CN112699057B - Early warning system in software development process - Google Patents

Early warning system in software development process Download PDF

Info

Publication number
CN112699057B
CN112699057B CN202110311061.XA CN202110311061A CN112699057B CN 112699057 B CN112699057 B CN 112699057B CN 202110311061 A CN202110311061 A CN 202110311061A CN 112699057 B CN112699057 B CN 112699057B
Authority
CN
China
Prior art keywords
unit
software
client
early warning
card punching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110311061.XA
Other languages
Chinese (zh)
Other versions
CN112699057A (en
Inventor
李芬芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Nanyi Technology Co.,Ltd.
Original Assignee
Guangzhou Hongyi Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Hongyi Information Technology Co Ltd filed Critical Guangzhou Hongyi Information Technology Co Ltd
Priority to CN202110311061.XA priority Critical patent/CN112699057B/en
Publication of CN112699057A publication Critical patent/CN112699057A/en
Application granted granted Critical
Publication of CN112699057B publication Critical patent/CN112699057B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • G06F11/3688Test management for test execution, e.g. scheduling of test suites
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • G06F11/3692Test management for test results analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/70Software maintenance or management
    • G06F8/72Code refactoring

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Software Systems (AREA)
  • Computer Hardware Design (AREA)
  • Quality & Reliability (AREA)
  • Debugging And Monitoring (AREA)

Abstract

The invention discloses an early warning system in the software development process, which comprises: the system comprises a database, a GPS positioning unit, a client information input unit, a client requirement input unit, a software testing unit, a mouse track scanning unit, a modeling unit, a button click recognition unit, an abnormity early warning unit, an abnormity processing unit, a test result output unit, a test evaluation unit and an adjustment optimization unit, wherein the large data is used for calling a card punching range of management software required by a client, which is input into the database by the client requirement input unit, the software testing unit is used for confirming the effective card punching range of the design, and early warning is given and the software is optimized when the design exceeds the range required by the client; whether misoperation exists in the software testing process is confirmed through the mouse track scanning unit and the button clicking recognition unit, if the misoperation exists, an alarm signal is sent out, and the processing is carried out in time, so that delay of subsequent software popularization and marketing is avoided, and the satisfaction degree of customers is improved.

Description

Early warning system in software development process
Technical Field
The invention relates to the technical field of software development, in particular to an early warning system in a software development process.
Background
The software development process comprises requirement capture, requirement analysis, design, realization and test, the test plays an important role in the software development process, a certain software system can be operated or determined by manual or automatic means in the software test process, the software test aims at detecting whether the software function meets the specified requirement or judging the difference between the expected result and the actual result, in the software test process, when the tested software function does not meet the requirement of a customer, an early warning signal needs to be sent out in time, and the function of the software is adjusted and optimized after the early warning signal is received, so that the software which is satisfied by the customer is designed; meanwhile, in the software testing operation process, misoperation can occur, and if the misoperation is not found, a vulnerability can occur, so that the subsequent popularization and marketing work of the software is delayed, early warning is timely given, and the vulnerability caused by misoperation is found, which is favorable for promoting the marketing progress of the software;
the management software is based on enterprise management requirements, along with the development of scientific technology, the attendance management software gradually becomes a very important ring in enterprise management, in the development process of the management software, corresponding employee card punching ranges need to be designed according to the requirements of different customers, and if the attendance range exceeds the card punching range required by the customer during testing, early warning is needed in time and the range is adjusted to meet the requirements of the customer, so that the satisfaction degree of the customer on software functions is improved, and the developed software can help the customer to implement a more effective management system.
Therefore, a warning system in the software development process is needed to solve the above problems.
Disclosure of Invention
The invention aims to provide an early warning system in a software development process, so as to solve the problems in the background technology.
In order to solve the technical problems, the invention provides the following technical scheme: an early warning system in software development process, its characterized in that: the method comprises the following steps: the system comprises a database, a GPS positioning unit, a client information input unit, a client requirement input unit, a software testing unit, a mouse track scanning unit, a modeling unit, a button click identification unit, an abnormity early warning unit, an abnormity processing unit, a test result output unit, a test evaluation unit and an adjustment optimization unit;
the output end of the GPS positioning unit is connected with the input end of the customer information input unit, the output ends of the customer information input unit and the customer requirement input unit are connected with the input end of the database, the input end of the mouse track scanning unit is connected with the output end of the modeling unit, the output end of the mouse track scanning unit is connected with the input end of the software testing unit, the output end of the software testing unit is connected with the input end of the button click identification unit, the output end of the button click identification unit is connected with the input end of the abnormity early warning unit, the output end of the abnormity early warning unit is connected with the input end of the abnormity processing unit, the output end of the abnormity processing unit is connected with the input end of the test result output unit, and the output end of the test result output unit is connected with the input end, the output end of the database is connected with the input end of the test evaluation unit, the output end of the test evaluation unit is connected with the input end of the abnormity early warning unit, the output end of the abnormity early warning unit is connected with the input end of the adjustment optimization unit, and the output end of the adjustment optimization unit is connected with the input end of the software test unit;
the client information input unit stores address information of a client company, the GPS positioning unit positions and confirms specific position coordinates of the client company, the position coordinate information is transmitted to the database, the mouse track scanning unit scans the mouse moving track of a test operation page, the position of a button needing to be clicked during testing is confirmed according to the moving track of the mouse, the modeling unit models the whole test page, confirms the position coordinates of the button, the button coordinate information is transmitted to the software testing unit through the mouse track scanning unit, the software testing unit tests the card punching function developed by software, the button clicking identification unit judges whether the button clicking is effective in the operation process after the testing operation is finished, and the identified result is transmitted to the abnormity early warning unit, when the invalid click is identified, an alarm signal is sent to the exception processing unit through the exception early warning unit, the invalid click of the button is processed through the exception processing unit, and a processed correct test result is transmitted to the database through the test result output unit;
the method comprises the steps that range data of employee attendance and attendance checking required by different clients are input into a database through a client requirement input unit, the range data of employee attendance and attendance checking and correct test result data are transferred into a test evaluation unit, whether the test result meets the requirements of the clients or not is judged through comparison of the test evaluation unit, the data which do not meet the requirements of the clients are transmitted into an abnormity early warning unit, an alarm signal is sent into an adjustment optimization unit through the abnormity early warning unit, the effective attendance checking range of software is rescheduled and adjusted through the adjustment optimization unit, and the adjusted data are transmitted to a software testing unit for retesting.
Further, the abnormality warning unit not only sends out an alarm signal to the adjustment optimization unit when the test result is evaluated to not meet the customer requirement, but also sends out an alarm signal to the abnormality processing unit due to misoperation in the software test operation process.
Further, the client information input unit inputs address information of different client companies, the client companies are positioned through the GPS positioning unit, and the position coordinate set of all the client companies is confirmed to be (x, y) = { (x)1,y1),(x2,y2),...,(xn,yn) And n represents the number of client companies, and position coordinate information is transmitted to the client requirement input unit through the client information input unit.
Further, the customer demand entry unit receives the customer position coordinate information, and the set of the effective card punching distances of the employees which take the company as the center and are required by the customers is stored in the customer demand entry unit and is d = { d = { d }1,d2,...,dnAnd n represents the number of client companies, and the effective employee card punching data required by the client is recorded into the database through the client requirement recording unit.
Further, the software testing unit tests that the set of valid card punching ranges of corresponding companies in the card punching function of software development is s = { s = }1,s2,...,snAnd calculating an effective distance r in the software card punching function according to the following formula:
Figure DEST_PATH_IMAGE001
wherein the content of the first and second substances,
Figure 255718DEST_PATH_IMAGE002
obtaining a card punching effective distance set designed for the corresponding company as r = { r =1,r2,...,rnN represents the number of client companies, the tested effective software card punching data are transmitted to the database through the test result output unit, the effective software card punching distance is calculated through the measured card punching range, and the purpose of calculating the effective card punching distance is to compare with the effective employee card punching distance required by the client, so that the client company can more effectively check the card according to the effective software card punching distanceWhether the card punching function of software development can meet the requirements of different customers is well judged, compared with the card punching range, the card punching distance enables the test result to be more visual, the comparison between the card punching distances is simpler, the test evaluation result can be more visually and clearly obtained, and the test process is accelerated.
Further, the test evaluation unit calls the software effective card punching data tested in the database and the employee effective card punching data required by the client, and the test evaluation unit compares the employee effective card punching distance set d required by different clients with the effective distance r in the software card punching function tested one by one: if it is
Figure DEST_PATH_IMAGE003
The software card punching range is within the effective card punching range of the staff required by the client, so that the requirements of the client can be met; if it is
Figure 704017DEST_PATH_IMAGE004
And the situation that the card punching range of the developed software exceeds the effective card punching range of the staff required by the client and cannot meet the requirements of the client is shown, the data which do not meet the requirements of the client are transmitted to the abnormity early warning unit, the abnormity early warning unit sends a warning signal to the adjustment optimization unit, early warning is timely carried out after the data which do not meet the requirements of the client are tested, the quick adjustment and optimization of the software are facilitated, the adverse effect on the promotion of the software development process is avoided, and the software is delayed to be popularized and put on the market.
Further, the adjustment optimization unit adjusts the software card punching range after receiving the alarm signal, and adjusts r until r is adjusted
Figure 483754DEST_PATH_IMAGE003
And transmitting the adjusted corresponding effective card punching distance data to the software testing unit within the effective card punching range of the staff required by the client, and retesting through the software testing unit until the adjusted effective card punching distance meets the requirements of the client.
Furthermore, when the software testing unit performs testing operation, a misoperation condition can occur, the mouse track scanning unit scans a testing operation page and confirms the moving track of the mouse and the positions of points staying in sequence, the moving track of the mouse confirms the positions of buttons needing to be clicked during testing, and the modeling unit is used for modeling the whole testing operation page: establishing a two-dimensional coordinate system by taking the center of the page as an origin, and scanning to obtain a coordinate set (x) of the positions of buttons clicked by a mouse in sequence,y)={(x1 ,y1 ),(x2 ,y2 ),...,(xm ,ym ) M represents the number of buttons to be clicked in the test process, and the shortest distance d between two front and rear buttons arranged in sequence is calculated according to the following formulai
Figure DEST_PATH_IMAGE005
Wherein x isiAbscissa, y, representing a random buttoniRepresenting the ordinate of one button randomly, the shortest distance between the two buttons is D = { D = { D }1 ,d2 ,...,dm-1 And transmitting the scanned position coordinates of the buttons and the position relation among the buttons to the software testing unit, testing the software function through the software testing unit, and calculating the shortest distance between two buttons in the adjacent sequence according to the click sequence after confirming the position coordinates of the buttons in the testing operation process, so as to quickly confirm the position of the button with invalid click when the button click recognition unit recognizes that the button click is invalid, thereby being beneficial to giving early warning in time and finding a leak caused by misoperation.
Further, when the software testing unit tests the software function, the button click recognition unit is used for recognizing whether the mouse clicks the button needing to be clicked effectively, when the button is recognized to be not clicked or invalid, the button position information which is not clicked is transmitted to the abnormity early warning unit, and an alarm signal is sent to the abnormity processing unit through the abnormity early warning unit.
Furthermore, after the abnormity processing unit receives the alarm signal, the abnormity processing unit judges whether the shortest distance between two points where the mouse stays in sequence is equal to the corresponding shortest distance in the D through the mouse moving track scanned by the mouse scanning unit and the positions of the staying points, screens out corresponding buttons with unequal shortest distances, confirms the sequence and the positions of the buttons, and retests through the software testing unit until the testing operation passes the testing result output unit without error, and further confirms whether to click the buttons through comparison with the shortest distance between the two points where the scanned mouse stays when moving, so that the vulnerability can be found out quickly and processed in time, and the delay condition of subsequent popularization and marketing of software is avoided.
Compared with the prior art, the invention has the following beneficial effects:
1. the invention inputs the range data of the employee on-duty and off-duty punch card required by different client companies into the database through the client requirement input unit, transfers the range data of the employee on-duty and off-duty punch card and the correct test result data into the test evaluation unit, compares and judges whether the test result meets the requirements of the client through the test evaluation unit, transmits the data which does not meet the requirements of the client into the abnormity early warning unit, sends an alarm signal into the adjustment optimization unit through the abnormity early warning unit, replans and adjusts the effective punch card range of the software through the adjustment optimization unit, transmits the adjusted data to the software test unit for retesting until the requirements of the client are met, compared with the punch card range, the punch card distance enables the test result to be more visual, the comparison between the punch card distances is simpler, and the test evaluation result can be more clearly obtained, the test process is accelerated, when the tested software function does not meet the requirements of customers, an early warning signal needs to be sent out in time to adjust and optimize the software, so that the satisfaction degree of the customers is improved;
2. the invention scans the mouse moving track of a test operation page through a mouse track scanning unit, confirms the button position needing to be clicked during testing according to the moving track of the mouse, models the whole test page through a modeling unit, confirms the position coordinate of the button, transmits the button coordinate information to a software test unit through the mouse track scanning unit, tests the card punching function developed by software through the software test unit, judges whether the button click is effective or not in the operation process through a button click identification unit after the test operation is finished, transmits the identification result to an abnormity early warning unit, transmits an alarm signal to an abnormity processing unit through the abnormity early warning unit when the invalid click is identified, processes the invalid click of the button through the abnormity processing unit, outputs the correct test result after the processing, and timely gives early warning, The vulnerability caused by misoperation is found, so that the software marketing progress is promoted, and the delay condition of the subsequent software popularization and marketing work is avoided.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
fig. 1 is a system configuration diagram of an early warning system in a software development process according to the present invention.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are described herein for the purpose of illustration and explanation and not limitation.
Referring to fig. 1, the present invention provides a technical solution: an early warning system in software development process, its characterized in that: the method comprises the following steps: the system comprises a database, a GPS positioning unit, a client information input unit, a client requirement input unit, a software testing unit, a mouse track scanning unit, a modeling unit, a button click identification unit, an abnormity early warning unit, an abnormity processing unit, a test result output unit, a test evaluation unit and an adjustment optimization unit;
the output end of the GPS positioning unit is connected with the input end of the customer information input unit, the output ends of the customer information input unit and the customer requirement input unit are connected with the input end of the database, the input end of the mouse track scanning unit is connected with the output end of the modeling unit, the output end of the mouse track scanning unit is connected with the input end of the software testing unit, the output end of the software testing unit is connected with the input end of the button click identification unit, the output end of the button click identification unit is connected with the input end of the abnormity early warning unit, the output end of the abnormity early warning unit is connected with the input end of the abnormity processing unit, the output end of the abnormity processing unit is connected with the input end of the test result output unit, the output end of the test result output unit is connected with the input end of the database, the, the output end of the abnormity early warning unit is connected with the input end of the adjustment optimization unit, and the output end of the adjustment optimization unit is connected with the input end of the software testing unit;
the client information input unit stores address information of a client company, the client company is positioned by the GPS positioning unit to confirm specific position coordinates, the position coordinate information is transmitted to the database, a mouse track scanning unit scans a mouse moving track of a test operation page, the position of a button needing to be clicked during testing is confirmed according to the moving track of the mouse, a modeling unit models the whole test page, the position coordinates of the button are confirmed, the button coordinate information is transmitted to the software testing unit by the mouse track scanning unit, the software testing unit tests the card punching function developed by software, the button clicking identification unit judges whether the button clicking is effective during the operation process after the testing operation is finished, the identification result is transmitted to the abnormity early warning unit, and an alarm signal is transmitted to the abnormity processing unit by the abnormity early warning unit when invalid clicking is identified, processing invalid button clicks through an exception processing unit, and transmitting a processed correct test result to a database through a test result output unit;
the method comprises the steps of inputting range data of workers required by different clients for attendance and attendance card punching into a database through a client requirement input unit, transferring the range data of the workers for attendance card punching and correct test result data into a test evaluation unit, comparing and judging whether the test result meets the requirements of the clients through the test evaluation unit, transmitting the data which do not meet the requirements of the clients into an abnormity early warning unit, sending an alarm signal into an adjustment optimization unit through the abnormity early warning unit, replanning and adjusting the card punching effective range of software through the adjustment optimization unit, and transmitting the adjusted data to a software test unit for retesting.
The abnormity early warning unit not only sends out an alarm signal to the adjustment optimization unit when the test result is evaluated to not meet the requirement of a client, but also sends out the alarm signal to the abnormity processing unit due to misoperation in the software test operation process.
The client information input unit inputs address information of different client companies, the client companies are positioned through the GPS positioning unit, and the position coordinate set of all the client companies is confirmed to be (x, y) = { (x)1,y1),(x2,y2),...,(xn,yn) And n represents the number of client companies, and the position coordinate information is transmitted to the client requirement input unit through the client information input unit.
The client requirement input unit receives the position coordinate information of the client, and the set of the effective card punching distances of employees which take the company as the center and are required by the client is stored in the client requirement input unit and is d = { d = }1,d2,...,dnAnd n represents the number of client companies, and the effective employee card punching data required by the client is recorded into the database through the client requirement recording unit.
The software testing unit tests that the set of the effective card punching ranges of the corresponding companies in the card punching function of software development is s = { s =1,s2,...,snAnd calculating an effective distance r in the software card punching function according to the following formula:
Figure 410122DEST_PATH_IMAGE006
wherein the content of the first and second substances,
Figure 490074DEST_PATH_IMAGE002
obtaining a card punching effective distance set designed for the corresponding company as r = { r =1,r2,...,rnN represents the number of client companies, tested effective software card punching data are transmitted to a database through a test result output unit, the effective software card punching distance is calculated through the measured card punching range, the purpose of calculating the effective card punching distance is to compare with the effective employee card punching distance required by a client, and therefore whether the card punching function developed by software can meet the requirements of different clients or not is judged better.
The testing and evaluating unit calls software effective card punching data tested in the database and employee effective card punching data required by a client, and compares the employee effective card punching distance set d required by different clients with the effective distance r in the software card punching function tested one by utilizing the testing and evaluating unit: if it is
Figure DEST_PATH_IMAGE007
The software card punching range is within the effective card punching range of the staff required by the client, so that the requirements of the client can be met; if it is
Figure 843695DEST_PATH_IMAGE008
The method comprises the steps that a user can check the software, the user can check the software according to the user requirement, the user can not use the software to read the software, the user can not use the software, theThe promotion of the development process causes bad influence, thereby delaying the promotion and the marketing of the software.
The adjusting and optimizing unit adjusts the software card punching range after receiving the alarm signal, and adjusts r until r is up to
Figure 379237DEST_PATH_IMAGE007
And the developed software card punching range is within the effective card punching range of the staff required by the client, the adjusted corresponding effective card punching distance data is transmitted to the software testing unit, and the software testing unit is used for retesting until the adjusted effective card punching distance meets the requirements of the client.
When the software testing unit carries out testing operation, the situation of misoperation can appear, the mouse track scanning unit scans the testing operation page and confirms the moving track of the mouse and the position of the point staying in sequence, the moving track of the mouse confirms the position of the button needing to be clicked during testing, and the modeling unit is utilized to model the whole testing operation page: establishing a two-dimensional coordinate system by taking the center of the page as an origin, and scanning to obtain a coordinate set (x) of the positions of buttons clicked by a mouse in sequence,y)={(x1 ,y1 ),(x2 ,y2 ),...,(xm ,ym ) M represents the number of buttons to be clicked in the test process, and the shortest distance d between two front and rear buttons arranged in sequence is calculated according to the following formulai
Figure DEST_PATH_IMAGE009
Wherein x isiAbscissa, y, representing a random buttoniRepresenting the ordinate of one button randomly, the shortest distance between the two buttons is D = { D = { D }1 ,d2 ,...,dm-1 Transmitting the scanned position coordinates of the buttons and the position relationship among the buttons to softwareIn the test unit, the software function is tested through the software test unit, the shortest distance between two adjacent buttons is calculated according to the click sequence after the position coordinates of the buttons in the test operation process are confirmed, the purpose is to quickly confirm the position of the button with invalid click when the button click recognition unit recognizes that the button click is invalid, and therefore early warning is timely given and a bug caused by misoperation can be found conveniently.
When the software testing unit tests the software function, the button click identification unit is used for identifying whether the mouse effectively clicks the button needing to be clicked or not, when the button is identified to be not clicked or invalid, the position information of the button which is not clicked is transmitted to the abnormity early warning unit, and an alarm signal is sent to the abnormity processing unit through the abnormity early warning unit.
After the abnormity processing unit receives the alarm signal, the mouse moving track scanned by the mouse scanning unit and the positions of the stopped points are utilized, the abnormity processing unit is utilized to judge whether the shortest distance between two points stopped by the mouse in sequence is equal to the corresponding shortest distance in the D, corresponding buttons with unequal shortest distances are screened out, the sequence and the positions of the buttons are confirmed, the software testing unit is used for retesting until the testing operation is correct, the testing result is output by the testing result output unit, whether the button is clicked or not is further confirmed by comparing the shortest distance with the shortest distance between the two points stopped when the scanned mouse moves, the vulnerability can be rapidly found out and timely processed, and the delay condition of subsequent popularization and marketing of software is avoided.
The first embodiment is as follows: the client company is positioned through a GPS positioning unit, and the set of the effective card punching distances of employees which are required by the clients and take the company as the center is stored in a client requirement input unit and is d = { d = { d }1,d2,d3,d4,d5The unit is meter, and the set of valid card punching ranges of corresponding companies in the card punching function of software development is s = { s =(s) } tested by the software testing unit1,s2,s3,s4,s5} = {12000, 14000, 10000, 11000, 9000}, rootAccording to the formula
Figure 109295DEST_PATH_IMAGE010
Obtaining a card punching effective distance set designed for a corresponding company as r = { r =1,r2,r3,r4,r5The unit is meter, the tested software effective card punching data are transmitted to a database through a test result output unit, a test evaluation unit calls the tested software effective card punching data in the database and employee effective card punching data required by a client, and a test evaluation unit compares an employee effective card punching distance set d required by different clients with effective distances r in the tested software card punching function one by one: r is1>d1,r2>d2,r3<d3,r4>d4,r5<d5Through comparison, the designed effective distance r for punching the card is found1、r2And r4The data which can not meet the requirements of customers are transmitted to the abnormity early warning unit, the abnormity early warning unit sends an alarm signal to the adjustment optimization unit, and the adjustment optimization unit adjusts r after receiving the alarm signal1、r2And r4Up to
Figure DEST_PATH_IMAGE011
And the card punching range of the developed software is within the effective card punching range of the employee required by the client.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. An early warning system in software development process, its characterized in that: the method comprises the following steps: the system comprises a database, a GPS positioning unit, a client information input unit, a client requirement input unit, a software testing unit, a mouse track scanning unit, a modeling unit, a button click identification unit, an abnormity early warning unit, an abnormity processing unit, a test result output unit, a test evaluation unit and an adjustment optimization unit;
the output end of the GPS positioning unit is connected with the input end of the customer information input unit, the output ends of the customer information input unit and the customer requirement input unit are connected with the input end of the database, the input end of the mouse track scanning unit is connected with the output end of the modeling unit, the output end of the mouse track scanning unit is connected with the input end of the software testing unit, the output end of the software testing unit is connected with the input end of the button click identification unit, the output end of the button click identification unit is connected with the input end of the abnormity early warning unit, the output end of the abnormity early warning unit is connected with the input end of the abnormity processing unit, the output end of the abnormity processing unit is connected with the input end of the test result output unit, and the output end of the test result output unit is connected with the input end, the output end of the database is connected with the input end of the test evaluation unit, the output end of the test evaluation unit is connected with the input end of the abnormity early warning unit, the output end of the abnormity early warning unit is connected with the input end of the adjustment optimization unit, and the output end of the adjustment optimization unit is connected with the input end of the software test unit;
the client information input unit stores address information of a client company, the GPS positioning unit positions and confirms specific position coordinates of the client company, the position coordinate information is transmitted to the database, the mouse track scanning unit scans the mouse moving track of a test operation page, the position of a button needing to be clicked during testing is confirmed according to the moving track of the mouse, the modeling unit models the whole test page, confirms the position coordinates of the button, the button coordinate information is transmitted to the software testing unit through the mouse track scanning unit, the software testing unit tests the card punching function developed by software, the button clicking identification unit judges whether the button clicking is effective in the operation process after the testing operation is finished, and the identified result is transmitted to the abnormity early warning unit, when the invalid click is identified, an alarm signal is sent to the exception processing unit through the exception early warning unit, the invalid click of the button is processed through the exception processing unit, and a processed correct test result is transmitted to the database through the test result output unit;
the method comprises the steps that range data of employee attendance and attendance checking required by different clients are input into a database through a client requirement input unit, the range data of employee attendance and attendance checking and correct test result data are transferred into a test evaluation unit, whether the test result meets the requirements of the clients or not is judged through comparison of the test evaluation unit, the data which do not meet the requirements of the clients are transmitted into an abnormity early warning unit, an alarm signal is sent into an adjustment optimization unit through the abnormity early warning unit, the effective attendance checking range of software is rescheduled and adjusted through the adjustment optimization unit, and the adjusted data are transmitted to a software testing unit for retesting.
2. The early warning system in the software development process according to claim 1, wherein: the abnormality early warning unit not only sends out an alarm signal to the adjustment optimization unit when the test result is evaluated to not meet the customer requirement, but also sends out an alarm signal to the abnormality processing unit due to misoperation in the software test operation process.
3. The early warning system in the software development process according to claim 1, wherein: the client information input unit inputs address information of different client companies, the GPS positioning unit positions the client companies and confirms that the position coordinate set of all the client companies is (x, y) = { (x)1,y1),(x2,y2),...,(xn,yn) And n represents the number of client companies, and position coordinate information is transmitted to the client requirement input unit through the client information input unit.
4. The early warning system in the software development process according to claim 3, wherein: the client requirement input unit receives the position coordinate information of the client, and the set of the effective card punching distances of employees which are required by the client and take a company as a center is stored in the client requirement input unit and is d = { d = (d) }1,d2,...,dnAnd n represents the number of client companies, and the effective employee card punching data required by the client is recorded into the database through the client requirement recording unit.
5. The early warning system in the software development process according to claim 1, wherein: the software testing unit tests that the set of the effective card punching ranges of the corresponding companies in the card punching function of the software development is s = { s = }1,s2,...,snAnd calculating an effective distance r in the software card punching function according to the following formula:
Figure RE-DEST_PATH_IMAGE001
wherein the content of the first and second substances,
Figure 883174DEST_PATH_IMAGE002
obtaining a card punching effective distance set designed for the corresponding company as r = { r =1,r2,...,rnN represents the number of client companies, and the tested effective software card punching data are transmitted to the database through the test result output unit.
6. The early warning system in the software development process according to claim 5, wherein: the test evaluation unit calls the effective card punching data of the software tested in the databaseAnd the employee effective card punching data required by the client, and comparing the employee effective card punching distance set d required by different clients with the effective distance r in the tested software card punching function one by using the test evaluation unit: if it is
Figure RE-DEST_PATH_IMAGE003
The software card punching range is within the effective card punching range of the staff required by the client, so that the requirements of the client can be met; if it is
Figure 613232DEST_PATH_IMAGE004
And when the condition that the card punching range of the developed software exceeds the effective card punching range of the staff required by the client and cannot meet the requirements of the client is shown, transmitting the data which cannot meet the requirements of the client to the abnormity early warning unit, and sending an alarm signal to the adjustment and optimization unit by the abnormity early warning unit.
7. The early warning system in the software development process according to claim 6, wherein: the adjustment optimization unit adjusts the software card punching range after receiving the alarm signal, and adjusts r until r is adjusted
Figure 547690DEST_PATH_IMAGE003
And transmitting the adjusted corresponding effective card punching distance data to the software testing unit within the effective card punching range of the staff required by the client, and retesting through the software testing unit until the adjusted effective card punching distance meets the requirements of the client.
8. The early warning system in the software development process according to claim 5, wherein: when the software testing unit carries out testing operation, the condition of misoperation can occur, the mouse track scanning unit scans a testing operation page and confirms the moving track of the mouse and the positions of points staying in sequence, the moving track of the mouse confirms the positions of buttons needing to be clicked during testing, and the modeling is utilizedThe unit models the whole test operation page: establishing a two-dimensional coordinate system by taking the center of the page as an origin, and scanning to obtain a coordinate set (x) of the positions of buttons clicked by a mouse in sequence,y)={(x1 ,y1 ),(x2 ,y2 ),...,(xm ,ym ) M represents the number of buttons to be clicked in the test process, and the shortest distance d between two front and rear buttons arranged in sequence is calculated according to the following formulai
Figure RE-DEST_PATH_IMAGE005
Wherein x isiAbscissa, y, representing a random buttoniRepresenting the ordinate of one button randomly, the shortest distance between the two buttons is D = { D = { D }1 ,d2 ,...,dm-1 And transmitting the scanned position coordinates of the buttons and the position relation among the buttons to the software testing unit, and testing the software function through the software testing unit.
9. The early warning system in the software development process according to claim 8, wherein: when the software testing unit tests the software function, the button click identification unit is used for identifying whether the mouse effectively clicks the button needing to be clicked, when the button is identified to be not clicked or not clicked, the position information of the button which is not clicked is transmitted to the abnormity early warning unit, and an alarm signal is sent to the abnormity processing unit through the abnormity early warning unit.
10. The early warning system in the software development process according to claim 9, wherein: after the abnormity processing unit receives the alarm signal, the mouse moving track scanned by the mouse track scanning unit and the positions of the stopped points are utilized to judge whether the shortest distance between the two points stopped by the mouse in sequence is equal to the corresponding shortest distance in the D, corresponding buttons with unequal shortest distances are screened out, the sequence and the positions of the buttons are confirmed, and the software testing unit is used for retesting until the testing operation is correct and the testing result is output by the testing result output unit.
CN202110311061.XA 2021-03-24 2021-03-24 Early warning system in software development process Active CN112699057B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110311061.XA CN112699057B (en) 2021-03-24 2021-03-24 Early warning system in software development process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110311061.XA CN112699057B (en) 2021-03-24 2021-03-24 Early warning system in software development process

Publications (2)

Publication Number Publication Date
CN112699057A CN112699057A (en) 2021-04-23
CN112699057B true CN112699057B (en) 2021-06-18

Family

ID=75515633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110311061.XA Active CN112699057B (en) 2021-03-24 2021-03-24 Early warning system in software development process

Country Status (1)

Country Link
CN (1) CN112699057B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114331228B (en) * 2022-03-09 2022-05-31 广州弘一信息科技股份有限公司 Internet-based personnel management early warning system in software development process
CN114780437B (en) * 2022-05-24 2023-01-31 广州掌动智能科技有限公司 Auxiliary correction method and system for software automatic test script

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2782005A1 (en) * 2013-03-18 2014-09-24 Tata Consultancy Services Ltd. Verifying state reachability in a statechart model having computer program code embedded therein
WO2016089636A1 (en) * 2014-12-01 2016-06-09 Microsoft Technology Licensing, Llc User interface display testing system
CN107564118A (en) * 2017-07-11 2018-01-09 贵港市瑞成科技有限公司 A kind of smart mobile phone fingerprint attendance system
CN109086209A (en) * 2018-08-14 2018-12-25 安徽云才信息技术有限公司 A kind of method of attendance checking system automation effect detection
CN109697165A (en) * 2018-12-20 2019-04-30 广东电网有限责任公司 A kind of software automation safety detecting method, device and storage medium
CN111399805A (en) * 2020-03-13 2020-07-10 云南云电同方科技有限公司 Software development management system and method

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101368327B1 (en) * 2006-12-22 2014-02-26 삼성전자주식회사 System and method for reporting execution flow of program
US9317399B2 (en) * 2012-09-28 2016-04-19 Synopsys, Inc. Policy evaluation based upon dynamic observation, static analysis and code change history
CN202331585U (en) * 2011-09-22 2012-07-11 南京聚合数码科技有限公司 Checking-in control management system
US9513898B2 (en) * 2014-06-30 2016-12-06 Google Inc. Systems and methods for updating software in a hazard detection system
EP3144816A1 (en) * 2015-09-15 2017-03-22 Tata Consultancy Services Limited Static analysis based efficient elimination of false positives
US10102107B2 (en) * 2016-11-28 2018-10-16 Bank Of America Corporation Source code migration tool
US20180225110A1 (en) * 2017-02-08 2018-08-09 International Business Machines Corporation Legacy program code analysis and optimization
CN108415824A (en) * 2017-09-28 2018-08-17 平安科技(深圳)有限公司 Attendance data test method, terminal, equipment and computer readable storage medium
CN108008939A (en) * 2017-12-25 2018-05-08 苏州赛源微电子有限公司 A kind of early warning system in software development process
CN110096416B (en) * 2019-03-13 2022-07-08 中国平安人寿保险股份有限公司 Abnormity warning method and device, computer device and readable storage medium
CN111625229A (en) * 2020-05-18 2020-09-04 辽宁工程技术大学 Computer software development auxiliary system
CN111737151B (en) * 2020-07-27 2020-11-20 深圳诚一信科技有限公司 Software interaction test system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2782005A1 (en) * 2013-03-18 2014-09-24 Tata Consultancy Services Ltd. Verifying state reachability in a statechart model having computer program code embedded therein
WO2016089636A1 (en) * 2014-12-01 2016-06-09 Microsoft Technology Licensing, Llc User interface display testing system
CN107564118A (en) * 2017-07-11 2018-01-09 贵港市瑞成科技有限公司 A kind of smart mobile phone fingerprint attendance system
CN109086209A (en) * 2018-08-14 2018-12-25 安徽云才信息技术有限公司 A kind of method of attendance checking system automation effect detection
CN109697165A (en) * 2018-12-20 2019-04-30 广东电网有限责任公司 A kind of software automation safety detecting method, device and storage medium
CN111399805A (en) * 2020-03-13 2020-07-10 云南云电同方科技有限公司 Software development management system and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
综合网管系统软件测试模型的研究与实现;陈良臣;张朔;《计算机与数字工程》;20140430;第632页-第636页 *

Also Published As

Publication number Publication date
CN112699057A (en) 2021-04-23

Similar Documents

Publication Publication Date Title
CN112699057B (en) Early warning system in software development process
US20180101836A1 (en) Systems and methods for mobile image capture and processing of documents
CN109727229B (en) Method and device for detecting false solder
CN113032792B (en) System business vulnerability detection method, system, equipment and storage medium
US11694499B2 (en) Systems and methods for updating an image registry for use in fraud detection related to financial documents
CN111382740B (en) Text picture analysis method, text picture analysis device, computer equipment and storage medium
TW202034262A (en) Loan matching system and method
CN113888480A (en) MES-based quality tracing method and system
CN112199277A (en) Browser-based defect reproduction method, device, equipment and storage medium
CN113032834A (en) Database table processing method, device, equipment and storage medium
CN109857499B (en) Universal method for acquiring cash register software screen amount based on windows system
JP2019133483A (en) Facility examiner specifying program, facility examiner specifying method, and information processing apparatus
CN112115745A (en) Method, device and system for identifying code missing scanning behaviors of commodities
CN111581110B (en) Service data accuracy detection method, device, system and storage medium
US20210090086A1 (en) Systems and methods for fraud detection for images of financial documents
CN111260378B (en) Quality tracing method and system based on MES
CN116302974A (en) Data testing method, device, apparatus, medium and program product
CN115237796A (en) Link abnormity identification method and device, storage medium and electronic equipment
CN115018505A (en) Payment request processing method, device, equipment and storage medium
CN115080827A (en) Sensitive data processing method and device
CN111625455A (en) Program testing method, device, equipment and medium
KR102209430B1 (en) Performance based risk assessment method for port facility using mobile terminal
CN116109080B (en) Building integrated management platform based on BIM and AR
CN114118949B (en) Information processing system and method for bill
KR102476785B1 (en) Image library system and counterfeit detection method for artificial intelligence-based counterfeit product detection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220824

Address after: Room 108, Building 1, No. 11, Chang'an Road, Infant Industry Cultural and Creative Park, Jinjiang Economic Development Zone (Wuli Park), Quanzhou City, Fujian Province, 362000

Patentee after: Quanzhou Kejuhui Technology Co.,Ltd.

Address before: Room 1402, 1936 Kaichuang Avenue, Huangpu District, Guangzhou, Guangdong 510530

Patentee before: Guangzhou Hongyi Information Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220829

Address after: 1st Floor, Building C, Chuangke Street, Sanchuangyuan, No. 3001, Century Avenue, Sunei Community, Luoshan Street, Jinjiang City, Quanzhou City, Fujian Province, 362000

Patentee after: Fujian Nanyi Technology Co.,Ltd.

Address before: Room 108, Building 1, No. 11, Chang'an Road, Infant Industry Cultural and Creative Park, Jinjiang Economic Development Zone (Wuli Park), Quanzhou City, Fujian Province, 362000

Patentee before: Quanzhou Kejuhui Technology Co.,Ltd.