CN111695883A - Automatic checking method for consistency of operation of live-line work order and master station listing - Google Patents

Automatic checking method for consistency of operation of live-line work order and master station listing Download PDF

Info

Publication number
CN111695883A
CN111695883A CN202010582704.XA CN202010582704A CN111695883A CN 111695883 A CN111695883 A CN 111695883A CN 202010582704 A CN202010582704 A CN 202010582704A CN 111695883 A CN111695883 A CN 111695883A
Authority
CN
China
Prior art keywords
work order
checking
line
live
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010582704.XA
Other languages
Chinese (zh)
Other versions
CN111695883B (en
Inventor
唐鹤
吴树鸿
吴海江
邱桂华
黄浩刚
杜飞强
黄猛才
梁若生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Original Assignee
Guangdong Power Grid Co Ltd
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Foshan Power Supply Bureau of Guangdong Power Grid Corp filed Critical Guangdong Power Grid Co Ltd
Priority to CN202010582704.XA priority Critical patent/CN111695883B/en
Publication of CN111695883A publication Critical patent/CN111695883A/en
Application granted granted Critical
Publication of CN111695883B publication Critical patent/CN111695883B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a method for automatically checking consistency of a line live-line work order and master station listing operation, which comprises the steps of data acquisition, data processing and analysis of the live-line work order, and output of a display result; data acquisition: using a data acquisition middleware to periodically synchronize electrician single data from a visual system; data processing and analysis with work order: splitting the synchronized live-line work order according to the equipment name, checking and analyzing the work order data, checking the card hanging and picking conditions and the card hanging synchronization condition, and storing the work order data in a warehouse; and outputting a result: after the work order data is subjected to listing checking, analyzing, storing and warehousing, the condition of listing and removing of the line hot-line work order line can be checked through accessing a web system. The invention can clearly see what cards are hung on the current feeder line card by checking the work order data, and whether the card-hanging condition meets the requirement of the current work order card-hanging.

Description

Automatic checking method for consistency of operation of live-line work order and master station listing
Technical Field
The invention relates to the field of power system operation methods, in particular to an automatic checking method for consistency of operation of a line live-line work order and a master station listing.
Background
With the continuous improvement of national economic level and living quality, the reliability, safety and quick response of the national to power supply are higher and higher. As an electric power practitioner, the safety is always kept at the first place, and the card hanging is an important means for guaranteeing the safety. For the work order, how to confirm whether the work order is marked or not, whether the corresponding card is marked or not and whether the card picking is missed or not after the work is finished; according to the prior art, a worker checks the real-time system diagram of the main station by comparing with a work order, and the worker is required to check whether the cards are already picked or not after the work is finished. Because the judgment is carried out manually, the efficiency is low, omission is easy, and the judgment accuracy is influenced by the mental appearance and the responsibility of people, so the error rate is high. Due to the problems described above, there is a need to find an efficient, improved accuracy method.
The patent specification with the application number of 201911268805.3 discloses a transformer substation field operation control system and method based on three-dimensional dynamic modeling, and the application is provided; based on a three-dimensional digital model, intelligently managing and controlling the operation field through intelligent identification and early warning; based on a three-dimensional digital model, the virtual reality system is used for performing live-action rehearsal and equipment simulation training on typical production operation and safety accidents. However, the patent can not clearly see what cards are hung on the current feeder line card by checking the work order data, and whether the card-hanging condition meets the requirement of the current work order card.
Disclosure of Invention
The invention provides an automatic checking method for consistency of operation of a line live working work order and master station listing, which can clearly see what listing is hung on a current feeder line listing by checking work order data and whether the listing condition meets the requirement of the current work order listing.
In order to achieve the technical effects, the technical scheme of the invention is as follows:
an automatic checking method for consistency of operation of a line live working work order and master station listing comprises the following steps:
s1: synchronizing the electrified worksheet data of the visual system through the data acquisition system;
s2: splitting and storing electrician bill data into a warehouse;
s3: checking, analyzing and checking the electrified worksheet;
s4: and outputting the checking result of the electrified worksheet.
Further, the data acquisition in step S1 is to synchronize electrician data from the visualization system at regular time intervals, and the period is every minute.
Further, the charged work order data in the step S2 is split and stored in a warehouse, and the charged work order data is split according to the line name; if a work order contains multiple line names, the work order is divided into multiple lines of data and then stored in a database.
Further, in step S3, the checking, analyzing and verifying process for the electrician bill data includes:
checking the current registering plate, judging whether live working or reclosing quit is registered in the live work order data, if so, outputting a corresponding live working or reclosing quit plate, and otherwise, outputting a null value.
Further, the step S3 of analyzing and checking the process further includes:
and (4) checking whether the cards are not listed, judging whether live working or reclosing exit cards are listed or not in the time interval of batch repeated exit and input, if so, outputting a null value, otherwise, judging whether live working or reclosing exit records exist in the history of listing, if so, outputting a null value, and otherwise, outputting the cards which are not listed.
Further, the step S3 of analyzing and checking the process further includes:
checking whether the cards are not picked, judging whether the delay time is empty or not in the batch quitting and putting time interval or not, assigning the delay time to the batch input reclosing time when the delay time is not empty, judging whether the delay time is in the batch input reclosing time within seven days or not, judging whether live working is hung or reclosing quitting is carried out or not if the delay time is met, and outputting the cards which are not picked if the delay time is not in the batch quitting and putting time interval.
Further, in step S3, the hang-off check is performed according to the following expression:
Tag=SwitchReplyTime+LineTagMap;
the system comprises a Tag-card checking field, a switchReplyTime switch power restoration time and a LineTagMap-master station line card set.
Further, the check result with the work order is output in step S4, the analysis result is stored in a storage through the analysis in the previous step, and the analysis result is displayed through a page.
Further, the work order data processing and analysis are carried out: and splitting the synchronized live-line work order according to the equipment name, checking and analyzing the work order data, checking the card hanging and picking conditions and the card hanging synchronization condition, and storing the card hanging and picking conditions and the card hanging synchronization condition in a warehouse.
Further, outputting the result: after the work order data is subjected to listing checking, analyzing, storing and warehousing, the condition of listing and removing of the line hot-line work order line can be checked through accessing a web system.
Compared with the prior art, the technical scheme of the invention has the beneficial effects that:
the invention can clearly see what brand is hung on the current feeder line listing by checking the work order data, and whether the listing condition meets the requirement of the current work order listing; the synchronization of the main network and the distribution network can help related personnel to know the abnormal situation of the main network and the distribution network; through the automatic detection of the program, the burden of the practitioner is reduced, the working efficiency and the accuracy are improved, the error probability caused by the fact that the human eyes compare the system diagram one by one is reduced, the safety is greatly improved, and the automatic detection system has good popularization practicability.
Drawings
FIG. 1 is a flow chart of the method of the present invention.
Detailed Description
The drawings are for illustrative purposes only and are not to be construed as limiting the patent;
for the purpose of better illustrating the embodiments, certain features of the drawings may be omitted, enlarged or reduced, and do not represent the size of an actual product;
it will be understood by those skilled in the art that certain well-known structures in the drawings and descriptions thereof may be omitted.
The technical solution of the present invention is further described below with reference to the accompanying drawings and examples.
An automatic checking method for consistency of operation of a line live-line work order and a master station listing comprises data acquisition, data processing and analysis of the live-line work order and output of a display result.
Data acquisition: and the data acquisition middleware is utilized to periodically synchronize electrician single data from the visual system.
Data processing and analysis with work order: and splitting the synchronized live-line work order according to the equipment name, checking and analyzing the work order data, checking the card hanging and picking conditions and the card hanging synchronization condition, and storing the card hanging and picking conditions and the card hanging synchronization condition in a warehouse.
And outputting a result: after the work order data is subjected to listing checking, analyzing, storing and warehousing, the condition of listing and removing of the line hot-line work order line can be checked through accessing a web system.
As shown in fig. 1, an automatic checking method for consistency of a line live work order and master station listing operation includes the following specific steps:
and S1, newly building a conversion configuration visualization system and new system database information through the deployed data acquisition middleware system, selecting a source table and a target table, cleaning and converting fields, and storing the fields in a warehouse.
S2, processing the collected data, and then updating the processed data to a database; the specific process is as follows:
s201, processing collected data regularly to obtain a line field, splitting the line field by taking a comma as a segmentation symbol, judging whether the line field contains a plurality of line names, inquiring information of units to which the line field belongs according to the line names, and performing database insertion on the data split into a plurality of lines after data processing, wherein the line field only contains an execution updating operation of one line.
S3, checking and verifying the live work order, checking and analyzing the hang and pick brand of the work order data, and storing the result in a database; the specific process is as follows:
s301, acquiring a work order data set every minute, and traversing the data set.
S302, setting the line name of the work order data to a new set, and obtaining the listing information of the line master station in batches through the line name set.
S303, judging whether the time interval is within the batch quitting and inputting time interval, if so, acquiring the current master station listing of the line from the line listing set, judging whether a live operation or reclosing quitting listing exists, if so, outputting a null value, otherwise, judging whether a listing history has a live operation or reclosing quitting record, if so, outputting a null value, and if not, outputting an unaffiliated listing. Judging whether the delay time is empty or not in the interval of batch quitting and putting time, if not, assigning the delay time to the batch putting reclosing time, judging whether the delay time is in the interval of the batch putting time and seven days, if so, judging whether live working is hung or reclosing quitting is hung, and if so, outputting the non-picked plate. Checking the hanging and picking cards, wherein the expression is as follows:
Tag=SwitchReplyTime+LineTagMap;
and the Tag-card checking field, the switchReplyTime, the switch power restoration time and the LineTagMap-master station line card set are also included.
And S4, after the analysis and the storage in the database are carried out through the step S3, the analysis result can be inquired through visiting the system live-line work order card hanging check, and the current card hanging of the line, the card hanging and picking and abnormal conditions can be seen.
The same or similar reference numerals correspond to the same or similar parts;
the positional relationships depicted in the drawings are for illustrative purposes only and are not to be construed as limiting the present patent;
it should be understood that the above-described embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the claims of the present invention.

Claims (10)

1. An automatic checking method for consistency of operation of a line live working work order and a master station listing is characterized by comprising the following steps:
s1: synchronizing the electrified worksheet data of the visual system through the data acquisition system;
s2: splitting and storing electrician bill data into a warehouse;
s3: checking, analyzing and checking the electrified worksheet;
s4: and outputting the checking result of the electrified worksheet.
2. The method of claim 1, wherein the data collection in step S1 is timing tape electrician order data from a visualization system with a period of one minute.
3. The method for automatically checking the consistency of the operation of hanging the line live working work order and the master station according to claim 2, wherein the data of the live work order in the step S2 is split and stored in a warehouse, and the data of the live work order is split according to the line name; if a work order contains multiple line names, the work order is divided into multiple lines of data and then stored in a database.
4. The method according to claim 3, wherein the step S3 is performed with a checking, analyzing and verifying process for checking and verifying the consistency of the live line work order and the main station branding operation, and the checking and verifying process includes:
checking the current registering plate, judging whether live working or reclosing quit is registered in the live work order data, if so, outputting a corresponding live working or reclosing quit plate, and otherwise, outputting a null value.
5. The method according to claim 4, wherein the step S3 of analyzing and checking the consistency of the hot-line work order and the main station listing operation further comprises:
and (4) checking whether the cards are not listed, judging whether live working or reclosing exit cards are listed or not in the time interval of batch repeated exit and input, if so, outputting a null value, otherwise, judging whether live working or reclosing exit records exist in the history of listing, if so, outputting a null value, and otherwise, outputting the cards which are not listed.
6. The method according to claim 5, wherein the step S3 of analyzing and checking the consistency of the hot-line work order and the main station listing operation further comprises:
checking whether the cards are not picked, judging whether the delay time is empty or not in the batch quitting and putting time interval or not, assigning the delay time to the batch input reclosing time when the delay time is not empty, judging whether the delay time is in the batch input reclosing time within seven days or not, judging whether live working is hung or reclosing quitting is carried out or not if the delay time is met, and outputting the cards which are not picked if the delay time is not in the batch quitting and putting time interval.
7. The method for automatically checking the consistency of the branding operation of the line live-working work order and the master station according to claim 6, wherein in the step S3, the branding and the picking are checked, and the expression is as follows:
Tag=SwitchReplyTime+LineTagMap;
the system comprises a Tag-card checking field, a switchReplyTime switch power restoration time and a LineTagMap-master station line card set.
8. The method according to claim 7, wherein the inspection result of the live work order is output in step S4, the analysis result is stored in a storage through the analysis in the previous step, and the analysis result is displayed on a page.
9. The method for automatically checking the consistency of the operation of the line live-working work order and the main station listing according to claim 8, is characterized in that the data processing and analysis of the live-working work order comprises the following steps: and splitting the synchronized live-line work order according to the equipment name, checking and analyzing the work order data, checking the card hanging and picking conditions and the card hanging synchronization condition, and storing the card hanging and picking conditions and the card hanging synchronization condition in a warehouse.
10. The method for automatically checking the consistency of the operation of the line live-working work order and the main station card hanging operation according to claim 9, is characterized in that the output result is as follows: after the work order data is subjected to listing checking, analyzing, storing and warehousing, the condition of listing and removing of the line hot-line work order line can be checked through accessing a web system.
CN202010582704.XA 2020-06-23 2020-06-23 Automatic checking method for consistency of line live working worksheet and master station listing operation Active CN111695883B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010582704.XA CN111695883B (en) 2020-06-23 2020-06-23 Automatic checking method for consistency of line live working worksheet and master station listing operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010582704.XA CN111695883B (en) 2020-06-23 2020-06-23 Automatic checking method for consistency of line live working worksheet and master station listing operation

Publications (2)

Publication Number Publication Date
CN111695883A true CN111695883A (en) 2020-09-22
CN111695883B CN111695883B (en) 2023-12-29

Family

ID=72483530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010582704.XA Active CN111695883B (en) 2020-06-23 2020-06-23 Automatic checking method for consistency of line live working worksheet and master station listing operation

Country Status (1)

Country Link
CN (1) CN111695883B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113191746A (en) * 2021-05-28 2021-07-30 广东电网有限责任公司 Method and system for summarizing and analyzing real-time listing information of main network and distribution network
CN113537836A (en) * 2021-08-16 2021-10-22 中国南方电网有限责任公司 Live working scheduling method and device and computer equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103942726A (en) * 2014-03-26 2014-07-23 国家电网公司 Intelligent inspection method for condition evaluation work of power grid equipment
CN107526768A (en) * 2017-07-04 2017-12-29 国网冀北电力有限公司 A kind of listed assistance system of intelligence and implementation method
CN110046726A (en) * 2019-04-24 2019-07-23 广东电网有限责任公司 A kind of O&M is listed method, system, equipment and storage medium automatically

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103942726A (en) * 2014-03-26 2014-07-23 国家电网公司 Intelligent inspection method for condition evaluation work of power grid equipment
CN107526768A (en) * 2017-07-04 2017-12-29 国网冀北电力有限公司 A kind of listed assistance system of intelligence and implementation method
CN110046726A (en) * 2019-04-24 2019-07-23 广东电网有限责任公司 A kind of O&M is listed method, system, equipment and storage medium automatically

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113191746A (en) * 2021-05-28 2021-07-30 广东电网有限责任公司 Method and system for summarizing and analyzing real-time listing information of main network and distribution network
CN113537836A (en) * 2021-08-16 2021-10-22 中国南方电网有限责任公司 Live working scheduling method and device and computer equipment

Also Published As

Publication number Publication date
CN111695883B (en) 2023-12-29

Similar Documents

Publication Publication Date Title
CN111695883A (en) Automatic checking method for consistency of operation of live-line work order and master station listing
CN102651148A (en) Method for monitoring security check-in monitoring system
CN111126217A (en) Intelligent operation and maintenance management system for power transmission line based on intelligent identification
CN116185757B (en) Intelligent monitoring system for energy consumption of machine room
CN115757363B (en) Multi-level management method and system for three-dimensional cadastral database
CN115793584A (en) Internet of things equipment production process supervision system based on big data
CN111371184A (en) Power equipment topological structure based on cable identification and automatic identification method thereof
CN111861186A (en) Method for detecting power grid risk event and acquiring power failure equipment
CN110688507A (en) Power distribution network line loss panoramic visual display system and method
CN114077767A (en) BIM-based project progress monitoring system and method
CN116027725A (en) Group control optimization analysis system based on high-efficiency machine room
CN112418231A (en) System algorithm for collecting operation and maintenance and AI model
CN104618151A (en) GIS technology-based ONU equipment fault location method for EPON network
CN104112183A (en) Plug-and-play intelligent scheduling model management system and management method of intelligent substation
CN111652325A (en) Enterprise power consumption mode identification method and device based on clustering and storage medium
CN116094174A (en) Knowledge graph-based power grid operation and maintenance monitoring method, system, equipment and medium
CN103390035A (en) Intelligent warning signal type matching method based on regular expressions
CN112286884B (en) Method, system and medium for automatically generating topology of ring main unit of power distribution network
CN111724137A (en) Method for automatically checking consistency of line fault work order and master station hang tag
CN113835387A (en) Operation and maintenance management method, system and medium
CN114118717A (en) Mine enterprise production state supervision method and system
CN104238419B (en) Hand-held energy-saving monitoring intelligent work system and method for work
CN113595100A (en) Electric power compensation system
CN111885359A (en) Intelligent rolling line monitoring system and method based on machine vision
CN113052137A (en) Identification and judgment method for construction site environment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant