CN110536392A - Poewr control method, device, equipment and storage medium - Google Patents
Poewr control method, device, equipment and storage medium Download PDFInfo
- Publication number
- CN110536392A CN110536392A CN201810910946.XA CN201810910946A CN110536392A CN 110536392 A CN110536392 A CN 110536392A CN 201810910946 A CN201810910946 A CN 201810910946A CN 110536392 A CN110536392 A CN 110536392A
- Authority
- CN
- China
- Prior art keywords
- frequency domain
- domain resource
- power control
- transmission
- control parameters
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/06—TPC algorithms
- H04W52/08—Closed loop power control
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/06—TPC algorithms
- H04W52/10—Open loop power control
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/06—TPC algorithms
- H04W52/16—Deriving transmission power values from another channel
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/18—TPC being performed according to specific parameters
- H04W52/20—TPC being performed according to specific parameters using error rate
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/18—TPC being performed according to specific parameters
- H04W52/24—TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/18—TPC being performed according to specific parameters
- H04W52/24—TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters
- H04W52/242—TPC being performed according to specific parameters using SIR [Signal to Interference Ratio] or other wireless path parameters taking into account path loss
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses a kind of Poewr control method, device, equipment and storage mediums, at least to realize the power control parameters for determining multiple frequency domain resources.The described method includes: the transmission when the second frequency domain resource is triggered by the signaling of first frequency domain resource, or the transmission of second frequency domain resource is indicated by the signaling of first frequency domain resource, or second frequency domain resource is activated by the signaling of first frequency domain resource, or first frequency domain resource, when being switched to second frequency domain resource, the first communication node executes the operation of following one: determining the associated power control parameters of transmission of the second frequency domain resource according to the associated power control parameters of transmission of the first frequency domain resource;The associated path loss parameter of transmission of the second frequency domain resource is determined according to synchronization signal block SSB.
Description
Technical field
The present invention relates to fields of communication technology, are situated between more particularly to a kind of Poewr control method, device, equipment and storage
Matter.
Background technique
Currently, new generation of wireless communication (New Radio, NR) technology as the 5th Generation Mobile Communication System is being formulated
In, NR technology needs support unprecedented more different types of application scenarios, it is also necessary to while supporting traditional frequency range, new high frequency
Section and wave beam mode, bring very big challenge to the design of power control.
The power of uplink is related with several factors, such as path loss, target received power, maximum transmission power, closes
Ring power adjustment, the bandwidth of transmission, rate of transmission etc..Uplink includes at least Physical Uplink Shared Channel in NR
(Physical Uplink Shared Channel, PUSCH), Physical Uplink Control Channel (Physical Uplink
Control Channel, PUCCH) and uplink detection reference signal (Sounding Reference Signal, SRS).
It supports member carrier (component carrier, CC) being further divided into several fractional bandwidths in NR
(bandwidth part, BWP).One can only be activated to a user equipment (User Equipment, UE) synchronization
BWP.When BWP switching occurs, the scheduling information of uplink may be sent on original BWP, and uplink is new
BWP is sent.When sending uplink on new BWP, power control parameters, especially path loss (Pathloss, PL) information
How to determine and is still not clear in the related art.
Summary of the invention
In order to overcome drawbacks described above, the technical problem to be solved in the present invention is to provide a kind of Poewr control method, device, set
Standby and storage medium, at least to realize the power control parameters for determining multiple frequency domain resources.
In order to solve the above technical problems, one of embodiment of the present invention Poewr control method includes:
When the transmission of the second frequency domain resource is by the signaling triggering of first frequency domain resource or second frequency domain resource
Transmission by first frequency domain resource signaling instruction or second frequency domain resource by the letter of first frequency domain resource
When activation or first frequency domain resource being enabled to be switched to second frequency domain resource, the first communication node executes following one
Operation:
The associated power control of transmission of the second frequency domain resource is determined according to the associated power control parameters of transmission of the first frequency domain resource
Parameter;
The associated path loss parameter of transmission of the second frequency domain resource is determined according to synchronization signal block SSB.
In order to solve the above technical problems, one of embodiment of the present invention power control device include condition judgment module and
Operation module;
The operation module, for determining the transmission of the second frequency domain resource by first frequency when the condition judgment module
Domain resource signaling triggering perhaps second frequency domain resource transmission by first frequency domain resource signaling instruction or
Signaling activation or first frequency domain resource of second frequency domain resource by first frequency domain resource are switched to described the
When two frequency domain resources, the first communication node of triggering executes the operation of following one:
The associated power control of transmission of the second frequency domain resource is determined according to the associated power control parameters of transmission of the first frequency domain resource
Parameter;
The associated path loss parameter of transmission of the second frequency domain resource is determined according to synchronization signal block SSB.
In order to solve the above technical problems, one of embodiment of the present invention receiving device includes memory and processor, institute
It states memory and is stored with power control computer program, the processor executes the computer program to realize side as described above
The step of method.
In order to solve the above technical problems, one of embodiment of the present invention computer readable storage medium, is stored with power
Control computer program;
The power control computer program can be executed by least one processor, to realize the step of method as described above
Suddenly.
The present invention has the beneficial effect that: each embodiment of the present invention realizes the power control parameters for determining multiple frequency domain resources,
Particularly, when realizing frequency domain resource and switching, the power control parameters of multiple frequency domain resources can be determined.
The above description is only an overview of the technical scheme of the present invention, in order to better understand the technical means of the present invention,
And it can be implemented in accordance with the contents of the specification, and in order to allow above and other objects of the present invention, feature and advantage can
It is clearer and more comprehensible, the followings are specific embodiments of the present invention.
Detailed description of the invention
By reading the following detailed description of the preferred embodiment, various other advantages and benefits are common for this field
Technical staff will become clear.The drawings are only for the purpose of illustrating a preferred embodiment, and is not considered as to the present invention
Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the schematic diagram that the first frequency domain resource is switched to the second frequency domain resource in the embodiment of the present invention;
Fig. 2 is the schematic diagram that the second frequency domain resource is activated on the basis of the first frequency domain resource in the embodiment of the present invention;
Fig. 3 is the schematic diagram that multiple first frequency domain resources can refer in the embodiment of the present invention;
Fig. 4 is in the embodiment of the present invention while can to activate the schematic diagram of multiple BWP;
Fig. 5 is a kind of structural schematic diagram of power control device in the embodiment of the present invention.
Specific embodiment
In wireless communication system, in order to reduce sending device power consumption, and reduces unnecessary high power and send to other biographies
It is interfered caused by defeated, needs to carry out transmission power control transmission.The size of communication range, communicating pair transceiver most
It is big to send the bandwidth etc. occupied for power and receiving sensitivity, the modulation coding scheme of data and rate, the frequency band of work, transmission
Factor can all influence to send power.It generally requires under conditions of meeting the received signal quality requirement of receiving end, uses as far as possible
Lower transmission power.
In the general communication technology, communication node 1 sends reference signal, and communication node 2 is measured according to the reference signal and saved
Point 1 arrives the path loss PL (referred to as path loss) of node 2.PL is to be received with the transmission power of the reference signal of node 1 with node 2
Reference signal reception power difference calculate.Assuming that the PL that node 2 arrives the transmission channel of node 1 arrives the letter of node 2 with node 1
The PL in road is identical, then node 2 can use the transmission power of transmission of the above-mentioned PL calculate node 2 as sending node to node 1.By
It is folk prescription planar survey as a result, therefore the factor belongs to ring opening moiety in sending power in PL.It is laggard that node 1 receives transmission
Row parsing, quality is that node 2 provides the information of power adjustment based on the received, which belongs to close-loop power control.Wherein, function
Rate control can be referred to as power control.
In LTE, the link of base station to terminal is downlink, and the link of terminal to base station is uplink.Downlink
Power by base station according to it is each scheduling UE channel measurement and dispatching algorithm determine.The power control of uplink is out
The mode of ring combination closed loop.In addition, there are also specific amounts relevant to transmission, such as transmission rate, modulation and coding strategy
(Modulation and Coding Scheme, MCS) grade, transmission bandwidth etc. also will affect power.
Here is the transmission rating formula of the PUSCH channel of LTE, as example to influence power parameters into
Row explanation.
In the case where carrier wave polymerize (Carrier Aggregation) scene, each UE supports several member carriers CC, each
CC is also referred to as a serving cell (Serving Cell).Subscript c refers to serving cell in above formula.From above formula it can be seen that, function
Power is sent in rate calculation formula to calculate for serving cell.
The power P of uplink PUSCHPUSCHRing opening moiety by target received power PO_PUSCH, path loss amount PL and path loss
Factor-alpha determines that wherein target received power is divided into cell-level and UE grades of parameters, is all determined by base station and is allocated to UE;And closed loop
Part is then that base station according to the gap of measurement result and target determines closed-loop power control adjustment amount, to transmit power control commands
The mode of (Transmit Power Control Command, TPC Command) notifies UE, i.e. is directed to PUSCH's in DCI
δPUSCH.UE safeguards the power adjustment f (i) of a local, is updated according to transmission power control commands, is reached using above-mentioned formula
The purpose of closed loop power control.Wherein, i is subframe number, ΔTFIt is the relevant power excursion of MCS, PCMAXIt is the maximum power of UE
Limitation.
The cell-level target received power P of LTEO_PUSCHBe to discriminate between PUSCH (semi-static, dynamic, message 3MSG3) and
PUCCH respectively corresponds different Block Error Rates (Block Error Ratio, BLER) demand.UE grades of target received power parameters
P0_UE_specific is also to discriminate between above several and is configured, and is to compensate for systematic bias, such as PL evaluated error, absolutely
The error of output power setting.
F (i) is updated according to transmission power control commands and is divided into two ways: accumulating and absolute-value sense, wherein absolute value side
Formula is the closed power adjustment amount f (i) that the local UE is directly updated with the transmission power control commands that base station is sent, and accumulating is then by base
The history value of the closed power adjustment amount for the transmission power control commands and the local the UE that send of standing determines the closed loop function of the local UE jointly
Rate adjustment amount f (i).It should be noted that f (i) here represents the closed power adjustment amount of the local UE.PUCCH is transmitted,
Ignore lower target meaning, the closed-loop power control adjustment amount of the local UE in power control formula is indicated with g (i), f (i) meaning with PUSCH
It is similar, it is the closed power adjustment amount of the local UE for PUCCH.
The closed power adjustment amount f (i) of the local UE, also referred to as power control adjust state (Power Control
Adjustment State)。
In 5G technology, the power control of uplink is BWP rank, i.e. the uplink to each BWP rank, determines hair respectively
Send power.
5G technology introduces the transmission mode of wave beam, and base station and UE support multi-beam.When work in beam modes, function
Rate calculates the characteristic for needing to consider wave beam.Resource in 5G for path loss measurement is related to the wave beam of transmission path, needs base station
Configuration, so path loss measurement parameter exists independently of open loop power control parameter and closed-loop power control parameter.
In order to support the mode of wave beam, power contorl parameters are divided into 3 parts configuration: open loop power control parameter, closed-loop power control ginseng
Reference signal (RS) parameter that number, path loss measure.Wherein each part supports configuration multiple, i.e. open loop power control parameter (or its collection
Close) J can be at most configured, the number of each open loop power control parameter (or its set) is j;Path loss measurement parameter (or its set)
K can be at most configured, the number of each path loss measurement parameter (or its set) is k;Closed-loop power control parameter (or its set) is most
L can be mostly configured, the number of each closed-loop power control parameter (or its set) is l;Wherein, j is whole less than or equal to J greater than 0
Number, k are the integer for being less than or equal to K greater than 0, and l is the integer for being less than or equal to L greater than 0, and J, K, L are the integer greater than 0.
Wherein, open loop power control parameter includes at least one following parameter: target received power, the path loss factor;The path loss
Reference signal (RS) parameter of measurement includes at least one of: for the reference signal resource instruction of path loss measurement, for road
The reference signal resource type of loss measurement indicates;The closed-loop power control parameter includes at least one of: close-loop power control into
Journey mark, close-loop power control process number.
The open Loop Power control parameter sets include at least one of: target received power, the path loss factor;
The path loss measurement parameter set includes at least one of: the reference signal resource type for path loss measurement refers to
The path loss of the reference signal show, measured for the reference signal resource instruction of path loss measurement, two or more path losses
The processing rule of value;
The close-loop power control process parameter includes at least one of: close-loop power control process identification (PID) set is closed
Ring power control process number.
If UE supports multiple wave beams (or wave beam group), base station configures each possible wave beam (or wave beam group) and open loop
Power control parameters, closed-loop power control parameter, the association between path loss measurement parameter.Wave beam (or wave beam group) can be provided by reference to signal
Source instruction.
Reference signal includes at least one of: uplink detection signal (Sounding Reference Signal, SRS),
Channel state information reference signals (Channel State Information Reference Signal, CSI-RS), it is synchronous
Block (secondary Synchronization Block, SSB), Phase Tracking reference signal (Phase Tracking
Reference Signal, PTRS), track reference signal (Tracking Reference Signal, TRS), demodulation reference letter
Number (Demodulation Reference Signal, DMRS).
The uplink that base station is UE indicates reference signal resource, and UE is made to obtain power associated by the reference signal resource
Control parameter.
It is exemplified below:
The PUSCH transmission that base station is UE configures J1 open loop power control parameter (or it is gathered), K1 path loss measurement parameter (or
It is gathered), L1 closed-loop power control parameter (or its set).
Base station is the transmission mode that UE configures PUSCH, such as codebook-based transmission (Codebook Based
), or the transmission based on non-code book (Non-codebook Based Transmission) Transmission.
Base station is uplink detection signal resource collection (the SRS resource that UE configures the transmission mode based on PUSCH
Set), including at least one uplink detection signal resource (SRS resource).
Base station is that UE sends Downlink Control Information (Downlink Control Information, DCI), including
SRS resource indicates (SRS Resource Indicator, SRI), and SRI is determined for the precoding of PUSCH transmission.It is different
The SRI set indicated in the DCI of PUSCH transmission mode may be different.For example, the SRI set of codebook-based transmission may have 2
A SRI, each SRI represent a SRS resource (Resource);The SRI set of transmission based on non-code book may have 15
SRI, each SRI represent SRS resource or multiple SRS resources.
Base station is that UE configures being associated with for each of the SRI set indicated in DCI member SRI and at least one of:
Open loop power control parameter (or its set) number, path loss measurement parameter (or its set) number, closed-loop power control parameter (or its set)
Number.
The power control parameters of UE PUSCH transmission are informed by the SRI in DCI in base station.
Wherein, described uplink includes the following categories: PRACH (Physical Random Access
Channel, Physical Random Access Channel), PUCCH, PUSCH, SRS.
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here
It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure
It is fully disclosed to those skilled in the art.
In subsequent description, it is only using the suffix for indicating such as " module ", " component " or " unit " of element
Be conducive to explanation of the invention, itself there is no a specific meaning.Therefore, " module ", " component " or " unit " can mix
Ground uses.
Using for distinguishing element " first ", the prefixes such as " second " only for being conducive to explanation of the invention,
Itself is without specific meaning.
Mobile terminal can be mobile phone, tablet computer, laptop, palm PC, personal digital assistant (Personal
Digital Assistant, PDA), portable media player (Portable Media Player, PMP), navigation device,
Wearable device, Intelligent bracelet, pedometer etc..
Embodiment one
The embodiment of the present invention provides a kind of Poewr control method, which comprises
When the transmission of the second frequency domain resource is by the signaling triggering of first frequency domain resource or second frequency domain resource
Transmission by first frequency domain resource signaling instruction or second frequency domain resource by the letter of first frequency domain resource
When activation or first frequency domain resource being enabled to be switched to second frequency domain resource, the first communication node executes following one
Operation:
The associated power control of transmission of the second frequency domain resource is determined according to the associated power control parameters of transmission of the first frequency domain resource
Parameter;
The associated path loss parameter of transmission of the second frequency domain resource is determined according to synchronization signal block SSB.
Method is executed in receiving device side in the embodiment of the present invention, such as UE.Wherein, frequency domain resource includes following one:
Fractional bandwidth BWP and member carrier CC.
The embodiment of the present invention realizes the determination of the power control parameters in multiple frequency domain resources, suitable for frequency domain resource switching
Scene and the scene of same power control grouping.For example, the scene and first that the first frequency domain resource switches to the second frequency domain resource
Frequency domain resource and the second frequency domain belong to the scene of same frequency domain resource group.Wherein, power control grouping can be frequency domain resource group.
The synchronization signal block SSB refers to that the first communication node receives the synchronization signal SS/ physical broadcast of Master Information Block MIB
Channel PBCH.
In some embodiments, the operation of following one can also be performed in first communication node:
The reference signal of the path loss parameter associated by the transmission of second frequency domain resource is by before sending, not described
Second frequency domain resource sends the transmission of second frequency domain resource;
After the reference signal of the path loss parameter associated by the transmission of second frequency domain resource is sent, described in transmission
The transmission of second frequency domain resource;
After the reference signal of the path loss parameter associated by the transmission of second frequency domain resource is sent and measures path loss,
Send the transmission of second frequency domain resource.
In detail, UE is configured for several frequency domain resources in some embodiments.Frequency domain resource refers to following one:
BWP and CC.
As shown in Figure 1, being provided when UE is instructed to be switched to the second frequency domain resource from the first frequency domain resource according to the first frequency domain
The power control parameters in source are made to determine the power control parameters of the second frequency domain resource.
Wherein, in certain frequency domain, several frequency domain resources are restricted to a moment only one of frequency
Domain resource is activated.Assuming that be configured with several BWP in a CC, and limit in each CC a moment only one
BWP is activated.Certain moment t1, BWP1, which are activated, is used as at least uplink.Thereafter certain moment t2, BWP2 are activated as uplink
Transmission.The power control parameters of the uplink of BWP1 may be used to determine whether the power control parameters of the uplink of BWP2.
Wherein, being switched to the second frequency domain resource from the first frequency domain resource may include: the transmission of the second frequency domain resource by
The triggering of one frequency domain resource or instruction.Wherein, the scheduling letter of the transmission in the transmission of the first frequency domain resource comprising the second frequency domain resource
Breath.For example, the scheduling information of the uplink in the first frequency domain resource comprising the second frequency domain resource.For example, being wrapped in the DCI of BWP1
It is used to dispatch the uplink PUSCH on BWP2 containing uplink scheduling information.
Alternatively, being switched to the transmission that the second frequency domain resource may include: the second frequency domain resource from the first frequency domain resource is pair
The response of the transmission of first frequency domain resource.Wherein, the sound of the transmission in the transmission of the second frequency domain resource comprising the first frequency domain resource
Answer information.For example, the ack/nack response of the PDSCH transmission sent on BWP1, response message, such as HARQ, in BWP2
On PUCCH or PUSCH in carrying.
Alternatively, being switched to the MAC signaling touching that the second frequency domain resource may include: the first frequency domain resource from the first frequency domain resource
Hair or instruction are switched to the second frequency domain resource.For example, the MAC signaling triggering uplink on BWP1 is switched to BWP2, or
MAC signaling instruction uplink on BWP1 is switched to BWP2.
Alternatively, being switched to the MAC (media that the second frequency domain resource may include: the first frequency domain resource from the first frequency domain resource
Access control, Media Access Control) signaling instruction the second frequency domain resource of activation.For example, the MAC signaling on BWP1 refers to
Show that activation BWP2 carries out uplink.Since synchronization can only activate a BWP, so BWP1 is substituted by BWP2, i.e. BWP1
It is switched on BWP2.
As shown in Fig. 2, when UE work is in the first frequency domain resource, when being instructed to the second frequency domain resource of activation, the first frequency domain money
The power control parameters in source are used as determining the power control parameters of the second frequency domain resource.Wherein, including following one: the first frequency domain money
Source is switched to the second frequency domain resource;First frequency domain resource and the second frequency domain resource are all in state of activation.
For example, the first frequency domain resource is replaced by the second frequency domain resource when UE is instructed to the second frequency domain resource of activation.Such as BWP1
It is switched to BWP2.Or UE be instructed to activation the second frequency domain resource when, the first frequency domain resource is swashed simultaneously with the second frequency domain resource
It is living.
When UE work is in the first frequency domain resource, is instructed to the second frequency domain resource of activation, and the first frequency domain resource and the
Two frequency domain resources belong to same frequency domain resource group, then the function of the second frequency domain resource is determined according to the power control parameters of the first frequency domain resource
Control parameter.
Frequency domain resource group refers to that several frequency domain resources share power control parameters.Frequency domain resource group can be RRC (Radio
Resource Control, wireless heterogeneous networks) configuration or RRC configure multiple frequency domain resource groups and by MAC layer signaling it is living its
One or more of or RRC configure multiple frequency domain resource groups and one or more activated by physical layer signaling.Its
In, frequency domain resource group is referred to as power control frequency domain resource group.
For example, UE supports 5 CC, wherein preceding 2 CC are configured as power control frequency domain parameter group 1, rear 3 CC are configured as function
Control frequency domain parameter group 2.RRC signaling configures the above parameter.Perhaps RRC signaling configures the above parameter and by MAC layer signaling or object
The frequency domain resource group that reason layer signaling selects one or more of which to come into force as current time.
After second frequency domain resource is activated, before the second frequency domain resource sends uplink, it is not received by the second frequency domain
RS indicated by the path loss measurement parameter of the uplink of resource is not enough to estimate path loss amount on the time, then according to
The power control parameters of one frequency domain resource determine the power control parameters of the second frequency domain resource.
According to the power control parameters of corresponding first frequency domain resource of the reference signal resource information of the transmission of the second frequency domain resource
Partially or entirely determine the power control parameters of the transmission of the second frequency domain resource.
Wherein, the power control parameters of the transmission of the second frequency domain resource are determined according to the power control parameters of the transmission of the first frequency domain resource
It may include: the power control that the transmission of the second frequency domain resource is determined according to the path loss measurement parameter of the power control parameters of the first frequency domain resource
The path loss measurement parameter of parameter.
Alternatively, determining the power control parameters of the transmission of the second frequency domain resource according to the power control parameters of the transmission of the first frequency domain resource
It may include: the power control that the transmission of the second frequency domain resource is determined according to the open loop power control parameter of the power control parameters of the first frequency domain resource
The open loop power control parameter of parameter.
Alternatively, determining the power control parameters of the transmission of the second frequency domain resource according to the power control parameters of the transmission of the first frequency domain resource
It may include: the power control that the transmission of the second frequency domain resource is determined according to the closed-loop power control parameter of the power control parameters of the first frequency domain resource
The closed-loop power control parameter of parameter.Closed-loop power control parameter includes at least one of: closed-loop power control number, closed-loop power control number correspond to
Closed-loop power control adjustment amount.
Wherein, the open loop power control parameter of the power control parameters of the second frequency domain resource, closed-loop power control parameter, path loss measurement parameter can
The function of the second frequency domain resource of corresponding gain of parameter or use from the power control parameters of the first frequency domain resource is selected independently
Control the correspondence parameter of parameter.For example, the power control parameters of the second frequency domain resource can only use the power control parameters of the first frequency domain resource
In partial parameters for another example only use the so-called second frequency domain money of path loss measurement parameter in the power control parameters of the first frequency domain resource
Path loss measurement parameter in the power control parameters in source, and remaining power control parameters uses and is allocated to the second frequency domain resource.
Citing: when the first frequency domain resource BWP1 is switched to the second frequency domain resource BWP2, even if for BWP2 separate configurations road
The RS of loss measurement is arrived among PUSCH sending instant, very if scheduled the PUSCH of BWP2 on BWP1 on being switched to BWP2
Corresponding RS may be had little time to send for BWP2 for path loss measurement, that is to say, that path loss estimation cannot be completed, then BWP1
It is reasonable that path loss measurement parameter, which is used for BWP2,.
The path loss measurement parameter of the power control parameters of first frequency domain resource is used to determine the power control of the transmission of the second frequency domain resource
The path loss measurement parameter of parameter, until the RS that the path loss of the transmission configuration for the second frequency domain resource measures is sent.
Alternatively, the path loss measurement parameter of the power control parameters of the first frequency domain resource is used to determine the transmission of the second frequency domain resource
The path loss measurement parameter of power control parameters, until the RS transmission that the path loss of the transmission configuration for the second frequency domain resource measures, and by UE
Measurement obtains the path loss amount of the RS.
Optionally, when the path loss measurement parameter quantity in the power control parameters of the first frequency domain resource is more than 1, according to the first frequency
The path loss measurement parameter of the power control parameters of domain resource determines the path loss measurement parameter of the power control parameters of the transmission of the second frequency domain resource
When, the path loss measurement parameter of the power control parameters of first frequency domain resource includes following one:
The corresponding path loss measurement parameter of transmission power of the nearest PUSCH sent in the first frequency domain resource;
The corresponding path loss measurement parameter of transmission power of the nearest PUCCH sent in the first frequency domain resource;
The corresponding path loss measurement parameter of spatial relationship of the nearest PUCCH in the activation of the first frequency domain resource;
The corresponding path loss measurement parameter of spatial relationship of the PUCCH of the least resource number of first frequency domain resource activation;
The smallest path loss measurement parameter is numbered in the power control information of the PUSCH of first frequency domain resource configuration;
The smallest association of association number of SRI and PUSCH power control in the power control information of the PUSCH of first frequency domain resource configuration
In path loss measurement parameter;
Minimum circuit loss value in the SSB and/or CSI-RS for path loss measurement of first frequency domain resource configuration.
For example, have K1 to the PUSCH transmission of the first frequency domain resource configuration path loss measurement parameter, number k is respectively 0 to arrive
K1-1, wherein K1=4.Then numbering the smallest open loop power control parameter in the power control information of the PUSCH of the first frequency domain resource configuration is
Refer to that number k is 0 path loss measurement parameter.
For another example, there are K1 to the PUSCH transmission configuration open loop power control parameter of the first frequency domain resource, number k value is respectively 0
To K1-1, wherein K1=4.And configure being associated with for several SRI and path loss measurement parameter, it is assumed that for 2 associations, SRI 0 and k
=0 association, corresponding association number are that 0, SRI 1 is associated with k=3, and corresponding association number is 1.Then the first frequency domain resource configures
Path loss measurement parameter in the power control information of PUSCH in the smallest association of association number of SRI and PUSCH power control refer to SRI0 with
The path loss measurement parameter of the j=0 indicated in the association of j=0.
The circuit loss value that the measurement parameter of the above first frequency domain resource configuration obtains can be used for the transmission of the second frequency domain resource
Path loss item when power calculation.
Minimum circuit loss value in the SSB and/or CSI-RS for path loss measurement of first frequency domain resource configuration, refers in UE
It monitors and selects the smallest circuit loss value being used as in the second frequency domain resource power control parameters of a circuit loss value in the RS of path loss information.
Optionally, the associated power control parameters of transmission of first frequency domain resource include following one:
The physical down of first frequency domain resource of the dispatch of transmission comprising second frequency domain resource controls
Reference signal resource information associated by channel PDCCH;
Physical Downlink Control Channel comprising activating first frequency domain resource of the signaling of second frequency domain resource
Reference signal resource information associated by PDCCH;
Media access control signaling institute comprising activating first frequency domain resource of the signaling of second frequency domain resource
Associated reference signal resource information.
Optionally, it is greater than predetermined threshold in the SSB and/or CSI-RS for path loss measurement of the first frequency domain resource configuration
The average value of several circuit loss values is used as the circuit loss value in the second frequency domain resource power control parameters.
Optionally, it is greater than predetermined threshold in the SSB and/or CSI-RS for path loss measurement of the first frequency domain resource configuration
The maximum circuit loss value of several circuit loss values is used as the circuit loss value in the second frequency domain resource power control parameters.The predetermined threshold is preparatory
The value of definition, or the value for base station configuration.
Optionally, the open loop power control parameter of the power control parameters of the first frequency domain resource is used to determine the transmission of the second frequency domain resource
Power control parameters open loop power control parameter, until the transmission configuration for the second frequency domain resource path loss measure RS send.
Alternatively, the open loop power control parameter of the power control parameters of the first frequency domain resource is used to determine the transmission of the second frequency domain resource
The open loop power control parameter of power control parameters, until the RS transmission that the path loss of the transmission configuration for the second frequency domain resource measures, and by UE
Measurement obtains the path loss amount of the RS.
Optionally, when the open loop power control number of parameters in the power control parameters of the first frequency domain resource is more than 1, according to the first frequency
The path loss measurement parameter of the power control parameters of domain resource determines the open loop power control parameter of the power control parameters of the transmission of the second frequency domain resource
When, the open loop power control parameter of the power control parameters of first frequency domain resource includes following one:
The corresponding open loop power control parameter of transmission power of the nearest PUSCH sent in the first frequency domain resource;
The corresponding open loop power control parameter of transmission power of the nearest PUCCH sent in the first frequency domain resource;
The corresponding open loop power control parameter of spatial relationship of the nearest PUCCH in the activation of the first frequency domain resource;
The corresponding open loop power control parameter of spatial relationship of the PUCCH of the least resource number of first frequency domain resource activation;
The smallest open loop power control parameter is numbered in the power control information of the PUSCH of first frequency domain resource configuration;
The smallest association of association number of SRI and PUSCH power control in the power control information of the PUSCH of first frequency domain resource configuration
In open loop power control parameter;
For example, having J1 to the PUSCH transmission configuration open loop power control parameter of the first frequency domain resource, number is respectively 0 to J1-
1.The smallest open loop power control parameter is then numbered in the power control information of the PUSCH of the first frequency domain resource configuration refers to that number is 0 to open
Ring power control parameters.
For example, the PUSCH transmission configuration open loop power control parameter to the first frequency domain resource has J1, number j value is respectively 0
To J1-1, wherein J1=8.And configure being associated with for several SRI and open loop power control parameter, it is assumed that for 2 associations, SRI 0 and j
=0 association, corresponding association number are that 0, SRI 1 is associated with j=3, and corresponding association number is 1.Then the first frequency domain resource configures
Open loop power control parameter in the power control information of PUSCH in the smallest association of association number of SRI and PUSCH power control refer to SRI0 with
The open loop power control parameter of the j=0 indicated in the association of j=0.
Optionally, the closed-loop power control parameter of the power control parameters of the first frequency domain resource is used to determine the transmission of the second frequency domain resource
Power control parameters closed-loop power control parameter, until the transmission configuration for the second frequency domain resource path loss measure RS send.
Alternatively, the closed-loop power control parameter of the power control parameters of the first frequency domain resource is used to determine the transmission of the second frequency domain resource
The closed-loop power control parameter of power control parameters, until the RS transmission that the path loss of the transmission configuration for the second frequency domain resource measures, and by UE
Measurement obtains the path loss amount of the RS.
Optionally, when the closed-loop power control number of parameters in the power control parameters of the first frequency domain resource is more than 1, according to the first frequency
The path loss measurement parameter of the power control parameters of domain resource determines the closed-loop power control parameter of the power control parameters of the transmission of the second frequency domain resource
When, the closed-loop power control parameter of the power control parameters of first frequency domain resource includes following one:
The corresponding closed-loop power control parameter of transmission power of the nearest PUSCH sent in the first frequency domain resource;
The corresponding closed-loop power control parameter of transmission power of the nearest PUCCH sent in the first frequency domain resource;
The corresponding closed-loop power control parameter of spatial relationship of the nearest PUCCH in the activation of the first frequency domain resource;
The corresponding closed-loop power control parameter of spatial relationship of the PUCCH of the least resource number of first frequency domain resource activation;
The smallest closed-loop power control parameter is numbered in the power control information of the PUSCH of first frequency domain resource configuration;
The smallest association of association number of SRI and PUSCH power control in the power control information of the PUSCH of first frequency domain resource configuration
In closed-loop power control parameter;
The transmission of second frequency domain resource can be used the first frequency domain resource above-mentioned closed-loop power control parameter include it is following at least
One of: closed-loop power control number, the closed-loop power control of the first frequency domain resource number corresponding power control and adjust state.Power control adjusts state
The closed-loop power control adjustment amount of the local referred to as UE.
That is, the transmission of the second frequency domain resource is using the power control parameters of some or all of first frequency domain resource until being second
The RS of the path loss measurement of the transmission configuration of frequency domain resource is sent, or until the path loss of the transmission configuration for the second frequency domain resource is surveyed
The RS of amount is sent, and obtains the path loss amount of the RS by UE measurement.
It after RS transmission for the path loss measurement of the transmission configuration of the second frequency domain resource, or is the biography of the second frequency domain resource
The RS of path loss that transmission & distribution are set measurement is sent, and after obtaining the path loss amount of the RS by UE measurement, the transmission of the second frequency domain resource makes
It is determined with the power control parameters of the transmission configuration for the second frequency domain resource and sends power.
Alternatively, UE thinks after activating the second frequency domain resource, before the second frequency domain resource sends uplink, base station is
RS indicated by the path loss measurement parameter for being allocated to and corresponding to the uplink in the second frequency domain resource is had sent, and on the time
It can satisfy UE to receive the RS and estimate path loss amount.
That is, it is above-mentioned it is each refer to that time domain is nearest recently, be when determining power for the transmission of the second frequency domain resource, away from
The parameter of the transmission sent in the first frequency domain resource nearest from the moment.
The power control parameters of frequency domain resource in the embodiment of the present invention may be for frequency domain resource configuration for all types
The power control parameters of transmission, it is also possible to the transmission power control parameters of the setting type of frequency domain resource.Setting type transmission include with
It is one of lower: PUSCH, PUCCH, SRS.
In detail, as shown in figure 3, when the embodiment of the present invention mainly realizes that BWP can activate multiple, second newly activated is frequently
Domain resource can refer to the PC parameter of the first frequency domain resource of more than one, and how to determine and which the first frequency domain resource used.
Wherein, UE is configured for several frequency domain resources.Frequency domain resource refers to following one: BWP, CC.
When UE work is in the first frequency domain resource of several activation, when the UE is instructed to newly activate the second frequency domain resource
When, determine that the power control parameters of the second frequency domain resource may include following one according to the power control parameters of multiple first frequency domain resources:
The power control information of the first frequency domain resource where the instruction information of the second frequency domain resource of activation determines the second frequency
The power control information of domain resource;
Determine that the second frequency domain provides at a distance of the power control information of the first nearest frequency domain resource according to the second frequency domain resource frequency domain
The power control information in source;
Second is determined according to the power control information for the first frequency domain resource for belonging to same frequency domain resource group with the second frequency domain resource
The power control information of frequency domain resource;
Belong to number distance in several first frequency domain resources of same frequency domain resource group according to the second frequency domain resource
The power control information of the first nearest frequency domain resource of two frequency domain resources determines the power control information of the second frequency domain resource;
According to belonging to several the first frequency domain resource frequency domains of same frequency domain resource group with the second frequency domain resource at a distance of the
The power control information of the first nearest frequency domain resource of two frequency domain resources determines the power control information of the second frequency domain resource.
The instruction information of above-mentioned the second frequency domain resource of activation can refer to the MAC layer comprising triggering the second frequency domain resource activation
Signaling, or dispatch the physical layer signaling of the transmission of the second frequency domain resource.Wherein, the physics of the transmission of the second frequency domain resource is dispatched
Layer signaling can refer to the scheduling information that scheduling PUSCH transmission is sent in the second frequency domain resource, may also mean that in the first frequency domain
The PDSCH that resource is sent is indicated on the second frequency domain resource and sends response message.
Above-mentioned frequency domain resource group refers to the frequency domain resource group of power control, and every group includes several frequency domain resources, these frequency domains money
Transmission on source can share same group of power control parameters or common sparing power control parameters.For example, only sharing path loss measurement ginseng
Several or shared path loss measurement parameter and closed-loop power control parameter.
Frequency domain resource group can share one group of power control parameters just for the transmission of setting type or common sparing power control is joined
Number.
The transmission for setting type includes at least one of: PUSCH, PUCCH, SRS.
Optionally, PUSCH can refer to the PUSCH of carrying specific transactions.Specific transactions refer to following one: URLLC is (super
The communication of highly reliable ultralow time delay), eMBB (Enhance Mobile Broadband enhances mobile broadband), mMTC (extensive object
Networking).
The frequency domain resource group that base station is UE configures power control parameters, including at least one of: at least one open loop power control ginseng
Manifold is closed, at least one path loss measurement parameter set, at least one closed-loop power control parameter sets.
The frequency domain resource group configuration reference signal information that base station is UE is associated with power control parameters.Reference signal information is by frequency
The transmission of all frequency domain resources in the resource group of domain refers to.
For example, the frequency domain resource group that base station is UE configures power control parameters, including open loop power control parameter pond, path loss measurement parameter
Pond, closed-loop power control parameter pond.Base station is also that the frequency domain resource group of UE configures reference signal information pool, and configuration association relationship pond.
Each incidence relation includes reference signal information and open loop power control parameter, path loss measurement parameter, closed-loop power control parameter.Frequency domain money
Reference signal information referenced by the transmission of frequency domain resource in the group of source both is from above-mentioned reference signal information pool.Reference signal pond
It may not also directly configure, but inform UE by other configurations.For example, the SRI for including in configuration by SRS resource set
It obtains, or according to the SRS resource in the SRS resource set for the transmission that configuration purposes is codebook-based/non-code book in DCI
The possibility of transmission combines.Above-mentioned SRS resource set may be to configure for frequency domain resource group.
The reference signal information as referenced by PUSCH transmission refers to the domain SRI in the DCI for dispatching the PUSCH.PUCCH is passed
Defeated referenced reference signal information refers to the spatial relationship of the PUCCH of MAC CE activation.
Base station is that the single frequency domain resource in the frequency domain resource group of UE configures being associated with for reference signal information and power control parameters.
The transmission that reference signal information is only used for the single frequency domain resource in frequency domain resource group refers to.
For example, the frequency domain resource group that base station is UE configures power control parameters, including open loop power control parameter pond, path loss measurement parameter
Pond, closed-loop power control parameter pond.Base station is also each frequency domain resource configuration reference signal information pool in the frequency domain resource group of UE, and is matched
Set incidence relation pond.Each incidence relation includes reference signal information and open loop power control parameter, path loss measurement parameter, closed loop function
Control parameter.All frequency domain resources i.e. in frequency domain resource group share power control parameters pond, but each frequency domain resource independently establishes it
Reference signal information is associated with power control parameters pond.
Embodiment two
The embodiment of the present invention provides a kind of power control device, as shown in figure 5, described device includes condition judgment module 10
With operation module 12;
The operation module 12, for determining the transmission of the second frequency domain resource by described the when the condition judgment module 10
The signaling of one frequency domain resource triggers or the transmission of second frequency domain resource is indicated by the signaling of first frequency domain resource,
Perhaps signaling activation or first frequency domain resource of second frequency domain resource by first frequency domain resource is switched to institute
When stating the second frequency domain resource, the first communication node of triggering executes the operation of following one:
The associated power control of transmission of the second frequency domain resource is determined according to the associated power control parameters of transmission of the first frequency domain resource
Parameter;
The associated path loss parameter of transmission of the second frequency domain resource is determined according to synchronization signal block SSB.
Wherein, the synchronization signal block SSB refers to that the first communication node receives the synchronization signal SS/ object of Master Information Block MIB
Manage broadcast channel PBCH.
Optionally, the operation of following one can also be performed in first communication node:
The reference signal of the path loss parameter associated by the transmission of second frequency domain resource is by before sending, not described
Second frequency domain resource sends the transmission of second frequency domain resource;
After the reference signal of the path loss parameter associated by the transmission of second frequency domain resource is sent, described in transmission
The transmission of second frequency domain resource.
Optionally, the frequency domain resource includes following one: fractional bandwidth and member carrier.
Optionally, the transmission of second frequency domain resource includes following one by first frequency domain resource triggering:
The scheduling information of transmission in the transmission of first frequency domain resource comprising second frequency domain resource;
The transmission of second frequency domain resource is the response of the transmission to first frequency domain resource;
The media access control signaling triggering of first frequency domain resource is switched to second frequency domain resource;
The media access control signaling triggering of first frequency domain resource activates second frequency domain resource;
The transmission of second frequency domain resource includes following one by first frequency domain resource instruction:
The scheduling information of transmission in the transmission of first frequency domain resource comprising second frequency domain resource;
The transmission of second frequency domain resource is the response of the transmission to first frequency domain resource;
The media access control signaling instruction of first frequency domain resource is switched to second frequency domain resource;
The media access control signaling instruction of first frequency domain resource activates second frequency domain resource.
Optionally, the operation module 12, specifically for the power control parameters according to the transmission of the first frequency domain resource, use with
At least one lower mode determines the power control parameters of the transmission of the second frequency domain resource:
The biography of second frequency domain resource is determined according to the path loss measurement parameter of the power control parameters of first frequency domain resource
The path loss measurement parameter of defeated power control parameters;
The biography of second frequency domain resource is determined according to the open loop power control parameter of the power control parameters of first frequency domain resource
The open loop power control parameter of defeated power control parameters;
The biography of second frequency domain resource is determined according to the closed-loop power control parameter of the power control parameters of first frequency domain resource
The closed-loop power control parameter of defeated power control parameters.
Optionally, the power control parameters of first frequency domain resource include following one:
The transmission power pair for the Physical Uplink Shared Channel PUSCH that nearest first frequency domain resource of frequency domain resource is sent
The power control parameters answered;
The transmission power pair for the Physical Uplink Control Channel PUCCH that nearest first frequency domain resource of frequency domain resource is sent
The power control parameters answered;
The spatial relationship pair of the Physical Uplink Control Channel PUCCH of nearest first frequency domain resource activation of frequency domain resource
The power control parameters answered;
The spatial relationship pair of the Physical Uplink Control Channel PUCCH of the least resource number of the first frequency domain resource activation
The power control parameters answered;
The smallest power control is numbered in the power control information of the Physical Uplink Shared Channel PUSCH of the first frequency domain resource configuration
Parameter;
Uplink detection is with reference to letter in the power control information of the Physical Uplink Shared Channel PUSCH of the first frequency domain resource configuration
Power control parameters in the smallest association of association number of number resource instruction SRI and Physical Uplink Shared Channel PUSCH power control;
First frequency domain resource is configured to the minimum circuit loss value in the synchronization signal block SSB of path loss measurement;
First frequency domain resource is configured to the minimum in the channel state information reference signals CSI-RS of path loss measurement
Circuit loss value;
First frequency domain resource is configured to the synchronization signal block SSB and channel state information reference signals of path loss measurement
Minimum circuit loss value in CSI-RS.
Optionally, the operation module 12, specifically for the power control parameters according to the transmission of the first frequency domain resource, use with
At least one lower mode determines the power control parameters of the transmission of the second frequency domain resource:
Described is determined according to the power control parameters of the transmission of the Physical Uplink Shared Channel PUSCH of first frequency domain resource
The power control parameters of the transmission power of the Physical Uplink Shared Channel PUSCH of two frequency domain resources;
Described is determined according to the power control parameters of the transmission of the Physical Uplink Control Channel PUCCH of first frequency domain resource
The power control parameters of the transmission power of the Physical Uplink Control Channel PUCCH of two frequency domain resources;
Described is determined according to the power control parameters of the transmission of the Physical Uplink Control Channel PUCCH of first frequency domain resource
The power control parameters of the transmission power of the Physical Uplink Shared Channel PUSCH of two frequency domain resources;
Described is determined according to the power control parameters of the transmission of the Physical Uplink Shared Channel PUSCH of first frequency domain resource
The power control parameters of the transmission power of the Physical Uplink Control Channel PUCCH of two frequency domain resources.
Optionally, second frequency domain resource and first frequency domain resource belong to same power control grouping and include:
Second frequency domain resource and first frequency domain resource belong to same power control grouping for setting the transmission of type.
Wherein, the power control parameters include at least one of: open loop power control parameter, closed-loop power control parameter and path loss measurement
Reference signal parameter.Optionally, the open loop power control parameter includes at least one of: target received power and path loss because
Son;The closed-loop power control parameter includes at least one of: close-loop power control process identification (PID) and close-loop power control process
Number;The reference signal parameter of the path loss measurement includes at least one of: the reference signal resource instruction for path loss measurement
With the reference signal resource type instruction measured for path loss.
The embodiment of the present invention is Installation practice corresponding to embodiment one, in specific implementation can be refering to embodiment
One, there is corresponding technical effect.
Embodiment three
The embodiment of the present invention provides a kind of receiving device, and the equipment includes memory and processor, and the memory is deposited
Power control computer program is contained, the processor executes the computer program to realize such as any one of embodiment 1
The step of the method.
The embodiment of the present invention can have corresponding technical effect refering to embodiment one in specific implementation.
Example IV
The embodiment of the present invention provides a kind of computer readable storage medium, and the storage medium is stored with power control calculating
Machine program;
The power control computer program can be executed by least one processor, to realize as any one in embodiment one
The step of item the method.
The embodiment of the present invention can have corresponding technical effect refering to above-mentioned corresponding embodiment in specific implementation.
In each embodiment of the present invention for convenience of description, using base station and UE (user equipment, user equipment) into
Row description, but not as limitation of the present invention.In implementation process, base station and UE can be by NB (NodeB), gNB, TRP
(transmiter receiver point), AP (access point), website, user, STA, relaying (relay), terminal etc.
The title of various communication nodes replaces.Base station can also refer to network side (network), UTRA, EUTRA etc..
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that the process, method, article or the device that include a series of elements not only include those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do
There is also other identical elements in the process, method of element, article or device.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on this understanding, technical solution of the present invention substantially in other words does the prior art
The part contributed out can be embodied in the form of software products, which is stored in a storage medium
In (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that a terminal (can be mobile phone, computer, service
Device, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited to above-mentioned specific
Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art
Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much
Form, all of these belong to the protection of the present invention.
Claims (17)
1. a kind of Poewr control method, which is characterized in that the described method includes:
When the transmission of the second frequency domain resource is by the signaling triggering of first frequency domain resource or the biography of second frequency domain resource
It is defeated to be swashed by the signaling instruction of first frequency domain resource or second frequency domain resource by the signaling of first frequency domain resource
When living or described first frequency domain resource is switched to second frequency domain resource, the first communication node executes the behaviour of following one
Make:
The associated power control parameters of transmission of the second frequency domain resource are determined according to the associated power control parameters of transmission of the first frequency domain resource;
The associated path loss parameter of transmission of the second frequency domain resource is determined according to synchronization signal block SSB.
2. the method as described in claim 1, which is characterized in that the synchronization signal block SSB refers to that the first communication node receives
The synchronization signal SS/ Physical Broadcast Channel PBCH of Master Information Block MIB.
3. the method as described in claim 1, which is characterized in that first communication node also executes the operation of following one:
The reference signal of the path loss parameter associated by the transmission of second frequency domain resource is by before sending, not described second
Frequency domain resource sends the transmission of second frequency domain resource;
After the reference signal of the path loss parameter associated by the transmission of second frequency domain resource is sent, described second is sent
The transmission of frequency domain resource;
After the reference signal of the path loss parameter associated by the transmission of second frequency domain resource is sent and measures path loss, send
The transmission of second frequency domain resource.
4. the method as described in claim 1, which is characterized in that the frequency domain resource includes following one: fractional bandwidth and at
Member's carrier wave.
5. the method as described in claim 1, which is characterized in that the transmission of second frequency domain resource is provided by first frequency domain
The signaling triggering in source includes following one:
The scheduling information of transmission in the transmission of first frequency domain resource comprising second frequency domain resource;
The transmission of second frequency domain resource is the response of the transmission to first frequency domain resource;
The media access control signaling triggering of first frequency domain resource is switched to second frequency domain resource;
The media access control signaling triggering of first frequency domain resource activates second frequency domain resource.
6. the method as described in claim 1, which is characterized in that the transmission of second frequency domain resource is provided by first frequency domain
The signaling instruction in source includes following one:
The scheduling information of transmission in the transmission of first frequency domain resource comprising second frequency domain resource;
The transmission of second frequency domain resource is the response of the transmission to first frequency domain resource;
The media access control signaling instruction of first frequency domain resource is switched to second frequency domain resource;
The media access control signaling instruction of first frequency domain resource activates second frequency domain resource.
7. the method as described in any one of claim 1-6, which is characterized in that the transmission according to the first frequency domain resource
Associated power control parameters determine that the power control parameters of the transmission of the second frequency domain resource include at least one of:
Second frequency domain is determined according to the path loss measurement parameter of power control parameters associated by the transmission of first frequency domain resource
The path loss measurement parameter of the power control parameters of the transmission of resource;
Second frequency domain is determined according to the open loop power control parameter of power control parameters associated by the transmission of first frequency domain resource
The open loop power control parameter of the power control parameters of the transmission of resource;
Second frequency domain is determined according to the closed-loop power control parameter of power control parameters associated by the transmission of first frequency domain resource
The closed-loop power control parameter of the power control parameters of the transmission of resource.
8. the method for claim 7, which is characterized in that the associated power control parameters packet of the transmission of first frequency domain resource
Include following one:
The associated power control parameters of Physical Uplink Shared Channel PUSCH that nearest first frequency domain resource is sent;
The associated power control parameters of Physical Uplink Control Channel PUCCH that nearest first frequency domain resource is sent;
The corresponding power control ginseng of the spatial relationship of the Physical Uplink Control Channel PUCCH of nearest first frequency domain resource activation
Number;
The spatial relationship of the Physical Uplink Control Channel PUCCH of the least resource number of the first frequency domain resource activation is corresponding
Power control parameters;
The smallest power control ginseng is numbered in the power control information of the Physical Uplink Shared Channel PUSCH of the first frequency domain resource configuration
Number;
Uplink detection reference signal money in the power control information of the Physical Uplink Shared Channel PUSCH of the first frequency domain resource configuration
Source indicates the power control parameters in the smallest association of association number of SRI and Physical Uplink Shared Channel PUSCH power control;
First frequency domain resource is configured to the minimum path loss in the synchronization signal SS/ Physical Broadcast Channel PBCH of path loss measurement
Value;
First frequency domain resource is configured to the minimum path loss in the channel state information reference signals CSI-RS of path loss measurement
Value;
First frequency domain resource is configured to the synchronization signal block SSB and channel state information reference signals CSI- of path loss measurement
Minimum circuit loss value in RS.
9. the method for claim 7, which is characterized in that the associated power control parameters packet of the transmission of first frequency domain resource
Include following one:
The Physical Downlink Control Channel of first frequency domain resource of the dispatch of transmission comprising second frequency domain resource
Reference signal resource information associated by PDCCH;
Physical downlink control channel PDCCH institute comprising activating first frequency domain resource of the signaling of second frequency domain resource
Associated reference signal resource information;
Associated by the media access control signaling of first frequency domain resource of signaling comprising activation second frequency domain resource
Reference signal resource information.
10. the method as described in any one of claim 1-6, which is characterized in that the biography according to the first frequency domain resource
Defeated power control parameters determine that the power control parameters of the transmission of the second frequency domain resource include at least one of:
Second frequency is determined according to the power control parameters of the transmission of the Physical Uplink Shared Channel PUSCH of first frequency domain resource
The power control parameters of the transmission power of the Physical Uplink Shared Channel PUSCH of domain resource;
Second frequency is determined according to the power control parameters of the transmission of the Physical Uplink Control Channel PUCCH of first frequency domain resource
The power control parameters of the transmission power of the Physical Uplink Control Channel PUCCH of domain resource;
Second frequency is determined according to the power control parameters of the transmission of the Physical Uplink Control Channel PUCCH of first frequency domain resource
The power control parameters of the transmission power of the Physical Uplink Shared Channel PUSCH of domain resource;
Second frequency is determined according to the power control parameters of the transmission of the Physical Uplink Shared Channel PUSCH of first frequency domain resource
The power control parameters of the transmission power of the Physical Uplink Control Channel PUCCH of domain resource.
11. the method as described in any one of claim 1-6, which is characterized in that second frequency domain resource and described the
One frequency domain resource belongs to same power control grouping.
12. the method as described in any one of claim 1-6, which is characterized in that the biography according to the first frequency domain resource
Defeated power control parameters determine that the power control parameters of the transmission of the second frequency domain resource include at least one of:
Determine that the second frequency domain provides at a distance of the power control information of the first nearest frequency domain resource according to the second frequency domain resource frequency domain frequency domain
The power control information in source;
The second frequency is determined according to the power control information for the first frequency domain resource for being associated with same frequency domain resource group with the second frequency domain resource
The power control information of domain resource;
The second frequency of number distance in multiple first frequency domain resources of same frequency domain resource group is associated with according to the second frequency domain resource
The power control information of the first nearest frequency domain resource of domain resource determines the power control information of the second frequency domain resource;
According to being associated with multiple first frequency domain resource frequency domains of same frequency domain resource group with the second frequency domain resource at a distance of the second frequency
The power control information of the first nearest frequency domain resource of domain resource determines the power control information of the second frequency domain resource.
13. the method as described in any one of claim 1-6, which is characterized in that the power control parameters include it is following at least
One of: open loop power control parameter, closed-loop power control parameter, path loss measurement parameter.
14. method as claimed in claim 13, which is characterized in that the open loop power control parameter includes at least one of: mesh
Tag splice receives power, the path loss factor;
The closed-loop power control parameter includes at least one of: close-loop power control process identification (PID), close-loop power control process
Number;
The path loss measurement parameter includes at least one of: for the reference signal resource instruction of path loss measurement, for path loss
The reference signal resource type of measurement indicates.
15. a kind of power control device, which is characterized in that described device includes condition judgment module and operation module;
The operation module, for determining that the transmission of the second frequency domain resource is provided by first frequency domain when the condition judgment module
Source signaling triggering perhaps second frequency domain resource transmission by first frequency domain resource signaling instruction or it is described
Signaling activation or first frequency domain resource of second frequency domain resource by first frequency domain resource are switched to second frequency
When the resource of domain, the first communication node of triggering executes the operation of following one:
The associated power control parameters of transmission of the second frequency domain resource are determined according to the associated power control parameters of transmission of the first frequency domain resource;
The associated path loss parameter of transmission of the second frequency domain resource is determined according to synchronization signal block SSB.
16. a kind of receiving device, which is characterized in that the equipment includes memory and processor, and the memory storage is active
Rate controls computer program, and the processor executes the computer program to realize such as any one of claim 1-14 institute
The step of stating method.
17. a kind of computer readable storage medium, which is characterized in that the storage medium is stored with power control computer journey
Sequence;The power control computer program can be executed by least one processor, to realize as any one in claim 1-14
The step of item the method.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810910946.XA CN110536392B (en) | 2018-08-10 | 2018-08-10 | Power control method, device, equipment and storage medium |
PCT/CN2019/100104 WO2020030159A1 (en) | 2018-08-10 | 2019-08-10 | Power control method and apparatus, receiving device, and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810910946.XA CN110536392B (en) | 2018-08-10 | 2018-08-10 | Power control method, device, equipment and storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110536392A true CN110536392A (en) | 2019-12-03 |
CN110536392B CN110536392B (en) | 2022-11-15 |
Family
ID=68657279
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810910946.XA Active CN110536392B (en) | 2018-08-10 | 2018-08-10 | Power control method, device, equipment and storage medium |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN110536392B (en) |
WO (1) | WO2020030159A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113691928A (en) * | 2020-05-14 | 2021-11-23 | 大唐移动通信设备有限公司 | Information processing method and device and terminal |
CN114585067A (en) * | 2020-12-02 | 2022-06-03 | 维沃移动通信有限公司 | SRS power control indication method, resource cluster dividing method and equipment |
CN114585067B (en) * | 2020-12-02 | 2024-06-07 | 维沃移动通信有限公司 | SRS power control indication method, resource cluster division method and equipment |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117812719A (en) * | 2022-09-30 | 2024-04-02 | 华为技术有限公司 | Communication method and device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102308640A (en) * | 2009-02-09 | 2012-01-04 | 交互数字专利控股公司 | Apparatus and method for uplink power control for a wireless transmitter/receiver unit utilizing multiple carriers |
CA3019646A1 (en) * | 2016-04-01 | 2017-10-05 | Huawei Technologies Co., Ltd. | System and method for srs switching, transmission, and enhancements |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102474824B (en) * | 2009-09-30 | 2013-12-25 | 上海贝尔股份有限公司 | Method and device for uplink power control in communication system based on carrier aggregation |
JP5588236B2 (en) * | 2010-06-21 | 2014-09-10 | 株式会社Nttドコモ | Transmission power control method, mobile terminal apparatus and radio base station apparatus |
CN111586825B (en) * | 2017-08-09 | 2021-11-16 | 维沃移动通信有限公司 | Power control method, receiving method, power distribution method and related equipment |
CN109803363B (en) * | 2017-11-17 | 2022-11-08 | 华为技术有限公司 | Communication method, communication device and system |
-
2018
- 2018-08-10 CN CN201810910946.XA patent/CN110536392B/en active Active
-
2019
- 2019-08-10 WO PCT/CN2019/100104 patent/WO2020030159A1/en active Application Filing
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102308640A (en) * | 2009-02-09 | 2012-01-04 | 交互数字专利控股公司 | Apparatus and method for uplink power control for a wireless transmitter/receiver unit utilizing multiple carriers |
CA3019646A1 (en) * | 2016-04-01 | 2017-10-05 | Huawei Technologies Co., Ltd. | System and method for srs switching, transmission, and enhancements |
Non-Patent Citations (3)
Title |
---|
HUAWEI等: "《R1-1805892 Remaining issues on bandwidth part and wideband operation》", 《3GPP TSG RAN WG1 MEETING #93》 * |
LG ELECTRONICS INC.: "《R2-1713879 Summary of e-mail discussion [99bis43] Impact of BWP》", 《3GPP TSG-RAN WG2 MEETING #100》 * |
VIVO: "《R1-1801546_Remaining issues on NR UL power control》", 《3GPP TSG RAN WG1 MEETING #92》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113691928A (en) * | 2020-05-14 | 2021-11-23 | 大唐移动通信设备有限公司 | Information processing method and device and terminal |
CN113691928B (en) * | 2020-05-14 | 2022-09-20 | 大唐移动通信设备有限公司 | Information processing method and device and terminal |
CN114585067A (en) * | 2020-12-02 | 2022-06-03 | 维沃移动通信有限公司 | SRS power control indication method, resource cluster dividing method and equipment |
WO2022117039A1 (en) * | 2020-12-02 | 2022-06-09 | 维沃移动通信有限公司 | Srs power control indication method, and resource cluster division method and device |
CN114585067B (en) * | 2020-12-02 | 2024-06-07 | 维沃移动通信有限公司 | SRS power control indication method, resource cluster division method and equipment |
Also Published As
Publication number | Publication date |
---|---|
WO2020030159A1 (en) | 2020-02-13 |
CN110536392B (en) | 2022-11-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20220201619A1 (en) | Power control method, apparatus and system | |
CN105122871B (en) | The system and method for Adaptive Transmission in wireless network | |
CN108112065B (en) | Method and device for determining transmission power and configuring signaling, terminal and base station | |
US20210021391A1 (en) | Method and apparatus for transmitting and receiving uplink signal, storage medium, and electronic device | |
CN104025673B (en) | For setting the method and its equipment of down transmitting power in wireless access system | |
CN109803362A (en) | Poewr control method, UE, base station, method for parameter configuration and control method | |
CN110036673A (en) | For the power distribution of uplink transmission | |
CN110035484A (en) | A kind of Poewr control method, the first communication node and the second communication node | |
TW202121864A (en) | Method for determining transmission parameters, electronic device, apparatus, and medium | |
CN110392418A (en) | Poewr control method and device, base station, terminal, computer readable storage medium | |
CN109474372A (en) | A kind of method, apparatus and system of data transmission | |
CN103312484A (en) | Method for controlling transmitting power of sounding reference signal (SRS), user equipment (UE) and base station | |
CN110536392A (en) | Poewr control method, device, equipment and storage medium | |
CN107431942A (en) | A kind of report method of channel condition information, user equipment and base station | |
WO2020030117A1 (en) | Method and apparatus for determining power control parameter, and storage medium and electronic device | |
CN109600154A (en) | Parameter acquiring method and device | |
WO2024030708A1 (en) | Techniques for beam refinement and beam selection enhancement | |
US11228355B2 (en) | Methods of energy optimization for multi-antenna systems | |
US20230353262A1 (en) | Prioritization and timing for cross-link interference reporting | |
US20230354074A1 (en) | Cross-link interference reporting configuration and payload design | |
US11817924B1 (en) | Transmission precoding matrix indicator grouping and designs for uplink multi-layer transmissions | |
WO2023023921A1 (en) | Antenna configuration switching for uplink transmission | |
US20230413209A1 (en) | Techniques for network energy saving sequences and cell interaction | |
US20240056978A1 (en) | Antenna grouping for power management in wireless communications | |
US20240031937A1 (en) | Downlink transmit power control group common dci |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |