CN110851934B - Substation SSD file generation method - Google Patents
Substation SSD file generation method Download PDFInfo
- Publication number
- CN110851934B CN110851934B CN201911091023.7A CN201911091023A CN110851934B CN 110851934 B CN110851934 B CN 110851934B CN 201911091023 A CN201911091023 A CN 201911091023A CN 110851934 B CN110851934 B CN 110851934B
- Authority
- CN
- China
- Prior art keywords
- interval
- main wiring
- file
- instance model
- ssd
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0876—Aspects of the degree of configuration automation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
Abstract
The invention relates to a generation method of an SSD file of a transformer substation, which comprises the following steps: exhausting all main wiring modes of the transformer substation and a plurality of interval information corresponding to each main wiring mode; constructing an interval instance model file according to all main wiring modes of the transformer substation and a plurality of interval information corresponding to each main wiring mode; each interval instance model file is determined according to the interval type, the interval maximization equipment and the main wiring mode of the interval; and acquiring a main wiring mode of the transformer substation for generating the SSD file and related interval equipment, searching a plurality of corresponding interval instance model files according to the main wiring mode, and modifying the interval instance model files according to the interval equipment on the basis of the searched interval instance model files to generate the SSD file. The method only needs to modify the interval instance model file generated in advance, does not need to care the position and the associated attribute of each equipment graphic element, and effectively improves the generation efficiency of the SSD file.
Description
Technical Field
The invention relates to a generation method of an SSD file of a transformer substation, and belongs to the technical field of relay protection of power systems.
Background
The substation configuration language (Substation Configuration Language, SCL) is the foundation for realizing the intelligent station, and by using the SCL language to perform unified modeling on the system and equipment in the intelligent station, different service users can conveniently know the organization structure, the function distribution and the equipment functions and the accessible information model of the whole intelligent station system. SSD (System Specification Description) is a primary system specification description file of the intelligent station conforming to the SCL grammar, can describe a primary system structure, association of secondary equipment and the like, and has important roles in realizing automatic configuration and some advanced applications of the intelligent station. For example, the automatic configuration function of communication parameters and virtual terminal connection lines in the intelligent station can be realized through SSD, and the automatic generation of a system wiring diagram of a monitoring system and even a scheduling end can be realized.
Currently, research into SSDs is mainly focused on automatic mapping from SSD files, while less is involved in how to generate SSD files themselves. For example, chinese patent application documents with application publication numbers CN106933942a and CN106485599a respectively disclose a method for automatically mapping a primary system wiring described based on a substation specification and a method for visually displaying an SSD configuration file of an intelligent substation, which describe a method for displaying an SSD file in a graphic and tree structure respectively, but both the methods are based on existing SSD files and then visually displaying the SSD files, so as to achieve the effect of friendly interpretation of the SSD files, and how to generate the SSD files is not described.
Compared with visual display of SSD files, how to efficiently generate SSD files is a basic work, and the current method for generating SSD files depends on drawing tools or manually dragging moving elements, so that the generating efficiency of SSD files is low. For example, chinese patent document with grant bulletin number CN106055786B discloses a graphical SSD configuration method based on an IED template, which uses an IEC61850 model structure or a similar tree hierarchy structure as a data structure of an in-station library for a current intelligent substation, and includes graphical engineering configuration tools, first drawing primary devices and electrical connection relations thereof in the SSD, then drawing secondary device primitives in the substation by using primitive functions of the graphics tools, associating the secondary device primitives with corresponding models thereof to form an IED template, and further forming a template library of the IED. And finally, when carrying out secondary association of the SSD, directly carrying out the secondary association on primary equipment of the SSD and an electric connection graph thereof in a form of dragging the IED template, and ensuring intuitive and convenient configuration. However, the method still adopts a drawing tool to carry out configuration on the SSD configuration, mainly aims at improving the efficiency of the association of the primary equipment and the secondary equipment, and does not fundamentally improve the efficiency of SSD generation.
Disclosure of Invention
The invention aims to provide a generation method of an SSD file of a transformer substation, which is used for solving the problem that the existing SSD file generation method is low in efficiency.
In order to solve the technical problems, the invention provides a method for generating SSD files of a transformer substation, which comprises the following steps:
exhausting all main wiring modes of the transformer substation and a plurality of interval information corresponding to each main wiring mode;
constructing an interval instance model file according to all main wiring modes of the transformer substation and a plurality of interval information corresponding to each main wiring mode; each interval instance model file is determined according to the interval type, the interval maximization equipment and the main wiring mode of the interval;
and acquiring a main wiring mode of a transformer substation for generating the SSD file and related interval equipment, searching a plurality of corresponding interval instance model files according to the main wiring mode, and modifying the interval instance model files according to the interval equipment on the basis of the searched interval instance model files to generate the SSD file.
The beneficial effects of the invention are as follows: and generating an interval instance model file of all the main wiring modes of the transformer substation and corresponding interval maximizing equipment in advance through exhausting the main wiring modes of the transformer substation and the corresponding intervals. When an SSD file of a certain transformer substation is required to be generated, only the main wiring mode of the transformer substation and related interval equipment are required to be known, and the interval instance model file is modified, so that the SSD file can be quickly generated without concern about the position and the associated attribute of each equipment graphic element, and the generation efficiency of the SSD file is effectively improved.
Further, in order to reliably obtain all the main wiring modes of the transformer substation and the interval information corresponding to the main wiring modes, all the main wiring modes of the transformer substation and a plurality of interval information corresponding to each main wiring mode are exhausted according to engineering examples.
Further, in order to modify the interval instance model file to quickly obtain the SSD file of the substation, the process of modifying based on the found interval instance model file includes: and combining and cutting the searched interval instance model files.
Drawings
Fig. 1 is a flowchart of a method of generating a substation SSD file of the invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be further described in detail with reference to the accompanying drawings and specific embodiments.
The embodiment provides a method for generating an SSD file of a transformer substation, and a corresponding flow chart is shown in FIG. 1, and the method comprises the following steps:
(1) And (5) exhausting all main wiring modes of the transformer substation and a plurality of interval information corresponding to each main wiring mode.
Based on the exhaustion of the main wiring mode and the interval of the transformer substation, the wiring mode and the interval division are relatively fixed, and all the main wiring modes of the transformer substation and corresponding multiple interval information can be acquired by referring to the existing method or according to engineering examples. For example, for a substation, a main wiring mode and information of a plurality of intervals corresponding to the main wiring mode are acquired.
(2) And constructing an interval instance model file according to all the main wiring modes of the transformer substation and a plurality of interval information corresponding to each main wiring mode.
Each interval instance model file is determined according to the corresponding interval type, the maximizing equipment of the interval and the main wiring mode of the interval. The interval instance model file herein refers to a model file described in SCL syntax that contains interval types and interval device maximization configurations, for example, an instance model file for a certain line interval is as follows:
(3) And acquiring a main wiring mode of the transformer substation for generating the SSD file and related interval equipment, searching a plurality of corresponding interval instance model files according to the main wiring mode, and modifying the interval instance model files according to the interval equipment on the basis of the searched interval instance model files to generate the SSD file.
When a certain transformer substation needs to generate an SSD file, the position and the associated attribute of each equipment graphic element are not required to be concerned, only the wiring mode of primary equipment and all interval and interval equipment are required to be provided, the interval instance model file generated in the step (2) is modified, and the modification process comprises combination and cutting, so that the SSD file is automatically generated. For example, for a primary device interval, the interval type and the primary device type included in the interval type are first determined, then the interval instance model file is matched, and the interval instance model is cut according to the device type in the primary device interval to generate a corresponding interval instance. Corresponding interval instances are generated for all primary device intervals in turn. And finally, combining all the interval examples according to the main wiring mode to generate a final SSD file.
Taking the generation of a 220kV high-voltage side SSD file as an example, the wiring mode of the high-voltage side of the station is double-master double-branch. Obtaining interval configuration under a double-parent double-tapping line mode according to an interval instance model file, for example: including transformer spacing, bus-tie spacing, and branch spacing, etc. And deleting the primary equipment in the interval instance model file according to the primary equipment configuration of the station, and combining all interval instance model files obtained after deletion into a double-parent double-divided SSD file.
Of course, in the above method for generating the SSD file of the substation, if the interval instance model file is already constructed before, that is, the existing interval instance model file is stored, then in the process of generating the SSD file of the substation, the first two steps are not needed, and the existing interval instance model file is directly utilized to generate the SSD file of the substation.
By the method for generating the SSD file of the transformer substation, the SSD file can be generated rapidly, and the problem of low efficiency in the current SSD configuration process is solved effectively.
Claims (3)
1. The method for generating the SSD file of the transformer substation is characterized by comprising the following steps of:
exhausting all main wiring modes of the transformer substation and a plurality of interval information corresponding to each main wiring mode;
constructing an interval instance model file according to all main wiring modes of the transformer substation and a plurality of interval information corresponding to each main wiring mode; each interval instance model file is determined according to the interval type, the interval maximization equipment and the main wiring mode of the interval;
and acquiring a main wiring mode of a transformer substation for generating the SSD file and related interval equipment, searching a plurality of corresponding interval instance model files according to the main wiring mode, and modifying the interval instance model files according to the interval equipment on the basis of the searched interval instance model files to generate the SSD file.
2. The method for generating the SSD file of the transformer substation according to claim 1, wherein all main wiring modes of the transformer substation and a plurality of interval information corresponding to each main wiring mode are exhausted according to engineering examples.
3. The method for generating the SSD file of the substation according to claim 1 or 2, characterized in that the process of modifying on the basis of the found interval instance model file includes: and combining and cutting the searched interval instance model files.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911091023.7A CN110851934B (en) | 2019-11-09 | 2019-11-09 | Substation SSD file generation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911091023.7A CN110851934B (en) | 2019-11-09 | 2019-11-09 | Substation SSD file generation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110851934A CN110851934A (en) | 2020-02-28 |
CN110851934B true CN110851934B (en) | 2023-06-06 |
Family
ID=69600932
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911091023.7A Active CN110851934B (en) | 2019-11-09 | 2019-11-09 | Substation SSD file generation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110851934B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111611257B (en) * | 2020-05-15 | 2022-11-29 | 中国南方电网有限责任公司 | Consistency checking method for main wiring diagram G file and SSD file |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2922664A1 (en) * | 2007-10-23 | 2009-04-24 | Areva T & D Prot & Controle Sa | AUTOMATIC GENERATION METHOD OF AN SSD FILE. |
EP2264967A1 (en) * | 2009-06-17 | 2010-12-22 | ABB Technology AG | Inter-bay substation automation application |
CN102930111A (en) * | 2012-11-12 | 2013-02-13 | 广东电网公司电力科学研究院 | Converting station substation configuration description (SCD) model file generating method and device thereof |
CN105512213A (en) * | 2016-02-03 | 2016-04-20 | 国家电网公司 | Intelligent substation primary-secondary equipment state information visual displaying method based on configuration files and G language |
CN106326450A (en) * | 2016-08-26 | 2017-01-11 | 山东电力工程咨询院有限公司 | Interaction method for realizing SCD (system configuration description) file sign-in and sign-off based on data integration |
CN106485599A (en) * | 2016-10-10 | 2017-03-08 | 国网福建省电力有限公司 | A kind of visual presentation method of intelligent substation SSD configuration file |
CN109583068A (en) * | 2018-11-22 | 2019-04-05 | 国网浙江省电力有限公司嘉兴供电公司 | Secondary system of intelligent substation rapid modeling system and method based on main wiring diagram |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11327114B2 (en) * | 2018-06-15 | 2022-05-10 | State Grid Hebei Electric Power Research Institute | Fully-automatic closed-loop detection method and device for intelligent substation |
-
2019
- 2019-11-09 CN CN201911091023.7A patent/CN110851934B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2922664A1 (en) * | 2007-10-23 | 2009-04-24 | Areva T & D Prot & Controle Sa | AUTOMATIC GENERATION METHOD OF AN SSD FILE. |
EP2264967A1 (en) * | 2009-06-17 | 2010-12-22 | ABB Technology AG | Inter-bay substation automation application |
CN102930111A (en) * | 2012-11-12 | 2013-02-13 | 广东电网公司电力科学研究院 | Converting station substation configuration description (SCD) model file generating method and device thereof |
CN105512213A (en) * | 2016-02-03 | 2016-04-20 | 国家电网公司 | Intelligent substation primary-secondary equipment state information visual displaying method based on configuration files and G language |
CN106326450A (en) * | 2016-08-26 | 2017-01-11 | 山东电力工程咨询院有限公司 | Interaction method for realizing SCD (system configuration description) file sign-in and sign-off based on data integration |
CN106485599A (en) * | 2016-10-10 | 2017-03-08 | 国网福建省电力有限公司 | A kind of visual presentation method of intelligent substation SSD configuration file |
CN109583068A (en) * | 2018-11-22 | 2019-04-05 | 国网浙江省电力有限公司嘉兴供电公司 | Secondary system of intelligent substation rapid modeling system and method based on main wiring diagram |
Non-Patent Citations (4)
Title |
---|
Jia Li 等.Research on SSD Based Automatic Virtual Terminal Connection of Smart Substation.《Proceedings of PURPLE MOUNTAIN FORUM 2019-International Forum on Smart Grid Protection and Control》.2019,全文. * |
刘甜 ; 卢磊 ; 丁沿 ; .基于IEC61850的可视化系统配置器的设计与实现.《电子设计工程》.2015,(第08期),全文. * |
周博曦 ; 孟昭勇 ; 王志臣 ; 姜维 ; 万全 ; .基于CIM的变电站与配电馈线一次接线图自动绘制算法.《电力系统自动化》.2012,(第11期),全文. * |
陈锦山 等.基于间隔的智能变电站SSD建模规范研究与应用.《智能电网》.2017,第5卷(第9期),全文. * |
Also Published As
Publication number | Publication date |
---|---|
CN110851934A (en) | 2020-02-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107402976B (en) | Power grid multi-source data fusion method and system based on multi-element heterogeneous model | |
CN106650161B (en) | Electrical single line diagram mapping method and system based on power grid GIS | |
CN102522819B (en) | Record wave pattern modeling method for fault record device of intelligent transformer substation | |
CN103675600B (en) | Based on the Fault Diagnosis of Distribution Network system and method for topological knowledge | |
CN105701271B (en) | Method for creating and deleting equipment in graph-model hybrid simulation modeling of power system | |
CN101499109A (en) | Power distribution management information graphic system | |
CN106841908A (en) | The visual presentation method of the distribution network failure positioning based on power grid GIS | |
CN110852023B (en) | Automatic generation method and device for primary main wiring diagram of intelligent substation | |
CN104239589A (en) | Method for implementing intelligent analysis system of distribution network business expansions | |
CN110851934B (en) | Substation SSD file generation method | |
CN111309836A (en) | Automatic mapping method and system for single line diagram of 10kV distribution line | |
CN110705885A (en) | Intelligent statistical analysis method for photovoltaic permeability of power grid equipment | |
CN104091034A (en) | Automatic circuit contact graph forming system and method based on graph matching | |
CN104240142A (en) | Version difference highly-visualized exhibition method for intelligent substation secondary system configuration | |
CN104573208A (en) | GIS (Geographic Information System)-based distribution network wiring diagram mapping method | |
CN109830954A (en) | The topological hierarchy recognition methods automatically generated suitable for power grid visualization simulation model | |
CN102868220B (en) | Intelligent comprehensive command decomposition method of master station type comprehensive intelligent error prevention system for power scheduling | |
CN107729007A (en) | A kind of transformer station uniformly monitors the implementation method of graphic editor on-line | |
CN103577569A (en) | Method for realizing PSASP (power system analysis software package) data file graphics on basis of SVG (scalable vector graphics) technology | |
CN113407172B (en) | Distribution cloud master station-based automatic platform area graph display system and method | |
CN104243218A (en) | Power system communication mode bill compilation method based on multi-scheduling constraints | |
CN103489059A (en) | Object-oriented method and system for comprehensively displaying power grid monitoring information | |
CN106055786A (en) | Graphical SSD (System Specification Description) configuration method based on IED (Intelligent Electronic Device) template | |
CN110991158A (en) | Bidirectional modeling method and system based on graph-model integration | |
CN110989980A (en) | Load control acquisition monitoring system based on GIS positioning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |