CN115375255A - Engineering cost data center management system and device - Google Patents

Engineering cost data center management system and device Download PDF

Info

Publication number
CN115375255A
CN115375255A CN202110545578.5A CN202110545578A CN115375255A CN 115375255 A CN115375255 A CN 115375255A CN 202110545578 A CN202110545578 A CN 202110545578A CN 115375255 A CN115375255 A CN 115375255A
Authority
CN
China
Prior art keywords
data
project
authority
database
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202110545578.5A
Other languages
Chinese (zh)
Inventor
赵海洋
陈璐
韩超
陈阳阳
吕飞
薛冰
刘丰鸣
周培培
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110545578.5A priority Critical patent/CN115375255A/en
Publication of CN115375255A publication Critical patent/CN115375255A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/64Protecting data integrity, e.g. using checksums, certificates or signatures

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Computer Security & Cryptography (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Quality & Reliability (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Economics (AREA)
  • Bioethics (AREA)
  • General Health & Medical Sciences (AREA)
  • Computer Hardware Design (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of engineering cost information management, in particular to an engineering cost data center management system. The invention has the advantages that: this application is at first recorded with inside all relevant equipment of company, give different authorities, the recordable nature of information inquiry and modification has been guaranteed, data safety has been promoted, this application encodes equipment according to the region, the data in the same region carry out backup storage many times, the safety of data has been guaranteed, the possibility that data was tampered is reduced, this application is with holistic data electronization and modularization, convenient inquiry and processing, and visual processing has been carried out with holistic drawing and condition, make anyone can both directly perceived clear understand data and understand the meaning of data.

Description

Engineering cost data center management system and device
Technical Field
The invention relates to the technical field of engineering cost information management, in particular to an engineering cost data center management system.
Background
At present, new technologies represented by mobile internet, internet of things, cloud computing and the like are widely applied to various industries in the society, production and living modes of people are continuously changed, and great progress of the society is promoted. The application of information technology is not free from large data, and whatever information is finally converted into a digital code and stored, and the data becomes a carrier for recording information.
At present, in the construction cost industry, each company has own data including calculation data and engineering project data, but now, a large number of calculation processes can be saved, the data are repeated due to non-intercommunication, and many data can be reused under the existing condition, but the data cannot be effectively utilized due to the imperfect data management, and under the existing system, the accuracy of the data cannot be guaranteed at many times, and the situation of artificial tampering exists, so that the difficulty is increased for subsequent auditing and related work.
Therefore, a management system capable of ensuring the accuracy and instantaneity of information is needed to help people manage corresponding data.
Disclosure of Invention
A project cost data center management system is provided,
the system comprises a database, a processing module and a permission system;
the database comprises a material database, a project database, a personnel database, a contract database and a fund database;
the processing module comprises a graphic processing module, a data pulling module, a timing updating module and a project analysis module;
the authority system comprises an administrator authority, a common authority and a temporary authority;
the database is used for storing data used and generated by construction cost;
the processing module is used for processing data generated in the construction cost and is responsible for acquiring the data from the outside for updating;
the authority system is used for protecting data security, and particularly encryption is performed by using a hardware serial number for identification and encryption.
Preferably, the material database acquires the future price, the on-site purchase price and the national instruction price of related raw materials, and performs weighted calculation on the basis of a plurality of prices, and the project database stores and acquires information related to projects, including project types, design drawings, final cost calculation results and total engineering construction materials; the personnel database comprises personnel data for internal arrangement of a company and labor service outsourcing data; the contract database comprises signing contracts and the existing contract information; the funds database includes a project funds budget, project funds movement data.
Preferably, the graphic processing module comprises CAD graphic processing, modeling graphic processing and vector graphic processing; the data pulling module comprises a national standard pulling module, a corresponding guide data pulling module and various public data pulling module; the timing updating module is responsible for updating data at regular time and backing up and updating the data; the project analysis module is used for analyzing projects, and distinguishing and classifying the projects according to different construction categories, different construction properties and different project properties.
Preferably, the administrator authority is an internal manager authority of a company, the common authority is an authority of each project financial accounting person, only editing authorities of the view and the project are provided, the temporary authority is a temporary open authority of an auditor, all data can be seen, but editing cannot be performed.
Preferably, the authority level of the authority system is computer code, specifically, a network card number and a hard disk number of a company financial staff computer, and the authority level is determined if the two correspond to each other.
Preferably, the graph processing module generates a construction drawing, obtains corresponding drawing information by taking BIM as a standard, determines construction amount and material amount, can determine a shooting position of a project picture according to EXIT information of the picture, processes and classifies the picture, observes and compares the CAD drawing with the modeling drawing, checks specific project amount, pulls prices of various official networks and public names by the data pulling module to ensure the accuracy of overall calculation, updates the picture from daily time by the timing updating module, stores and backs up data, classifies the project position and the project type by the project analysis module to ensure the clear logic of project classification. .
Preferably, the authorities are connected through the internet and are coded according to geographical positions.
A project cost data center management device can be a tablet computer and a mobile phone.
Preferably, the tablet computer and the mobile phone are connected through an ethernet, and the internal storage module is used for verifying and storing corresponding quotation data and project data.
Preferably, the authority of the mobile phone is determined as an IEM code.
The invention has the following advantages:
1. according to the method and the device, all relevant devices in a company are recorded, different authorities are given, the recordability of information inquiry and modification is guaranteed, and the data safety is improved.
2. According to the method and the device, the equipment is coded according to regions, and data in the same region are backed up and stored for multiple times, so that the safety of the data is ensured, and the possibility of tampering the data is reduced.
3. The method and the device have the advantages that the whole data is electronized and modularized, the query and the processing are convenient, the whole drawing and the condition are visually processed, and anyone can visually and clearly know the data and the meaning of the data.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a processing module according to the present invention;
FIG. 3 is a diagram of a database according to the present invention.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of protection of the invention is not limited to the following.
As shown in fig. 1, a construction cost data center management system,
the system comprises a database, a processing module and a permission system;
the database comprises a material database, a project database, a personnel database, a contract database and a fund database;
the processing module comprises a graphic processing module, a data pulling module, a timing updating module and a project analysis module;
the authority system comprises an administrator authority, a common authority and a temporary authority;
the database is used for storing data used and generated by construction cost;
the processing module is used for processing data generated in the construction cost and is responsible for acquiring the data from the outside for updating;
the authority system is used for protecting data security, and particularly encryption is carried out by identifying and encrypting through a hardware serial number.
The method comprises the steps that a material database obtains the future price, the on-site purchase price and the national instruction price of relevant raw materials, weighted calculation is carried out on the basis of a plurality of prices, and information relevant to projects, including project types, design drawings, final cost calculation results and total engineering construction materials, is stored and obtained by a project database; the personnel database comprises personnel data in the company and labor outsourcing data; the contract database comprises signing contracts and the existing contract information; the funds database includes a project funds budget, project funds movement data.
The graphic processing module comprises CAD graphic processing, modeling graphic processing and vector graphic processing; the data pulling module comprises a national standard pulling module, a corresponding guide data pulling module and various public data pulling module; the timing updating module is responsible for updating data at regular time and backing up and updating the data; the project analysis module is used for analyzing projects, and distinguishing and classifying the projects according to different construction categories, different construction properties and different project properties.
The administrator authority is the authority of management personnel inside the company, the common authority is the authority of financial accounting personnel of each project, only the editing authority of the project for viewing is provided, the temporary authority is the temporary open authority of the auditing personnel, all data can be seen, but editing cannot be carried out.
The authority level of the authority system is computer code, specifically network card number and hard disk number of company financial accounting personnel computer, and the authority level is determined if the two correspond to each other.
The image processing module is used for generating a construction drawing, obtaining corresponding drawing information by taking BIM as a standard, determining construction amount and material amount, determining the shooting position of a project picture according to EXIT information of the picture, processing and classifying the picture, observing and comparing the CAD drawing and the modeling drawing, checking specific project amount, pulling prices of various official networks and public prices by the data pulling module, ensuring the accuracy of overall calculation, updating the timing updating module from the time of each day, storing and backing up data, classifying the project analysis module from the position of the project and the type of the project, and ensuring clear logic of project classification. .
All the authorities are connected through the Internet and are coded according to the geographical position.
A project cost data center management device can be a tablet computer and a mobile phone.
The tablet personal computer and the mobile phone are connected through the Ethernet, and the internal storage module is used for verifying and storing corresponding quotation data and project data.
The authority of the mobile phone is determined as IEM code.
The first embodiment is as follows:
the construction cost information of a project of a dormitory building of a certain school is characterized in that the geographical position of a target object and the corresponding design drawing information are firstly determined, the information is matched with data stored in a database, wherein the information mainly comprises a building type, and the matching is carried out on the building position and the building floor height, and the priority is the building type, the building floor height and the building position;
after determining that the data matched with the dormitory building in the database is data, directly building an independent database for the dormitory building, storing and matching the internal data, copying and storing the data by a corresponding authority system, storing the data in the authority of an administrator, and simultaneously storing the data in batches because the corresponding authority is coded according to the geographical position, and randomly storing the data in a plurality of geographical positions, so that the safety of the information is determined to the maximum extent, the safety of the information is ensured, the tampering of the data is avoided, wherein the data is stored according to the geographical position coding range by taking provinces as a unit, and in the common authority, corresponding personnel only upload the authority and have no modification authority, and the integrity of the data is ensured;
matching the project drawing with an internal database to obtain project conditions including geographic positions, engineering quantities and the like, and generating a BIM (building information modeling) graph to facilitate checking and managing workload at any time;
the data capturing module regularly updates data every day, determines raw materials and artificial prices, and performs new calculation on data calculated by construction workers every day according to captured data after the construction workers produce construction cost data, so that the accuracy of information is ensured;
the corresponding authority code is determined according to the network card address of the machine and the hard disk code, if the network card address of the machine and the hard disk code are not matched, the corresponding database cannot be accessed, the corresponding initial authority is determined at the beginning of establishing the database, the authority possessed by the computer of the general company is quantitative, the authority cannot be changed after the determined number is determined, and the computer needs to be registered again even if the computer is damaged and changed, so that the information safety is ensured.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. A project cost data center management system is characterized in that:
the system comprises a database, a processing module and a permission system;
the database comprises a material database, a project database, a personnel database, a contract database and a fund database;
the processing module comprises a graphic processing module, a data pulling module, a timing updating module and a project analysis module;
the authority system comprises an administrator authority, a common authority and a temporary authority;
the database is used for storing data used and generated by construction cost;
the processing module is used for processing data generated in the engineering cost and is responsible for acquiring the data from the outside for updating;
the authority system is used for protecting data security, and particularly encryption is carried out by identifying and encrypting through a hardware serial number.
2. A construction cost data center management system according to claim 1, wherein: the material database acquires the future price, the on-site purchase price and the national instruction price of related raw materials, and performs weighted calculation on the basis of a plurality of prices, and the project database stores and acquires information related to projects, including project types, design drawings, final cost calculation results and total engineering construction materials; the personnel database comprises personnel data in the company and labor outsourcing data; the contract database comprises signing contracts and the existing contract information; the funds database includes a project funds budget, project funds movement data.
3. The project cost data center management system according to claim 1, wherein: the graphic processing module comprises CAD graphic processing, modeling graphic processing and vector graphic processing; the data pulling module comprises national standard pulling data, corresponding guide data and various public announcement data; the timing updating module is responsible for updating data at regular time and backing up and updating the data; the project analysis module is used for analyzing projects, and distinguishing and classifying the projects according to different construction categories, different construction properties and different project properties.
4. A construction cost data center management system according to claim 1, wherein: the administrator authority is the authority of an administrator inside a company, the common authority is the authority of each project financial accounting staff, only the editing authority of the project for viewing is possessed, the temporary authority is the temporary open authority of an auditor, all data can be seen, and editing cannot be carried out.
5. The project cost data center management system according to claim 4, wherein: the authority level of the authority system is computer code, specifically network card number and hard disk number of company financial accounting personnel computer, and the authority level is determined if the two correspond to each other.
6. A construction cost data center management system according to claim 3, wherein: the image processing module is used for generating a construction drawing, obtaining corresponding drawing information by taking BIM as a standard, determining construction amount and material amount, determining the shooting position of a project picture according to EXIT information of the picture, processing and classifying the picture, observing and comparing a CAD drawing and a modeling drawing, checking specific project amount, pulling prices of various official networks by the data pulling module, ensuring the accuracy of overall calculation, updating the timing updating module from the time of each day, storing and backing up data, classifying the project analysis module from the position of the project and the type of the project, and ensuring clear logic of project classification. .
7. The construction cost data center management device according to claim 4, wherein: and all the authorities are connected through the Internet and are coded according to the geographical position.
8. A project cost data center management device is characterized in that: the system comprises an input end and an output end, and can be a tablet personal computer and a mobile phone.
9. A construction cost data center management apparatus according to claim 8, wherein: the tablet personal computer and the mobile phone are connected through the Ethernet, and the internal storage module is used for verifying and storing corresponding quotation data and project data.
10. A construction cost data center management apparatus according to claim 8, wherein: and the authority of the mobile phone is determined as an IEM code.
CN202110545578.5A 2021-05-19 2021-05-19 Engineering cost data center management system and device Withdrawn CN115375255A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110545578.5A CN115375255A (en) 2021-05-19 2021-05-19 Engineering cost data center management system and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110545578.5A CN115375255A (en) 2021-05-19 2021-05-19 Engineering cost data center management system and device

Publications (1)

Publication Number Publication Date
CN115375255A true CN115375255A (en) 2022-11-22

Family

ID=84058676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110545578.5A Withdrawn CN115375255A (en) 2021-05-19 2021-05-19 Engineering cost data center management system and device

Country Status (1)

Country Link
CN (1) CN115375255A (en)

Similar Documents

Publication Publication Date Title
US20020077941A1 (en) Method and apparatus for documentation, analysis, auditing, accounting, protection, registration, and verification of trade secrets
CN108197779B (en) Building service management method
CN109993233B (en) Method and system for predicting data auditing objective based on machine learning
US20090076969A1 (en) System and method for deployment and financing of a security system
CN112069543B (en) Archive intelligent analysis management system based on big data
CN114443923A (en) Electronic archiving method and system for power grid operation and inspection project archives
CN113722301A (en) Big data processing method, device and system based on education information and storage medium
CN111597418B (en) Big data-based archive data storage system
CN107693997B (en) Fire fighting equipment detection and maintenance management system and management method
US20170243159A1 (en) Tracking Systems And Methods For Commodities
Boonpheng et al. Bringing blockchain technology to construction engineering management
CN114091944A (en) Cloud-end-coordinated distribution network engineering field operation analysis decision system
CN207070219U (en) Projects supervision system based on video monitoring
CN115375255A (en) Engineering cost data center management system and device
KR102469474B1 (en) Automatic construction daily report creation system using video input apparatus at the construction site
US20230176246A1 (en) System for immutability verifying, recording and storing digital representation of objects and events
CN115760018A (en) Intelligent construction site management method, device and system and computer readable storage medium
Park et al. Blockchain based concept model for construction quality management
CN117036062A (en) Accounting resource calculation method and device
CN114022114B (en) Data management system and method based on telecommunication industry
CN115730913A (en) Enterprise employee registration system and method
Singh et al. Conceptual Model of Quality Management Based on Blockchain in Construction Industry
CN113807797A (en) Underground engineering construction management and monitoring system integrated with BIM and intelligent algorithm
CN113139198B (en) Enterprise management information sharing system based on Internet
US20240070233A1 (en) System for verifying digital representation of objects and events

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20221122