker and the supervisor establish matching connection between a first mobile equipment end and a third mobile equipment end operated by the project worker and the supervisor, when the project worker uploads information to be examined and approved through the first mobile equipment end, the first mobile equipment end simultaneously acquires current position information and sends the current position information to a cloud management platform, the third mobile equipment end simultaneously acquires the current position information and sends the current position information to the cloud management platform, a process operation module analyzes the two pieces of position information when receiving an uploading request, judges whether the project worker and the supervisor are in the same project site, and receives the information to be examined and approved uploaded by the project worker when the project worker and the supervisor are judged to be in the same project site.
The digital quality supervision and management system has the advantages that the digital quality supervision and management system is high in intelligentization, and the quality management and control efficiency is greatly improved.
The digital quality supervision and management system has the advantages that the authenticity and the effectiveness of the whole supervision process can be greatly guaranteed.
The digital quality supervision and management system has the advantages that confidential data can be prevented from being leaked, and the safety of the digital system is improved.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without inventive exercise.
Fig. 1 is a schematic diagram of a digital quality supervision management system of the present invention.
Detailed Description
Reference will now be made in detail to the embodiments of the present application, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the drawings are exemplary and intended to be used for explaining the present application and should not be construed as limiting the present application.
Fig. 1 shows a digital quality supervision management system according to the present application, which includes: the mobile terminal comprises a cloud management platform, a first mobile device terminal and a second mobile device terminal. The first mobile equipment terminal is used for the project personnel to connect to the cloud management platform and upload the information to be approved to the cloud management platform. And the second mobile equipment terminal is used for allowing the manager to connect to the cloud management platform and to check the information to be checked and approved uploaded by the project personnel. Here, the project personnel refers to personnel who perform project management on a project site, and send the relevant construction conditions of the project site as information to be audited to the cloud management platform according to the project nodes. And the manager mainly examines and approves the information to be examined and sent by the project personnel. The first mobile device end and the second mobile device end can be mobile phones, tablets or other intelligent mobile devices.
In the present application, a cloud management platform includes: the system comprises a user management module, a flow creation module and a flow operation module.
The user management module is used for configuring the identity information of the user. The identity information contains the project authority of the user in addition to the conventional name, position and role (project person or manager) of all users. Here, the user management module is used for automatically setting the project authority of the project personnel according to the qualification information uploaded by the project personnel. It will be appreciated that different project types require management by project personnel with corresponding qualifications.
The process creating module is used for creating a plurality of corresponding supervision process templates according to different project categories. The number of categories of items involved varies according to the kind of service. And different items may correspond to different processes. And establishing a corresponding supervision flow module for all involved projects in advance. Therefore, subsequently, project personnel can select the corresponding monitoring flow module according to the project in charge of the project personnel.
In the present application, in order to improve the efficiency of flow creation, an image recognition technique is used. The method for the flow creation module to create the supervision flow template comprises the following steps:
the first user obtains flow charts of all processes including one project category through the first mobile terminal and sends the flow charts to the cloud management platform. The flow creation module identifies the flow diagram and automatically generates a corresponding supervisory flow template according to the flow diagram. Specifically, the first user can take a paper flowchart by taking a picture, and the flowchart creation module can automatically identify the standard flowchart, so that a corresponding supervision flowchart template is generated inside. Thereby avoiding the need to manually set up the processes one by one.
The process creating module is used for enabling project personnel to select a corresponding monitoring process template from the multiple monitoring process templates according to the current project category so as to create a new process, and the process module determines whether to respond to a creating request of the project personnel according to the project authority corresponding to the project personnel. As mentioned previously, the categories of projects that can be managed by project personnel of different qualifications are different. When a project person attempts to create a new flow, the flow creation module verifies whether the project person qualifies to create the flow. And only when the project personnel has the authority corresponding to the creation of the flow, the flow new creation module creates a new flow according to the operation of the project personnel.
And the flow operation module is used for operating the new flow. On one hand, the method receives the information to be approved uploaded by the project personnel. On the other hand, the method also receives the auditing opinions of the managers on the information to be audited. Therefore, the process nodes are switched between project personnel and management personnel, and the whole process is operated.
The digital quality supervision and management system is mainly applied to quality monitoring of construction sites on project sites, and therefore, project personnel need to be ensured to be actually present when the project personnel transmit information to be examined and approved. In order to implement this supervision function, when a new flow is created, the new flow needs to be bound to a corresponding project site.
As a preferred embodiment, when the number of project sites is 1, the specific method for creating the new flow is:
after the project personnel arrive at the project site, the project personnel are connected to the cloud management platform through the first mobile equipment terminal, the corresponding monitoring process template is selected through the process creating module, and the process creating module receives the position information of the project site acquired by the first mobile equipment terminal and creates a new process marked with the position information.
As a preferred embodiment, when the number of project sites is 2, the specific method of creating the new flow is:
the method comprises the steps that after a project person arrives at a first project place, the project person is connected to a cloud management platform through a first mobile device end, a corresponding monitoring flow template is selected through a flow establishing module, the flow establishing module receives position information of the first project place acquired by the first mobile device end and establishes a prepared flow marked with the position information, after the project person arrives at a second project place, the project person is connected to the cloud management platform through the first mobile device end, the previously established prepared flow is selected through the flow establishing module, the flow establishing module receives position information of the second project place acquired by the first mobile device end, and the flow establishing module converts the previously established prepared flow into a new flow marked with the position information of the two project places according to the received position information of the second project place. Thus, the project personnel need to reach two project sites before the new process creation can be completed.
In order to improve the process creation efficiency, when the number of project sites is 2, the specific method for creating a new process may further be:
after a first project person arrives at a first project place, a first mobile device end operated by the first project person is connected to a cloud management platform, after a second project person arrives at a second project place, another first mobile device end operated by the second project person is connected to the cloud management platform, the first project person and the second project person establish matching connection between the two first mobile device ends operated by the first project person and the second project person, the first project person selects a corresponding monitoring process template through a process newly-built module, and the process newly-built module simultaneously receives position information of the first project place acquired by the first mobile device end of the first project person and position information of the second project place acquired by the first mobile device end of the second project person and then creates a new process simultaneously marked with the position information of the two project places. Therefore, project personnel can cooperate with another project personnel to finish the binding of a new process and two project sites only by actually arriving at one project site.
After the creation of the new process bound with the project site is finished, when subsequent project personnel upload information to be examined through a first mobile equipment terminal, the first mobile equipment terminal also acquires current position information and sends the current position information to a cloud management platform, a process operation module analyzes the position information when receiving an uploading request, judges whether the newly acquired position information is the same as the position of the project site bound with the process, judges whether the project personnel are in the project site, and receives the information to be examined uploaded by the project personnel when the project personnel are judged to be in the project site.
Therefore, by binding the supervision and management process with the site of the project which needs to be supervised and managed, the project personnel can be ensured to arrive at the project site for real data acquisition, such as videos, images and the like, when uploading the data to be checked subsequently. The condition that personnel are falsely present is avoided, and the effectiveness and the authenticity of project quality monitoring are improved.
As a preferred embodiment, the cloud management platform further comprises: the device comprises a data storage module, a data query module and a security region setting module.
The data storage module is used for storing data. The data query module is used for a user to query data. The safety zone setting module is used for setting a safety zone. The data query module acquires the position information of the user when receiving a query request sent by the user, judges whether the user is in a safe area or not according to the position information, and responds to the query request of the user to acquire corresponding data from the data storage module when judging that the user is in the safe area.
The digital platform is easy to leak confidential information because data is stored on the line. In the present application, in order to avoid such a situation, the location where the user inquires the information is limited, and is generally limited to the inside of a company. After the security zone is set, the user can query relevant information in the cloud management platform only in the security zone. Once the user leaves the safe area, no information query can be performed through the cloud management system.
As a preferred embodiment, the cloud management platform further comprises: and a permission application module.
The authority application module is used for project personnel to apply for the auxiliary security area, the project personnel sends an application request containing the auxiliary security area to the authority application module through the first mobile equipment terminal, and after a corresponding manager approves the application request, the project personnel can perform data query in the auxiliary security area.
It will be appreciated that in some special or emergency situations, the user may need to perform a query for relevant material in an unsecured area. At this time, the project personnel can send the area needing emergency login as an auxiliary safety area to the cloud management platform. After the communication confirmation is carried out with the corresponding manager, and the manager passes the application in the cloud platform, the project personnel can carry out data query work in the newly applied auxiliary safety area.
It is understood that the service life, such as 1 hour, or 1 day, is also set by the project personnel when the auxiliary security area application is made. Therefore, after the administrator passes the application in the cloud platform, the project personnel can perform data query work on the newly applied auxiliary security area within a preset time.
As a preferred embodiment, the cloud management platform further comprises: a risk word configuration module and a risk word setting module. The risk word configuration module is used for configuring a primary risk word bank and a high-level risk word bank. And the primary risk word bank contains more risk words than the risk words in the high-level risk word bank. And the risk word setting module is used for sending the set primary risk word bank and the set high-level risk word bank to the first mobile equipment terminal and the second mobile equipment terminal. The first mobile equipment end is provided with a first monitoring and intercepting module, and the second mobile equipment end is provided with a second monitoring and intercepting module. And when the first mobile equipment terminal sends information outwards, the first listener carries out monitoring interception according to the identity of the information receiver. And when the second mobile equipment terminal sends information outwards, the second listener carries out monitoring interception according to the identity of the information receiver.
Specifically, when the first mobile device terminal sends information to the outside, if the information receiver is a project person or a manager, risk judgment is not performed, if the information receiver is an external person, risk investigation is performed on the information through a primary risk word bank, and if a risk word exists, the information is intercepted and reported. When the second mobile equipment terminal sends information outwards, if the information receiver is a manager, risk judgment is not carried out, if the information receiver is a project person, risk investigation is carried out on the information through a high-level risk word bank, if risk words exist, the information is intercepted and reported, if the information receiver is an external person, risk investigation is carried out on the information through a primary risk word bank, and if the risk words exist, the information is intercepted and reported.
It will be appreciated that the manager acts as a management layer, with the information that it can reach being more confidential than the project personnel. Information is typically leaked from higher layers to lower layers, from inside to outside. In order to avoid such a situation, in the present application, information monitoring is not performed for information of a level order or information of a lower order or an upper order. And when the project personnel send information to external personnel through the first mobile equipment terminal, carrying out risk judgment on the information through the most perfect primary risk word bank. And if the information has the keywords in the primary risk word bank, determining that the information has risks. And when the manager sends information to the project personnel through the second mobile equipment terminal, the risk judgment is carried out on the information through the more key high-level risk word bank. And if the information has keywords in the high-level risk lexicon, determining that the information has risks. When the manager sends information to external personnel through the second mobile equipment terminal, risk judgment is carried out on the information through the more comprehensive primary risk word bank. And if the information has the keywords in the primary risk word bank, determining that the information has risks.
As a preferred embodiment, the digital quality supervision and management system further comprises: and a third mobile equipment terminal.
And the third mobile equipment terminal is used for allowing a supervisor to be connected to the cloud management platform to assist project personnel in uploading the information to be examined and approved. It can be understood that in some special occasions, the operation of the process not only needs project personnel and management personnel inside the company to participate, but also needs supervision personnel outside the company to participate in the quality supervision or acceptance of the project and other work.
In a process link needing participation of a supervisor, a project worker and the supervisor establish matching connection between a first mobile equipment end and a third mobile equipment end operated by the project worker and the supervisor, when the project worker uploads information to be examined and approved through the first mobile equipment end, the first mobile equipment end simultaneously acquires current position information and sends the current position information to a cloud management platform, the third mobile equipment end simultaneously acquires the current position information and sends the current position information to the cloud management platform, a process operation module analyzes the two pieces of position information when receiving an uploading request, judges whether the project worker and the supervisor are in the same project site, and receives the information to be examined and approved uploaded by the project worker when the project worker and the supervisor are in the same project site.
Therefore, the digital quality supervision and management system can ensure that corresponding personnel really arrive at the scene to carry out actual quality supervision and management under each node of the process, and ensures reliable and effective operation of projects and quality supervision effect.
The foregoing shows and describes the general principles, principal features and advantages of the invention. It should be understood by those skilled in the art that the above embodiments do not limit the present invention in any way, and all technical solutions obtained by using equivalent alternatives or equivalent variations fall within the scope of the present invention.

Claims (10)

1. A digital quality supervision and management system, comprising:
a cloud management platform;
the first mobile equipment terminal is used for connecting project personnel to the cloud management platform and uploading information to be approved to the cloud management platform;
the second mobile equipment terminal is used for the manager to connect to the cloud management platform and to verify the information to be verified uploaded by the project personnel;
the cloud management platform comprises:
the user management module is used for configuring the identity information of the user, the identity information comprises the project authority of the user, and the user management module is used for automatically setting the project authority of project personnel according to qualification information uploaded by the project personnel;
the process creation module is used for creating a plurality of corresponding supervision process templates according to different project categories;
the system comprises a process newly-built module, a monitoring process module and a process module, wherein the process newly-built module is used for a project worker to select a corresponding monitoring process template from a plurality of monitoring process templates according to the current project type so as to create a new process, and the process module determines whether to respond to a creation request of the project worker according to the project authority corresponding to the project worker;
and the process operation module is used for operating the new process and receiving the information to be examined and approved uploaded by the project personnel and the examination and approval opinions of the information to be examined and approved by the management personnel.
2. The digital quality supervision management system according to claim 1,
when the number of project sites is 1, the specific method for creating the new process is as follows:
after the project personnel arrive at the project site, the project personnel are connected to the cloud management platform through the first mobile equipment terminal, the corresponding monitoring process template is selected through the process establishing module, and the process establishing module establishes a new process marked with position information after receiving the position information of the project site acquired by the first mobile equipment terminal.
3. The digital quality supervision management system according to claim 2,
when the number of project sites is 2, the specific method for creating the new process is as follows:
after a project person arrives at a first project place, the project person is connected to the cloud management platform through the first mobile device end, the corresponding monitoring process template is selected through the process creating module, the process creating module receives the position information of the first project place acquired by the first mobile device end and creates a preparation process marked with the position information, after the project person arrives at a second project place, the project person is connected to the cloud management platform through the first mobile device end and selects the preparation process created before through the process creating module, the process creating module receives the position information of a second project place acquired by the first mobile device end, and the process creating module converts the preparation process created before into a new process marked with the position information of two project places according to the received position information of the second project place;
or the like, or, alternatively,
after a first project person arrives at a first project place, the first mobile device end operated by the first project person is connected to the cloud management platform, after a second project person arrives at a second project place, the other first mobile device end operated by the second project person is connected to the cloud management platform, the first project person and the second project person establish matching connection between the two first mobile device ends operated by the first project person and the second project person, the first project person selects the corresponding monitoring flow template through the flow creating module, and the flow creating module simultaneously receives position information of the first project place acquired by the first mobile device end of the first project person and position information of the second project place acquired by the first mobile device end of the second project person and then creates a new flow marked with the position information of the two project places.
4. The digital quality supervision management system according to claim 3,
when the project personnel upload the information to be examined and approved through the first mobile equipment terminal, the first mobile equipment terminal simultaneously acquires current position information and sends the current position information to the cloud management platform, the process operation module analyzes the position information when receiving an uploading request, judges whether the project personnel are in a project site, and receives the information to be examined and approved uploaded by the project personnel when judging that the project personnel are in the project site.
5. The digital quality supervision management system according to claim 1,
the cloud management platform further comprises:
the data storage module is used for storing data;
the data query module is used for a user to query data;
the safety area setting module is used for setting a safety area;
the data query module acquires the position information of the user when receiving a query request sent by the user, judges whether the user is in the safe area or not according to the position information, and responds to the query request of the user to acquire corresponding data from the data storage module when judging that the user is in the safe area.
6. The digital quality supervision management system according to claim 5,
the cloud management platform further comprises:
and the authority application module is used for project personnel to apply for an auxiliary security area, the project personnel sends an application request containing the auxiliary security area to the authority application module through the first mobile equipment terminal, and after a corresponding manager approves the application request, the project personnel can perform data query in the auxiliary security area.
7. The digital quality supervision management system according to claim 1,
the cloud management platform further comprises:
the risk word configuration module is used for configuring a primary risk word bank and a high-level risk word bank;
the risk word setting module is used for sending the set primary risk word bank and the set high-level risk word bank to the first mobile equipment terminal and the second mobile equipment terminal;
the first mobile equipment end is provided with a first monitoring and intercepting module, and the second mobile equipment end is provided with a second monitoring and intercepting module;
when the first mobile equipment terminal sends information to the outside, the first listener carries out monitoring interception according to the identity of an information receiver;
and when the second mobile equipment terminal sends information outwards, the second listener carries out monitoring interception according to the identity of the information receiver.
8. The digital quality supervision management system according to claim 7,
when the first mobile equipment terminal sends information outwards, if an information receiver is a project person or a manager, risk judgment is not carried out, if the information receiver is an external person, risk investigation is carried out on the information through the primary risk word bank, and if risk words exist, the information is intercepted and reported;
when the second mobile equipment terminal sends information outwards, if the information receiver is a manager, risk judgment is not carried out, if the information receiver is a project person, risk investigation is carried out on the information through the high-level risk word bank, if risk words exist, the information is intercepted and reported, if the information receiver is an external person, risk investigation is carried out on the information through the primary risk word bank, and if the risk words exist, the information is intercepted and reported.
9. The digital quality supervision management system according to claim 1,
the method for the process creation module to create the supervision process template comprises the following steps:
a first user obtains flow charts of all processes including a project category through the first mobile terminal and sends the flow charts to the cloud management platform;
the flow creation module identifies the flow graph and automatically generates the corresponding supervision flow template according to the flow graph.
10. The digital quality supervision management system according to claim 1,
the digital quality supervision and management system further comprises:
the third mobile equipment terminal is used for allowing a supervisor to connect to the cloud management platform to assist project personnel in uploading to-be-approved information;
in a process link needing participation of a supervisor, project personnel and the supervisor operate the first mobile equipment end and the third mobile equipment end to establish matching connection, when the project personnel upload information to be examined and approved through the first mobile equipment end, the first mobile equipment end simultaneously acquires current position information and sends the current position information to the cloud management platform, the third mobile equipment end simultaneously acquires the current position information and sends the current position information to the cloud management platform, the process operation module analyzes the two pieces of position information when receiving an uploading request, judges whether the project personnel and the supervisor are in the same project site, and receives the information to be examined and uploaded by the project personnel when judging that the project personnel and the supervisor are in the same project site.
CN202211212083.1A 2022-09-30 2022-09-30 Digital quality supervision and management system Withdrawn CN115577930A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211212083.1A CN115577930A (en) 2022-09-30 2022-09-30 Digital quality supervision and management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211212083.1A CN115577930A (en) 2022-09-30 2022-09-30 Digital quality supervision and management system

Publications (1)

Publication Number Publication Date
CN115577930A true CN115577930A (en) 2023-01-06

Family

ID=84582770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211212083.1A Withdrawn CN115577930A (en) 2022-09-30 2022-09-30 Digital quality supervision and management system

Country Status (1)

Country Link
CN (1) CN115577930A (en)

Similar Documents

Publication Publication Date Title
CN1988489B (en) Intelligent system and method for monitoring house
DE602005000704T2 (en) System for processing cryptographic keys for a wireless access point
CN104753887B (en) Security management and control implementation method, system and cloud desktop system
CN100492991C (en) Network element management method, system and network element
CN105976471B (en) A kind of access control equipment, caller management method and system
CN104247486A (en) Establishing connectivity between an enterprise security perimeter of a device and an enterprise
CN104869141A (en) Method for operating and controlling conference television terminal and device thereof
CN109413362A (en) A kind of call voice access video-meeting method and device
CN102137069A (en) Method and system for realizing application of internet of things
US10192262B2 (en) System for periodically updating backings for resource requests
CN101820630A (en) Method and equipment for remotely operating computer through wireless terminal
CN107944709A (en) A kind of training space Sharing Management system and method
CN106101054A (en) The single-point logging method of a kind of multisystem and centralized management system
CN108965297A (en) A kind of access control equipment management system
CN115001860B (en) Safety management system for paperless digital conference
CN108574696A (en) A kind of command dispatching system and working method based on GIS map
CN114090983A (en) Heterogeneous federated learning platform communication method and device
US10013237B2 (en) Automated approval
CN111784901A (en) Cloud access control system based on cloud computing and mobile internet and implementation method
CN108540573A (en) A kind of multimedia command dispatching system and working method based on human-computer interaction
CN109756469A (en) A kind of public account management method, device and computer readable storage medium
CN115577930A (en) Digital quality supervision and management system
KR101277507B1 (en) System for security smart phone
CN107437136A (en) The multi-party combination treatment method of hidden danger information and device
CN107113308A (en) Method for authenticating and access device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20230106