CN112102107A - Method, device and equipment for generating report of power supply system - Google Patents
Method, device and equipment for generating report of power supply system Download PDFInfo
- Publication number
- CN112102107A CN112102107A CN202010748576.1A CN202010748576A CN112102107A CN 112102107 A CN112102107 A CN 112102107A CN 202010748576 A CN202010748576 A CN 202010748576A CN 112102107 A CN112102107 A CN 112102107A
- Authority
- CN
- China
- Prior art keywords
- report
- content
- information
- module
- power grid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/28—Databases characterised by their database models, e.g. relational or object models
- G06F16/284—Relational databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
The invention relates to a method, a device and equipment for generating a report of a power supply system, belonging to the technical field of power grid maintenance, wherein the method comprises the following steps of obtaining maintenance list content, wherein the maintenance list content comprises the following steps: power failure maintenance content and approval opinions; acquiring power grid risk content of a target power supply system, wherein the power grid risk content comprises at least one of power grid risk release times, accident event levels and risk time periods; and generating a report according to the contents of the overhaul list and the power grid risk contents based on a preset report template, wherein the report comprises at least one of a daily report or a monthly report. The intelligent interaction between the current power grid problem risk-based function and the power failure of the OMS system maintenance management module is realized, and the accuracy of report data acquisition is improved.
Description
Technical Field
The invention belongs to the technical field of power grid maintenance, and particularly relates to a method, a device and equipment for generating a report of a power supply system.
Background
With the development of science and technology, the electric power field is rapidly developed, and the importance of a power supply system is increasingly highlighted. In order to ensure the temperature operation of a power supply system, the monitoring and the maintenance of the state of power grid equipment become an important ring.
In order to meet the requirement of 'maintenance specialization', various operation data in a power supply system need to be counted in time, and report processing is carried out on the operation data, so that support on a maintenance plan is realized.
However, with the increasing and diversification of power equipment, the existing data statistics module and report generation module cannot meet the requirements of the existing maintenance plan on data. Therefore, how to collect and report data becomes an urgent problem to be solved.
Disclosure of Invention
In order to at least solve the problems in the prior art, the invention provides a method, a device and equipment for generating a report of a power supply system.
The technical scheme provided by the invention is as follows:
on one hand, the report generation method of the power supply system is characterized by comprising the following steps:
acquiring the content of a service list, wherein the content of the service list comprises the following steps: power failure maintenance content and approval opinions;
acquiring power grid risk content of a target power supply system, wherein the power grid risk content comprises at least one of power grid risk release times, accident event levels and risk time periods;
and generating a report according to the contents of the overhaul list and the power grid risk contents based on a preset report template, wherein the report comprises at least one of a daily report or a monthly report.
Optionally, the method further includes:
acquiring power failure information of the key equipment within a preset time period based on a preset format according to the report;
and sending the power failure information of the key equipment to a preset terminal.
Optionally, the method further includes:
recording the sending information of the power failure information of the key equipment;
receiving an information transmission inquiry request, and determining the transmission information of the power failure information of the key equipment corresponding to the information transmission inquiry request.
Optionally, the method further includes:
receiving overhaul query information, and acquiring corresponding overhaul personnel information according to the overhaul query information, wherein the overhaul personnel information comprises: at least one of personnel name, mobile phone number and department information.
Optionally, generating a report according to the contents of the overhaul list and the contents of the power grid risk based on a preset report template, before, further comprising:
filtering the overhaul list content and the power grid risk content based on a preset filtering rule to obtain target content;
based on preset report template, generating a report according to the contents of the overhaul list and the power grid risk contents, including:
and generating a report based on a preset report module and the target content.
In another aspect, a report generating apparatus for a power supply system includes: the system comprises a first acquisition module, a second acquisition module and a report generation module;
the first obtaining module is used for obtaining the content of the maintenance order, and the content of the maintenance order comprises the following steps: power failure maintenance content and approval opinions;
the second acquisition module is used for acquiring power grid risk content of the target power supply system, wherein the power grid risk content comprises at least one of power grid risk release times, accident event levels and risk time periods;
and the report generation module is used for generating a report according to the contents of the overhaul list and the power grid risk contents based on a preset report template, wherein the report comprises at least one of a daily report or a monthly report.
Optionally, the system further comprises a third obtaining module and a sending module;
the third acquisition module is used for acquiring the power failure information of the key equipment in a preset time period based on a preset format according to the report;
and the sending module is used for sending the power failure information of the key equipment to a preset terminal.
Optionally, the system further comprises a storage module and a query module;
the storage module is used for recording the sending information of the power failure information of the key equipment;
and the query module is used for receiving an information sending query request and determining the sending information of the power failure information of the key equipment corresponding to the information sending query request.
Optionally, the method further includes: a filtration module;
the filtering module is used for generating a report according to the overhaul list content and the power grid risk content based on a preset report template, and filtering the overhaul list content and the power grid risk content based on a preset filtering rule to obtain target content;
and the report generation module is used for generating a report based on the preset report module and the target content.
In still another aspect, a power supply system report generating apparatus includes: a processor, and a memory coupled to the processor;
the memory is used for storing a computer program, and the computer program is at least used for executing the power supply system report generating method;
the processor is used for calling and executing the computer program in the memory.
The invention has the beneficial effects that:
the method, the device and the equipment for generating the report of the power supply system provided by the embodiment of the invention comprise the following steps of obtaining the content of a maintenance order, wherein the content of the maintenance order comprises the following steps: power failure maintenance content and approval opinions; acquiring power grid risk content of a target power supply system, wherein the power grid risk content comprises at least one of power grid risk release times, accident event levels and risk time periods; and generating a report according to the contents of the overhaul list and the power grid risk contents based on a preset report template, wherein the report comprises at least one of a daily report or a monthly report. The intelligent interaction between the current power grid problem risk-based function and the power failure of the OMS system maintenance management module is realized, and the accuracy of report data acquisition is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic flow chart of a method for generating a report of a power supply system according to an embodiment of the present invention;
FIG. 2 is a schematic diagram of a monthly report template according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of a report generation apparatus of a power supply system according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of a report generation device of a power supply system according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the technical solutions of the present invention will be described in detail below. It is to be understood that the described embodiments are merely exemplary of the invention, and not restrictive of the full scope of the invention. All other embodiments, which can be derived by a person skilled in the art from the examples given herein without any inventive step, are within the scope of the present invention.
In order to at least solve the technical problem provided by the present invention, an embodiment of the present invention provides a power supply system report generating method.
Fig. 1 is a schematic flow chart of a method for generating a report of a power supply system according to an embodiment of the present invention, referring to fig. 1, the method according to the embodiment of the present invention may include the following steps:
s11, acquiring the content of the maintenance order, wherein the content of the maintenance order comprises the following steps: and examining and approving the content.
And S12, acquiring the power grid risk content of the target power supply system, wherein the power grid risk content comprises at least one of power grid risk release times, accident event levels and risk time periods.
And S13, generating a report based on the preset report template according to the contents of the overhaul bill and the power grid risk contents, wherein the report comprises at least one of a daily report or a monthly report.
In a specific implementation process, a certain power supply system can be defined as a target power supply system, and the power supply system report generation method is applied to the target power supply system.
In the embodiment of the invention, the content of the service list can be acquired through the OMS system. The OMS system is an outage management system, which is called an outage management system, and is generally abbreviated as OMS. The power system OMS system is an important component of a Distribution Management System (DMS), including planned blackout management and fault blackout management. The purpose is to strengthen the management of planned power failure, rapidly process fault power failure, shorten power failure time, improve power supply reliability and provide power supply recovery information for a fault repair response system.
In this embodiment, the maintenance order content that has been powered off is obtained through the maintenance order management module of the OMS system, and the maintenance content and approval opinions in the maintenance order can be extracted. Acquiring the power grid risk content of the target power supply system, and intelligently interacting the power grid risk content with the maintenance list content, so as to generate a report according to a preset template.
For example, the contents of the inspection list, inspection and approval opinions, failure and power failure information, planned power failure information, and the like may be acquired. And acquiring the current risk of the power grid, and intelligently interacting the current risk with the OMS so as to generate a more accurate report.
In this embodiment, the risk issue condition of the power grid may be interacted with the risk early warning notice module of the OMS. When the power grid risk issue times and the accident event level item number are counted, the power grid risk and the accident event level of the power failure plan related to the same power grid risk early warning notice book can be combined into one statistic.
In order to guarantee the accuracy of the report, optionally, based on a preset report template, generating the report according to the contents of the overhaul list and the power grid risk contents, and before, further comprising: filtering the overhaul bill content and the power grid risk content based on a preset filtering rule to obtain target content; based on predetermineeing the report form template, according to examining and repairing list content and electric wire netting risk content, generate the report form, include: and generating a report based on the preset report module and the target content.
For example, the material of the report includes a repair order content and a power grid risk content, wherein the material includes a large number of daily shift flow logs of dispatchers, and in the logs, there may be a plurality of pieces of useless information, such as redundant punctuations, repeated expressions and other contents.
The reports in the power distribution network can include distribution network line maintenance reports which are periodically issued every day, every week and every month, the descriptions, maintenance schemes and solution conditions of all line problems in corresponding time are detailed in the reports, and meanwhile, data statistics can be summarized according to different types of the problems.
Optionally, the method further includes: acquiring power failure information of the key equipment within a preset time period based on a preset format according to the report; and sending the power failure information of the key equipment to a preset terminal.
For example, a short message prompt may be set, and when the key device has power-off information, the short message prompt may be sent to a preset user for prompt.
Optionally, the method further includes: recording the sending information of the power failure information of the key equipment; and receiving an information transmission inquiry request, and determining the transmission information of the power failure information of the key equipment corresponding to the information transmission inquiry request.
For example, reminder transmission information of power failure information of the key device, such as transmission time, transmission frequency, transmission user and the like of the reminder information, can be stored. And the user can send an information sending query request so as to query the sending information of the power failure information of the key equipment corresponding to the information sending query request.
Optionally, the method further includes: receiving maintenance inquiry information, acquiring corresponding maintenance personnel information according to the maintenance inquiry information, wherein the maintenance personnel information comprises: at least one of personnel name, mobile phone number and department information.
For example, the user may query the maintenance information, for example, may query information such as the name, the mobile phone number, the department to which the maintenance person belongs, and the like of the maintenance person, thereby implementing tracing back of the maintenance person.
In the embodiment of the invention, in order to facilitate the operation of a user, the functions of flexible data statistics, data collection, material and report generation and the like can be set.
And the generated report comprises a monthly report, a daily report and the like. Fig. 2 is a schematic diagram of a monthly report template according to an embodiment of the present invention, referring to fig. 2, the monthly report may include: year, name, month, total, etc., where the name may include: the number of repeated power failures, the number of power failure cancellation, the execution rate of the power failure plan, the number of temporary stops, the temporary stop rate, the actual execution power failure plan number (including the temporary stops), the number of repeated power failure equipment, the number of repeated power failure lines, the non-stop rate, the delay rate, the actual execution completion number and the like.
In this embodiment, the maintenance index statistics may include the number of repeated power failures, the number of power failure cancellations, the power failure plan execution rate, the number of temporary stops, the temporary stop rate, the actual execution power failure plan number, the number of repeated power failure devices, the number of repeated power failure times, the non-stop rate, the non-stop number, the delay rate, the delay time, and the actual execution completion number, and the statistics of various rates may show detailed statistical formulas, and the non-planned power failures, the repeated power failures, the plan cancellations, and the delay lists may show details and fill in brief work contents and reasons, and may exempt and recover.
The daily report obtained by the embodiment of the invention is as follows: risk distribution situation statistics and interaction with the OMS can be achieved.
When data acquisition is performed, acquisition may be performed in the form of planned collection: each basic unit logs in an adjustment web client, downloads a 'month plan standard template form' and fills in the 'month plan standard template form', then leads in an adjustment system, the system identifies whether each field in the form is missing, produces the month plan in the adjustment after passing the identification, and if not, prompts errors to the basic unit and then uploads the basic unit again until the month plan is correctly generated in the adjustment; planning to take a bill: including power outage start, end time, and job content changes (add, modify, delete). And the basic unit initiates an application at the adjustment web end, and the operation personnel change the application after agreeing.
The method for generating the report of the power supply system provided by the embodiment of the invention comprises the following steps of obtaining the content of a maintenance order, wherein the content of the maintenance order comprises the following steps: power failure maintenance content and approval opinions; acquiring power grid risk content of a target power supply system, wherein the power grid risk content comprises at least one of power grid risk release times, accident event levels and risk time periods; and generating a report according to the contents of the overhaul list and the power grid risk contents based on a preset report template, wherein the report comprises at least one of a daily report or a monthly report. The intelligent interaction between the current power grid problem risk-based function and the power failure of the OMS system maintenance management module is realized, and the accuracy of report data acquisition is improved.
Based on a general inventive concept, the embodiment of the invention also provides a report generation device of the power supply system.
Fig. 3 is a schematic structural diagram of a report generation apparatus for a power supply system according to an embodiment of the present invention, referring to fig. 3, the apparatus according to the embodiment of the present invention may include the following structures: a first obtaining module 31, a second obtaining module 32 and a report generating module 33;
the first obtaining module 31 is configured to obtain a service ticket content, and the service ticket content includes: power failure maintenance content and approval opinions;
the second obtaining module 32 is configured to obtain grid risk content of the target power supply system, where the grid risk content includes at least one of grid risk issue times, accident event levels, and risk time periods;
and the report generation module 33 is configured to generate a report according to the contents of the overhaul schedule and the contents of the power grid risk based on a preset report template, where the report includes at least one of a daily report and a monthly report.
Optionally, the system further includes a third obtaining module 34 and a sending module 35;
the third obtaining module 34 is configured to obtain, according to the report, power failure information of the key device within a preset time period based on a preset format;
and the sending module 35 is configured to send the power failure information of the key device to a preset terminal.
Optionally, the method further includes: a storage module 36 and a query module 37;
the storage module 36 is used for recording the sending information of the power failure information of the key equipment;
and the query module 37 is configured to receive the information sending query request, and determine sending information of the power failure information of the key device corresponding to the information sending query request.
Optionally, the method further includes: a filtration module 38;
the filtering module 38 is configured to generate a report according to the overhaul list content and the power grid risk content based on a preset report template, and filter the overhaul list content and the power grid risk content based on a preset filtering rule to obtain a target content before generating the report;
and a report generation module 33, configured to generate a report based on the preset report module and the target content.
With regard to the apparatus in the above-described embodiment, the specific manner in which each module performs the operation has been described in detail in the embodiment related to the method, and will not be elaborated here.
The report generation device for the power supply system provided by the embodiment of the invention, by acquiring the content of the maintenance order, comprises the following steps: power failure maintenance content and approval opinions; acquiring power grid risk content of a target power supply system, wherein the power grid risk content comprises at least one of power grid risk release times, accident event levels and risk time periods; and generating a report according to the contents of the overhaul list and the power grid risk contents based on a preset report template, wherein the report comprises at least one of a daily report or a monthly report. The intelligent interaction between the current power grid problem risk-based function and the power failure of the OMS system maintenance management module is realized, and the accuracy of report data acquisition is improved.
Based on a general inventive concept, the embodiment of the invention also provides a power supply system report generation device.
Fig. 4 is a schematic structural diagram of a report generation device of a power supply system according to an embodiment of the present invention, and referring to fig. 4, a report generation device of a power supply system according to an embodiment of the present invention includes: a processor 41, and a memory 42 coupled to the processor.
The memory 42 is used for storing a computer program, and the computer program is at least used for the power supply system report generation method described in any one of the above embodiments;
the processor 41 is used to invoke and execute computer programs in memory.
The above description is only for the specific embodiments of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present invention, and all the changes or substitutions should be covered within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the appended claims.
It is understood that the same or similar parts in the above embodiments may be mutually referred to, and the same or similar parts in other embodiments may be referred to for the content which is not described in detail in some embodiments.
It should be noted that the terms "first," "second," and the like in the description of the present invention are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. Further, in the description of the present invention, the meaning of "a plurality" means at least two unless otherwise specified.
Any process or method descriptions in flow charts or otherwise described herein may be understood as representing modules, segments, or portions of code which include one or more executable instructions for implementing specific logical functions or steps of the process, and alternate implementations are included within the scope of the preferred embodiment of the present invention in which functions may be executed out of order from that shown or discussed, including substantially concurrently or in reverse order, depending on the functionality involved, as would be understood by those reasonably skilled in the art of the present invention.
It should be understood that portions of the present invention may be implemented in hardware, software, firmware, or a combination thereof. In the above embodiments, the various steps or methods may be implemented in software or firmware stored in memory and executed by a suitable instruction execution system. For example, if implemented in hardware, as in another embodiment, any one or combination of the following techniques, which are known in the art, may be used: a discrete logic circuit having a logic gate circuit for implementing a logic function on a data signal, an application specific integrated circuit having an appropriate combinational logic gate circuit, a Programmable Gate Array (PGA), a Field Programmable Gate Array (FPGA), or the like.
It will be understood by those skilled in the art that all or part of the steps carried by the method for implementing the above embodiments may be implemented by hardware related to instructions of a program, which may be stored in a computer readable storage medium, and when the program is executed, the program includes one or a combination of the steps of the method embodiments.
In addition, functional units in the embodiments of the present invention may be integrated into one processing module, or each unit may exist alone physically, or two or more units are integrated into one module. The integrated module can be realized in a hardware mode, and can also be realized in a software functional module mode. The integrated module, if implemented in the form of a software functional module and sold or used as a stand-alone product, may also be stored in a computer readable storage medium.
The storage medium mentioned above may be a read-only memory, a magnetic or optical disk, etc.
In the description herein, references to the description of the term "one embodiment," "some embodiments," "an example," "a specific example," or "some examples," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and that variations, modifications, substitutions and alterations can be made to the above embodiments by those of ordinary skill in the art within the scope of the present invention.
Claims (10)
1. A method for generating a report of a power supply system is characterized by comprising the following steps:
acquiring the content of a service list, wherein the content of the service list comprises the following steps: power failure maintenance content and approval opinions;
acquiring power grid risk content of a target power supply system, wherein the power grid risk content comprises at least one of power grid risk release times, accident event levels and risk time periods;
and generating a report according to the contents of the overhaul list and the power grid risk contents based on a preset report template, wherein the report comprises at least one of a daily report or a monthly report.
2. The method of claim 1, further comprising:
acquiring power failure information of the key equipment within a preset time period based on a preset format according to the report;
and sending the power failure information of the key equipment to a preset terminal.
3. The method of claim 2, further comprising:
recording the sending information of the power failure information of the key equipment;
receiving an information transmission inquiry request, and determining the transmission information of the power failure information of the key equipment corresponding to the information transmission inquiry request.
4. The method of claim 1, further comprising:
receiving overhaul query information, and acquiring corresponding overhaul personnel information according to the overhaul query information, wherein the overhaul personnel information comprises: at least one of personnel name, mobile phone number and department information.
5. The method according to claim 1, wherein before generating a report based on a preset report template according to the overhaul list content and the grid risk content, the method further comprises:
filtering the overhaul list content and the power grid risk content based on a preset filtering rule to obtain target content;
based on preset report template, generating a report according to the contents of the overhaul list and the power grid risk contents, including:
and generating a report based on a preset report module and the target content.
6. A report generation device for a power supply system is characterized by comprising: the system comprises a first acquisition module, a second acquisition module and a report generation module;
the first obtaining module is used for obtaining the content of the maintenance order, and the content of the maintenance order comprises the following steps: power failure maintenance content and approval opinions;
the second acquisition module is used for acquiring power grid risk content of the target power supply system, wherein the power grid risk content comprises at least one of power grid risk release times, accident event levels and risk time periods;
and the report generation module is used for generating a report according to the contents of the overhaul list and the power grid risk contents based on a preset report template, wherein the report comprises at least one of a daily report or a monthly report.
7. The apparatus of claim 6, further comprising: a third acquisition module and a sending module;
the third acquisition module is used for acquiring the power failure information of the key equipment in a preset time period based on a preset format according to the report;
and the sending module is used for sending the power failure information of the key equipment to a preset terminal.
8. The apparatus of claim 7, further comprising a storage module and a query module;
the storage module is used for recording the sending information of the power failure information of the key equipment;
and the query module is used for receiving an information sending query request and determining the sending information of the power failure information of the key equipment corresponding to the information sending query request.
9. The apparatus of claim 6, further comprising: a filtration module;
the filtering module is used for generating a report according to the overhaul list content and the power grid risk content based on a preset report template, and filtering the overhaul list content and the power grid risk content based on a preset filtering rule to obtain target content;
and the report generation module is used for generating a report based on the preset report module and the target content.
10. A power supply system report generation device, comprising: a processor, and a memory coupled to the processor;
the memory is used for storing a computer program, and the computer program is at least used for executing the power supply system report generation method of any one of claims 1-5;
the processor is used for calling and executing the computer program in the memory.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010748576.1A CN112102107A (en) | 2020-07-30 | 2020-07-30 | Method, device and equipment for generating report of power supply system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010748576.1A CN112102107A (en) | 2020-07-30 | 2020-07-30 | Method, device and equipment for generating report of power supply system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112102107A true CN112102107A (en) | 2020-12-18 |
Family
ID=73749916
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010748576.1A Pending CN112102107A (en) | 2020-07-30 | 2020-07-30 | Method, device and equipment for generating report of power supply system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112102107A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117057590A (en) * | 2023-10-11 | 2023-11-14 | 国网山东省电力公司博兴县供电公司 | Power grid overhaul management system and method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040181469A1 (en) * | 2003-03-10 | 2004-09-16 | Yuji Saeki | Accounting management method for grid computing system |
CN102479359A (en) * | 2010-11-27 | 2012-05-30 | 甘肃省电力公司兰州供电公司 | Power grid overhauling plan compilation method based on graphic operations |
CN103336839A (en) * | 2013-07-16 | 2013-10-02 | 国家电网公司 | Electric system specialized overhaul data processing method |
CN206294207U (en) * | 2016-12-30 | 2017-06-30 | 国网山西省电力公司 | Grid power blackout proposed figures for the plan Optimization Platform based on " big operation " multi-constraint condition |
CN109800893A (en) * | 2018-12-25 | 2019-05-24 | 国家电网公司东北分部 | Fault message and secondary device operation management information WEB Homepage Publishing method |
CN110569994A (en) * | 2019-08-28 | 2019-12-13 | 国网山东省电力公司 | power grid maintenance work monitoring system based on accurate weather and early warning method thereof |
CN111090973A (en) * | 2019-11-26 | 2020-05-01 | 北京明略软件系统有限公司 | Report generation method and device and electronic equipment |
CN111160795A (en) * | 2019-12-31 | 2020-05-15 | 国网安徽省电力有限公司芜湖供电公司 | Management system and method for distribution network graph-model transaction and power failure lean assessment |
-
2020
- 2020-07-30 CN CN202010748576.1A patent/CN112102107A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040181469A1 (en) * | 2003-03-10 | 2004-09-16 | Yuji Saeki | Accounting management method for grid computing system |
CN102479359A (en) * | 2010-11-27 | 2012-05-30 | 甘肃省电力公司兰州供电公司 | Power grid overhauling plan compilation method based on graphic operations |
CN103336839A (en) * | 2013-07-16 | 2013-10-02 | 国家电网公司 | Electric system specialized overhaul data processing method |
CN206294207U (en) * | 2016-12-30 | 2017-06-30 | 国网山西省电力公司 | Grid power blackout proposed figures for the plan Optimization Platform based on " big operation " multi-constraint condition |
CN109800893A (en) * | 2018-12-25 | 2019-05-24 | 国家电网公司东北分部 | Fault message and secondary device operation management information WEB Homepage Publishing method |
CN110569994A (en) * | 2019-08-28 | 2019-12-13 | 国网山东省电力公司 | power grid maintenance work monitoring system based on accurate weather and early warning method thereof |
CN111090973A (en) * | 2019-11-26 | 2020-05-01 | 北京明略软件系统有限公司 | Report generation method and device and electronic equipment |
CN111160795A (en) * | 2019-12-31 | 2020-05-15 | 国网安徽省电力有限公司芜湖供电公司 | Management system and method for distribution network graph-model transaction and power failure lean assessment |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117057590A (en) * | 2023-10-11 | 2023-11-14 | 国网山东省电力公司博兴县供电公司 | Power grid overhaul management system and method |
CN117057590B (en) * | 2023-10-11 | 2024-02-02 | 国网山东省电力公司博兴县供电公司 | Power grid overhaul management system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7779290B2 (en) | Computer implemented systems and methods for pre-emptive service and improved use of service resources | |
JP2016192891A (en) | System and methods for improved demand response management system (drms) | |
WO2019006654A1 (en) | Financial self-service equipment maintenance dispatch generation method, hand-held terminal and electronic device | |
US20120253540A1 (en) | Energy grid device commissioning method and system | |
CN110728836A (en) | Concentrator meter reading abnormity analysis method and system | |
WO2002080459A1 (en) | Service monitoring and reporting system | |
CN105117830A (en) | Wind farm production operation and maintenance information collection application system and method | |
CN110134053B (en) | Monitoring configuration method, device and equipment for distribution transformer fault power failure quick response | |
US20200117151A1 (en) | Outage and switch management for a power grid system | |
CN108764596A (en) | The monitoring method and monitoring system of the power failure of metering automation system | |
CN111667076A (en) | Tracking method for processing power failure fault | |
CN112102107A (en) | Method, device and equipment for generating report of power supply system | |
CN110516828B (en) | Monitoring information processing system and method | |
CN109447497A (en) | A kind of PROJECT TIME estimates management method and system | |
CN111146868A (en) | Power communication machine room dynamic loop monitoring standardized access method and system | |
CN111666741A (en) | Automatic generation method of scheduling comprehensive report | |
CN116108740A (en) | Modeling method and device for power equipment | |
CN107979174B (en) | Workflow operation method based on power grid operation management system | |
CN112446619B (en) | Power distribution network rush-repair processing method and device | |
CN111158870A (en) | Method and device for managing database | |
CN117977789A (en) | Unified Internet of things equipment running state monitoring system based on electric power data | |
CN115801545B (en) | Method, system, equipment and medium for reporting abnormality of hybrid cloud tube in real time | |
CN215679427U (en) | Meteorological data operation monitoring management system on duty | |
CN102592203A (en) | Rule engine based KPI (Key Performance Indicator) generation method in business activity monitoring | |
Liu et al. | Integrated fuzzy filter for distribution outage information |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |