CN110533293A - A kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal - Google Patents
A kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal Download PDFInfo
- Publication number
- CN110533293A CN110533293A CN201910689253.7A CN201910689253A CN110533293A CN 110533293 A CN110533293 A CN 110533293A CN 201910689253 A CN201910689253 A CN 201910689253A CN 110533293 A CN110533293 A CN 110533293A
- Authority
- CN
- China
- Prior art keywords
- engineering
- information
- module
- building
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 17
- 238000000034 method Methods 0.000 claims abstract description 34
- 238000010276 construction Methods 0.000 claims abstract description 33
- 230000002452 interceptive effect Effects 0.000 claims abstract description 23
- 238000012502 risk assessment Methods 0.000 claims abstract description 20
- 238000012423 maintenance Methods 0.000 claims description 5
- 230000015572 biosynthetic process Effects 0.000 claims description 4
- 238000003786 synthesis reaction Methods 0.000 claims description 2
- 230000005540 biological transmission Effects 0.000 description 3
- 238000011156 evaluation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- LHCPRYRLDOSKHK-UHFFFAOYSA-N 7-deaza-8-aza-adenine Chemical compound NC1=NC=NC2=C1C=NN2 LHCPRYRLDOSKHK-UHFFFAOYSA-N 0.000 description 1
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012407 engineering method Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 238000012552 review Methods 0.000 description 1
- 230000002195 synergetic effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0282—Rating or review of business operators or products
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/50—Network services
- H04L67/55—Push-based network services
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Development Economics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Finance (AREA)
- Accounting & Taxation (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of underground engineering Quality Monitoring Systems based on the collaboration of mobile Internet multiterminal, belong to underground engineering quality surveillance technical field.The system includes integrated application analysis platform, comprehensive operation management platform, professional version mobile client, public's version mobile client and database.The system is based on mobile Internet, effective supervision and management is carried out to project by the collaborative work of full platform, in project monitor procedure, can from document library intelligent recommendation staff need document information, based on project interactive information, credit appraisal, the credit information based on unit of taking part in building can be carried out to unit of taking part in building, and then risk assessment, control project risk are carried out to new projects.Based on project risk, system can provide aid decision, guarantee construction quality.Project can be arranged and be filed after project, convenient for keeping and be utilized.
Description
Technical field
The invention belongs to underground engineering quality surveillance technical fields, particularly relate to a kind of based on the collaboration of mobile Internet multiterminal
Underground engineering Quality Monitoring System.
Background technique
With the construction of urban informationization, underground engineering is continuously increased, and corresponding information content is in exponential increase.
Based on the above circumstances, for how to guarantee the quality of underground engineering, the credit information of unit of taking part in building how is grasped, such as
What grasps the operating position of quality supervision person, how the risk of evaluation of subterranean engineering, and how to arrange, in archival quality monitor procedure
The material document of formation becomes to become increasingly complex.
Traditional underground engineering quality surveillance is also merely resting in artificial treatment, it is difficult to meet the informationization of underground engineering
Demand.
Summary of the invention
In view of this, the present invention proposes a kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal,
The system can greatly promote the level of IT application of underground engineering quality surveillance, improve the quality supervision and control effect of underground engineering
Rate.
To achieve the goals above, the technical scheme adopted by the invention is as follows:
A kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal, including it is integrated application analysis platform, comprehensive
Close operation management platform, professional version mobile client, public's version mobile client and database;Wherein,
The integrated application analysis platform includes:
Quality supervision and control module, for managing the underground engineering built;
Quality surveillance logging modle, for managing the underground engineering for having built completion;
Unit of taking part in building's credit appraisal module passes through credit appraisal system model for the performance according to unit of taking part in building in engineering
Credit appraisal is made to unit of taking part in building;
Risk assessment on engineering module is assessed for the risk to newly built construction, according to the credit appraisal of unit of taking part in building to the work
Cheng Jinhang risk assessment obtains engineering risk index;
Aid decision module, for the risk system by engineering risk index each stage that judges engineering in whole process of construction
Number, and according to risk factor, provide the judgement whether quality supervision person needs scene to be checked at this stage;
Engineering profiling module, for filing to electronic document formed in engineering;
It registers management module, registers for staff, and record the position of staff in real time;
Intelligent recommendation module, for required at this stage literary to using the staff of professional version mobile client to push
Shelves;
The comprehensive operation management platform includes:
Maintenance management service module, the operating status for monitoring server;
Location-based service module, for obtaining the location information of professional version and public's version mobile client;
Client upgrade service module, the upgrading for professional version mobile client and public's version mobile client;
Unified account number management services module is moved for management comprehensive applied analysis platform, professional version mobile client and public's version
The account information of dynamic client;
Instant message service module, for realizing integrated application analysis platform, professional version mobile client and the mobile visitor of public's version
Message between the end of family is sent;
Push Service module, for realizing integrated application analysis platform, professional version mobile client and public's version mobile client
Between message push;
The professional version mobile client includes:
First login module, for logging in professional version mobile client;
Quality supervision management module, the case where for managing the underground engineering being responsible for, checking engineering essential information, each stage, and
Determine whether engineering can enter the next stage;
First information interactive module, for carrying out information exchange with integrated application analysis platform and public's version client, display is
Reading and people of unread information;
First pushing module, for receiving the message push of integrated application analysis platform and public's version mobile client;
Public version mobile client includes:
Second login module logs in public's version mobile client for unit of taking part in building;
Engineering information module shows for construction unit, submits the construction information in each stage;
Second information exchange module, for carrying out information exchange with integrated application analysis platform and professional version client, display is
Reading and people of unread information;
Second pushing module, for receiving the message push of integrated application analysis platform and public's version mobile client;
The database for store user information, location information, underground engineering information, interactive information, intelligent recommendation information and
Credit scoring information.
Preferably, the quality supervision and control module is for executing following procedure:
Engineering essential information is filled in, the quality supervision person of the engineering is responsible in distribution, and generates the login account of the engineering;
By Engineering Division at 10 stages, including tell somebody what one's real intentions are, waterproof, bottom plate, wall, top plate, main body check and accept, completion information examine,
Pre- examination, final acceptance of construction, Put on Records, are managed engineering according to the stage, only can just enter after completion previous stage
Next stage;
Quality supervision personnel to log in professional version client by account show its engineering list being responsible for, and make to step on by account
The construction unit and quality supervision personnel for recording public's version client carry out information exchange.
Preferably, unit of taking part in building's credit appraisal module is for executing following procedure:
The interactive information for recording unit of taking part in building after engineering, the credit scoring of unit of taking part in building is provided by interactive information, is obtained
It objectively evaluates;
It is scored by quality supervision person each unit of taking part in building, obtains subjective assessment;
According to objectively evaluating and subjective assessment, score the unit of taking part in building of the engineering, and according in the engineering scoring and
History scoring, updates the comprehensive score of unit of taking part in building.
Preferably, the Risk assessment on engineering module is for executing following procedure:
Engineering information is added, the name and information of engineering Zhong Ge unit of taking part in building are obtained, and obtains the credit scoring of each unit of taking part in building;
The risk factor of the engineering is obtained by risk assessment algorithm according to the comprehensive score of each unit of taking part in building.
Preferably, the engineering profiling module is for executing following procedure:
Engineering essential information is added by platform;
During quality surveillance, transmitting can be with the interactive information of attachment transmitted by unit of taking part in building or quality supervision personnel;
The tree graph of the engineering is produced after the completion of engineering, shows engineering All Files or the file in some stage, and provide engineering
The downloading of All Files or some stage file.
Preferably, the intelligent recommendation module is for executing following procedure:
Secondary file is added, auxiliary document library is updated;
The stage according to locating for engineering recommends secondary file required for the stage to quality supervision personnel;
The client of unit of taking part in building is sent to using the secondary file of needs as attachment according to the operation of quality supervision personnel.
The present invention has the following beneficial effects: compared to background technique
Present system can compare the Railway Project proposed at the beginning of satisfactory solution design.System is based on mobile Internet, leads to
The collaborative work for crossing full platform carries out effective supervision and management to project, can be intelligent from document library in project monitor procedure
Change the document information that recommended work personnel need, be based on project interactive information, credit appraisal can be carried out to unit of taking part in building, based on ginseng
The credit information of unit is built, and then risk assessment, control project risk are carried out to new projects.Based on project risk, system can be mentioned
For aid decision, guarantee construction quality.Project can be arranged and be filed after project, convenient for keeping and be utilized.
Detailed description of the invention
Fig. 1 is the flow chart that quality surveillance is disposed in the embodiment of the present invention;
Fig. 2 is the flow chart of final acceptance of construction in the embodiment of the present invention.
Specific embodiment
The present invention is described further with reference to the accompanying drawings and detailed description.
A kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal, including integrated application analysis are flat
Platform, comprehensive operation management platform, professional version mobile client, public's version mobile client and database;Wherein,
The integrated application analysis platform includes:
Quality supervision and control module, for managing the underground engineering built;
Quality surveillance logging modle, for managing the underground engineering for having built completion;
Unit of taking part in building's credit appraisal module passes through credit appraisal system model for the performance according to unit of taking part in building in engineering
Credit appraisal is made to unit of taking part in building;
Risk assessment on engineering module is assessed for the risk to newly built construction, according to the credit appraisal of unit of taking part in building to the work
Cheng Jinhang risk assessment obtains engineering risk index;
Aid decision module, for the risk system by engineering risk index each stage that judges engineering in whole process of construction
Number, and according to risk factor, provide the judgement whether quality supervision person needs scene to be checked at this stage;
Engineering profiling module, for filing to electronic document formed in engineering;
It registers management module, registers for staff, and record the position of staff in real time;
Intelligent recommendation module, for required at this stage literary to using the staff of professional version mobile client to push
Shelves;
The comprehensive operation management platform includes:
Maintenance management service module, the operating status for monitoring server;
Location-based service module, for obtaining the location information of professional version and public's version mobile client;
Client upgrade service module, the upgrading for professional version mobile client and public's version mobile client;
Unified account number management services module is moved for management comprehensive applied analysis platform, professional version mobile client and public's version
The account information of dynamic client;
Instant message service module, for realizing integrated application analysis platform, professional version mobile client and the mobile visitor of public's version
Message between the end of family is sent;
Push Service module, for realizing integrated application analysis platform, professional version mobile client and public's version mobile client
Between message push;
The professional version mobile client includes:
First login module, for logging in professional version mobile client;
Quality supervision management module, the case where for managing the underground engineering being responsible for, checking engineering essential information, each stage, and
Determine whether engineering can enter the next stage;
First information interactive module, for carrying out information exchange with integrated application analysis platform and public's version client, display is
Reading and people of unread information;
First pushing module, for receiving the message push of integrated application analysis platform and public's version mobile client;
Public version mobile client includes:
Second login module logs in public's version mobile client for unit of taking part in building;
Engineering information module shows for construction unit, submits the construction information in each stage;
Second information exchange module, for carrying out information exchange with integrated application analysis platform and professional version client, display is
Reading and people of unread information;
Second pushing module, for receiving the message push of integrated application analysis platform and public's version mobile client;
The database for store user information, location information, underground engineering information, interactive information, intelligent recommendation information and
Credit scoring information.
Preferably, the quality supervision and control module is for executing following procedure:
Engineering essential information is filled in, the quality supervision person of the engineering is responsible in distribution, and generates the login account of the engineering;
By Engineering Division at 10 stages, including tell somebody what one's real intentions are, waterproof, bottom plate, wall, top plate, main body check and accept, completion information examine,
Pre- examination, final acceptance of construction, Put on Records, are managed engineering according to the stage, only can just enter after completion previous stage
Next stage;
Quality supervision personnel to log in professional version client by account show its engineering list being responsible for, and make to step on by account
The construction unit and quality supervision personnel for recording public's version client carry out information exchange.
Preferably, unit of taking part in building's credit appraisal module is for executing following procedure:
The interactive information for recording unit of taking part in building after engineering, the credit scoring of unit of taking part in building is provided by interactive information, is obtained
It objectively evaluates;
It is scored by quality supervision person each unit of taking part in building, obtains subjective assessment;
According to objectively evaluating and subjective assessment, score the unit of taking part in building of the engineering, and according in the engineering scoring and
History scoring, updates the comprehensive score of unit of taking part in building.
Preferably, the Risk assessment on engineering module is for executing following procedure:
Engineering information is added, the name and information of engineering Zhong Ge unit of taking part in building are obtained, and obtains the credit scoring of each unit of taking part in building;
The risk factor of the engineering is obtained by risk assessment algorithm according to the comprehensive score of each unit of taking part in building.
Preferably, the engineering profiling module is for executing following procedure:
Engineering essential information is added by platform;
During quality surveillance, transmitting can be with the interactive information of attachment transmitted by unit of taking part in building or quality supervision personnel;
The tree graph of the engineering is produced after the completion of engineering, shows engineering All Files or the file in some stage, and provide engineering
The downloading of All Files or some stage file.
Preferably, the intelligent recommendation module is for executing following procedure:
Secondary file is added, auxiliary document library is updated;
The stage according to locating for engineering recommends secondary file required for the stage to quality supervision personnel;
The client of unit of taking part in building is sent to using the secondary file of needs as attachment according to the operation of quality supervision personnel.
Correspondingly, the integrated application analysis platform executes following procedure:
Manage the underground engineering built;
The underground engineering of completion has been built in management;
According to performance of the unit of taking part in building in engineering, credit appraisal is made to unit of taking part in building by credit appraisal system model;
The risk of newly built construction is assessed, risk assessment is carried out to the engineering according to the credit appraisal of unit of taking part in building, must be gone to work
Journey risk index;
By the risk factor in engineering risk index each stage that judges engineering in whole process of construction, and according to risk system
Number provides the judgement whether quality supervision person needs scene to be checked at this stage;
Electronic document formed in engineering is filed;
It registers to staff, and records the position of staff in real time;
The document to required for using the staff of professional version mobile client to push at this stage;
The comprehensive operation management platform is for executing following procedure:
The operating status of monitoring server;
Obtain the location information of professional version and public's version mobile client;
Professional version mobile client and public's version mobile client are upgraded;
The account information of management comprehensive applied analysis platform, professional version mobile client and public's version mobile client;
Message transmission is carried out between integrated application analysis platform, professional version mobile client and public's version mobile client;
Message push is carried out between integrated application analysis platform, professional version mobile client and public's version mobile client;
The professional version mobile client is for executing following procedure:
Log in professional version mobile client;
The case where managing the underground engineering be responsible for, checking engineering essential information, each stage, and determine whether engineering can be into
Enter to the next stage;
Information exchange is carried out with integrated application analysis platform and public's version client, display has been read and people of unread information;
Receive the message push of integrated application analysis platform and public's version mobile client;
Public's version mobile client is for executing following procedure:
Unit of taking part in building logs in public's version mobile client;
Construction unit shows, submits the construction information in each stage;
Information exchange is carried out with integrated application analysis platform and professional version client, display has been read and people of unread information;
Receive the message push of integrated application analysis platform and public's version mobile client.
The system is based on mobile Internet, carries out effective supervision and management to project by the collaborative work of full platform.In
In project monitor procedure, can from document library intelligent recommendation staff need document information, be based on project interactive information,
Credit appraisal, the credit information based on unit of taking part in building can be carried out to unit of taking part in building, and then risk assessment, control are carried out to new projects
Project risk.Based on project risk, system can provide aid decision, guarantee construction quality.Project can be carried out after project
It arranges and files.
The system can be divided into 5 layers, respectively data source, infrastructure layer, data Layer, service when implementing from bottom to top
Supporting layer, application layer and represent layer.
Data source:
Various types of data source needed for platform operation, including underground engineering data source, committee do the Room (office) data source, internet crawl number
According to source etc..
Infrastructure layer:
Hardware support environment needed for platform operation, including database server, application server, parking lot digital transmission module, shifting
Dynamic internet etc..
Data Layer:
Data supporting environment needed for platform operation, by grabbing data in underground engineering data, internet content, committee does
Underground engineering application issue library is constructed in office's exchange data and other data basis.
Supporting layer:
Software support environment needed for platform operation, including instant message service, POC, location-based service, Information Push Service, system
One account management service, maintenance management service etc..
Application layer:
The service application that platform provides mainly includes public's version APP, professional version APP, integrated application analysis and synthesis O&M pipe
Reason etc..
Represent layer:
Can be by mobile terminals such as mobile phone, tablet computers, pc client, the service of access platform publication is managed platform
Maintenance etc..
Referring to Figures 1 and 2, as follows using the underground engineering method for quality control of above system:
Step 1: quality supervision and control.First item dividing at 10 stages, specifically include tell somebody what one's real intentions are, waterproof, bottom plate, wall,
Top plate, main body are checked and accepted, completion information examines, pre- examination, final acceptance of construction, Put on Records.
Step 2: quality surveillance record.Interactive information all in quality supervision monitor procedure is recorded.
Step 3: unit of taking part in building's credit appraisal.According to the performance of unit of taking part in building in the project, pass through credit appraisal system mould
Type makes evaluation to unit of taking part in building.
Step 4: Project Risk Assessment.Project progress risk is commented for new projects, according to the credit of unit of taking part in building
Estimate, the risk of more preferable control project reduces the risk of project.
Step 5: aid decision.By project risk index, it further can determine whether that project is each in whole process of construction
The risk factor in stage, according to the coefficient, system can provide the deduction whether quality supervision person needs site inspection at this stage.
Step 6: project filing.After the completion of project, the electronic document formed in project can be filed.Follow text
The formation rule of part, keeps the organic connections between file, distinguishes different values, convenient for keeping and utilizes.
Step 7: management of registering.Quality supervision and control department is facilitated to grasp the operating position of staff in real time, and every
It situation of registering.
Step 8: mobile phone terminal+platform, full platform are supported.Mobile phone terminal is divided into public's version and professional version, the user of professional version are
The staff of quality supervision and control department, the user of public's version are the units of taking part in building of project construction, and platform is mainly quality prison
The administrative staff for superintending and directing administrative department use.Public's version and professional version are divided into Android editions and IOS editions again.4 App and 1 platforms
Information exchange, synergetic office work are realized by internet.
Step 9: intelligent recommendation.For staff during being handled official business using professional version, system can be existing according to project
Stage pushes the document needed at this stage to professional version, facilitates office staff, provide office efficiency.
Specifically, in the step 1 quality supervision and control concrete mode are as follows:
(1) the quality supervision person of the project is responsible in add items information, platform entry item essential information, distribution, and generates the project
Login account.
(2) item dividing specifically includes at 10 stages and tells somebody what one's real intentions are, the examination of waterproof, bottom plate, wall, top plate, main body, is completed
Data review, pre- examination, final acceptance of construction, Put on Records.Project is managed according to the stage, only after completion previous stage
It can enter to next stage.
(3) quality supervision personnel log in professional version client by account, it can be seen that oneself responsible bulleted list.Construction unit
Public's version client is logged in by account, information exchange can be carried out with quality supervision personnel.
The concrete mode of unit of taking part in building's credit appraisal in the step 3 are as follows:
(1) interactive information for recording unit of taking part in building, after project, the credit scoring of unit of taking part in building is provided by interactive information,
Objectively evaluate;
(2) quality supervision person scores to each unit of taking part in building, i.e. subjective assessment according to the performance in project;
(3) basis is objectively evaluated scores with unit of taking part in building of the subjective assessment to the project, and according to the scoring in the project
It scores with history, updates the comprehensive score of unit of taking part in building.
The concrete mode of Project Risk Assessment in the step 4 are as follows:
(1) add items information obtains the name and information of project Zhong Ge unit of taking part in building, and the credit for obtaining each unit of taking part in building is commented
Point;
(2) risk factor of the project is obtained by risk assessment algorithm according to the comprehensive score of each unit of taking part in building.
The concrete mode that project is filed in the step 6 are as follows:
(1) project essential information passes through platform add items essential information;
(2) interactive information in project, during quality surveillance, unit of taking part in building or quality supervision personnel transmission can be with the friendships of attachment
Mutual information;
(3) item file is shown stage by stage, and the tree graph of the project is produced after the completion of project, can show project All Files
Show the file in some stage;
(4) item file is packaged downloading, and the tree graph of the project is produced after the completion of project, can be packaged download items All Files
The file for downloading some stage can be packaged.
The concrete mode of intelligent recommendation in the step 9 are as follows:
(1) secondary file is added, auxiliary document library is updated;
(2) stage according to locating for project, system can recommend secondary file required for the stage to quality supervision personnel;
(3) quality supervision personnel can be sent to the client of unit of taking part in building using the secondary file of needs as attachment;
(4) unit of taking part in building can download secondary file after logging in client, and according to secondary file information, further improve project.
Specific step is as follows for monitor procedure:
(1) project information is added to by project application, Quality Supervision Station according to the online entry item information of material that unit of taking part in building submits
System, while generating the risk factor of the login account of unit of taking part in building, password and the project;
(2) unit of taking part in building can check project information, application and interaction letter also can be transmitted by account, password login public version App
It ceases (attachment can be added);
(3) the quality supervision person for being responsible for the project can check the project information after logging in the project, while can be to the application of the project
It is handled, will go into next stage after success;
(4) quality supervision person can be sent to unit of taking part in building for auxiliary document as attachment when handling information;
(5) after project, platform can evaluate unit of taking part in building;
(6) after project application success, risk assessment can be carried out to new projects according to unit of taking part in building's information.
In short, present system is based on mobile Internet, project is effectively supervised by the collaborative work of full platform
And management, in project monitor procedure, can from document library intelligent recommendation staff need document information, be based on project
Interactive information can carry out credit appraisal, the credit information based on unit of taking part in building to unit of taking part in building, and then carry out risk to new projects
Assessment, control project risk.Based on project risk, system can provide aid decision, guarantee construction quality.It can be right after project
Project is arranged and is filed, and convenient for keeping and is utilized.As it can be seen that the present invention greatly facilitates the work of underground engineering quality surveillance
Make, the working efficiency of staff can be greatly improved.
It is to be appreciated that be intended merely to facilitate this field common for the above-mentioned narration for this patent specific embodiment
Technical staff understands this patent scheme and the exemplary description enumerated, does not imply that the protection scope of this patent is limited solely to
In this few example, those of ordinary skill in the art completely can the art of this patent scheme is made fully understand under the premise of,
In the form of not paying any creative work, by taking combination technique feature, replacement to each example cited by this patent
More technical characteristics etc. mode is added in some technical characteristics, obtains more specific embodiments, all these specific implementations
Mode is within the covering scope of patent claims book, and therefore, these new specific embodiments also should be in this patent
Protection scope within.
Claims (6)
1. a kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal, which is characterized in that answered including synthesis
With analysis platform, comprehensive operation management platform, professional version mobile client, public's version mobile client and database;Wherein,
The integrated application analysis platform includes:
Quality supervision and control module, for managing the underground engineering built;
Quality surveillance logging modle, for managing the underground engineering for having built completion;
Unit of taking part in building's credit appraisal module passes through credit appraisal system model for the performance according to unit of taking part in building in engineering
Credit appraisal is made to unit of taking part in building;
Risk assessment on engineering module is assessed for the risk to newly built construction, according to the credit appraisal of unit of taking part in building to the work
Cheng Jinhang risk assessment obtains engineering risk index;
Aid decision module, for the risk system by engineering risk index each stage that judges engineering in whole process of construction
Number, and according to risk factor, provide the judgement whether quality supervision person needs scene to be checked at this stage;
Engineering profiling module, for filing to electronic document formed in engineering;
It registers management module, registers for staff, and record the position of staff in real time;
Intelligent recommendation module, for required at this stage literary to using the staff of professional version mobile client to push
Shelves;
The comprehensive operation management platform includes:
Maintenance management service module, the operating status for monitoring server;
Location-based service module, for obtaining the location information of professional version and public's version mobile client;
Client upgrade service module, the upgrading for professional version mobile client and public's version mobile client;
Unified account number management services module is moved for management comprehensive applied analysis platform, professional version mobile client and public's version
The account information of dynamic client;
Instant message service module, for realizing integrated application analysis platform, professional version mobile client and the mobile visitor of public's version
Message between the end of family is sent;
Push Service module, for realizing integrated application analysis platform, professional version mobile client and public's version mobile client
Between message push;
The professional version mobile client includes:
First login module, for logging in professional version mobile client;
Quality supervision management module, the case where for managing the underground engineering being responsible for, checking engineering essential information, each stage, and
Determine whether engineering can enter the next stage;
First information interactive module, for carrying out information exchange with integrated application analysis platform and public's version client, display is
Reading and people of unread information;
First pushing module, for receiving the message push of integrated application analysis platform and public's version mobile client;
Public version mobile client includes:
Second login module logs in public's version mobile client for unit of taking part in building;
Engineering information module shows for construction unit, submits the construction information in each stage;
Second information exchange module, for carrying out information exchange with integrated application analysis platform and professional version client, display is
Reading and people of unread information;
Second pushing module, for receiving the message push of integrated application analysis platform and public's version mobile client;
The database for store user information, location information, underground engineering information, interactive information, intelligent recommendation information and
Credit scoring information.
2. a kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal according to claim 1,
Be characterized in that: the quality supervision and control module is for executing following procedure:
Engineering essential information is filled in, the quality supervision person of the engineering is responsible in distribution, and generates the login account of the engineering;
By Engineering Division at 10 stages, including tell somebody what one's real intentions are, waterproof, bottom plate, wall, top plate, main body check and accept, completion information examine,
Pre- examination, final acceptance of construction, Put on Records, are managed engineering according to the stage, only can just enter after completion previous stage
Next stage;
Quality supervision personnel to log in professional version client by account show its engineering list being responsible for, and make to step on by account
The construction unit and quality supervision personnel for recording public's version client carry out information exchange.
3. a kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal according to claim 1,
Be characterized in that: unit of taking part in building's credit appraisal module is for executing following procedure:
The interactive information for recording unit of taking part in building after engineering, the credit scoring of unit of taking part in building is provided by interactive information, is obtained
It objectively evaluates;
It is scored by quality supervision person each unit of taking part in building, obtains subjective assessment;
According to objectively evaluating and subjective assessment, score the unit of taking part in building of the engineering, and according in the engineering scoring and
History scoring, updates the comprehensive score of unit of taking part in building.
4. a kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal according to claim 1,
Be characterized in that: the Risk assessment on engineering module is for executing following procedure:
Engineering information is added, the name and information of engineering Zhong Ge unit of taking part in building are obtained, and obtains the credit scoring of each unit of taking part in building;
The risk factor of the engineering is obtained by risk assessment algorithm according to the comprehensive score of each unit of taking part in building.
5. a kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal according to claim 1,
Be characterized in that: the engineering profiling module is for executing following procedure:
Engineering essential information is added by platform;
During quality surveillance, transmitting can be with the interactive information of attachment transmitted by unit of taking part in building or quality supervision personnel;
The tree graph of the engineering is produced after the completion of engineering, shows engineering All Files or the file in some stage, and provide engineering
The downloading of All Files or some stage file.
6. a kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal according to claim 1,
Be characterized in that: the intelligent recommendation module is for executing following procedure:
Secondary file is added, auxiliary document library is updated;
The stage according to locating for engineering recommends secondary file required for the stage to quality supervision personnel;
The client of unit of taking part in building is sent to using the secondary file of needs as attachment according to the operation of quality supervision personnel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910689253.7A CN110533293A (en) | 2019-07-29 | 2019-07-29 | A kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910689253.7A CN110533293A (en) | 2019-07-29 | 2019-07-29 | A kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110533293A true CN110533293A (en) | 2019-12-03 |
Family
ID=68662002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910689253.7A Pending CN110533293A (en) | 2019-07-29 | 2019-07-29 | A kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110533293A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114924535A (en) * | 2022-05-18 | 2022-08-19 | 北京天辰信科技有限公司 | Method and system for acquiring information from engineering data to perform safety production early warning |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020198755A1 (en) * | 2001-06-22 | 2002-12-26 | Birkner Charles Christian | Integrated quality assurance control system to manage construction projects |
US20050209897A1 (en) * | 2004-03-16 | 2005-09-22 | Luhr Stanley R | Builder risk assessment system |
US20050251433A1 (en) * | 2004-04-16 | 2005-11-10 | Orifici Joseph M | Method and system to assess, track and implement capital projects by municipalities |
WO2008077189A1 (en) * | 2006-12-22 | 2008-07-03 | David Longmuir | Method of assessing project credit risk |
CN101676932A (en) * | 2008-09-16 | 2010-03-24 | 深圳市红旗信息技术有限公司 | Electronic monitoring method and system of government-invested construction project |
CN101976400A (en) * | 2010-11-17 | 2011-02-16 | 苏州德融嘉信信用管理技术有限公司 | Grading work control method based on credit grading work system |
CN102521709A (en) * | 2011-12-22 | 2012-06-27 | 上海建科工程咨询有限公司 | Building construction quality safety online risk management system |
CN103942654A (en) * | 2014-04-30 | 2014-07-23 | 国家电网公司 | Electric power engineering quality supervision and management platform |
CN104517188A (en) * | 2014-12-25 | 2015-04-15 | 国家电网公司 | Engineering project security management intelligent integrated machine |
CN106408254A (en) * | 2016-09-06 | 2017-02-15 | 江苏智通交通科技有限公司 | Highway engineering project supervision system |
CN107146065A (en) * | 2017-03-20 | 2017-09-08 | 中国铁道科学研究院电子计算技术研究所 | Railway engineering management platform system |
CN207163495U (en) * | 2017-09-01 | 2018-03-30 | 国网北京市电力公司 | Environmental monitoring system |
CN108022049A (en) * | 2017-12-07 | 2018-05-11 | 浙江省水利水电工程质量与安全监督管理中心 | Quality of Water Conservancy Projects safety supervision risk evaluating system and method |
CN109754132A (en) * | 2017-11-02 | 2019-05-14 | 周金泉 | A kind of ladder level credit estimation method and assessment system |
-
2019
- 2019-07-29 CN CN201910689253.7A patent/CN110533293A/en active Pending
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020198755A1 (en) * | 2001-06-22 | 2002-12-26 | Birkner Charles Christian | Integrated quality assurance control system to manage construction projects |
US20050209897A1 (en) * | 2004-03-16 | 2005-09-22 | Luhr Stanley R | Builder risk assessment system |
US20050251433A1 (en) * | 2004-04-16 | 2005-11-10 | Orifici Joseph M | Method and system to assess, track and implement capital projects by municipalities |
WO2008077189A1 (en) * | 2006-12-22 | 2008-07-03 | David Longmuir | Method of assessing project credit risk |
CN101676932A (en) * | 2008-09-16 | 2010-03-24 | 深圳市红旗信息技术有限公司 | Electronic monitoring method and system of government-invested construction project |
CN101976400A (en) * | 2010-11-17 | 2011-02-16 | 苏州德融嘉信信用管理技术有限公司 | Grading work control method based on credit grading work system |
CN102521709A (en) * | 2011-12-22 | 2012-06-27 | 上海建科工程咨询有限公司 | Building construction quality safety online risk management system |
CN103942654A (en) * | 2014-04-30 | 2014-07-23 | 国家电网公司 | Electric power engineering quality supervision and management platform |
CN104517188A (en) * | 2014-12-25 | 2015-04-15 | 国家电网公司 | Engineering project security management intelligent integrated machine |
CN106408254A (en) * | 2016-09-06 | 2017-02-15 | 江苏智通交通科技有限公司 | Highway engineering project supervision system |
CN107146065A (en) * | 2017-03-20 | 2017-09-08 | 中国铁道科学研究院电子计算技术研究所 | Railway engineering management platform system |
CN207163495U (en) * | 2017-09-01 | 2018-03-30 | 国网北京市电力公司 | Environmental monitoring system |
CN109754132A (en) * | 2017-11-02 | 2019-05-14 | 周金泉 | A kind of ladder level credit estimation method and assessment system |
CN108022049A (en) * | 2017-12-07 | 2018-05-11 | 浙江省水利水电工程质量与安全监督管理中心 | Quality of Water Conservancy Projects safety supervision risk evaluating system and method |
Non-Patent Citations (2)
Title |
---|
夏伦月等: "机电安装工程项目的管理要素探讨", 《科技信息》 * |
姜煜东: "在工程建设领域推行工程保证担保制度的探讨", 《广东土木与建筑》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114924535A (en) * | 2022-05-18 | 2022-08-19 | 北京天辰信科技有限公司 | Method and system for acquiring information from engineering data to perform safety production early warning |
CN114924535B (en) * | 2022-05-18 | 2022-12-02 | 北京天辰信科技有限公司 | Method and system for acquiring information from engineering data to perform safety production early warning |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110276530A (en) | A kind of intelligent engineering operation and maintenance supervising method | |
CN104240342B (en) | Access control method and device based on identity authentication | |
CN108711006B (en) | Income management method, management node, system and storage equipment | |
CN108009801A (en) | Management information system | |
US20090030711A1 (en) | Project Management System and Method | |
CN208888869U (en) | It is a kind of based on internet+external coordination construction team safety control platform | |
CN108346245A (en) | A kind of shared books method and system | |
CN108694649A (en) | A kind of intellectual property trusteeship service platform | |
CN115375146A (en) | Digital construction integrated platform | |
CN111383130A (en) | Full life cycle management and control platform, mobile operation and maintenance client and terminal | |
CN107451794A (en) | A kind of science service online management system | |
CN112085225A (en) | Operation and maintenance system and method for user side power equipment | |
CN103295164A (en) | Power grid safety monitoring management information system and management method | |
CN110533293A (en) | A kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal | |
CN113902416A (en) | Method for managing whole process of building information assets and related equipment | |
KR20090001468A (en) | System and method for the news of death using internet | |
US20100042446A1 (en) | Systems and methods for providing core property review | |
CN110689219A (en) | Big data-based user behavior evaluation display method, device, equipment and medium | |
KR20060010284A (en) | System for real time controlling driving data of power plant | |
CN108470049A (en) | A kind of construction project management system based on instrument board | |
CN109426683A (en) | Project Management System based on BIM network technology | |
CN114283037A (en) | Training and engagement system, electronic equipment and storage medium | |
CN104992274A (en) | APCD tobacco market supervision mobile phone client and compute side working platform | |
CN112150326A (en) | Enterprise intellectual property cloud office digital management system | |
KR100989689B1 (en) | Integrating management system for supporting for service of bank and method of the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191203 |