CN113256266B - Building construction data archiving processing method and system based on data analysis and computer storage medium - Google Patents

Building construction data archiving processing method and system based on data analysis and computer storage medium Download PDF

Info

Publication number
CN113256266B
CN113256266B CN202110647000.0A CN202110647000A CN113256266B CN 113256266 B CN113256266 B CN 113256266B CN 202110647000 A CN202110647000 A CN 202110647000A CN 113256266 B CN113256266 B CN 113256266B
Authority
CN
China
Prior art keywords
construction
building
project
sub
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110647000.0A
Other languages
Chinese (zh)
Other versions
CN113256266A (en
Inventor
汤小伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Heyou Network Technology Co ltd
Original Assignee
Shaanxi Heyou Network Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Heyou Network Technology Co ltd filed Critical Shaanxi Heyou Network Technology Co ltd
Priority to CN202110647000.0A priority Critical patent/CN113256266B/en
Publication of CN113256266A publication Critical patent/CN113256266A/en
Application granted granted Critical
Publication of CN113256266B publication Critical patent/CN113256266B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Primary Health Care (AREA)

Abstract

The invention discloses a building construction data archiving processing method and system based on data analysis and a computer storage medium. The building construction data archiving processing method based on data analysis comprises the following steps: counting the number of construction sub-items corresponding to the building; acquiring a construction period corresponding to each construction sub-project of the building; acquiring constructor information corresponding to each construction sub-project of the building; acquiring construction equipment information corresponding to each construction sub-project of the building; analyzing and processing construction information corresponding to each construction sub-project of the building; arranging construction information corresponding to each sub-construction project of the building; the problem that data archived and processed by the existing building construction data archiving and processing method is limited and cannot effectively reflect specific construction information of building engineering is solved, and meanwhile, the reference and the rationality of construction data of each construction sub-project of the building are greatly improved.

Description

Building construction data archiving processing method and system based on data analysis and computer storage medium
Technical Field
The invention belongs to the technical field of data archiving processing, and relates to a building construction data archiving processing method and system based on data analysis and a computer storage medium.
Background
Along with the rapid development of economy, the building industry is rapidly developed, the archiving and the combing of the building construction data are one of indispensable projects for building construction, and meanwhile, the archiving and the processing of the building construction data have important reference values and reference meanings in the aspects of city construction and the like.
The existing building construction data archiving and processing method is mainly used for processing and archiving data of images and construction files acquired in a construction process, and obviously, the existing building construction data archiving and processing method has certain disadvantages.
Disclosure of Invention
In view of the above, in order to solve the problems in the background art, a method, a system and a computer storage medium for archiving and processing building construction data based on data analysis are provided, so as to implement accurate processing and archiving of the building construction data;
the purpose of the invention can be realized by the following technical scheme:
the invention provides a building construction data archiving processing method based on data analysis, which comprises the following steps:
s1, counting the quantity of construction sub-projects: counting the number of construction sub-projects corresponding to the building through a construction sub-project number counting module, numbering the counted construction sub-projects corresponding to the building according to a preset sequence, and marking the construction sub-projects as 1, 2,. i,. n;
s2, acquiring a construction period: acquiring a construction period corresponding to each construction sub-project of the building through a construction information acquisition module, and further constructing a construction period set Z (Z1, Z2,. multidot.Zi,. multidot.Zn) of each sub-project of the building, wherein Zi represents the construction period corresponding to the ith construction sub-project of the building;
s3, construction material information acquisition: acquiring material information corresponding to each construction sub-project of the building through a construction information acquisition module;
s4, acquiring manual information: the construction information acquisition module is used for acquiring the information of constructors corresponding to each construction sub-project of the building, further acquiring the quantity of the constructors corresponding to each construction sub-project of the building, numbering the constructors of each construction sub-project of the building according to a preset sequence, and sequentially marking the constructors as 1, 2,. x,. y;
s5, construction equipment information acquisition: construction equipment information corresponding to each construction sub-project of the building is obtained through a construction information obtaining module;
s6, information analysis and processing: analyzing and processing the construction period, construction material information, artificial information and construction equipment information corresponding to each construction sub-project of the building through a data processing and analyzing module, and counting the comprehensive rationality of the building construction;
s7, construction information arrangement: and arranging the construction period, the construction material information, the manual information and the construction equipment information corresponding to each sub-construction project of the building through a construction information arrangement module, and further acquiring the arranged construction information corresponding to the building.
Further, the construction material information comprises construction material models, the number corresponding to each construction model material and the unit price corresponding to each type of construction material, the models of the construction materials of each construction sub-project of the building are numbered according to a preset sequence, and are sequentially marked as 1, 2,. j,. m, so that a construction material information set L of each model of each construction sub-project of the building is constructed w d (L w d 1,L w d 2,...L w d j,...L w d m),L w d j represents the w-th information corresponding to the j-th model material of the d-th construction sub-project of the building, w represents the construction material information, and w is a1, a2, a1 and a2 respectively represent the number corresponding to each construction model material and the unit price corresponding to each model construction material.
Further, the manual information comprises construction duration corresponding to each constructor and labor cost corresponding to each constructor, and then a manual information set R of each constructor of each construction sub-project of the building is constructed e d (R e d 1,R e d 2,...R e d x,...R e d y),R e d x represents the e-th personal work information corresponding to the x-th constructor of the d-th construction sub-project of the building, e represents the work information, and e is b1, b2, b1 and b2 respectively represent construction time and labor cost.
Furthermore, the construction equipment is machine equipment corresponding to construction, models corresponding to construction equipment of each construction sub-project of the building are obtained, the models corresponding to the construction equipment of each construction sub-project of the building are numbered according to a preset sequence, the models are marked as 1, 2, k, h, the number corresponding to the construction equipment of each model, the working time corresponding to the construction equipment of each model and the construction cost corresponding to the construction equipment of each model are obtained, and an information set J of the construction equipment of each model of each construction sub-project of the building is constructed z d (J z d 1,J z d 2,...J z d k,...J z d h),J z d k represents the z-th information corresponding to each model of construction equipment of the kth construction sub-project of the building, z represents the construction equipment information, and z is c1, c2, c3, c1, c2 and c3 respectively represent the number corresponding to each model of construction equipment, the working time corresponding to each model of construction equipment and the construction cost corresponding to each model of construction equipment.
Further, the specific analysis processing procedure of the information analysis and processing comprises the following steps:
s61, according to the obtained construction period corresponding to each construction sub-project of the building, comparing each construction sub-project of the building with the standard construction period corresponding to each construction sub-project of the building, and further counting the reasonable influence coefficient of the construction period of each construction sub-project of the building, wherein the calculation formula is
Figure GDA0003508067440000031
α d Expressing the rationality influence coefficient T of the construction period corresponding to the d-th construction sub-project of the building d Represents the construction period, T, corresponding to the d-th construction sub-project of the building d standard Representing the standard construction period corresponding to the d-th construction sub-project of the building;
s62, obtaining information set of each model of construction material of each construction sub-project of the building, further obtaining the quantity corresponding to each model of construction material of each construction sub-project of the building and the corresponding unit price of each model of construction material, further comparing the quantity corresponding to each model of construction material of each construction sub-project of the building with the standard quantity corresponding to each model of construction material of each construction sub-project, further counting the rationality influence coefficient of the quantity of construction material of each model of construction sub-project of the building, simultaneously comparing the unit price corresponding to each model of construction material of each construction sub-project of the building with the standard unit price corresponding to each model of construction material, further counting the rationality influence coefficient of the unit price of construction material of each model of construction sub-project of the building, according to the counted rationality influence coefficient of the quantity of construction material of each model of each construction sub-project of the building and the rationality influence coefficient of the unit price of construction material of each model of each construction sub-project of the building, further counting the rationality influence coefficient of the construction material of each construction sub-project of the building;
s63, acquiring the manual information set of each constructor of each construction sub-project of the building, further acquiring the construction time length and the manual cost corresponding to each constructor of each construction sub-project of the building, comparing the number of constructors corresponding to each construction sub-project of the building with the number of standard constructors corresponding to each construction sub-project of the building according to the number of constructors corresponding to each construction sub-project of the building, further counting the rationality influence coefficient of the number of constructors of each construction project of the building, comparing the construction time length and the manual cost corresponding to each constructor of each construction sub-project of the building with the standard construction time length and the standard manual cost corresponding to each constructor of the building, counting the rationality influence coefficient of each construction information of each constructor of each construction sub-project of the building, and counting the rationality influence coefficient of the number of constructors of each construction project of the building and the rationality influence coefficient of each construction information of each constructor of each construction sub-project of the building according to the statistics Further, counting the information rationality influence coefficient of the constructors of each construction sub-project of the building;
s64, acquiring information sets of construction equipment of each type of construction sub-project of the building, further acquiring the number of the construction equipment of each type corresponding to each construction sub-project of the building, the working time length corresponding to the construction equipment of each type and the construction cost corresponding to the construction equipment of each type, comparing the number of the construction equipment of each type corresponding to each construction sub-project of the building, the working time length corresponding to the construction equipment of each type and the construction cost corresponding to the construction equipment of each type with the standard number, the standard working time length and the standard construction cost corresponding to the construction equipment of each type of each construction sub-project, counting the rationality influence coefficients of the construction equipment information of each type of each construction sub-project of the building, and further counting the rationality influence coefficients of the construction equipment information of each construction sub-project of the building.
Further, the information analysis and processing further comprises comprehensively analyzing and processing the construction period, the construction material information, the artificial information and the construction equipment information corresponding to each construction sub-project of the building, and further, according to the counted construction period rationality influence coefficient of each construction sub-project of the building, the construction material rationality influence coefficient of each construction sub-project of the building, the information rationality influence coefficient of each construction sub-project of the building and the construction equipment information rationality influence coefficient of each construction sub-project of the building, the comprehensive rationality influence coefficient of the construction information is further counted.
Further, the construction information arrangement comprises the steps that a user arranges construction information corresponding to each construction sub-project of the building, then the construction information arrangement template is extracted from the database, the construction period, construction material information, manual information and construction equipment information corresponding to each construction sub-project of the building are arranged according to the construction information arrangement template, label addition is carried out on the arranged information, then the construction information corresponding to the building after the label is added is integrated and compressed, and then the arranged construction information corresponding to the building is obtained.
Further, the method also comprises the step of sending construction information, wherein the construction information comprehensive rationality influence coefficient and the arranged construction information corresponding to the building are sent to a construction supervision worker corresponding to the building for analysis and archiving through an information sending terminal.
The invention provides a building construction data archiving processing system based on data analysis, wherein a data processing and analyzing module is respectively connected with a construction information acquisition module, a database and an information sending terminal, a construction information sorting module is respectively connected with a construction information acquisition module and the information sending terminal, and the construction information acquisition module is connected with a construction sub-project quantity counting module, wherein the construction information acquisition module comprises a construction sub-project construction period acquisition unit, a construction material information acquisition unit, a manual information acquisition unit and a construction equipment information acquisition unit.
A third aspect of the present invention provides a computer storage medium, in which a computer program is burned, and when the computer program runs in a memory of a server, the computer program implements the method according to any one of the above-mentioned embodiments.
The invention has the beneficial effects that:
(1) according to the construction data archiving and processing method based on data analysis, the construction period, the construction material information, the manual information and the construction equipment information corresponding to each construction sub-project of the building are acquired, processed and archived, so that the problem that the archived and processed data of the existing construction data archiving and processing method has limitation and cannot effectively reflect the specific construction information of the construction project is solved, the reference of the construction data of each construction sub-project of the building is greatly improved, and meanwhile, the rationality of the information of each construction sub-project of the building project is effectively analyzed.
(2) According to the construction information comprehensive reasonability influence coefficient and the construction information corresponding to the building after arrangement are sent to the construction supervision personnel corresponding to the building for analysis and filing, so that the efficiency of the construction supervision personnel for acquiring the construction information of each construction sub-project of the building is greatly improved, and the efficiency of the construction supervision personnel for acquiring the reasonability of the construction information of each construction sub-project of the building is also greatly improved.
(3) In the construction information arrangement, the construction period, the construction material information, the manual information and the construction equipment information corresponding to each construction sub-project of the building are arranged according to the construction information arrangement template, and the arranged information is added with a label, so that the arrangement efficiency of the construction information of each construction sub-project of the building is greatly improved, and meanwhile, the arrangement definition of the construction information of each construction sub-project of the building and the acquisition efficiency of effective information by building managers are also greatly improved.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a flow chart of the steps of the method of the present invention;
FIG. 2 is a schematic diagram showing the connection of the modules of the system of the present invention;
fig. 3 is a schematic diagram of the connection of the construction information acquisition module according to the present invention.
Detailed Description
While the foregoing is directed to embodiments of the present invention, other and further embodiments of the invention may be devised without departing from the basic scope thereof, and the scope thereof is determined by the claims that follow.
Referring to fig. 1, a first aspect of the present invention provides a building construction data archiving processing method based on data analysis, including the following steps:
s1, counting the quantity of construction sub-projects: counting the number of construction sub-projects corresponding to the building through a construction sub-project number counting module, numbering the counted construction sub-projects corresponding to the building according to a preset sequence, and marking the construction sub-projects as 1, 2,. i,. n;
s2, acquiring a construction period: acquiring a construction period corresponding to each construction sub-project of the building through a construction information acquisition module, and further constructing a construction period set Z (Z1, Z2,. multidot.Zi,. multidot.Zn) of each sub-project of the building, wherein Zi represents the construction period corresponding to the ith construction sub-project of the building;
s3, construction material information acquisition: acquiring material information corresponding to each construction sub-project of the building through a construction information acquisition module;
specifically, the construction material information includes the type of construction material, the quantity corresponding to each construction type material and the unit price corresponding to each type of construction material, the types of the construction materials of each construction sub-project of the building are numbered according to a preset sequence, and are sequentially marked as 1, 2,. j,. m, and then a construction material information set L of each type of construction sub-project of the building is constructed w d (L w d 1,L w d 2,...L w d j,...L w d m),L w d j represents the w-th information corresponding to the j-th model material of the d-th construction sub-project of the building, w represents the construction material information, and w is a1, a2, a1 and a2 respectively represent the number corresponding to each construction model material and the unit price corresponding to each model construction material.
According to the embodiment of the invention, the construction material information corresponding to each construction sub-project is obtained, so that a powerful data basis is provided for the subsequent rationality of the selection of the construction materials of each construction sub-project of the building and the rationality analysis of the price of the construction materials, and meanwhile, the selection and the calling of the construction materials directly influence the construction quality of the building.
S4, acquiring manual information: the construction information acquisition module is used for acquiring the information of constructors corresponding to each construction sub-project of the building, further acquiring the quantity of the constructors corresponding to each construction sub-project of the building, numbering the constructors of each construction sub-project of the building according to a preset sequence, and sequentially marking the constructors as 1, 2,. x,. y;
specifically, the manual information includes construction duration corresponding to each constructor and labor cost corresponding to each constructor, and then manual information sets R of each constructor of each construction sub-project of the building are constructed e d (R e d 1,R e d 2,...R e d x,...R e d y),R e d x represents the e-th personal work information corresponding to the x-th constructor of the d-th construction sub-project of the building, e represents the manual information, e is b1, b2, b1 and b2 respectively represent construction time length and manual cost, d represents the number of the construction sub-project of the building, and d is 1, 2.
According to the embodiment of the invention, the actual working time length and the actual cost corresponding to each constructor of each construction sub-project are effectively obtained by obtaining the constructor information corresponding to each construction sub-project of the building, the actual working time length of the constructor directly influences the construction period of each sub-project of the building, and a bedding is provided for the subsequent rationality analysis of the constructor information corresponding to each sub-project of the building.
S5, construction equipment information acquisition: construction equipment information corresponding to each construction sub-project of the building is obtained through a construction information obtaining module;
specifically, the construction equipment is machine equipment corresponding to construction, models corresponding to construction equipment of each construction sub-project of the building are obtained, the models corresponding to the construction equipment of each construction sub-project of the building are numbered according to a preset sequence, the models are marked as 1, 2, k, h, the number corresponding to the construction equipment of each model, the working time corresponding to the construction equipment of each model and the construction cost corresponding to the construction equipment of each model are obtained, and an information set J of the construction equipment of each model of each construction sub-project of the building is constructed z d (J z d 1,J z d 2,...J z d k,...J z d h),J z d k represents the z-th information corresponding to each model of construction equipment of the kth construction sub-project of the building, z represents the construction equipment information, and z is c1, c2, c3, c1, c2 and c3 respectively represent the number corresponding to each model of construction equipment, the working time corresponding to each model of construction equipment and the construction cost corresponding to each model of construction equipment.
According to the embodiment of the invention, the specific use information corresponding to the construction equipment of the building is effectively obtained by obtaining the information corresponding to the construction equipment of each construction sub-project of the building, and information basis and data reference are provided for the subsequent analysis of the construction equipment information.
S6, information analysis and processing: analyzing and processing the construction period, construction material information, manual information and construction equipment information corresponding to each construction sub-project of the building through a data processing and analyzing module, and counting the comprehensive rationality of the building construction;
specifically, the specific analysis processing procedure of the information analysis and processing includes the following steps:
s61, according to the obtained construction period corresponding to each construction sub-project of the building, comparing each construction sub-project of the building with the standard construction period corresponding to each construction sub-project of the building, and further counting the rationality influence coefficient of the construction period of each construction sub-project of the building, wherein the calculation formula is
Figure GDA0003508067440000091
α d Expressing the rationality influence coefficient T of the construction period corresponding to the d-th construction sub-project of the building d Represents the construction period, T, corresponding to the d-th construction sub-project of the building d standard Representing the standard construction period corresponding to the d-th construction sub-project of the building;
s62, obtaining information set of each model of construction material of each construction sub-project of the building, further obtaining the quantity corresponding to each model of construction material of each construction sub-project of the building and the corresponding unit price of each model of construction material, further comparing the quantity corresponding to each model of construction material of each construction sub-project of the building with the standard quantity corresponding to each model of construction material of each construction sub-project, further counting the rationality influence coefficient of the quantity of construction material of each model of construction sub-project of the building, simultaneously comparing the unit price corresponding to each model of construction material of each construction sub-project of the building with the standard unit price corresponding to each model of construction material, further counting the rationality influence coefficient of the unit price of construction material of each model of construction sub-project of the building, according to the counted rationality influence coefficient of the quantity of construction material of each model of each construction sub-project of the building and the rationality influence coefficient of the unit price of construction material of each model of each construction sub-project of the building, further counting the rationality influence coefficient of the construction material of each construction sub-project of the building;
wherein, the calculation formula of the reasonable influence coefficient of the quantity of the construction materials of each model of each construction sub-project of the building is
Figure GDA0003508067440000101
β d r A1 representing the rationality influence coefficient corresponding to the r model construction material quantity of the d construction sub-project of the building d r A1 representing the quantity of the construction material corresponding to the r model of the d construction sub-project d standard of r And the standard quantity corresponding to the r model construction material of the d construction sub-project of the building is shown.
Wherein, each construction sub-project of the building has various types of construction materialsThe influence coefficient of the rationality of the unit price of the material is calculated by the formula
Figure GDA0003508067440000102
δ d r A2 representing the rationality influence coefficient corresponding to the r model construction material quantity of the d construction sub-project of the building d r A2 representing the unit price corresponding to the r model construction material of the d construction sub-project of the building r standard And the standard unit price corresponding to the r-th construction material of the building is shown.
Wherein, the computing formula of the rationality influence coefficient of the construction material of each construction sub-project of the building is
Figure GDA0003508067440000103
γ d And the construction material rationality influence coefficient corresponding to the d-th construction sub-project of the building is represented, r represents a construction material model number, and r is 1, 2,. j,. m.
S63, acquiring the manual information set of each constructor of each construction sub-project of the building, further acquiring the construction time length and the manual cost corresponding to each constructor of each construction sub-project of the building, comparing the number of constructors corresponding to each construction sub-project of the building with the number of standard constructors corresponding to each construction sub-project of the building according to the number of constructors corresponding to each construction sub-project of the building, further counting the rationality influence coefficient of the number of constructors of each construction project of the building, comparing the construction time length and the manual cost corresponding to each constructor of each construction sub-project of the building with the standard construction time length and the standard manual cost corresponding to each constructor of the building, counting the rationality influence coefficient of each construction information of each constructor of each construction sub-project of the building, and counting the rationality influence coefficient of the number of constructors of each construction project of the building and the rationality influence coefficient of each construction information of each constructor of each construction sub-project of the building according to the statistics Further, counting the information rationality influence coefficient of the constructors of each construction sub-project of the building;
wherein, the calculation formula of the reasonable influence coefficient of the quantity of the constructors of each construction project of the building is
Figure GDA0003508067440000111
ε d Expressing the rationality influence coefficient, H, corresponding to the number of constructors of the d-th construction sub-project of the building d Indicates the number of constructors, H, corresponding to the d-th sub-project of the building d standard And the standard number of constructors corresponding to the d-th construction sub-project of the building is shown.
Wherein, the calculation formula of the rationality influence coefficient of each construction information of each constructor of each construction sub-project of the building is
Figure GDA0003508067440000112
φ e dt B1 showing the rationality influence coefficient corresponding to the e-th construction information of the t-th constructor of the d-th construction sub-project of the building d t ,b2 d t Respectively represents the construction time and labor cost corresponding to the t-th constructor of the d-th construction sub-project of the building, b1 Standard of merit ,b2 Standard of merit Respectively indicating the standard construction time and the standard labor cost corresponding to the building constructor.
Wherein, the calculation formula of the information rationality influence coefficient of each construction sub-project constructor of the building is
Figure GDA0003508067440000121
And the rationality influence coefficient corresponding to the information of the constructors of the ith construction sub-project of the building is represented, t represents the number of the constructors of each construction sub-project, and t is 1, 2, the.
S64, acquiring information sets of construction equipment of each type of construction sub-project of the building, further acquiring the number of the construction equipment of each type corresponding to each construction sub-project of the building, the working time length corresponding to the construction equipment of each type and the construction cost corresponding to the construction equipment of each type, comparing the number of the construction equipment of each type corresponding to each construction sub-project of the building, the working time length corresponding to the construction equipment of each type and the construction cost corresponding to the construction equipment of each type with the standard number, the standard working time length and the standard construction cost corresponding to the construction equipment of each type of each construction sub-project, counting the rationality influence coefficients of the construction equipment information of each type of each construction sub-project of the building, and further counting the rationality influence coefficients of the construction equipment information of each construction sub-project of the building.
Wherein, the calculation formula of the information rationality influence coefficient of each type of construction equipment of each construction sub-project of the building is
Figure GDA0003508067440000122
μ z dg C1 showing the rationality influence coefficient corresponding to the z-th information of the g-th model construction equipment of the d construction sub-projects of the building d g ,c2 d g ,c3 d g Respectively representing the quantity, the working time length and the construction cost corresponding to the g model construction equipment of the d construction sub-projects of the building, c1 d standard g ,c2 d standard g ,c3 d standard g And respectively representing the standard quantity, the standard working time and the standard construction cost corresponding to the No. g construction equipment of the d construction sub-projects of the building.
Wherein, the calculation formula of the information rationality influence coefficient of each construction sub-project construction equipment of the building is
Figure GDA0003508067440000123
η d And the rationality influence coefficients corresponding to the construction equipment information of the d construction sub-projects of the building are represented, g represents the model number of the construction equipment of each construction washing project, and g is 1, 2, k, h.
Specifically, the information analysis and processing further comprises comprehensively analyzing and processing construction periods, construction material information, artificial information and construction equipment information corresponding to each construction sub-project of the building, and further counting the comprehensive reasonable influence coefficient of the construction information according to the counted reasonable influence coefficient of the construction period of each construction sub-project of the building, the reasonable influence coefficient of the construction material of each construction sub-project of the building, the reasonable influence coefficient of the constructor information of each construction sub-project of the building and the reasonable influence coefficient of the construction equipment information of each construction sub-project of the building, wherein the calculation formula is that
Figure GDA0003508067440000131
Xi represents the comprehensive rationality influence coefficient corresponding to the construction information, and n represents the number corresponding to the construction sub-project.
According to the embodiment of the invention, the construction period, the construction material information, the manual information and the construction equipment information corresponding to each construction sub-project of the building are analyzed and processed, so that the problem that the data archived and processed by the conventional construction data archiving and processing method has limitation and cannot effectively reflect the specific construction information of the building project is solved, the reference of the construction data of each construction sub-project of the building is greatly improved, and the rationality of the information of each construction sub-project of the building project is effectively analyzed.
S7, construction information arrangement: the construction period, the construction material information, the manual information and the construction equipment information corresponding to each sub-construction project of the building are arranged through a construction information arrangement module, and then the construction information corresponding to the arranged building is obtained;
specifically, the construction information arrangement includes that a user arranges construction information corresponding to each construction sub-project of the building, further extracts a construction information arrangement template of the building from a database, arranges construction periods, construction material information, manual information and construction equipment information corresponding to each construction sub-project of the building according to the construction information arrangement template of the building, adds labels to the arranged information, further integrates and compresses the construction information corresponding to the building after the labels are added, and further acquires the arranged construction information corresponding to the building.
In a specific embodiment, the tag adding is used for performing tag adding on the construction information corresponding to the constructed building, wherein the tag corresponding to the construction information comprises a period tag, a material tag, an artificial tag and an equipment tag, and then each constructed tag is matched and added with the construction information corresponding to the building, so that the arrangement efficiency of the construction information of each construction sub-project of the building is greatly improved, and meanwhile, the arrangement definition of the construction information of each construction sub-project of the building and the obtaining efficiency of effective information by building supervisors are also greatly improved.
In one embodiment, the construction information integration and compression is used for integrating construction information into a document format, wherein the compression modes include compression into files, compression into barcodes and compression into two-dimensional code forms, the invention selects the compression into the two-dimensional code forms, and the specific operation process comprises the following steps:
a1, carrying out data analysis on the building construction information integration information, determining the data length, determining the format and version according to the data length, converting the input data into bit streams through data coding, and carrying out finite field conversion by adopting an error correction channel coding algorithm to generate error correction channel coding data code words;
a2, generating a corresponding key from the data code word, encrypting the key according to an encryption algorithm, and converting the encrypted key into an encrypted code word according to a preset encoding algorithm;
a3, obtaining the data code length and the error correction grade of the data code word by encrypting the code word, and searching the number of the error correction code word blocks in a preset error correction characteristic table entry;
and A4, generating the two-dimensional code information from the data code word and the encrypted code word according to the structural mode corresponding to the number of the error correction code word blocks.
According to the embodiment of the invention, the construction integration information corresponding to the building is compressed into the two-dimensional code form, so that the storage space corresponding to the construction information of the building is greatly saved, meanwhile, the convenience of sending is greatly improved by the method of sending in the two-dimensional code form, and the convenience of acquiring information by building supervision personnel is also greatly improved.
S8, construction information sending: and sending the comprehensive rationality influence coefficient of the building construction information and the arranged construction information corresponding to the building to a construction supervision worker corresponding to the building through an information sending terminal for analysis and archiving.
According to the embodiment of the invention, the construction information comprehensive rationality influence coefficient and the construction information corresponding to the arranged building are sent to the construction manager corresponding to the building for analysis and archiving, so that the efficiency of the construction manager for acquiring the construction information of each construction sub-project of the building is greatly improved, and the efficiency of the construction manager for acquiring the rationality of the construction information of each construction sub-project of the building is also greatly improved.
Referring to fig. 2 to 3, a second aspect of the present invention provides a building construction data archiving and processing system based on data analysis, in which a data processing and analyzing module is respectively connected to a construction information obtaining module, a database, and an information sending terminal, a construction information collating module is respectively connected to a construction information obtaining module and an information sending terminal, and a construction information obtaining module is connected to a construction sub-project quantity counting module, wherein the construction information obtaining module includes a construction sub-project construction period obtaining unit, a construction material information obtaining unit, a manual information obtaining unit, and a construction equipment information obtaining unit.
The database is used for storing the standard construction period corresponding to each construction sub-project of the building, the standard quantity corresponding to each model of construction material of each construction sub-project, the standard constructor quantity corresponding to each construction sub-project of the building, the standard construction time length corresponding to the constructor, the standard labor cost, the standard quantity corresponding to each model of construction equipment of each construction sub-project, the standard working time length and the standard construction cost.
A third aspect of the present invention provides a computer storage medium, in which a computer program is burned, and when the computer program runs in a memory of a server, the computer program implements the method according to any one of the above-mentioned embodiments.
The foregoing is illustrative and explanatory only of the present invention, and it is intended that the present invention cover modifications, additions, or substitutions by those skilled in the art, without departing from the spirit of the invention or exceeding the scope of the claims.

Claims (8)

1. The building construction data archiving processing method based on data analysis is characterized by comprising the following steps: the method comprises the following steps:
s1, counting the quantity of construction sub-projects: counting the number of construction sub-projects corresponding to the building through a construction sub-project number counting module, numbering the counted construction sub-projects corresponding to the building according to a preset sequence, and sequentially marking the construction sub-projects as 1, 2,. i,. n;
s2, acquiring a construction period: acquiring a construction period corresponding to each construction sub-project of the building through a construction information acquisition module, and further constructing a construction period set Z (Z1, Z2,. Zi,. Zn) of each sub-project of the building, wherein Zi represents a construction period corresponding to the ith construction sub-project of the building;
s3, construction material information acquisition: acquiring material information corresponding to each construction sub-project of the building through a construction information acquisition module;
s4, acquiring manual information: the construction information acquisition module is used for acquiring the information of constructors corresponding to each construction sub-project of the building, further acquiring the quantity of the constructors corresponding to each construction sub-project of the building, numbering the constructors of each construction sub-project of the building according to a preset sequence, and sequentially marking the constructors as 1, 2,. x,. y;
s5, construction equipment information acquisition: construction equipment information corresponding to each construction sub-project of the building is obtained through a construction information obtaining module;
s6, information analysis and processing: analyzing and processing the construction period, construction material information, manual information and construction equipment information corresponding to each construction sub-project of the building through a data processing and analyzing module, and counting the comprehensive rationality of the building construction;
s7, construction information arrangement: the construction period, the construction material information, the manual information and the construction equipment information corresponding to each sub-construction project of the building are arranged through a construction information arrangement module, and then the construction information corresponding to the arranged building is obtained;
the specific analysis processing process of the information analysis and processing comprises the following steps:
s61, according to the construction period corresponding to each construction sub-project of the building, further connectingComparing each construction sub-project of the building with the standard construction period corresponding to each construction sub-project of the building, and further counting the rationality influence coefficient of the construction period of each construction sub-project of the building, wherein the calculation formula is
Figure FDA0003508067430000021
α d Expressing the rationality influence coefficient T of the construction period corresponding to the d-th construction sub-project of the building d Represents the construction period, T, corresponding to the d-th construction sub-project of the building d standard The standard construction period corresponding to the d-th construction sub-project of the building is represented;
s62, obtaining information set of each model of construction material of each construction sub-project of the building, further obtaining the quantity corresponding to each model of construction material of each construction sub-project of the building and the corresponding unit price of each model of construction material, further comparing the quantity corresponding to each model of construction material of each construction sub-project of the building with the standard quantity corresponding to each model of construction material of each construction sub-project, further counting the rationality influence coefficient of the quantity of construction material of each model of construction sub-project of the building, simultaneously comparing the unit price corresponding to each model of construction material of each construction sub-project of the building with the standard unit price corresponding to each model of construction material, further counting the rationality influence coefficient of the unit price of construction material of each model of construction sub-project of the building, according to the counted rationality influence coefficient of the quantity of construction material of each model of each construction sub-project of the building and the rationality influence coefficient of the unit price of construction material of each model of each construction sub-project of the building, further counting the rationality influence coefficient of the construction material of each construction sub-project of the building;
wherein, the calculation formula of the reasonable influence coefficient of the quantity of the construction materials of each model of each construction sub-project of the building is
Figure FDA0003508067430000022
β d r A1 representing the rationality influence coefficient corresponding to the r model construction material quantity of the d construction sub-project of the building d r Indicating the quantity corresponding to the r model construction material of the d construction sub-project,a1 d standard r The standard quantity corresponding to the r model construction material of the d construction sub-project of the building is represented;
wherein, the calculation formula of the unit price rationality influence coefficient of each type of construction material of each construction sub-project of the building is
Figure FDA0003508067430000031
δ d r A2 representing the rationality influence coefficient corresponding to the r model construction material quantity of the d construction sub-project of the building d r A2 representing the unit price corresponding to the r model construction material of the d construction sub-project of the building r standard Representing the standard unit price corresponding to the construction material of the r-th model of the building;
wherein, the calculation formula of the rationality influence coefficient of the construction materials of each construction sub-project of the building is
Figure FDA0003508067430000032
γ d The construction material rationality influence coefficient corresponding to the d-th construction sub-project of the building is represented, r represents the construction material model number, and r is 1, 2,. j,. m;
s63, acquiring the manual information set of each constructor of each construction sub-project of the building, further acquiring the construction time length and the manual cost corresponding to each constructor of each construction sub-project of the building, comparing the number of constructors corresponding to each construction sub-project of the building with the number of standard constructors corresponding to each construction sub-project of the building according to the number of constructors corresponding to each construction sub-project of the building, further counting the rationality influence coefficient of the number of constructors of each construction project of the building, comparing the construction time length and the manual cost corresponding to each constructor of each construction sub-project of the building with the standard construction time length and the standard manual cost corresponding to each constructor of the building, counting the rationality influence coefficient of each construction information of each constructor of each construction sub-project of the building, and counting the rationality influence coefficient of the number of constructors of each construction project of the building and the rationality influence coefficient of each construction information of each constructor of each construction sub-project of the building according to the statistics Further, counting the information rationality influence coefficient of the constructors of each construction sub-project of the building;
wherein, the calculation formula of the reasonable influence coefficient of the quantity of the constructors of each construction project of the building is
Figure FDA0003508067430000033
ε d Expressing the rationality influence coefficient, H, corresponding to the number of constructors of the d-th construction sub-project of the building d Indicates the number of constructors, H, corresponding to the d-th sub-project of the building d standard Representing the number of standard constructors corresponding to the d-th construction sub-project of the building;
wherein, the calculation formula of the rationality influence coefficient of each construction information of each constructor of each construction sub-project of the building is
Figure FDA0003508067430000041
φ e dt B1 showing the rationality influence coefficient corresponding to the e-th construction information of the t-th constructor of the d-th construction sub-project of the building d t ,b2 d t Respectively represents the construction time and labor cost corresponding to the t-th constructor of the d-th construction sub-project of the building, b1 Standard of merit ,b2 Standard of merit Respectively representing the standard construction time and the standard labor cost corresponding to the building constructor;
wherein, the calculation formula of the information rationality influence coefficient of each construction sub-project constructor of the building is
Figure FDA0003508067430000042
Figure FDA0003508067430000043
The method comprises the steps of representing a rationality influence coefficient corresponding to the information of the constructors of the d-th construction sub-project of the building, wherein t represents the number of the constructors of each construction sub-project, and t is 1, 2, a.
S64, acquiring information sets of construction equipment of each type of construction sub-project of the building, further acquiring the number of the construction equipment of each type corresponding to each construction sub-project of the building, the working time length corresponding to the construction equipment of each type and the construction cost corresponding to the construction equipment of each type, comparing the number of the construction equipment of each type corresponding to each construction sub-project of the building, the working time length corresponding to the construction equipment of each type and the construction cost corresponding to the construction equipment of each type with the standard number, the standard working time length and the standard construction cost corresponding to the construction equipment of each type of each construction sub-project, counting the rationality influence coefficients of the construction equipment information of each type of each construction sub-project of the building, and further counting the rationality influence coefficients of the construction equipment information of each construction sub-project of the building;
wherein, the calculation formula of the information rationality influence coefficient of each type of construction equipment of each construction sub-project of the building is
Figure FDA0003508067430000051
μ z dg C1 showing the rationality influence coefficient corresponding to the z-th information of the g-th model construction equipment of the d construction sub-projects of the building d g ,c2 d g ,c3 d g Respectively represents the corresponding quantity, the working time length and the construction cost of the g model construction equipment of the d construction sub-projects of the building, and c1 d standard of g ,c2 d standard g ,c3 d standard g Respectively representing the standard quantity, the standard working time and the standard construction cost corresponding to the No. g construction equipment of the d construction sub-projects of the building;
wherein, the calculation formula of the information rationality influence coefficient of each construction sub-project construction equipment of the building is
Figure FDA0003508067430000052
η d Expressing the rationality influence coefficients corresponding to the construction equipment information of the d construction sub-projects of the building, wherein g expresses the model number of the construction equipment of each construction washing project, and g is 1, 2,. k,. h;
the information analysis and processing also comprises construction period, construction material information, artificial information and construction equipment information corresponding to each construction sub-project of the buildingCarrying out comprehensive analysis and processing, and further carrying out statistics on the comprehensive rationality influence coefficient of the construction information of the building according to the counted rationality influence coefficient of the construction period of each construction sub-project of the building, the rationality influence coefficient of construction materials of each construction sub-project of the building, the rationality influence coefficient of constructor information of each construction sub-project of the building and the rationality influence coefficient of construction equipment information of each construction sub-project of the building; the calculation formula is
Figure FDA0003508067430000053
Xi represents the comprehensive rationality influence coefficient corresponding to the building construction information, and n represents the number corresponding to the building construction sub-project.
2. The building construction data archiving processing method based on data analysis according to claim 1, characterized in that: the construction material information comprises construction material models, the quantity corresponding to each construction model material and the unit price corresponding to each type of construction material, the models of the construction materials of each construction sub-project of the building are numbered according to a preset sequence, the numbers are marked as 1, 2, the w d (L w d 1,L w d 2,...L w d j,...L w d m),L w d j represents the w-th information corresponding to the jth model material of the d construction sub-project of the building, w represents the construction material information, and w is a1 and a 2; a1 and a2 respectively indicate the number of construction type materials and the unit price of each type of construction material.
3. The building construction data archiving processing method based on data analysis according to claim 1, characterized in that: the manual information comprises construction time corresponding to each constructor and labor cost corresponding to each constructor, and then manual information sets R of each constructor of each construction sub-project of the building are constructed e d (R e d 1,R e d 2,...R e d x,...R e d y),R e d x represents the e-th personal work information corresponding to the x-th constructor of the d-th construction sub-project of the building, e represents the manual information, and e is b1 and b 2; b1 and b2 represent construction time and labor cost, respectively.
4. The construction data archiving processing method based on data analysis according to claim 1, characterized in that: the construction equipment is machine equipment corresponding to construction, models corresponding to construction equipment of each construction sub-project of the building are obtained, the models corresponding to the construction equipment of each construction sub-project of the building are numbered according to a preset sequence, the numbers are marked as 1, 2, k, h, the number corresponding to the construction equipment of each model, the working time corresponding to the construction equipment of each model and the construction cost corresponding to the construction equipment of each model are obtained, and an information set J of the construction equipment of each model of each construction sub-project of the building is constructed z d (J z d 1,J z d 2,...J z d k,...J z d h),J z d k represents the z-th information corresponding to the kth construction equipment of the building of the d-th construction sub-project, z represents the construction equipment information, and z is c1, c2 and c 3; c1, c2 and c3 respectively represent the number of the construction equipment of each model, the working time length of the construction equipment of each model and the construction cost of the construction equipment of each model.
5. The building construction data archiving processing method based on data analysis according to claim 1, characterized in that: the construction information arrangement comprises the steps that a user arranges construction information corresponding to each construction sub-project of the building, then a construction information arrangement template of the building is extracted from a database, the construction period, construction material information, manual information and construction equipment information corresponding to each construction sub-project of the building are arranged according to the construction information arrangement template of the building, label addition is carried out on the arranged information, then construction information corresponding to the building after the label addition is integrated and compressed, and then construction information corresponding to the building after arrangement is obtained.
6. The building construction data archiving processing method based on data analysis according to claim 1, characterized in that: the method also comprises the step of transmitting construction information, wherein the construction information comprehensive rationality influence coefficient and the construction information corresponding to the building after arrangement are transmitted to a construction supervisor corresponding to the building for analysis and archiving through an information transmitting terminal.
7. The utility model provides a building construction data archives processing system based on data analysis which characterized in that: the data processing and analyzing module is respectively connected with the construction information acquisition module, the database and the information sending terminal, the construction information sorting module is respectively connected with the construction information acquisition module and the information sending terminal, the construction information acquisition module is connected with the construction sub-project quantity counting module, and the construction information acquisition module comprises a construction sub-project construction period acquisition unit, a construction material information acquisition unit, a manual information acquisition unit and a construction equipment information acquisition unit.
8. A computer storage medium, wherein a computer program is burned on the computer storage medium, and when the computer program runs in a memory of a server, the computer program realizes the method of any one of claims 1 to 6.
CN202110647000.0A 2021-06-10 2021-06-10 Building construction data archiving processing method and system based on data analysis and computer storage medium Active CN113256266B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110647000.0A CN113256266B (en) 2021-06-10 2021-06-10 Building construction data archiving processing method and system based on data analysis and computer storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110647000.0A CN113256266B (en) 2021-06-10 2021-06-10 Building construction data archiving processing method and system based on data analysis and computer storage medium

Publications (2)

Publication Number Publication Date
CN113256266A CN113256266A (en) 2021-08-13
CN113256266B true CN113256266B (en) 2022-08-30

Family

ID=77187477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110647000.0A Active CN113256266B (en) 2021-06-10 2021-06-10 Building construction data archiving processing method and system based on data analysis and computer storage medium

Country Status (1)

Country Link
CN (1) CN113256266B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114611980A (en) * 2022-03-23 2022-06-10 武汉有方设计有限公司 Engineering project cost analysis method, equipment and computer storage medium
CN116151775B (en) * 2023-04-18 2023-07-07 苏州开普岩土工程有限公司 Digital management method and system for construction process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2017746A1 (en) * 2007-04-24 2009-01-21 Siemens Aktiengesellschaft Method and device for planning and evaluation of industrial processes
CN109685558A (en) * 2018-12-14 2019-04-26 国网辽宁省电力有限公司经济技术研究院 A kind of Cost for Electric Power Engineering evaluation system based on BIM technology
CN110570133A (en) * 2019-09-18 2019-12-13 赖玲玲 building engineering dynamic cost analysis and control system based on big data
CN111738486A (en) * 2020-05-09 2020-10-02 北京兴中海建工程造价咨询有限公司 Comprehensive management method and system for construction project cost, bid inviting and consultation
CN112348332A (en) * 2020-10-26 2021-02-09 郑州铁路职业技术学院 Engineering cost monitored control system based on cloud calculates

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109670779A (en) * 2018-11-29 2019-04-23 深圳华森建筑与工程设计顾问有限公司 A kind of green building project statistical analysis platform and method
US11263557B2 (en) * 2019-09-11 2022-03-01 REQpay Inc. Construction management method, system, computer readable medium, computer architecture, computer-implemented instructions, input-processing-output, graphical user interfaces, databases and file management

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2017746A1 (en) * 2007-04-24 2009-01-21 Siemens Aktiengesellschaft Method and device for planning and evaluation of industrial processes
CN109685558A (en) * 2018-12-14 2019-04-26 国网辽宁省电力有限公司经济技术研究院 A kind of Cost for Electric Power Engineering evaluation system based on BIM technology
CN110570133A (en) * 2019-09-18 2019-12-13 赖玲玲 building engineering dynamic cost analysis and control system based on big data
CN111738486A (en) * 2020-05-09 2020-10-02 北京兴中海建工程造价咨询有限公司 Comprehensive management method and system for construction project cost, bid inviting and consultation
CN112348332A (en) * 2020-10-26 2021-02-09 郑州铁路职业技术学院 Engineering cost monitored control system based on cloud calculates

Also Published As

Publication number Publication date
CN113256266A (en) 2021-08-13

Similar Documents

Publication Publication Date Title
CN113256266B (en) Building construction data archiving processing method and system based on data analysis and computer storage medium
CN109635006A (en) Social security business association rule digging and recommendation apparatus and method based on Apriori
CN112614011B (en) Power distribution network material demand prediction method and device, storage medium and electronic equipment
CN111859046A (en) Water pollution tracing system and method based on pollution element source analysis
CN111311190A (en) Experimental data management method convenient for data collection
CN101996364A (en) Method for modifying labor time standard and labor time standard management system
CN116384837B (en) Information processing method, system and inspector terminal for engineering quality inspection
CN113064992A (en) Complaint work order structured processing method, device, equipment and storage medium
CN111737549B (en) Economic index intelligent analysis system
CN111428142B (en) Code reviewer recommendation system and method based on random forest classifier
CN110096503A (en) A kind of analysis method and system of three coordinate measuring point data of white body
CN113420902A (en) Component prediction model training method, component prediction method and related equipment
CN116823188B (en) Production management system and method based on big data analysis
CN107122961A (en) Excel nested report data processing methods based on SAP system
CN113469704A (en) System and method for automatically recommending customer service strategy
CN113535818A (en) Method and equipment for constructing audit comprehensive knowledge base
CN112733011A (en) Self-recommendation system for information consultation
CN113034116A (en) Industrial production material cooperative management system based on Internet and artificial intelligence
Shan et al. A new model for predicting the total tree height for stems cut-to-length by harvesters in Pinus radiata plantations
CN116128413B (en) Intelligent warehouse material statistics system based on Bluetooth communication
CN117271618A (en) Engineering information digital consultation management system and method based on Internet of things
CN115063207A (en) Building material purchasing intelligent price comparison analysis and processing system based on cloud computing
CN114782025A (en) Laboratory data intelligent management system
CN113905289A (en) Multi-standard energy data unified management method and system
CN109241135B (en) Mining system for intelligently extracting data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220812

Address after: Room 5-01, 5th Floor, Building 6, Headquarters Economic Park, No. 1309, Shangye Road, Fengxi New Town, Xixian New District, Xi'an City, Shaanxi Province 710000

Applicant after: SHAANXI HEYOU NETWORK TECHNOLOGY CO.,LTD.

Address before: Putian Internet of things innovation and R & D base, No.18, jingangsi Road, Donghu New Technology Development Zone, Wuhan City, Hubei Province, 430074

Applicant before: Wuhan yuanmingsheng Network Technology Co.,Ltd.

GR01 Patent grant
GR01 Patent grant