CN112073610A - Bridge construction supervisory equipment - Google Patents

Bridge construction supervisory equipment Download PDF

Info

Publication number
CN112073610A
CN112073610A CN202010912715.XA CN202010912715A CN112073610A CN 112073610 A CN112073610 A CN 112073610A CN 202010912715 A CN202010912715 A CN 202010912715A CN 112073610 A CN112073610 A CN 112073610A
Authority
CN
China
Prior art keywords
plate
bridge construction
front lens
frame
lens
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010912715.XA
Other languages
Chinese (zh)
Inventor
牛虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010912715.XA priority Critical patent/CN112073610A/en
Publication of CN112073610A publication Critical patent/CN112073610A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N23/00Cameras or camera modules comprising electronic image sensors; Control thereof
    • H04N23/50Constructional details
    • H04N23/52Elements optimising image sensor operation, e.g. for electromagnetic interference [EMI] protection or temperature control by heat transfer or cooling elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/10Cleaning by methods involving the use of tools characterised by the type of cleaning tool
    • B08B1/12Brushes
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N23/00Cameras or camera modules comprising electronic image sensors; Control thereof
    • H04N23/50Constructional details
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N23/00Cameras or camera modules comprising electronic image sensors; Control thereof
    • H04N23/50Constructional details
    • H04N23/55Optical parts specially adapted for electronic image sensors; Mounting thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Cleaning In General (AREA)

Abstract

The invention discloses a bridge construction monitoring device, which structurally comprises a protective cover, a machine body, a connecting seat, a connecting frame and a mirror surface, wherein the protective cover is fixedly embedded at the upper end of the machine body, the machine body is movably clamped with the front end of the connecting frame, the connecting frame is welded with the connecting seat, the mirror surface is arranged at the front end of the machine body, the front lens can be inwards contracted along a fixed plate through the collision of sparks to the front lens, so that iron filings condensed by spark cooling can downwards slide into the space between the fixed plate and the front lens through the front lens, splashed water can also enter a collecting block in the same way, the cracking caused by the cold heat exchange can be avoided by avoiding the direct contact of the iron filings of the sparks and the water, the water and the iron filings discharged from the cavity can be guided into the outer pipe, and a connecting rod can drive a bottom plate to swing forwards through the thrust generated by the water to the outer pipe, therefore, the scrap iron at the bottom of the inner wall of the outer pipe can be swept by the sweeping brush.

Description

Bridge construction supervisory equipment
Technical Field
The invention relates to the field of bridge construction, in particular to bridge construction monitoring equipment.
Background
Bridge construction control mainly is the equipment that is used for carrying out the control to the bridge construction, installs in the eminence usually and carries out real time monitoring to the below region to can rotate the regulation through the camera of remote control, so can lock the region that needs the control, be the common equipment of bridge construction, based on the above-mentioned description the inventor finds, a bridge construction supervisory equipment that has now mainly has following not enough, for example:
if bridge construction control is installed on the main support that the welding was accomplished, and the spark that the welding produced can drop downwards, meet the wind that blows towards surveillance camera head the place ahead when the staff carries out branch's scaffold weldment to the main support more than the bridge construction control, then can make the spark redirecting collide the glass lens of bridge construction camera, if carry out water spray cooling to the support of welding this moment again, then can make moisture fall on the glass lens, thereby lead to receiving the condition that the fracture appears in the heat exchange replacement glass lens of cold.
Disclosure of Invention
Aiming at the problems, the invention provides bridge construction monitoring equipment.
In order to achieve the purpose, the invention is realized by the following technical scheme: a bridge construction monitoring device structurally comprises a protective cover, a machine body, a connecting seat, a connecting frame and a mirror surface, wherein the protective cover is fixedly embedded at the upper end of the machine body, the machine body is movably clamped with the front end of the connecting frame, the connecting frame is welded with the connecting seat, and the mirror surface is installed at the front end of the machine body; the mirror surface comprises an inner lens, a reset strip, a front lens and fixing plates, wherein the inner lens is fixedly embedded between the two fixing plates, the reset strip is arranged between the front lens and the inner lens, and the front lens is movably clamped with the inner lens.
As a further optimization of the invention, the fixing plate comprises a collecting block, a combining rod, an outer-row mechanism and a frame body, wherein the collecting block is movably clamped with the frame body through the combining rod, the outer-row mechanism is arranged between the collecting block and the frame body, and the collecting block which is not extruded by the object can be pushed to slide outwards through the outer-row mechanism.
As a further optimization of the invention, the collecting block comprises a cooling plate, an upper sliding plate, a discharge cavity and a plate body, wherein the cooling plate is embedded and fixed at the position close to the upper end of the right side of the plate body, the upper sliding plate is movably clamped with the lower end of the right side of the plate body, the discharge cavity and the plate body are of an integrated structure, and the six cooling plates are uniformly distributed at the upper end of the right side in an arc shape.
As a further optimization of the present invention, the upper slide plate includes a push rod, a plate surface, and a swing plate, the push rod is movably engaged with the plate surface, the swing plate is hinged to the upper end of the plate surface, and the push rod can push the swing plate to swing upward by an inertial force generated by the upward sliding of the mechanism.
As a further optimization of the invention, the outer discharge mechanism comprises an outer tube, outer swing rods, a bottom plate and cleaning brushes, the outer swing rods are hinged with the upper end of the inner wall of the outer tube, the bottom plate is hinged with the bottom of the outer swing rods, the cleaning brushes and the bottom plate are of an integrated structure, and the number of the outer swing rods is four, and the four outer swing rods are uniformly distributed on the upper end of the inner wall of the outer tube in parallel.
As a further optimization of the invention, the bottom plate comprises a frame, a clearing block, a lower connecting plate, an inner connecting plate and elastic pieces, wherein the clearing block is in clearance fit with the lower connecting plate, the lower connecting plate and the frame are of an integrated structure, the inner connecting plate is fixedly embedded at the upper end of the clearing block, the elastic pieces are arranged between the frame and the inner connecting plate, seven clearing blocks are arranged, and the clearing blocks are uniformly distributed on the lower connecting plate in parallel.
As a further optimization of the invention, the clearing block comprises a contact surface, an inner swinging plate and a middle fixing plate, the contact surface and the inner swinging plate are of an integrated structure, the inner swinging plate is hinged with the edge side of the middle fixing plate, and the two inner swinging plates are uniformly and symmetrically distributed on the left side and the right side of the middle fixing plate.
The invention has the following beneficial effects:
1. through the clash that the spark produced to preceding lens, can make preceding lens along the inside shrink of fixed plate to the iron fillings that make the spark cooling condense can be through preceding lens between the downward slip fixed plate of income and the preceding lens, and spatter inside moisture also can get into collection piece with same mode, iron fillings through avoiding the spark and moisture at last direct contact, then can avoid receiving cold heat exchange the condition that the fracture appears.
2. Inside can leading-in with the inside moisture of discharge chamber and iron fillings through the outer tube, and through the thrust that moisture produced to the outer tube, can make the combination pole drive the underlying plate swing forward to the messenger clears away the brush and can sweep away the iron fillings of outer inside pipe wall bottom, the effectual inside moisture of collection piece and the unable normal discharge's of iron fillings condition of having avoided.
Drawings
Fig. 1 is a schematic structural diagram of a bridge construction monitoring device according to the present invention.
FIG. 2 is a schematic diagram of a mirror structure with a partial side view.
Fig. 3 is a side view of a half-section of the fixing plate according to the present invention.
FIG. 4 is a side view of a half-section of the collector block of the present invention.
FIG. 5 is a side view of the upper skateboard.
FIG. 6 is a schematic side view of a half-section of an outer discharge mechanism according to the present invention.
FIG. 7 is a schematic structural diagram of a side view cross section of the bottom plate of the present invention.
FIG. 8 is a side view of a half-section of a cleaning block of the present invention.
In the figure: the device comprises a shield-1, a machine body-2, a connecting seat-3, a connecting frame-4, a mirror surface-5, an inner lens-51, a reset strip-52, a front lens-53, a fixing plate-54, a collecting block-a 1, a connecting rod-a 2, an outer discharge mechanism-a 3, a frame-a 4, a cooling plate-a 11, an upper sliding plate-a 12, a discharge cavity-a 13, a plate body-a 14, a boosting rod-b 1, a plate surface-b 2, a swinging plate-b 3, an outer tube-c 1, an outer swinging rod-c 2, a bottom plate-c 3, a clearing brush-c 4, a frame-c 31, a clearing block-c 32, a lower connecting plate-c 33, an inner connecting plate-c 34, an elastic sheet-c 35, a contact surface-d 1, an inner swinging plate-d 2 and a middle fixing plate-d 3.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
As shown in fig. 1-5:
the invention provides bridge construction monitoring equipment, which structurally comprises a protective cover 1, a machine body 2, a connecting seat 3, a connecting frame 4 and a mirror surface 5, wherein the protective cover 1 is embedded at the upper end of the machine body 2, the machine body 2 is movably clamped with the front end of the connecting frame 4, the connecting frame 4 is welded with the connecting seat 3, and the mirror surface 5 is installed at the front end of the machine body 2; the mirror surface 5 comprises an inner lens 51, a reset bar 52, a front lens 53 and fixing plates 54, wherein the inner lens 51 is embedded between the two fixing plates 54, the reset bar 52 is installed between the front lens 53 and the inner lens 51, and the front lens 53 is movably clamped with the inner lens 51.
The fixing plate 54 comprises a collecting block a1, a connecting rod a2, an outer-row mechanism a3 and a frame a4, wherein the collecting block a1 is movably clamped with the frame a4 through the connecting rod a2, the outer-row mechanism a3 is installed between the collecting block a1 and the frame a4, the collecting block a1 which is not pressed by an object can be pushed to slide outwards through the outer-row mechanism a3, and the impact generated by the collecting block a1 can be buffered through the outer-row mechanism a 3.
Wherein, collection piece a1 includes cooling plate a11, goes up slide a12, discharge chamber a13, plate body a14, cooling plate a11 inlays and leans on the upper end position in plate body a 14's right side, go up slide a12 and plate body a 14's right side and lean on lower extreme activity block, discharge chamber a13 and plate body a14 structure as an organic whole, cooling plate a11 is equipped with six, and even right side upper end at c 14 is arc distribution, through cooling plate a11 atress swing, can carry out primary cooling to the iron fillings that the spark condenses.
The upper sliding plate a12 comprises an assistant push rod b1, a plate surface b2 and a swinging plate b3, the assistant push rod b1 is movably clamped with the plate surface b2, the swinging plate b3 is hinged with the upper end of the plate surface b2, the assistant push rod b1 can push the swinging plate b3 to swing upwards through the inertia force generated by the upward sliding of the mechanism, and therefore scrap iron and moisture on the upper surface of the swinging plate b3 can be discharged into an object.
The detailed use method and action of the embodiment are as follows:
in the invention, the front lens 53 can be contracted inwards along the fixing plate 54 by the impact of sparks on the front lens 53, so that iron filings cooled and condensed by sparks can slide downwards between the fixing plate 54 and the front lens 53 through the front lens 53, the front lens 53 can be quickly pushed to reset by the resetting strip 52, the force of the impact of the collection block a1 and the front lens 53 can be buffered in the process, the front lens 53 can be prevented from being damaged by collision, the passing iron filings can be primarily cooled by the temperature reduction plate a11, moisture splashed to 35 can also enter the collection block a1 in the same way, the impact of the collection block a1 by the quick resetting of 35 can enable the upper sliding plate a12 to slide upwards along the plate body a14, and when the upper sliding plate a12 slides to the utmost, the swinging plate b3 can swing upwards along the plate body 2 by the force generated by the upper sliding plate a12 and the inner wall of the plate body a14, therefore, the swinging plate b3 can guide the iron filings and water on the upper sliding plate a12 into the discharging cavity a13, and the situation that the cold and hot alternating 35 cracks can be avoided by avoiding the direct contact between the iron filings and the water on the spark on the discharging cavity a 35.
Example 2
As shown in fig. 6-8:
the outer discharging mechanism a3 comprises an outer tube c1, an outer swing rod c2, a bottom plate c3 and a removing brush c4, the outer swing rod c2 is hinged to the upper end of the inner wall of the outer tube c1, the bottom plate c3 is hinged to the bottom of the outer swing rod c2, the removing brush c4 and the bottom plate c3 are of an integrated structure, the number of the outer swing rods c2 is four, the inner wall upper end of the outer tube c1 is uniformly distributed in parallel, and the outer swing rod c2 can swing forwards through thrust generated by moisture on the outer swing rod c2, so that scrap iron entering the outer tube c1 can be cleaned by the removing brush c 4.
The bottom plate c3 comprises a frame c31, a clearing block c32, a lower connecting plate c33, an inner connecting plate c34 and elastic pieces c35, the clearing block c32 is in clearance fit with the lower connecting plate c33, the lower connecting plate c33 and the frame c31 are of an integrated structure, the inner connecting plate c34 is embedded and fixed at the upper end of the clearing block c32, the elastic pieces c35 are installed between the frame c31 and the inner connecting plate c34, seven clearing blocks c32 are arranged and evenly distributed on the lower connecting plate c33 in parallel, and the clearing block c32 can extend downwards through the throwing force generated by the mechanism swinging, so that the clearing block c32 can push away iron chips between objects.
Wherein, clear away piece c32 includes contact surface d1, interior pendulum board d2, well solid board d3, contact surface d1 and interior pendulum board d2 structure as an organic whole, the avris hinged joint of interior pendulum board d2 and well solid board d3, interior pendulum board d2 is equipped with two, and even the left and right sides at well solid board d3 is the symmetric distribution, and the frictional force that produces through object degree contact surface d1 can make interior pendulum board d2 inwards swing to can make contact surface d1 closely laminate with the inboard of object.
The detailed use method and action of the embodiment are as follows:
in the invention, because the moisture and the scrap iron entering the collection block a1 can not be automatically cleaned, so that the collection block a1 can fill the moisture and the scrap iron in the collection block a1 after being used for a long time, the collection block a1 can not be normally used, the moisture and the scrap iron in the discharge cavity a13 can be led into the collection block a13 through the outer tube c1, the combination rod a2 can drive the bottom plate c3 to swing forwards through the thrust generated by the moisture to the outer tube c1, so that the scrap iron at the bottom of the inner wall of the outer tube c1 can be swept by the sweeping brush c4, the moisture and the scrap iron can be discharged outwards through the outer tube c1, the sweeping force generated by the swing of the outer swing rod c2 can enable the cleaning block c32 to extend downwards along the lower connecting plate c33, and the pushing force generated by the inner wall of the cleaning brush c4 abutting the contact surface d1 can cause the inner swing plate d2 to swing inwards along the middle fixed plate d3, thereby make contact surface d1 can with the inner wall of cleaing away brush c4 closely laminate to the piece c32 is clear away to the messenger can outwards be released two iron fillings of cleaing away between the brush c4, the effectual inside moisture of collection piece a1 and the unable normal discharge's of iron fillings condition of having avoided.
The technical solutions of the present invention or similar technical solutions designed by those skilled in the art based on the teachings of the technical solutions of the present invention are all within the scope of the present invention to achieve the above technical effects.

Claims (7)

1. The utility model provides a bridge construction supervisory equipment, its structure includes guard shield (1), organism (2), links up seat (3), link (4), mirror surface (5), guard shield (1) is inlayed in the upper end position of organism (2), the front end activity block of organism (2) and link (4), link (4) with link (3) weld mutually, its characterized in that: the mirror surface (5) is arranged at the front end of the machine body (2);
the mirror surface (5) comprises an inner lens (51), a reset strip (52), a front lens (53) and fixing plates (54), the inner lens (51) is embedded between the two fixing plates (54), the reset strip (52) is installed between the front lens (53) and the inner lens (51), and the front lens (53) is movably clamped with the inner lens (51).
2. A bridge construction monitoring apparatus according to claim 1, wherein: the fixing plate (54) comprises a collecting block (a1), a connecting rod (a2), an outer-row mechanism (a3) and a frame body (a4), wherein the collecting block (a1) is movably clamped with the frame body (a4) through the connecting rod (a2), and the outer-row mechanism (a3) is installed between the collecting block (a1) and the frame body (a 4).
3. A bridge construction monitoring apparatus according to claim 2, wherein: the collection block (a1) comprises a cooling plate (a11), an upper sliding plate (a12), a discharge cavity (a13) and a plate body (a14), wherein the cooling plate (a11) is embedded in the right side of the plate body (a14) and close to the upper end position, the upper sliding plate (a12) and the right side of the plate body (a14) are movably clamped at the lower end, and the discharge cavity (a13) and the plate body (a14) are of an integrated structure.
4. A bridge construction monitoring apparatus according to claim 3, wherein: the upper sliding plate (a12) comprises an assistant push rod (b1), a plate surface (b2) and a swinging plate (b3), the assistant push rod (b1) is movably clamped with the plate surface (b2), and the swinging plate (b3) is hinged with the upper end of the plate surface (b 2).
5. A bridge construction monitoring apparatus according to claim 2, wherein: the outer row mechanism (a3) comprises an outer pipe (c1), an outer swing rod (c2), a bottom plate (c3) and a clearing brush (c4), wherein the outer swing rod (c2) is hinged to the upper end of the inner wall of the outer pipe (c1), the bottom plate (c3) is hinged to the bottom of the outer swing rod (c2), and the clearing brush (c4) and the bottom plate (c3) are of an integrated structure.
6. A bridge construction monitoring apparatus according to claim 5, wherein: bottom board (c3) include frame (c31), clear away piece (c32), lower connecting plate (c33), internal plate (c34), elastic sheet (c35), clear away piece (c32) and lower connecting plate (c33) clearance fit, lower connecting plate (c33) and frame (c31) are the integral structure, internal plate (c34) are embedded in the upper end position of clearing away piece (c32), elastic sheet (c35) are installed between frame (c31) and internal plate (c 34).
7. The bridge construction monitoring device of claim 6, wherein: clear away piece (c32) including contact surface (d1), interior swing board (d2), well solid board (d3), contact surface (d1) and interior swing board (d2) structure as an organic whole, the avris hinged joint of interior swing board (d2) and well solid board (d 3).
CN202010912715.XA 2020-09-03 2020-09-03 Bridge construction supervisory equipment Withdrawn CN112073610A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010912715.XA CN112073610A (en) 2020-09-03 2020-09-03 Bridge construction supervisory equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010912715.XA CN112073610A (en) 2020-09-03 2020-09-03 Bridge construction supervisory equipment

Publications (1)

Publication Number Publication Date
CN112073610A true CN112073610A (en) 2020-12-11

Family

ID=73666377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010912715.XA Withdrawn CN112073610A (en) 2020-09-03 2020-09-03 Bridge construction supervisory equipment

Country Status (1)

Country Link
CN (1) CN112073610A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113391609A (en) * 2021-07-24 2021-09-14 胥大兰 Safety production monitoring system for mine and urban underground pipe gallery
CN113819374A (en) * 2021-09-13 2021-12-21 曾清楠 Maintain high clean type intelligent security equipment of security

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150326800A1 (en) * 2014-05-08 2015-11-12 Olympus Corporation Solid-state imaging apparatus and endoscope apparatus
JP2017071915A (en) * 2015-10-05 2017-04-13 株式会社小松製作所 Construction management system and construction management method
JP2018110368A (en) * 2016-12-28 2018-07-12 キヤノンマーケティングジャパン株式会社 Information processing apparatus, control method of the same, and program
CN110286462A (en) * 2019-06-01 2019-09-27 瑞声科技(新加坡)有限公司 Prism mould group and periscopic camera
CN211368489U (en) * 2019-10-30 2020-08-28 衡阳佳鑫信息技术有限公司 Mounting bracket is used in road bridge construction control
CN211378107U (en) * 2020-03-12 2020-08-28 衡阳佳鑫信息技术有限公司 Device for monitoring road construction management
CN211391727U (en) * 2019-10-22 2020-09-01 南京晓庄学院 Unmanned vehicle monitoring equipment with shockproof function

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150326800A1 (en) * 2014-05-08 2015-11-12 Olympus Corporation Solid-state imaging apparatus and endoscope apparatus
JP2017071915A (en) * 2015-10-05 2017-04-13 株式会社小松製作所 Construction management system and construction management method
JP2018110368A (en) * 2016-12-28 2018-07-12 キヤノンマーケティングジャパン株式会社 Information processing apparatus, control method of the same, and program
CN110286462A (en) * 2019-06-01 2019-09-27 瑞声科技(新加坡)有限公司 Prism mould group and periscopic camera
CN211391727U (en) * 2019-10-22 2020-09-01 南京晓庄学院 Unmanned vehicle monitoring equipment with shockproof function
CN211368489U (en) * 2019-10-30 2020-08-28 衡阳佳鑫信息技术有限公司 Mounting bracket is used in road bridge construction control
CN211378107U (en) * 2020-03-12 2020-08-28 衡阳佳鑫信息技术有限公司 Device for monitoring road construction management

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113391609A (en) * 2021-07-24 2021-09-14 胥大兰 Safety production monitoring system for mine and urban underground pipe gallery
CN113391609B (en) * 2021-07-24 2022-05-20 江西中科冠物联网科技有限公司 Safety production monitoring system for mine and urban underground pipe gallery
CN113819374A (en) * 2021-09-13 2021-12-21 曾清楠 Maintain high clean type intelligent security equipment of security
CN113819374B (en) * 2021-09-13 2023-12-26 曾清楠 Clean intelligent security equipment with high maintenance safety

Similar Documents

Publication Publication Date Title
CN112073610A (en) Bridge construction supervisory equipment
CN202387561U (en) Elastic expansion device of cathode wires of electric precipitator
CN111928672A (en) Organic garbage pyrolysis equipment
CN112554642A (en) Anti-climbing protection equipment for electric power facilities
CN111943482A (en) Neck water drum on float glass melting furnace
CN208467488U (en) A kind of plasma cladding build-up welding apparatus
CN105932598A (en) Pull-down type bird nest removing device
CN206153224U (en) Small -size intelligent guardrail cleaning robot
CN212759137U (en) Cleaning device for polar plates of electrode wires of electric dust collector
CN209020128U (en) A kind of flue gas purification system pretreater demister
CN217942288U (en) Welding gun for oil pan welding equipment
CN109047347B (en) Descaling header device
CN113731037A (en) Industrial toxic waste gas heat energy recycling equipment
CN211716592U (en) Cleaning device for biomass boiler convenient to discharge waste residue
CN207939096U (en) It is a kind of that the long-range barrier clearing device of molten electric transmission line hot-line is cut based on laser
CN216265993U (en) Patrol and examine robot track barrier cleaning device
KR100775253B1 (en) An apparatus for removing the scrap in door cleaner of coke oven
CN113418371B (en) Bamboo heating and drying assembly line
CN219580897U (en) Recovery air duct for powder spraying operation
CN216079858U (en) Ash removal device of waste heat boiler for power generation by waste heat of glass kiln
CN205999327U (en) Pusher machine coke cleaning apparatus
CN210923054U (en) Welding detection device for spring
CN220498065U (en) Laser cutting machine convenient to clear away slag
CN215232728U (en) Vortex dust removal baffle for filtering viscous dust
CN217536811U (en) Expansion joint cleaning device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20201211