CN115096319A - Method and device for determining initial orbit of satellite in star chain based on optical angle measurement data - Google Patents

Method and device for determining initial orbit of satellite in star chain based on optical angle measurement data Download PDF

Info

Publication number
CN115096319A
CN115096319A CN202211015616.7A CN202211015616A CN115096319A CN 115096319 A CN115096319 A CN 115096319A CN 202211015616 A CN202211015616 A CN 202211015616A CN 115096319 A CN115096319 A CN 115096319A
Authority
CN
China
Prior art keywords
satellite
orbit
position information
initial
target
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211015616.7A
Other languages
Chinese (zh)
Other versions
CN115096319B (en
Inventor
王宇翔
张雪萍
苏永恒
韦荻山
管占磊
姜文俊
佟雨
郭云肖
吴功友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aerospace Hongtu Information Technology Co Ltd
Original Assignee
Aerospace Hongtu Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aerospace Hongtu Information Technology Co Ltd filed Critical Aerospace Hongtu Information Technology Co Ltd
Priority to CN202211015616.7A priority Critical patent/CN115096319B/en
Publication of CN115096319A publication Critical patent/CN115096319A/en
Application granted granted Critical
Publication of CN115096319B publication Critical patent/CN115096319B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C21/00Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00
    • G01C21/24Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 specially adapted for cosmonautical navigation
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C1/00Measuring angles

Landscapes

  • Engineering & Computer Science (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Astronomy & Astrophysics (AREA)
  • Automation & Control Theory (AREA)
  • Navigation (AREA)

Abstract

The invention provides a method and a device for determining an initial orbit of a satellite in a star chain based on optical angle measurement data, which relate to the technical field of astronomical measurement and comprise the following steps: acquiring target data corresponding to a satellite chain satellite; determining the geocentric distance of the target track based on the optical angle measurement data at the initial moment, the position information of the measuring station and a preset observation distance rough value; constructing a standard satellite orbit of a satellite chain satellite and a preset orbit of the satellite chain satellite based on the earth-center distance and the target data, and calculating the position information of the satellite-to-satellite point of the standard satellite orbit and the position information of the satellite-to-satellite point of the preset orbit; correcting the standard satellite orbit based on the position information of the satellite points of the standard satellite orbit and the position information of the satellite points of the preset orbit to obtain a target standard satellite orbit; iterative optimization is carried out on the target standard satellite orbit based on the optical angle measurement data at the final moment to obtain the initial orbit of the satellite chain satellite, and the technical problem that the existing initial orbit determination method is low in precision and efficiency is solved.

Description

Method and device for determining initial orbit of satellite in star chain based on optical angle measurement data
Technical Field
The invention relates to the technical field of astronomical measurement, in particular to a method and a device for determining an initial orbit of a star-link satellite based on optical angle measurement data.
Background
The method is mainly used for determining the initial orbit of the azimuth pitching angle measurement data, the method for determining the initial orbit of the right ascension and declination data is relatively few, and the initial orbit determination precision is related to the observation time;
in the method for determining the initial orbit by using the optical data of the short arc segment of the low-orbit satellite (the orbit height is 200-600 kilometers) in practical application, the error ratio obtained by calculation is large, even the number of the orbits cannot be obtained, and the method for determining the initial orbit according to two points is the phoenix unicorn angle, and the result cannot be determined due to too little measured data.
In addition, no method for determining initial orbit specially aiming at optical data of a satellite in a star link exists at present.
The space exploration technology company plans to build a 'star chain' network consisting of about 1.2 ten thousand satellites in space between 2019 and 2024 to provide internet services, wherein 1584 satellites are deployed in a near-earth orbit 550 kilometers above the earth and start working from 2020.
No effective solution has been proposed to the above problems.
Disclosure of Invention
In view of this, the present invention aims to provide a method and an apparatus for determining an initial orbit of a satellite in a satellite chain based on optical goniometric data, so as to alleviate the technical problems of low accuracy and efficiency of the existing initial orbit determination method.
In a first aspect, an embodiment of the present invention provides a method for determining an initial orbit of a satellite in a satellite chain based on optical goniometric data, including: acquiring target data corresponding to a satellite chain satellite, wherein the target data comprises: optical angle measurement data at the initial moment, optical angle measurement data at the final moment and position information of the measuring station; determining the geocentric distance of the target track based on the optical angle measurement data at the initial moment, the position information of the measuring station and a preset observation distance rough value; constructing a standard satellite orbit and a preset orbit of the satellite chain satellite based on the earth-center distance and the target data, and calculating the position information of the off-satellite point of the standard satellite orbit and the position information of the off-satellite point of the preset orbit; correcting the standard satellite orbit based on the position information of the satellite points of the standard satellite orbit and the position information of the satellite points of the preset orbit to obtain a target standard satellite orbit; and performing iterative optimization on the target standard satellite orbit based on the optical angle measurement data at the final moment to obtain the initial orbit of the satellite-link satellite.
Further, the optical goniometric data includes: measuring time, right ascension and declination; the position information of the station comprises: longitude, latitude, and altitude.
Further, determining the geocentric distance of the target track based on the optical angle measurement data at the initial time, the position information of the measuring station and a preset observation distance rough value, includes: a first calculation step, calculating initial position information of the satellite chain satellite in a J2000 inertial coordinate system based on the coarse value of the preset observation distance and the right ascension and the declination at the initial moment; a first determination step of determining the position information of the measuring station in a ground-fixed coordinate system based on the position information of the measuring station at the initial moment, and converting the position information of the measuring station in the ground-fixed coordinate system into the position information of the measuring station in a J2000 inertial coordinate system; a second calculation step of calculating an initial earth-center distance of the target orbit based on the initial position information of the satellite-linked satellite in the J2000 inertial coordinate system and the position information of the survey station in the J2000 inertial coordinate system; if the initial earth-center distance is not in the preset range, adjusting the preset observation distance rough value, and repeatedly executing the first calculation step, the first determination step and the second calculation step until the initial earth-center distance is in the preset range, and determining the initial earth-center distance in the preset range as the earth-center distance of the target track.
Further, the orbit parameters of the standard satellite orbit include: the system comprises a semi-long axis, an inclination angle, an eccentricity, a rising intersection declination, an perigee argument, a mean perigee angle and a first initial epoch, wherein the semi-long axis is the geocentric distance of the target track, the inclination angle is 53 degrees, the eccentricity, the rising intersection declination, the perigee argument and the mean perigee angle are all 0, and the first initial epoch is an initial time; the position and speed of the preset track comprises the following steps: the position of the rover in a J2000 inertial coordinate system, the velocity of the satellite chain satellites at an initial time in the standard satellite orbit, and the first initial epoch.
Further, based on the position information of the satellite points in the standard satellite orbit and the position information of the satellite points in the preset orbit, the standard satellite orbit is corrected to obtain a target standard satellite orbit, which includes: a first correction step of calculating a first mean anomaly based on the position information of the satellite points of the standard satellite orbit at the initial time and the position information of the satellite points of the preset orbit at the initial time, and correcting the standard satellite orbit based on the first mean anomaly to obtain a first intermediate standard satellite orbit; and a second correction step of calculating a first rising intersection right ascension based on the longitude of the satellite chain at the initial time in the first intermediate standard satellite orbit and the longitude of the satellite chain at the initial time in the preset orbit, and correcting the first intermediate standard satellite orbit based on the first rising intersection right ascension to obtain the target standard satellite orbit.
Further, performing iterative optimization on the target standard satellite orbit based on the optical angle measurement data at the final time to obtain an initial orbit of the satellite-link satellite, including: a second determination step, determining the target right ascension and the target declination of the satellite chain at the last moment in the target standard satellite orbit; an executing step, if a difference value between the target right ascension and the target declination and the right ascension and the declination corresponding to the last moment in the optical goniometry data is greater than a threshold value, calculating a visibility distance of the target standard satellite orbit at the last moment, calculating position information and a sub-satellite point of the satellite chain satellite at the last moment based on the visibility distance, the target right ascension and the target declination, and adjusting a semi-major axis of the target standard satellite orbit based on the position information and the sub-satellite point of the satellite chain satellite at the last moment to obtain a final standard satellite orbit; a third correction step of calculating a second approximate point angle based on the position information of the satellite point of the final standard satellite orbit at the last moment and the position information of the satellite point of the preset orbit at the last moment, and correcting the final standard satellite orbit based on the second approximate point angle to obtain a second intermediate standard satellite orbit; a fourth correction step of calculating a second ascent point right ascent based on the longitude of the satellite chain at the last time in the second intermediate standard satellite orbit and the longitude of the satellite chain satellite at the initial time in the preset orbit, and correcting the second intermediate standard satellite orbit based on the first ascent point right ascent point to obtain a third intermediate standard satellite orbit; a third determination step of determining a final right ascension and a final declination of the satellite chain at an initial time in the third intermediate standard satellite orbit; if the difference between the final right ascension angle and the final declination corresponding to the initial time in the optical angle measurement data is greater than a threshold value, calculating a visibility distance of the third intermediate standard satellite orbit at the initial time, determining a target sub-satellite point based on the visibility distance of the initial time and the right ascension angle and the declination corresponding to the initial time, determining the third intermediate standard satellite orbit as the standard satellite orbit, determining the target sub-satellite point as the sub-satellite point of the preset orbit, and repeatedly executing the first correcting step, the second determining step, the executing step, the third correcting step, the fourth correcting step, and the third determining step until the difference between the final right ascension angle and the final declination corresponding to the initial time in the optical angle measurement data is less than or equal to the threshold value, and determining a third intermediate standard satellite orbit corresponding to the difference value between the final right ascension and the final declination corresponding to the final right ascension and the initial time in the optical angle measurement data, which is less than or equal to a threshold value, as the initial orbit of the satellite chain satellite.
In a second aspect, an embodiment of the present invention further provides a device for determining an initial orbit of a satellite in a satellite chain based on optical goniometric data, including: the satellite positioning system comprises an acquisition unit, a determination unit, a construction unit, a correction unit and an optimization unit, wherein the acquisition unit is used for acquiring target data corresponding to a satellite chain satellite, and the target data comprises: optical angle measurement data at the initial moment, optical angle measurement data at the final moment and position information of the measuring station; the determining unit is used for determining the earth center distance of the target track based on the optical angle measurement data at the initial moment, the position information of the measuring station and a preset observation distance rough value; the construction unit is used for constructing a standard satellite orbit and a preset orbit of the satellite chain satellite based on the geocentric distance and the target data, and calculating the position information of the off-satellite point of the standard satellite orbit and the position information of the off-satellite point of the preset orbit; the correction unit is used for correcting the standard satellite orbit based on the position information of the satellite points of the standard satellite orbit and the position information of the satellite points of the preset orbit to obtain a target standard satellite orbit; and the optimization unit is used for performing iterative optimization on the target standard satellite orbit based on the optical angle measurement data at the final moment to obtain the initial orbit of the satellite-link satellite.
Further, the optical goniometric data includes: measuring time, right ascension and declination; the position information of the station comprises: longitude, latitude, and altitude.
In a third aspect, an embodiment of the present invention further provides an electronic device, including a memory and a processor, where the memory is used to store a program that supports the processor to execute the method in the first aspect, and the processor is configured to execute the program stored in the memory.
In a fourth aspect, an embodiment of the present invention further provides a computer-readable storage medium, on which a computer program is stored.
In the embodiment of the present invention, target data corresponding to a satellite in a satellite chain is obtained, where the target data includes: optical angle measurement data at the initial moment, optical angle measurement data at the final moment and position information of the measuring station; determining the geocentric distance of the target track based on the optical angle measurement data at the initial moment, the position information of the measuring station and a preset observation distance rough value; constructing a standard satellite orbit and a preset orbit of the satellite chain satellite based on the earth-center distance and the target data, and calculating the position information of the off-satellite point of the standard satellite orbit and the position information of the off-satellite point of the preset orbit; correcting the standard satellite orbit based on the position information of the satellite points of the standard satellite orbit and the position information of the satellite points of the preset orbit to obtain a target standard satellite orbit; and performing iterative optimization on the target standard satellite orbit based on the optical angle measurement data at the final moment to obtain the initial orbit of the satellite chain satellite, so that the purpose of determining the initial orbit of the satellite chain satellite by using the optical angle measurement data is achieved, the technical problem that the existing initial orbit determination method is low in precision and efficiency is solved, and the technical effect of improving the precision and efficiency of determining the initial orbit of the satellite chain satellite is achieved.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. The objectives and other advantages of the invention will be realized and attained by the structure particularly pointed out in the written description and claims hereof as well as the appended drawings.
In order to make the aforementioned and other objects, features and advantages of the present invention comprehensible, preferred embodiments accompanied with figures are described in detail below.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
Fig. 1 is a flowchart of a method for determining an initial orbit of a satellite in a satellite chain based on optical goniometric data according to an embodiment of the present invention;
fig. 2 is a schematic diagram of an initial orbit determination device for a satellite in a satellite chain based on optical goniometric data according to an embodiment of the present invention;
fig. 3 is a schematic diagram of an electronic device according to an embodiment of the present invention.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings, and it is apparent that the described embodiments are some, but not all embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The first embodiment is as follows:
according to an embodiment of the present invention, there is provided an embodiment of a method for determining an initial orbit of a satellite in a satellite chain based on optical goniometric data, wherein the steps illustrated in the flowchart of the drawings may be performed in a computer system such as a set of computer executable instructions, and wherein although a logical order is illustrated in the flowchart, in some cases the steps illustrated or described may be performed in an order different than here.
Fig. 1 is a flowchart of a method for determining an initial orbit of a satellite in a satellite chain based on optical goniometric data according to an embodiment of the present invention, as shown in fig. 1, the method includes the following steps:
step S102, acquiring target data corresponding to a satellite chain satellite, wherein the target data comprises: optical angle measurement data at the initial moment, optical angle measurement data at the final moment and position information of the measuring station;
the optical goniometric data includes: measuring time, right ascension and declination; the position information of the measuring station comprises: longitude, latitude and altitude, where one measurement time corresponds to one right ascension and one declination.
Step S104, determining the earth center distance of the target track based on the optical angle measurement data at the initial moment, the position information of the measuring station and a preset observation distance rough value;
step S106, constructing a standard satellite orbit and a preset orbit of the satellite chain satellite based on the geocentric distance and the target data, and calculating the position information of the off-satellite point of the standard satellite orbit and the position information of the off-satellite point of the preset orbit;
step S108, based on the position information of the satellite points of the standard satellite orbit and the position information of the satellite points of the preset orbit, correcting the standard satellite orbit to obtain a target standard satellite orbit;
and S110, performing iterative optimization on the target standard satellite orbit based on the optical angle measurement data at the final moment to obtain the initial orbit of the satellite-link satellite.
In the embodiment of the present invention, target data corresponding to a satellite in a satellite chain is obtained, where the target data includes: optical angle measurement data at the initial moment, optical angle measurement data at the final moment and position information of the measuring station; determining the geocentric distance of the target track based on the optical angle measurement data at the initial moment, the position information of the measuring station and a preset observation distance rough value; constructing a standard satellite orbit and a preset orbit of the satellite chain satellite based on the earth-center distance and the target data, and calculating the position information of the off-satellite point of the standard satellite orbit and the position information of the off-satellite point of the preset orbit; correcting the standard satellite orbit based on the position information of the satellite points of the standard satellite orbit and the position information of the satellite points of the preset orbit to obtain a target standard satellite orbit; and performing iterative optimization on the target standard satellite orbit based on the optical angle measurement data at the final moment to obtain the initial orbit of the satellite link satellite, so that the purpose of determining the initial orbit of the satellite link satellite by using the optical angle measurement data is achieved, the technical problem that the existing initial orbit determination method is low in precision and efficiency is solved, and the technical effect of improving the precision and efficiency of determining the initial orbit of the satellite link satellite is achieved.
In the embodiment of the present invention, step S104 includes the following steps:
a first calculation step of calculating initial position information of the satellite chain satellite in a J2000 inertial coordinate system based on the coarse value of the preset observation distance and the right ascension and the declination at the initial moment;
a first determination step of determining the position information of the measuring station in a ground-fixed coordinate system based on the position information of the measuring station at the initial moment, and converting the position information of the measuring station in the ground-fixed coordinate system into the position information of the measuring station in a J2000 inertial coordinate system;
a second calculation step of calculating an initial earth center distance of the target orbit based on the initial position information of the satellite chain satellite in the J2000 inertial coordinate system and the position information of the survey station in the J2000 inertial coordinate system;
if the initial earth-center distance is not in the preset range, adjusting the preset observation distance rough value, and repeatedly executing the first calculation step, the first determination step and the second calculation step until the initial earth-center distance is in the preset range, and determining the initial earth-center distance in the preset range as the earth-center distance of the target track.
In the embodiment of the present invention, a coarse predicted observation distance value is first given, it should be noted that the observation distance is used to represent the distance between the observation station and the satellite in the satellite chain, and according to the coarse predicted observation distance value, the right ascension (α) and the declination (δ) at the initial time, the initial position information of the satellite in the J2000 inertial coordinate system is specifically calculated as follows:
Figure F_220727101931212_212923002
;
Figure F_220727101931309_309607003
then, based on the position information of the measuring station at the initial time, the position information of the measuring station in the earth-fixed coordinate system is determined, and the position information of the measuring station in the earth-fixed coordinate system is converted into the position information of the measuring station in the J2000 inertial coordinate system (
Figure F_220727101931372_372115004
)。
Then, based on the initial position information of the satellite chain satellites in the J2000 inertial coordinate system and the position information of the survey station in the J2000 inertial coordinate system, the initial earth center distance of the target orbit is calculated, wherein the initial earth center distance r =
Figure F_220727101931434_434641005
,(
Figure F_220727101931500_500525006
)=
Figure F_220727101931563_563019007
+ (
Figure F_220727101931625_625515008
)。
And finally, adjusting the preset observation distance rough value and repeatedly executing the first calculation step, the first determination step and the second calculation step until the initial earth center distance is within the preset range, and determining the initial earth center distance within the preset range as the earth center distance of the target track.
The upper limit of the preset range is the equator radius of the earth + the maximum orbit height, and the lower limit of the preset range is the equator radius of the earth-the minimum orbit height.
In the embodiment of the invention, after the earth-center distance of the survey station is acquired, the standard satellite orbit and the preset orbit are constructed according to the earth-center distance of the survey station and the target data.
Orbit parameters of standard satellite orbits include: the system comprises a semi-long axis, an inclination angle, an eccentricity, a rising intersection declination, an perigee argument, a mean perigee angle and a first initial epoch, wherein the semi-long axis is the geocentric distance of the target track, the inclination angle is 53 degrees, the eccentricity, the rising intersection declination, the perigee argument and the mean perigee angle are all 0, and the first initial epoch is the initial time.
The track parameters of the preset track comprise: the position of the rover in a J2000 inertial coordinate system, the velocity of the satellite chain satellites at an initial time in the standard satellite orbit, and the first initial epoch.
In the embodiment of the present invention, step S108 includes the following steps:
a first correction step of calculating a first flat proximal angle based on the position information of the satellite proximal point of the standard satellite orbit at the initial time and the position information of the satellite proximal point of the preset orbit at the initial time, and correcting the standard satellite orbit based on the first flat proximal angle to obtain a first intermediate standard satellite orbit;
and a second correction step of calculating a first ascent point right ascent base on the longitude of the satellite chain at the initial time in the first intermediate standard satellite orbit and the longitude of the satellite chain at the initial time in the preset orbit, and correcting the first intermediate standard satellite orbit based on the first ascent point right ascent base to obtain the target standard satellite orbit.
In an embodiment of the present invention, the standard satellite orbit and the preset orbit are first converted from the J2000 inertial system to the geostationary coordinate system, and then the positions of the quasi-satellite orbit and the preset orbit in the geostationary coordinate system are converted to the sub-satellite points (i.e., for latitude and longitude representation).
Then, according to the point under the satellite, the time of the latitude in the standard satellite orbit equal to the latitude of the preset orbit initial time is searched, the position of J2000 is calculated, the first mean anomaly is calculated by combining the position of the J2000 satellite chain satellite at the initial time, and the first intermediate standard satellite orbit is obtained by correcting the standard satellite orbit, wherein the calculation process of the first mean anomaly M1 is as follows:
because the original data is too short, the two-body prediction needs to be carried out on the standard satellite orbit to generate the J2000 position speed;
the standard satellite orbit J2000 position velocity is then reconverted to the interstellar point.
Then, searching the moment with the latitude same as the initial moment latitude of the preset orbit in the latitude and longitude report of the standard satellite orbit, and calculating the J2000 position speed of the standard orbit at the moment;
and calculating a mean-anomaly angle M according to the position speed.
Figure P_220727101933644_644089001
Wherein, the first and the second end of the pipe are connected with each other,
Figure F_220727101931690_690947009
j2000 position at the initial time for a standard satellite orbit;
Figure F_220727101931753_753466010
is the J2000 position of the standard satellite orbit at the same latitude as the latitude of the initial moment of the preset orbit.
After the first intermediate standard satellite orbit is obtained, a first rising intersection right ascension is calculated by using the longitude of the satellite of the initial time in the first intermediate standard satellite orbit and the longitude of the satellite of the initial time in the preset orbit, and the first intermediate standard satellite orbit is corrected based on the first rising intersection right ascension to obtain the target standard satellite orbit, wherein the first rising intersection right ascension rana = the longitude of the initial time of the preset orbit-the longitude of the initial time of the first intermediate standard satellite orbit.
The target standard satellite orbit is a satellite orbit obtained after the initial orbit determination of a satellite in a star chain is performed using the right ascension and the declination at the initial time in the optical goniometry data.
In the embodiment of the present invention, step S110 includes the following steps:
a second determination step of determining a target right ascension and a target declination of the satellite chain at the last moment in the target standard satellite orbit;
executing a step of calculating a visibility distance of the target standard satellite orbit at the last moment if a difference value between the target right ascension and the target declination corresponding to the last moment in the optical goniometry data and the right ascension and the declination corresponding to the last moment is greater than a threshold value, calculating position information and an under-satellite point of the satellite chain at the last moment based on the visibility distance and the target right ascension and the target declination, and adjusting a semi-major axis of the target standard satellite orbit based on the position information and the under-satellite point of the satellite chain at the last moment to obtain a final standard satellite orbit;
a third correction step of calculating a second approximate point angle based on the position information of the satellite point of the final standard satellite orbit at the last moment and the position information of the satellite point of the preset orbit at the last moment, and correcting the final standard satellite orbit based on the second approximate point angle to obtain a second intermediate standard satellite orbit;
a fourth correction step of calculating a second ascent point right ascent based on the longitude of the satellite chain at the last time in the second intermediate standard satellite orbit and the longitude of the satellite chain satellite at the initial time in the preset orbit, and correcting the second intermediate standard satellite orbit based on the first ascent point right ascent point to obtain a third intermediate standard satellite orbit;
a third determination step of determining a final right ascension and a final declination of the satellite chain at an initial time in the third intermediate standard satellite orbit;
if the difference between the final right ascension angle and the final declination corresponding to the initial time in the optical angle measurement data is greater than a threshold value, calculating a visibility distance of the third intermediate standard satellite orbit at the initial time, determining a target sub-satellite point based on the visibility distance of the initial time and the right ascension angle and the declination corresponding to the initial time, determining the third intermediate standard satellite orbit as the standard satellite orbit, determining the target sub-satellite point as the sub-satellite point of the preset orbit, and repeatedly executing the first correcting step, the second determining step, the executing step, the third correcting step, the fourth correcting step, and the third determining step until the difference between the final right ascension angle and the final declination corresponding to the initial time in the optical angle measurement data is less than or equal to the threshold value, and determining a third intermediate standard satellite orbit corresponding to the difference value between the final right ascension and the final declination corresponding to the final right ascension and the initial time in the optical angle measurement data, which is less than or equal to a threshold value, as the initial orbit of the satellite chain satellite.
In the embodiment of the invention, after the target standard satellite orbit is obtained, the orbit row of the target standard satellite orbit is forecasted, the target right ascension and the target declination at the last moment of the target standard satellite orbit are calculated, and are compared with the right ascension and the declination at the last moment in the optical angle measurement data, if the difference value between the target right ascension and the target declination corresponding to the right ascension and the last moment in the optical angle measurement data is less than or equal to the threshold value, the initial orbit determination of the satellite chain is finished, and the target standard satellite orbit is the initial orbit of the satellite chain.
It should be noted that the calculation process of the target right ascension and the target declination is as follows:
firstly, calculating the position of the measuring station at the last moment in a J2000 inertial coordinate system;
then, the J2000 position velocity (x, y, z; v) of the target standard satellite orbit relative to the survey station is calculated x ,v y ,v z ) = position of the target standard satellite orbit in the J2000 inertial frame at the last instant-position of the last instant station in the J2000 inertial frame;
calculating the target right ascension and the target declination:
Figure F_220727101931847_847206011
Figure F_220727101931959_959526012
(
Figure F_220727101932022_022022013
)。
if the difference value between the final right ascension and the final declination corresponding to the initial time in the optical angle measurement data is larger than a threshold value, performing iterative optimization on a target standard satellite orbit, wherein the specific process is as follows:
using a survey station to carry out two-body forecast on a satellite chain satellite, and calculating the visibility of a target standard satellite orbit to obtain the visibility distance of the last moment;
right ascension according to visibility distance and target
Figure F_220727101932086_086983014
Declination of target
Figure F_220727101932149_149448015
And calculating the subsatellite point (longitude and latitude) of the target standard satellite orbit at the last moment:
1) firstly, calculating the position of a target standard satellite orbit under J2000 inertial coordinates:
Figure F_220727101932211_211954016
;
Figure F_220727101932275_275392017
2) and calculating the position of the target standard satellite orbit relative to the J2000 inertial coordinate system of the survey station (
Figure F_220727101932338_338422018
) = position under track J2000 + station J2000 position;
3) converting the position of the target standard satellite orbit relative to the position in the J2000 inertial coordinate system of the observation station into the position in the earth-fixed coordinate system;
4) and (4) converting subsatellite points (longitude and latitude) according to the position in the earth-fixed coordinate system.
Calculating the position and semimajor axis process according to the right ascension and declination at the last moment in the optical measurement data:
and calculating the subsatellite point (longitude and latitude) by using the calculated visibility distance at the last moment and the right ascension and declination at the last moment in the optical angle measurement data.
1) Firstly, calculating the position of a target standard satellite orbit J2000 in an inertial coordinate system:
Figure F_220727101932432_432176019
;
Figure F_220727101932497_497598020
2) and then calculating the position of the target standard satellite orbit relative to the J2000 inertial coordinate system of the survey station (
Figure F_220727101932560_560096021
) = position of the target standard satellite orbit in the J2000 inertial frame + position of the survey station in the J2000 inertial frame;
3) converting the position of the target standard satellite orbit in the J2000 inertial coordinate system relative to the survey station into the position in the earth-fixed coordinate system;
4) and converting the position into a sub-satellite point (longitude and latitude) according to the position in the earth-fixed coordinate system.
Finally, calculating the adjusted semimajor axis, and adjusting the target standard satellite orbit to obtain the final standard satellite orbit;
Figure F_220727101932638_638235022
then, searching a point with the same latitude at the last moment in the final standard satellite orbit lower point and the latitude at the last moment in the optical angle measurement data, calculating a second ascent point right ascension, and correcting the final standard satellite orbit to obtain a second intermediate standard satellite orbit;
the adjusted second ascension point right ascension calculation process:
second rising point right ascension = first rising point right ascension + (last-minute longitude in optical goniometric data — last-minute longitude of target standard satellite orbit).
And calculating a second approximate point angle according to the position of the last moment of the second intermediate standard satellite orbit in the J2000 inertial coordinate system and the position of the last moment satellite chain satellite in the J2000 inertial coordinate system in the optical angle measurement data, and correcting the second intermediate standard satellite orbit to obtain a third intermediate standard satellite orbit.
Second approximate point angle M calculation process:
the method comprises the following steps: calculating the position included angle corresponding to the last moment of the track and the last moment of the original data, wherein cosM = < M0, M1>
Figure P_220727101933694_694389001
Wherein the content of the first and second substances,
Figure F_220727101932702_702179023
j2000 position at the last time instant for the second intermediate standard satellite orbit;
Figure F_220727101932780_780319024
is the J2000 position of the last right ascension and declination transition in the optical goniometric data.
The third intermediate standard satellite orbit is an initial orbit obtained by optimizing optical angle measurement data at the last moment.
And then, converting the third intermediate standard satellite orbit into the orbit number of the initial epoch, calculating the right ascension latitude, comparing the right ascension latitude with the right ascension latitude at the initial moment in the optical angle measurement data, judging whether the right ascension latitude is smaller than a threshold value, and if the right ascension latitude is smaller than the threshold value, determining that the initial orbit is finished, namely, the third intermediate standard satellite orbit is the initial orbit of the satellite chain satellite.
Specifically, a two-body orbit predictor is used for calculating the number of orbits of the three intermediate standard satellite orbits at the initial moment;
converting six numbers of the third middle standard satellite orbit at the initial moment into J2000 position velocity of the third middle standard satellite orbit, and calculating the position of the survey station in a J2000 inertial coordinate system;
calculating the position velocity in the J2000 relationship coordinate system of the third intermediate standard satellite orbit relative to the survey station = orbit J2000 position velocity-survey station J2000 position;
calculating the final right ascension and the final declination: finally, the product is processed
Figure F_220727101932842_842857025
(ii) a Finally, the product is processed
Figure F_220727101932907_907265026
(
Figure F_220727101932969_969790027
)。
If the distance is still larger than the preset distance, the third intermediate standard satellite orbit is set as the standard orbit again, the visibility of the third intermediate standard satellite orbit at the initial moment is calculated, a new visibility distance is generated, the down-star point of the target generated by the calculation of the right ascension and the declination at the initial moment in the optical angle measurement data is combined, and the target sub-satellite point is used as the sub-satellite point of the new preset orbit, the first correction step, the second determination step, the execution step, the third correction step, the fourth correction step and the third determination step are repeatedly executed until the difference value between the right ascension and the declination corresponding to the initial time in the final right ascension and the final declination and the optical angle measurement data is less than or equal to the threshold value, and determining a third intermediate standard satellite orbit corresponding to the difference value between the final right ascension and the final declination corresponding to the initial time in the optical angle measurement data and the right ascension and the declination smaller than or equal to a threshold value as the initial orbit of the satellite chain satellite.
Example two:
the embodiment of the invention also provides a device for determining the initial orbit of the satellite in the star chain based on the optical angle measurement data, which is used for executing the method for determining the initial orbit of the satellite in the star chain based on the optical angle measurement data provided by the embodiment of the invention, and the following is a specific introduction of the device provided by the embodiment of the invention.
As shown in fig. 2, fig. 2 is a schematic diagram of the above-mentioned device for determining an initial orbit of a satellite in a satellite chain based on optical goniometric data, and the device for determining an initial orbit of a satellite in a satellite chain based on optical goniometric data includes: an acquisition unit 10, a determination unit 20, a construction unit 30, a modification unit 40 and an optimization unit 50.
The acquiring unit is configured to acquire target data corresponding to a satellite-linked satellite, where the target data includes: optical angle measurement data at the initial moment, optical angle measurement data at the final moment and position information of the measuring station;
the determining unit is used for determining the earth center distance of the target track based on the optical angle measurement data at the initial moment, the position information of the measuring station and a preset observation distance rough value;
the construction unit is used for constructing a standard satellite orbit and a preset orbit of the satellite chain satellite based on the geocentric distance and the target data, and calculating the position information of the off-satellite point of the standard satellite orbit and the position information of the off-satellite point of the preset orbit;
the correction unit is used for correcting the standard satellite orbit based on the position information of the satellite points of the standard satellite orbit and the position information of the satellite points of the preset orbit to obtain a target standard satellite orbit;
and the optimization unit is used for performing iterative optimization on the target standard satellite orbit based on the optical angle measurement data at the final moment to obtain the initial orbit of the satellite-link satellite.
In the embodiment of the present invention, target data corresponding to a satellite in a satellite chain is obtained, where the target data includes: optical angle measurement data at the initial moment, optical angle measurement data at the final moment and position information of the measuring station; determining the geocentric distance of the target track based on the optical angle measurement data at the initial moment, the position information of the measuring station and a preset observation distance rough value; constructing a standard satellite orbit and a preset orbit of the satellite chain satellite based on the earth-center distance and the target data, and calculating the position information of the off-satellite point of the standard satellite orbit and the position information of the off-satellite point of the preset orbit; correcting the standard satellite orbit based on the position information of the satellite points of the standard satellite orbit and the position information of the satellite points of the preset orbit to obtain a target standard satellite orbit; and performing iterative optimization on the target standard satellite orbit based on the optical angle measurement data at the final moment to obtain the initial orbit of the satellite chain satellite, so that the purpose of determining the initial orbit of the satellite chain satellite by using the optical angle measurement data is achieved, the technical problem that the existing initial orbit determination method is low in precision and efficiency is solved, and the technical effect of improving the precision and efficiency of determining the initial orbit of the satellite chain satellite is achieved.
Preferably, the optical goniometric data includes: measuring time, right ascension and declination; the position information of the station comprises: longitude, latitude, and altitude.
Example three:
an embodiment of the present invention further provides an electronic device, including a memory and a processor, where the memory is used to store a program that supports the processor to execute the method described in the first embodiment, and the processor is configured to execute the program stored in the memory.
Referring to fig. 3, an embodiment of the present invention further provides an electronic device 100, including: a processor 60, a memory 61, a bus 62 and a communication interface 63, wherein the processor 60, the communication interface 63 and the memory 61 are connected through the bus 62; the processor 60 is arranged to execute executable modules, such as computer programs, stored in the memory 61.
The Memory 61 may include a high-speed Random Access Memory (RAM) and may also include a non-volatile Memory (non-volatile Memory), such as at least one disk Memory. The communication connection between the network element of the system and at least one other network element is realized through at least one communication interface 63 (which may be wired or wireless), and the internet, a wide area network, a local network, a metropolitan area network, and the like can be used.
The bus 62 may be an ISA bus, a PCI bus, an EISA bus, or the like. The bus may be divided into an address bus, a data bus, a control bus, etc. For ease of illustration, only one double-headed arrow is shown in FIG. 3, but this does not indicate only one bus or one type of bus.
The memory 61 is used for storing a program, the processor 60 executes the program after receiving an execution instruction, and the method executed by the apparatus defined by the flow process disclosed in any of the foregoing embodiments of the present invention may be applied to the processor 60, or implemented by the processor 60.
The processor 60 may be an integrated circuit chip having signal processing capabilities. In implementation, the steps of the above method may be performed by instructions in the form of hardware integrated logic circuits or software in the processor 60. The Processor 60 may be a general-purpose Processor, and includes a Central Processing Unit (CPU), a Network Processor (NP), and the like; the device can also be a Digital Signal Processor (DSP), an Application Specific Integrated Circuit (ASIC), a Field-Programmable Gate Array (FPGA), or other Programmable logic devices, discrete Gate or transistor logic devices, discrete hardware components. The various methods, steps and logic blocks disclosed in the embodiments of the present invention may be implemented or performed. A general purpose processor may be a microprocessor or the processor may be any conventional processor or the like. The steps of the method disclosed in connection with the embodiments of the present invention may be directly implemented by a hardware decoding processor, or implemented by a combination of hardware and software modules in the decoding processor. The software module may be located in ram, flash memory, rom, prom, or eprom, registers, etc. storage media as is well known in the art. The storage medium is located in a memory 61, and the processor 60 reads the information in the memory 61 and completes the steps of the method in combination with the hardware.
Example four:
the embodiment of the present invention further provides a computer-readable storage medium, where a computer program is stored on the computer-readable storage medium, and when the computer program is executed by a processor, the computer program performs the steps of the method in the first embodiment.
In addition, in the description of the embodiments of the present invention, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the several embodiments provided in the present application, it should be understood that the disclosed system, apparatus and method may be implemented in other ways. The above-described embodiments of the apparatus are merely illustrative, and for example, the division of the units is only one logical division, and there may be other divisions when actually implemented, and for example, a plurality of units or components may be combined or integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed coupling or direct coupling or communication connection between each other may be through some communication interfaces, indirect coupling or communication connection between devices or units, and may be in an electrical, mechanical or other form.
The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that the following descriptions are only illustrative and not restrictive, and that the scope of the present invention is not limited to the above embodiments: those skilled in the art can still make modifications or changes to the embodiments described in the foregoing embodiments, or make equivalent substitutions for some features, within the scope of the disclosure; such modifications, changes or substitutions do not depart from the spirit and scope of the embodiments of the present invention, and they should be construed as being included therein. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. A satellite chain satellite initial orbit determination method based on optical angle measurement data is characterized by comprising the following steps:
acquiring target data corresponding to a satellite chain satellite, wherein the target data comprises: optical angle measurement data at the initial moment, optical angle measurement data at the final moment and position information of the measuring station;
determining the geocentric distance of the target track based on the optical angle measurement data at the initial moment, the position information of the measuring station and a preset observation distance rough value;
constructing a standard satellite orbit and a preset orbit of the satellite chain satellite based on the earth-center distance and the target data, and calculating the position information of the off-satellite point of the standard satellite orbit and the position information of the off-satellite point of the preset orbit;
correcting the standard satellite orbit based on the position information of the satellite points of the standard satellite orbit and the position information of the satellite points of the preset orbit to obtain a target standard satellite orbit;
and performing iterative optimization on the target standard satellite orbit based on the optical angle measurement data at the final moment to obtain the initial orbit of the satellite chain satellite.
2. The method of claim 1,
the optical goniometric data includes: measuring time, right ascension and declination;
the position information of the station comprises: longitude, latitude, and altitude.
3. The method of claim 2, wherein determining the geocentric distance of the target track based on the optical angle measurement data at the initial time and a preset coarse observation distance value comprises:
a first calculation step of calculating initial position information of the satellite chain satellite in a J2000 inertial coordinate system based on the coarse value of the preset observation distance and the right ascension and the declination at the initial moment;
a first determination step of determining the position information of the survey station in a ground-fixed coordinate system based on the position information of the survey station at the initial time, and converting the position information of the survey station in the ground-fixed coordinate system into the position information of the survey station in a J2000 inertial coordinate system;
a second calculation step of calculating an initial earth center distance of the target orbit based on the initial position information of the satellite chain satellite in the J2000 inertial coordinate system and the position information of the survey station in the J2000 inertial coordinate system;
if the initial earth-center distance is not in the preset range, adjusting the preset observation distance rough value, and repeatedly executing the first calculation step, the first determination step and the second calculation step until the initial earth-center distance is in the preset range, and determining the initial earth-center distance in the preset range as the earth-center distance of the target track.
4. The method of claim 1,
the orbit parameters of the standard satellite orbit include: the system comprises a semi-long axis, an inclination angle, an eccentricity, a rising intersection declination, an perigee argument, a mean perigee angle and a first initial epoch, wherein the semi-long axis is the geocentric distance of the target track, the inclination angle is 53 degrees, the eccentricity, the rising intersection declination, the perigee argument and the mean perigee angle are all 0, and the first initial epoch is the initial time;
the position and speed of the preset track comprises the following steps: a position of the target orbit in a J2000 inertial coordinate system, a velocity of the satellite in the standard satellite orbit at an initial time, and the first initial epoch.
5. The method according to claim 4, wherein the correcting the standard satellite orbit based on the position information of the subsatellite point of the standard satellite orbit and the position information of the subsatellite point of the preset orbit to obtain a target standard satellite orbit comprises:
a first correction step of calculating a first mean anomaly based on the position information of the satellite points of the standard satellite orbit at the initial time and the position information of the satellite points of the preset orbit at the initial time, and correcting the standard satellite orbit based on the first mean anomaly to obtain a first intermediate standard satellite orbit;
and a second correction step of calculating a first ascent point right ascent base on the longitude of the satellite chain at the initial time in the first intermediate standard satellite orbit and the longitude of the satellite chain at the initial time in the preset orbit, and correcting the first intermediate standard satellite orbit based on the first ascent point right ascent base to obtain the target standard satellite orbit.
6. The method of claim 5, wherein iteratively optimizing the target standard satellite orbit based on the final time-of-day optical goniometric data to obtain an initial orbit of the satellite chain comprises:
a second determination step, determining the target right ascension and the target declination of the satellite chain at the last moment in the target standard satellite orbit;
an executing step, if a difference value between the target right ascension and the target declination and the right ascension and the declination corresponding to the last moment in the optical goniometry data is greater than a threshold value, calculating a visibility distance of the target standard satellite orbit at the last moment, calculating position information and a sub-satellite point of the satellite chain satellite at the last moment based on the visibility distance, the target right ascension and the target declination, and adjusting a semi-major axis of the target standard satellite orbit based on the position information and the sub-satellite point of the satellite chain satellite at the last moment to obtain a final standard satellite orbit;
a third correction step of calculating a second approximate point angle based on the position information of the satellite point of the final standard satellite orbit at the last moment and the position information of the satellite point of the preset orbit at the last moment, and correcting the final standard satellite orbit based on the second approximate point angle to obtain a second intermediate standard satellite orbit;
a fourth correction step of calculating a second ascent point right ascent base on the longitude of the satellite chain satellite at the last time in the second intermediate standard satellite orbit and the longitude of the satellite chain satellite at the initial time in the preset orbit, and correcting the second intermediate standard satellite orbit based on the first ascent point right ascent base to obtain a third intermediate standard satellite orbit;
a third determination step of determining a final right ascension and a final declination of the satellite chain at an initial time in the third intermediate standard satellite orbit;
if the difference between the final right ascension angle and the final declination corresponding to the initial time in the optical angle measurement data is greater than a threshold value, calculating a visibility distance of the third intermediate standard satellite orbit at the initial time, determining a target sub-satellite point based on the visibility distance of the initial time and the right ascension angle and the declination corresponding to the initial time, determining the third intermediate standard satellite orbit as the standard satellite orbit, determining the target sub-satellite point as the sub-satellite point of the preset orbit, and repeatedly executing the first correcting step, the second determining step, the executing step, the third correcting step, the fourth correcting step, and the third determining step until the difference between the final right ascension angle and the final declination corresponding to the initial time in the optical angle measurement data is less than or equal to the threshold value, and determining a third intermediate standard satellite orbit corresponding to the difference value between the final right ascension and the final declination corresponding to the final right ascension and the initial time in the optical angle measurement data, which is less than or equal to a threshold value, as the initial orbit of the satellite chain satellite.
7. An initial orbit determination device for a satellite in a satellite chain based on optical goniometric data, comprising: an acquisition unit, a determination unit, a construction unit, a modification unit and an optimization unit, wherein,
the acquiring unit is configured to acquire target data corresponding to a satellite-linked satellite, where the target data includes: optical angle measurement data at the initial moment, optical angle measurement data at the final moment and position information of the measuring station;
the determining unit is used for determining the earth center distance of the target track based on the optical angle measurement data at the initial moment, the position information of the measuring station and a preset observation distance rough value;
the construction unit is used for constructing a standard satellite orbit and a preset orbit of the satellite chain satellite based on the geocentric distance and the target data, and calculating the position information of the off-satellite point of the standard satellite orbit and the position information of the off-satellite point of the preset orbit;
the correction unit is used for correcting the standard satellite orbit based on the position information of the satellite points of the standard satellite orbit and the position information of the satellite points of the preset orbit to obtain a target standard satellite orbit;
and the optimization unit is used for performing iterative optimization on the target standard satellite orbit based on the optical angle measurement data at the final moment to obtain the initial orbit of the satellite-link satellite.
8. The apparatus of claim 7,
the optical goniometric data includes: measuring time, right ascension and declination;
the position information of the station comprises: longitude, latitude, and altitude.
9. An electronic device comprising a memory for storing a program that enables a processor to perform the method of any of claims 1 to 6 and a processor configured to execute the program stored in the memory.
10. A computer-readable storage medium, on which a computer program is stored, which, when being executed by a processor, carries out the steps of the method according to any one of the claims 1 to 6.
CN202211015616.7A 2022-08-24 2022-08-24 Method and device for determining initial orbit of satellite in star chain based on optical angle measurement data Active CN115096319B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211015616.7A CN115096319B (en) 2022-08-24 2022-08-24 Method and device for determining initial orbit of satellite in star chain based on optical angle measurement data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211015616.7A CN115096319B (en) 2022-08-24 2022-08-24 Method and device for determining initial orbit of satellite in star chain based on optical angle measurement data

Publications (2)

Publication Number Publication Date
CN115096319A true CN115096319A (en) 2022-09-23
CN115096319B CN115096319B (en) 2022-11-18

Family

ID=83301117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211015616.7A Active CN115096319B (en) 2022-08-24 2022-08-24 Method and device for determining initial orbit of satellite in star chain based on optical angle measurement data

Country Status (1)

Country Link
CN (1) CN115096319B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115326077A (en) * 2022-10-13 2022-11-11 中国西安卫星测控中心 Initial track determination method for short arc optical measurement suitable for small eccentricity track
CN116609813A (en) * 2023-05-17 2023-08-18 北京星网宇达科技股份有限公司 Satellite orbit position determining system, method, equipment and storage medium

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006036009A (en) * 2004-07-27 2006-02-09 National Institute Of Information & Communication Technology Position coordinate indicating method of geostationary satellite and coordinates indicating device using it
CN101738598A (en) * 2008-11-19 2010-06-16 中国科学院国家天文台 Method for performing real-time measurement on track and position of satellite or aircraft
US20130013199A1 (en) * 2011-07-06 2013-01-10 Zheng You Method for measuring precision of star sensor and system using the same
CN103453906A (en) * 2013-08-09 2013-12-18 清华大学 Prediction method for satellite orbit
CN103927289A (en) * 2014-04-23 2014-07-16 上海微小卫星工程中心 Method for determining preliminary orbit of low-orbit target satellite according to space-based satellite angle measurement data
BR102015018439A2 (en) * 2014-08-28 2016-03-01 Boeing Co method, and, tangible machine readable medium
CN108279426A (en) * 2018-01-24 2018-07-13 北京电子工程总体研究所 A kind of tracking telemetry and command station to sub-satellite point lateral range Analytic Calculation Method
CN108871348A (en) * 2018-05-08 2018-11-23 中国人民解放军国防科技大学 Low-orbit satellite autonomous orbit determination method using space-based visible light camera
CN110160516A (en) * 2019-05-06 2019-08-23 航天东方红卫星有限公司 It is a kind of based on the in-orbit localization method of the extraterrestrial target of angle measurement and ranging information high-precision
CN110595485A (en) * 2019-08-08 2019-12-20 上海航天电子有限公司 Low-orbit satellite long-term orbit forecasting method based on two-line root number
CN111551183A (en) * 2020-06-09 2020-08-18 中国人民解放军63921部队 GEO target multi-point preferred short arc orbit determination method based on space-based optical observation data
CN111578950A (en) * 2020-06-09 2020-08-25 中国人民解放军63921部队 Space-based optical monitoring-oriented GEO target autonomous arc segment association and orbit determination method
CN111998855A (en) * 2020-09-02 2020-11-27 中国科学院国家天文台长春人造卫星观测站 Geometric method and system for determining space target initial orbit through optical telescope common-view observation
CN112257343A (en) * 2020-10-22 2021-01-22 上海卫星工程研究所 High-precision ground track repetitive track optimization method and system
KR102214277B1 (en) * 2020-09-23 2021-02-10 한국 천문 연구원 A method for determining the trajectory of a geostationary satellite using an electro-optical system
CN112540367A (en) * 2020-12-02 2021-03-23 中国人民解放军空军预警学院 Space target radar orbit determination real-time identification method, equipment and storage medium
CN112800169A (en) * 2021-04-15 2021-05-14 航天宏图信息技术股份有限公司 Data matching method, device and equipment for synchronous belt satellite and storage medium
CN113310496A (en) * 2021-05-08 2021-08-27 北京航天飞行控制中心 Method and device for determining lunar-ground transfer orbit
US20210356275A1 (en) * 2020-05-13 2021-11-18 Korea Astronomy And Space Science Institute Method of satellite precise orbit determination using parallactic refraction scale factor estimation

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006036009A (en) * 2004-07-27 2006-02-09 National Institute Of Information & Communication Technology Position coordinate indicating method of geostationary satellite and coordinates indicating device using it
CN101738598A (en) * 2008-11-19 2010-06-16 中国科学院国家天文台 Method for performing real-time measurement on track and position of satellite or aircraft
US20130013199A1 (en) * 2011-07-06 2013-01-10 Zheng You Method for measuring precision of star sensor and system using the same
CN103453906A (en) * 2013-08-09 2013-12-18 清华大学 Prediction method for satellite orbit
CN103927289A (en) * 2014-04-23 2014-07-16 上海微小卫星工程中心 Method for determining preliminary orbit of low-orbit target satellite according to space-based satellite angle measurement data
BR102015018439A2 (en) * 2014-08-28 2016-03-01 Boeing Co method, and, tangible machine readable medium
CN108279426A (en) * 2018-01-24 2018-07-13 北京电子工程总体研究所 A kind of tracking telemetry and command station to sub-satellite point lateral range Analytic Calculation Method
CN108871348A (en) * 2018-05-08 2018-11-23 中国人民解放军国防科技大学 Low-orbit satellite autonomous orbit determination method using space-based visible light camera
CN110160516A (en) * 2019-05-06 2019-08-23 航天东方红卫星有限公司 It is a kind of based on the in-orbit localization method of the extraterrestrial target of angle measurement and ranging information high-precision
CN110595485A (en) * 2019-08-08 2019-12-20 上海航天电子有限公司 Low-orbit satellite long-term orbit forecasting method based on two-line root number
US20210356275A1 (en) * 2020-05-13 2021-11-18 Korea Astronomy And Space Science Institute Method of satellite precise orbit determination using parallactic refraction scale factor estimation
CN111551183A (en) * 2020-06-09 2020-08-18 中国人民解放军63921部队 GEO target multi-point preferred short arc orbit determination method based on space-based optical observation data
CN111578950A (en) * 2020-06-09 2020-08-25 中国人民解放军63921部队 Space-based optical monitoring-oriented GEO target autonomous arc segment association and orbit determination method
CN111998855A (en) * 2020-09-02 2020-11-27 中国科学院国家天文台长春人造卫星观测站 Geometric method and system for determining space target initial orbit through optical telescope common-view observation
KR102214277B1 (en) * 2020-09-23 2021-02-10 한국 천문 연구원 A method for determining the trajectory of a geostationary satellite using an electro-optical system
CN112257343A (en) * 2020-10-22 2021-01-22 上海卫星工程研究所 High-precision ground track repetitive track optimization method and system
CN112540367A (en) * 2020-12-02 2021-03-23 中国人民解放军空军预警学院 Space target radar orbit determination real-time identification method, equipment and storage medium
CN112800169A (en) * 2021-04-15 2021-05-14 航天宏图信息技术股份有限公司 Data matching method, device and equipment for synchronous belt satellite and storage medium
CN113310496A (en) * 2021-05-08 2021-08-27 北京航天飞行控制中心 Method and device for determining lunar-ground transfer orbit

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JIN CHOI 等: "Two-Site Optical Observation and Initial Orbit Determination for Geostationary Earth Orbit Satellites", 《JOURNAL OF ASTRONOMY & SPACE SCIENCES》 *
刘磊 等: "基于天基光学测角的高轨空间目标轨道确定", 《光学学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115326077A (en) * 2022-10-13 2022-11-11 中国西安卫星测控中心 Initial track determination method for short arc optical measurement suitable for small eccentricity track
CN116609813A (en) * 2023-05-17 2023-08-18 北京星网宇达科技股份有限公司 Satellite orbit position determining system, method, equipment and storage medium
CN116609813B (en) * 2023-05-17 2024-04-02 北京星网宇达科技股份有限公司 Satellite orbit position determining system, method, equipment and storage medium

Also Published As

Publication number Publication date
CN115096319B (en) 2022-11-18

Similar Documents

Publication Publication Date Title
CN115096319B (en) Method and device for determining initial orbit of satellite in star chain based on optical angle measurement data
Huffman et al. Integrated Multi-satellitE Retrievals for GPM (IMERG) technical documentation
US6023291A (en) Satellite camera attitude determination and image navigation by means of earth edge and landmark measurement
CN106871932B (en) Satellite-borne laser on-orbit pointing calibration method based on pyramid search terrain matching
CN111680354B (en) Method for calculating self-intersection point of orbit of near-earth regression orbit satellite subsatellite point and photographing point
EP0264756B1 (en) Position measuring method with satellite
CN110646820B (en) Quality inspection method, device, equipment and storage medium of RTK positioning data
US10859707B2 (en) Method for optimally adjusting give error bounds or for optimally computing the variances of residuals of IGP points of an ionospheric grid for correcting an SBAS system and SBAS system for implementing said method
Mulawa On-orbit geometric calibration of the OrbView-3 high resolution imaging satellite
US20170227654A1 (en) Method for predicting the orbit of a satellite and corresponding satellite signal receiver
CN111912430B (en) On-orbit geometric calibration method, device, equipment and medium for high-orbit optical satellite
CN111949922A (en) On-satellite rapid calculation method and system suitable for earth detection task multi-time window
CN112346086A (en) Efficient and rapid occultation forecasting method based on near space floating platform
CN111736188B (en) Satellite positioning method, device, electronic equipment and storage medium
CN114593736A (en) Geographical positioning method, positioning error analysis method and system of sweep type satellite
CN116996115B (en) Low-orbit satellite receiving time window calculation method, device and equipment
CN115616637A (en) Urban complex environment navigation positioning method based on three-dimensional grid multipath modeling
CN115327587A (en) Low-orbit satellite orbit error correction method and system based on GNSS positioning information
Jeong et al. A study of trajectory models for satellite image triangulation
KR101903753B1 (en) Apparatus for detecting tilt of antenna
Tonolo et al. Georeferencing of EROS-A1 high resolution images with rigorous and rational function model
Ashkenazi Models for controlling national and continental networks
CN114777730B (en) Method and device for calculating altitude of ground-based sun
Murzabekov et al. A Method for Correcting for Tilt Errors in a Plumb-Line Deviation Astrometer
CN111667533A (en) Method for obtaining strict imaging model parameters of satellite based on rational function model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant