CN114265380B - High-end equipment manufacturing robustness scheduling method and device based on VNS - Google Patents

High-end equipment manufacturing robustness scheduling method and device based on VNS Download PDF

Info

Publication number
CN114265380B
CN114265380B CN202210195558.4A CN202210195558A CN114265380B CN 114265380 B CN114265380 B CN 114265380B CN 202210195558 A CN202210195558 A CN 202210195558A CN 114265380 B CN114265380 B CN 114265380B
Authority
CN
China
Prior art keywords
workpieces
workpiece
batch
processing
workshop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210195558.4A
Other languages
Chinese (zh)
Other versions
CN114265380A (en
Inventor
陆少军
马崇轺
刘心报
郑锐
江涛
赵婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei University of Technology
Original Assignee
Hefei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei University of Technology filed Critical Hefei University of Technology
Priority to CN202210195558.4A priority Critical patent/CN114265380B/en
Publication of CN114265380A publication Critical patent/CN114265380A/en
Application granted granted Critical
Publication of CN114265380B publication Critical patent/CN114265380B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a VNS-based high-end equipment manufacturing robustness scheduling method and device, and relates to the technical field of high-end equipment manufacturing. The invention designs an intelligent optimization algorithm for improving variable neighborhood search aiming at the problem of dual-target hierarchical scheduling of complex products related to deterioration effect and uncertain processing time in the manufacture of high-end equipment.

Description

High-end equipment manufacturing robustness scheduling method and device based on VNS
Technical Field
The invention relates to the technical field of high-end equipment manufacturing, in particular to a VNS-based high-end equipment manufacturing robustness scheduling method and device.
Background
In a high-end device manufacturing process, a large number of intermediate products are produced at a certain stage, and it is difficult for one factory to meet these requirements, so that there are a plurality of factories to produce the desired intermediate products. Meanwhile, a manufacturer often considers a plurality of targets in the production process of a product, and then needs to design a production distribution plan to ensure that each factory can complete the plan within a specified time and each target is as optimal as possible.
The Variable Neighborhood Search algorithm (VNS) is a widely used meta-heuristic algorithm for solving such problems, and was first proposed by Mladenovi ć, n., & Hansen, P. (1997), which diversifies the Search direction by changing the Neighborhood structure, thereby enhancing the Search capability and optimizing the computational performance. The basic idea of the variable neighborhood search algorithm is a process of systematically changing a neighborhood structure set to expand a search range in a search process to obtain a local optimal solution, and then systematically changing the neighborhood structure set to expand the search range to find another local optimal solution based on the local optimal solution.
However, conventional VNS can only solve the single-target optimization problem, and the conventional VNS neighborhood structure is mainly random switching. Therefore, the search efficiency of the conventional VNS is relatively low, and an effective solution cannot be quickly provided for the considered multi-objective optimization problem.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a VNS-based high-end equipment manufacturing robustness scheduling method and device, and solves the problem that the existing scheduling method is poor in effect in practical application.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme:
in a first aspect, a VNS-based high-end equipment manufacturing robustness scheduling method is provided, where the method includes:
s1, acquiring workpiece information, workshop information, algorithm parameters and a neighborhood structure;
s2, randomly generating an initial distribution result containing the distribution relation between each workpiece and each workshop;
s3, determining the processing sequence and the batch of the workpieces of each workshop in the initial distribution result through a processing sequence and batch generation algorithm to obtain an initial dispatching scheme; wherein, the scheduling scheme comprises: the order and lot of work pieces for each plant;
s4, updating the initial scheduling scheme by using the maximum minimum completion probability as a target through a variable neighborhood search algorithm to obtain the current optimal scheduling scheme;
and S5, optimizing the current optimal dispatching scheme by using the processing sequence and batch improvement algorithm with the aim of minimizing the sum of the inventory costs of all workshops to obtain the optimal dispatching scheme.
Further, the workpiece information includes: number of workpieces, completion due time, basic machining time for each workpiece;
the workshop information includes: number of plants, batch capacity, degradation factor of processing, degradation factor of loading.
Further, the steps of the process sequence and lot generation algorithm include:
s31, distributing the data to the workshop
Figure DEST_PATH_IMAGE002
The workpieces are arranged in a non-decreasing sequence according to the average value of the basic processing time to obtain the processing sequence of the workpieces;
s32, if the distribution is performed in the workshop
Figure 20140DEST_PATH_IMAGE002
Number of workpieces
Figure DEST_PATH_IMAGE004
Less than batch capacitycThen all workpieces are placed in a first batch; otherwise, it will
Figure DEST_PATH_IMAGE006
Placing a workpiece in a first batch, and placing the remaining workpieces in a batch sizecSequentially distributing the raw materials in a plurality of batches to obtain a workshop
Figure 205919DEST_PATH_IMAGE002
The order and batch of processing of the workpieces;
and S33, repeatedly executing S31-S32 until the processing sequence and the batch corresponding to all the workshops are obtained.
Further, the obtaining formula of the minimum completion probability of the scheduling scheme is as follows:
Figure DEST_PATH_IMAGE008
Figure DEST_PATH_IMAGE010
Figure DEST_PATH_IMAGE012
Figure DEST_PATH_IMAGE014
wherein the content of the first and second substances,
Figure DEST_PATH_IMAGE016
indicating the result of the dispensing of the workpiece, whereinjResult of distribution of individual workpiecesv j The value of (d) indicates the assigned plant;
Figure DEST_PATH_IMAGE018
representing a minimum completion probability of the scheduling scheme;
Figure DEST_PATH_IMAGE020
representing a plant
Figure 176018DEST_PATH_IMAGE002
At the expiration date
Figure DEST_PATH_IMAGE022
A previous completion probability;
Figure DEST_PATH_IMAGE024
representing a standard normal distribution probability function;
Figure DEST_PATH_IMAGE026
and
Figure DEST_PATH_IMAGE028
respectively representing workshops during processing of workpieces in non-decreasing sequence of mean values of basic processing times
Figure 124775DEST_PATH_IMAGE002
Average of completion times andvariance;
Figure DEST_PATH_IMAGE030
presentation to plant
Figure 894148DEST_PATH_IMAGE002
To (1) arAn average value of basic processing times of the respective processed workpieces, which are subject to normal distribution;
Figure DEST_PATH_IMAGE032
a variance representing a base processing time that follows a normal distribution;
Figure DEST_PATH_IMAGE034
a deterioration coefficient indicating the processing of the workpiece;
Figure DEST_PATH_IMAGE036
a deterioration coefficient indicating a loading lot;
cindicating the batch capacity.
Further, the variable neighborhood searching algorithm includes:
s41, making the current iteration numbert=0, current neighborhood structurek=1;
S42, ordert=t+1, and initializing the current number of searchestime=0;
S43, ordertime=time+1 in the second placekSearching a new scheduling scheme by the variable neighborhood, and acquiring the minimum completion probability of the new scheduling scheme;
s44, if the minimum completion probability of the new scheduling scheme is less than the initial scheduling scheme, executing S45; otherwise, it ordersk=1, and the new scheduling scheme is taken as an initial scheduling scheme, and S46 is performed;
s45, orderk=k+1, if
Figure DEST_PATH_IMAGE038
Not greater than the number of neighbourhood structuresThen execution proceeds to S46; otherwise, it ordersk=1, then perform S46;
s46, iftimeIf the number of times of searching is larger than that of each iteration, S47 is executed; otherwise, go to S43;
s47, iftIf the number of iterations is larger than the maximum number of iterations, taking the initial scheduling scheme as the current optimal scheduling scheme, and acquiring the minimum completion probability of the initial scheduling scheme; otherwise, S42 is executed.
Further, the neighborhood structure includes:
the first neighborhood structure: randomly selecting a workpiece from the workshops with the lowest completion probability and randomly distributing the workpiece to other workshops;
the second neighborhood structure: exchanging a workpiece randomly selected from the workshop with the lowest finishing probability with a workpiece with a smaller average basic processing time randomly selected from other workshops;
the third neighborhood structure: randomly reverses a portion of the scheme encoding now.
Further, the processing order and batch improvement algorithm comprises:
s51, obtaining the maximum improved searching timesitimesInter-vehicle in current optimal scheduling scheme
Figure 241822DEST_PATH_IMAGE002
Is completed with probability of completion
Figure 133555DEST_PATH_IMAGE020
And inventory cost
Figure DEST_PATH_IMAGE040
Make the current number of improved searchesitime=0, acquisition plant
Figure 458357DEST_PATH_IMAGE002
The difference between the average values of the basic processing times of the respective adjacent workpieces in the processing order of (1) is obtained as a setD(ii) a Order tox=2,y=1, placing the first workpiece in the first virtual group;
Figure DEST_PATH_IMAGE042
Figure DEST_PATH_IMAGE044
wherein the content of the first and second substances,
Figure 215441DEST_PATH_IMAGE030
presentation to plant
Figure 761829DEST_PATH_IMAGE002
To (1) arAn average value of basic processing times of the respective processed workpieces, which are subject to normal distribution;
s52, if
Figure DEST_PATH_IMAGE046
Then will bexA workpiece is put inyA virtual group; otherwise, it will bexA workpiece is put iny+1 virtual groups, ordery=y+1;
Wherein:
Figure DEST_PATH_IMAGE048
Figure DEST_PATH_IMAGE050
Figure 886780DEST_PATH_IMAGE026
and
Figure 761195DEST_PATH_IMAGE028
respectively representing workshops during processing of workpieces in non-decreasing sequence of mean values of basic processing times
Figure 590480DEST_PATH_IMAGE002
Mean and variance of completion times;
Figure 866740DEST_PATH_IMAGE034
a deterioration coefficient indicating the processing of the workpiece;
Figure 241221DEST_PATH_IMAGE036
a deterioration coefficient indicating a loading lot;
s53, ifxSmaller than the workshop
Figure 602932DEST_PATH_IMAGE002
Number of workpieces
Figure 845695DEST_PATH_IMAGE004
Then, thenx=x+1 and return to S52; otherwise, jumping to S54;
s54, ifySmaller than the workshop
Figure 104025DEST_PATH_IMAGE002
Number of workpieces
Figure 774041DEST_PATH_IMAGE004
Randomly reversing the partial processing sequence of the workpieces in each virtual group, and then forming a new workshop workpiece processing sequence according to the sequence of the virtual groups,itime=itime+1, go to S55; otherwise, jumping to S58;
s55, if the distribution is to the workshop
Figure 623048DEST_PATH_IMAGE002
Number of workpieces
Figure 279289DEST_PATH_IMAGE004
Less than batch capacitycThen all workpieces are placed in a first batch; otherwise, it will
Figure 795721DEST_PATH_IMAGE006
Placing a workpiece in a first batch, and placing the remaining workpieces in a batch sizecSequentially distributing the raw materials in a plurality of batches to obtain an updated workshop
Figure 495692DEST_PATH_IMAGE002
The order and batch of processing of the workpieces;
s56 plant based on updating
Figure 97575DEST_PATH_IMAGE002
The processing order and the batch of the workpieces are obtained and updated
Figure 557506DEST_PATH_IMAGE002
Is/are as follows
Figure DEST_PATH_IMAGE052
Figure DEST_PATH_IMAGE054
Completion probability
Figure DEST_PATH_IMAGE056
And inventory cost
Figure DEST_PATH_IMAGE058
S57, if
Figure DEST_PATH_IMAGE060
And is
Figure DEST_PATH_IMAGE062
Then the updated workshop
Figure 505608DEST_PATH_IMAGE002
The processing sequence and the batch of the workpieces are used as the current optimal scheduling scheme; otherwise, jumping to S58;
s58, ifitimeitimesThen return to S54; otherwise, outputting the current optimal scheduling scheme.
Further, the plant
Figure 392793DEST_PATH_IMAGE002
Inventory cost of
Figure 950813DEST_PATH_IMAGE040
The calculation formula of (c) is:
Figure DEST_PATH_IMAGE064
Figure DEST_PATH_IMAGE066
Figure DEST_PATH_IMAGE068
wherein the content of the first and second substances,
Figure DEST_PATH_IMAGE070
indicating allocation in a plant
Figure 788670DEST_PATH_IMAGE002
First, therProcessing the workpiece;
Figure DEST_PATH_IMAGE072
representing workpieces
Figure 669907DEST_PATH_IMAGE070
(ii) inventory cost;
Figure DEST_PATH_IMAGE074
representing the inventory cost per unit time;
Figure 259151DEST_PATH_IMAGE026
indicating that the work is being machined in non-decreasing order of mean value of basic machining time
Figure 835626DEST_PATH_IMAGE002
An average of completion times;
Figure DEST_PATH_IMAGE076
representing workpieces
Figure 152207DEST_PATH_IMAGE070
Average of the actual completion times of (a);
Figure DEST_PATH_IMAGE078
representing workpieces
Figure 638683DEST_PATH_IMAGE070
Actual completion time of (d);
Figure DEST_PATH_IMAGE080
=1 denotes the secondiA workshopgA processed workpiece andg+1 workpieces not in the same batch, otherwise
Figure 916605DEST_PATH_IMAGE080
=0。
Further, the randomly reversing the partial processing order of the workpieces in each virtual group comprises:
step 1: initializationq=1;
Step 2: if it is firstqIf the number of the workpieces of each virtual group is 1, jumping to the step 4; otherwise, jumping to the step 3;
and step 3: randomly selecting a plurality of workpieces which are continuously machined from the virtual group, and reversing the machining sequence of the workpieces;
and 4, step 4: output the firstqOrder of processing of each virtual groupq=q+1;
And 5: and repeating the step 2 to the step 5 until all the virtual groups are traversed.
In a second aspect, a VNS-based high-end equipment manufacturing robustness scheduling apparatus is provided, the apparatus comprising:
the parameter acquisition module is used for acquiring workpiece information, workshop information, algorithm parameters and a neighborhood structure;
the initial distribution result generation module is used for randomly generating an initial distribution result containing the distribution relation between each workpiece and the workshop;
the initial dispatching scheme generation module is used for determining the processing sequence and the batch of the workpieces of each workshop in the initial distribution result through a processing sequence and batch generation algorithm to obtain an initial dispatching scheme; wherein, the scheduling scheme comprises: the order and lot of work pieces for each plant;
the current optimal scheduling scheme generating module is used for updating the initial scheduling scheme by using the maximized minimum completion probability as a target through a variable neighborhood search algorithm to obtain a current optimal scheduling scheme;
and the processing sequence and batch improvement module is used for optimizing the current optimal dispatching scheme by using a processing sequence and batch improvement algorithm with the aim of minimizing the sum of the inventory costs of all workshops as a target to obtain the optimal dispatching scheme.
In a third aspect, a computer readable storage medium storing a computer program for high-end equipment manufacturing scheduling, wherein the computer program causes a computer to perform the VNS-based high-end equipment manufacturing robust scheduling method described above.
In a fourth aspect, an electronic device is provided, comprising:
one or more processors;
a memory; and
one or more programs, wherein the one or more programs are stored in the memory and configured to be executed by the one or more processors, the programs comprising instructions for performing the VNS-based high-end equipment manufacturing robustness scheduling method described above.
(III) advantageous effects
The invention provides a VNS-based high-end equipment manufacturing robustness scheduling method and device. Compared with the prior art, the method has the following beneficial effects:
1) the invention designs an intelligent optimization algorithm for improving variable neighborhood search aiming at the problem of dual-target hierarchical scheduling of complex products related to deterioration effect and uncertain processing time in the manufacture of high-end equipment.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a flow chart of an embodiment of the present invention;
FIG. 2 is a schematic illustration of the allocation of workpieces and workshops, and workpiece processing sequencing and lot determination in accordance with an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention are clearly and completely described, and it is obvious that the described embodiments are a part of the embodiments of the present invention, but not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The embodiment of the application provides a high-end equipment manufacturing robustness scheduling method and device based on a VNS, and solves the problem that an existing scheduling method is poor in effect in practical application.
In order to solve the technical problems, the general idea of the embodiment of the application is as follows:
in the high-end equipment manufacturing process, since uncertainty is an inevitable factor in the actual high-end equipment production planning scheduling environment: the pre-established production plan may face multiple disturbances during the implementation process, and the system parameters may change in real time, so that an accurate value of the job processing time may not be obtained, and the job processing time may be randomly distributed within an interval. There is also a deteriorating effect in the manufacturing process, and the actual machining time of the workpiece is prolonged due to aging or temperature rise of machine parts.
In terms of research problems, the traditional scheduling algorithm is based on a specific production situation, and the existence of deterioration effect in production and processing is not always considered; meanwhile, due to the limitation and restriction of various conditions, in actual production, the processing time of the operation cannot obtain a determined value, but obeys a certain probability distribution, so the completion time of the production plan is also an uncertain value, and for a supply chain manager, the probability of completing production within a certain period is considered to be more practical than the completion time considered in the traditional scheduling algorithm; in actual production, some decisions of an enterprise are often not determined by one factor, and a traditional scheduling algorithm only considering a single target has large limitation, and a scheme which is not practical is likely to be generated in practical application. Meanwhile, in the actual manufacturing process of high-end equipment, the worsening effect of processing, uncertainty of processing time and comprehensive decision of a plurality of targets are often involved, and a traditional production scheduling method based on a certain situation may not be suitable or a scheme deviating from the actual requirement may be obtained because proper parameter values cannot be obtained.
In research methods, the NP-hard problem is generally solved by adopting a heuristic algorithm, wherein the variable neighborhood search algorithm is a meta-heuristic algorithm which is widely applied to solving the production scheduling problem. The variable neighborhood search is characterized in that a neighborhood structure formed by different actions is used for alternative search, and the concentration and the dispersion are well balanced. Meanwhile, the performance of the variable neighborhood search algorithm is also influenced by neighborhood definition and search strategies, more factors can be considered in a complex production situation, the neighborhood definition or the search strategies in the previous research are not applicable, or the algorithm needs to consume more time and cannot obtain a satisfactory solution in a limited time. Therefore, for the production scheduling of complex products, it is necessary to design a good neighborhood definition and search strategy.
Therefore, the invention aims to consider the problem of dual-target hierarchical scheduling of complex products of deterioration effect (the deterioration effect considered here is based on the starting time of a job, namely the actual processing time of the job is a function related to the starting time of the job) and uncertain processing time, and provides an intelligent algorithm combining a variable neighborhood search algorithm and a heuristic algorithm according to the mode characteristics of the production and processing of high-end equipment, so that a proper neighborhood is defined and three neighborhood structures are designed in a targeted manner, the algorithm can make a reasonable and satisfactory scheduling decision for each manufacturer in a short time or provide decision support for decision makers of enterprises, thereby improving the production efficiency of high-end equipment manufacturing systems, reducing the inventory cost and further improving the market competitive advantage.
In order to better understand the technical scheme, the technical scheme is described in detail in the following with reference to the attached drawings of the specification and specific embodiments.
One use scenario of the embodiment of the present invention is as follows:
in a product manufacturing process, the finishing due time is
Figure 590163DEST_PATH_IMAGE022
Need forNA different workpiece havingMA parallel workshop, in which each workpiece can be produced in one workshop in a continuous batch mode and the capacity of each batch isc(i.e., the maximum number of workpieces that can be processed in a batch), a loading time is required before beginning processing of each batch of workpieces, which results in a reduction in the number of workpieces that can be processed in a batchNThe processing time of each workpiece is uncertain (following a normal distribution).
In this embodiment:
Figure 54642DEST_PATH_IMAGE022
indicating a time-out due;
Mindicating the number of plants;
Figure 989100DEST_PATH_IMAGE004
is distributed to a workshop
Figure 903835DEST_PATH_IMAGE002
The number of workpieces;
Figure DEST_PATH_IMAGE082
to express the productjA workpiece; and products are in commonNA workpiece;
Figure DEST_PATH_IMAGE084
to represent
Figure 127006DEST_PATH_IMAGE082
The basic processing time of (a);
Figure 519810DEST_PATH_IMAGE070
indicating allocation in a plant
Figure 308775DEST_PATH_IMAGE002
First, therProcessing the workpiece;
Figure DEST_PATH_IMAGE086
representing workpieces
Figure 676302DEST_PATH_IMAGE070
A base machining time (referring to an actual machining time of the workpiece without considering other factors);
Figure 308141DEST_PATH_IMAGE030
presentation to plant
Figure 114423DEST_PATH_IMAGE002
To (1) arThe mean value of the basic machining time of the individual machined workpieces,
Figure 289052DEST_PATH_IMAGE032
the variance is represented as a constant, invariant.
Figure DEST_PATH_IMAGE088
Representing workpieces
Figure 561902DEST_PATH_IMAGE070
Actual processing time of (a);
Figure 678107DEST_PATH_IMAGE034
a deterioration coefficient indicating the processing of the workpiece;
Figure DEST_PATH_IMAGE090
representing workpieces
Figure 694604DEST_PATH_IMAGE070
The start processing time of (2);
Figure DEST_PATH_IMAGE092
representing work
Figure 379532DEST_PATH_IMAGE070
The actual completion time of.
Figure DEST_PATH_IMAGE094
Shown in the workshop
Figure 823283DEST_PATH_IMAGE002
To (1) akEach batch;
Figure DEST_PATH_IMAGE096
representing batches
Figure 226451DEST_PATH_IMAGE094
Actual loading time of (a);
Figure 374536DEST_PATH_IMAGE036
a deterioration coefficient indicating a loading lot;
Figure DEST_PATH_IMAGE098
representing batches
Figure 664703DEST_PATH_IMAGE094
The start time of (c);
Figure DEST_PATH_IMAGE100
representing a plant
Figure 794202DEST_PATH_IMAGE002
The actual processing time of (a);
Figure DEST_PATH_IMAGE102
and
Figure DEST_PATH_IMAGE104
respectively representing workshops during processing of workpieces in non-decreasing sequence of mean values of basic processing times
Figure 700978DEST_PATH_IMAGE002
Mean and variance of completion time.
Figure DEST_PATH_IMAGE012A
Figure DEST_PATH_IMAGE014A
Figure DEST_PATH_IMAGE106
=1 denotes the secondjThe workpieces are distributed atiWorkshop the firstrProcessing otherwise
Figure 842634DEST_PATH_IMAGE106
=0;
Figure 580783DEST_PATH_IMAGE080
=1 denotes the secondiA workshopgA processed workpiece andg+1 workpieces not in the same batch, otherwise
Figure 84445DEST_PATH_IMAGE080
=0;
Figure DEST_PATH_IMAGE108
Figure DEST_PATH_IMAGE110
Figure DEST_PATH_IMAGE112
Figure DEST_PATH_IMAGE114
Figure 482714DEST_PATH_IMAGE020
Representing a plant
Figure 972601DEST_PATH_IMAGE002
At the expiration date
Figure 955469DEST_PATH_IMAGE022
A previous completion probability;
Figure DEST_PATH_IMAGE010A
Figure DEST_PATH_IMAGE116
represents the total inventory cost;
Figure DEST_PATH_IMAGE118
representing workpieces
Figure 895612DEST_PATH_IMAGE070
(ii) inventory cost;
Figure 573718DEST_PATH_IMAGE074
representing the cost of inventory per unit time.
Example 1:
as shown in fig. 1, the present invention provides a VNS-based high-end equipment manufacturing robustness scheduling method, which is executed by a computer, and includes:
s1, acquiring workpiece information, workshop information, algorithm parameters and a neighborhood structure;
s2, randomly generating an initial distribution result containing the distribution relation between each workpiece and each workshop;
s3, determining the processing sequence and the batch of the workpieces of each workshop in the initial distribution result through a processing sequence and batch generation algorithm to obtain an initial dispatching scheme; wherein, the scheduling scheme comprises: the order and lot of work pieces for each plant;
s4, updating the initial scheduling scheme by a variable neighborhood search algorithm with the maximum and minimum completion probability as a target to obtain the current optimal scheduling scheme;
and S5, optimizing the current optimal dispatching scheme by using the processing sequence and batch improvement algorithm with the aim of minimizing the sum of the inventory costs of all workshops to obtain the optimal dispatching scheme.
The beneficial effect of this embodiment does:
1) the embodiment of the invention considers the deterioration effect of workpiece production and processing, uncertainty of workpiece processing time, double-target decision and other factors based on the actual production condition, can be suitable for the proposed complex scheduling problem, and has more practical significance and wider application range. Particularly in the case of manufacturing large-scale complex products, the scheme obtained by the invention has strong robustness, and can provide a reliable decision scheme for a decision maker in a short time.
The following describes the implementation process of the embodiment of the present invention in detail:
and S1, acquiring preset parameters such as workpiece information, workshop information, algorithm parameters, neighborhood structures and the like.
In particular, the method comprises the following steps of,
the acquired workpiece information includes: number of workpiecesNTime to completion
Figure 742663DEST_PATH_IMAGE022
The base machining time (following a normal distribution) for each workpiece is recorded
Figure 455404DEST_PATH_IMAGE084
The acquired workshop information comprises: number of plantsMCapacity of each batchcCoefficient of deterioration in working
Figure 300869DEST_PATH_IMAGE034
Coefficient of deterioration of loading
Figure 731850DEST_PATH_IMAGE036
The algorithm parameters include: relevant parameters of the variable neighborhood searching algorithm, such as maximum iteration times, neighborhood structure number and maximum searching times of each iteration; and parameters associated with the process sequence and lot improvement algorithm, e.g. maximum improvement search times
And S2, randomly generating an initial distribution result containing the distribution relation between each workpiece and the workshop.
Specifically, all workpieces are numbered, all workpieces are distributed to corresponding workshops in a coding mode, and an initial distribution result is randomly generated.
As shown in FIG. 2, assuming that the embodiment has 10 workpieces in total, the initial allocation result can be recorded as
Figure 563540DEST_PATH_IMAGE016
Here, theN=10, and
Figure DEST_PATH_IMAGE120
a value of (1) ~MRandom integer of (1) representsjThe respective work pieces are distributed to the corresponding workshops.
Thus, the workshop allocated to each workpiece can be obtained.
S3, determining the processing sequence and the batch of the workpieces of each workshop in the initial distribution result through a processing sequence and batch generation algorithm to obtain an initial dispatching scheme; wherein, the scheduling scheme comprises: the order and lot of work pieces for each plant.
Optionally, the processing order and batch generation algorithm of this embodiment may adopt the following steps:
s31, distributing the data to the workshop
Figure 537312DEST_PATH_IMAGE002
The workpieces are arranged in a non-decreasing sequence according to the average value of the basic processing time to obtain the processing sequence of the workpieces;
s32, if the distribution is performed in the workshop
Figure 822188DEST_PATH_IMAGE002
Number of workpieces
Figure 474886DEST_PATH_IMAGE004
Less than batch capacitycThen all the workpieces are put in the first batch, namely the workshop has only one batch at the moment; otherwise, the workpiece needs to be further divided into batches, and therefore, the workpiece needs to be divided into batches
Figure 985633DEST_PATH_IMAGE006
Placing a workpiece in a first batch, and placing the remaining workpieces in a batch sizecSequentially distributing the raw materials in a plurality of batches to obtain a workshop
Figure 672966DEST_PATH_IMAGE002
The order and batch of processing of the workpieces;
and S33, repeatedly executing S31-S32 until the processing sequence and the batch corresponding to all workshops are obtained.
As shown in fig. 2, in a workshop
Figure DEST_PATH_IMAGE122
And batch capacitycFor example, =3, the workpieces assigned to the workshop are No. 3, 5, 6, and 10, and 4 workpieces in total are 6, 3, 5, and 10 after being arranged in non-decreasing order according to the average value of the basic processing time, so that No. 6 workpieces need to be placed in the first lot, and No. 3, 5, and 10 workpieces need to be placed in the second lot, and thus the workshop is configured to have No. 6 workpieces placed therein
Figure DEST_PATH_IMAGE124
The number of lots of workpieces of (1) is 2, and the processing is performed in the order of generating the lots, and the processing order of the workpieces in each lot is processed in descending order of the average value of the basic processing time, that is, in No. 6, 3, 5, 10.
Compared with other processing sequences and batch generation algorithms, the steps have the advantages that: the average value of the workshop completion time processed according to the scheme is the smallest of all the sequencing and batch sequencing, so that the workshop processed according to the processing scheme can maximize the completion probability after determining that the workpiece is distributed to the workshop before the completion due date.
S4, updating the initial scheduling scheme by a variable neighborhood search algorithm with the maximum and minimum completion probability as a target to obtain the current optimal scheduling scheme.
Optionally, the variable neighborhood search algorithm of this embodiment may adopt the following steps:
s41, making the current iteration numbert=0, current neighborhood structurek=1;
S42, ordert=t+1, and initializing the current number of searchestime=0;
S43, ordertime=time+1 in the second placekSearching a new scheduling scheme by the variable neighborhood, and acquiring the minimum completion probability of the new scheduling scheme;
s44, if the minimum completion probability of the new scheduling scheme is smaller than the initial scheduling scheme, executing S45; otherwise, it ordersk=1, and the new scheduling scheme is taken as an initial scheduling scheme, and S46 is performed;
s45, orderk=k+1, if
Figure DEST_PATH_IMAGE125
If not, executing S46; otherwise, it ordersk=1, then perform S46;
s46, iftimeIf the number of times of searching is larger than that of each iteration, S47 is executed; otherwise, go to S43;
s47, iftIf the number of iterations is larger than the maximum number of iterations, taking the initial scheduling scheme as the current optimal scheduling scheme, and acquiring the minimum completion probability of the initial scheduling scheme; otherwise, S42 is executed.
Optionally, the number of the neighborhood structures designed in this embodiment is three, specifically as follows:
the first neighborhood structure: randomly selecting a workpiece from the workshops with the lowest completion probability and randomly distributing the workpiece to other workshops;
the second neighborhood structure: exchanging a workpiece randomly selected from the workshop with the lowest finishing probability with a workpiece with a smaller average basic processing time randomly selected from other workshops;
the third neighborhood structure: randomly encoding the current schemeVIs reversed.
In this embodiment, the calculation formula of the minimum completion probability of the scheduling scheme is as follows:
Figure DEST_PATH_IMAGE008A
Figure DEST_PATH_IMAGE126
representing a plant
Figure DEST_PATH_IMAGE127
At the expiration date
Figure DEST_PATH_IMAGE128
The previous completion probability and the calculation formula is as follows:
Figure DEST_PATH_IMAGE010AA
Figure DEST_PATH_IMAGE129
and
Figure DEST_PATH_IMAGE130
respectively representing workshops during processing of workpieces in non-decreasing sequence of mean values of basic processing times
Figure 434468DEST_PATH_IMAGE127
The mean and variance of the completion time, and the calculation formula is:
Figure DEST_PATH_IMAGE012AA
Figure DEST_PATH_IMAGE014AA
therefore, the minimum completion probability of the scheduling scheme is maximized by the variable neighborhood search algorithm, and the processing task is ensured to be completed on time as far as possible.
And S5, optimizing the current optimal dispatching scheme by using the processing sequence and batch improvement algorithm with the aim of minimizing the sum of the inventory costs of all workshops to obtain the optimal dispatching scheme.
Optionally, in order to reduce the inventory cost, the processing sequence and lot improvement algorithm of the present embodiment may employ the following steps:
s51, obtaining the maximum improved searching timesitimesInter-vehicle in current optimal scheduling scheme
Figure 964675DEST_PATH_IMAGE127
Is completed with probability of completion
Figure 793960DEST_PATH_IMAGE126
And inventory cost
Figure DEST_PATH_IMAGE131
Make the current number of improved searchesitime=0, acquisition plant
Figure 742324DEST_PATH_IMAGE127
The difference between the average values of the basic processing times of the respective adjacent workpieces in the processing order of (1) is obtained as a setD(ii) a Order tox=2,y=1, placing the first workpiece in the first virtual group;
Figure DEST_PATH_IMAGE042A
Figure DEST_PATH_IMAGE044A
wherein the content of the first and second substances,
Figure DEST_PATH_IMAGE132
representing a plant
Figure 24794DEST_PATH_IMAGE127
To (1) arAn average value of basic processing times of the respective processed workpieces;
s52, if
Figure DEST_PATH_IMAGE133
Then will bexA workpiece is put inyA virtual group; otherwise, it will bexA workpiece is put iny+1 virtual groups, ordery=y+1;
Wherein:
Figure DEST_PATH_IMAGE048A
Figure DEST_PATH_IMAGE050A
Figure 183243DEST_PATH_IMAGE129
and
Figure 160426DEST_PATH_IMAGE130
respectively representing workshops during processing of workpieces in non-decreasing sequence of mean values of basic processing times
Figure 681406DEST_PATH_IMAGE127
Mean and variance of completion times;
Figure DEST_PATH_IMAGE134
a deterioration coefficient indicating the processing of the workpiece;
Figure DEST_PATH_IMAGE135
a deterioration coefficient indicating a loading lot;
s53, ifxSmaller than the workshop
Figure 554685DEST_PATH_IMAGE127
Number of workpieces
Figure DEST_PATH_IMAGE136
Then, thenx=x+1 and return to S52; otherwise, jumping to S54;
s54, ifySmaller than workshop
Figure 59484DEST_PATH_IMAGE127
Number of workpieces
Figure 715724DEST_PATH_IMAGE136
Randomly reversing the partial processing sequence of the workpieces in each virtual group, and then forming a new workshop workpiece processing sequence according to the sequence of the virtual groups,itime=itime+1, jump to S55; otherwise, jumping to S58;
s55, if the distribution is to the workshop
Figure 966577DEST_PATH_IMAGE127
Number of workpieces
Figure 807494DEST_PATH_IMAGE136
Less than batch capacitycThen all workpieces are placed in a first batch; otherwise, it will
Figure DEST_PATH_IMAGE137
Placing a workpiece in a first batch, and placing the remaining workpieces in a batch sizecSequentially distributing the raw materials in a plurality of batches to obtain an updated workshop
Figure 62239DEST_PATH_IMAGE127
The order and batch of processing of the workpieces;
s56 plant based on updating
Figure 522171DEST_PATH_IMAGE127
The processing order and the batch of the workpieces are obtained and updated
Figure 627530DEST_PATH_IMAGE127
Is/are as follows
Figure DEST_PATH_IMAGE138
Figure DEST_PATH_IMAGE139
Completion probability
Figure DEST_PATH_IMAGE140
And inventory cost
Figure DEST_PATH_IMAGE141
S57, if
Figure DEST_PATH_IMAGE142
And is
Figure DEST_PATH_IMAGE143
Then the updated workshop
Figure 357458DEST_PATH_IMAGE127
The processing sequence and the batch of the workpieces are used as the current optimal scheduling scheme; otherwise, jumping to S58;
s58, ifitimeitimesReturning to S54; otherwise, outputting the current optimal scheduling scheme.
Wherein the content of the first and second substances,
Figure 915478DEST_PATH_IMAGE131
the calculation formula of (2) is as follows:
Figure DEST_PATH_IMAGE064A
Figure DEST_PATH_IMAGE066A
therefore, the workshops are parallel and do not interfere with each other, so that the inventory cost of each workshop is reduced, and the total inventory cost can be further reduced on the premise of maximizing the minimum completion probability.
Further, optionally, randomly reversing the partial machining order of the workpieces in each virtual group comprises:
step 1: initializationq=1;
And 2, step: if it is firstqIf the number of the workpieces of each virtual group is 1, jumping to the step 4; otherwise, jumping to the step 3;
and step 3: randomly selecting a plurality of workpieces which are continuously machined from the virtual group, and reversing the machining sequence of the workpieces; (similar to the third neighborhood architecture implementation)
And 4, step 4: output the firstqProcessing of individual virtual groupsSequence, orderq=q+1;
And 5: and repeating the step 2 to the step 5 until all the virtual groups are traversed.
In addition, further optionally, in this embodiment, the implementation steps of the three neighborhood structures are:
the first neighborhood structure is realized by the following steps:
step 1: calculating the completion probability of all workshops to obtain the sequence number of the workshop with the minimum completion probability
Figure DEST_PATH_IMAGE145
Let us order
Figure DEST_PATH_IMAGE147
Step 2: randomly generating 1 in the range of 1 to
Figure DEST_PATH_IMAGE149
Random integer
Figure DEST_PATH_IMAGE151
And step 3: if it is not
Figure DEST_PATH_IMAGE153
Randomly generating 1 in the range of 1 to
Figure DEST_PATH_IMAGE155
Random integer
Figure DEST_PATH_IMAGE157
(ii) a Otherwise, returning to the step 2;
and 4, step 4: if it is not
Figure DEST_PATH_IMAGE159
Then, then
Figure DEST_PATH_IMAGE161
Obtaining a new solution and ending; otherwise, go back to step 3.
The second neighborhood structure is realized by the following steps:
step 1: calculate outThe completion probability of all workshops, and the sequence number of the workshop with the minimum completion probability
Figure 8461DEST_PATH_IMAGE145
Step 2: randomly generating 1 in the range of 1 to
Figure 358540DEST_PATH_IMAGE149
Random integer
Figure DEST_PATH_IMAGE163
And step 3: if it is not
Figure DEST_PATH_IMAGE165
Then randomly generating 1 in the range of 1 to
Figure 478943DEST_PATH_IMAGE149
Random integer
Figure DEST_PATH_IMAGE167
(ii) a Otherwise, jumping to the step 2;
and 4, step 4: if it is not
Figure DEST_PATH_IMAGE169
And is
Figure DEST_PATH_IMAGE171
Then, then
Figure DEST_PATH_IMAGE173
Figure DEST_PATH_IMAGE175
Obtaining a new solution and ending; otherwise, jumping to the step 3;
the third neighborhood structure is realized by the following steps:
step 1: randomly generating two from 1 to
Figure 98493DEST_PATH_IMAGE149
Random different integers
Figure DEST_PATH_IMAGE177
And
Figure DEST_PATH_IMAGE179
and 2, step: if it is not
Figure DEST_PATH_IMAGE181
Then, then
Figure DEST_PATH_IMAGE183
Figure DEST_PATH_IMAGE185
Figure DEST_PATH_IMAGE187
And step 3: order to
Figure DEST_PATH_IMAGE189
0;
Figure DEST_PATH_IMAGE191
And 4, step 4: order to
Figure DEST_PATH_IMAGE193
Figure DEST_PATH_IMAGE195
Figure DEST_PATH_IMAGE197
Figure DEST_PATH_IMAGE199
And 5: if it is not
Figure DEST_PATH_IMAGE201
Returning to the step 4; otherwise get newAnd finishing the solution.
Example 2:
a VNS-based high-end equipment manufacturing robustness scheduling apparatus, the apparatus comprising:
the parameter acquisition module is used for acquiring workpiece information, workshop information, algorithm parameters and a neighborhood structure;
the initial distribution result generation module is used for randomly generating an initial distribution result containing the distribution relation between each workpiece and the workshop;
the initial dispatching scheme generation module is used for determining the processing sequence and the batch of the workpieces of each workshop in the initial distribution result through a processing sequence and batch generation algorithm to obtain an initial dispatching scheme; wherein, the scheduling scheme comprises: the order and lot of work pieces for each plant;
the current optimal scheduling scheme generating module is used for updating the initial scheduling scheme by using the maximized minimum completion probability as a target through a variable neighborhood search algorithm to obtain a current optimal scheduling scheme;
and the processing sequence and batch improvement module is used for optimizing the current optimal dispatching scheme by using a processing sequence and batch improvement algorithm with the aim of minimizing the sum of the inventory costs of all workshops as a target to obtain the optimal dispatching scheme.
Example 3:
a computer-readable storage medium storing a computer program for high-end equipment manufacturing scheduling, wherein the computer program causes a computer to perform the steps of:
s1, acquiring workpiece information, workshop information, algorithm parameters and a neighborhood structure;
s2, randomly generating an initial distribution result containing the distribution relation between each workpiece and each workshop;
s3, determining the processing sequence and the batch of the workpieces of each workshop in the initial distribution result through a processing sequence and batch generation algorithm to obtain an initial dispatching scheme; wherein, the scheduling scheme comprises: the order and lot of work pieces for each plant;
s4, updating the initial scheduling scheme by a variable neighborhood search algorithm with the maximum and minimum completion probability as a target to obtain the current optimal scheduling scheme;
and S5, optimizing the current optimal dispatching scheme by using the processing sequence and batch improvement algorithm with the aim of minimizing the sum of the inventory costs of all workshops to obtain the optimal dispatching scheme.
Example 4:
an electronic device, comprising:
one or more processors;
a memory; and
one or more programs, wherein the one or more programs are stored in the memory and configured to be executed by the one or more processors, the programs comprising instructions for performing the steps of:
s1, acquiring workpiece information, workshop information, algorithm parameters and a neighborhood structure;
s2, randomly generating an initial distribution result containing the distribution relation between each workpiece and each workshop;
s3, determining the processing sequence and the batch of the workpieces of each workshop in the initial distribution result through a processing sequence and batch generation algorithm to obtain an initial dispatching scheme; wherein, the scheduling scheme comprises: the order and lot of work pieces for each plant;
s4, updating the initial scheduling scheme by a variable neighborhood search algorithm with the maximum and minimum completion probability as a target to obtain the current optimal scheduling scheme;
and S5, optimizing the current optimal dispatching scheme by using the processing sequence and batch improvement algorithm with the aim of minimizing the sum of the inventory costs of all workshops to obtain the optimal dispatching scheme.
It can be understood that the VNS-based high-end equipment manufacturing robustness scheduling apparatus, the storage medium, and the electronic device provided in the embodiment of the present invention correspond to the VNS-based high-end equipment manufacturing robustness scheduling method, and for explanation, examples, and beneficial effects of relevant contents, parts may refer to corresponding contents in the VNS-based high-end equipment manufacturing robustness scheduling method, and details are not described here.
In summary, compared with the prior art, the invention has the following beneficial effects:
(1) the invention designs an intelligent optimization algorithm for improving variable neighborhood search aiming at the problem of dual-target hierarchical scheduling of complex products related to deterioration effect and uncertain processing time in the manufacture of high-end equipment.
(2) In the variable neighborhood algorithm, three simple and feasible neighborhood structures are designed, so that the algorithm can achieve good balance between the concentration and the dispersion during operation, the convergence rate of the algorithm is improved, and the local optimal solution can be skipped in the iteration process.
(3) According to the invention, the factors of deterioration effect of workpiece production and processing, uncertainty of workpiece processing time, dual-objective decision and the like are considered based on actual production conditions. A simpler code is defined and may be adapted to other conventional production schedules. By combining the processing sequence and batch generation algorithm and the processing sequence and batch improvement algorithm, the method can be suitable for the proposed complex scheduling problem, and has more practical significance and wider application range. Particularly in the case of manufacturing large-scale complex products, the scheme obtained by the invention has strong robustness, and can provide a reliable decision scheme for a decision maker in a short time.
It should be noted that, through the above description of the embodiments, those skilled in the art can clearly understand that each embodiment can be implemented by software plus a necessary general hardware platform. With this understanding in mind, the above-described technical solutions may be embodied in the form of a software product, which can be stored in a computer-readable storage medium such as ROM/RAM, magnetic disk, optical disk, etc., and includes instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute the methods described in the embodiments or some parts of the embodiments. In this document, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (11)

1. A VNS-based high-end equipment manufacturing robustness scheduling method is characterized by comprising the following steps:
s1, acquiring workpiece information, workshop information, algorithm parameters and a neighborhood structure;
s2, randomly generating an initial distribution result containing the distribution relation between each workpiece and each workshop;
s3, determining the processing sequence and the batch of the workpieces of each workshop in the initial distribution result through a processing sequence and batch generation algorithm to obtain an initial dispatching scheme; wherein, the scheduling scheme comprises: the order and lot of work pieces for each plant;
s4, updating the initial scheduling scheme by a variable neighborhood search algorithm with the maximum and minimum completion probability as a target to obtain the current optimal scheduling scheme;
s5, optimizing the current optimal dispatching scheme by using a processing sequence and batch improvement algorithm with the aim of minimizing the sum of inventory costs of all workshops to obtain the optimal dispatching scheme;
the processing order and batch improvement algorithm comprises the following steps:
s51, obtaining the maximum improved searching timesitimesInter-vehicle in current optimal scheduling scheme
Figure DEST_PATH_IMAGE001
Is completed with probability
Figure 838438DEST_PATH_IMAGE002
And inventory cost
Figure DEST_PATH_IMAGE003
Make the current number of improved searchesitime=0, acquisition plant
Figure 2703DEST_PATH_IMAGE001
The difference between the average values of the basic processing times of the respective adjacent workpieces in the processing order of (1) is obtained as a setD(ii) a Order tox=2,y=1, placing the first workpiece in the first virtual group;
Figure DEST_PATH_IMAGE005
Figure DEST_PATH_IMAGE007
wherein the content of the first and second substances,
Figure 916432DEST_PATH_IMAGE008
representing a plant
Figure 925977DEST_PATH_IMAGE001
To (1) arAn average value of basic processing times of the respective processed workpieces;
s52, if
Figure DEST_PATH_IMAGE009
Then will bexA workpiece is put inyA virtual group; otherwise, it will bexA workpiece is put iny+1 virtual groups, ordery=y+1;
Wherein:
Figure DEST_PATH_IMAGE011
Figure DEST_PATH_IMAGE013
Figure 975972DEST_PATH_IMAGE014
and
Figure DEST_PATH_IMAGE015
respectively representing workshops during processing of workpieces in non-decreasing sequence of mean values of basic processing times
Figure 980313DEST_PATH_IMAGE001
Mean and variance of completion times;
Figure 974814DEST_PATH_IMAGE016
a deterioration coefficient indicating the processing of the workpiece;
Figure DEST_PATH_IMAGE017
to representA degradation factor of the loading lot;
Figure 725732DEST_PATH_IMAGE018
representing a minimum completion probability of the scheduling scheme;
Figure DEST_PATH_IMAGE019
representing a plant
Figure 958130DEST_PATH_IMAGE001
The number of workpieces;
Figure 933040DEST_PATH_IMAGE020
indicating a time-out due;
Figure DEST_PATH_IMAGE021
representing a plant
Figure 821361DEST_PATH_IMAGE022
To (1) axA processed workpiece andx-the difference between the mean values of the basic machining times of 1 machined workpiece;
s53, ifxSmaller than the workshop
Figure 969446DEST_PATH_IMAGE001
Number of workpieces
Figure 790771DEST_PATH_IMAGE019
Then, thenx=x+1 and return to S52; otherwise, jumping to S54;
s54, ifySmaller than the workshop
Figure 936582DEST_PATH_IMAGE001
Number of workpieces
Figure 843358DEST_PATH_IMAGE019
Randomly reversing the partial processing sequence of the workpieces in each virtual group, and then forming a new workshop workpiece processing sequence according to the sequence of the virtual groups,itime=itime+1, go to S55; otherwise, jumping to S58;
s55, if the distribution is to the workshop
Figure 732816DEST_PATH_IMAGE001
Number of workpieces
Figure 470965DEST_PATH_IMAGE019
Less than batch capacitycThen all workpieces are placed in a first batch; otherwise, it will
Figure DEST_PATH_IMAGE023
Placing a workpiece in a first batch, and placing the remaining workpieces in a batch sizecSequentially distributing the raw materials in a plurality of batches to obtain an updated workshop
Figure 990939DEST_PATH_IMAGE001
The order and batch of processing of the workpieces;
s56 plant based on updating
Figure 385012DEST_PATH_IMAGE001
The processing order and the batch of the workpieces are obtained and updated
Figure 874899DEST_PATH_IMAGE001
Average of completion times
Figure 405237DEST_PATH_IMAGE024
Sum variance
Figure DEST_PATH_IMAGE025
Completion probability
Figure 624342DEST_PATH_IMAGE026
Heyu (Chinese character) libraryCost of storage
Figure DEST_PATH_IMAGE027
S57, if
Figure 771289DEST_PATH_IMAGE028
And is
Figure DEST_PATH_IMAGE029
Then the updated workshop
Figure 205813DEST_PATH_IMAGE001
The processing sequence and the batch of the workpieces are used as the current optimal scheduling scheme; otherwise, jumping to S58;
s58, ifitimeitimesThen return to S54; otherwise, outputting the current optimal scheduling scheme.
2. The VNS-based robust scheduling method for high-end equipment manufacturing of claim 1, wherein the artifact information comprises: number of workpieces, completion due time, basic machining time for each workpiece;
the workshop information includes: number of plants, batch capacity, degradation factor of processing, degradation factor of loading.
3. The VNS-based high-end equipment manufacturing robust dispatching method of claim 1, wherein the process sequence and lot generation algorithm step comprises:
s31, distributing the data to the workshop
Figure 652975DEST_PATH_IMAGE001
The workpieces are arranged in a non-decreasing sequence according to the average value of the basic processing time to obtain the processing sequence of the workpieces;
s32, if the distribution is to the workshop
Figure 311489DEST_PATH_IMAGE001
Number of workpieces
Figure 680153DEST_PATH_IMAGE019
Less than batch capacitycThen all workpieces are placed in a first batch; otherwise, it will
Figure 715106DEST_PATH_IMAGE023
Placing a workpiece in a first batch, and placing the remaining workpieces in a batch sizecSequentially distributing the raw materials in a plurality of batches to obtain a workshop
Figure 16774DEST_PATH_IMAGE001
The order and batch of processing of the workpieces;
and S33, repeatedly executing S31-S32 until the processing sequence and the batch corresponding to all the workshops are obtained.
4. The VNS-based high-end equipment manufacturing robustness scheduling method of claim 1, wherein the minimum completion probability of the scheduling scheme is obtained by the formula:
Figure DEST_PATH_IMAGE031
Figure DEST_PATH_IMAGE033
Figure DEST_PATH_IMAGE035
Figure DEST_PATH_IMAGE037
wherein the content of the first and second substances,
Figure 518293DEST_PATH_IMAGE038
indicating the result of the dispensing of the workpiece, whereinjResult of distribution of individual workpiecesv j The value of (d) indicates the assigned plant;
Figure 108675DEST_PATH_IMAGE018
representing a minimum completion probability of the scheduling scheme;
Figure 681739DEST_PATH_IMAGE002
representing a plant
Figure 103493DEST_PATH_IMAGE001
At the expiration date
Figure DEST_PATH_IMAGE039
A previous completion probability;
Figure 572651DEST_PATH_IMAGE040
representing a standard normal distribution probability function;
Figure 447066DEST_PATH_IMAGE014
and
Figure 86471DEST_PATH_IMAGE015
respectively representing workshops during processing of workpieces in non-decreasing sequence of mean values of basic processing times
Figure 300414DEST_PATH_IMAGE001
Mean and variance of completion times;
Figure DEST_PATH_IMAGE041
indicating allocation to plants
Figure 2791DEST_PATH_IMAGE001
To (1) arA base machining time for each machined workpiece;
Figure 567765DEST_PATH_IMAGE008
presentation to plant
Figure 217052DEST_PATH_IMAGE001
To (1) arA base machining time average value of each machined workpiece;
Figure 816660DEST_PATH_IMAGE042
represents the variance;
Figure 424359DEST_PATH_IMAGE016
a deterioration coefficient indicating the processing of the workpiece;
Figure 273367DEST_PATH_IMAGE017
a deterioration coefficient indicating a loading lot;
cindicating the batch capacity.
5. The VNS-based robust scheduling method for high-end equipment manufacturing of claim 1, wherein the variable neighborhood search algorithm comprises:
s41, making the current iteration numbert=0, current neighborhood structurek=1;
S42, ordert=t+1, and initializing the current number of searchestime=0;
S43, ordertime=time+1 in the second placekSearching a new scheduling scheme by the variable neighborhood, and acquiring the minimum completion probability of the new scheduling scheme;
s44, if the minimum completion probability of the new scheduling scheme is smaller than the initial scheduling scheme, executing S45; otherwise, it ordersk=1, and the new scheduling scheme is taken as an initial scheduling scheme, and S46 is performed;
s45, orderk=k+1, if
Figure DEST_PATH_IMAGE043
If not, executing S46; otherwise, it ordersk=1, then perform S46;
s46, iftimeIf the number of times of searching is larger than that of each iteration, S47 is executed; otherwise, go to S43;
s47, iftIf the number of iterations is larger than the maximum number of iterations, taking the initial scheduling scheme as the current optimal scheduling scheme, and acquiring the minimum completion probability of the initial scheduling scheme; otherwise, S42 is executed.
6. The VNS-based high-end equipment manufacturing robust scheduling method of claim 1, wherein the neighborhood structure comprises:
the first neighborhood structure: randomly selecting a workpiece from the workshops with the lowest completion probability and randomly distributing the workpiece to other workshops;
the second neighborhood structure: exchanging a workpiece randomly selected from the workshop with the lowest finishing probability with a workpiece with a smaller average basic processing time randomly selected from other workshops;
the third neighborhood structure: randomly reverses a portion of the scheme encoding now.
7. The VNS-based robust scheduling of high-end equipment manufacturing of claim 1, wherein the plant floor
Figure 195186DEST_PATH_IMAGE001
Inventory cost of
Figure 446039DEST_PATH_IMAGE003
The calculation formula of (2) is as follows:
Figure DEST_PATH_IMAGE045
Figure DEST_PATH_IMAGE047
Figure 896743DEST_PATH_IMAGE048
wherein the content of the first and second substances,
Figure DEST_PATH_IMAGE049
indicating allocation in a plant
Figure 701888DEST_PATH_IMAGE001
First, therProcessing the workpiece;
Figure 958557DEST_PATH_IMAGE050
representing workpieces
Figure 267178DEST_PATH_IMAGE049
(ii) inventory cost;
Figure DEST_PATH_IMAGE051
representing the inventory cost per unit time;
Figure 482259DEST_PATH_IMAGE014
indicating that the work is being machined in non-decreasing order of mean value of basic machining time
Figure 240612DEST_PATH_IMAGE001
An average of completion times;
Figure 300972DEST_PATH_IMAGE052
representing workpieces
Figure 464100DEST_PATH_IMAGE049
Average of the actual completion times of (a);
Figure DEST_PATH_IMAGE053
representing workpieces
Figure 850082DEST_PATH_IMAGE049
Actual completion time of (d);
Figure 98661DEST_PATH_IMAGE054
=1 denotes the secondiA workshopgA processed workpiece andg+1 workpieces not in the same batch, otherwise
Figure 962712DEST_PATH_IMAGE054
=0;
Figure DEST_PATH_IMAGE055
Representing a plant
Figure 245925DEST_PATH_IMAGE022
To (1) aaAn average value of basic processing times of the respective processed workpieces;
Figure 802809DEST_PATH_IMAGE056
representing workpieces
Figure 273104DEST_PATH_IMAGE049
Is measured in real time.
8. The VNS-based robust scheduling method for high-end equipment manufacturing of claim 1, wherein the randomly reversing the partial machining order of the workpieces in each virtual group comprises:
step 1: initializationq=1;
Step 2: if it is firstqIf the number of the workpieces of each virtual group is 1, jumping to the step 4; otherwise, jumping to the step 3;
and step 3: randomly selecting a plurality of workpieces which are continuously machined from the virtual group, and reversing the machining sequence of the workpieces;
and 4, step 4: output the firstqOrder of processing of each virtual groupq=q+1;
And 5: and repeating the step 2 to the step 5 until all the virtual groups are traversed.
9. A VNS-based high-end equipment manufacturing robustness scheduling apparatus, comprising:
the parameter acquisition module is used for acquiring workpiece information, workshop information, algorithm parameters and a neighborhood structure;
the initial distribution result generation module is used for randomly generating an initial distribution result containing the distribution relation between each workpiece and the workshop;
the initial dispatching scheme generation module is used for determining the processing sequence and the batch of the workpieces of each workshop in the initial distribution result through a processing sequence and batch generation algorithm to obtain an initial dispatching scheme; wherein, the scheduling scheme comprises: the order and lot of work pieces for each plant;
the current optimal scheduling scheme generating module is used for updating the initial scheduling scheme by using the maximized minimum completion probability as a target through a variable neighborhood search algorithm to obtain a current optimal scheduling scheme;
the processing sequence and batch improvement module is used for optimizing the current optimal dispatching scheme by using a processing sequence and batch improvement algorithm with the aim of minimizing the sum of the inventory costs of all workshops as a target to obtain the optimal dispatching scheme;
the processing order and batch improvement algorithm comprises the following steps:
s51, obtaining the maximum improved searching timesitimesInter-vehicle in current optimal scheduling scheme
Figure 675267DEST_PATH_IMAGE001
Is completed with probability of completion
Figure 609725DEST_PATH_IMAGE002
And inventory cost
Figure 71930DEST_PATH_IMAGE003
Make the current number of improved searchesitime=0, acquisition plant
Figure 29522DEST_PATH_IMAGE001
The difference between the average values of the basic processing times of the respective adjacent workpieces in the processing order of (1) is obtained as a setD(ii) a Order tox=2,y=1, placing the first workpiece in the first virtual group;
Figure DEST_PATH_IMAGE057
Figure 766534DEST_PATH_IMAGE007
wherein the content of the first and second substances,
Figure 758760DEST_PATH_IMAGE008
representing a plant
Figure 126288DEST_PATH_IMAGE001
To (1) arAn average value of basic processing times of the respective processed workpieces;
s52, if
Figure 836755DEST_PATH_IMAGE009
Then will bexA workpiece is put inyA virtual group; otherwise, it will bexA workpiece is put iny+1 virtual groups, ordery=y+1;
Wherein:
Figure 643037DEST_PATH_IMAGE058
Figure 486840DEST_PATH_IMAGE013
Figure 290848DEST_PATH_IMAGE014
and
Figure 223032DEST_PATH_IMAGE015
respectively representing workshops during processing of workpieces in non-decreasing sequence of mean values of basic processing times
Figure 833005DEST_PATH_IMAGE001
Mean and variance of completion times;
Figure 799824DEST_PATH_IMAGE016
a deterioration coefficient indicating the processing of the workpiece;
Figure 509154DEST_PATH_IMAGE017
a deterioration coefficient indicating a loading lot;
Figure 194213DEST_PATH_IMAGE018
representing a minimum completion probability of the scheduling scheme;
Figure 342298DEST_PATH_IMAGE019
representing a plant
Figure 163624DEST_PATH_IMAGE001
The number of workpieces;
Figure 43855DEST_PATH_IMAGE020
indicating a time-out due;
Figure 950631DEST_PATH_IMAGE021
representing a plant
Figure 902406DEST_PATH_IMAGE022
To (1) axA processed workpiece andx-the difference between the mean values of the basic machining times of 1 machined workpiece;
s53, ifxSmaller than workshop
Figure 578238DEST_PATH_IMAGE001
Number of workpieces
Figure 894950DEST_PATH_IMAGE019
Then, thenx=x+1 and return to S52; otherwise, jumping to S54;
s54, ifySmaller than the workshop
Figure 289023DEST_PATH_IMAGE001
Number of workpieces
Figure 778910DEST_PATH_IMAGE019
Randomly reversing the partial processing sequence of the workpieces in each virtual group, and then forming a new workshop workpiece processing sequence according to the sequence of the virtual groups,itime=itime+1, go to S55; otherwise, jumping to S58;
s55, if the distribution is to the workshop
Figure 574827DEST_PATH_IMAGE001
Number of workpieces
Figure 62441DEST_PATH_IMAGE019
Less than batch capacitycThen all workpieces are placed in a first batch; otherwise, it will
Figure 678230DEST_PATH_IMAGE023
Placing a workpiece in a first batch, and placing the remaining workpieces in a batch sizecSequentially distributing the raw materials in a plurality of batches to obtain an updated workshop
Figure 971808DEST_PATH_IMAGE001
The order and batch of processing of the workpieces;
s56 plant based on updating
Figure 622232DEST_PATH_IMAGE001
The processing order and the batch of the workpieces are obtained and updated
Figure 277817DEST_PATH_IMAGE001
Average of completion times
Figure 646481DEST_PATH_IMAGE024
Sum variance
Figure 478171DEST_PATH_IMAGE025
Completion probability
Figure 983102DEST_PATH_IMAGE026
And inventory costs
Figure 812517DEST_PATH_IMAGE027
S57, if
Figure 199636DEST_PATH_IMAGE028
And is
Figure 38279DEST_PATH_IMAGE029
Then the updated workshop is
Figure 397716DEST_PATH_IMAGE001
The processing sequence and the batch of the workpieces are used as the current optimal scheduling scheme; otherwise, jumping to S58;
s58, ifitimeitimesThen return to S54; otherwise, outputting the current optimal scheduling scheme.
10. A computer-readable storage medium storing a computer program for high-end equipment manufacturing scheduling, wherein the computer program causes a computer to perform the VNS-based high-end equipment manufacturing robust scheduling method of any one of claims 1-8.
11. An electronic device, comprising:
one or more processors;
a memory; and
one or more programs, wherein the one or more programs are stored in the memory and configured to be executed by the one or more processors, the programs comprising instructions for performing the VNS-based high-end equipment manufacturing robust scheduling method of any one of claims 1-8.
CN202210195558.4A 2022-03-02 2022-03-02 High-end equipment manufacturing robustness scheduling method and device based on VNS Active CN114265380B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210195558.4A CN114265380B (en) 2022-03-02 2022-03-02 High-end equipment manufacturing robustness scheduling method and device based on VNS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210195558.4A CN114265380B (en) 2022-03-02 2022-03-02 High-end equipment manufacturing robustness scheduling method and device based on VNS

Publications (2)

Publication Number Publication Date
CN114265380A CN114265380A (en) 2022-04-01
CN114265380B true CN114265380B (en) 2022-05-24

Family

ID=80833848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210195558.4A Active CN114265380B (en) 2022-03-02 2022-03-02 High-end equipment manufacturing robustness scheduling method and device based on VNS

Country Status (1)

Country Link
CN (1) CN114265380B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106959675A (en) * 2017-03-21 2017-07-18 山东大学 A kind of multi-objective scheduling optimization method towards Flow Shop
CN112286149A (en) * 2020-10-15 2021-01-29 山东师范大学 Flexible workshop scheduling optimization method and system considering crane transportation process

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8190463B2 (en) * 2000-09-06 2012-05-29 Masterlink Corporation System and method for managing mobile workers
DE102018107120A1 (en) * 2017-05-22 2018-11-22 Biotronik Se & Co. Kg Selective activation of parasympathetic nerve in a vagus nerve stimulation device
CN107578178B (en) * 2017-09-11 2018-08-28 合肥工业大学 Based on the dispatching method and system for becoming neighborhood search and gravitation search hybrid algorithm
CN113177781B (en) * 2021-05-17 2022-09-30 合肥工业大学 Production assembly cooperative scheduling method and system based on variable neighborhood and genetic operator

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106959675A (en) * 2017-03-21 2017-07-18 山东大学 A kind of multi-objective scheduling optimization method towards Flow Shop
CN112286149A (en) * 2020-10-15 2021-01-29 山东师范大学 Flexible workshop scheduling optimization method and system considering crane transportation process

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
考虑恶化和学习效应的多机制造系统智能优化方法;陆少军;《系统科学与数学》;20191031;第39卷(第10期);第1597-1608页 *

Also Published As

Publication number Publication date
CN114265380A (en) 2022-04-01

Similar Documents

Publication Publication Date Title
CN107590603B (en) Based on the dispatching method and system for improving change neighborhood search and differential evolution algorithm
CN107168267B (en) Based on the production scheduled production method and system for improving population and heuristic strategies
CN111667191B (en) Dual-target robust resource allocation method and system under resource sharing and transfer view
CN111695806B (en) Resource allocation method, device equipment and storage medium
CN108846623A (en) Based on the complete vehicle logistics dispatching method and device of multiple target ant group algorithm, storage medium, terminal
CN110084401B (en) Scheduling optimization method and device based on reserved maintenance time
CN111382942A (en) Replacement flow shop energy efficiency optimization scheduling method integrated with delivery date configuration
CN110458326B (en) Mixed group intelligent optimization method for distributed blocking type pipeline scheduling
CN110046761A (en) A kind of ethyl alcohol inventory's Replenishment Policy based on multi-objective particle
CN106611275A (en) Production scheduling algorithm for solving job shop production problem
CN116933939A (en) Flexible workshop collaborative production method and system based on improved raccoon optimization algorithm
CN111105133B (en) Production scheduling method, computer device, and storage medium
CN110471274A (en) Based on the machine components process line dispatching method for improving unified particle swarm algorithm
Piroozfard et al. Reduction of carbon emission and total late work criterion in job shop scheduling by applying a multi-objective imperialist competitive algorithm
CN114265380B (en) High-end equipment manufacturing robustness scheduling method and device based on VNS
Wei et al. Picker routing optimization of storage stacker based on improved multi-objective iterative local search algorithm.
Chyu et al. Optimizing fuzzy makespan and tardiness for unrelated parallel machine scheduling with archived metaheuristics
CN116048030B (en) Multi-production-line production task ordering method and device, storage medium and electronic equipment
CN116151424B (en) Method for discharging among skip in multiple parks
Wu et al. An efficient algorithm for stochastic capacity portfolio planning problems
CN110705844A (en) Robust optimization method of job shop scheduling scheme based on non-forced idle time
CN113723695B (en) Remanufacturing scheduling optimization method based on scene
CN114819660A (en) Dynamic evolution design crowdsourcing human resource task matching method and system
CN115249113A (en) Distributed zero-waiting flow shop scheduling method and system with preparation time
Kizilay et al. A discrete artificial bee colony algorithm for the assignment and parallel machine scheduling problem in DYO paint company

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant