CN111611061A - Task management method, management terminal, management system and memory - Google Patents

Task management method, management terminal, management system and memory Download PDF

Info

Publication number
CN111611061A
CN111611061A CN202010261173.4A CN202010261173A CN111611061A CN 111611061 A CN111611061 A CN 111611061A CN 202010261173 A CN202010261173 A CN 202010261173A CN 111611061 A CN111611061 A CN 111611061A
Authority
CN
China
Prior art keywords
management
database
objects
message
task
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010261173.4A
Other languages
Chinese (zh)
Inventor
向平
朱新林
程晓沪
徐金霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gold East Paper Jiangsu Co Ltd
Original Assignee
Gold East Paper Jiangsu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gold East Paper Jiangsu Co Ltd filed Critical Gold East Paper Jiangsu Co Ltd
Priority to CN202010261173.4A priority Critical patent/CN111611061A/en
Publication of CN111611061A publication Critical patent/CN111611061A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Program initiating; Program switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching
    • G06F9/4843Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
    • G06F9/4881Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues

Abstract

The invention discloses a task management method, a management terminal, a management system and a memory, wherein the task management method comprises the steps of pre-storing attribute contents of a plurality of management objects in the management terminal; assigning a corresponding plurality of first database addresses to a plurality of management objects; receiving a first database message entering a first database address; the first database message or instructions from the first database message are associated with the corresponding management object to obtain the archived data. The management terminal is directly added to manage a plurality of management objects, so that the running condition and quality of the equipment are tracked and controlled, the operation is simple, and the cost is low.

Description

Task management method, management terminal, management system and memory
Technical Field
The present invention relates to the field of data processing technologies, and in particular, to a task management method, a management terminal, a management system, and a memory.
Background
With the popularization of automation equipment in various fields, the requirement for management and control of the preparation process is higher and higher. For example, in the paper industry, when high quality products are to be produced, not only the materials but also the operation and quality of the manufacturing equipment need to be strictly controlled.
The inventor of the present application found in long-term research and development that, at present, paper making equipment is generally controlled by a control system processor, for example, a PLC (Programmable Logic Controller), and software adopted by a general OS (operation system), for example, RSview32, has no function of a historical curve, and a real-time curve can only record 5 seconds, and cannot track and control the operation condition and quality of the equipment. If the OS system is directly upgraded, the reconstruction cost is high, and the loss caused by shutdown is larger.
Disclosure of Invention
The invention provides a task management method, a management terminal, a management system and a memory, which aim to solve the technical problem that the cost for directly upgrading an OS (operating system) is overlarge in the prior art.
In order to solve the above technical problem, one technical solution adopted by the present invention is to provide a task management method, including:
pre-storing attribute contents of a plurality of management objects in a management terminal;
assigning a corresponding plurality of first database addresses to the plurality of management objects;
receiving a first database message entering the first database address;
associating the first database message or instructions from the first database message with the corresponding management object to obtain archived data.
In a specific embodiment, the pre-storing, in the management terminal, the attribute contents of the plurality of management objects includes:
receiving a second database message, the second database message comprising a header of a second database address;
assigning the second database address to the management terminal and associating the second database address with the plurality of management objects;
creating the management objects according to the types of the management objects, and setting the attribute contents of the management objects.
In a specific embodiment, the number of the management objects is two, and the method for associating the second database address with the management objects specifically includes:
confirming a communication protocol between the management terminal and the management object, and configuring a definition file according to the communication protocol so as to define two management objects;
and setting the second database addresses of the two management objects in a drive file under the definition file.
In a specific embodiment, the method for creating the management objects according to the types of the management objects and setting the attribute contents of the management objects includes:
creating an engineering project through engineering software, the engineering project comprising a plurality of management objects;
and setting the data filing time length and the data storage position in the engineering project.
In a specific embodiment, the method of associating the first database message or the instruction from the first database message with the corresponding management object includes:
acquiring the engineering quantity of the management object;
and archiving the engineering quantity of the management object to the corresponding first database address according to the first database message to obtain the archived data.
In a specific embodiment, after obtaining the archived data, the method further includes:
creating a historical curve picture under the engineering project;
and calling out a required filing curve in a window of the historical curve picture.
In order to solve the above technical problem, another technical solution adopted by the present invention is to provide a task management method, including:
pre-storing tasks in a management terminal;
assigning a corresponding database address to the task;
receiving a database message entering the database address;
associating the database message or an instruction from the database message with the task.
In order to solve the technical problem, another technical scheme adopted by the invention is to provide a management terminal, wherein the management terminal is used for prestoring tasks; assigning a corresponding database address to the task; receiving a database message entering the database address; associating the database message or an instruction from the database message with the task.
In order to solve the above technical problem, another technical solution adopted by the present invention is to provide a management system, including a management terminal and a plurality of management objects, wherein the management terminal is configured to pre-store attribute contents of the plurality of management objects; assigning a corresponding plurality of first database addresses to the plurality of management objects; receiving a first database message entering the first database address; associating the first database message or instructions from the first database message with the corresponding management object to obtain archived data.
In order to solve the above technical problem, another technical solution adopted by the present invention is to provide a memory storing program data, which can be executed to implement the method as described above.
According to the invention, the attribute contents of a plurality of management objects are prestored in the management terminal, the corresponding first database addresses are distributed to the management objects, after a first database message entering the first database address is received, the first database message or an instruction from the first database message is associated with the corresponding management object to obtain the filing data, the management terminals can be directly added to manage the management objects, so that the tracking management and control of the running condition and the quality of the equipment are realized, the operation is simple, and the cost is low.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments are briefly introduced below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without inventive efforts, wherein:
FIG. 1 is a flowchart illustrating an embodiment of a task management method of the present invention;
FIG. 2 is a flowchart illustrating another embodiment of a task management method according to the present invention;
FIG. 3 is a schematic structural diagram of a management terminal and a management object in another embodiment of the task management method of the present invention;
FIG. 4 is a schematic view of an operation interface in another embodiment of the task management method of the present invention;
FIG. 5 is a schematic view of an operation interface in another embodiment of the task management method of the present invention;
FIG. 6 is a schematic view of an operation interface in another embodiment of the task management method of the present invention;
FIG. 7 is a schematic view of an operation interface in another embodiment of the task management method of the present invention;
FIG. 8 is a schematic view of an operation interface in another embodiment of the task management method of the present invention;
FIG. 9 is a schematic view of an operation interface in another embodiment of the task management method of the present invention;
FIG. 10 is a schematic view of an operation interface in another embodiment of the task management method of the present invention;
FIG. 11 is a flowchart illustrating another embodiment of a task management method according to the present invention;
FIG. 12 is a schematic diagram of the structure of the memory of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
The terms "first" and "second" in this application are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. In the description of the present application, "plurality" means at least two, e.g., two, three, etc., unless explicitly specifically limited otherwise. Furthermore, the terms "include" and "have," as well as any variations thereof, are intended to cover non-exclusive inclusions. For example, a process, method, system, article, or apparatus that comprises a list of steps or elements is not limited to only those steps or elements listed, but may alternatively include other steps or elements not listed, or inherent to such process, method, article, or apparatus. While the term "and/or" is merely one type of association that describes an associated object, it means that there may be three types of relationships, e.g., a and/or B, which may mean: a exists alone, A and B exist simultaneously, and B exists alone. In addition, the character "/" herein generally indicates that the former and latter related objects are in an "or" relationship.
Referring to fig. 1, an embodiment of the task management method of the present invention includes:
s110, attribute contents of a plurality of management objects are prestored in the management terminal.
In this embodiment, the management terminal may be a processing device such as a server, and the management object may be a PLC system or the like.
And S120, distributing the corresponding first database addresses to a plurality of management objects.
S130, receiving a first database message entering a first database address.
S140, associating the first database message or the instruction from the first database message with the corresponding management object to obtain the archived data.
According to the embodiment of the invention, the attribute contents of a plurality of management objects are prestored in the management terminal, the corresponding first database addresses are distributed to the management objects, after the first database message entering the first database address is received, the first database message or the instruction from the first database message is associated with the corresponding management object to obtain the filing data, the management terminal can be directly added to manage the management objects, so that the tracking management and control on the running condition and the quality of the equipment are realized, the operation is simple, and the cost is low.
Referring to fig. 2 and 3, another embodiment of the task management method of the present invention includes:
s210, receiving a second database message, wherein the second database message comprises a header of a second database address.
S220, assigning the second database address to the management terminal 310, and associating the second database address with the plurality of management objects 320.
In this embodiment, the management terminal 310 may be a Processing device such as a server, and the hardware configuration of the server is a CPU (Central Processing Unit) with a Processing speed of main stream I3 or higher, a hard disk with a storage capacity of 40GB or higher, a memory with a storage capacity of 2GB or higher, and necessary accessories such as a display, a keyboard, and a mouse. The operating system of the server is Windows XP, Windows 2000 and above versions.
In this embodiment, the management objects 320 may be PLC systems, and the number of the management objects 320 is two.
The method for associating the second database address with the plurality of management objects 320 specifically includes:
s221, confirming the communication protocol between the management terminal 310 and the management object 320, and configuring the definition file according to the communication protocol to define two management objects 320.
In this embodiment, the management terminal 310 and the management object 320 may use TCP/IP protocol, and the location file may define "Topic definition" by configuring an ABTCP file. Referring to fig. 4 and 5 together, two management objects 320 are defined as "DAGANG" and "C98", respectively, wherein the connection mode of "DAGANG" is set to "local", the discrete read block sizes of "DAGANG" and "C98" are set to "16000", the register read block sizes are set to "1000", the update interval is set to "1000" milliseconds, and the reply timeout is set to "12" seconds, respectively.
S222, setting the second database addresses of the two management objects 320 in the drive file under the definition file.
Referring to fig. 6, in this embodiment, the drive file is set as a "Hosts" file, the file path is "C: \. \ System32\ Drivers \ Etc \ Hosts", the second database address of "DAGANG" is set as "10.16.223.40", and the second database address of "C98" is "10.16.223.50".
S230, creating a plurality of management objects 320 according to the types of the management objects 320, and setting the attribute contents of the management objects 320.
In this embodiment, the method for creating the plurality of management objects 320 includes:
s231, creating an engineering project through engineering software, wherein the engineering project comprises a plurality of management objects.
And S232, setting the data filing time length and the data storage position in the engineering project.
Referring also to FIG. 7, in this embodiment, an engineering project, named "GCC 1G 98", may be created by INTOUCH engineering software. The data filing time length (namely, the time length of keeping the log file is) 30 days is set under the project, the storage address of the log file is D:/HIST1, and the printing control parameters are set according to the requirement.
S240, assigning the corresponding first database addresses to the management objects 320.
S250, receiving a first database message entering a first database address.
S260, associating the first database message or the instruction from the first database message with the corresponding management object 320 to obtain the archived data.
In this embodiment, the method of associating the first database message or an instruction from the first database message with the corresponding management object 320 includes:
TABLE 1 GCC1 plant increase Curve
Figure BDA0002439345120000071
S261, acquiring the engineering quantity of the management object 320;
in this embodiment, the management terminal 310 collects the amount of work to be archived, and the archive list is shown in table 1 above.
And S262, archiving the engineering quantity of the management object 320 to the corresponding first database address according to the first database message to obtain archived data.
Referring to fig. 8, in the present embodiment, defining a database of archived Data, that is, defining relevant attributes of variables under "geographic dictionary" includes defining a variable name "SGB-TOTAL", defining a variable description as "SGB PRODUCT TOTAL", defining a Data type such as a digital quantity, an integer, or a real number, defining an accessed management object 320 such as "DAGANG", defining an Item, where the Item corresponds to a first database address corresponding to the management object 320, and checking a "Log Data" option.
In this embodiment, obtaining the archived data may further include:
and S271, creating a history curve picture under the engineering project.
Referring also to fig. 9, in the present embodiment, a history curve screen is created by historical _ windows.
S272, calling out the required filing curve in the window of the history curve screen.
Referring to fig. 10, in this embodiment, the INTOUCH runs the software "WinderViewer" to run the project file, and the required archive curve can be called in the history curve window. The situation of the archived data can be more intuitively known through the archive curve.
Referring to fig. 11, another embodiment of the task management method of the present invention includes:
and S410, pre-storing the tasks in the management terminal.
And S420, distributing the corresponding database address to the task.
S430, receiving a database message entering the database address.
And S440, associating the database message or the instruction from the database message with the task.
According to the embodiment of the invention, the task is prestored in the management terminal, the corresponding database address is allocated to the task, the database message or the instruction from the database message is associated with the task after the database message entering the database address is received, so as to obtain the filing data, and the management terminal can be directly added to manage the task, so that the tracking control on the running condition and quality of the equipment is realized, the operation is simple, and the cost is low.
The embodiment of the management terminal is used for pre-storing tasks; assigning the corresponding database address to the task; receiving a database message entering a database address; the database message or an instruction from the database message is associated with the task.
According to the embodiment of the invention, the task is prestored in the management terminal, the corresponding database address is allocated to the task, the database message or the instruction from the database message is associated with the task after the database message entering the database address is received, so as to obtain the filing data, and the management terminal can be directly added to manage the task, so that the tracking control on the running condition and quality of the equipment is realized, the operation is simple, and the cost is low.
Referring to fig. 3, the management system of the present invention includes a management terminal 310 and a plurality of management objects 320, the management objects 320 are connected to a plurality of control systems 340 belonging to one of the management objects 320 and a plurality of control systems 350 belonging to another management object 320 through a network device 330, and the management terminal 310 is configured to pre-store attribute contents of the plurality of management objects 320; assigning a corresponding plurality of first database addresses to a plurality of management objects 320; receiving a first database message entering a first database address; the first database message or instructions from the first database message are associated with the corresponding management object 320 to obtain the archived data.
According to the embodiment of the invention, the attribute contents of a plurality of management objects are prestored in the management terminal, the corresponding first database addresses are distributed to the management objects, after the first database message entering the first database address is received, the first database message or the instruction from the first database message is associated with the corresponding management object to obtain the filing data, the management terminal can be directly added to manage the management objects, so that the tracking management and control on the running condition and the quality of the equipment are realized, the operation is simple, and the cost is low.
Referring to fig. 12, an embodiment of the memory 50 of the present invention stores program data 510, and the program data 510 can be executed to implement a task management method.
For a specific process of the task management method, reference is made to the above embodiment of the task management method, and details are not described herein again.
According to the embodiment of the invention, the attribute contents of a plurality of management objects are prestored in the management terminal, the corresponding first database addresses are distributed to the management objects, after the first database message entering the first database address is received, the first database message or the instruction from the first database message is associated with the corresponding management object to obtain the filing data, the management terminal can be directly added to manage the management objects, so that the tracking management and control on the running condition and the quality of the equipment are realized, the operation is simple, and the cost is low.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes performed by the present specification and drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (10)

1. A method for task management, comprising:
pre-storing attribute contents of a plurality of management objects in a management terminal;
assigning a corresponding plurality of first database addresses to the plurality of management objects;
receiving a first database message entering the first database address;
associating the first database message or instructions from the first database message with the corresponding management object to obtain archived data.
2. The method according to claim 1, wherein the pre-storing, at the management terminal, the attribute contents of the plurality of management objects comprises:
receiving a second database message, the second database message comprising a header of a second database address;
assigning the second database address to the management terminal and associating the second database address with the plurality of management objects;
creating the management objects according to the types of the management objects, and setting the attribute contents of the management objects.
3. The method according to claim 2, wherein the number of the plurality of management objects is two, and the method of associating the second database address with the plurality of management objects specifically comprises:
confirming a communication protocol between the management terminal and the management object, and configuring a definition file according to the communication protocol so as to define two management objects;
and setting the second database addresses of the two management objects in a drive file under the definition file.
4. The method according to claim 3, wherein the method for creating the plurality of management objects according to the types of the plurality of management objects and setting the attribute contents of the plurality of management objects comprises:
creating an engineering project through engineering software, the engineering project comprising a plurality of management objects;
and setting the data filing time length and the data storage position in the engineering project.
5. The method of claim 4, wherein associating the first database message or an instruction from the first database message with the corresponding management object comprises:
acquiring the engineering quantity of the management object;
and archiving the engineering quantity of the management object to the corresponding first database address according to the first database message to obtain the archived data.
6. The method of claim 5, wherein obtaining the archived data further comprises:
creating a historical curve picture under the engineering project;
and calling out a required filing curve in a window of the historical curve picture.
7. A method for task management, comprising:
pre-storing tasks in a management terminal;
assigning a corresponding database address to the task;
receiving a database message entering the database address;
associating the database message or an instruction from the database message with the task.
8. The management terminal is characterized in that the management terminal is used for prestoring tasks; assigning a corresponding database address to the task; receiving a database message entering the database address; associating the database message or an instruction from the database message with the task.
9. The management system is characterized by comprising a management terminal and a plurality of management objects, wherein the management terminal is used for prestoring attribute contents of the management objects; assigning a corresponding plurality of first database addresses to the plurality of management objects; receiving a first database message entering the first database address; associating the first database message or instructions from the first database message with the corresponding management object to obtain archived data.
10. A memory storing program data executable to implement the method of any one of claims 1 to 6 or claim 7.
CN202010261173.4A 2020-04-03 2020-04-03 Task management method, management terminal, management system and memory Pending CN111611061A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010261173.4A CN111611061A (en) 2020-04-03 2020-04-03 Task management method, management terminal, management system and memory

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010261173.4A CN111611061A (en) 2020-04-03 2020-04-03 Task management method, management terminal, management system and memory

Publications (1)

Publication Number Publication Date
CN111611061A true CN111611061A (en) 2020-09-01

Family

ID=72198134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010261173.4A Pending CN111611061A (en) 2020-04-03 2020-04-03 Task management method, management terminal, management system and memory

Country Status (1)

Country Link
CN (1) CN111611061A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060224641A1 (en) * 2005-03-31 2006-10-05 Peter Surma Parallel archiving for a messaging system
CN105071986A (en) * 2015-07-27 2015-11-18 武汉兴图新科电子股份有限公司 Method for monitoring operation state of system
CN110837592A (en) * 2019-11-08 2020-02-25 京东数字科技控股有限公司 Method, apparatus and computer readable storage medium for data archiving

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060224641A1 (en) * 2005-03-31 2006-10-05 Peter Surma Parallel archiving for a messaging system
CN105071986A (en) * 2015-07-27 2015-11-18 武汉兴图新科电子股份有限公司 Method for monitoring operation state of system
CN110837592A (en) * 2019-11-08 2020-02-25 京东数字科技控股有限公司 Method, apparatus and computer readable storage medium for data archiving

Similar Documents

Publication Publication Date Title
US5832191A (en) Method and apparatus for automatically enabling communication with a network printer
CN111970315A (en) Method, device and system for pushing message
EP3489776B1 (en) Control device, control method, and program
TW202207681A (en) Method for data processing, system and computer readable storage medium
CN115695470A (en) Internet of things platform and edge gateway terminal cloud cooperation system, method and device
US20220030090A1 (en) Selective address space aggregation
EP3703342B1 (en) Dynamic load balancing in network centric process control systems
JP6934951B2 (en) Universal data access across devices
CN110677443A (en) Data transmitting and receiving method, transmitting end, receiving end, system and storage medium
CN111611061A (en) Task management method, management terminal, management system and memory
CN111092774A (en) Configuration method and equipment of acquisition gateway
CN112130936A (en) Polling-based data calling method, device, equipment and storage medium
CN114090268B (en) Container management method and container management system
CN107347024B (en) Method, equipment and system for storing operation log
CN114726905A (en) Method, device, equipment and storage medium for accessing Tbox network to Android system
CN108566293B (en) Electronic device, zk node information notification method, and storage medium
CN111538553A (en) Dual-core Web desktop application access processing method and device and storage medium
US20230017884A1 (en) Method and system for seamlessly remote monitoring an availability of a published remote resource on a host
CN111209613A (en) Rapid design method and system of intelligent product
CN114553861B (en) File transmission method and device, storage medium and electronic equipment
US11947342B1 (en) Container registry and subscription service for industrial systems
CN115827392B (en) Monitoring method, device and system of distributed system
US20220198405A1 (en) Apparatus, system and method for building system diagnostics
CN114553866A (en) Full data access method, device and computer readable storage medium
CN113760304A (en) System configuration method, device, equipment and medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination