CN110475365B - Pre-scheduling duration control method and base station - Google Patents

Pre-scheduling duration control method and base station Download PDF

Info

Publication number
CN110475365B
CN110475365B CN201810443272.7A CN201810443272A CN110475365B CN 110475365 B CN110475365 B CN 110475365B CN 201810443272 A CN201810443272 A CN 201810443272A CN 110475365 B CN110475365 B CN 110475365B
Authority
CN
China
Prior art keywords
scheduling
uplink
terminal
duration
effective
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810443272.7A
Other languages
Chinese (zh)
Other versions
CN110475365A (en
Inventor
马骢
王建生
周昌林
赵锦松
何雅君
丁霞俊
李海振
姜奇华
童海生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Group Zhejiang Co Ltd
Original Assignee
China Mobile Group Zhejiang Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Group Zhejiang Co Ltd filed Critical China Mobile Group Zhejiang Co Ltd
Priority to CN201810443272.7A priority Critical patent/CN110475365B/en
Publication of CN110475365A publication Critical patent/CN110475365A/en
Application granted granted Critical
Publication of CN110475365B publication Critical patent/CN110475365B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • H04W72/1263Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
    • H04W72/1268Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/535Allocation or scheduling criteria for wireless resources based on resource usage policies
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Abstract

The embodiment of the invention provides a pre-scheduling duration control method and a base station. The method comprises the following steps: acquiring a first pre-scheduling parameter of a terminal; the first pre-scheduling parameter is an uplink pre-scheduling parameter of a preset period on the terminal, and the uplink pre-scheduling parameter is the ratio of the effective pre-scheduling times of uplink pre-scheduling operation to the total pre-scheduling times; determining a first pre-scheduling time length corresponding to the first pre-scheduling parameter according to a preset corresponding relation between an uplink pre-scheduling parameter and a pre-scheduling time length; and controlling the duration of the uplink prescheduling operation of the terminal according to the first prescheduling duration. According to the method and the device, the uplink pre-scheduling duration time in the current period is controlled according to the pre-scheduling condition of the last preset period of the terminal, the uplink pre-scheduling duration time of the terminal is configured in a self-adaptive and dynamic mode, more padding packets caused by improper configuration are avoided, and the IoT is reduced.

Description

Pre-scheduling duration control method and base station
Technical Field
The embodiment of the invention relates to the technical field of mobile communication, in particular to a prescheduling duration control method and a base station.
Background
In Long Term Evolution (LTE) of the universal mobile telecommunications technology, uplink scheduling refers to a base station scheduler dynamically selecting which terminals are scheduled according to various grasped information and how much transmission resources are allocated to the terminals. The scheduler can maximize the system throughput or optimize the user experience according to different scheduling purposes and different algorithms, and can also pursue a certain balance between the two. Currently, uplink scheduling is mainly triggered by User Equipment (UE), and mainly includes the following procedures:
1. the UE transmits an Uplink Scheduling Request (SR) through an Uplink Control Information (UCI) in a Physical Uplink Control Channel (PUCCH) to Request an Uplink resource from a base station (Evolved Node B, eNB);
2. after receiving the SR, the eNB issues a UL grant permission;
3. the UE informs the eNB of the data volume needing to be transmitted;
4. after receiving a Buffer State Report (BSR) reported by the UE, the eNB determines how to allocate resources to the UE for data transmission according to a Sounding Reference Signal (SRS) reported by the UE and a comprehensive analysis of existing resources of the eNB.
However, when the UE transmits Uplink data each time, if there is no Physical Uplink Shared Channel (PUSCH) resource, the UE needs to apply for the PUSCH through the SR, which undoubtedly results in an increase in Uplink data delay, thereby affecting the perception of the user. Therefore, in order to reduce uplink delay, an uplink prescheduling mechanism is introduced.
The uplink pre-scheduling mechanism allocates a certain uplink resource to the UE in advance, and the UE does not need to apply through an SR process, so that the time delay of uplink data can be reduced. Meanwhile, after the pre-scheduling mechanism is started, if the UE has no real data, a padding (padding) packet is also sent, which causes null scheduling, so that uplink data sent by the UE is increased, thereby increasing Interference over Thermal (IoT). Therefore, the core problem of current prescheduling is how to reduce IoT rise as much as possible on the basis of optimizing latency.
In order to solve the above problem, the conventional mechanism mainly reduces IoT degradation caused by pre-scheduling by limiting the number of Physical Resource Blocks (PRBs) of a single subframe pre-scheduling or limiting the uplink pre-scheduling duration.
However, in some cases, ioT cannot be effectively reduced by limiting the total number of PRBs in a single subframe or limiting the uplink pre-scheduling duration, because in a cell, there may exist some UEs in the uplink pre-scheduling duration, only a small part of data in the data that is passed through the pre-scheduling is real data, and the rest is padding packets. Therefore, setting the same total number of PRBs or uplink prescheduling duration for all UEs in a cell does not effectively reduce IoT.
Disclosure of Invention
The embodiment of the invention provides a prescheduling duration control method and a base station, which are used for solving the problem that the IoT cannot be effectively reduced by limiting the number of total PRBs (physical resource blocks) in a single-subframe prescheduling manner or limiting the duration of uplink prescheduling in the prior art.
In one aspect, an embodiment of the present invention provides a method for controlling a pre-scheduling duration, where the method is applied to a base station, and the method includes:
acquiring a first pre-scheduling parameter of a terminal; the first pre-scheduling parameter is an uplink pre-scheduling parameter of a preset period on the terminal, and the uplink pre-scheduling parameter is the ratio of the effective pre-scheduling times of uplink pre-scheduling operation to the total pre-scheduling times;
determining a first pre-scheduling time length corresponding to the first pre-scheduling parameter according to a preset corresponding relation between an uplink pre-scheduling parameter and a pre-scheduling time length;
and controlling the duration of the uplink prescheduling operation of the terminal according to the first prescheduling duration.
In another aspect, an embodiment of the present invention provides a base station, where the base station includes:
the acquisition module is used for acquiring a first pre-scheduling parameter of the terminal; the first pre-scheduling parameter is an uplink pre-scheduling parameter of a preset period on the terminal, and the uplink pre-scheduling parameter is the ratio of the effective pre-scheduling times of uplink pre-scheduling operation to the total pre-scheduling times;
the determining module is used for determining a first pre-scheduling time length corresponding to the first pre-scheduling parameter according to a preset corresponding relation between an uplink pre-scheduling parameter and the pre-scheduling time length;
and the control module is used for controlling the duration of the uplink prescheduling operation of the terminal according to the first prescheduling duration.
On the other hand, an embodiment of the present invention further provides an electronic device, which includes a memory, a processor, a bus, and a computer program that is stored in the memory and is executable on the processor, where the processor implements the steps in the method for controlling a pre-scheduling duration when executing the program.
In still another aspect, an embodiment of the present invention further provides a non-transitory computer-readable storage medium, on which a computer program is stored, where the computer program, when executed by a processor, implements the steps in the method for controlling a pre-scheduling duration.
The prescheduling time control method and the base station provided by the embodiment of the invention determine a first prescheduling time corresponding to a first prescheduling parameter by acquiring the first prescheduling parameter of a terminal according to a preset corresponding relation between the uplink prescheduling parameter and the prescheduling time, and control the duration of uplink prescheduling operation of the terminal according to the first prescheduling time; according to the method and the device, the uplink pre-scheduling duration time in the current period is controlled according to the pre-scheduling condition of the last preset period of the terminal, the uplink pre-scheduling duration time of the terminal is configured adaptively and dynamically, and the terminals of different service models correspond to different uplink pre-scheduling duration times, so that more padding packets caused by improper configuration are avoided, and the IoT is reduced.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and those skilled in the art can also obtain other drawings according to the drawings without creative efforts.
Fig. 1 is a schematic flow chart of a method for controlling a pre-scheduling duration according to an embodiment of the present invention;
fig. 2 is a schematic flowchart of a prescheduling duration control method according to another embodiment of the present invention;
fig. 3 is a schematic structural diagram of a base station according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of an electronic device according to an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Fig. 1 shows a flowchart of a method for controlling a pre-scheduling duration according to an embodiment of the present invention.
As shown in fig. 1, a method for controlling a pre-scheduling duration according to an embodiment of the present invention is applied to a base station, and the method includes:
step 101, acquiring a first pre-scheduling parameter of a terminal; the first pre-scheduling parameter is an uplink pre-scheduling parameter of a preset period on the terminal, and the uplink pre-scheduling parameter is a ratio of effective pre-scheduling times of uplink pre-scheduling operation to total pre-scheduling times.
The preset period of the uplink pre-scheduling may be preset. The preset period may be set to a short time value, such as 10 seconds, 30 seconds, and in the current preset period, a first pre-scheduling parameter of a last preset period of the terminal is obtained;
the uplink pre-scheduling parameter is a ratio of an effective pre-scheduling frequency of the uplink pre-scheduling operation to a total pre-scheduling frequency, and the first pre-scheduling parameter is an uplink pre-scheduling parameter of a previous preset period. If the uplink data sent by the user corresponding to the pre-scheduling operation includes real data, but not all packets, the pre-scheduling is effective.
Specifically, the uplink pre-scheduling parameter may be determined according to the following formula 1:
equation 1:
Figure GDA0003921821840000041
wherein, P is an uplink pre-scheduling parameter, N1 is an effective pre-scheduling frequency, and N2 is a total pre-scheduling frequency.
Step 102, determining a first pre-scheduling time length corresponding to the first pre-scheduling parameter according to a preset corresponding relation between an uplink pre-scheduling parameter and a pre-scheduling time length.
The preset corresponding relation is a mapping relation between an uplink pre-scheduling parameter and a pre-scheduling time length, the first pre-scheduling time length of the terminal in the preset period is determined according to the preset corresponding relation and the first pre-scheduling parameter of the terminal, and the pre-scheduling time length of each terminal can be controlled respectively.
Due to the fact that the service conditions of all the terminals are different, the pre-scheduling duration is controlled respectively, and the IoT can be prevented from being lifted. For example, for a terminal with a higher first pre-scheduling parameter, the allocated first pre-scheduling duration is longer, and for a terminal with a lower first pre-scheduling parameter, the allocated first pre-scheduling duration is shorter, so that a situation that more padding packets are uploaded by a terminal with a lower first pre-scheduling parameter due to the same pre-scheduling restriction measure applied to all terminals in the cell can be avoided.
And 103, controlling the duration of the uplink prescheduling operation of the terminal according to the first prescheduling duration.
The method comprises the steps that the duration of uplink pre-scheduling operation of a terminal is controlled according to a first pre-scheduling duration, and users of different service models are realized and correspond to different pre-scheduling durations; the uplink prescheduling duration time can be configured in a self-adaptive mode according to the prescheduling condition of a preset period on the terminal, and is not set uniformly in a cell level. The terminal with higher uplink pre-scheduling parameters in the last preset period, that is, the frequency of effective pre-scheduling is higher, because the time of the preset period is shorter, the real uplink data that the terminal needs to send is still more in the current preset period, and therefore, the terminal is configured with longer pre-scheduling duration. Similarly, for a terminal corresponding to a lower gear, the effective pre-scheduling frequency is lower, and a shorter pre-scheduling duration is configured, so that the situation that too many padding packets are sent to cause the lifting of the IoT is avoided.
In the above embodiment of the present invention, a first pre-scheduling parameter of a terminal is obtained, a first pre-scheduling duration corresponding to the first pre-scheduling parameter is determined according to a preset corresponding relationship between an uplink pre-scheduling parameter and a pre-scheduling duration, and a duration of an uplink pre-scheduling operation of the terminal is controlled according to the first pre-scheduling duration; the uplink pre-scheduling duration time in the current period is controlled according to the pre-scheduling condition of the last preset period of the terminal, the uplink pre-scheduling duration time of the terminal is configured adaptively and dynamically, and the terminals of different service models correspond to different uplink pre-scheduling duration times, so that more padding packets caused by improper configuration are avoided, and the IoT is reduced. The invention solves the problem that the IoT can not be effectively reduced by limiting the total PRB number of the single subframe pre-scheduling or limiting the uplink pre-scheduling duration in the prior art.
Preferably, in the embodiment of the present invention, the preset corresponding relationship includes at least two gears of the uplink pre-scheduling parameter, and the gear to which the larger uplink pre-scheduling parameter belongs is not lower than the gear to which the smaller uplink pre-scheduling parameter belongs;
each gear corresponds to different pre-scheduling time lengths, and the gears and the pre-scheduling time lengths are in a direct proportion relation.
The preset corresponding relation comprises a threshold value, and the uplink pre-scheduling parameters are divided into at least two different gears through the threshold value; each gear corresponds to a numerical value interval of the uplink pre-scheduling parameter, and the gear to which the larger uplink pre-scheduling parameter belongs is not lower than the gear to which the smaller uplink pre-scheduling parameter belongs.
As a specific example, when there is a threshold value N1, the correspondence relationship includes two gears, namely, a D1 gear and a D2 gear (the D1 gear is higher than the D2 gear), and if the uplink pre-scheduling parameter is greater than N1, the uplink pre-scheduling parameter belongs to the D1 gear; if the uplink pre-scheduling parameter is smaller than N1, the uplink pre-scheduling parameter belongs to D2 grade; when the uplink pre-scheduling parameter is equal to N1, the uplink pre-scheduling parameter may be divided into a D1 gear or a D2 gear, which is not limited herein in the embodiments of the present invention.
Each gear corresponds to different pre-scheduling time lengths, and the gear and the pre-scheduling time lengths are in a direct proportion relationship, that is, the pre-scheduling time length corresponding to a higher gear is longer than the pre-scheduling time length corresponding to a lower gear, for example, in the above example, the pre-scheduling time length corresponding to the D1 gear is longer than the pre-scheduling time length corresponding to the D2 gear. Because the uplink pre-scheduling parameter of the terminal corresponding to the higher gear in the last preset period is higher, that is, the frequency of effective pre-scheduling is higher, and because the time of the preset period is shorter, the real uplink data that the terminal needs to send in the current preset period is still more, so that the terminal is configured with longer pre-scheduling duration. Similarly, for a terminal corresponding to a lower gear, the frequency of effective pre-scheduling is lower, and a shorter pre-scheduling duration is configured, so that excessive padding packet transmission and IoT lifting are avoided.
Optionally, in this embodiment of the present invention, the step of controlling a duration of an uplink pre-scheduling operation of the terminal according to the first pre-scheduling duration includes:
and controlling the operation duration of each uplink pre-scheduling operation of the terminal in the current preset period to be the first pre-scheduling duration.
Specifically, for each terminal, the operation duration of each uplink pre-scheduling operation of the terminal in the current preset period is controlled to be the first pre-scheduling duration, so that the uplink pre-scheduling duration of the terminal in the current preset period is dynamically adjusted according to the pre-scheduling condition of the terminal in the previous preset period.
Preferably, in the embodiment of the present invention, the step of obtaining the first pre-scheduling parameter of the terminal in a preset period includes:
and obtaining the effective pre-scheduling times of the uplink pre-scheduling operation of the terminal in a preset period.
The step of obtaining the first pre-scheduling parameter of the last preset period of the terminal comprises obtaining the effective pre-scheduling times of the uplink pre-scheduling operation of the last preset period of the terminal and obtaining the total pre-scheduling times of the uplink pre-scheduling operation of the last preset period of the terminal. The number of effective pre-scheduling times is the number of effective uplink pre-scheduling operations, and the base station or the terminal can record the number of effective uplink pre-scheduling operations occurring at the terminal, so as to facilitate subsequent determination of uplink pre-scheduling parameters (as in the first case below).
Preferably, in the embodiment of the present invention, the step of obtaining the effective pre-scheduling times of the uplink pre-scheduling operation in a preset period at the terminal includes two cases, namely a case one and/or a case two, specifically:
in the first situation, the base station obtains the effective pre-scheduling times of the uplink pre-scheduling operation of the terminal in a preset period, which are recorded in advance by the base station.
In case one, in each preset period, the base station counts the number of times of the effective uplink pre-scheduling operation, for example, in each uplink pre-scheduling operation, the base station counts the PUSCH scheduled by the terminal according to the pre-scheduling condition, and determines whether the operation is an effective pre-scheduling operation: if a Protocol Data Unit (PDU) of a Media Access Control (MAC) layer of the PUSCH corresponding to the uplink pre-scheduling operation includes a payload of a non-MAC layer, determining that the uplink pre-scheduling operation is an effective pre-scheduling operation; therefore, if the payload (payload) of the MAC PDU includes the payload of the non-MAC layer in addition to the MAC control message, it may be determined that the payload of the non-MAC layer is the real uplink data of the terminal.
Acquiring a protocol data unit PDU of a media access control MAC layer of a physical uplink shared channel resource PUSCH of each uplink prescheduling operation of the terminal in a previous preset period;
for each uplink pre-scheduling operation, if the PDU of the MAC layer of the PUSCH corresponding to the uplink pre-scheduling operation comprises a payload of a non-MAC layer, determining that the uplink pre-scheduling operation is an effective pre-scheduling operation;
and determining the number of the effective pre-scheduling operation, wherein the number of the effective pre-scheduling operation is the effective pre-scheduling number.
When the number of times of effective uplink pre-scheduling operation of the terminal in a previous preset period is obtained, the terminal can also obtain the PDU of the MAC layer of the PUSCH of each uplink pre-scheduling operation of the terminal in the previous preset period, and whether the uplink pre-scheduling operation is the effective uplink pre-scheduling operation is judged in real time according to the PDU of the MAC layer; and determining the total times of the effective uplink pre-scheduling operation.
In the embodiment of the present invention, a first pre-scheduling parameter of a terminal is obtained, a first pre-scheduling duration corresponding to the first pre-scheduling parameter is determined according to a preset corresponding relationship between the uplink pre-scheduling parameter and a pre-scheduling duration, and the duration of an uplink pre-scheduling operation of the terminal is controlled according to the first pre-scheduling duration; the uplink prescheduling duration time in the current period is controlled according to the prescheduling condition of a preset period on the terminal, so that the uplink prescheduling duration time of the terminal is adaptively and dynamically configured; and the terminals of different service models correspond to different uplink pre-scheduling durations, and for the terminal with a higher effective uplink pre-scheduling operation rate in the previous preset period, the longer uplink pre-scheduling duration is configured, otherwise, the shorter uplink pre-scheduling duration is configured, so that more padding packets caused by improper configuration are avoided, and the IoT is reduced.
Fig. 2 is a schematic flow chart illustrating a method for controlling a pre-scheduled time period according to another embodiment of the present invention, where in this embodiment, the corresponding relationship includes three gears.
As shown in fig. 2, the method for controlling a pre-scheduling duration provided in the embodiment of the present invention is applied to a base station, and the method includes:
step 201, acquiring a first pre-scheduling parameter of a terminal; the first pre-scheduling parameter is an uplink pre-scheduling parameter of a last preset period of the terminal, and the uplink pre-scheduling parameter is a ratio of effective pre-scheduling times of uplink pre-scheduling operation to total pre-scheduling times.
The preset period of the uplink pre-scheduling may be preset. The preset period can be set to a short time value, such as 10 seconds and 30 seconds, and in the current preset period, a first pre-scheduling parameter of a preset period on the terminal is obtained;
the uplink pre-scheduling parameter is a ratio of effective pre-scheduling times of the uplink pre-scheduling operation to total pre-scheduling times, and the first pre-scheduling parameter is an uplink pre-scheduling parameter of a previous preset period. The effective pre-scheduling means that if the uplink data sent by the user corresponding to the pre-scheduling operation includes real data, but not all packets, the pre-scheduling is effective pre-scheduling.
Step 202, determining a first pre-scheduling time length corresponding to a first pre-scheduling parameter according to a preset corresponding relation between an uplink pre-scheduling parameter and a pre-scheduling time length; the corresponding relation comprises three gears, and the gear to which the larger uplink pre-scheduling parameter belongs is not lower than the gear to which the smaller uplink pre-scheduling parameter belongs; each gear corresponds to different pre-scheduling time lengths, and the gears and the pre-scheduling time lengths are in a direct proportion relation.
The preset corresponding relation is a mapping relation between an uplink pre-scheduling parameter and a pre-scheduling time length, the first pre-scheduling time length of the terminal in the preset period is determined according to the preset corresponding relation and the first pre-scheduling parameter of the terminal, and the pre-scheduling time length of each terminal can be controlled respectively.
Specifically, the preset correspondence relationship can be represented by the following table 1:
table 1:
uplink pre-scheduling parameters Gear position Prescheduling duration
P1<X<P2 M1 T1
P2<X<P3 M2 T2
P3<X<P4 M3 T3
Wherein, X, P1-P6 are uplink pre-scheduling parameters, and P1< P2< P3< P4< P5< P6;
m1, M2 and M3 are gears, and M1 is lower than M2 and lower than M3;
t1, T2 and T3 are gears, the duration of T3 is longer than that of T2, and the duration of T2 is longer than that of T1;
when P1< X < P2, the corresponding gear is M1, and the corresponding pre-scheduling duration is T1.
When X = P1, P2, or P3, the corresponding gear may be the previous gear or the next gear, and the embodiment of the present invention is not limited herein.
Because the service conditions of each terminal are different, the uplink pre-scheduling duration is controlled respectively, and the lifting of the IoT can be avoided. For example, for a terminal with a first uplink pre-scheduling parameter and a higher first pre-scheduling parameter, the allocated first uplink pre-scheduling duration is longer, and for a terminal with a first uplink pre-scheduling parameter and a lower first pre-scheduling parameter, the allocated first uplink pre-scheduling duration is shorter, so that the situation that more padding packets are uploaded by terminals with the first uplink pre-scheduling parameter and the lower first pre-scheduling parameter due to the same pre-scheduling limitation measure for all terminals in a cell can be avoided.
And 203, controlling the duration of the uplink pre-scheduling operation of the terminal according to the first pre-scheduling duration.
The method comprises the steps that uplink pre-scheduling duration of a terminal is controlled according to a first pre-scheduling duration, users of different service models are achieved, and the different pre-scheduling durations correspond to the users; the uplink prescheduling duration time can be configured in a self-adaptive mode according to the prescheduling condition of a preset period on the terminal, and is not set uniformly in a cell level. The terminal with higher uplink pre-scheduling parameters in the last preset period, that is, the effective pre-scheduling frequency is higher, and because the time of the preset period is shorter, the real uplink data that the terminal needs to send in the current preset period is still more, so that a longer pre-scheduling duration is configured for the terminal. Similarly, for a terminal corresponding to a lower gear, the frequency of effective pre-scheduling is lower, and a shorter pre-scheduling duration is configured, so that excessive padding packet transmission and IoT lifting are avoided.
In the above embodiment of the present invention, a first pre-scheduling parameter of a terminal is obtained, a first pre-scheduling duration corresponding to the first pre-scheduling parameter is determined according to a preset corresponding relationship between an uplink pre-scheduling parameter and a pre-scheduling duration, and a duration of an uplink pre-scheduling operation of the terminal is controlled according to the first pre-scheduling duration; the uplink pre-scheduling duration time in the current period is controlled according to the pre-scheduling condition of the last preset period of the terminal, the uplink pre-scheduling duration time of the terminal is configured adaptively and dynamically, and the terminals of different service models correspond to different uplink pre-scheduling duration times, so that more padding packets caused by improper configuration are avoided, and the IoT is reduced. The invention solves the problem that the IoT can not be effectively reduced by limiting the total PRB number of the single subframe pre-scheduling or limiting the uplink pre-scheduling duration in the prior art.
The method for controlling the pre-scheduling duration according to the embodiment of the present invention is described above, and a base station according to the embodiment of the present invention will be described below with reference to the accompanying drawings.
Referring to fig. 3, an embodiment of the present invention provides a base station 300, where the base station 300 includes:
an obtaining module 301, configured to obtain a first pre-scheduling parameter of a terminal; the first pre-scheduling parameter is an uplink pre-scheduling parameter of a last preset period of the terminal, and the uplink pre-scheduling parameter is a ratio of effective pre-scheduling times of uplink pre-scheduling operation to total pre-scheduling times.
The preset period of the uplink pre-scheduling may be preset. The preset period may be set to a short time value, such as 10 seconds, 30 seconds, and in the current preset period, a first pre-scheduling parameter of a last preset period of the terminal is obtained;
the uplink pre-scheduling parameter is a ratio of effective pre-scheduling times of the uplink pre-scheduling operation to total pre-scheduling times, and the first pre-scheduling parameter is an uplink pre-scheduling parameter of a previous preset period. The uplink data sent by the user corresponding to the effective pre-scheduling operation, that is, the pre-scheduling operation, includes real data, but is not all padding packets.
The determining module 302 is configured to determine a first pre-scheduling duration corresponding to the first pre-scheduling parameter according to a preset correspondence between an uplink pre-scheduling parameter and a pre-scheduling duration.
The preset corresponding relation is a mapping relation between an uplink pre-scheduling parameter and an uplink pre-scheduling duration, the first uplink pre-scheduling duration of the terminal in the preset period is determined according to the preset corresponding relation and the first pre-scheduling parameter of the first uplink pre-scheduling parameter of the terminal, and the uplink pre-scheduling duration of each terminal can be controlled respectively.
Due to the fact that the service conditions of each terminal are different, the uplink pre-scheduling duration is controlled respectively, and the IoT can be prevented from being lifted. For example, for a terminal with a first uplink pre-scheduling parameter and a higher first pre-scheduling parameter, the allocated first uplink pre-scheduling duration is longer, and for a terminal with a first uplink pre-scheduling parameter and a lower first pre-scheduling parameter, the allocated first uplink pre-scheduling duration is shorter, so that the situation that more padding packets are uploaded by a terminal with a first uplink pre-scheduling parameter and a lower first pre-scheduling parameter due to the same pre-scheduling limitation measure applied to all terminals in a cell can be avoided.
And the control module 303 is configured to control a duration of an uplink prescheduling operation of the terminal according to the first prescheduling duration.
The method comprises the steps that the duration of uplink pre-scheduling operation of a terminal is controlled according to a first pre-scheduling duration, and users of different service models are realized and correspond to different pre-scheduling durations; the uplink prescheduling duration time can be configured in a self-adaptive manner according to the prescheduling condition of a preset period on the terminal, and is not set uniformly in a cell level.
Optionally, in the embodiment of the present invention, the preset corresponding relationship includes at least two gears of the uplink pre-scheduling parameter, and a gear to which a larger uplink pre-scheduling parameter belongs is not lower than a gear to which a smaller uplink pre-scheduling parameter belongs;
each gear corresponds to different pre-scheduling time lengths, and the gears and the pre-scheduling time lengths are in a direct proportion relation.
Optionally, in an embodiment of the present invention, the obtaining end module includes:
and the obtaining submodule is used for obtaining the effective pre-scheduling times of the uplink pre-scheduling operation of the terminal in a preset period.
Optionally, in an embodiment of the present invention, the obtaining sub-module includes:
a first obtaining unit, configured to obtain effective pre-scheduling times of an uplink pre-scheduling operation in a preset period on a terminal, where the times are recorded in advance by the base station 300;
and/or
A second obtaining unit, configured to obtain a protocol data unit PDU of a media access control MAC layer of a physical uplink shared channel resource PUSCH of each uplink pre-scheduling operation of the terminal in a previous preset period;
acquiring a protocol data unit PDU of a media access control MAC layer of a physical uplink shared channel resource PUSCH of each uplink prescheduling operation of a terminal in a last preset period;
for each uplink pre-scheduling operation, if the PDU of the MAC layer of the PUSCH corresponding to the uplink pre-scheduling operation comprises a payload of a non-MAC layer, determining that the uplink pre-scheduling operation is an effective pre-scheduling operation;
and determining the number of the effective pre-scheduling operation, wherein the number of the effective pre-scheduling operation is the effective pre-scheduling number.
Optionally, in an embodiment of the present invention, the control module 303 is configured to:
and controlling the operation duration of each uplink pre-scheduling operation of the terminal in the current preset period to be the first pre-scheduling duration.
In the above embodiment of the present invention, a first pre-scheduling parameter of a terminal is obtained by an obtaining module 301, according to a preset corresponding relationship between an uplink pre-scheduling parameter and a pre-scheduling duration, a determining module 302 determines the first pre-scheduling duration corresponding to the first pre-scheduling parameter, and a control module 303 controls a duration of an uplink pre-scheduling operation of the terminal according to the first pre-scheduling duration; the uplink pre-scheduling duration time in the current period is controlled according to the pre-scheduling condition of the last preset period of the terminal, the uplink pre-scheduling duration time of the terminal is configured adaptively and dynamically, and the terminals of different service models correspond to different uplink pre-scheduling duration times, so that more padding packets caused by improper configuration are avoided, and the IoT is reduced. The invention solves the problem that the IoT can not be effectively reduced by limiting the total PRB number of the single subframe pre-scheduling or limiting the uplink pre-scheduling duration in the prior art.
Fig. 4 is a schematic structural diagram of an electronic device according to yet another embodiment of the present invention.
Referring to fig. 4, an embodiment of the present invention provides an electronic device, which includes a memory (memory) 41, a processor (processor) 42, a bus 43, and a computer program stored in the memory 41 and running on the processor. The memory 41 and the processor 42 complete communication with each other through the bus 43.
The processor 42 is used to call the program instructions in the memory 41 to implement the method of fig. 1 when executing the program.
In another embodiment, the processor, when executing the program, implements the method of:
acquiring a first pre-scheduling parameter of a terminal; the first pre-scheduling parameter is an uplink pre-scheduling parameter of a preset period on the terminal, and the uplink pre-scheduling parameter is the ratio of the effective pre-scheduling times of uplink pre-scheduling operation to the total pre-scheduling times;
determining a first pre-scheduling time length corresponding to the first pre-scheduling parameter according to a preset corresponding relation between an uplink pre-scheduling parameter and a pre-scheduling time length;
and controlling the duration of the uplink prescheduling operation of the terminal according to the first prescheduling duration.
The electronic device provided in the embodiment of the present invention may be configured to execute the program corresponding to the method in the embodiment of the method, and details of this implementation are not described again.
In the electronic device provided in the embodiment of the present invention, when the processor executes the program, a first pre-scheduling parameter of the terminal is obtained, a first pre-scheduling duration corresponding to the first pre-scheduling parameter is determined according to a preset correspondence between an uplink pre-scheduling parameter and a pre-scheduling duration, and a duration of an uplink pre-scheduling operation of the terminal is controlled according to the first pre-scheduling duration; the uplink pre-scheduling duration time in the current period is controlled according to the pre-scheduling condition of the last preset period of the terminal, the uplink pre-scheduling duration time of the terminal is configured adaptively and dynamically, and the terminals of different service models correspond to different uplink pre-scheduling duration times, so that more padding packets caused by improper configuration are avoided, and the IoT is reduced.
A non-transitory computer readable storage medium is provided according to a further embodiment of the present invention, having a computer program stored thereon, which when executed by a processor implements the steps of fig. 1.
In another embodiment, the program when executed by a processor implements a method comprising:
acquiring a first pre-scheduling parameter of a terminal; the first pre-scheduling parameter is an uplink pre-scheduling parameter of a preset period on the terminal, and the uplink pre-scheduling parameter is the ratio of the effective pre-scheduling times of uplink pre-scheduling operation to the total pre-scheduling times;
determining a first pre-scheduling time length corresponding to the first pre-scheduling parameter according to a preset corresponding relation between an uplink pre-scheduling parameter and a pre-scheduling time length;
and controlling the duration of the uplink prescheduling operation of the terminal according to the first prescheduling duration.
In the non-transitory computer-readable storage medium provided in the embodiment of the present invention, when the program is executed by the processor, the method in the above-described method embodiment is implemented, and details of this implementation are not described again.
The non-transitory computer readable storage medium provided in the embodiment of the present invention obtains a first pre-scheduling parameter of a terminal, determines a first pre-scheduling duration corresponding to the first pre-scheduling parameter according to a preset correspondence between an uplink pre-scheduling parameter and a pre-scheduling duration, and controls a duration of an uplink pre-scheduling operation of the terminal according to the first pre-scheduling duration; the uplink pre-scheduling duration time in the current period is controlled according to the pre-scheduling condition of the last preset period of the terminal, the uplink pre-scheduling duration time of the terminal is configured adaptively and dynamically, and the terminals of different service models correspond to different uplink pre-scheduling duration times, so that more padding packets caused by improper configuration are avoided, and the IoT is reduced.
Yet another embodiment of the present invention discloses a computer program product comprising a computer program stored on a non-transitory computer readable storage medium, the computer program comprising program instructions which, when executed by a computer, enable the computer to perform the method provided by the above-described method embodiments, for example, comprising:
when a failed back-switching request sent by a terminal is received, determining a target cell corresponding to the failed back-switching request; the failure back-cut request is a back-built request after the terminal executes the enhanced single wireless voice call continuity (ESRVCC) switching execution failure;
determining a number of requests corresponding to failed handoff requests of the target cell;
and when the request times reach a preset threshold value of the target cell, stopping forwarding the ESRVCC switching request aiming at the target cell.
The above-described embodiments of the apparatus are merely illustrative, and the units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of the present embodiment. One of ordinary skill in the art can understand and implement it without inventive effort.
Through the above description of the embodiments, those skilled in the art will clearly understand that each embodiment can be implemented by software plus a necessary general hardware platform, and certainly can also be implemented by hardware. With this understanding in mind, the above-described technical solutions may be embodied in the form of a software product, which can be stored in a computer-readable storage medium such as ROM/RAM, magnetic disk, optical disk, etc., and includes instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute the methods described in the embodiments or some parts of the embodiments.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (10)

1. A prescheduling time length control method is applied to a base station, and is characterized in that the method comprises the following steps:
acquiring a first pre-scheduling parameter of a terminal; the first pre-scheduling parameter is an uplink pre-scheduling parameter of a preset period on the terminal, and the uplink pre-scheduling parameter is the ratio of the effective pre-scheduling times of uplink pre-scheduling operation to the total pre-scheduling times;
determining a first pre-scheduling time length corresponding to the first pre-scheduling parameter according to a preset corresponding relation between an uplink pre-scheduling parameter and a pre-scheduling time length;
controlling the duration of the uplink prescheduling operation of the terminal according to the first prescheduling duration;
wherein, the effective pre-scheduling times are the times of effective pre-scheduling operation, and the judging whether the uplink pre-scheduling operation is the effective pre-scheduling operation comprises: and if the protocol data unit PDU of the media access control MAC layer of the PUSCH corresponding to the uplink pre-scheduling operation comprises the effective load of the non-MAC layer, determining that the uplink pre-scheduling operation is the effective pre-scheduling operation.
2. The method according to claim 1, wherein the preset correspondence includes at least two gears of the uplink pre-scheduling parameters, and the gear to which the larger uplink pre-scheduling parameter belongs is not lower than the gear to which the smaller uplink pre-scheduling parameter belongs;
each gear corresponds to different pre-scheduling time lengths, and the gears and the pre-scheduling time lengths are in a direct proportion relation.
3. The method of claim 1, wherein the step of obtaining the first pre-scheduling parameter of the terminal comprises:
and obtaining the effective pre-scheduling times of the uplink pre-scheduling operation of the terminal in a preset period.
4. The method according to claim 3, wherein the step of obtaining the effective pre-scheduling times of the uplink pre-scheduling operation of a preset period at the terminal comprises:
acquiring effective pre-scheduling times of uplink pre-scheduling operation of a preset period on a terminal, which are pre-recorded by the base station;
and/or
Acquiring a protocol data unit PDU of a media access control MAC layer of a physical uplink shared channel resource PUSCH of each uplink prescheduling operation of a terminal in a last preset period;
for each uplink pre-scheduling operation, if the PDU of the MAC layer of the PUSCH corresponding to the uplink pre-scheduling operation comprises a payload of a non-MAC layer, determining that the uplink pre-scheduling operation is an effective pre-scheduling operation;
and determining the times of the effective pre-scheduling operation, wherein the times of the effective pre-scheduling operation are the effective pre-scheduling times.
5. The method according to claim 1, wherein the step of controlling the duration of the uplink prescheduling operation of the terminal according to the first prescheduling duration includes:
and controlling the operation duration of each uplink pre-scheduling operation of the terminal in the current preset period to be the first pre-scheduling duration.
6. A base station, characterized in that the base station comprises:
the terminal comprises an acquisition module, a scheduling module and a scheduling module, wherein the acquisition module is used for acquiring a first pre-scheduling parameter of the terminal; the first pre-scheduling parameter is an uplink pre-scheduling parameter of a preset period on the terminal, and the uplink pre-scheduling parameter is the ratio of the effective pre-scheduling times of uplink pre-scheduling operation to the total pre-scheduling times;
the determining module is used for determining a first pre-scheduling time length corresponding to the first pre-scheduling parameter according to a preset corresponding relation between an uplink pre-scheduling parameter and the pre-scheduling time length;
the control module is used for controlling the duration of the uplink pre-scheduling operation of the terminal according to the first pre-scheduling duration;
wherein, the effective pre-scheduling times are the times of effective pre-scheduling operation, and the judging whether the uplink pre-scheduling operation is the effective pre-scheduling operation comprises: and if the protocol data unit PDU of the media access control MAC layer of the PUSCH corresponding to the uplink pre-scheduling operation comprises the effective load of the non-MAC layer, determining that the uplink pre-scheduling operation is the effective pre-scheduling operation.
7. The base station of claim 6, wherein the obtaining module comprises:
and the obtaining submodule is used for obtaining the effective pre-scheduling times of the uplink pre-scheduling operation of the terminal in a preset period.
8. The base station of claim 7, wherein the acquisition submodule comprises:
a first obtaining unit, configured to obtain, by the base station, effective pre-scheduling times of an uplink pre-scheduling operation of a preset period on a terminal, which are recorded in advance by the base station;
and/or
A second obtaining unit, configured to obtain a protocol data unit PDU of a media access control MAC layer of a physical uplink shared channel resource PUSCH of each uplink pre-scheduling operation of the terminal in a previous preset period;
for each uplink pre-scheduling operation, if the PDU of the MAC layer of the PUSCH corresponding to the uplink pre-scheduling operation comprises the effective load of the non-MAC layer, determining that the uplink pre-scheduling operation is an effective pre-scheduling operation;
and determining the times of the effective pre-scheduling operation, wherein the times of the effective pre-scheduling operation are the effective pre-scheduling times.
9. An electronic device, comprising a memory, a processor, a bus and a computer program stored on the memory and executable on the processor, wherein the processor executes the program to implement the steps of the prescheduling duration control method according to any one of claims 1-5.
10. A non-transitory computer readable storage medium having stored thereon a computer program, characterized in that: the program when executed by a processor implements the steps in the prescheduling duration control method of any one of claims 1-5.
CN201810443272.7A 2018-05-10 2018-05-10 Pre-scheduling duration control method and base station Active CN110475365B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810443272.7A CN110475365B (en) 2018-05-10 2018-05-10 Pre-scheduling duration control method and base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810443272.7A CN110475365B (en) 2018-05-10 2018-05-10 Pre-scheduling duration control method and base station

Publications (2)

Publication Number Publication Date
CN110475365A CN110475365A (en) 2019-11-19
CN110475365B true CN110475365B (en) 2023-04-11

Family

ID=68503996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810443272.7A Active CN110475365B (en) 2018-05-10 2018-05-10 Pre-scheduling duration control method and base station

Country Status (1)

Country Link
CN (1) CN110475365B (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101835262B (en) * 2010-02-12 2012-09-05 华为技术有限公司 Resource allocation method and equipment
CN102104974B (en) * 2011-02-28 2014-01-01 华为技术有限公司 Method, device and system for carrying out uplink pre-scheduling processing
CN102821477B (en) * 2012-08-15 2015-10-21 中国联合网络通信集团有限公司 The method of adjustment in dispatch request cycle and device
US10064213B2 (en) * 2013-12-16 2018-08-28 Telefonaktiebolaget Lm Ericsson (Publ) Method and network node for pre-scheduling grant transmission
WO2016165070A1 (en) * 2015-04-14 2016-10-20 华为技术有限公司 Methods and devices for transmitting uplink information, transmitting and receiving downlink information, and system scheduling
CN113973384A (en) * 2015-05-20 2022-01-25 瑞典爱立信有限公司 Node and method for pre-scheduling uplink resources in a wireless network according to the application requirements of a UE
CN107484249B (en) * 2016-06-07 2020-08-18 大唐移动通信设备有限公司 Pre-scheduling method and system based on service type

Also Published As

Publication number Publication date
CN110475365A (en) 2019-11-19

Similar Documents

Publication Publication Date Title
US20200383135A1 (en) Method for random access in idle state and device
US20230189283A1 (en) Conditional Uplink Radio Resource Utilization in a Cellular Network
US10492235B2 (en) Transmission resource requesting method and apparatus
CA2775952C (en) A method and apparatus to control scheduling
US11057930B2 (en) Method, system, and terminal device for data transmission in unlicensed spectrum
CN110312317B (en) Method, device and system for controlling data transmission
KR101176911B1 (en) Method and apparatus for scheduling request
US11134507B2 (en) Method and apparatus for processing scheduling request
CN105451345B (en) Uplink authorization information sending method and base station
US9119093B2 (en) Scheduling of delay-sensitive traffic
US10362597B2 (en) Periodic uplink grant alignment in a cellular network
CN111294936B (en) Transmission method and terminal
CN110100399B (en) Method, device, equipment and storage medium for determining channel detection mechanism
WO2018177115A1 (en) Scheduling-free transmission method and apparatus
CN108540994B (en) Method and device for triggering cache status report and user equipment
WO2020248133A1 (en) Channel access configuration method and apparatus, and device and storage medium
US10200988B2 (en) Physical resource block scheduling method, device, and system
CN111757509B (en) Data transmission method and equipment
CN110475365B (en) Pre-scheduling duration control method and base station
EP3503616B1 (en) Multi-air interface communication method and device
CN110891321B (en) SR transmission method and device, storage medium and terminal
CN108462563B (en) Uplink pre-scheduling method and device
JP6113768B2 (en) Method and apparatus for controlling scheduling
CN115278912A (en) Data transmission scheduling method and system
CN113677031A (en) Terminal uplink resource scheduling method, device, computing equipment and computer storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant