CN112734404B - Iterative man-hour statistical method and device in research and development process and computer equipment - Google Patents

Iterative man-hour statistical method and device in research and development process and computer equipment Download PDF

Info

Publication number
CN112734404B
CN112734404B CN202110336938.0A CN202110336938A CN112734404B CN 112734404 B CN112734404 B CN 112734404B CN 202110336938 A CN202110336938 A CN 202110336938A CN 112734404 B CN112734404 B CN 112734404B
Authority
CN
China
Prior art keywords
list
project management
development process
management sub
iterative
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110336938.0A
Other languages
Chinese (zh)
Other versions
CN112734404A (en
Inventor
蔡文
白剑
黄海亮
梁瑛玮
张海林
鲁和平
李长杰
陈焕然
邓叶秾
李乐
王浩
洪行健
冷冬
丁一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yifang Information Technology Co ltd
Original Assignee
Guangzhou Easefun Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Easefun Information Technology Co ltd filed Critical Guangzhou Easefun Information Technology Co ltd
Priority to CN202110336938.0A priority Critical patent/CN112734404B/en
Publication of CN112734404A publication Critical patent/CN112734404A/en
Application granted granted Critical
Publication of CN112734404B publication Critical patent/CN112734404B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1091Recording time for administrative or management purposes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The invention discloses a research and development process iteration man-hour statistical method, a research and development process iteration man-hour statistical device and computer equipment. Wherein the method comprises the following steps: the method comprises the steps of creating a development cycle list for the iterative incremental software development process, automatically associating project management sub-lists responsible for each person in the created development cycle list for the iterative incremental software development process, wherein the project management sub-lists can clearly view project requirements responsible for each person so as to facilitate task claiming and assignment work, synchronizing important information of the project management lists including priority and predicted release time into the project management sub-lists by one key, refreshing data by one key according to data in the project management sub-lists after one key synchronization, and synchronously updating calculation work hour aggregate data after the requirement lists are adjusted each time so as to facilitate efficient determination of requirement ranges. Through the mode, the demand range can be efficiently adjusted, and the adjusted man-hour data can be timely refreshed.

Description

Iterative man-hour statistical method and device in research and development process and computer equipment
Technical Field
The invention relates to the technical field of man-hour statistics, in particular to a man-hour statistical method, a man-hour statistical device and computer equipment for research and development process iteration.
Background
The conventional iterative work-hour statistical scheme for the research and development process generally needs to efficiently determine the demand range of the current Sprint (used in the development period of the iterative incremental software development process) when the version of the routine Sprint is started, but cannot efficiently adjust the demand range and timely refresh and display the adjusted work-hour data because an internal PM (Project Management) system does not support adjustment of the demand range.
Disclosure of Invention
In view of this, the present invention provides a method, an apparatus, and a computer device for calculating iterative working hours in a research and development process, which can efficiently adjust a demand range and refresh and display adjusted working hour data in time.
According to one aspect of the invention, a method for counting the iterative working hours of a research and development process is provided, which comprises the following steps: creating a development cycle list for an iterative incremental software development process; wherein, the development cycle list for the iterative incremental software development process has available working hours which are recorded in advance in the version cycle of each terminal personnel; automatically associating the project management sub-list responsible for each person in the created development cycle list for the iterative incremental software development process; wherein the project management sub-order can clearly view project requirements for which each person is responsible to facilitate task claiming and assignment work; one-key synchronization of important information including priority and predicted release time of the project management order to the project management sub-order; and refreshing the data one key according to the data in the project management sub-list after one-key synchronization, and synchronously updating the calculation man-hour aggregate data after the requirement list is adjusted each time so as to be convenient for efficiently determining the requirement range.
Wherein the creating is for a development cycle list for an iterative incremental software development process; wherein, the development cycle list for the iterative incremental software development process has available working hours recorded in the version cycle of each terminal personnel in advance, and comprises the following steps: automatically reading a project space and a version corresponding to a development cycle needing to be newly added in the iterative incremental software development process through a data interface provided by a project management system, selecting a version cycle, and creating a development cycle list for the iterative incremental software development process by adopting a storage mode based on the selected version cycle; and available working hours in the version period of each terminal person are recorded in advance in the development period list for the iterative incremental software development process.
Wherein the automatically associating is performed for each person responsible project management sub-sheet in the created development cycle list for the iterative incremental software development process; wherein the project management sub-order can clearly view project requirements for which each person is responsible to facilitate task claiming and assignment work, comprising: the method comprises the steps that a development cycle entry of a corresponding version for the iterative incremental software development process is clicked to conduct a man-hour summarizing page of each end in the corresponding version, the man-hour summarizing page of each end in the corresponding version is based on the conducted man-hour summarizing page of each end in the corresponding version, on the starting day of the created development cycle for the iterative incremental software development process, after all requirements in a requirement list are split and subjected to time estimation, a project manager synchronously updates the priority and the estimated release time of a project management sub-list to the project management sub-list by one key, and the project management sub-list responsible for each person in the created development cycle list for the iterative incremental software development process is automatically associated in a mode that the priority of the project management sub-list is consistent with a parent list; wherein the project management sub-sheet can clearly view project requirements for which each person is responsible to facilitate task claiming and assignment.
Wherein, the step of refreshing data by one key according to the data in the project management sub-list after the one-key synchronization, and synchronously updating the calculation man-hour aggregate data after the requirement list is adjusted each time so as to be convenient for efficiently determining the requirement range comprises the following steps: according to the data in the project management sub-list after one-key synchronization, summoning a meeting which is determined by team decision makers for developing and developing each end supervisor, project manager and product manager to carry out a requirement range, determining the meeting based on the requirement range, adopting a mode of adjusting the priority of the meeting after requirement passing and the requirement related to work hour information in the determined meeting, refreshing the data by one key, and synchronously updating the calculated work hour aggregate data after the requirement list is adjusted each time so as to be convenient for efficiently determining the requirement range.
After the step of refreshing data one time according to the data in the project management sub-list synchronized by one time, and synchronously updating the calculation man-hour aggregate data after adjusting the requirement list each time so as to efficiently determine the requirement range, the method further comprises the following steps: and after the development cycle for the iterative incremental software development process is started, performing claiming or assigning work on each end person through the project management sub-sheet.
According to another aspect of the present invention, there is provided a working hour statistic device for iteration of a development process, including: the device comprises a creating module, an association module, a synchronization module and a refreshing module; the creating module is used for creating a development cycle list used in the iterative incremental software development process; wherein, the development cycle list for the iterative incremental software development process has available working hours which are recorded in advance in the version cycle of each terminal personnel; the association module is used for automatically associating the project management sub-list responsible for each person in the created development cycle list for the iterative incremental software development process; wherein the project management sub-order can clearly view project requirements for which each person is responsible to facilitate task claiming and assignment work; the synchronization module is used for synchronizing important information including priority and predicted release time of the project management list to the project management sub-list in a one-key mode; and the refreshing module is used for refreshing the data in one key according to the data in the project management sub-list after one key synchronization, and synchronously updating the calculation man-hour aggregate data after the requirement list is adjusted each time so as to be convenient for efficiently determining the requirement range.
Wherein the creating module is specifically configured to: automatically reading a project space and a version corresponding to a development cycle needing to be newly added in the iterative incremental software development process through a data interface provided by a project management system, selecting a version cycle, and creating a development cycle list for the iterative incremental software development process by adopting a storage mode based on the selected version cycle; and available working hours in the version period of each terminal person are recorded in advance in the development period list for the iterative incremental software development process.
Wherein the association module is specifically configured to: the method comprises the steps that a development cycle entry of a corresponding version for the iterative incremental software development process is clicked to conduct a man-hour summarizing page of each end in the corresponding version, the man-hour summarizing page of each end in the corresponding version is based on the conducted man-hour summarizing page of each end in the corresponding version, on the starting day of the created development cycle for the iterative incremental software development process, after all requirements in a requirement list are split and subjected to time estimation, a project manager synchronously updates the priority and the estimated release time of a project management sub-list to the project management sub-list by one key, and the project management sub-list responsible for each person in the created development cycle list for the iterative incremental software development process is automatically associated in a mode that the priority of the project management sub-list is consistent with a parent list; wherein the project management sub-sheet can clearly view project requirements for which each person is responsible to facilitate task claiming and assignment.
Wherein the refresh module is specifically configured to: according to the data in the project management sub-list after one-key synchronization, summoning a meeting which is determined by team decision makers for developing and developing each end supervisor, project manager and product manager to carry out a requirement range, determining the meeting based on the requirement range, adopting a mode of adjusting the priority of the meeting after requirement passing and the requirement related to work hour information in the determined meeting, refreshing the data by one key, and synchronously updating the calculated work hour aggregate data after the requirement list is adjusted each time so as to be convenient for efficiently determining the requirement range.
Wherein, the iterative man-hour statistics device of research and development process still includes: a claim assignment module; and the claiming assignment module is used for claiming or assigning each terminal person through the project management sub-sheet after the development cycle for the iterative incremental software development process is started.
According to yet another aspect of the present invention, there is provided a computer apparatus comprising: at least one processor; and a memory communicatively coupled to the at least one processor; wherein the memory stores instructions executable by the at least one processor to enable the at least one processor to perform a man-hour statistical method of development process iteration as claimed in any one of the preceding claims.
According to a further aspect of the present invention, there is provided a computer readable storage medium storing a computer program which, when executed by a processor, implements a method of man-hour statistics for an iteration of a development process as described in any one of the above.
It can be found that, by the above scheme, a development cycle list for an iterative incremental software development process can be created, wherein the development cycle list for the iterative incremental software development process has available working hours which are entered in each end person version cycle in advance, and a project management sub-list which is responsible for each person in the created development cycle list for the iterative incremental software development process can be automatically associated, wherein the project management sub-list can clearly view the project requirements which are responsible for each person so as to facilitate the task recognition and assignment work, and can synchronize important information of the project management sub-list, including priority and predicted release time, into the project management sub-list by one key, and can synchronously update the calculation working hour aggregate data after each adjustment of the requirement list according to the data in the project management sub-list after one key synchronization, refresh the data by one key so as to facilitate the efficient determination of the requirement range, the method can realize efficient adjustment of the demand range and can refresh and display the adjusted man-hour data in time.
Further, the above scheme can automatically read the project space and version corresponding to the development cycle needed to be newly added for the iterative incremental software development process through the data interface provided by the project management system, select the version cycle, and create the development cycle list for the iterative incremental software development process by adopting a storage mode based on the selected version cycle; the development cycle list for the iterative incremental software development process has available working hours in the version cycle of each end person which are input in advance, so that the advantage that the available working hours, the version cycle and the like of each end person can be input in advance is achieved, and planning work of the development cycle for the iterative incremental software development process can be well done.
Further, according to the scheme, the working hour summarizing page of each end in the corresponding version can be performed by clicking the development cycle inlet of the corresponding version for the iterative incremental software development process, and based on the working hour summarizing page of each end in the corresponding version, on the starting date of the created development cycle for the iterative incremental software development process, after all the requirements in the requirement list are split and evaluated by each end, the priority and the predicted release time of the project management order are synchronously updated to the project management sub-order by one key by the project manager, so that the project management sub-order responsible for each person in the created development cycle list for the iterative incremental software development process is automatically associated in a mode that the priority of the project management sub-order is consistent with the parent order; the project management sub-order can clearly check project requirements which are responsible for each person so as to facilitate task claiming and assignment work, and the project management sub-order has the advantages that when the project management sub-order is claimed or assigned for work of each end person, a requirement list which is responsible for each person can be visually seen, whether the presently claimed task is saturated or not, whether adjustment is needed or not and the like can be achieved, and the output of each end person can be improved.
Furthermore, according to the scheme, team decision makers such as a research and development end supervisor, a project manager and a product manager can be summoned to carry out a requirement range determining conference according to data in the project management sub-list after one-key synchronization, the conference is determined based on the carried requirement range, a mode of adjusting information such as required priority and requirement related labor hour in the determining conference is adopted, data is refreshed by one key, calculation labor hour aggregate data after the requirement list is adjusted each time is synchronously updated, efficient determination of the requirement range is facilitated, efficient requirement range adjustment can be achieved, and adjusted labor hour data can be timely refreshed and displayed.
Further, the above scheme can perform the claiming or assigning work on each end person through the project management sub-list after the development cycle for the iterative incremental software development process is started, which has the advantage of realizing more efficient task scheduling work.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a flow chart illustrating an embodiment of a method for computing work hours through iterative development processes;
FIG. 2 is a flow chart illustrating an iterative man-hour statistical method of the present invention;
FIG. 3 is a schematic structural diagram of an embodiment of an iterative working-hour counting apparatus according to the present invention;
FIG. 4 is a schematic diagram of another embodiment of a time counting apparatus for iteration of the development process of the present invention;
FIG. 5 is a schematic structural diagram of an embodiment of the computer apparatus of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples. It is to be noted that the following examples are only illustrative of the present invention, and do not limit the scope of the present invention. Similarly, the following examples are only some but not all examples of the present invention, and all other examples obtained by those skilled in the art without any inventive work are within the scope of the present invention.
The invention provides a research and development process iterative man-hour statistical method, which can realize efficient adjustment of a demand range and can refresh and display adjusted man-hour data in time.
Referring to fig. 1, fig. 1 is a schematic flow chart of an embodiment of a method for counting iterative working hours in a development process of the present invention. It should be noted that the method of the present invention is not limited to the flow sequence shown in fig. 1 if the results are substantially the same. As shown in fig. 1, the method comprises the steps of:
s101: creating a development period Sprint list for an iterative incremental software development process; the development cycle list for the iterative incremental software development process comprises available working hours which are recorded in the version cycle of each terminal person in advance.
Wherein, the creating is used for creating a development period Sprint list of the iterative incremental software development process; the development cycle list for the iterative incremental software development process includes available working hours recorded in advance in the version cycle of each terminal person, and may include:
automatically reading a project space and a version corresponding to a development cycle Sprint which needs to be newly added in the iterative incremental software development process through a data interface provided by a project management PM system, selecting a version cycle, and creating a development cycle Sprint list for the iterative incremental software development process by adopting a storage mode based on the selected version cycle; the development cycle list for the iterative incremental software development process has available working hours in the version cycle of each end person which are input in advance, so that the advantage that the available working hours, the version cycle and the like of each end person can be input in advance is achieved, and planning work of the development cycle for the iterative incremental software development process can be well done.
In this embodiment, a manner of entering an entry operation of available man-hours of each end in a version by clicking a personnel entry of a corresponding version data line may be used, and available man-hours in a version cycle of each end person are entered in advance in the development cycle list for the iterative incremental software development process.
In this embodiment, the development cycle list for the iterative incremental software development process may also include, by other means, available man-hours and the like that are recorded in advance in the version cycle of each end person, and the present invention is not limited thereto.
S102: automatically associating the project management PM submenus responsible for each person in the created development period Sprint list for the iterative incremental software development process; wherein the project management PM sub-order can clearly view project requirements for which each person is responsible to facilitate task recognition and assignment.
The PM submenus responsible for the project management of each person in the created development cycle Sprint list for the iterative incremental software development process are automatically associated; wherein, the project management PM sub-sheet can clearly view project requirements responsible for each person to facilitate task claiming and assigning work, and can include:
the method comprises the steps that a development cycle Sprint entry of a corresponding version for the iterative incremental software development process is clicked to conduct a work hour summarizing page of each end person in the corresponding version, the work hour summarizing page of each end person in the corresponding version is based on the conducted work hour summarizing page, on the starting date of the created development cycle Sprint for the iterative incremental software development process, after all requirements in a requirement list are split and evaluated by each end, a project manager synchronously updates the priority and the predicted release time of a project management PM sheet to the project management PM sub-sheet by one key, and the project management PM sub-sheet responsible for each person in the created development cycle Sprint list for the iterative incremental software development process is automatically associated in a mode that the priority of the project management PM sub-sheet is consistent with a parent sheet; the project requirements which are responsible for each person can be clearly checked through the project management PM sub-list, so that the task claiming and assignment work can be facilitated, the advantage is that when the project management PM sub-list claiming or assignment work can be carried out by each end person, the requirement list which is responsible for each person can be visually seen, whether the current claiming task is saturated or not, whether adjustment is needed or not and the like can be achieved, and the output of each end person can be improved.
S103: and one-key synchronization of important information such as the priority and the predicted release time of the item management PM sheet into the item management PM sub sheet.
In this embodiment, it is possible to ensure that the accurate demand priority and the estimated distribution time are transmitted to the college students with multiple ends and multiple people in cooperation by synchronizing important information such as the priority and the estimated distribution time of the project management PM sheet into the project management PM sub-sheet by one key, and the present invention is not limited thereto.
S104: and managing data in the PM submenu according to the item after one-key synchronization, refreshing the data by one key, and synchronously updating the data of the calculated man-hour aggregate after the requirement list is adjusted each time so as to be convenient for efficiently determining the requirement range.
The managing data in the PM sub-list according to the item synchronized by one key, refreshing data by one key, and synchronously updating the calculation man-hour aggregate data after adjusting the requirement list each time so as to efficiently determine the requirement range may include:
according to the data in the project management PM submenu which is synchronized by one key, team decision makers such as development and research end supervisors, project managers and product managers are summoned to carry out a requirement range determining conference, the conference is determined based on the carried requirement range, a mode of adjusting information such as required priority and requirement related labor hour in the determining conference is adopted, the data are refreshed by one key, the calculation labor hour aggregate data after the requirement list is adjusted each time is synchronously updated so as to efficiently determine the requirement range, the advantage is that the requirement range adjustment can be efficiently carried out, and the adjusted labor hour data can be timely refreshed and displayed.
After the data in the PM sub-list is managed according to the item synchronized by the key, the data is refreshed by the key, and the calculation man-hour aggregate data after the requirement list is adjusted each time is updated synchronously so as to determine the requirement range efficiently, the method may further include:
after the development cycle Sprint for the iterative incremental software development process is started, the project management PM sub-sheet is used for claiming or assigning work to each end person, so that the advantage of more efficiently carrying out the task scheduling work is realized.
It can be seen that, in the present implementation, a development cycle list for an iterative incremental software development process can be created, wherein the development cycle list for the iterative incremental software development process has available working hours entered in each end-person version cycle in advance, and a project management sub-list for each person in the created development cycle list for the iterative incremental software development process can be automatically associated, wherein the project management sub-list can clearly view the project requirements for each person to facilitate the task claiming and assigning work, and can synchronize important information of the project management sub-list, including priority and predicted release time, into the project management sub-list by one key, and can synchronize, according to data in the project management sub-list synchronized by one key, data refreshed by one key, the calculated working hour aggregate data after each adjustment of the requirement list by synchronization update to facilitate efficient determination of the requirement range, the method can realize efficient adjustment of the demand range and can refresh and display the adjusted man-hour data in time.
Further, in this implementation, a project space and a version corresponding to a development cycle to be newly added for the iterative incremental software development process may be automatically read through a data interface provided by the project management system, a version cycle is selected, and a development cycle list for the iterative incremental software development process is created in a storage manner based on the selected version cycle; the development cycle list for the iterative incremental software development process has available working hours in the version cycle of each end person which are input in advance, so that the advantage that the available working hours, the version cycle and the like of each end person can be input in advance is achieved, and planning work of the development cycle for the iterative incremental software development process can be well done.
Furthermore, in this implementation, a user time summary page of each end in the corresponding version can be performed by clicking a development cycle entry for the iterative incremental software development process of the corresponding version, and based on the performed user time summary page of each end in the corresponding version, on the starting date of the created development cycle for the iterative incremental software development process, after all the requirements in the requirement list of each end are split and time-estimated, the project manager synchronously updates the priority and the estimated release time of the project management order to the project management sub-order by one key, so as to ensure that the priority of the project management sub-order is consistent with that of the parent order, and automatically associate the project management sub-orders responsible for each user in the created development cycle list for the iterative incremental software development process; the project management sub-order can clearly check project requirements which are responsible for each person so as to facilitate task claiming and assignment work, and the project management sub-order has the advantages that when the project management sub-order is claimed or assigned for work of each end person, a requirement list which is responsible for each person can be visually seen, whether the presently claimed task is saturated or not, whether adjustment is needed or not and the like can be achieved, and the output of each end person can be improved.
Furthermore, in this implementation, a team decision maker such as a research and development end supervisor, a project manager, a product manager and the like can be summoned to carry out a demand range determination conference according to the data in the project management sub-list after the one-key synchronization, and the conference is determined based on the carried demand range, a mode of adjusting information such as demand priority, demand related labor hour and the like in the determination conference is adopted, the data is refreshed by one key, and the calculation labor hour aggregate data after the demand list is adjusted each time is synchronously updated so as to efficiently determine the demand range.
Referring to fig. 2, fig. 2 is a flow chart of another embodiment of the iterative man-hour counting method of the development process of the present invention. In this embodiment, the method includes the steps of:
s201: creating a development cycle list for an iterative incremental software development process; the development cycle list for the iterative incremental software development process comprises available working hours which are recorded in the version cycle of each terminal person in advance.
As described above in S101, further description is omitted here.
S202: automatically associating the project management sub-list responsible for each person in the created development cycle list for the iterative incremental software development process; wherein the project management sub-order can clearly view project requirements for which each person is responsible to facilitate task recognition and assignment.
As described above in S102, further description is omitted here.
S203: and one-key synchronization of important information including priority and predicted release time of the project management sub-list.
As described above in S103, which is not described herein.
S204: and refreshing the data one time according to the data in the project management sub-list after one-time synchronization, and synchronously updating the calculation man-hour aggregate data after the requirement list is adjusted each time so as to be convenient for efficiently determining the requirement range.
As described above in S104, and will not be described herein.
S205: after the development cycle for the iterative incremental software development process is initiated, each end person is claimed or assigned work through the project management sub-sheet.
It can be seen that in the present embodiment, after the development cycle for the iterative incremental software development process is started, the project management sub-sheet can be used to perform the claiming or assigning work on each end person, which has the advantage of more efficiently performing the task scheduling work.
The invention also provides a research and development process iterative man-hour counting device, which can realize efficient adjustment of the demand range and can refresh and display the adjusted man-hour data in time.
Referring to fig. 3, fig. 3 is a schematic structural diagram of an embodiment of an iterative working hour counting apparatus in a research and development process according to the present invention. In this embodiment, the iterative working hour statistic device 30 includes a creating module 31, an associating module 32, a synchronizing module 33, and a refreshing module 34.
The creating module 31 is configured to create a development cycle list for the iterative incremental software development process; the development cycle list for the iterative incremental software development process comprises available working hours which are recorded in the version cycle of each terminal person in advance.
The association module 32 is configured to automatically associate the created project management sub-list responsible for each person in the development cycle list for the iterative incremental software development process; wherein the project management sub-order can clearly view project requirements for which each person is responsible to facilitate task recognition and assignment.
The synchronization module 33 is configured to synchronize important information of the project management sub-sheet, including priority and expected release time, with the project management sub-sheet by one key.
The refreshing module 34 is configured to refresh the data by one key according to the data in the item management sub-list after the one-key synchronization, and synchronously update the data of the calculated man-hour aggregate after the requirement list is adjusted each time so as to efficiently determine the requirement range.
Optionally, the creating module 31 may be specifically configured to:
automatically reading a project space and a version corresponding to a development cycle needing to be newly added in the iterative incremental software development process through a data interface provided by a project management system, selecting a version cycle, and creating a development cycle list for the iterative incremental software development process by adopting a storage mode based on the selected version cycle; the development cycle list for the iterative incremental software development process comprises available working hours which are recorded in the version cycle of each terminal person in advance.
Optionally, the association module 32 may be specifically configured to:
the method comprises the steps that a development cycle entry of a corresponding version for the iterative incremental software development process is clicked to conduct a man-hour summarizing page of each end in the corresponding version, the man-hour summarizing page of each end in the corresponding version is based on the working, on the starting date of the created development cycle for the iterative incremental software development process, after all requirements in a requirement list are split and subjected to time estimation, a project manager synchronously updates the priority and the estimated release time of a project management sub-list to the project management sub-list by one key, so that the project management sub-list responsible for each person in the created development cycle list for the iterative incremental software development process is automatically associated in a mode that the priority of the project management sub-list is consistent with that of a parent list; wherein the project management sub-order can clearly view project requirements for which each person is responsible to facilitate task recognition and assignment.
Optionally, the refresh module 34 may be specifically configured to:
according to the data in the project management sub-list after one-key synchronization, team decision makers such as a research and development end supervisor, a project manager, a product manager and the like are summoned to carry out a requirement range determining conference, the conference is determined based on the carried requirement range, the mode of adjusting information such as required priority, requirement related working hours and the like in the determined conference is adopted, the data are refreshed by one key, and the calculated working hour aggregate data after the requirement list is adjusted each time is synchronously updated so as to be convenient for efficiently determining the requirement range.
Referring to fig. 4, fig. 4 is a schematic structural diagram of another embodiment of the iterative man-hour counting apparatus in the development process of the present invention. Unlike the previous embodiment, the iterative working hour counting device 40 of the development process of the present embodiment further includes a claim assignment module 41.
The claim assigning module 41 is configured to perform a claim or assignment work on each end person through the project management sub-sheet after the development cycle for the iterative incremental software development process is started.
Each unit module of the iterative man-hour statistics apparatus 30/40 may perform the corresponding steps in the above method embodiments, so that the details of each unit module are not repeated herein, and please refer to the description of the corresponding steps above.
The present invention further provides a computer device, as shown in fig. 5, comprising: at least one processor 51; and a memory 52 communicatively coupled to the at least one processor 51; the memory 52 stores instructions executable by the at least one processor 51, and the instructions are executed by the at least one processor 51 to enable the at least one processor 51 to perform the above-mentioned man-hour statistical method for the development process iteration.
Wherein the memory 52 and the processor 51 are coupled in a bus, which may comprise any number of interconnected buses and bridges, which couple one or more of the various circuits of the processor 51 and the memory 52 together. The bus may also connect various other circuits such as peripherals, voltage regulators, power management circuits, and the like, which are well known in the art, and therefore, will not be described any further herein. A bus interface provides an interface between the bus and the transceiver. The transceiver may be one element or a plurality of elements, such as a plurality of receivers and transmitters, providing a means for communicating with various other apparatus over a transmission medium. The data processed by the processor 51 is transmitted over a wireless medium via an antenna, which further receives the data and transmits the data to the processor 51.
The processor 51 is responsible for managing the bus and general processing and may also provide various functions including timing, peripheral interfaces, voltage regulation, power management, and other control functions. And the memory 52 may be used to store data used by the processor 51 in performing operations.
The present invention further provides a computer-readable storage medium storing a computer program. The computer program realizes the above-described method embodiments when executed by a processor.
It can be found that, by the above scheme, a development cycle list for an iterative incremental software development process can be created, wherein the development cycle list for the iterative incremental software development process has available working hours which are entered in each end person version cycle in advance, and a project management sub-list which is responsible for each person in the created development cycle list for the iterative incremental software development process can be automatically associated, wherein the project management sub-list can clearly view the project requirements which are responsible for each person so as to facilitate the task recognition and assignment work, and can synchronize important information of the project management sub-list, including priority and predicted release time, into the project management sub-list by one key, and can synchronously update the calculation working hour aggregate data after each adjustment of the requirement list according to the data in the project management sub-list after one key synchronization, refresh the data by one key so as to facilitate the efficient determination of the requirement range, the method can realize efficient adjustment of the demand range and can refresh and display the adjusted man-hour data in time.
Further, the above scheme can automatically read the project space and version corresponding to the development cycle needed to be newly added for the iterative incremental software development process through the data interface provided by the project management system, select the version cycle, and create the development cycle list for the iterative incremental software development process by adopting a storage mode based on the selected version cycle; the development cycle list for the iterative incremental software development process has available working hours in the version cycle of each end person which are input in advance, so that the advantage that the available working hours, the version cycle and the like of each end person can be input in advance is achieved, and planning work of the development cycle for the iterative incremental software development process can be well done.
Further, according to the scheme, the working hour summarizing page of each end in the corresponding version can be performed by clicking the development cycle inlet of the corresponding version for the iterative incremental software development process, and based on the working hour summarizing page of each end in the corresponding version, on the starting date of the created development cycle for the iterative incremental software development process, after all the requirements in the requirement list are split and evaluated by each end, the priority and the predicted release time of the project management order are synchronously updated to the project management sub-order by one key by the project manager, so that the project management sub-order responsible for each person in the created development cycle list for the iterative incremental software development process is automatically associated in a mode that the priority of the project management sub-order is consistent with the parent order; the project management sub-order can clearly check project requirements which are responsible for each person so as to facilitate task claiming and assignment work, and the project management sub-order has the advantages that when the project management sub-order is claimed or assigned for work of each end person, a requirement list which is responsible for each person can be visually seen, whether the presently claimed task is saturated or not, whether adjustment is needed or not and the like can be achieved, and the output of each end person can be improved.
Furthermore, according to the scheme, team decision makers such as a research and development end supervisor, a project manager and a product manager can be summoned to carry out a requirement range determining conference according to data in the project management sub-list after one-key synchronization, the conference is determined based on the carried requirement range, a mode of adjusting information such as required priority and requirement related labor hour in the determining conference is adopted, data is refreshed by one key, calculation labor hour aggregate data after the requirement list is adjusted each time is synchronously updated, efficient determination of the requirement range is facilitated, efficient requirement range adjustment can be achieved, and adjusted labor hour data can be timely refreshed and displayed.
Further, the above scheme can perform the claiming or assigning work on each end person through the project management sub-list after the development cycle for the iterative incremental software development process is started, which has the advantage of realizing more efficient task scheduling work.
In the several embodiments provided in the present invention, it should be understood that the disclosed system, apparatus and method may be implemented in other manners. For example, the above-described apparatus embodiments are merely illustrative, and for example, a division of a module or a unit is merely a logical division, and an actual implementation may have another division, for example, a plurality of units or components may be combined or integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, devices or units, and may be in an electrical, mechanical or other form.
Units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the embodiment.
In addition, functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit. The integrated unit can be realized in a form of hardware, and can also be realized in a form of a software functional unit.
The integrated unit, if implemented in the form of a software functional unit and sold or used as a stand-alone product, may be stored in a computer readable storage medium. Based on such understanding, the technical solution of the present invention may be substantially or partially implemented in the form of a software product stored in a storage medium and including instructions for causing a computer device (which may be a personal computer, a server, a network device, or the like) or a processor (processor) to execute all or part of the steps of the method according to the embodiments of the present invention. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes.
The above description is only a part of the embodiments of the present invention, and not intended to limit the scope of the present invention, and all equivalent devices or equivalent processes performed by the present invention through the contents of the specification and the drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (6)

1. A method for counting iterative working hours of a research and development process is characterized by comprising the following steps:
creating a development cycle list for an iterative incremental software development process; wherein, the development cycle list for the iterative incremental software development process has available working hours which are recorded in advance in the version cycle of each terminal personnel;
automatically associating the project management sub-list responsible for each person in the created development cycle list for the iterative incremental software development process; wherein the project management sub-order can clearly view project requirements for which each person is responsible to facilitate task claiming and assignment work;
synchronizing the priority and the important information of the predicted release time of the project management list to the project management sub-list by one key;
according to the data in the project management sub-list after one-key synchronization, refreshing the data by one key, and synchronously updating the data of the calculated man-hour aggregate after the requirement list is adjusted each time so as to determine the requirement range;
wherein the automatically associating is performed for each person responsible project management sub-sheet in the created development cycle list for the iterative incremental software development process; wherein the project management sub-order can clearly view project requirements for which each person is responsible to facilitate task claiming and assignment work, comprising:
the method comprises the steps that a development cycle entry of a corresponding version for the iterative incremental software development process is clicked to conduct a man-hour summarizing page of each end in the corresponding version, and the man-hour summarizing page of each end in the corresponding version is based on the man-hour summarizing page of each end in the corresponding version, on the starting date of the created development cycle for the iterative incremental software development process, after all requirements in a requirement list are split and time-estimating, a project manager synchronously updates the priority and the estimated release time of a project management sub-list to the project management sub-list by one key, so that the project management sub-list responsible for each person in the created development cycle list for the iterative incremental software development process is automatically associated in a mode that the priority of the project management sub-list is consistent with the project management list; wherein the project management sub-order can clearly view project requirements for which each person is responsible to facilitate task claiming and assignment work;
the step of refreshing data one key according to the data in the project management sub-list synchronized by one key, and synchronously updating the data of the calculated man-hour aggregate after the requirement list is adjusted each time so as to facilitate the determination of the requirement range comprises the following steps:
and according to the data in the project management sub-list after one-key synchronization, summoning and developing a meeting for determining the requirement range by a team decision maker of each end supervisor, project manager and product manager, determining the meeting based on the requirement range, refreshing the data by one-key in a mode of adjusting the priority of the meeting after requirement passing and the labor hour information related to the requirement in the determined meeting, and synchronously updating the calculated labor hour aggregate data after the requirement list is adjusted each time so as to be convenient for determining the requirement range.
2. The iterative development process man-hour statistic method of claim 1 in which said creating a list of development cycles for an iterative incremental software development process; wherein, the development cycle list for the iterative incremental software development process has available working hours recorded in the version cycle of each terminal personnel in advance, and comprises the following steps:
automatically reading a project space and a version corresponding to a development cycle needing to be newly added in the iterative incremental software development process through a data interface provided by a project management system, selecting a version cycle, and creating a development cycle list for the iterative incremental software development process by adopting a storage mode based on the selected version cycle; and available working hours in the version period of each terminal person are recorded in advance in the development period list for the iterative incremental software development process.
3. The iterative labor hour statistical method of development process as claimed in claim 1, wherein after said one-touch updating data according to the data in the project management sub-list after said one-touch synchronization, and synchronously updating the calculated labor hour aggregate data after each adjustment of requirement list to facilitate the determination of requirement range, further comprising:
and after the development cycle for the iterative incremental software development process is started, performing claiming or assigning work on each end person through the project management sub-sheet.
4. An iterative development process man-hour statistics apparatus, comprising:
the device comprises a creating module, an association module, a synchronization module and a refreshing module;
the creating module is used for creating a development cycle list used in the iterative incremental software development process; wherein, the development cycle list for the iterative incremental software development process has available working hours which are recorded in advance in the version cycle of each terminal personnel;
the association module is used for automatically associating the project management sub-list responsible for each person in the created development cycle list for the iterative incremental software development process; wherein the project management sub-order can clearly view project requirements for which each person is responsible to facilitate task claiming and assignment work;
the synchronization module is used for synchronizing the priority and the important information of the predicted release time of the project management list to the project management sub-list in a one-key mode;
the refreshing module is used for refreshing data in a one-key mode according to the data in the project management sub-list after the one-key synchronization, and synchronously updating the calculation man-hour aggregate data after the requirement list is adjusted each time so as to determine the requirement range conveniently;
wherein the association module is specifically configured to:
the method comprises the steps that a development cycle entry of a corresponding version for the iterative incremental software development process is clicked to conduct a man-hour summarizing page of each end in the corresponding version, and the man-hour summarizing page of each end in the corresponding version is based on the man-hour summarizing page of each end in the corresponding version, on the starting date of the created development cycle for the iterative incremental software development process, after all requirements in a requirement list are split and time-estimating, a project manager synchronously updates the priority and the estimated release time of a project management sub-list to the project management sub-list by one key, so that the project management sub-list responsible for each person in the created development cycle list for the iterative incremental software development process is automatically associated in a mode that the priority of the project management sub-list is consistent with the project management list; wherein the project management sub-order can clearly view project requirements for which each person is responsible to facilitate task claiming and assignment work;
the refresh module is specifically configured to:
and according to the data in the project management sub-list after one-key synchronization, summoning and developing a meeting for determining the requirement range by a team decision maker of each end supervisor, project manager and product manager, determining the meeting based on the requirement range, refreshing the data by one-key in a mode of adjusting the priority of the meeting after requirement passing and the labor hour information related to the requirement in the determined meeting, and synchronously updating the calculated labor hour aggregate data after the requirement list is adjusted each time so as to be convenient for determining the requirement range.
5. The iterative development process labor-hour statistic apparatus according to claim 4, wherein said creation module is specifically configured to:
automatically reading a project space and a version corresponding to a development cycle needing to be newly added in the iterative incremental software development process through a data interface provided by a project management system, selecting a version cycle, and creating a development cycle list for the iterative incremental software development process by adopting a storage mode based on the selected version cycle; and available working hours in the version period of each terminal person are recorded in advance in the development period list for the iterative incremental software development process.
6. The iterative development process man-hour statistic apparatus as claimed in claim 4, further comprising:
a claim assignment module;
and the claiming assignment module is used for claiming or assigning each terminal person through the project management sub-sheet after the development cycle for the iterative incremental software development process is started.
CN202110336938.0A 2021-03-30 2021-03-30 Iterative man-hour statistical method and device in research and development process and computer equipment Active CN112734404B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110336938.0A CN112734404B (en) 2021-03-30 2021-03-30 Iterative man-hour statistical method and device in research and development process and computer equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110336938.0A CN112734404B (en) 2021-03-30 2021-03-30 Iterative man-hour statistical method and device in research and development process and computer equipment

Publications (2)

Publication Number Publication Date
CN112734404A CN112734404A (en) 2021-04-30
CN112734404B true CN112734404B (en) 2021-07-16

Family

ID=75595960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110336938.0A Active CN112734404B (en) 2021-03-30 2021-03-30 Iterative man-hour statistical method and device in research and development process and computer equipment

Country Status (1)

Country Link
CN (1) CN112734404B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113741935B (en) * 2021-08-27 2024-03-26 西藏宁算科技集团有限公司 Project and product synchronous iteration upgrading method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102456177A (en) * 2010-10-27 2012-05-16 镇江华扬信息科技有限公司 Software project management system
CN108629558A (en) * 2018-04-10 2018-10-09 北京京东尚科信息技术有限公司 software development management system
CN110163524A (en) * 2019-05-29 2019-08-23 四川长虹电器股份有限公司 A kind of work cooperating management platform based on agile development management
CN112486557A (en) * 2020-11-25 2021-03-12 浙江臻善科技股份有限公司 Development-based complete life cycle management platform and method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108537503A (en) * 2018-03-26 2018-09-14 西南电子技术研究所(中国电子科技集团公司第十研究所) software development management system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102456177A (en) * 2010-10-27 2012-05-16 镇江华扬信息科技有限公司 Software project management system
CN108629558A (en) * 2018-04-10 2018-10-09 北京京东尚科信息技术有限公司 software development management system
CN110163524A (en) * 2019-05-29 2019-08-23 四川长虹电器股份有限公司 A kind of work cooperating management platform based on agile development management
CN112486557A (en) * 2020-11-25 2021-03-12 浙江臻善科技股份有限公司 Development-based complete life cycle management platform and method

Also Published As

Publication number Publication date
CN112734404A (en) 2021-04-30

Similar Documents

Publication Publication Date Title
CN108874558B (en) Message subscription method of distributed transaction, electronic device and readable storage medium
CN110546606A (en) Tenant upgrade analysis
CN111221726A (en) Test data generation method and device, storage medium and intelligent equipment
US10467192B2 (en) Method and apparatus for updating data table in keyvalue database
US9619535B1 (en) User driven warehousing
US11520823B2 (en) Information providing system and information providing method
CN104063505A (en) Job application method and system for network recruitment
US10701213B2 (en) Dynamically generating an aggregation routine
CN109255587B (en) Collaborative processing method and device for working data
CN111784318A (en) Data processing method and device, electronic equipment and storage medium
CN102272751A (en) Data integrity in a database environment through background synchronization
CN112734404B (en) Iterative man-hour statistical method and device in research and development process and computer equipment
CN111090803A (en) Data processing method and device, electronic equipment and storage medium
CN111459629A (en) Azkaban-based project operation method and device and terminal equipment
US10423930B2 (en) Schedule management system, non-transitory computer readable medium, and schedule management method
US20210216516A1 (en) Management of a secondary vertex index for a graph
CN111143421A (en) Data sharing method and device, electronic equipment and storage medium
CN112559641B (en) Pull chain table processing method and device, readable storage medium and electronic equipment
CN113377872B (en) Offline synchronization method, device and equipment of online system data in big data center
CN114742024A (en) Service information processing method and device and electronic equipment
CN109783217B (en) Shut down determination method, apparatus, electronic equipment and the storage medium of period
WO2021028891A1 (en) Scalable interactive data collection system
US9189176B2 (en) Identifying newly connected printers
CN102567388B (en) Device and method for data update
EP3407191A1 (en) Managing job schedules

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Room 402, No. 66, North Street, University Town Center, Panyu District, Guangzhou City, Guangdong Province, 510006

Patentee after: Yifang Information Technology Co.,Ltd.

Address before: 510006 Room 601, 603, 605, science museum, Guangdong University of technology, 100 Waihuan West Road, Xiaoguwei street, Panyu District, Guangzhou City, Guangdong Province

Patentee before: GUANGZHOU EASEFUN INFORMATION TECHNOLOGY Co.,Ltd.

CP03 Change of name, title or address