CN114255544A - Demand calculation method for different meters of same household of electric power charging system - Google Patents

Demand calculation method for different meters of same household of electric power charging system Download PDF

Info

Publication number
CN114255544A
CN114255544A CN202111402343.7A CN202111402343A CN114255544A CN 114255544 A CN114255544 A CN 114255544A CN 202111402343 A CN202111402343 A CN 202111402343A CN 114255544 A CN114255544 A CN 114255544A
Authority
CN
China
Prior art keywords
demand
calculation server
edge calculation
power
meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111402343.7A
Other languages
Chinese (zh)
Inventor
林雪山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Zhongyuan Energy Chain Technology Co ltd
Original Assignee
Xiamen Zhongyuan Energy Chain Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Zhongyuan Energy Chain Technology Co ltd filed Critical Xiamen Zhongyuan Energy Chain Technology Co ltd
Priority to CN202111402343.7A priority Critical patent/CN114255544A/en
Publication of CN114255544A publication Critical patent/CN114255544A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/003Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity for electricity
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/12Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity in which metering is on a time basis
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a demand calculation method for different meters of the same household of an electric power charging system, which comprises the following steps: s1: the intelligent demand ammeter with the built-in Internet of things communication function, the DTU communication module, the edge calculation server and the touch screen form a completed metering and early warning regulation and control system; s2: firstly, the edge calculation server in S1 issues a clock synchronization instruction to all the intelligent demand meters which are successfully connected; s3: the intelligent demand meter in S2 realizes clock synchronization with the edge calculation server. When the multi-meter clock synchronization system is used, relevant parameters are conveniently applied to actual regulation and control, more important application requirements are met, the voltage and current of each loop can be collected and calculated in real time, the clock synchronization characteristic is better, automatic synchronization of the multi-meter clock at the beginning and the end of each month can be realized, the risk of time difference during use is reduced, the problem of precision reduction caused by time accumulation errors is solved, and the product reliability is improved.

Description

Demand calculation method for different meters of same household of electric power charging system
Technical Field
The invention relates to the technical field of electric power charging systems, in particular to a demand calculation method for different meters of the same household of an electric power charging system.
Background
According to the related documents of development and improvement committee, at present, large industrial electricity users above 315kVA (100 kVA in partial regions) in China adopt two parts of electricity price, basic electricity charge for electricity charge, electricity quantity charge and power regulation charge. There are two charging modes for the basic electricity charge: 1. charging according to the size of the transformer capacity (kVA) and the unit price of the capacity (element/(kVA month); 2, charging according to the size of the maximum demand (maximum demand value (kW) and the unit price of the demand (element/(kW month); and the unit price of the demand is generally 1.5 times of the unit price of the capacity).
Meanwhile, accurate demand calculation is more beneficial to implementation of maximum demand reduction measures, safe lines, economic line operation, power grid dispatching, saving of power plant investment for the country and the like.
At present, in the market, for electricity users with multiple meters in the same household, the simple algebraic sum of the demand of multiple independent electricity meters is mostly adopted. Because the maximum demand is the maximum average power value (the current setting method of the maximum demand in China) of every 15 minutes in the same month, the time points of the maximum demand collected by each electric meter are inconsistent under the condition, and due to the popularization of the distributed energy system, partial loop electric meters have the opportunity to transmit power back to the power grid (the demand of the electric meter at the moment is a negative value under the condition), and therefore, the demand calculation mode under the condition of multiple meters of the same household is to be improved.
In the case that the times of maximum demand of the upper and lower-level electric meters are usually inconsistent, simple algebraic difference calculation shows the degree of inaccuracy due to the fact that the resident electricity consumption such as large industrial production electricity consumption and dormitory photos exists in the same factory boundary range and the resident electricity consumption policy does not need basic electricity charges.
More importantly, the demand monitoring and metering in the current market is mostly used for background charging, and related parameters are not used for actual regulation and control, so that more important application requirements cannot be met. Moreover, the current demand ammeter algorithm on the market has no negative value, and cannot be applied to the same household number, a plurality of electric network electric quantity meters and a scene with reversed load.
Disclosure of Invention
Based on the technical problems in the background art, the invention provides a demand calculation method for different meters of the same household of an electric power charging system.
The invention provides a demand calculation method for different meters of the same household of an electric power charging system, which comprises the following steps:
the method comprises the following steps:
s1: an intelligent demand ammeter with a built-in internet of things communication function, a DTU communication module, an edge calculation server and a touch screen form a complete metering and early warning regulation and control system;
s2: firstly, the edge calculation server in S1 issues a clock synchronization instruction to all the intelligent demand meters which are successfully connected;
s3: the intelligent demand meter in the S2 and the edge calculation server realize clock synchronization;
s4: the intelligent demand meter in the S3 collects the voltage and current of each loop in real time, and then calculates the collected voltage and current in real time and stores the voltage and current in a local register;
s5: the intelligent demand meter in the S4 calculates the maximum demand and the occurrence time of each loop according to the collected voltage and current, and uploads the calculated maximum demand and the occurrence time of each loop to the edge calculation server through the DTU communication module;
s6: the edge calculation server in S5 calculates the vector difference or vector sum of the maximum demand according to the time point of the maximum demand and the occurrence time of each loop, and combines the requirements set in advance;
s7: the edge calculation server in the S6 collects the real-time power of each electric meter every minute while collecting the demand of the intelligent demand electric meter, substitutes the demand algorithm into the demand change predicted whether the demand change caused by the power change of the next 2-14 minutes exceeds the set value, if the prediction exceeds the set value, the edge calculation server sends a signal to control the energy storage system to change the standby power charging working condition into the power supply working condition, and meanwhile, the edge calculation server gives the power supply power.
Preferably, in S2, the edge calculation server may calculate, at 0: 00 automatically perform clock synchronization.
Preferably, in S4, when the collected power is in a load shedding state, the demand is a negative value.
Preferably, in S7, when the edge computing server gives the power of the power supply, the edge computing server further sends a signal to control the controllable load to unload or reduce the load.
Preferably, in S4, the demand can be obtained by using vector differences or vector sums of devices as needed to satisfy the application scenario of multi-table serial or parallel relationship.
When the multi-meter clock synchronization system is used, relevant parameters are conveniently applied to actual regulation and control, more important application requirements are met, the voltage and current of each loop can be collected and calculated in real time, the clock synchronization characteristic is better, automatic synchronization of the multi-meter clock at the beginning and the end of each month can be realized, the risk of time difference during use is reduced, the problem of precision reduction caused by time accumulation errors is solved, and the product reliability is improved.
Drawings
Fig. 1 is a flowchart of a demand calculation method for different meters of the same household of an electric power charging system according to the present invention.
Detailed Description
The present invention will be further illustrated with reference to the following specific examples.
Examples
The embodiment provides a demand calculation method for different meters of the same household of an electric power charging system, which comprises the following steps:
s1: the intelligent demand ammeter with the built-in Internet of things communication function, the DTU communication module, the edge calculation server and the touch screen form a completed metering and early warning regulation and control system;
s2: firstly, the edge computing server in S1 issues a clock synchronization command to all the connected intelligent demand meters, and in addition, because the requirement of multi-meter demand metering on event synchronization is high, the edge computing server can calculate the clock synchronization command at 0: 00 automatically carrying out clock synchronization;
s3: the intelligent demand meter in the S2 and the edge calculation server realize clock synchronization;
s4: the intelligent demand ammeter in the S3 collects the voltage and current of each loop in real time, then calculates the collected voltage and current in real time, and when the collected electric quantity is in a load shedding state, the demand is a negative value;
s5: the intelligent demand meter in the S4 calculates the maximum demand and the occurrence time of each loop according to the collected current, and uploads the calculated maximum demand and the occurrence time of each loop to the edge calculation server through the DTU communication module;
s6: the edge calculation server in S5 calculates the arithmetic difference or the arithmetic sum of the maximum demand according to the received maximum demand of each loop and the occurrence time thereof, and in combination with the requirement set in advance, the edge calculation server calculates the arithmetic difference or the arithmetic sum of the maximum demand according to the occurrence time point thereof, and the specific algorithm for performing the vector difference or the vector sum is as follows:
when setting multi-meter demand overlay (take 1 day 0: 16 hour demand as an example):
the demand at that time: MDDay 1, 0: 16=MD1Day 1, 0: 16+MD2Day 1, 0: 16+MDnDay 1, 0: 16
Maximum demand in the month: MD ═ MAX (MD)Day 1, 0: 01:MDAnd (5) in month of 24: 00)
When the summary/sub-chart demand difference is set (taking 1 day 0: 16 hourly demand as an example):
the demand at that time: MDDay 1, 0: 16Total of MDDay 1, 0: 16-MD1Day 1, 0: 16-MDnDay 1, 0: 16
Maximum demand in the month: MD ═ MAX (MD)Day 1, 0: 01:MDAnd (5) in month of 24: 00);
S7: the method comprises the steps that the edge calculation server in S6 collects the demand of the intelligent demand electric meter, collects the real-time power of each electric meter every minute, substitutes and predicts whether the demand change caused by the power change of the next 2-14 minutes exceeds a set value or not through a demand algorithm, if the demand change exceeds the set value, the edge calculation server sends a signal to control the energy storage system to be changed from a standby power charging working condition to a power supply working condition, meanwhile, the edge calculation server gives the power of the power supply, and when the edge calculation server gives the power of the power supply, the edge calculation server also sends a signal to control the controllable load to unload or reduce the load.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (5)

1. A demand calculation method for different meters of the same household of an electric power charging system is characterized by comprising the following steps:
s1: an intelligent demand ammeter with a built-in internet of things communication function, a DTU communication module, an edge calculation server and a touch screen form a complete metering and early warning regulation and control system;
s2: firstly, the edge calculation server in S1 issues a clock synchronization instruction to all the intelligent demand meters which are successfully connected;
s3: the intelligent demand meter in the S2 and the edge calculation server realize clock synchronization;
s4: the intelligent demand meter in the S3 collects the voltage and current of each loop in real time, and then calculates the collected voltage and current in real time and stores the voltage and current in a local register;
s5: the intelligent demand meter in the S4 calculates the maximum demand and the occurrence time of each loop according to the collected voltage and current, and uploads the calculated maximum demand and the occurrence time of each loop to the edge calculation server through the DTU communication module;
s6: the edge calculation server in S5 calculates the vector difference or vector sum of the maximum demand according to the time point of the maximum demand and the occurrence time of each loop, and combines the requirements set in advance;
s7: the edge calculation server in the S6 collects the real-time power of each electric meter every minute while collecting the demand of the intelligent demand electric meter, substitutes the demand algorithm into the demand change predicted whether the demand change caused by the power change of the next 2-14 minutes exceeds the set value, if the prediction exceeds the set value, the edge calculation server sends a signal to control the energy storage system to change the standby power charging working condition into the power supply working condition, and meanwhile, the edge calculation server gives the power supply power.
2. The method for calculating the demand of the electricity billing system according to claim 1, wherein in S2, the edge calculation server calculates the average value of the sum of the average value of the average values: 00 automatically perform clock synchronization.
3. The method as claimed in claim 1, wherein in S4, when the collected power is in a reverse load state, the demand is a negative value.
4. The method as claimed in claim 1, wherein in S7, when the edge computing server provides the power of the power supply, the edge computing server further sends a signal to control the controllable load to unload or reduce the load.
5. The method for calculating the demand of the electric power billing system according to the user-owned different tables of claim 1, wherein in S4, the demand can be used as the demand device vector difference or vector sum, and meets the application scenario of the multi-table series or parallel relationship.
CN202111402343.7A 2021-11-24 2021-11-24 Demand calculation method for different meters of same household of electric power charging system Pending CN114255544A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111402343.7A CN114255544A (en) 2021-11-24 2021-11-24 Demand calculation method for different meters of same household of electric power charging system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111402343.7A CN114255544A (en) 2021-11-24 2021-11-24 Demand calculation method for different meters of same household of electric power charging system

Publications (1)

Publication Number Publication Date
CN114255544A true CN114255544A (en) 2022-03-29

Family

ID=80793181

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111402343.7A Pending CN114255544A (en) 2021-11-24 2021-11-24 Demand calculation method for different meters of same household of electric power charging system

Country Status (1)

Country Link
CN (1) CN114255544A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010122384A1 (en) * 2009-03-19 2010-10-28 パナソニック電工電路株式会社 Electricity meter
CN102376026A (en) * 2011-10-31 2012-03-14 冶金自动化研究设计院 Industrial enterprise power utilization load optimizing system
KR101157651B1 (en) * 2011-12-23 2012-06-18 주식회사 신아시스템 Demand controller switchable to electric generator in peak and method for controlling the same
JP2013162571A (en) * 2012-02-02 2013-08-19 Osaki Electric Co Ltd Energy saving system
CN103558453A (en) * 2013-10-22 2014-02-05 国家电网公司 System for collecting maximum demand of multi-power-source power supply direct power purchase customers
CN104937804A (en) * 2013-03-15 2015-09-23 株式会社东芝 Power demand estimating device, method, and program, and demand restraint planning device
JP2016220515A (en) * 2015-05-21 2016-12-22 株式会社日立製作所 Energy demand forecasting system and energy demand forecasting method
CN110148957A (en) * 2019-05-27 2019-08-20 合肥阳光新能源科技有限公司 A kind of demand control method, apparatus and system based on energy-storage system
CN110829426A (en) * 2019-11-26 2020-02-21 国网电子商务有限公司 Method and device for adjusting maximum demand of enterprise
CN111786378A (en) * 2020-06-01 2020-10-16 武汉中电国为技术有限公司 Method and device for deciding electric load and electric power monitoring equipment
CN112526185A (en) * 2020-12-04 2021-03-19 国网青海省电力公司 Multi-loop or power supply electricity consumption customer maximum demand meter device and metering method thereof

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010122384A1 (en) * 2009-03-19 2010-10-28 パナソニック電工電路株式会社 Electricity meter
CN102376026A (en) * 2011-10-31 2012-03-14 冶金自动化研究设计院 Industrial enterprise power utilization load optimizing system
KR101157651B1 (en) * 2011-12-23 2012-06-18 주식회사 신아시스템 Demand controller switchable to electric generator in peak and method for controlling the same
JP2013162571A (en) * 2012-02-02 2013-08-19 Osaki Electric Co Ltd Energy saving system
CN104937804A (en) * 2013-03-15 2015-09-23 株式会社东芝 Power demand estimating device, method, and program, and demand restraint planning device
CN103558453A (en) * 2013-10-22 2014-02-05 国家电网公司 System for collecting maximum demand of multi-power-source power supply direct power purchase customers
JP2016220515A (en) * 2015-05-21 2016-12-22 株式会社日立製作所 Energy demand forecasting system and energy demand forecasting method
CN110148957A (en) * 2019-05-27 2019-08-20 合肥阳光新能源科技有限公司 A kind of demand control method, apparatus and system based on energy-storage system
CN110829426A (en) * 2019-11-26 2020-02-21 国网电子商务有限公司 Method and device for adjusting maximum demand of enterprise
CN111786378A (en) * 2020-06-01 2020-10-16 武汉中电国为技术有限公司 Method and device for deciding electric load and electric power monitoring equipment
CN112526185A (en) * 2020-12-04 2021-03-19 国网青海省电力公司 Multi-loop or power supply electricity consumption customer maximum demand meter device and metering method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
代波: "基于计量自动化系统的多回路供电客户需量叠加技术研究及应用", 《机电信息》 *

Similar Documents

Publication Publication Date Title
Wong et al. Review on the optimal placement, sizing and control of an energy storage system in the distribution network
CN107491867B (en) Safety checking and evaluating method for multi-cycle transmission and transformation maintenance plan
US20090063257A1 (en) Automated peak demand controller
CN107112763A (en) Electricity grid network gateway polymerize
CN102074954A (en) Comprehensive energy-conservation evaluation and decision-making method for urban and rural distribution network
CN110429653A (en) Consider energy storage and the rural power grids distributed photovoltaic consumption method and terminal device of DR
CN105243254A (en) General line loss analysis method
CN107785888B (en) A kind of intelligent electric power load control system and control method
CN103187735A (en) Bidirectional intelligent gateway device for distributed new energy grid connection
US20170102677A1 (en) Power management system, power management method, and controller
CN109728579A (en) A kind of appraisal procedure of power distribution network operational efficiency, assessment device and assessment equipment
US20140142772A1 (en) Energy management system, energy management method, program, server apparatus, and local server
Meng et al. Distributed generation and storage optimal control with state estimation
CN111126703A (en) Method and device for predicting maximum power consumption demand of enterprise
Abadi et al. Active management of LV residential networks under high PV penetration
MansourLakouraj et al. Multi-timescale risk-constrained volt/var control of distribution grids with electric vehicles and solar inverters
Yuan et al. Bess aided renewable energy supply using deep reinforcement learning for 5g and beyond
CN104950738B (en) The system and method that multiple-way supply circuit controls maximum demand
CN103927589A (en) Orderly power utility centralized decision-making method for multi-time scale coordination
CN114255544A (en) Demand calculation method for different meters of same household of electric power charging system
CN105529712B (en) Integrated design microgrid control method is matched somebody with somebody in one kind storage
JP6549896B2 (en) Electric power demand adjustment device, electric power demand adjustment method and electric power demand adjustment program
Hashmi et al. Co-optimizing energy storage for prosumers using convex relaxations
CN204515013U (en) Multiple-way supply circuit maximum demand calculates display device in real time
CN114462676A (en) User side energy storage optimization method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220329

RJ01 Rejection of invention patent application after publication