CN111784310A - Management system for informatization electric power engineering administration project and working method thereof - Google Patents

Management system for informatization electric power engineering administration project and working method thereof Download PDF

Info

Publication number
CN111784310A
CN111784310A CN202010772063.4A CN202010772063A CN111784310A CN 111784310 A CN111784310 A CN 111784310A CN 202010772063 A CN202010772063 A CN 202010772063A CN 111784310 A CN111784310 A CN 111784310A
Authority
CN
China
Prior art keywords
project
information
power engineering
module
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010772063.4A
Other languages
Chinese (zh)
Inventor
曹浩然
刘卫华
林林
张波
潘静娟
林鹏
陈志峰
张丁溶
吴同
蒋徐勇
万浩
冯君扬
傅慧华
刘陶林
马超飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Nantong Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Power Supply Co of State Grid Jiangsu Electric Power Co Ltd filed Critical Nantong Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority to CN202010772063.4A priority Critical patent/CN111784310A/en
Publication of CN111784310A publication Critical patent/CN111784310A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/30Administration of product recycling or disposal
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W90/00Enabling technologies or technologies with a potential or indirect contribution to greenhouse gas [GHG] emissions mitigation

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Data Mining & Analysis (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a management system of an informationized electric power engineering administration project and a working method thereof, wherein the management system comprises the following steps: the system comprises a mobile terminal of a project management application system of an electric power engineering department, a cloud server system and a computer terminal of the project management application system of the electric power engineering department. The invention solves the problems of complicated flow, incomplete risk point record, low rectification efficiency, difficult project later-period reproduction and the like caused by the complex factors of units and personnel and the like in the electric power engineering project in the actual work.

Description

Management system for informatization electric power engineering administration project and working method thereof
Technical Field
The invention relates to a management system of an informatization electric power engineering administration project and a working method thereof.
Background
In recent years, the investment scale of power supply enterprises is getting larger, the workload of project management is getting larger and larger correspondingly, the requirements on time, quality and the like of project management are getting higher and higher, the traditional working means such as manual accounts and electronic forms cannot meet the requirements of company management, and a set of management system of information-based project management of power engineering management needs to be established to realize efficient management.
With the advent of the internet plus and big data era, the informatization development is rapidly advanced, the popularization of related technologies such as GIS, GPS, mobile 4G and even mobile 5G and the like, the wide application of handheld terminals, the deep integration of informatization technical means and electric power engineering administration projects is enhanced, and the necessary trend of the current development is to fully utilize advanced technologies for improving the engineering management quality and the engineering management efficiency.
Disclosure of Invention
The invention aims to provide a management system of an informatization electric power engineering administration project and a working method thereof, which solve the problems of complicated flow, incomplete risk point record, low rectification efficiency, difficult project later reproduction and the like caused by the complexity of related units and personnel and the like in the actual work of the electric power engineering administration project.
The technical solution of the invention is as follows:
a management system for an information-based electric power engineering administration project is characterized in that: the method comprises the following steps: the system comprises a mobile terminal of a project management application system of an electric power engineering department, a cloud server system and a computer terminal of the project management application system of the electric power engineering department;
the mobile terminal of the electric power engineering administration project management application system is used for collecting relevant data of an electric power engineering administration project and transmitting the relevant data of the electric power engineering administration project to the cloud server system so that the cloud server system can process or store the relevant data of the electric power engineering administration project;
the cloud server system is used for receiving a data processing request sent by the computer terminal of the project management application system of the power engineering administration department, processing data transmitted by the mobile terminal of the project management application system of the power engineering administration department and sending a data processing result to the computer terminal of the project management application system of the power engineering administration department;
the computer terminal of the project management application system of the power engineering administration department is used for sending a data processing request to the cloud server and displaying a received data processing result to a user;
the mobile terminal of the project management application system of the power engineering administration department comprises an information query module, an information acquisition module and a project establishment module, wherein the information query module is used for querying information of projects of the power engineering administration department on site, the information collection and update module is used for uploading and updating information of the projects of the power engineering administration department, information of personnel on site and the like, and the project establishment module is used for establishing new projects;
the computer terminal of the project management application system of the power engineering administration department comprises a project management module and a statistical analysis module, wherein the project management module is used for carrying out data query, progress management and early warning control on finished and ongoing power engineering administration projects, and the statistical analysis module is used for realizing multi-dimensional statistical analysis based on project information.
And the project establishment module is used for establishing a new project by a field user and providing project numbers and project number information.
And the information query module is used for providing information query of project information of the electric power engineering administration department for field users.
The information acquisition module is used for the on-site user to carry out information collection to electric power engineering administration project, includes: personnel information acquisition, field information acquisition, positioning information acquisition and project data acquisition.
The project management module comprises: all project query, project administration query, project visa query, concealed project query, project acceptance record query, balance material warehouse-returning query and waste material recycling query;
all project queries are mainly used for progress management, information management, supervision management, early warning control and graphical positioning of all completed or incomplete projects;
the project administration inquiry is mainly used for inquiring administration records, project compensation, project pictures and project early warning of administration projects;
the project visa query is mainly used for querying visa information generated by a field project;
the hidden project query is mainly used for progress management, information management, supervision management, early warning control and graphical positioning of hidden project;
the project acceptance record query is mainly used for performing progress management, information management, supervision management, early warning control and graphical positioning on completed projects needing acceptance;
the balance material warehouse returning query is mainly used for querying the balance condition of the project materials;
the waste material recycling query is mainly used for querying the waste material recycling condition of the project.
The statistical analysis module is specifically configured to:
and (4) carrying out digital and graphical statistical analysis on compensation amount of the administrative project from the dimensions of region, personnel and month.
The cloud server system includes: the system comprises a database module, a load balancing controller, an OSS static resource storage module and a function realization module;
and the function realization module is used for responding to a data processing request sent by the project management application system computer terminal of the electric power engineering department, calling data in the database module for processing, and sending a data processing result to the project management application system computer terminal of the electric power engineering department.
The mobile terminal of the project management application system of the power engineering administration department comprises a project establishment module, an information query module and an information acquisition module, wherein the project establishment module is used for establishing a new project, the information query module is used for inquiring information of projects of the power engineering administration department on site, and the information acquisition module is used for acquiring and updating the information of the projects of the power engineering administration department;
collecting data related to an electric administration project, and transmitting the data related to the electric administration project to a cloud server system so that the cloud server system can process or store the data related to the electric administration project;
receiving a data processing request sent by a project management application system computer terminal of an electric power engineering department, processing data related to the project of the electric power engineering department, and sending a data processing result to the project management application system computer terminal of the electric power engineering department;
displaying the data processing result to a user in a graphical and tabulated manner;
the electric power engineering management computer terminal comprises a project management module and a data statistics module, wherein the project management module is used for realizing all project inquiry, project administration inquiry, project visa inquiry, concealed project inquiry, project acceptance record inquiry, balance material warehouse withdrawal inquiry and waste material recycling inquiry, and the data statistics module is used for realizing multi-dimensional statistical analysis based on project data.
The electric power engineering administration project is a project for expropriating land and performing compensation caused by construction of an electric power system, the construction land expropriated by the electric power engineering administration project is farmland, roads, houses or greening land, relevant data of the electric power engineering administration project is characters, field pictures and field positioning formats, and the relevant data of the electric power engineering administration project is positioning information of an item occurrence place, self-photographing of field experts and accompanying personnel, basic condition pictures of the item occurrence place, prices and total prices of various types of compensation, signed compensation file pictures, material resources and other remark information;
the mobile terminal of the project management application system of the power engineering administration department comprises an information query module, an information acquisition module and a project establishment module; the information query module is used for inquiring the information of the project of the administrative department of the electric power engineering on site, so that managers can conveniently query the information of the project of the administrative department, which is in progress and completed, of the administrative department specialist in a mobile phone terminal and can perform real-time supervision, and meanwhile, the administrative department specialist can also query the information of the project of the administrative department specialist in progress and completed; the system comprises an information acquisition module, a mobile phone terminal, a mobile phone positioning service, a mobile phone terminal, an information processing module, a compensation information processing module and a mobile phone text function, wherein the information acquisition module is used for uploading and updating information of electric power engineering administrative department projects, field personnel information and the like, administrative department experts can provide photos of field conditions, personnel information photos and compensation file photos by calling the mobile phone camera on the field, record field positioning information by calling the mobile phone positioning service, enter specific materials for compensation and corresponding prices and areas or quantities of compensation objects by curing material compensation information in the mobile phone terminal, and record field remark conditions by the mobile phone text function; the project establishment module is used for establishing a new project, and the establishment of the new project comprises a selection area and a project number; the mobile phone terminal comprises an information acquisition module and a project establishment module, all acquired data or modified data belong to relevant data for the electric power engineering project, and the data are transmitted to the cloud server system so that the cloud server system can process the relevant data of the electric power engineering project;
the cloud server system includes: the system comprises a database module, a load balancing controller, an OSS static resource storage module and a function realization module; the database module comprises a project information database, a personnel information database, a region information database, a database for recording project photos and database basic information for recording geographic position information; the load balancing controller is used for keeping the server to operate stably and keeping the working efficiency of the server in real time; the OSS static resource storage module is mainly used for storing the field photos, and meanwhile, under the condition of being based on a large number of projects, the OSS static resource storage module is independently used for storing the field photos, so that the running efficiency of the server is improved; the function realization module is used for responding to a data processing request sent by the project management application system computer terminal of the power engineering administration department, calling data in the database module for processing, and sending a data processing result to the project management application system computer terminal of the power engineering administration department;
the project management system of the electric power engineering administration department is realized based on a cloud server; cloud server resources are owned and operated by a third party cloud service provider, the resources are provided through a network, and all hardware, software, security and other supportive infrastructures are owned and managed by the cloud provider;
the computer terminal of the project management application system of the power engineering administration department comprises a project management module and a statistical analysis module; the project management module is used for performing data query, schedule management and early warning control on finished and ongoing electric power engineering administration projects, and the statistical analysis module is used for realizing multi-dimensional statistical analysis based on project information; the project management module is subdivided into all project query, project administration query, project visa query, concealed project query, project acceptance record query, balance material warehouse-returning query and waste material recycling query; the data query function in the project management module is condition screening query and fuzzy query, the condition screening query is a screening condition set by a system, and when a user queries by using the screening condition, the query result is a query record meeting the screening condition; the fuzzy query is to perform fuzzy retrieval on synonyms of keywords input by a user, so that more retrieval results are obtained; the addition of screening query and fuzzy query are matched with each other, so that the user can be helped to find needed information more quickly; the progress management function in the project management module is that each project record is provided with a project progress state, a manager manages the project progress according to the change of the project progress state, and project details comprise project positioning information, project site photos, project personnel photos and compensation file photos which are displayed in a map form, so that the manager can manage the project progress in a targeted manner; the early warning control function in the project management module is used for solving the problem that projects are early warned if the ratio of the market unit price to the reference unit price exceeds a threshold value, so that early warning control is realized; the statistical analysis function is subdivided into regional statistics, personnel statistics and month statistics, and the compensation amount value of the project of the electric power engineering department is counted from three different dimensions to form a trend change chart, the sudden change of the value means an abnormal condition, and managers can inquire the abnormal condition and find out the reason according to the chart in time.
A working method of a management system of an information-based electric power engineering administration project is characterized by comprising the following steps: the method comprises the following specific steps:
s210, project creation: the method comprises the following steps that a government specialist uses a mobile phone terminal APP to newly build an electric power engineering project, complete project basic information is filled in, the project basic information is uploaded and photographed automatically, and a face is identified by self-photographing, so that the government specialist can be ensured to go to a project site to check, and meanwhile, the information can be transmitted to a server, so that a manager can conveniently check the project again;
s220, adding information of the person with the user: entering a project survey page, and adding pedestrian information such as names, self-photographing and the like;
s230 item location add: adding project site location, wherein the function is realized by calling a mobile phone location service;
s240 photo adding before construction: adding a photo before project construction, and recording information such as reconstruction and restoration of plants, expropriated land or other facilities required to be removed in a construction project, wherein the information is used for supplementing the explanation of a compensation file and monitoring the situation of a site after construction;
s250 negotiation document photo addition: the photos of negotiation files are added, meanwhile, the cooperation of the administrative specialist and the co-pedestrian is needed, the fairness and the justice of negotiation are jointly monitored, and the negotiation result can be guaranteed to be more persuasive;
s260 indemnity details addition: the addition of the negotiation result requires the compensation cost of various materials or the cost of removal, reconstruction, restoration and the like, at this time, if the coefficient obtained by the unit price of the filled unit price ratio in the material warehouse exceeds the threshold set by the manager, the coefficient is pushed to the manager for verification, if the manager passes the verification, the next step S270 operation can be carried out, and if the manager fails the verification, the step of the cost addition is repeated S260;
s270 contract document addition: adding a photo of a contract file of a field project by a government specialist;
s280 photo adding in construction: adding a picture of a project in construction by a special office;
s290, adding photos after construction: adding a photo after project construction is completed by a special administrative department member, comparing the special administrative department member with a negotiation file signed at that time, and supervising a constructor to construct according to the requirement of the negotiation file completely;
s300, displaying project data: data generated by all administrative projects are processed and stored through the cloud server and finally displayed to management personnel at a computer terminal or a mobile terminal.
Due to the fact that internal supervision requirements are continuously improved, the digitization rate of a project of an electric power engineering department and the management informatization level of the project of the electric power engineering department are improved under the background of deep application of an enhanced information technology in engineering management practice, a 'big cloud object movement' technology is comprehensively applied, multiple departments of personnel such as a special person of the administrative department, a project management center and a supervision department are fused on the same platform, multiple identities and multiple authorities of personnel work together on the unified platform, field engineering projects and information are digitized and locked through a management system mobile terminal APP, project work of the field engineering department is brought into a real-time monitoring category, and project data of the engineering department and project evidence of the engineering department are transmitted to a cloud server; the cloud server and the management system computer terminal jointly make project management work of the engineering administration department informationized, promote deep development, centralized sharing and integrated application of project data of the engineering administration department, improve judgment capability in project work of the engineering administration department by means of intelligent analysis, and improve engineering management quality and engineering management efficiency.
The invention solves the problems of complicated flow, incomplete risk point record, low rectification efficiency, difficult project later-period reproduction and the like caused by the complex factors of units and personnel and the like in the electric power engineering project in the actual work.
Drawings
Fig. 1 is a schematic structural diagram of a management system for an information-based electric power engineering administration project according to the present invention.
Fig. 2 is a schematic flow chart of a management system for an information-based electric power engineering administration project according to the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not limiting. It should be further noted that, for the convenience of description, only some of the structures related to the present invention are shown in the drawings, not all of the structures. All other embodiments, which can be obtained by a person skilled in the art without making creative efforts based on the embodiments of the present invention, shall fall within the protection scope of the present invention.
Fig. 1 is a schematic structural diagram of a management system for an information-based electric power engineering administration project according to an embodiment of the present invention, which is applicable to dynamic and visual management of an electric power engineering administration project, and specifically includes: the system comprises a power engineering administration project management application system mobile terminal 110, a cloud server system 120 and a power engineering administration project management application system computer terminal 130.
The mobile terminal 110 of the project management application system of the power engineering administration department is used for collecting relevant data of a project of the power engineering administration department and transmitting the relevant data of the project of the power engineering administration department to the cloud server system 120, so that the cloud server system 120 processes the relevant data of the project of the power engineering administration department;
the mobile terminal 110 of the electric power engineering administration project management application system comprises an information query module, an information acquisition module and a project establishment module, wherein the information query module is used for inquiring information of projects of the electric power engineering administration on site, the information collection and update module is used for uploading and updating information, on-site personnel information and the like of the projects of the electric power engineering administration, and the project establishment module is used for establishing new projects;
the cloud server system 120 is configured to receive a data processing request sent by the electric power engineering administration project management application system computer terminal 130, process data transmitted by the electric power engineering administration project management application system mobile terminal 110, and send a data processing result to the electric power engineering administration project management application system computer terminal 130;
the computer terminal 130 of the project management application system of the power engineering administration department is used for sending a data processing request to the cloud server system 120 and displaying a received data processing result to a user;
the computer terminal 130 of the project management application system for electric power engineering administration comprises a project management module and a statistical analysis module, wherein the project management module is used for performing data query, schedule management and early warning control on finished and ongoing electric power engineering administration projects, and the statistical analysis module is used for realizing multi-dimensional statistical analysis based on project information.
The electric power engineering administration project may be a project for expropriating and compensating for land caused by construction of an electric power system. In a specific example, the construction land used by the electric power engineering administration project may be a farmland, a road, a house, a green land, and the like, and the present embodiment does not specifically limit the type, area, removal of facilities or crops or green trees, flowers and plants, etc., removal and repair of designated facilities, and the like of the construction land used by the electric power engineering administration project. The related data of the project of the power engineering administration department may be in the format of characters, pictures of the site, the site location, and the like, and in a specific example, the related data of the project of the power engineering administration department may be location information of the project place, self-photographs of the site personnel and the accompanying personnel, basic condition photographs of the project place, prices and total prices of various types of compensation, photographs of signed compensation files, materials, and other remark information, and the embodiment is not particularly limited.
In an optional embodiment of the present invention, the mobile terminal 110 of the project management application system of the power engineering department includes an information query module, an information collection module, and a project establishment module. The information query module is used for inquiring the information of the project of the administrative department of the electric power engineering on site, so that managers can conveniently query the information of the project of the administrative department, which is in progress and completed, of the administrative department specialist in the mobile phone terminal and can perform real-time supervision, and meanwhile, the administrative department specialist can also query the information of the project of the administrative department specialist in progress and completed. The information acquisition module is used for uploading and updating information of electric power engineering administration projects, field personnel information and the like, administrative department professionals can provide photos of field conditions, personnel information photos, compensation file photos and the like by calling a mobile phone camera on the field by using a mobile phone terminal, field positioning information is recorded by calling mobile phone positioning services, specific materials to be compensated, corresponding prices and the area or the quantity of the compensated materials are input by curing material compensation information in the mobile phone terminal, and the field remarking conditions are recorded by a mobile phone text function. The project establishment module is used for establishing a new project, and the establishment of the new project comprises a selection area, a project number and the like. The mobile phone terminal comprises an information acquisition module and a project establishment module, wherein all acquired data or modified data belong to relevant data for the electric power engineering project, and the data are transmitted to the cloud server system 120, so that the cloud server system 120 processes the relevant data of the electric power engineering project.
In an optional embodiment of the present invention, the cloud server system 120 includes: the system comprises a database module, a load balancing controller, an OSS static resource storage module and a function realization module. The database module comprises basic information such as a project information database, a personnel information database, a region information database, a database for recording project photos, a database for recording geographic position information and the like. The load balancing controller is used for keeping the server to operate stably and keeping the working efficiency of the server in real time. The OSS static resource storage module is mainly used for storing the field photos, the photos shot by the mobile phone are generally large at present, and meanwhile, the OSS static resource storage module is independently used for storing the field photos under the condition of being based on a large number of projects, so that the running efficiency of the server is improved. And the function implementation module is used for responding to a data processing request sent by the computer terminal 130 of the project management application system of the power engineering administration department, calling data in the database module for processing, and sending a data processing result to the computer terminal 130 of the project management application system of the power engineering administration department.
In an optional embodiment of the invention, the electric power engineering department project management system is implemented based on a cloud server. Cloud server resources (e.g., servers and storage space, etc.) are owned and operated by third party cloud service providers, these resources are provided over a network, while all hardware, software, security, and other supporting infrastructure is owned and managed by the cloud provider. Compared with the traditional independent server, the cloud server has the advantages of price advantage, powerful function and convenience in management, and meanwhile, quick deployment, flexible change and safety management of the system can be achieved.
In an alternative embodiment of the present invention, the computer terminal 130 of the project management application system of the power engineering department comprises a project management module and a statistical analysis module. The project management module is used for performing data query, progress management and early warning control on finished and ongoing electric power engineering administration projects, and the statistical analysis module is used for realizing multi-dimensional statistical analysis based on project information. The project management module is subdivided into all project query, project administration query, project visa query, concealed project query, project acceptance record query, balance material warehouse-returning query and waste material recycling query. The data query function in the project management module can be condition screening query and fuzzy query, the condition screening query is a screening condition set by a system, and when a user uses the screening condition to perform query, a query result is a query record meeting the screening condition; the fuzzy query can be used for carrying out fuzzy retrieval on synonyms of keywords input by a user, so that more retrieval results are obtained. The addition of the screening query and the fuzzy query are matched with each other, so that the user can be helped to find needed information more quickly. The progress management function in the project management module is that each project record is provided with the progress state of the project, managers can manage the project progress according to the change of the project progress states, and meanwhile, project details comprise positioning information of the project (project positions are displayed in a map mode), on-site photos of the project, personnel photos, compensation file photos and the like, so that the managers can manage the project progress in a targeted mode conveniently. The early warning control function in the project management module is that market unit price for reimbursement amount is fluctuant, unit price in the system is reference unit price, the system sets a threshold value, if the ratio of the market unit price to the reference unit price exceeds the threshold value, early warning can occur, and managers need to solve the problem that the project is early warned, thereby achieving early warning control. The statistical analysis function is subdivided into regional statistics, personnel statistics and month statistics, and the compensation amount value of the project of the electric power engineering department is counted from three different dimensions to form a trend change chart, the sudden change of the value means an abnormal condition, and managers can inquire the abnormal condition and find out the reason according to the chart in time.
Fig. 2 is a flowchart illustrating a management system for an information-based electric power engineering administration project according to a second embodiment of the present invention. The method of the embodiment is applicable to the dynamic and visual management of the electric power engineering administration project, and can be realized by a management system of an information electric power engineering administration project, and the method specifically comprises the following steps:
s210, a project is newly established, a government officer uses a mobile phone terminal APP to newly establish an electric power engineering government project, complete project basic information is filled, the project basic information is uploaded and automatically photographed, and a face is identified by self-photographing, so that the government officer can be ensured to go to a project site to check, and meanwhile, the information can be transmitted to a server, so that a manager can conveniently check the project;
s220, adding the information of the same-pedestrian, entering a project survey page, and adding the information of the same-pedestrian, such as names, self-photographs and the like;
s230, item positioning addition, item field positioning is added, and the function is realized by calling a mobile phone positioning service;
s240, adding photos before construction, adding photos before project construction, and recording information such as reconstruction and restoration of plants, expropriated land or other facilities which need to be removed in a construction project, wherein the information is used for supplementing the explanation of the compensation file on one hand and supervising the situation of a site after construction on the other hand;
s250, adding photos of negotiation files, simultaneously requiring the cooperation of a special official and a pedestrian at the administrative department, jointly monitoring the fairness and justness of negotiation, and ensuring that negotiation results are more persuasive;
s260, adding compensation details, wherein the addition negotiation result needs to relate to compensation fees of various materials or fees for removal, reconstruction, restoration and the like, if the filled unit price ratio exceeds a threshold value set by a manager, the coefficient obtained by the unit price ratio in the material library is pushed to the manager for verification, if the manager passes the verification, the next step S270 of operation can be carried out, and if the manager fails the verification, the step of adding the fees of S260 is repeated;
s270, adding contract files, and adding photos of the contract files of the field projects by administrative staff;
s280, adding photos in construction, and adding photos of projects in construction by administrative staff;
s290, adding photos after construction, adding photos after project construction by a special administrative department, comparing the photo with a negotiation file signed at that time, and supervising a constructor to construct according to the requirements of the negotiation file completely.
And S300, displaying project data, wherein the data generated by all administrative projects are processed and stored through the cloud server, and finally displayed to a manager at a computer terminal or a mobile terminal.
Finally, it should be noted that the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting the same. It will be understood by those skilled in the art that various changes and modifications may be made, and equivalents may be substituted, without departing from the scope of the invention, which is defined in the claims appended hereto. Therefore, although the present invention has been described in greater detail by the above embodiments, the present invention is not limited to the above embodiments, and may include other equivalent embodiments without departing from the spirit of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims (10)

1. A management system for an information-based electric power engineering administration project is characterized in that: the method comprises the following steps: the system comprises a mobile terminal of a project management application system of an electric power engineering department, a cloud server system and a computer terminal of the project management application system of the electric power engineering department;
the mobile terminal of the electric power engineering administration project management application system is used for collecting relevant data of an electric power engineering administration project and transmitting the relevant data of the electric power engineering administration project to the cloud server system so that the cloud server system can process or store the relevant data of the electric power engineering administration project;
the cloud server system is used for receiving a data processing request sent by the computer terminal of the project management application system of the power engineering administration department, processing data transmitted by the mobile terminal of the project management application system of the power engineering administration department and sending a data processing result to the computer terminal of the project management application system of the power engineering administration department;
the computer terminal of the project management application system of the power engineering administration department is used for sending a data processing request to the cloud server and displaying a received data processing result to a user;
the mobile terminal of the project management application system of the power engineering administration department comprises an information query module, an information acquisition module and a project establishment module, wherein the information query module is used for querying information of projects of the power engineering administration department on site, the information collection and update module is used for uploading and updating information of the projects of the power engineering administration department, information of personnel on site and the like, and the project establishment module is used for establishing new projects;
the computer terminal of the project management application system of the power engineering administration department comprises a project management module and a statistical analysis module, wherein the project management module is used for carrying out data query, progress management and early warning control on finished and ongoing power engineering administration projects, and the statistical analysis module is used for realizing multi-dimensional statistical analysis based on project information.
2. The system for managing an information-based electric power engineering administration project according to claim 1, wherein: and the project establishment module is used for establishing a new project by a field user and providing project numbers and project number information.
3. The system for managing an information-based electric power engineering administration project according to claim 1, wherein: and the information query module is used for providing information query of project information of the electric power engineering administration department for field users.
4. The system for managing an information-based electric power engineering administration project according to claim 1, wherein: the information acquisition module is used for the on-site user to carry out information collection to electric power engineering administration project, includes: personnel information acquisition, field information acquisition, positioning information acquisition and project data acquisition.
5. The system for managing an information-based electric power engineering administration project according to claim 1, wherein: the project management module comprises: all project query, project administration query, project visa query, concealed project query, project acceptance record query, balance material warehouse-returning query and waste material recycling query;
all project queries are mainly used for progress management, information management, supervision management, early warning control and graphical positioning of all completed or incomplete projects;
the project administration inquiry is mainly used for inquiring administration records, project compensation, project pictures and project early warning of administration projects;
the project visa query is mainly used for querying visa information generated by a field project;
the hidden project query is mainly used for progress management, information management, supervision management, early warning control and graphical positioning of hidden project;
the project acceptance record query is mainly used for performing progress management, information management, supervision management, early warning control and graphical positioning on completed projects needing acceptance;
the balance material warehouse returning query is mainly used for querying the balance condition of the project materials;
the waste material recycling query is mainly used for querying the waste material recycling condition of the project.
6. The system for managing an information-based electric power engineering administration project according to claim 1, wherein: the statistical analysis module is specifically configured to:
and (4) carrying out digital and graphical statistical analysis on compensation amount of the administrative project from the dimensions of region, personnel and month.
7. The system for managing an information-based electric power engineering administration project according to claim 1, wherein: the cloud server system includes: the system comprises a database module, a load balancing controller, an OSS static resource storage module and a function realization module;
and the function realization module is used for responding to a data processing request sent by the project management application system computer terminal of the electric power engineering department, calling data in the database module for processing, and sending a data processing result to the project management application system computer terminal of the electric power engineering department.
8. The system for managing an information-based electric power engineering administration project according to claim 1, wherein:
the mobile terminal of the project management application system of the power engineering administration department comprises a project establishment module, an information query module and an information acquisition module, wherein the project establishment module is used for establishing a new project, the information query module is used for inquiring information of projects of the power engineering administration department on site, and the information acquisition module is used for acquiring and updating the information of the projects of the power engineering administration department;
collecting data related to an electric administration project, and transmitting the data related to the electric administration project to a cloud server system so that the cloud server system can process or store the data related to the electric administration project;
receiving a data processing request sent by a project management application system computer terminal of an electric power engineering department, processing data related to the project of the electric power engineering department, and sending a data processing result to the project management application system computer terminal of the electric power engineering department;
displaying the data processing result to a user in a graphical and tabulated manner;
the electric power engineering management computer terminal comprises a project management module and a data statistics module, wherein the project management module is used for realizing all project inquiry, project administration inquiry, project visa inquiry, concealed project inquiry, project acceptance record inquiry, balance material warehouse withdrawal inquiry and waste material recycling inquiry, and the data statistics module is used for realizing multi-dimensional statistical analysis based on project data.
9. The system for managing an information-based electric power engineering administration project according to claim 1, wherein: the electric power engineering administration project is a project for expropriating land and performing compensation caused by construction of an electric power system, the construction land expropriated by the electric power engineering administration project is farmland, roads, houses or greening land, relevant data of the electric power engineering administration project is characters, field pictures and field positioning formats, and the relevant data of the electric power engineering administration project is positioning information of an item occurrence place, self-photographing of field experts and accompanying personnel, basic condition pictures of the item occurrence place, prices and total prices of various types of compensation, signed compensation file pictures, material resources and other remark information;
the mobile terminal of the project management application system of the power engineering administration department comprises an information query module, an information acquisition module and a project establishment module; the information query module is used for inquiring the information of the project of the administrative department of the electric power engineering on site, so that managers can conveniently query the information of the project of the administrative department, which is in progress and completed, of the administrative department specialist in a mobile phone terminal and can perform real-time supervision, and meanwhile, the administrative department specialist can also query the information of the project of the administrative department specialist in progress and completed; the system comprises an information acquisition module, a mobile phone terminal, a mobile phone positioning service, a mobile phone terminal, an information processing module, a compensation information processing module and a mobile phone text function, wherein the information acquisition module is used for uploading and updating information of electric power engineering administrative department projects, field personnel information and the like, administrative department experts can provide photos of field conditions, personnel information photos and compensation file photos by calling the mobile phone camera on the field, record field positioning information by calling the mobile phone positioning service, enter specific materials for compensation and corresponding prices and areas or quantities of compensation objects by curing material compensation information in the mobile phone terminal, and record field remark conditions by the mobile phone text function; the project establishment module is used for establishing a new project, and the establishment of the new project comprises a selection area and a project number; the mobile phone terminal comprises an information acquisition module and a project establishment module, all acquired data or modified data belong to relevant data for the electric power engineering project, and the data are transmitted to the cloud server system so that the cloud server system can process the relevant data of the electric power engineering project;
the cloud server system includes: the system comprises a database module, a load balancing controller, an OSS static resource storage module and a function realization module; the database module comprises a project information database, a personnel information database, a region information database, a database for recording project photos and database basic information for recording geographic position information; the load balancing controller is used for keeping the server to operate stably and keeping the working efficiency of the server in real time; the OSS static resource storage module is mainly used for storing the field photos, and meanwhile, under the condition of being based on a large number of projects, the OSS static resource storage module is independently used for storing the field photos, so that the running efficiency of the server is improved; the function realization module is used for responding to a data processing request sent by the project management application system computer terminal of the power engineering administration department, calling data in the database module for processing, and sending a data processing result to the project management application system computer terminal of the power engineering administration department;
the project management system of the electric power engineering administration department is realized based on a cloud server; cloud server resources are owned and operated by a third party cloud service provider, the resources are provided through a network, and all hardware, software, security and other supportive infrastructures are owned and managed by the cloud provider;
the computer terminal of the project management application system of the power engineering administration department comprises a project management module and a statistical analysis module; the project management module is used for performing data query, schedule management and early warning control on finished and ongoing electric power engineering administration projects, and the statistical analysis module is used for realizing multi-dimensional statistical analysis based on project information; the project management module is subdivided into all project query, project administration query, project visa query, concealed project query, project acceptance record query, balance material warehouse-returning query and waste material recycling query; the data query function in the project management module is condition screening query and fuzzy query, the condition screening query is a screening condition set by a system, and when a user queries by using the screening condition, the query result is a query record meeting the screening condition; the fuzzy query is to perform fuzzy retrieval on synonyms of keywords input by a user, so that more retrieval results are obtained; the addition of screening query and fuzzy query are matched with each other, so that the user can be helped to find needed information more quickly; the progress management function in the project management module is that each project record is provided with a project progress state, a manager manages the project progress according to the change of the project progress state, and project details comprise project positioning information, project site photos, project personnel photos and compensation file photos which are displayed in a map form, so that the manager can manage the project progress in a targeted manner; the early warning control function in the project management module is used for solving the problem that projects are early warned if the ratio of the market unit price to the reference unit price exceeds a threshold value, so that early warning control is realized; the statistical analysis function is subdivided into regional statistics, personnel statistics and month statistics, and the compensation amount value of the project of the electric power engineering department is counted from three different dimensions to form a trend change chart, the sudden change of the value means an abnormal condition, and managers can inquire the abnormal condition and find out the reason according to the chart in time.
10. A method of operating the system for managing an information-based electric power engineering administration project according to claim 1, comprising: the method comprises the following specific steps:
s210, project creation: the method comprises the following steps that a government specialist uses a mobile phone terminal APP to newly build an electric power engineering project, complete project basic information is filled in, the project basic information is uploaded and photographed automatically, and a face is identified by self-photographing, so that the government specialist can be ensured to go to a project site to check, and meanwhile, the information can be transmitted to a server, so that a manager can conveniently check the project again;
s220, adding information of the person with the user: entering a project survey page, and adding pedestrian information such as names, self-photographing and the like;
s230 item location add: adding project site location, wherein the function is realized by calling a mobile phone location service;
s240 photo adding before construction: adding a photo before project construction, and recording information such as reconstruction and restoration of plants, expropriated land or other facilities required to be removed in a construction project, wherein the information is used for supplementing the explanation of a compensation file and monitoring the situation of a site after construction;
s250 negotiation document photo addition: the photos of negotiation files are added, meanwhile, the cooperation of the administrative specialist and the co-pedestrian is needed, the fairness and the justice of negotiation are jointly monitored, and the negotiation result can be guaranteed to be more persuasive;
s260 indemnity details addition: the addition of the negotiation result requires the compensation cost of various materials or the cost of removal, reconstruction, restoration and the like, at this time, if the coefficient obtained by the unit price of the filled unit price ratio in the material warehouse exceeds the threshold set by the manager, the coefficient is pushed to the manager for verification, if the manager passes the verification, the next step S270 operation can be carried out, and if the manager fails the verification, the step of the cost addition is repeated S260;
s270 contract document addition: adding a photo of a contract file of a field project by a government specialist;
s280 photo adding in construction: adding a picture of a project in construction by a special office;
s290, adding photos after construction: adding a photo after project construction is completed by a special administrative department member, comparing the special administrative department member with a negotiation file signed at that time, and supervising a constructor to construct according to the requirement of the negotiation file completely;
s300, displaying project data: data generated by all administrative projects are processed and stored through the cloud server and finally displayed to management personnel at a computer terminal or a mobile terminal.
CN202010772063.4A 2020-08-04 2020-08-04 Management system for informatization electric power engineering administration project and working method thereof Pending CN111784310A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010772063.4A CN111784310A (en) 2020-08-04 2020-08-04 Management system for informatization electric power engineering administration project and working method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010772063.4A CN111784310A (en) 2020-08-04 2020-08-04 Management system for informatization electric power engineering administration project and working method thereof

Publications (1)

Publication Number Publication Date
CN111784310A true CN111784310A (en) 2020-10-16

Family

ID=72765574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010772063.4A Pending CN111784310A (en) 2020-08-04 2020-08-04 Management system for informatization electric power engineering administration project and working method thereof

Country Status (1)

Country Link
CN (1) CN111784310A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112215585A (en) * 2020-11-16 2021-01-12 国网江苏省电力有限公司南通供电分公司 Management system and management method for information-based electric power engineering administration project
CN112348473A (en) * 2020-11-10 2021-02-09 湖北福泰建筑装饰工程有限公司 Engineering management information visualization software
CN113033172A (en) * 2021-04-01 2021-06-25 国网江苏省电力有限公司南通供电分公司 Construction cost calculating and comparing system based on digital audit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140350841A1 (en) * 2013-05-24 2014-11-27 Junhua Xue Interactive dynamic cloud navigation system
CN106600231A (en) * 2016-12-14 2017-04-26 国网上海市电力公司 Dynamic management system for infrastructure projects
CN108200173A (en) * 2018-01-03 2018-06-22 广州供电局有限公司 A kind of electric power construction field informationization monitoring system
CN109711690A (en) * 2018-12-17 2019-05-03 广州天越电子科技有限公司 The method and system of management scene control project process real-time update
CN110809052A (en) * 2019-11-11 2020-02-18 软通动力信息技术有限公司 Public cloud-based hydraulic engineering management system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140350841A1 (en) * 2013-05-24 2014-11-27 Junhua Xue Interactive dynamic cloud navigation system
CN106600231A (en) * 2016-12-14 2017-04-26 国网上海市电力公司 Dynamic management system for infrastructure projects
CN108200173A (en) * 2018-01-03 2018-06-22 广州供电局有限公司 A kind of electric power construction field informationization monitoring system
CN109711690A (en) * 2018-12-17 2019-05-03 广州天越电子科技有限公司 The method and system of management scene control project process real-time update
CN110809052A (en) * 2019-11-11 2020-02-18 软通动力信息技术有限公司 Public cloud-based hydraulic engineering management system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112348473A (en) * 2020-11-10 2021-02-09 湖北福泰建筑装饰工程有限公司 Engineering management information visualization software
CN112215585A (en) * 2020-11-16 2021-01-12 国网江苏省电力有限公司南通供电分公司 Management system and management method for information-based electric power engineering administration project
CN113033172A (en) * 2021-04-01 2021-06-25 国网江苏省电力有限公司南通供电分公司 Construction cost calculating and comparing system based on digital audit

Similar Documents

Publication Publication Date Title
CN111784310A (en) Management system for informatization electric power engineering administration project and working method thereof
CN105303306B (en) Electric power material dispatching platform system
CN109146753A (en) Executing The Law While Managing Land dynamic visiting method and system based on 3S integrated technique
CN105023086A (en) Digital city management data sharing system based on cloud calculation
CN105023188A (en) Digitized city management data sharing system based on cloud data
CN112148679A (en) Data interaction method, system, device and storage medium based on multiple data platforms
CN103136249A (en) System and method of multiplex mode isomerous data integration
CN105022769A (en) Data interaction system of urban underground pipeline, and method thereof
CN112698953A (en) Power grid intelligent operation and detection platform based on micro-service
CN107730375B (en) Tax map management method, system and terminal equipment
CN109462736B (en) Road and bridge engineering construction video conference management method and system based on BIM + GIS modeling
CN105046386A (en) System for managing and monitoring urban social information and method
CN112115181A (en) Intelligent acquisition management system and method for expropriation data
CN105022771B (en) A kind of number law enforcement subsystem and its working method based on GIS
CN102436554A (en) Portable agricultural product market information acquisition device
CN112258159A (en) BIM + GIS-based hydraulic structure management system and method
CN112232635A (en) Wisdom water affairs data middling platform based on distributing type cloud framework
CN110706125A (en) Water conservancy big data analysis information service system and platform service system
US20080221959A1 (en) System and architecture for managing distributed design chains
CN110809052A (en) Public cloud-based hydraulic engineering management system and method
CN116128231A (en) Enterprise service system and construction method
CN112215585A (en) Management system and management method for information-based electric power engineering administration project
CN111382165A (en) Mobile homeland management system
CN114936242B (en) Data report customization application system
CN115456207A (en) Intelligent power plant digital engineering platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201016

RJ01 Rejection of invention patent application after publication