CN110485425A - Hammering method tube pile construction intelligent acquisition system based on NB_IOT - Google Patents

Hammering method tube pile construction intelligent acquisition system based on NB_IOT Download PDF

Info

Publication number
CN110485425A
CN110485425A CN201910721670.5A CN201910721670A CN110485425A CN 110485425 A CN110485425 A CN 110485425A CN 201910721670 A CN201910721670 A CN 201910721670A CN 110485425 A CN110485425 A CN 110485425A
Authority
CN
China
Prior art keywords
construction
pile
iot
data
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910721670.5A
Other languages
Chinese (zh)
Inventor
田一鸣
谢黎明
杜赛赛
吴平平
许大晴
赵翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Research And Development Center Of Energy Saving And Environmental Protection Technology And Equipment For Highway Traffic And Transportation Industry
Anhui Transport Consulting and Design Institute Co Ltd
Original Assignee
Research And Development Center Of Energy Saving And Environmental Protection Technology And Equipment For Highway Traffic And Transportation Industry
Anhui Transport Consulting and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Research And Development Center Of Energy Saving And Environmental Protection Technology And Equipment For Highway Traffic And Transportation Industry, Anhui Transport Consulting and Design Institute Co Ltd filed Critical Research And Development Center Of Energy Saving And Environmental Protection Technology And Equipment For Highway Traffic And Transportation Industry
Priority to CN201910721670.5A priority Critical patent/CN110485425A/en
Publication of CN110485425A publication Critical patent/CN110485425A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/06Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers for observation while placing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/10Miscellaneous comprising sensor means

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a kind of hammering method tube pile construction intelligent acquisition system based on NB_IOT, is related to tube pile construction systems technology field.The system includes tubular pole perpendicularity deviation detection module, displacement at pile top detection module, height of pile top detection module, pile penetration detection module, total blow counts module, the MCU core based on STM32L476, NB-IOT communication transmission module, system platform server.Each detection module automatic data collection during tubular pole hammer-impact construction, pass through NB-IOT communications to data receiver, server analyzes data, digital Platform shows, replace existing artificial observation, artificial detection, the form of construction work for manually reporting early warning, realizes and long-range, the live real time monitoring to construction data, the intelligence to construction quality is respectively organized to control in work progress.

Description

Hammering method tube pile construction intelligent acquisition system based on NB_IOT
Technical field
The present invention relates to a kind of hammering method tube pile construction intelligent acquisition system based on NB_IOT, belongs to tube pile construction technology Field.
Technical background
Preset tubular pole obtains wide use by hammer-impact construction in the foundation engineerings such as bridge pile foundation, is applicable in ground Soil property range is wider, is easy to guarantee construction quality and project progress.But since current unit in charge of construction is for tube pile construction management It is more coarse, proprietor can not to work progress carry out in real time detailed management, when there is construction problem designing unit also without Method accurately restores condition of construction, analyzes difficulty to throw into question, and can not put forward effective solutions in time.
For hammer-impact construction tubular pole under traditional construction and management condition existing more problem, from put forth effort improve construction Quality, reinforcement work progress control are started with, and have carried out several research work, but visible correlation in document and report both at home and abroad It is still more single to study function, in patent book " a kind of the pile penetration detection device and detection method of steel-pipe pile hammer piling ", With sensor reflective membrane etc., pile penetration data are detected in the construction process, are only only completed single datum collection.It is difficult to pair of system The Key Quality control point of hammering method tube pile construction overall process carries out effective monitoring and management, to lifting construction management level, protects The effect for demonstrate,proving construction quality is still relatively limited.
Summary of the invention
The purpose of the invention is to avoid above-mentioned existing deficiencies in the technology, provide a kind of based on NB_IOT Hammering method tube pile construction intelligent acquisition system, in the construction process to construction data carry out automatic collection, passed by NB_IOT Data receiver is transported to, server analyzes data, digital Platform shows, and replaces existing artificial observation, artificial inspection Survey, manually report the form of construction work of early warning, realize in work progress each tissue is long-range, scene to the real time monitoring of construction data, The intelligence of construction quality is controlled.
The NB-IoT utilized is a kind of new narrowband cellular communication LPWAN (low-power consumption wide area network) technology, and NB-IoT is focused Extensively cover the market (LPWA) Internet of Things (IoT) in low-power consumption, be can be merged with Cellular Networks evolution inexpensive carrier class it is highly reliable Property, high security wide area networking of things network technology.It is wide with covering, connection is more, rate is low, at low cost, low in energy consumption, the excellent spy of framework Point.Information transmission is carried out to reach real-time, efficiently and accurately complete tubular pole project to tube pile construction process by the network communication Construction.
Its technical solution is:
Hammering method tube pile construction intelligent acquisition system based on NB_IOT includes tubular pole perpendicularity deviation detection module, stake Displacement detection module, height of pile top detection module, pile penetration detection module and total blow counts module are pushed up, STM32L476 is based on MCU nucleus module, NB-IOT communication transmission module, data collection and analysis server, system platform server.Described is each The submodule verticality of tubular pole, displacement at pile top, hammering injection in dynamic collection work progress during tubular pole hammer-impact construction Degree, height of pile top, the data real-time automatic collecting construction data such as blow counts pass through NB-IOT network transmission to data acquisition service Construction data by digital Platform real-time exhibition, is carried out effective early warning to the data of record by device, system platform server.
The constituent parts in work progress are organized together by information-based means, improve unit in charge of construction, management, design list Position and the communication efficiency of owner, but also proprietor has more detailed and accurately understands and control to tube pile construction process.
Compared with the prior art, the invention has the advantages that:
Tubular pole system record work progress in abnormal data, owner's unit use tubular pole system, can science management Work progress plans as a whole construction speed, carries out work progress supervision and achievement inspection to construction, management and detection side, different to constructing Reason condition tracks solution in time.
Construction speed can be intuitively checked in tubular pole system, manufacturer uses management system, and the production of tubular pole produces In, the manufacturing parameter of tubular pole can be adjusted in time according to the optimization information in construction with reasonable arrangement tubular pole production plan.
Tubular pole system establishes the standard criterion library of profession for examination criteria in construction, according to logging data, intelligent decision Whether data meet detection quality standard, and Detection task can fast and accurately be completed by detecting unit using tubular pole system.
Detailed description of the invention
Fig. 1 is NB_IOT communication network architecture figure;
Fig. 2 is intelligent tubular pole system construction drawing;
Fig. 3 is single chip machine controlling circuit schematic diagram
Fig. 4 is MPU6050 circuit diagram;
Fig. 5 is GPS Beidou bimodulus locating module circuit diagram;
Fig. 6 is NB_IOT end-frame composition.
Specific embodiment
Below by way of specific embodiment, in conjunction with attached drawing, the invention will be further described.
As shown in Figure 1, Figure 2, Figure 3 shows, the overall structure of intelligent tube pile construction intelligent acquisition system is that each sensor acquires number MCU core is sent data to by interface modes such as IIC/ serial ports according to rear, MCU and NB-IOT module is led to by serial ports Letter, acquisition data provide API data interface, hand to development by NB_IOT network transmission to cloud platform, cloud platform Generator terminal or the visual software platform of computer end show realtime construction information to construction teams and groups, management, owner etc..It constructed simultaneously Once problem occurs in journey, effective early warning can be carried out by the data recorded in real time.Core single chip machine controlling circuit uses STM32L476RG microcontroller chip, is based on- M4 has FPU kernel.Its working frequency up to 80MHz, and Realize the performance under 80MHz frequency with 100DMIPS, up to 1MB flash memory, 128KB SRAM.There are many low by STM32L4 Power consumption mode allows user to have more low-power consumption mode selections to meet specific application demand of constructing outside the venue.
As shown in figure 4, the three axis accelerometer electronic gyroscope module based on MPU6050 is installed on tubular pole side, pass through MPU6050 measures X-axis acceleration and Z axis acceleration, and data send data to MCU nucleus module by IIC communication protocol, It is equal to the angle that atan (X-axis acceleration/Z axis acceleration) calculates tubular pole according to arctan function angle.Data are transmitted to system It is compared after platform with pre-set design standard, when data deviation is more than allowed band, system platform passes through early warning System is warned to each side such as construction teams and groups.
As shown in figure 5, the GPS/ Beidou positioning module based on ATGM332D-5N-31 mould group scheme, module are installed on stake top Side, GPS Beidou bimodulus locating module intermediary by IO respectively with GPS_TXD (chip pin 16), GPS_RXD (chip pin 17) it communicates, in the location information at middle real-time Transmission tubular pole of constructing, system can be calculated stake in work progress by data The relative displacement data on top, and compared with design standard, it is warned when being more than allowed band to construction manager.And join Phase survey data before examination can calculate the elevation of tubular pole.
Based on the ultrasonic distance measuring module of KS109 mould group, it is installed on pile driving equipment rack top, measurement stake top to test point Distance upload measurement data in real time, measurement accuracy 5mm is communicated by TTL serial ports with MCU, directly output range data, put down Platform show that this time hammers pile penetration size by the difference of each distance of operation.
Also or, ultrasonic distance measuring module is replaced with into high-precision laser range-finding sensor and is installed on pile driving equipment rack top End, the distance of measurement stake top to test point are transmitted to server operation by NB-IOT and obtain piling pile penetration data every time.
As shown in fig. 6, blow counts detection module uses SW-18010P vibrating sensor, it is installed on tubular pole side, works as construction When static, vibroswitch is in off-state, and output end exports high level, vibration switch transient switching when tube pile construction, output end Low level is exported, low and high level is detected by single-chip microcontroller, thus detects whether environment has vibration.
Tubular pole intelligence construction management system in service application service device mainly faces unit in charge of construction, supervisor, design The users such as unit, detection unit, manufacturer, monitoring tubular pole make in test pile, the daily log of construction and construction abnormal conditions With technological means, intelligence matches stake, and experts database enables common tube pile construction problem effectively and rapidly to solve.
In the present invention, it provides and limits unless there are specific, it is interlaced between feature, not necessarily it is individually present.With On be shown and described with including basic principles and main features and its advantage of the invention.Being engaged in the technical professional need to know, this The limitation be not limited to the above embodiment is invented, the above embodiments are only preferred examples of the present invention with specification, rather than are used The present invention is limited, to become unique selection.In the case where the spirit and scope of invention require, the present invention can be also further change in and excellent Change, to the present invention carry out improve and optimizate all enter scope of the claimed invention in, claimed specific range It is defined by the appending claims and its equivalent thereof.

Claims (6)

1. the hammering method tube pile construction intelligent acquisition system based on NB_IOT, it is characterised in that: examined comprising tubular pole perpendicularity deviation Module, displacement at pile top detection module, height of pile top detection module, pile penetration detection module and total blow counts module are surveyed, MCU nucleus module based on STM32L476, NB-IOT communication transmission module, data collection and analysis server, system platform service Device, tubular pole verticality, stake top of each submodule during tubular pole hammer-impact construction in dynamic monitoring work progress Displacement, hammering pile penetration, height of pile top, blow counts data real-time automatic collecting construction data, extremely by NB-IOT network transmission Construction data is passed through digital Platform real-time exhibition by data acquisition server, system platform server.
2. the hammering method tube pile construction intelligent acquisition system according to claim 1 based on NB_IOT, it is characterised in that: institute The tubular pole vertical missing detection module stated, the three axis accelerometer electronic gyroscope module detection tubular pole based on MPU6050 hang down Straight degree sends data to MCU nucleus module according to by IIC communication protocol.
3. the hammering method tube pile construction intelligent acquisition system according to claim 1 based on NB_IOT, it is characterised in that: institute The displacement at pile top detection module stated, be based on ATGM332D-5N-31 mould group scheme, by serial ports to SCM system export GPS and Beidou real-time positioning information calculates displacement at pile top data.
4. the hammering method tube pile construction intelligent acquisition system according to claim 1 based on NB_IOT, it is characterised in that: institute The pile penetration detection module stated, high-precision laser range-finding sensor are installed on pile driving equipment rack top, measurement stake top to detection The distance of point is transmitted to server operation by NB-IOT and obtains piling pile penetration data every time, until passing through after Platform Server Go out tubular pole elevation with pile penetration detection data, prospecting earth's surface altitude data logical operation.
5. the hammering method tube pile construction intelligent acquisition system according to claim 1 based on NB_IOT, it is characterised in that: institute The total blow counts module stated is uploaded to MCU core using KS109 vibrating sensor detection Pile Hammer Impact vibration number.
6. the hammering method tube pile construction intelligent acquisition system according to claim 1 based on NB_IOT, it is characterised in that: institute The service application service device stated, service application service device mainly install tubular pole intelligence construction management platform, and tubular pole intelligently manage by construction Platform uses core architecture of the J2EE platform as system, provides system administration, data report and query statistic function.
CN201910721670.5A 2019-08-06 2019-08-06 Hammering method tube pile construction intelligent acquisition system based on NB_IOT Pending CN110485425A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910721670.5A CN110485425A (en) 2019-08-06 2019-08-06 Hammering method tube pile construction intelligent acquisition system based on NB_IOT

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910721670.5A CN110485425A (en) 2019-08-06 2019-08-06 Hammering method tube pile construction intelligent acquisition system based on NB_IOT

Publications (1)

Publication Number Publication Date
CN110485425A true CN110485425A (en) 2019-11-22

Family

ID=68550090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910721670.5A Pending CN110485425A (en) 2019-08-06 2019-08-06 Hammering method tube pile construction intelligent acquisition system based on NB_IOT

Country Status (1)

Country Link
CN (1) CN110485425A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112013903A (en) * 2020-09-02 2020-12-01 中国华能集团有限公司 Quality control method and device for offshore wind power pile
CN113981972A (en) * 2021-11-30 2022-01-28 四川华西管桩工程有限公司 Hammering assistance, system and hammering data sharing system for pipe pile construction
CN117610937A (en) * 2023-12-19 2024-02-27 江苏筑港建设集团有限公司 Pile driving ship pile sinking construction intelligent management and control system based on data analysis

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563171A (en) * 2015-01-21 2015-04-29 中交四航局第二工程有限公司 Device and method for detecting penetration of hammering piling for steel pipe pile
CN104879169A (en) * 2015-05-18 2015-09-02 广州市建设工程质量安全检测中心 Underground engineering and deep foundation pit unattended real-time monitoring early warning system and working method thereof
CN108834279A (en) * 2018-06-29 2018-11-16 广州市浩洋电子股份有限公司 City illumination intelligent management system and localization method based on multi-internet integration
CN109167804A (en) * 2018-05-21 2019-01-08 广东力源液压机械有限公司 A kind of hydraulic pile hammer communication interaction method and its system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563171A (en) * 2015-01-21 2015-04-29 中交四航局第二工程有限公司 Device and method for detecting penetration of hammering piling for steel pipe pile
CN104879169A (en) * 2015-05-18 2015-09-02 广州市建设工程质量安全检测中心 Underground engineering and deep foundation pit unattended real-time monitoring early warning system and working method thereof
CN109167804A (en) * 2018-05-21 2019-01-08 广东力源液压机械有限公司 A kind of hydraulic pile hammer communication interaction method and its system
CN108834279A (en) * 2018-06-29 2018-11-16 广州市浩洋电子股份有限公司 City illumination intelligent management system and localization method based on multi-internet integration

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
焦安亮等: "《我国建筑智能工程施工技术及新应用》", 《建筑技术》 *
顾孙平: "《建筑基桩通论》", 31 January 2016, 上海:同济大学出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112013903A (en) * 2020-09-02 2020-12-01 中国华能集团有限公司 Quality control method and device for offshore wind power pile
CN113981972A (en) * 2021-11-30 2022-01-28 四川华西管桩工程有限公司 Hammering assistance, system and hammering data sharing system for pipe pile construction
CN117610937A (en) * 2023-12-19 2024-02-27 江苏筑港建设集团有限公司 Pile driving ship pile sinking construction intelligent management and control system based on data analysis
CN117610937B (en) * 2023-12-19 2024-05-17 江苏筑港建设集团有限公司 Pile driving ship pile sinking construction intelligent management and control system based on data analysis

Similar Documents

Publication Publication Date Title
CN110485425A (en) Hammering method tube pile construction intelligent acquisition system based on NB_IOT
CN102608963B (en) Summarized information monitoring system of tunnel
CN105957311A (en) Adaptive expansion slope stability intelligent monitoring early warning system
CN103016063A (en) Monitoring system for construction safety
CN108803312B (en) Novel road damage detecting system
CN103835764B (en) Underground works and deep basal pit pre-warning system for monitoring
CN203350459U (en) A quick reporting instrument for ground motion parameters
CN204065819U (en) A kind of dam deformation automatic monitoring system based on technology of Internet of things
CN210222990U (en) On-line monitoring system for windproof stay wire of power transmission line
CN105139292A (en) Power transmission and transformation engineering construction stage environment supervision inspection system and method
CN110705917A (en) Robot supervision system applied to construction site
CN102852129A (en) Automatic long-term monitoring system and monitoring method for severe roadbed deformation
CN202600791U (en) Lake patrol management system based on GPS (Global Positioning System), GPRS (General Packet Radio Service) and GIS (Geographic Information System) integrated technology
CN208621235U (en) A kind of two-dimensional ultrasonic wind energy power density measuring apparatus based on time difference method
CN107844964A (en) A kind of shield construction information management system
CN111894054A (en) Foundation pit excavation state monitoring system and method based on laser range finder networking
CN103149896A (en) Monitoring device and networked automatic monitoring and recording system for pile hammering machine construction
CN114638507A (en) Intelligent ocean platform detection system and method
CN104634400A (en) System and method for automatic bucket counting oil consumption measurement of excavator
CN104408919A (en) Manual road traffic parameter investigation system based on mobile intelligent terminal
CN202077190U (en) Downtilt angle device of remote real-time monitoring base station antenna
CN206712850U (en) A kind of intelligent noise monitoring system
CN106441199A (en) Ditcher work quality monitoring system and method
CN109798870A (en) A kind of well lid settlement monitoring device and mobile device
CN209311893U (en) A kind of unfavorable geologic body Stability Monitoring System

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191122

RJ01 Rejection of invention patent application after publication