Prior art keywords
maintenance
overhaul
notification
module
task list
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911333375.9A
Other languages
Chinese (zh)
Other versions
CN111091352A (en
Inventor
邬学杰
周永
玄建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Dongfang Deep Blue Information Technology Co ltd
Original Assignee
Qingdao Dongfang Deep Blue Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Dongfang Deep Blue Information Technology Co ltd filed Critical Qingdao Dongfang Deep Blue Information Technology Co ltd
Priority to CN201911333375.9A priority Critical patent/CN111091352B/en
Publication of CN111091352A publication Critical patent/CN111091352A/en
Application granted granted Critical
Publication of CN111091352B publication Critical patent/CN111091352B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Manufacturing & Machinery (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention belongs to the field of high-end equipment manufacturing process data management, and relates to a high-end equipment manufacturing process data management system, which comprises the following main structures: logging in an interface module, a process file management module, a necessary repair and replacement module and a couple repair and replacement module; the subordinate submodule also comprises a task list module, a notice sheet module, a process network module, a notice closed-loop module and a single management module, and the invention establishes an omnibearing multi-layer, structured and real-time electronic record, and can update and inquire the state of the equipment at any time; after the notification is issued, monitoring the whole process, and inquiring the execution state of the notification in real time to realize real-sense notification closed-loop management; establishing a perfect tracking management system, and realizing life-span tracking management for serial number-enabled materials; and accumulating process library data for a long time, precipitating and optimizing the process data, laying a foundation stone for improving the process management level, meeting the requirement of fine management, and enabling the whole management system to have evolutionary property.

Description

High-end equipment manufacturing industry process data management system
Technical field:
the invention belongs to the technical management field of high-end equipment manufacturing industry, and particularly relates to a process data management system of the high-end equipment manufacturing industry.
The background technology is as follows:
along with the rapid development of high-end equipment manufacturing industry, process data management is applied to basic data such as structural information, characteristic information, overhaul rules, overhaul processes, data and the like of products to be overhauled, the product and part structures are digitalized and converted into basic data of a system, overhaul processes of different maintenance levels corresponding to overhaul configurations and instantiated unit configurations are established, overhaul process basic data of product types or certain key materials is realized to guide production, overhaul flows are pushed by data to form data flows of process data management, so that informatization management of product operation life cycle is realized, therefore, the invention needs to design a high-end equipment manufacturing industry process data management system which can realize high-efficiency informatization management of product operation life cycle,
the invention comprises the following steps:
the invention aims to overcome the defects of the prior art, and seeks to design a high-end equipment manufacturing process data management system, so that the problems that the existing large-scale equipment has various maintenance strategies, including maintenance schemes with different degrees, different targets (reliability is the center, production guarantee is prior, user demand is prior) and different stages (regular, pre-event and post-event) are solved, the variety makes the selection of the maintenance schemes important and difficult, if unreasonable regular maintenance causes unnecessary maintenance waste, and the aim of lean maintenance is affected, and therefore, the software reasonably selects the maintenance schemes and modes based on product basic information, running information, maintenance history and maintenance knowledge to generate a maintenance plan and dispatch a maintenance work order.
In order to achieve the above object, the present invention relates to a process data management system for manufacturing high-end equipment, which is characterized in that the main structure comprises: a login module, a process file management module, a necessary repair and replacement module, a couple repair and replacement module and a single management module;
the login module comprises an account login module, the account login can be realized through the account login module, and when the process file management module, the process network maintenance sub-module, the necessary repair and replacement module, the even repair and replacement module and the single management module manage the process file after login, the specific operation steps are as follows:
1. process file management module
The mode of entering the file into the system in the process file management module comprises two parts of an online editing module and a file attachment importing module of the file; when the module is edited online, the necessary filling content is represented by fixed colors, white represents filling-selecting fields, and the fields are maintained in sequence in the module; after entering the document item information, ejecting the document attachment importing module through an uploading button, selecting an uploaded attachment in the ejected document attachment importing module through a browsing button, and closing a page through the uploading button after the selection is completed;
After uploading the attachment, the state of the stored document item is "sketched", check boxes at the current end of the document item to be submitted are checked, the document item is stored in the system through a "submit" button, and the corresponding state is changed into "submitted" at the moment; for each department personnel to confirm the validity of the document, wherein the submitted document item is not allowed to be modified any more, if the document in the submitted state is to be modified, the modification can be realized by a new version number operation, firstly, the document item to be modified is checked, a new item is automatically generated by the system through a new version number button, the information of the item is the same as the original item by default, and the field can be modified and the new document can be uploaded again by you; in order to ensure that the uploaded document is matched with the content such as the document type, the submitted document needs to be checked further; after entering a document checking and processing module, a document affirming person searches for a document item in a submitting state according to a constant condition through a searching module; the default here is to find out the document entry in the "committed" state; selecting a document item to be checked and confirmed, checking a check box in front of the item, and changing the state into checked after the approval by an approval button (the approval is only a function for confirming the validation here);
The module can also be used for carrying out association application, department staff with general viewing authority enter a query window through a document query module, enter search conditions to find document items to be viewed, select corresponding document items, download document attachments through a download button,
further, the default condition of inquiry in the module is that the document is checked, and the craftsman can associate the notification bill and the task list with the document existing in the system through the function of uploading the accessories in the notification bill or task list module.
Furthermore, the method for modifying two related documents in the module of the invention
Directly associating the document to the notice or task list through an upload button;
and secondly, directly associating the documents uploaded and checked by the document uploading module, wherein the documents in the associated system only need to check the previous check boxes, the corresponding document types and document numbers are selected and stored, and the associated documents can be selected or not selected.
2. Process network maintenance submodule
The process network maintenance submodule comprises online creation of a process network, introduction of the process network, maintenance of sequence before and after working procedures and determination of working procedure interval time, and finally forms a network topological graph, wherein the outline of key steps in the module is as follows:
Before technological network data is imported into the system, standard text codes of fixed inspection and even inspection of each maintenance level are required to be maintained; before a process network is imported into a system, related personnel of a technical department are required to supplement detailed process network data according to a process network template (standard format and content) provided by the system, and finally, the process network data are imported in batches; after the maintenance of the process network is finished, an intuitive process network report and a network topological graph can be derived for related personnel to check the integrity and correctness of the data;
3. module for repairing and replacing
The maintenance of the sub-module including creation, submission and delivery of the task template by the necessary maintenance and replacement module comprises the following steps:
1. template creation
When the parts are overhauled, notification of overhauling is needed, and the notification mainly comprises the content of overhauling required by regulations and the content of adding and modifying in combination with the maintenance level;
when the task list is arranged, the front-back correspondence relationship should be noted, the distribution of the working procedures and the components should be accurate, if errors occur, the task list is difficult to arrange, and attention should be paid: the network and each main data should exist;
four rows of options in the title bar after entering the task list creation module are respectively general data, procedures, components and task lists, and the four rows of options can be selected;
General information tab:
filling in task list numbers, wherein the task list numbers are the same as procedure, assembly and function position numbers and can be self-compiled, the numbers are different from the task list numbers finally generated, and the task list numbers can be maintained according to personal habits by themselves, but the task list numbers under the same task are required to be ensured to be consistent;
filling in a task list description: i.e. this working simple description (typically a process file),
factory information: the selection may be made by a single click,
model: selecting a suitable model;
maintenance level: 1-5 grade repair is selected;
the maintenance mode is as follows:
the technical object is as follows: the type of technical object for which the corresponding task is applicable, may be selected by a single click,
the process file comprises the following steps: if the task has a supported process file, filling;
and (3) production line: the production line is applicable, and can be defaulted;
planner group
Process tab
Through the procedure, the page is switched to a procedure column, and data are arranged according to the procedure column requirements;
task list number: must be consistent with general data tab maintenance, otherwise cannot be correlated,
sequence number: the task list contains the process numbers of the tasks, namely the tasks are required to be completed in a plurality of processes, and a plurality of processes are required to be listed in the plurality of processes, so that the tasks can be numbered by themselves, such as 0010, 0020 and the like, and four-bit serial numbers are generally selected;
The working center comprises: i.e., construction team, can be selected by clicking, such as: the middle and small parts are cleaned, overhauled and fall into a working class, and the final assembly is debugged into a working class 1;
standard text code: namely, the standard text codes in the network are used for specifying the specific working time of working procedures, the standard text codes can be selected through clicking, the standard text codes correspond to the working procedures, if ten standard text codes exist in the same process file, the number of the sequence number options is ten, for example: instruction manual for air conditioner disassembly operation: the standard text code contains four (i.e., four passes) then the sequence numbers should be 0010, 0020, 0030, 0040;
work and units: i.e., the man-hour time required for a team to perform the job;
component tabs: the components, i.e. the material information, items that have to be maintained are: coding, serial numbers, distribution numbers, components (materials), quantity, factories, necessary-replacement marks, necessary-inspection marks, overhaul sources, recoil information and routes;
the task list number is consistent with the general data and the process tabs, the sequence number is consistent with the process, each task list process tab has a plurality of sequence number component tabs, a plurality of sequence numbers are also provided in each task list process tab, and the distribution number represents the next common components (materials) of the process (standard text code) of the task;
The component (material) material code can be selected by clicking, and the material code can be inquired by writing "% material name%" into the material description;
factory information: the selection can be performed by clicking;
quantity: the amount of this material required in this process;
inventory: the material delivery point is indicated to be the material delivery point,
and (3) overhauling the source: the processing state required to be done when the project material is subjected to outsourcing maintenance or warehouse returning generally has the options of independence, outsourcing original installation, outsourcing non-original installation, self-repairing non-original installation, technical sealing, scrapping and the like;
type of evaluation: when the project material is subjected to outsourcing maintenance, the general material quantity is subjected to negative number processing in the warehouse-out maintenance process, the evaluation type is the old piece to be repaired, the material evaluation type is the old piece to be repaired when the material is taken after the repair, the turnover piece can be taken, and if the general default conventional new piece is not filled;
recoil, reservation purchase: the two items of data are automatically carried out by a general system;
the process notification number, which is filled in, needs to be issued after the notification system issues the notification;
within the component is a special type, namely purchasing services: when a process is selected to select a specially defined process, the component code needs ZS header code, and the item class is N;
The invention maintains the task list to upload the form according to the requirement when the task list is to be repaired and uploaded, and uploads the task list after maintaining the task list according to the form;
after the uploading of the table is completed, the system can check the correctness of the table contents, if the input is correct, the table contents can be directly stored, if the input error system prompts the wrong data line item number and the wrong reason, the task list can not be uploaded for the second time after being uploaded successfully, otherwise, the repeated data can be produced;
2. commit and down-ordering
The task list is a task template generated by associating the process files, the working procedures, the functional positions and the components, the process files are divided according to the working procedures at present, the practical task quantity is larger, the task list is changed into a mode of combining the process files according to one working procedure, thus saving time and reducing errors of data preparation,
head-up data: writing a process file in one process in one row of data;
process data: a plurality of process files correspond to one process;
component data: one process corresponds to a plurality of process files, and all components under the process;
the method has the advantages that the number of data preparation can be reduced, the accuracy is improved, the task template is in a 'created' state, the product serial number and the item are input into the popped interface through the 'processing' button, the task list can be converted into the process data of the check notification list, or the issued product serial number is changed, and the notification list data generated by the task list can be checked on a batch modification interface;
4. Even repair and replacement module
1. Even inspection notification creation
When the conventional overhaul notification is issued, the conventional overhaul notification is opened through the trouble-shooting, current car overhaul service which occurs during internal execution, the type of the notification is selected to be 'even check', a planner group is input, and the process jumps to the working order line to input trouble-shooting process data: maintenance level rules do not need maintenance, and site rules default to "in-company-out-of-factory"; entering a product serial number, a part number, a maintenance object, a project or a settlement WBS; inputting the material requirements used for overhauling the process, wherein the material requirements comprise disassembly or assembly of materials and auxiliary materials; maintaining an evaluation type and an overhaul source, and designating whether the material belongs to outsourcing repair or self-repair and a maintenance level range; after the process data is input, inputting a process notification list number, and generating an overhaul work list executed in a factory through submitting; the in-plant execution technology-enhanced overhaul service comprises a technical improvement of a specific maintenance level and a technical improvement overhaul service crossing the maintenance level;
opening a conventional overhaul notice, selecting 'even inspection' of the notice type, inputting a planner group, jumping to a working order line, inputting fault overhaul process data, and defaulting to 'in-company-out-of-factory' of the place rule; entering a product serial number, a part number, a maintenance object, a project or a settlement WBS; inputting the material requirements used for overhauling the process, wherein the material requirements comprise disassembly or assembly of materials and auxiliary materials; maintaining an evaluation type and an overhaul source, and designating whether the material belongs to outsourcing repair or self-repair and a maintenance level range;
Entering the requirement of a work order component: selecting part codes, quantity, sub-stock, assessment type, factory level route and maintenance source, if the part starts the sequence product serial number, selecting the disassembly position of the part, warehousing the part to a branch line Bian Ku at the beginning of 1 (referring to a branch line Bian Ku under a branch) across the branch plant part, and also taking the part from the sub-stock; opening an overhaul notice interface, and entering an overhaul notice input interface through an overhaul notice or through an opening button;
entering work orders and component requirements
The first procedure: the execution department is detached and installed, and the maintenance object is the upper layer configuration position which needs to be provided for the maintenance of the execution department;
component requirements: negative lines are used for disassembling old pieces, and an executive department logistics warehouse is entered; the old parts are installed and repaired in positive lines, and the old parts are retrieved from an executive department logistics warehouse; if the material starts the serial number control, the disassembly and installation positions of the material need to be selected;
and a second procedure: the executive department overhauls, and the maintenance object is a configuration position for overhauling by the executive department when the executive department moves back to the warehouse;
component requirements: the positive lines of old parts to be repaired are picked up from the logistics warehouse of the executive department; negative number returning repairing old parts are put into an executive part gate warehouse; by submitting, the notification status is changed from "proposed" to "created" by the save and submit button; the existing offerings maintenance construction scheme (including free offerings), including service material purchasing requirements, including service purchasing reception,
Opening a conventional overhaul notice, selecting 'even inspection' of the notice type, inputting a planner group, and jumping to a working order line to input fault overhaul process data:
maintenance level rules do not need maintenance, and in the process of fault maintenance, certain materials are failed, the materials are defaulted to be in factories, and the defaults are applicable to the maintenance level of the current product in the company;
the method comprises the steps of inputting a product serial number, a part number, a maintenance object, a project or settlement WBS, inputting a component requirement needing to be overhauled outside, wherein the evaluation type is 'to-be-overhauled part', and the overhauling source is 'outsourcing-not-original' or 'outsourcing-original'; designating a disassembly and assembly position;
opening an overhaul notification sheet:
entering an overhaul notice input interface through an overhaul notice or an open button, and selecting a planner on the head information, wherein the type of the overhaul notice is 'even inspection';
entering working orders and component requirements:
manually inputting a work order for disassembling the commission external part, wherein the information required by the work order is as follows: the operation content, the work center, the standard text code, the maintenance level, the maintenance object and the like are determined by the determination button;
entering the requirement of a work order component:
selecting a material code of a commissioned external part, wherein the number of the material code is negative, a sub-inventory is a maintenance warehouse with a logistics beginning, a factory-level route is a maintenance warehouse with a supplier, an evaluation type is a piece to be repaired, a maintenance source is a commissioned external-original package or a commissioned external-non-original package, if sequence product serial number management is started, disassembly position information is required to be input, the code of the commissioned external part which is purchased and repaired is selected, the number of the material code of the commissioned external part is positive, the sub-inventory is the maintenance warehouse with the logistics beginning, the factory-level route is the logistics beginning, the evaluation type is a piece to be repaired, the maintenance source is empty, and if sequence product serial number management is started, the disassembly position information is required to be input;
Submitting a maintenance notice.
2. Commit and execution
After submitting the overhaul notification bill, the system can generate an overhaul work bill;
according to the invention, after the synchronous request is operated, the material demand details are synchronized to the enterprise resource management system, the purchasing department checks the material demand summary information which is modified outside the commission on the purchasing demand summary function interface of the enterprise resource management system, the purchasing department creates corresponding purchasing contracts and purchasing orders according to the material demands which are summarized by the enterprise resource management system, then the purchasing department schedules by branch factories, executes work orders and report work orders, and the summary notice is input, so that the engineering department can conveniently use the summary notice to issue the detail notice, and the input data content is similar to the even inspection type notice;
recording overhaul notices, wherein the types of notices are summarized, and the product serial numbers or the part numbers are multiple columns or multiple numbers; the process line and the maintenance object are input, the position of the maintenance object to be selected specifically can be obtained according to the material code and the position (fuzzy query), the selected position can be used as a disassembly position or a maintenance object, meanwhile, the positions of the material can be fully filled by using the buttons of the filling position, and the position selection is completed through determination; recording a material demand line and a disassembly and assembly position, if the disassembly and assembly position is selected, automatically bringing the material disassembly and assembly position to the material demand line, and maintaining other fields, wherein if the maintenance object is selected, the disassembly and assembly position is manually selected; the old piece after being disassembled in the factory is put back into the warehouse, the next loading product is installed for continuous use, and the automatic system switching evaluation type is that the old piece is repaired; opening a conventional overhaul notice, selecting 'even inspection' of the notice type, inputting a planner group, and jumping to a working order line to input fault overhaul process data:
The maintenance level rule does not need maintenance, the place rule defaults to 'in-company-out-of-factory', the product serial number, the part number, the maintenance object, the project or the settlement WBS are input, the material requirement used for overhauling the procedure is input, the evaluation type is 'to-be-overhauled part', and the overhauling source is 'disassemble old part to evaluate type'; opening an overhaul notification sheet, entering an overhaul notification sheet input interface through the overhaul notification sheet or through an opening button, and selecting a planner on the head information, wherein the type of the overhaul notification sheet is 'even check'; repairing and scrapping materials, scrapping spare parts can occur in the repairing process, and new spare parts are required to be taken for repairing and overhauling in the repairing process; the method comprises the steps that scrapped materials are found in the process of overhauling business in a branch factory, after scrapped materials are confirmed by a quality inspection department, the serial numbers, the product serial numbers, the part numbers of the scrapped materials of a notification engineering department and the material supplementing process of the engineering department are recorded in the notification; opening a conventional overhaul notice, selecting 'even inspection' of the notice type, inputting a planner group, and jumping to a working order line to input fault overhaul process data:
maintenance level rules do not require maintenance, and site rules default to "in-company-out-of-factory"
The product serial number, the part serial number, the working center and the standard text code are recorded, the scrapped product serial number is recorded in the field of the lower-layer sequence product serial number, the system can automatically retrieve the upper-layer configuration product serial number, and the product serial number is filled into the maintenance product serial number, and the project is recorded or the WBS is settled; inputting detail information of materials to be scrapped on a component row, wherein the detail information comprises the quantity, in particular to a sub-warehouse out and a factory-level route; the self-made part demand sources are as follows: stock (overhaul), after-sales three packages, and work order requirements for generating overhaul notices executed by after-sales service stations and for generating in-plant overhaul work orders; the first three kinds of requirement information are transmitted to an enterprise resource management system self-built table, the self-made part requirements in the self-built table are checked regularly by a branch factory, and a new self-made work order is issued according to the requirements; the last work order requirement is transmitted to an enterprise resource management system, and a new work order is generated in the enterprise resource management system;
unscheduled reserve self-service:
after a conventional overhaul notice sheet is opened and head-up information is recorded, checking a storage check box on a single file of the notice sheet, and automatically filling the settlement of the storage by the system; the method comprises the steps of inputting self-made part requirements to be stored, enabling technical departments to send out fixed inspection, even inspection, technical addition and modification and fault notification sheets to be carried out on the outside of a factory, generating a work sheet through package planning, enabling outside personnel to send out materials based on a work Shan Di signboard, enabling outside personnel to carry out the work sheet, and enabling old parts in the execution process to be put in storage and returned into the factory through the old parts to finish self-repair and outsourcing;
Opening an overhaul notification sheet and issuing the overhaul maintenance notification sheet:
the invention records the maintenance/maintenance history record and production date information of the materials required by regular maintenance/maintenance, the system calculates the next maintenance/maintenance date according to the maintenance/maintenance period and history record of the materials, each month is at the end of generating a material list of the parts to be maintained/maintained in the next month, the maintenance list is firstly required to be distributed and settled for the materials to be maintained/maintained by a business department, the maintenance list is inspected and approved, after the inspection and approval of the business department is completed, the technical department performs maintenance/maintenance on the listed materials, the system generates an inspection notification list after the maintenance list is inspected and approved for the materials executed in the factory, the system writes the inspection notification list into a demand summarizing platform after the maintenance list is inspected and approved for the materials executed by a supplier, and the enterprise resource management system creates a purchase order for the stock maintenance/maintenance;
test
The engineering department takes new parts from the logistics warehouse to make experiments at irregular intervals, whether the spare parts are qualified or not can be driven on, an inventory maintenance notice is opened, the material codes, the quantity, the working center and the standard text codes required to be tested are recorded on a working instruction row, and the material codes, one positive and one negative, and other material codes used in the experiments are recorded on the assembly requirement to carry out maintenance outsourcing; in the overhaul process of the inventory overhaul service, the condition that the disassembled part is sent out for overhaul exists; opening an inventory part overhaul notification bill, wherein the type of the work bill is selected as 'inventory part overhaul', and the material codes, the quantity, the working center and the standard text codes which need overhaul and maintenance are recorded on a working instruction line; on the component row, inputting the material codes, the quantity and the sub-library which need to be overhauled outside after being disassembled, wherein the evaluation type is 'to-be-overhauled part', and the overhauling source is 'outsourcing-not-original' or 'outsourcing-original';
3. Engineering change sub-module
The engineering change sub-module is applied to the closed-loop requisite repair module and the even-change couple repair process and is used for solving the synchronous change of the follow-up execution problems caused by the change of the design and the process scheme, and the specific operation steps of the engineering change sub-module about engineering change principles and engineering change are carried out in the following manner:
the batch modification notification list is realized through the modification task list, and the batch modification notification list is realized on a batch modification notification list interface;
engineering change:
after the task list group package is planned, maintenance object, project and team information are not allowed to be modified, and other field information is allowed to be modified;
the task list allows any field to be modified before the notification bill is generated, and does not allow maintenance objects, projects, maintenance level rules, location rules, maintenance levels, projects, settlement WBS, product serial numbers, part numbers, production lines and work bills to be modified after the notification bill is generated and the notification bill is cancelled; after the work order is generated, material codes on the notification order are not allowed to be modified, the material requirement is cancelled, the material requirement quantity is required to be changed into 0, and material requirement rows are not allowed to be deleted; on the notification sheet and the task list, the component requirement information is allowed to be modified in any case, wherein the component requirement information comprises the number of components, the sub-library, the evaluation type, the overhaul source and the plant-level route;
Batch modification of notices by modifying task lists
After the fixed inspection process is imported, inquiring through a task list interface in a system, after confirming that the error is not found, generating a fixed inspection notice through a task list through a 'turning maintenance notice' button, modifying any process data on the generated notice, and modifying the notice in batches through modifying the task list;
batch modification of notification sheets
The data problem on the notification bill is modified, and the notification bill to be modified can be searched according to a certain search condition by modifying the notification bill interface in batches;
single modification notice
If the engineering change range is less, the corresponding overhaul notification can be found by singly modifying the notification, and the process data is modified;
cancel function
For a notification sheet in a state of "created", the system does not allow deletion operations to be performed on its process line and material line, and thus the deletion effect is achieved by canceling the function, and cancellation of the notification sheet includes three parts: the method comprises the steps of canceling a whole notice, canceling a working procedure line and canceling a material line;
notice process line cancellation
If the process line is canceled, the material line under the corresponding process line is also canceled, and the number of the material demand summarizing platforms is also changed to 0;
For the procedure line which does not generate the work order or has the work order state of not being issued, the corresponding work order can be cancelled, but if the procedure line has the work order generated and the work order state is the states of 'issued', 'reported' and the like, the procedure line cannot be cancelled directly, and the procedure line can be cancelled after the work order is cancelled
The cancelled procedure line can be cancelled, so that the procedure line can regenerate a work order, and the corresponding material line can be retransmitted to the material demand summarizing platform;
material line cancellation
After the material row is canceled, the corresponding quantity of the material demand summarizing platform is 0, the same material row can be canceled, and the material row is thrown to the material demand summarizing platform again after being canceled;
5. single piece management module
The single-piece management module comprises a query module and a module matched with original data; the query module is specifically as follows:
querying a whole vehicle task list: according to the maintenance schedule of 'product model', 'maintenance level', 'maintenance times', 'materials' matched task list (four fields are completely matched, the task list state is not cancelled/closed, and the corresponding task list cannot be completely matched according to the four fields, if the corresponding task list cannot be found according to the 'maintenance times', other task lists with empty matched 'maintenance times') are acquired, task list information is displayed on a 'maintenance level maintenance management interface', and the task list information is displayed from the suggested task list;
Inquiring a task list corresponding to maintenance level overhaul materials: matching the maintenance level management material interfaces according to the maintenance schedule of 'product model', 'maintenance level', 'maintenance times', and acquiring a maintenance level management 'material code' list (the maintenance times are unnecessary filling fields, if a material list corresponding to the maintenance times cannot be found according to the maintenance schedule, and the material list with empty maintenance times is acquired); according to the overhaul plan 'product model' and the above material codes, the history information (overhaul information summarizing interface) in the unit configuration corresponding to the specific material in the unit configuration is obtained, and mainly comprises the following fields: the method comprises the steps of (1) matching a task list (priority level 1) according to the data, wherein the maintenance plan product model, the maintenance level, the maintenance frequency, the material model, the maintenance level, the maintenance frequency, the last maintenance date, the next maintenance level, the maintenance frequency and the expiration date are displayed on a maintenance level maintenance management interface (displayed on a left measurement part of a suggested task list), the maintenance plan product model, the maintenance level, the maintenance frequency, the material model and a query task list (four fields are completely matched, the task list state is not cancelled/closed, the task list type is 'fixed check', the four fields cannot be completely matched, if the corresponding task list cannot be found according to the maintenance frequency, the other task lists matched with the maintenance frequency are empty are obtained, task list information is acquired and displayed on the maintenance level maintenance management interface, and the display is started from the suggested task list;
According to the above data matching task list (priority level 2), maintenance level, maintenance times, material codes, query task list (three fields are completely matched, the task list status is not cancelled/closed, the task list type is "stock maintenance", the three fields cannot be completely matched, if the corresponding task list cannot be found according to the "maintenance times", the other task list with the matching "maintenance times" being empty is not found), the task list information is obtained, displayed on the "maintenance level maintenance management interface", displayed from the suggested task list,
after the information inquiry is completed, displaying the information on a maintenance-division level maintenance management interface,
the matching module with the original data is specifically as follows: in the process of re-inquiring the data, if the maintenance-level maintenance management interface already exists, the new inquiry data and the original data are associated and displayed, and the new inquiry data and the original data are matched: the maintenance planning interface (product model, product serial number, maintenance level, maintenance times), the maintenance level maintenance management interface (maintenance level material, position, product serial number, actual task list, notice number) and then the notice is issued.
Compared with the prior art, the invention has the following beneficial effects: the comprehensive multi-level structured real-time electronic record is established, the state of the equipment can be updated and inquired at any time, the management is convenient, the inquiry and maintenance are easy, a standard process library is established, and the process data is templated, standardized, integrated and modularized; after the notification is issued, monitoring the whole process, and inquiring the execution state of the notification in real time to realize real-sense notification closed-loop management; establishing a perfect tracking management system, and realizing life-span tracking management for serial number-enabled materials; and accumulating process library data for a long time, precipitating and optimizing the process data, laying a foundation stone for improving the process management level, meeting the requirement of fine management, and enabling the whole management system to have evolutionary property. The method has the advantages of ingenious main concept, reasonable and clear hierarchical architecture, capability of realizing efficient management of process data, great improvement of working efficiency, good application effect and wide market prospect.
Description of the drawings:
fig. 1 is a functional interface schematic diagram of a process file management module according to the present invention.
Fig. 2 is a functional interface schematic of a process network maintenance sub-module according to the present invention.
Fig. 3 is a network topology diagram of a process network maintenance sub-module according to the present invention.
Fig. 4 is a functional interface schematic diagram of a module that has to be replaced according to the present invention.
Fig. 5 is a functional interface schematic diagram of the even-change even repair module according to the present invention.
FIG. 6 is a functional interface schematic of a single-piece management module according to the present invention.
Fig. 7 is a schematic diagram of traffic circulation during use of the present invention.
The specific embodiment is as follows:
the invention is further illustrated by the following examples in conjunction with the accompanying drawings.
Example 1:
the technical data management system of the high-end equipment manufacturing industry is realized by the following technical scheme:
in order to achieve the above object, the present embodiment relates to a process data management system for manufacturing high-end equipment, which is characterized in that the main structure includes: a login module, a process file management module, a necessary repair and replacement module, a couple repair and replacement module and a single management module;
the login module comprises an account login module, the account login can be realized through the account login module, and when the process file management module, the process network maintenance sub-module, the necessary repair and replacement module, the even repair and replacement module and the single management module manage the process file after login, the specific operation steps are as follows:
1. Process file management module
The mode of entering the file into the system in the process file management module comprises two parts of an online editing module and a file attachment importing module of the file; when the module is edited online, the necessary filling content is represented by fixed colors, white represents filling-selecting fields, and the fields are maintained in sequence in the module; after entering the document item information, ejecting the document attachment importing module through an uploading button, selecting an uploaded attachment in the ejected document attachment importing module through a browsing button, and closing a page through the uploading button after the selection is completed;
after uploading the attachment, the state of the stored document item is "sketched", check boxes at the current end of the document item to be submitted are checked, the document item is stored in the system through a "submit" button, and the corresponding state is changed into "submitted" at the moment; for each department personnel to confirm the validity of the document, wherein the submitted document item is not allowed to be modified any more, if the document in the submitted state is to be modified, the modification can be realized by a new version number operation, firstly, the document item to be modified is checked, a new item is automatically generated by the system through a new version number button, the information of the item is the same as the original item by default, and the field can be modified and the new document can be uploaded again by you; in order to ensure that the uploaded document is matched with the content such as the document type, the submitted document needs to be checked further; after entering a document checking and processing module, a document affirming person searches for a document item in a submitting state according to a constant condition through a searching module; the default here is to find out the document entry in the "committed" state; selecting a document item to be checked and confirmed, checking a check box in front of the item, and changing the state into checked after the approval by an approval button (the approval is only a function for confirming the validation here);
The module can also be used for carrying out association application, department staff with general viewing authority enter a query window through a document query module, enter search conditions to find document items to be viewed, select corresponding document items, download document attachments through a download button,
further, the default condition of inquiry in the module is that the document is checked, and the craftsman can associate the notification bill and the task list with the document existing in the system through the function of uploading the accessories in the notification bill or task list module.
Further, the method for modifying two related documents in the module of this embodiment
Directly associating the document to the notice or task list through an upload button;
and secondly, directly associating the documents uploaded and checked by the document uploading module, wherein the documents in the associated system only need to check the previous check boxes, the corresponding document types and document numbers are selected and stored, and the associated documents can be selected or not selected.
2. Process network maintenance submodule
The process network maintenance submodule comprises online creation of a process network, introduction of the process network, maintenance of sequence before and after working procedures and determination of working procedure interval time, and finally forms a network topological graph, wherein the outline of key steps in the module is as follows:
Before technological network data is imported into the system, standard text codes of fixed inspection and even inspection of each maintenance level are required to be maintained; before a process network is imported into a system, related personnel of a technical department are required to supplement detailed process network data according to a process network template (standard format and content) provided by the system, and finally, the process network data are imported in batches; after the maintenance of the process network is finished, an intuitive process network report and a network topological graph can be derived for related personnel to check the integrity and correctness of the data;
3. module for repairing and replacing
The maintenance of the sub-module including creation, submission and delivery of the task template by the necessary maintenance and replacement module comprises the following steps:
1. template creation
When the parts are overhauled, notification of overhauling is needed, and the notification mainly comprises the content of overhauling required by regulations and the content of adding and modifying in combination with the maintenance level;
when the task list is arranged, the front-back correspondence relationship should be noted, the distribution of the working procedures and the components should be accurate, if errors occur, the task list is difficult to arrange, and attention should be paid: the network and each main data should exist;
four rows of options in the title bar after entering the task list creation module are respectively general data, procedures, components and task lists, and the four rows of options can be selected;
General information tab:
filling in task list numbers, wherein the task list numbers are the same as procedure, assembly and function position numbers and can be self-compiled, the numbers are different from the task list numbers finally generated, and the task list numbers can be maintained according to personal habits by themselves, but the task list numbers under the same task are required to be ensured to be consistent;
filling in a task list description: i.e. this working simple description (typically a process file),
factory information: the selection may be made by a single click,
model: selecting a suitable model;
maintenance level: 1-5 grade repair is selected;
the maintenance mode is as follows:
the technical object is as follows: the type of technical object for which the corresponding task is applicable, may be selected by a single click,
the process file comprises the following steps: if the task has a supported process file, filling;
and (3) production line: the production line is applicable, and can be defaulted;
planner group
Process tab
Through the procedure, the page is switched to a procedure column, and data are arranged according to the procedure column requirements;
task list number: must be consistent with general data tab maintenance, otherwise cannot be correlated,
sequence number: the task list contains the process numbers of the tasks, namely the tasks are required to be completed in a plurality of processes, and a plurality of processes are required to be listed in the plurality of processes, so that the tasks can be numbered by themselves, such as 0010, 0020 and the like, and four-bit serial numbers are generally selected;
The working center comprises: i.e., construction team, can be selected by clicking, such as: the middle and small parts are cleaned, overhauled and fall into a working class, and the final assembly is debugged into a working class 1;
standard text code: namely, the standard text codes in the network are used for specifying the specific working time of working procedures, the standard text codes can be selected through clicking, the standard text codes correspond to the working procedures, if ten standard text codes exist in the same process file, the number of the sequence number options is ten, for example: instruction manual for air conditioner disassembly operation: the standard text code contains four (i.e., four passes) then the sequence numbers should be 0010, 0020, 0030, 0040;
work and units: i.e., the man-hour time required for a team to perform the job;
component tabs: the components, i.e. the material information, items that have to be maintained are: coding, serial numbers, distribution numbers, components (materials), quantity, factories, necessary-replacement marks, necessary-inspection marks, overhaul sources, recoil information and routes;
the task list number is consistent with the general data and the process tabs, the sequence number is consistent with the process, each task list process tab has a plurality of sequence number component tabs, a plurality of sequence numbers are also provided in each task list process tab, and the distribution number represents the next common components (materials) of the process (standard text code) of the task;
The component (material) material code can be selected by clicking, and the material code can be inquired by writing "% material name%" into the material description;
factory information: the selection can be performed by clicking;
quantity: the amount of this material required in this process;
inventory: the material delivery point is indicated to be the material delivery point,
and (3) overhauling the source: the processing state required to be done when the project material is subjected to outsourcing maintenance or warehouse returning generally has the options of independence, outsourcing original installation, outsourcing non-original installation, self-repairing non-original installation, technical sealing, scrapping and the like;
type of evaluation: when the project material is subjected to outsourcing maintenance, the general material quantity is subjected to negative number processing in the warehouse-out maintenance process, the evaluation type is the old piece to be repaired, the material evaluation type is the old piece to be repaired when the material is taken after the repair, the turnover piece can be taken, and if the general default conventional new piece is not filled;
recoil, reservation purchase: the two items of data are automatically carried out by a general system;
the process notification number, which is filled in, needs to be issued after the notification system issues the notification;
within the component is a special type, namely purchasing services: when a process is selected to select a specially defined process, the component code needs ZS header code, and the item class is N;
In the embodiment, when the task list is uploaded after the maintenance is necessary, a task list uploading form is maintained according to the requirement, and the task list is uploaded after the task list is maintained according to the form;
after the uploading of the table is completed, the system can check the correctness of the table contents, if the input is correct, the table contents can be directly stored, if the input error system prompts the wrong data line item number and the wrong reason, the task list can not be uploaded for the second time after being uploaded successfully, otherwise, the repeated data can be produced;
2. commit and down-ordering
The task list is a task template generated by associating the process files, the working procedures, the functional positions and the components, the process files are divided according to the working procedures at present, the practical task quantity is larger, the task list is changed into a mode of combining the process files according to one working procedure, thus saving time and reducing errors of data preparation,
head-up data: writing a process file in one process in one row of data;
process data: a plurality of process files correspond to one process;
component data: one process corresponds to a plurality of process files, and all components under the process;
the method has the advantages that the number of data preparation can be reduced, the accuracy is improved, the task template is in a 'created' state, the product serial number and the item are input into the popped interface through the 'processing' button, the task list can be converted into the process data of the check notification list, or the issued product serial number is changed, and the notification list data generated by the task list can be checked on a batch modification interface;
4. Even repair and replacement module
1. Even inspection notification creation
When the conventional overhaul notification is issued, the conventional overhaul notification is opened through the trouble-shooting, current car overhaul service which occurs during internal execution, the notification type is selected to be 'even check', a planner group is input, and the trouble-shooting process data is input by jumping to a working command line: maintenance level rules do not need maintenance, and site rules default to "in-company-out-of-factory"; entering a product serial number, a part number, a maintenance object, a project or a settlement WBS; inputting the material requirements used for overhauling the process, wherein the material requirements comprise disassembly or assembly of materials and auxiliary materials; maintaining an evaluation type and an overhaul source, and designating whether the material belongs to outsourcing repair or self-repair and a maintenance level range; after the process data is input, inputting a process notification list number, and generating an overhaul work list executed in a factory through submitting; the in-plant execution technology-enhanced overhaul service comprises a technical improvement of a specific maintenance level and a technical improvement overhaul service crossing the maintenance level;
opening a conventional overhaul notice, selecting 'even inspection' of the notice type, inputting a planner group, jumping to a working order line, inputting fault overhaul process data, and defaulting to 'in-company-out-of-factory' of the place rule; entering a product serial number, a part number, a maintenance object, a project or a settlement WBS; inputting the material requirements used for overhauling the process, wherein the material requirements comprise disassembly or assembly of materials and auxiliary materials; maintaining an evaluation type and an overhaul source, and designating whether the material belongs to outsourcing repair or self-repair and a maintenance level range;
Entering the requirement of a work order component: selecting part codes, quantity, sub-stock, assessment type, factory level route and maintenance source, if the part starts the sequence product serial number, selecting the disassembly position of the part, warehousing the part to a branch line Bian Ku at the beginning of 1 (referring to a branch line Bian Ku under a branch) across the branch plant part, and also taking the part from the sub-stock; opening an overhaul notice interface, and entering an overhaul notice input interface through an overhaul notice or through an opening button;
entering work orders and component requirements
The first procedure: the execution department is detached and installed, and the maintenance object is the upper layer configuration position which needs to be provided for the maintenance of the execution department;
component requirements: negative lines are used for disassembling old pieces, and an executive department logistics warehouse is entered; the old parts are installed and repaired in positive lines, and the old parts are retrieved from an executive department logistics warehouse; if the material starts the serial number control, the disassembly and installation positions of the material need to be selected;
and a second procedure: the executive department overhauls, and the maintenance object is a configuration position for overhauling by the executive department when the executive department moves back to the warehouse;
component requirements: the positive lines of old parts to be repaired are picked up from the logistics warehouse of the executive department; negative number returning repairing old parts are put into an executive part gate warehouse; by submitting, the notification status is changed from "proposed" to "created" by the save and submit button; the existing offerings maintenance construction scheme (including free offerings), including service material purchasing requirements, including service purchasing reception,
Opening a conventional overhaul notice, selecting 'even inspection' of the notice type, inputting a planner group, and jumping to a working order line to input fault overhaul process data:
maintenance level rules do not need maintenance, and in the process of fault maintenance, certain materials are failed, the materials are defaulted to be in factories, and the defaults are applicable to the maintenance level of the current product in the company;
the method comprises the steps of inputting a product serial number, a part number, a maintenance object, a project or settlement WBS, inputting a component requirement needing to be overhauled outside, wherein the evaluation type is 'to-be-overhauled part', and the overhauling source is 'outsourcing-not-original' or 'outsourcing-original'; designating a disassembly and assembly position;
opening an overhaul notification sheet:
entering an overhaul notice input interface through an overhaul notice or an open button, and selecting a planner on the head information, wherein the type of the overhaul notice is 'even inspection';
entering working orders and component requirements:
manually inputting a work order for disassembling the commission external part, wherein the information required by the work order is as follows: the operation content, the work center, the standard text code, the maintenance level, the maintenance object and the like are determined by the determination button;
entering the requirement of a work order component:
selecting a material code of a commissioned external part, wherein the number of the material code is negative, a sub-inventory is a maintenance warehouse with a logistics beginning, a factory-level route is a maintenance warehouse with a supplier, an evaluation type is a piece to be repaired, a maintenance source is a commissioned external-original package or a commissioned external-non-original package, if sequence product serial number management is started, disassembly position information is required to be input, the code of the commissioned external part which is purchased and repaired is selected, the number of the material code of the commissioned external part is positive, the sub-inventory is the maintenance warehouse with the logistics beginning, the factory-level route is the logistics beginning, the evaluation type is a piece to be repaired, the maintenance source is empty, and if sequence product serial number management is started, the disassembly position information is required to be input;
Submitting a maintenance notice.
2. Commit and execution
After submitting the overhaul notification bill, the system can generate an overhaul work bill;
after the synchronous request is operated, synchronizing the material demand details to an enterprise resource management system, checking material demand summary information subjected to outsourcing maintenance by a purchasing department at a purchasing demand summary function interface of the enterprise resource management system, creating corresponding purchasing contracts and purchasing orders by the purchasing department according to the material demands summarized by the enterprise resource management system, scheduling by a branch factory, executing work orders and reporting work, inputting summary notification, facilitating an engineering department to use the summary notification to issue the detail notification, and inputting data content similar to the even inspection type notification;
recording overhaul notices, wherein the types of notices are summarized, and the product serial numbers or the part numbers are multiple columns or multiple numbers; the process line and the maintenance object are input, the position of the maintenance object to be selected specifically can be obtained according to the material code and the position (fuzzy query), the selected position can be used as a disassembly position or a maintenance object, meanwhile, the positions of the material can be fully filled by using the buttons of the filling position, and the position selection is completed through determination; recording a material demand line and a disassembly and assembly position, if the disassembly and assembly position is selected, automatically bringing the material disassembly and assembly position to the material demand line, and maintaining other fields, wherein if the maintenance object is selected, the disassembly and assembly position is manually selected; the old piece after being disassembled in the factory is put back into the warehouse, the next loading product is installed for continuous use, and the automatic system switching evaluation type is that the old piece is repaired; opening a conventional overhaul notice, selecting 'even inspection' of the notice type, inputting a planner group, and jumping to a working order line to input fault overhaul process data:
The maintenance level rule does not need maintenance, the place rule defaults to 'in-company-out-of-factory', the product serial number, the part number, the maintenance object, the project or the settlement WBS are input, the material requirement used for overhauling the procedure is input, the evaluation type is 'to-be-overhauled part', and the overhauling source is 'disassemble old part to evaluate type'; opening an overhaul notification sheet, entering an overhaul notification sheet input interface through the overhaul notification sheet or through an opening button, and selecting a planner on the head information, wherein the type of the overhaul notification sheet is 'even check'; repairing and scrapping materials, scrapping spare parts can occur in the repairing process, and new spare parts are required to be taken for repairing and overhauling in the repairing process; the method comprises the steps that scrapped materials are found in the process of overhauling business in a branch factory, after scrapped materials are confirmed by a quality inspection department, the serial numbers, the product serial numbers, the part numbers of the scrapped materials of a notification engineering department and the material supplementing process of the engineering department are recorded in the notification; opening a conventional overhaul notice, selecting 'even inspection' of the notice type, inputting a planner group, and jumping to a working order line to input fault overhaul process data:
maintenance level rules do not require maintenance, and site rules default to "in-company-out-of-factory"
The product serial number, the part serial number, the working center and the standard text code are recorded, the scrapped product serial number is recorded in the field of the lower-layer sequence product serial number, the system can automatically retrieve the upper-layer configuration product serial number, and the product serial number is filled into the maintenance product serial number, and the project is recorded or the WBS is settled; inputting detail information of materials to be scrapped on a component row, wherein the detail information comprises the quantity, in particular to a sub-warehouse out and a factory-level route; the self-made part demand sources are as follows: stock (overhaul), after-sales three packages, and work order requirements for generating overhaul notices executed by after-sales service stations and for generating in-plant overhaul work orders; the first three kinds of requirement information are transmitted to an enterprise resource management system self-built table, the self-made part requirements in the self-built table are checked regularly by a branch factory, and a new self-made work order is issued according to the requirements; the last work order requirement is transmitted to an enterprise resource management system, and a new work order is generated in the enterprise resource management system;
unscheduled reserve self-service:
after a conventional overhaul notice sheet is opened and head-up information is recorded, checking a storage check box on a single file of the notice sheet, and automatically filling the settlement of the storage by the system; the method comprises the steps of inputting self-made part requirements to be stored, enabling technical departments to send out fixed inspection, even inspection, technical addition and modification and fault notification sheets to be carried out on the outside of a factory, generating a work sheet through package planning, enabling outside personnel to send out materials based on a work Shan Di signboard, enabling outside personnel to carry out the work sheet, and enabling old parts in the execution process to be put in storage and returned into the factory through the old parts to finish self-repair and outsourcing;
Opening an overhaul notification sheet and issuing the overhaul maintenance notification sheet:
the method comprises the steps that overhaul/maintenance histories and production date information of materials required by periodical overhaul/maintenance are recorded, the system calculates the next overhaul/maintenance date according to overhaul/maintenance periods and histories of the materials, a bill of materials of parts needing overhaul/maintenance in the next month is generated at the end of each month, a public institution distributes and settles WBS (space division business system) for the materials of the maintenance list needing overhaul/maintenance, and inspects the maintenance list, after the public institution inspects, the technical department performs overhaul/maintenance on the bill of materials, and for materials executed in the factory, an overhaul notification list is generated by a system after the maintenance list is inspected, the materials are executed by a supplier, after the maintenance list is inspected, the system writes the materials into a demand summarizing platform, and an enterprise resource management system creates purchase order of the stock overhaul/maintenance;
test
The engineering department takes new parts from the logistics warehouse to make experiments at irregular intervals, whether the spare parts are qualified or not can be driven on, an inventory maintenance notice is opened, the material codes, the quantity, the working center and the standard text codes required to be tested are recorded on a working instruction row, and the material codes, one positive and one negative, and other material codes used in the experiments are recorded on the assembly requirement to carry out maintenance outsourcing; in the overhaul process of the inventory overhaul service, the condition that the disassembled part is sent out for overhaul exists; opening an inventory part overhaul notification bill, wherein the type of the work bill is selected as 'inventory part overhaul', and the material codes, the quantity, the working center and the standard text codes which need overhaul and maintenance are recorded on a working instruction line; on the component row, inputting the material codes, the quantity and the sub-library which need to be overhauled outside after being disassembled, wherein the evaluation type is 'to-be-overhauled part', and the overhauling source is 'outsourcing-not-original' or 'outsourcing-original';
3. Engineering change sub-module
The engineering change sub-module is applied to the closed-loop requisite repair module and the even-change couple repair process and is used for solving the synchronous change of the follow-up execution problems caused by the change of the design and the process scheme, and the specific operation steps of the engineering change sub-module about engineering change principles and engineering change are carried out in the following manner:
the batch modification notification list is realized through the modification task list, and the batch modification notification list is realized on a batch modification notification list interface;
engineering change:
after the task list group package is planned, maintenance object, project and team information are not allowed to be modified, and other field information is allowed to be modified;
the task list allows any field to be modified before the notification bill is generated, and does not allow maintenance objects, projects, maintenance level rules, location rules, maintenance levels, projects, settlement WBS, product serial numbers, part numbers, production lines and work bills to be modified after the notification bill is generated and the notification bill is cancelled; after the work order is generated, material codes on the notification order are not allowed to be modified, the material requirement is cancelled, the material requirement quantity is required to be changed into 0, and material requirement rows are not allowed to be deleted; on the notification sheet and the task list, the component requirement information is allowed to be modified in any case, wherein the component requirement information comprises the number of components, the sub-library, the evaluation type, the overhaul source and the plant-level route;
Batch modification of notices by modifying task lists
After the fixed inspection process is imported, inquiring through a task list interface in a system, after confirming that the error is not found, generating a fixed inspection notice through a task list through a 'turning maintenance notice' button, modifying any process data on the generated notice, and modifying the notice in batches through modifying the task list;
batch modification of notification sheets
The data problem on the notification bill is modified, and the notification bill to be modified can be searched according to a certain search condition by modifying the notification bill interface in batches;
single modification notice
If the engineering change range is less, the corresponding overhaul notification can be found by singly modifying the notification, and the process data is modified;
cancel function
For a notification sheet in a state of "created", the system does not allow deletion operations to be performed on its process line and material line, and thus the deletion effect is achieved by canceling the function, and cancellation of the notification sheet includes three parts: the method comprises the steps of canceling a whole notice, canceling a working procedure line and canceling a material line;
notice process line cancellation
If the process line is canceled, the material line under the corresponding process line is also canceled, and the number of the material demand summarizing platforms is also changed to 0;
For the procedure line which does not generate the work order or has the work order state of not being issued, the corresponding work order can be cancelled, but if the procedure line has the work order generated and the work order state is the states of 'issued', 'reported' and the like, the procedure line cannot be cancelled directly, and the procedure line can be cancelled after the work order is cancelled
The cancelled procedure line can be cancelled, so that the procedure line can regenerate a work order, and the corresponding material line can be retransmitted to the material demand summarizing platform;
material line cancellation
After the material row is canceled, the corresponding quantity of the material demand summarizing platform is 0, the same material row can be canceled, and the material row is thrown to the material demand summarizing platform again after being canceled;
5. single piece management module
The single management module related to the embodiment comprises a query module and a module matched with the original data; the query module is specifically as follows:
querying a whole vehicle task list: according to the maintenance schedule of 'product model', 'maintenance level', 'maintenance times', 'materials' matched task list (four fields are completely matched, the task list state is not cancelled/closed, and the corresponding task list cannot be completely matched according to the four fields, if the corresponding task list cannot be found according to the 'maintenance times', other task lists with empty matched 'maintenance times') are acquired, task list information is displayed on a 'maintenance level maintenance management interface', and the task list information is displayed from the suggested task list;
Inquiring a task list corresponding to maintenance level overhaul materials: matching the maintenance level management material interfaces according to the maintenance schedule of 'product model', 'maintenance level', 'maintenance times', and acquiring a maintenance level management 'material code' list (the maintenance times are unnecessary filling fields, if a material list corresponding to the maintenance times cannot be found according to the maintenance schedule, and the material list with empty maintenance times is acquired); according to the overhaul plan 'product model' and the above material codes, the history information (overhaul information summarizing interface) in the unit configuration corresponding to the specific material in the unit configuration is obtained, and mainly comprises the following fields: the method comprises the steps of (1) matching a task list (priority level 1) according to the data, wherein the maintenance plan product model, the maintenance level, the maintenance frequency, the material model, the maintenance level, the maintenance frequency, the last maintenance date, the next maintenance level, the maintenance frequency and the expiration date are displayed on a maintenance level maintenance management interface (displayed on a left measurement part of a suggested task list), the maintenance plan product model, the maintenance level, the maintenance frequency, the material model and a query task list (four fields are completely matched, the task list state is not cancelled/closed, the task list type is 'fixed check', the four fields cannot be completely matched, if the corresponding task list cannot be found according to the maintenance frequency, the other task lists matched with the maintenance frequency are empty are obtained, task list information is acquired and displayed on the maintenance level maintenance management interface, and the display is started from the suggested task list;
According to the above data matching task list (priority level 2), maintenance level, maintenance times, material codes, query task list (three fields are completely matched, the task list status is not cancelled/closed, the task list type is "stock maintenance", the three fields cannot be completely matched, if the corresponding task list cannot be found according to the "maintenance times", the other task list with the matching "maintenance times" being empty is not found), the task list information is obtained, displayed on the "maintenance level maintenance management interface", displayed from the suggested task list,
after the information inquiry is completed, displaying the information on a maintenance-division level maintenance management interface,
the matching module with the original data is specifically as follows: in the process of re-inquiring the data, if the maintenance-level maintenance management interface already exists, the new inquiry data and the original data are associated and displayed, and the new inquiry data and the original data are matched: the maintenance planning interface (product model, product serial number, maintenance level, maintenance times), the maintenance level maintenance management interface (maintenance level material, position, product serial number, actual task list, notice number) and then the notice is issued.

Claims (3)

1. A high-end equipment manufacturing process data management system, which is characterized in that the main structure comprises: a login module, a process file management module, a necessary repair and replacement module, a couple repair and replacement module and a single management module; the login module comprises an account login module, the account login can be realized through the account login module, the process file management module, the process network maintenance sub-module, the necessary repair and replacement module, the even repair and replacement module and the single management module can be managed after the login, and the specific operation steps of managing the process files are as follows:
1. Process file management
The file entering system in the process file management module comprises an online editing module and a file attachment importing module of a file in the process file management module; when an online editing module is operated, the necessary filling content is represented by fixed colors, white represents the selected filling field, and the field is maintained in sequence in the module; after entering the document item information, ejecting the document attachment importing module through an uploading button, selecting an uploaded attachment in the ejected document attachment importing module through a browsing button, and closing a page through the uploading button after the selection is completed;
after uploading the attachment, the state of the stored document item is "sketched", check boxes at the current end of the document item to be submitted are checked, the document item is stored in the system through a "submit" button, and the corresponding state is changed into "submitted" at the moment; the validity of the document is confirmed by operators of various departments, wherein submitted document entries are not allowed to be modified any more, and if the document in a submitted state is to be modified, the document is realized through a new version number operation;
Modifying the document in the submitted state: firstly, checking a document item to be modified, automatically generating a new item by a system through a new version number button, modifying a field and uploading a new document by default, wherein the information of the item is the same as that of the original item;
the submitted document is further checked: to ensure that the uploaded document matches the document type content, further verification of the submitted document is required; after entering a document checking and processing module, a document affirming person searches for a document item in a submitting state according to a known condition through a searching module; the default here is to find out the document entry in the "committed" state; selecting a document item to be checked and confirmed, checking a check box in front of the item, and changing the state into checked after the approval by an approval button;
the process file management module can also be used for carrying out association application, a department employee with general viewing authority enters a query window through the document query module, the search condition is input to find out the document items to be viewed, the corresponding document items are selected, and the document accessories are downloaded through the download button;
2. Maintenance of process networks
Performing process network maintenance through a process network maintenance submodule, wherein the process network maintenance submodule comprises online creation of a process network, introduction of the process network, maintenance of sequence before and after working procedures and determination of working procedure interval time, and finally forming a network topological graph, and performing the process network maintenance comprises the following steps of:
before technological network data is imported into the system, maintaining standard text codes of fixed inspection and even inspection of each maintenance level; before a process network is imported into the system, relevant personnel in technical departments supplement detailed process network data according to a process network template provided by the system, and finally the process network data are imported in batches; after the maintenance of the process network is finished, an intuitive process network report and a network topological graph are exported for operators to check the integrity and correctness of the data;
3. maintenance of necessary repair and replacement
Maintenance is carried out by replacing the module with a necessary repair; the necessary repair and replacement module comprises sub-modules including creation, submission and delivery of task templates, and the specific maintenance operation steps are as follows:
s1, template creation
When the parts are overhauled, notification of overhauling is needed; the notification of maintenance mainly comprises the content of the regulation requiring maintenance and the content of the combination of maintenance level and modification; when the task list is arranged, the front-back corresponding relation should be noted, the distribution of the working procedure and the components should be accurate, and the network and each main data should exist;
Four rows of options are arranged in the title bar after entering the task list creation module, are respectively general data, procedures, components and task lists, and are operated by selecting the options; the task list is uploaded by the must-change repair module, the task list is maintained according to the requirement, the table is uploaded, and the task list is uploaded after the task list is maintained according to the table; after the uploading of the form is completed, the system can check the correctness of the form content, and if the input is correct, the form content is directly stored; if the input error system prompts the wrong data line item number and the error reason, the task list can not be uploaded for the second time after being uploaded successfully, otherwise, repeated data can be produced; the specific content of the operation of each option is as follows:
clicking a general information tab to fill in a task list number, wherein the task list number is the same as the process, component and function position number and can be self-compiled, the number is different from the task list number finally generated, and the task list number can be maintained according to personal habits, but the task list numbers under the same task are required to be consistent;
filling in a task list description: i.e. this work is described briefly;
clicking factory information to select;
click model: selecting a suitable model;
Single click service level: 1-5 stages of repair are selected;
the maintenance mode is selected by clicking the maintenance mode:
clicking a technical object: selecting by clicking according to the type of the technical object applicable to the corresponding task;
clicking a process file: if the task has a supported process file, filling;
clicking a production line: selecting an applicable production line or a default production line;
setting a planner group;
setting a procedure tab: through the procedure, the page is switched to a procedure column, and data are arranged according to the procedure column requirements; the method comprises the following steps:
setting a task list number: must be consistent with the maintenance of a generic data tab, otherwise, cannot be correlated;
setting a serial number: the task list is provided with the process numbers of the tasks, namely the tasks are required to be completed in a plurality of processes, the processes are required to be listed in a plurality of processes, and the tasks can be numbered by themselves, and four-bit serial numbers are selected;
setting a working center: i.e., construction teams, which include, by single click selection: the middle and small parts are cleaned, overhauled and fall into a working class, and the final assembly is debugged into a working class 1;
setting a standard text code: the standard text codes in the network are used for specifying the specific working time of working procedures, the standard text codes correspond to the working procedures through single click selection, and if ten standard text codes exist in the same process file, the number of the sequence number options is ten;
Setting work and units: i.e., the man-hour time required for a team to perform the job;
setting component tabs: the components, i.e. the material information, items that have to be maintained are: coding, serial numbers, distribution numbers, components, quantity, factories, necessary-replacement marks, necessary-inspection marks, overhaul sources, recoil information and routes; the task list number is consistent with the general data and the sequence number in the sequence tab, the sequence number is consistent with the sequence number in the sequence, each task list sequence tab has a plurality of sequence number component tabs, a plurality of sequence numbers are also required in each sequence number component tab, and the distribution number represents a plurality of components in the sequence of the task;
setting a material code of the component, wherein the material code can be inquired by clicking and selecting the material code and writing "% of material names"% "into the material description;
setting factory information: selecting by clicking;
the set number is as follows: the amount of this material required in this process;
setting an inventory: representing a material delivery point;
setting an overhaul source: when the project material is subjected to outsourcing maintenance or is returned to a warehouse, the processing state comprises irrelevant, outsourcing original packaging, outsourcing non-original packaging, self-repairing non-original packaging, technical sealing and scrapping options;
Setting an evaluation type: when the project material is subjected to outsourcing maintenance, the general material quantity is subjected to negative number processing in the warehouse-out maintenance process, the evaluation type is the old piece to be repaired, the material evaluation type is the old piece to be repaired when the material is taken after the repair, the turnover piece can be taken, and if the general default conventional new piece is not filled;
setting recoil, reservation and purchase: the two items of data are automatically carried out by the system;
setting a process notification number, wherein the process notification number is filled in, and a task list can be issued after a notification system issues a notification;
setting purchase service, wherein a special type, namely purchase service, exists in the component: when a process is selected to be a specially defined process, the component code needs ZS header code, and the item class is N;
s2, submitting and delivering
Submitting and issuing a task list, wherein the task list is a task template generated by associating process files, working procedures, functional positions and components, and the task list is used for merging the process files according to one working procedure, and specifically comprises the following steps of:
setting head-up data: writing a process file in one process in one row of data;
setting process data: a plurality of process files correspond to one process;
setting component data: one process corresponds to a plurality of process files, and all components under the process;
The method has the advantages that the number of data preparation can be reduced, the accuracy is improved, the task template is in a 'created' state, the product serial number and the item are input into the popped interface through the 'processing' button, the task list can be converted into the process data of the check notification list, or the product serial number which is already issued is changed, and the notification list data generated by the task list is checked in the batch modification interface;
4. even repair and replacement module
Performing even inspection notification creation, submission, execution and engineering change through an even repair and exchange module; the method comprises the following steps:
a1 even detection notification creation
When a conventional overhaul notification sheet is issued, determining an existing vehicle overhaul service through the fault overhaul which occurs during internal execution; opening a conventional overhaul notice, selecting 'even inspection' of the notice type, inputting a planner group, and jumping to a working order line to input fault overhaul process data: maintenance level rules do not need maintenance, and site rules default to "in-company-out-of-factory"; entering a product serial number, a part number, a maintenance object, a project or a settlement WBS; inputting the material requirements used for overhauling the process, wherein the material requirements comprise disassembly or assembly of materials and auxiliary materials; maintaining an evaluation type and a maintenance source, and designating that the material belongs to a grade range of outsourcing maintenance or self-maintenance and maintenance; after the process data is input, inputting a process notification list number, and generating an overhaul work list executed in a factory through submitting; the in-plant execution technology-enhanced overhaul service comprises a technical improvement of a specific maintenance level and a technical improvement overhaul service crossing the maintenance level;
Entering the requirement of a work order component: selecting part codes, quantity, sub-stock, assessment type, factory level route and maintenance source, if the part starts the sequence product serial number, selecting the disassembly position of the part, warehousing the part across the factory to the factory line Bian Ku at the beginning of 1, and also taking the part from the sub-stock; opening an overhaul notice interface, and entering an overhaul notice input interface through an overhaul notice or through an opening button;
entering work orders and component requirements, wherein:
the first procedure: the execution department is detached and installed, and the maintenance object is the upper layer configuration position which needs to be provided for the maintenance of the execution department;
first process component requirements: negative lines are used for disassembling old pieces, and an executive department logistics warehouse is entered; the old parts are installed and repaired in positive lines, and the old parts are retrieved from an executive department logistics warehouse; if the material starts the serial number control, the disassembly and installation positions of the material need to be selected;
and a second procedure: the executive department overhauls, and the maintenance object is a configuration position for overhauling by the executive department when the executive department moves back to the warehouse;
second process component requirements: the positive lines of old parts to be repaired are picked up from the logistics warehouse of the executive department; negative number returning repairing old parts are put into an executive part gate warehouse; by submitting, the notification status is changed from "proposed" to "created" by the save and submit button; the existing outsourcing overhaul construction scheme comprises service material purchasing requirements, service purchasing reception,
Opening a conventional overhaul notice, selecting 'even inspection' of the notice type, inputting a planner group, and jumping to a working order line to input fault overhaul process data:
maintenance level rules do not need maintenance, and in the process of fault maintenance, certain materials are failed, the materials are defaulted to be in factories, and the defaults are applicable to the maintenance level of the current product in the company;
the method comprises the steps of inputting a product serial number, a part number, a maintenance object, a project or settlement WBS, inputting a component requirement needing to be overhauled outside, wherein the evaluation type is 'to-be-overhauled part', and the overhauling source is 'outsourcing-not-original' or 'outsourcing-original'; designating a disassembly and assembly position;
opening an overhaul notification sheet:
entering an overhaul notice input interface through an overhaul notice or an open button, and selecting a planner on the head information, wherein the type of the overhaul notice is 'even inspection';
entering working orders and component requirements:
manually inputting a work order for disassembling the commission external part, wherein the information required by the work order is as follows: the operation content, the work center, the standard text code, the maintenance level, the maintenance object and the like are determined by the determination button;
entering the requirement of a work order component:
selecting a material code of a commissioned external part, wherein the number of the material code is negative, a sub-inventory is a maintenance warehouse with a logistics beginning, a factory-level route is a maintenance warehouse with a supplier, an evaluation type is a piece to be repaired, a maintenance source is a commissioned external-original package or a commissioned external-non-original package, if sequence product serial number management is started, disassembly position information is required to be input, the code of the commissioned external part which is purchased and repaired is selected, the number of the material code of the commissioned external part is positive, the sub-inventory is the maintenance warehouse with the logistics beginning, the factory-level route is the logistics beginning, the evaluation type is a piece to be repaired, the maintenance source is empty, and if sequence product serial number management is started, the disassembly position information is required to be input;
Submitting an overhaul notice;
a2, commit and execution
After submitting the overhaul notification bill, the system can generate an overhaul work bill;
the system synchronizes the material demand details to the enterprise resource management system after running the synchronization request, a purchasing department checks the material demand summary information of outsourcing repair at a purchasing demand summary function interface of the enterprise resource management system, the purchasing department creates corresponding purchasing contracts and purchasing orders according to the material demands summarized by the enterprise resource management system, then the purchasing department schedules by a branch factory, executes work orders and report work, and the summary notice is input, so that an engineering department can conveniently use the summary notice to issue a detail notice, and the input data content is similar to the even inspection type notice;
recording overhaul notices, wherein the types of notices are summarized, and the product serial numbers or the part numbers are multiple columns or multiple numbers; the method comprises the steps of inputting a working procedure line and a maintenance object, according to a material code and a position, obtaining the position of the maintenance object to be selected specifically, wherein the selected position is used as a disassembly position or a maintenance object, and meanwhile, all the positions of the material are filled by using a button of a filling position, and the position selection is completed through determination; recording a material demand line and a disassembly and assembly position, if the disassembly and assembly position is selected, automatically bringing the material disassembly and assembly position to the material demand line, and maintaining other fields, wherein if the maintenance object is selected, the disassembly and assembly position is manually selected; the old piece after being disassembled in the factory is put back into the warehouse, the next loading product is installed for continuous use, and the automatic system switching evaluation type is that the old piece is repaired; opening a conventional overhaul notice, selecting 'even inspection' of the notice type, and recording into a planning personnel group; skipping to a working order line to input fault maintenance process data:
The maintenance level rule does not need maintenance, the place rule defaults to 'in-company-out-of-factory', the product serial number, the part number, the maintenance object, the project or the settlement WBS are input, the material requirement used for overhauling the procedure is input, the evaluation type is 'to-be-overhauled part', and the overhauling source is 'disassemble old part to evaluate type'; opening an overhaul notification sheet, entering an overhaul notification sheet input interface through the overhaul notification sheet or through an opening button, and selecting a planner on the head information, wherein the type of the overhaul notification sheet is 'even check'; repairing and scrapping materials, scrapping spare parts can occur in the repairing process, and new spare parts are required to be taken for repairing and overhauling in the repairing process; the method comprises the steps that scrapped materials are found in the process of overhauling business in a branch factory, after scrapped materials are confirmed by a quality inspection department, the serial numbers, the product serial numbers, the part numbers of the scrapped materials of a notification engineering department and the material supplementing process of the engineering department are recorded in the notification; opening a conventional overhaul notice, selecting 'even inspection' of the notice type, and recording into a planning personnel group; skipping to a working order line to input fault maintenance process data:
maintenance level rules do not need maintenance, and site rules default to "in-company-out-of-factory";
The product serial number, the part serial number, the working center and the standard text code are recorded, the scrapped product serial number is recorded in the field of the lower-layer sequence product serial number, the system can automatically retrieve the upper-layer configuration product serial number, and the product serial number is filled into the maintenance product serial number, and the project is recorded or the WBS is settled; inputting detail information of materials to be scrapped on a component row, wherein the detail information comprises the quantity, in particular to a sub-warehouse out and a factory-level route; the self-made part demand sources are as follows: the system comprises a storage part, an after-sales three-pack part and a work order requirement part, wherein the after-sales three-pack part is used for generating an overhaul notice sheet executed by an after-sales service station and generating an in-factory overhaul work order; the first three kinds of requirement information are transmitted to an enterprise resource management system self-built table, the self-made part requirements in the self-built table are checked regularly by a branch factory, and a new self-made work order is issued according to the requirements; the last work order requirement is transmitted to an enterprise resource management system, and a new work order is generated in the enterprise resource management system;
unscheduled reserve self-service:
after a conventional overhaul notice sheet is opened and head-up information is recorded, checking a storage check box on a single file of the notice sheet, and automatically filling the settlement of the storage by the system; the method comprises the steps of inputting self-made part requirements to be stored, enabling technical departments to send out fixed inspection, even inspection, technical addition and modification and fault notification sheets to be carried out on the outside of a factory, generating a work sheet through package planning, enabling outside personnel to send out materials based on a work Shan Di signboard, enabling outside personnel to carry out the work sheet, and enabling old parts in the execution process to be put in storage and returned into the factory through the old parts to finish self-repair and outsourcing;
Issuing an overhaul notification sheet and an overhaul maintenance notification sheet:
the system records overhaul/maintenance history records and production date information of materials required by regular overhaul/maintenance, calculates the next overhaul/maintenance date according to the overhaul/maintenance period and history records of the materials, generates a bill of materials of parts to be overhauled/maintained in the next month at the end of each month, firstly distributes and settles WBS (space division service) to the materials of the maintenance list to be overhauled/maintained by a public institution, inspects and approves the maintenance list, and then carries out overhaul/maintenance on the bill of materials by a technical department after the public institution is inspected and approved, generates an overhaul notification list for the materials carried out in the factory, writes the overhaul notification list into a demand summarizing platform by the system after the maintenance list is inspected and approved by the materials carried out by a supplier, and creates a purchase order of stock overhaul/maintenance by an enterprise resource management system;
test
The engineering department takes new parts from the logistics warehouse to make experiments at irregular intervals, whether the spare parts are qualified or not can be driven on, an inventory maintenance notice is opened, on a working instruction row, the material codes, the quantity, the working center and the standard text codes which need to be tested are recorded, and on the assembly requirement, the material codes, one positive and one negative, and other material codes which can be used for experiments are recorded to carry out maintenance outsourcing maintenance; in the overhaul process of the inventory overhaul service, the condition that the disassembled part is sent out for overhaul exists; opening an inventory part overhaul notification bill, wherein the type of the work bill is selected as 'inventory part overhaul', and the material codes, the quantity, the working center and the standard text codes which need overhaul and maintenance are recorded on a working instruction line; on the assembly line, inputting the material codes, quantity and sub-library which need to be overhauled outside after being disassembled, wherein the evaluation type is 'to-be-overhauled part', and the overhauling source is 'outsourcing-not-original' or 'outsourcing-original';
A3, engineering change
Applying an engineering change sub-module to carry out engineering change; after the task list group package is planned, maintenance object, project and team information are not allowed to be modified, and other field information is allowed to be modified; the task list allows any field to be modified before the notification bill is generated, and does not allow maintenance objects, projects, maintenance level rules, location rules, maintenance levels, projects, settlement WBS, product serial numbers, part numbers, production lines and work bills to be modified after the notification bill is generated and the notification bill is cancelled; after the work order is generated, material codes on the notification order are not allowed to be modified, the material requirement is cancelled, the material requirement quantity is required to be changed into 0, and material requirement rows are not allowed to be deleted; on the notification sheet and the task list, the component requirement information is allowed to be modified in any case, wherein the component requirement information comprises the number of components, the sub-library, the evaluation type, the overhaul source and the plant-level route;
the engineering change sub-module is applied to the closed-loop requisite repair module and the even-change couple repair process and is used for solving the synchronous change of the follow-up execution problems caused by the change of the design and the process scheme, and the specific operation steps of the engineering change sub-module about engineering change principles and engineering change are carried out in the following manner:
The batch modification notification list is realized through the modification task list, and the batch modification notification list is realized on a batch modification notification list interface;
after the fixed inspection process is imported, inquiring through a task list interface in a system, after confirming that the error is not found, generating a fixed inspection notice through a task list through a 'turning maintenance notice' button, modifying any process data on the generated notice, and modifying the notice in batches through modifying the task list; the data problem on the notification bill is modified, and the notification bill to be modified can be searched according to a certain search condition by modifying the notification bill interface in batches;
single modification notice: if the engineering change range is less, the corresponding overhaul notification can be found by singly modifying the notification, and the process data is modified;
cancel function
For a notification sheet in a state of "created", the system does not allow deletion operations to be performed on its process line and material line, and thus the deletion effect is achieved by canceling the function, and cancellation of the notification sheet includes three parts: the method comprises the steps of canceling a whole notice, canceling a working procedure line and canceling a material line;
if the process line is canceled, the material line under the corresponding process line is also canceled, and the number of the material demand summarizing platforms is also changed to 0;
For a working procedure line which does not generate a working order or has a working order state of not being issued, the corresponding working order is cancelled, but if the working procedure line has generated the working order and the working order state is in the states of 'issued', 'reported' and the like, the working procedure line cannot be cancelled directly, and the working procedure line can be cancelled only after the working order is cancelled
The cancelled procedure line can be cancelled, so that the procedure line can regenerate a work order, and the corresponding material line can be retransmitted to the material demand summarizing platform;
after the material row is canceled, the corresponding quantity of the material demand summarizing platform becomes 0, the same material row can be canceled, and the material row is thrown to the material demand summarizing platform again after being canceled;
5. single piece management
Single management is carried out through a single management module, and the single management module comprises a query module and a module matched with the original data;
the query module operates specifically as follows:
querying a whole vehicle task list: according to the maintenance schedule, the product model, the maintenance level, the maintenance times and the materials are matched with a task list, task list information is obtained and displayed on a maintenance level maintenance management interface, and the task list is displayed from a suggested task list;
Inquiring a task list corresponding to maintenance level overhaul materials: matching the maintenance level management material interfaces according to the maintenance plans of 'product model', 'maintenance level', 'maintenance times', and acquiring a maintenance level management 'material coding' list; according to the maintenance plan 'product model' and the above material codes, acquiring the history information in the unit configuration corresponding to the specific material in the unit configuration, mainly comprising the following fields: the method comprises the steps of (1) matching a task list according to the data, checking the model of a planned product, the maintenance level, the maintenance frequency, the material code, inquiring the task list, acquiring task list information, displaying the task list information on a 'maintenance level checking management interface', and displaying the task list from a suggested task list;
according to the data, matching task list, maintenance level, maintenance times, material codes, inquiring task list, obtaining task list information, displaying on maintenance level maintenance management interface, starting display from suggested task list,
After the information inquiry is completed, displaying the information on a maintenance-division level maintenance management interface,
the matching module with the original data is specifically as follows: in the process of re-inquiring the data, when the maintenance-level maintenance management interface already exists, the new inquiry data and the original data are displayed in a correlated way, and the new inquiry data and the original data are matched: and the maintenance planning interface and the maintenance level maintenance management interface are used for issuing notification sheets.
2. The high-end equipment manufacturing process data management system according to claim 1, wherein the process file management module queries documents that are "checked" as a default condition, and the craftsman associates the notification ticket and task list with the documents already in the system by uploading the function of the attachment to the notification ticket or task list module.
3. The high-end equipment manufacturing process data management system of claim 1, wherein the modified method comprises two associated documents: directly associating the document to the notice or task list through an upload button;
and secondly, directly associating the documents uploaded and checked by the document uploading module, checking the previous check boxes of the documents in the associated system, selecting the corresponding document types and document numbers, and storing, wherein the associated documents are selected or not selected by the corresponding process lines.
CN201911333375.9A 2019-12-23 2019-12-23 High-end equipment manufacturing industry process data management system Active CN111091352B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911333375.9A CN111091352B (en) 2019-12-23 2019-12-23 High-end equipment manufacturing industry process data management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911333375.9A CN111091352B (en) 2019-12-23 2019-12-23 High-end equipment manufacturing industry process data management system

Publications (2)

Publication Number Publication Date
CN111091352A CN111091352A (en) 2020-05-01
CN111091352B true CN111091352B (en) 2023-07-14

Family

ID=70396539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911333375.9A Active CN111091352B (en) 2019-12-23 2019-12-23 High-end equipment manufacturing industry process data management system

Country Status (1)

Country Link
CN (1) CN111091352B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112749879B (en) * 2020-12-18 2022-03-15 成都飞机工业(集团)有限责任公司 Engineering global change method based on cooperation environment of remote place factory
CN114661731A (en) * 2020-12-22 2022-06-24 中核核电运行管理有限公司 Method for automatically updating nuclear power plant functional equipment group data
CN112700348A (en) * 2021-01-04 2021-04-23 长鑫存储技术有限公司 Process data processing method and device, storage medium and electronic equipment
CN113032858A (en) * 2021-03-24 2021-06-25 山东英信计算机技术有限公司 Server assembly method, system and device
CN113378529B (en) * 2021-06-25 2022-12-06 东风柳州汽车有限公司 Process documentation method, device, equipment and storage medium
CN116167591B (en) * 2023-04-19 2023-06-30 北京国信会视科技有限公司 Scheduling method, system, equipment and medium based on process network
CN117252358B (en) * 2023-09-07 2024-05-17 云智汇(武汉)科技服务有限公司 Mold management system and method

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140081697A1 (en) * 2003-05-22 2014-03-20 P&RO Solutions, Inc. Planning and scheduling tool assistant
US8170893B1 (en) * 2006-10-12 2012-05-01 Sergio J Rossi Eliminating sources of maintenance losses
CN102419830A (en) * 2010-09-27 2012-04-18 周小丹 Workshop resource planning system
US20120290343A1 (en) * 2011-05-13 2012-11-15 Bradley William R Work Order Audit System
CN103150624B (en) * 2013-02-06 2016-03-30 北京化工大学 Based on the equipment control supervisory system of process chart
US20150032482A1 (en) * 2013-07-29 2015-01-29 Independent Mitigation and Cleaning/Conservation Network, Inc. Claim summary and claim watch system and method
CN108460538B (en) * 2018-03-23 2021-05-14 国家深海基地管理中心 Manned submersible operation and guarantee informatization management system
CN108491939A (en) * 2018-03-28 2018-09-04 青岛河澄知识产权有限公司 A kind of Transit Equipment Intelligent Maintenance management method
CN110232526A (en) * 2019-06-17 2019-09-13 四川长虹电器股份有限公司 A kind of factory technics management system and method
CN110580026A (en) * 2019-09-18 2019-12-17 工业云制造(四川)创新中心有限公司 intelligent manufacturing MES system

Also Published As

Publication number Publication date
CN111091352A (en) 2020-05-01

Similar Documents

Publication Publication Date Title
CN111091352B (en) High-end equipment manufacturing industry process data management system
CN107831750B (en) IMES intelligent manufacturing execution system
CN110580026A (en) intelligent manufacturing MES system
CN113780990A (en) Cloud intelligence manufacturing platform based on artificial intelligence production management mode and processing method
WO1999033016A9 (en) Integrated business-to-business web commerce and business automation system
CN112418540A (en) Intelligent MES real-time data analysis system
CN111784099B (en) Airplane guarantee equipment project delivery management system and method
CN111353787A (en) Equipment comprehensive guarantee system based on cloud platform
KR20210082919A (en) Production and logistics ERP automation system by linking and using customer information
CN113469579A (en) Production and assembly project progress quality control system
CN116542624A (en) Ship whole-flow management data communication and early warning system
CN115587810A (en) Maintenance management system, management method, and computer storage medium
US20050060243A1 (en) Method for managing tools in a power plant service environment
JP5056962B2 (en) Sales production delivery system and sales production delivery method for steel strip products
CN107506860A (en) System and implementation method are realized in lean production plan
CN112348477A (en) Production management system for medical instrument factory and use method thereof
CN113592611A (en) Integrated management system for centralized acquisition and supervision of garbage incineration enterprises
Gautam et al. Comparison of JIT with other industrial production approaches: a review
Hamilton Cost management
CN114118925B (en) Defective product material management control system and method
CN118014503A (en) Textile fabric production management system
Gil-Goyzueta et al. Process Improvement Proposal Storage to Increase the Service Level Using Lean Warehousing in Commerce Companies
JP2002366610A (en) Manufacture information management structure and method therefor
JP2001117983A (en) Cost managing device and recording medium
CN116862386A (en) Industry interconnection platform system based on internet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant