CN110446227A - Control method and device, the equipment, medium on user equipment downlink window unlatching opportunity - Google Patents
Control method and device, the equipment, medium on user equipment downlink window unlatching opportunity Download PDFInfo
- Publication number
- CN110446227A CN110446227A CN201910947746.6A CN201910947746A CN110446227A CN 110446227 A CN110446227 A CN 110446227A CN 201910947746 A CN201910947746 A CN 201910947746A CN 110446227 A CN110446227 A CN 110446227A
- Authority
- CN
- China
- Prior art keywords
- gateway
- time delay
- terminal
- server
- message
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/0231—Traffic management, e.g. flow control or congestion control based on communication conditions
- H04W28/0236—Traffic management, e.g. flow control or congestion control based on communication conditions radio quality, e.g. interference, losses or delay
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W76/00—Connection management
- H04W76/10—Connection setup
- H04W76/11—Allocation or use of connection identifiers
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The embodiment of the present application discloses control method and device, the equipment, medium on a kind of user equipment downlink window unlatching opportunity, and the control method that user equipment downlink window opens opportunity comprises determining that the mark of the forward gateway to E-Packet between the terminal and server;According to the mark of the forward gateway, the gateway time delay of the forward gateway is determined;Wherein, the gateway time delay is for characterizing the speed speed that the server responds the forward gateway;According to the gateway time delay, the setting time delay of the terminal is set;Wherein, the time delay that sets terminates as terminal transmission uplink message to the time difference for opening downlink window.
Description
Technical field
The invention relates to wireless communication fields, relate to, but are not limited to the controlling party that user equipment downlink window opens opportunity
Method and device, equipment, medium.
Background technique
LPWAN(Low Power Wide Area Network, low-power Wide Area Network) be it is a kind of towards low-power consumption, it is wide
Cover the Internet of Things interconnection technique of application scenarios.LoRaWAN(Long Range Wide Area Network, remote wide area
Network) be the LPWAN communication technology one kind, have low-power consumption, remote, highly-safe characteristic, at home and abroad made extensively
With.
In LoRaWAN communication technology standard, the communication pattern of terminal is divided into Class A, Class B and Class C tri-
Class.When under Class mode A, terminal in the most of the time all in dormant state, only in active on server
After sending out data, of short duration unlatching downlink window is understood just to receive the data that server issues.The data that server issues reach eventually
When end, if the downlink window of terminal is not in open state, issuing data will be unable to be properly received by terminal, cause to issue
Loss of data.Therefore, it is necessary to a kind of control methods, are controlled by the unlatching opportunity of the downlink window to terminal, so that eventually
Server can be properly received on end after hair data issues data, avoids issuing loss of data.
Summary of the invention
In view of this, the embodiment of the present application be solve the problems, such as it is existing in the prior art at least one and a kind of terminal is provided
Control method and device, the equipment, medium on downlink window unlatching opportunity.
The technical solution of the embodiment of the present application is achieved in that
In a first aspect, the embodiment of the present application provides a kind of control method on user equipment downlink window unlatching opportunity, which comprises
Determine the mark of the forward gateway to E-Packet between the terminal and server;
According to the mark of the forward gateway, the gateway time delay of the forward gateway is determined;Wherein, the gateway time delay is used for table
Levy the speed speed that the server responds the forward gateway;
According to the gateway time delay, the setting time delay of the terminal is set;Wherein, the time delay that sets is sent as the terminal
For row the message ends to the time difference for opening downlink window, the downlink window receives what the server issued for the terminal
Downlink message.
Second aspect, the embodiment of the present application provide a kind of control device on user equipment downlink window unlatching opportunity, described device
Include:
Gateway determining module, for determining the mark of the forward gateway to E-Packet between the terminal and server;
Gateway time delay determining module determines the gateway time delay of the forward gateway for the mark according to the forward gateway;Its
In, the gateway time delay is for characterizing the speed speed that the server responds the forward gateway;
Time delay setup module is set, for the setting time delay of the terminal to be arranged according to the gateway time delay;Wherein, described to set
Fixed response time is that terminal transmission uplink message terminated to the time difference for opening downlink window, and the downlink window is for the end
End receives the downlink message that the server issues.
The third aspect, the embodiment of the present application provide a kind of control equipment on user equipment downlink window unlatching opportunity, the equipment
It include: memory, processor, the memory is stored with the computer program that can be run on a processor, and the processor is held
Realize that above-mentioned user equipment downlink window opens the control method on opportunity when the row computer program.
Fourth aspect, the embodiment of the present application provide a kind of computer readable storage medium, the computer-readable storage medium
Computer executable instructions are stored in matter, when which is configured to execute the unlatching of above-mentioned user equipment downlink window
The control method of machine.
In the embodiment of the present application, the setting time delay of terminal is set according to the network delay of forward gateway, to control end
The unlatching opportunity of downlink window is held, can be fluctuated to avoid network environment or server load variation causes terminal to receive response report
The success rate decline of text, leads to the wasting of resources.
Detailed description of the invention
Figure 1A is the framework and network element composition schematic diagram of LoRaWAN communication network in the embodiment of the present application;
Figure 1B is the downlink window opening process schematic diagram of terminal in the embodiment of the present application;
Fig. 2 is the implementation process schematic diagram for the control method that user equipment downlink window opens opportunity in the embodiment of the present application;
Fig. 3 is the implementation process schematic diagram for the control method that another user equipment downlink window opens opportunity in the embodiment of the present application;
Fig. 4 is the composed structure schematic diagram that the user equipment downlink window of the embodiment of the present application opens the control device on opportunity;
Fig. 5 is a kind of hardware entities schematic diagram for the control equipment that user equipment downlink window opens opportunity in the embodiment of the present application.
Specific embodiment
The technical solution of the application is further elaborated on reference to the accompanying drawings and examples.
Figure 1A is the framework and network element composition of illustrative LoRaWAN communication network, includes in the LoRaWAN communication network
Terminal 141, terminal 142, terminal 143, gateway 151, gateway 152 and server 160.
It is integrated with LoRaWAN network protocol service and LoRaWAN network management services in server 160, has LoRaWAN
LoRaWAN Message processing function and terminal, the gateway management function of consensus standard defined.
Communication mode between server 160 and gateway 151, gateway 152 is IP(Internet Protocol, internet association
View) broadband connections, such as Ethernet, 4G(the 4th Generation mobile communication technology,
Fourth generation mobile communication technology), WIFI(Wireless Fidelity, the WLAN skill based on IEEE 802.11b standard
Art), VSAT(Very Small Aperture Terminal, miniature earth station) satellite etc..
Communication mode between gateway 151, gateway 152 and corresponding terminal is LoRaWAN wireless communication.Gateway
151, gateway 152 has LoRaWAN message transmission function, and corresponding terminal is to have the sensor end of LoRaWAN communication function
End.In Figure 1A, when terminal 141, terminal 142 and terminal 143 are communicated with gateway 151 or gateway 152, assisted using LoRaWAN
View.
The downlink window opening process of LoRaWAN terminal is introduced by taking terminal 141 as an example below.As shown in Figure 1B, work as terminal
141 under Class mode A, if necessary to send uplink message to server 160, can open a uplink window 110.On
After row message is sent, terminal 141 will close uplink window 110, and in waiting setting after the closing of uplink window 110
The first downlink window 120 is opened after prolonging.Then, terminal 141 will make the first downlink window 120 maintain open state, at one section
The first downlink window 120 is closed after time.
Those skilled in the art will be seen that, terminal 141 can choose through the perhaps gateway 152 or simultaneously of gateway 151
Uplink message is sent to server 160 by gateway 151 and gateway 152.After server 160 receives uplink message, to upper
Row message is handled, and response message is generated.Terminal 141 is sent by gateway 151 or gateway 152 by response message.
When response message reaches terminal 141, if the first downlink window 120 is in the open state, terminal 141 is connect
The response message is received, the second downlink window 130 will not be then turned on.If terminal 141 do not open also the first downlink window 120 or
The second downlink of person window 130 has been switched off, and terminal 141 will be unable to receive the response message.The needs of server 160 re-issue
Response message, terminal 141 can open the first downlink window 120 or the at the time of setting time delay or window opens interval arrival
Two downlink windows 130.During a successful message issues, terminal 141 needs under the first downlink window 120 or the second
The open stage of row window 130 receives the response message that server 160 issues.
In LoRaWAN communication protocol, allow terminal network the stage and network after stage of communication to setting time delay into
Row modification.Under normal conditions, the setting time delay of terminal and window, which open interval, can use agreement default parameters or one
It is different from the fixed value of default parameters.That is, it is generally the case that the setting time delay and window of terminal, which open interval, is
Fixed, it will not change, for example, setting time delay as 1 second, it is 1 second that window, which opens interval also,.
But as shown in Figure 1A, after uplink message is sent server 160 by terminal 141, server 160 is received
The time of response message is not sustained.The time wherein spent may be by gateway 151 or gateway 152 and server
The influence of communication condition between 160, it is also possible to the processing speed of message be influenced by server 160, lead to terminal 141
A kind of irregular dispersity is presented in the response time of the uplink message of sending.If the setting time delay of terminal 141 maintains not
Become, in the response message of a certain number of uplink messages, the event of data loss of significant proportion necessarily occurs.
After terminal 141 has sent uplink message to server 160, if response message cannot be properly received, it will bring
Following problems:
1) terminal 141 judges that itself is in off-network state, frequently attempts suspension reconnection, influences regular traffic;
2) terminal 141 reduces the transmission rate of data automatically, and equipment power dissipation is caused to increase, and the occupancy of radio frequency resource is promoted, whole
Network transmission environmental degradation;
3) server 160 retransmits response message several times, and the equipment power dissipation of terminal 141 is caused to increase, server 160
Data processing load increases.
In order to avoid wasting of resources situation more than appearance, when the embodiment of the present application provides a kind of unlatching of user equipment downlink window
The control method of machine.
Embodiment one
The embodiment of the present application provides a kind of control method on user equipment downlink window unlatching opportunity, as shown in Fig. 2, the user equipment downlink window
Mouthful open opportunity control method include:
S110 determines the mark of the forward gateway to E-Packet between the terminal and server.
As shown in FIG. 1A and 1B, the control method in the embodiment of the present application is applied to server 160, and server 160 exists
The setting time delay of setting terminal 141 into the downward message of terminal 141, and then the first downlink window 120 of controlling terminal 141
Unlatching opportunity.
Server 160 can be communicated with terminal 141 by the realization of at least one gateway, as shown in Figure 1A, at least one net
Close includes gateway 151 and gateway 152.Those skilled in the art will be seen that, at least one net communicated to connect with server 160
The Central Shanxi Plain, each gateway length at a distance from server 160 is different, and the communication condition between each gateway and server 160 is not yet
Together.When being E-Packeted between terminal 141 and server 160 using different forward gateways, the uplink message of the sending of terminal 141
Response time is not also identical.In order to match from different response times, the downlink window of characterization terminal 141 opens setting for opportunity
Fixed response time is also required to difference.
Therefore, server 160 needs to determine the mark of forward gateway first, determine which gateway be server 160 with
The setting time delay of terminal 141 is arranged further according to the gateway time delay of the forward gateway for forward gateway between terminal 141.This Shen
It please be illustrated so that gateway 151 is forward gateway as an example in embodiment.
S120 determines the gateway time delay of the forward gateway according to the mark of the forward gateway;Wherein, the gateway
Time delay is for characterizing the speed speed that the server responds the forward gateway.
Here, in order to terminal 141 downlink window open opportunity accurately control, it is thus necessary to determine that forward gateway namely
The gateway time delay of gateway 151.
As shown in Figure 1A, terminal 141 issues uplink message, between the response message incoming terminal 141 of server 160
Time difference, including uplink message from terminal 141 to gateway 151 and from gateway 151 to the transmission duration of server 160, server
Time that the processing of 160 pairs of uplink messages generates response message and response message are from server 160 to gateway 151 and from gateway 151
To the transmission duration of terminal 141.In the embodiment of the present application, this time difference is referred to gateway time delay, for characterizing server
The speed speed of 160 response gateways 151.
The setting time delay of the terminal is arranged according to the gateway time delay in S130;Wherein, the time delay that sets is described
Terminal, which sends uplink message, to be terminated to the time difference for opening downlink window, and the downlink window is for the terminal reception clothes
The downlink message that business device issues.
Here, after terminal 141 issues uplink message, interval how long can just receive the response report of server 160
Text is determined by gateway time delay.In order to guarantee that terminal 141 can be successfully received response message, response message loss is avoided to make
It at the wasting of resources, needs to be arranged according to gateway time delay the setting time delay of terminal 141, improves terminal 141 and receive response message
Success rate.
As shown in Figure 1B, setting time delay terminates as the transmission uplink message of terminal 141 between the first downlink window 120 of unlatching
Time difference.In general, setting the unit of time delay as the second.
In the embodiment of the present application, the setting time delay of terminal is set according to the network delay of forward gateway, to control end
The unlatching opportunity of downlink window is held, can be fluctuated to avoid network environment or server load variation causes terminal to receive response report
The success rate decline of text, leads to the wasting of resources.
Embodiment two
The embodiment of the present application provides a kind of control method on user equipment downlink window unlatching opportunity, which opens opportunity
Control method include:
S210 determines the mark of the forward gateway to E-Packet between the terminal and server.
S220 obtains the propagation delay time between the forward gateway and the server.
In the embodiment of the present application, the propagation delay time between forward gateway and server is for characterizing the forward gateway and institute
State the speed speed of transmitting message between server.As shown in Figure 1A, propagation delay time is from forward gateway i.e. gateway 151 to service
Transmission duration the sum of of the transmission duration and response message of device 160 from server 160 to gateway 151.
In order to obtain propagation delay time, in some embodiments, S220 the following steps are included:
S221, the transmission duration of at least one message reported according to forward gateway described in the period 1 with second round, really
The propagation delay time of the fixed forward gateway;Wherein, the second round is less than the period 1.
Here, every second round, gateway 151 reports the transmission duration an of message to server 160.Second round is small
In the period 1.For example, the period 1 can be the integral multiple of second round, for example, 10 times.So, server 160 is by basis
Report recently the 10 transmission durations of gateway 151 determine the propagation delay time of gateway 151.By increasing the number of transmission duration,
Random error can be reduced, the accuracy in computation of propagation delay time is improved.
The value of second round can be determining, and it is according to the fluctuation of communication condition determining to be also possible to server 160.Such as
Fruit communication condition maintains to stablize, and the propagation delay time of gateway 151 will remain unchanged as whithin a period of time, and server 160 can increase
The value of second round reduces calculation amount.If communication condition fluctuation is very big, random errors affect result is accurate in order to prevent
Property, server 160 can reduce the value of second round, increase the sample frequency of transmission duration, to exclude the influence of random error,
Improve the accuracy of result.
The transmission duration for the message that gateway 151 is reported to server 160 can be uplink message from forward gateway i.e. gateway
151 arrive the transmission duration of server 160, are also possible to transmission duration of the response message from server 160 to gateway 151, can also
To be the sum of both of the aforesaid transmission duration.
If the transmission duration that gateway 151 reports is transmission duration of the uplink message from gateway 151 to server 160, can
To determine the transmission duration of message by sending common uplink message to server 160.As shown in Figure 1A, gateway 151 to
Server 160 sends uplink message.After server 160 receives uplink message, at the time of record receives the uplink message,
And the time of reception is written in the response message then issued.Gateway 151 receives after response message, so that it may according to this
The transmission duration of message is determined at the time of receiving the moment and send uplink message.
If the transmission duration that gateway 151 reports is transmission duration of the response message from server 160 to gateway 151, net
The transmission duration of message can be determined by receiving the generic downlink message that server 160 is sent by closing 151.As shown in Figure 1A,
Server 160 sends downlink message to gateway 151, and the sending instant of the downlink message is written in downlink message.Gateway 151
After receiving downlink message, so that it may determine message with the sending instant according at the time of itself receiving the downlink message
Transmit duration.
If the transmission duration that gateway 151 reports is uplink message from forward gateway i.e. biography of the gateway 151 to server 160
The sum of the transmission duration of defeated duration and response message from server 160 to gateway 151, gateway 151 can be by sending out to server
Dedicated message is sent to determine the transmission duration of message.As shown in Figure 1A, forward gateway namely gateway 151 are sent to server 160
Dedicated message.After server 160 receives dedicated message, dedicated message can be handed down to gateway 151.In this way, eliminating clothes
Be engaged in influence of the device 160 to the processing delay of dedicated message, gateway 151 can directly according to after issuing dedicated message, to receiving
The time difference of the dedicated message determines the transmission duration of message.
If what gateway 151 reported is the transmission duration of one way, server 160 need to report gateway 151 at least one
Transmission duration of the transmission duration of a message multiplied by 2, as message in a complete message response period;If on gateway 151
Report is that message one carrys out past the sum of a transmission duration between gateway 151 and server 160, then the report that gateway 151 reports
Text transmission duration is the transmission duration of message in a complete message response period.
Transmission duration based at least one message, server 160 can be by averaging to obtain the transmission of gateway 151
Time delay can also intend the regularity of distribution for transmitting duration and existing probability-distribution function (such as normal distyribution function)
It closes, obtains the desired value of propagation delay time.Here, transmission duration is the transmission duration of message in a complete message response period.
In order to determine propagation delay time based on the transmission duration of at least one message, in some embodiments, S221 includes
Following steps:
S221a, according to the transmission duration distribution arrangement serial number that sequence from small to large is at least one message.
S221b sorts according to transmission duration of the arrangement serial number at least one message, when obtaining message transmissions
Long sequence.
The total number of the arrangement serial number is rounded multiplied by setting ratio, and by product, obtains selected serial number by S221c.
S221d, by the corresponding propagation delay time transmitted duration and be determined as the forward gateway of the selected serial number.
Here, according to the transmission duration distribution arrangement serial number that sequence from small to large is at least one message.If transmission
The number of duration is 15, then the corresponding arrangement serial number 1 of the smallest transmission duration of numerical value, the maximum transmission duration of numerical value is corresponding
Arrangement serial number 15.When transmitting duration according to the sequence arrangement of serial number from small to large is arranged to get message transmissions are arrived for 15
Long sequence.
Typically, caused by the maximum value in message transmissions duration sequence is likely due to enchancement factor, reference price
It is worth lower.Therefore, in the embodiment of the present application, it is provided with a setting ratio, this setting ratio is less than 1, to exclude maximum
It is worth the influence of the enchancement factor represented.
In some embodiments, this setting ratio is also greater than 0.5, to adapt to propagation delay time caused by communication condition deterioration
Increase.For example, setting ratio can be 0.8.In this way, the total number 15 for arranging serial number is obtained multiplied by setting ratio 0.8
Product is 12, and selected serial number is 12.The corresponding transmission duration of serial number 12 is determined as propagation delay time.
In other embodiments, setting ratio can also be 0.7.In this way, the total number 15 of serial number will be arranged multiplied by setting
Ratio 0.7, obtained product are 10.5, need to be rounded product.In the embodiment of the present application, it can round up, obtain to product
To 11;Product can also be rounded downwards, obtain 10.
S230 obtains the server to the processing delay of uplink message.
Server is used to characterize the speed speed of the server process uplink message to the processing delay of uplink message.Such as
Shown in Figure 1A, server 160 needs to handle the uplink message from multiple terminals, and is managed to multiple terminals and gateway.
In this way, server 160 possibly can not receive after the uplink message of terminal 141 at the first time just to the uplink message at
Reason.On the other hand, server 160 needs while handling a large amount of uplink messages, under the operational capability that may cause server 160
Drop, to influence the processing speed to the uplink message of terminal 141.Therefore, in the embodiment of the present application, by server 160 to upper
The processing delay of row message is also used as the reference factor of gateway time delay.
In some embodiments, S230 the following steps are included:
S231 determines the Message processing time of the server received each uplink message within the period 3.
The average value of the Message processing time of the uplink message is determined as the processing delay by S232.
In the embodiment of the present application, in order to exclude the influence of enchancement factor, by the period 3, server 160 is to uplink report
The average handling time of text is as processing delay.
In some embodiments, server 160 can adjust the numerical value of period 3 according to the upper hair frequency of uplink message,
To guarantee that the number of uplink message in the period 3 is enough to exclude the influence of random error.
S240 determines the gateway time delay of the forward gateway according to the propagation delay time and the processing delay;Wherein, institute
Gateway time delay is stated for characterizing the speed speed that the server responds the forward gateway.
As shown in Figure 1A, after terminal 141 issues uplink message, uplink message needs to spend one from terminal 141 to gateway 151
It fixes time;After gateway 151 issues response message, response message is also required to take a certain time from gateway 151 to terminal 141.
In the embodiment of the present application, the gateway time delay of forward gateway is determined according to propagation delay time and processing delay.Such as Figure 1A institute
Show, the determination method of this gateway time delay considers transmission duration of the message between gateway 151 and server 160, and clothes
Business device 160 handles the time spent when uplink message.
It in other embodiments, can transmission duration and response message by uplink message from terminal 141 to gateway 151
The reference factor of gateway time delay is also used as from gateway 151 to the transmission duration of terminal 141.
In some embodiments, S240 the following steps are included:
S241 determines practical time delay according to the propagation delay time and the processing delay.
The practical time delay is determined as gateway time delay if the practical time delay is less than or equal to default time delay by S242.
The default time delay is determined as gateway time delay if the practical time delay is greater than default time delay by S243.
In the embodiment of the present application, practical time delay is the sum of propagation delay time and processing delay.If practical time delay is greater than default
Default time delay is determined as gateway time delay by time delay;If practical time delay is less than or equal to default time delay, practical time delay is determined as
Gateway time delay.
LoRaWAN communication protocol allows the setting time delay to terminal to modify, and range is 1-15 seconds.In some embodiments
In, default time delay can be set as 15 seconds, to prevent the downlink window of terminal 141 from opening opportunity beyond protocol requirement.At it
In his embodiment, default time delay can also be set as 15 seconds numerical value below, to prevent terminal 141 from opening setting for downlink window
Fixed response time is too long to cause equipment power dissipation to increase.
In some embodiments, in order to reduce calculation amount, rounding processing can be done to it after acquiring practical time delay,
Integer value is obtained, guarantees that gateway time delay is integer in seconds.
The setting time delay of the terminal is arranged according to the gateway time delay in S250;Wherein, the time delay that sets is described
Terminal, which sends uplink message, to be terminated to the time difference for opening downlink window, and the downlink window is for the terminal reception clothes
The downlink message that business device issues.
In communication process, terminal 141 is likely to be at the networking stage, it is also possible to the stage of communication after networking, in order to
Promote the efficiency that downlink window opens opportunity adjustment, the different phase according to locating for terminal 141 in the embodiment of the present application, to setting
Time delay uses different setting methods.
If terminal be in networking stage, in some embodiments, S210 the following steps are included:
211a, if the terminal is in the networking stage, receive the terminal networking request when, from the terminal with it is described
Optimal gateway is selected at least one gateway between server.
The mark of the optimal gateway is determined as the mark of the forward gateway by 212a.
Here, if terminal 141 is in, the networking stage, there are no determine through which gateway come forwarding terminal 141 and clothes
Be engaged in device 160 between message when, terminal 141 can first to server 160 send network request.Server 160 receives networking
After request, optimal gateway is selected from least one gateway connected to it, in the embodiment of the present application, which is gateway
151.The mark of gateway 151 is the mark of forward gateway.
Those skilled in the art will be seen that, when server 160 determines optimal gateway, need to consider whether terminal 141 is located
In in the coverage area of the gateway and between the gateway and terminal and server data transmission bauds and transmission quality whether
It meets the requirements.
Accordingly, S250 the following steps are included:
The gateway time delay is determined as the setting time delay by S251a.
The setting time delay is arranged in the response message for networking request in S252a.
Here, when terminal 141 is in the networking stage, there are no carried out report by any one gateway and server 160
Text interaction, the downlink window of terminal 141 open opportunity not yet according to the progress toning of the gateway time delay of any one gateway
It is whole.In this way, server 160 can initialize on the downlink window unlatching opportunity to terminal 141.It is, server 160 can
Gateway time delay to be determined as to set time delay, and the setting setting time delay in the response message for the request that networks.Terminal 141 receives
After the response message of networking request, so that it may adjust the unlatching opportunity of downlink window according to setting time delay.
Terminal be in network after stage of communication when, in some embodiments, S210 the following steps are included:
S211b will forward the gateway of the uplink message of the terminal if the terminal is in the stage of communication after networking
Mark is determined as the mark of forward gateway.
Here, terminal 141 be in network after stage of communication, this means that terminal 141 by with server 160
Uplink message was sent out on some gateway of communication connection.Therefore, server 160 can will forward the gateway of uplink message to determine
For forward gateway, the mark of the gateway is determined as to the mark of forward gateway.
Accordingly, S250 the following steps are included:
S251b obtains the current setting time delay of the terminal, obtains both fixed response times.
Both the fixed response time is subtracted a setting numerical value if the gateway time delay is less than both fixed response times by S252b,
Obtain setting time delay.
S253, if the gateway time delay is greater than or equal to both fixed response times, when the gateway time delay is determined as setting
Prolong.
The setting time delay is arranged in S254 in the transmitting order to lower levels for being sent to the terminal.
Here, terminal 141 is anticipated by sending out uplink message on some gateway for communicating to connect with server 160
Taste terminal 141 downlink window open opportunity adjustment was carried out according to the gateway time delay of the gateway.
In order to enable the downlink window of terminal 141, which opens opportunity, can adapt to the fluctuation and server load of communication condition
Variation, server 160 need to judge the current downlink window of terminal 141 opens opportunity whether can be with the current net of forward gateway
Time delay is closed to be adapted.
Based on this, server 160 obtains the current setting time delay of terminal 141, obtains both fixed response times, that is, terminal 141
Current downlink window opens opportunity.Then, server 160 compares the big of both fixed response times and the gateway time delay that determines in S240
It is small.
If gateway time delay is less than both fixed response times, numerical value subtracts when indicating the gateway time delay of forward gateway compared to last determine
It is small.It may be because communication condition improves, or becomes smaller because of the processing delay of server 160.At this point, in order to protect
The success rate that terminal 141 receives response message is demonstrate,proved, server 160 both will subtract a setting numerical value by fixed response time, when obtaining setting
Prolong, reduces the windowing time delay of terminal 141.
Here, server 160 can determine setting numerical value according to the size of gateway time delay in proportion.For example, setting number
Value can be the 10% of gateway time delay.When gateway time delay is 10s, setting numerical value is 1s.
If gateway time delay is more than or equal to both fixed response times, indicate that the gateway time delay of forward gateway is determined compared to last
When numerical value become larger.It may be because communication condition is degrading, or is become larger because of the processing delay of server 160.This
When, in order to guarantee that terminal 141 receives the success rate of response message, gateway time delay is determined as setting time delay by server 160.
Embodiment three
The embodiment of the present application provides a kind of control method on user equipment downlink window unlatching opportunity, and this method is logical applied to LoRaWAN
Server in communication network.It as shown in Figure 1A, include terminal 141, terminal 142, terminal 143, gateway in LoRaWAN communication network
151, gateway 152 and server 160.In the embodiment of the present application, when being opened with the downlink window of 160 controlling terminal 141 of server
It is illustrated for machine.
As shown in figure 3, the control method that user equipment downlink window opens opportunity includes:
S310, server 160 calculate the propagation delay time t between gateway 151 and server 160 with cycle T 11。
Here, it is forwarded between terminal 141 and server 160 using the message that gateway 151 is realized.In order to give server 160
Calculate propagation delay time t1Data are provided, gateway 151 is using T2 as the period, when taken at regular intervals itself arrives the message transmissions of server 160
It is long, and it is reported to server 160.
Wherein, cycle T 2 is less than cycle T 1.For example, period 1 T1It can be second round T2Integral multiple, for example, 10
Times.So, server 160 transmits duration for report recently according to gateway 151 10 to determine the propagation delay time of gateway 151
t1.By the number for increasing transmission duration, it is possible to reduce random error improves propagation delay time t1Accuracy in computation.
It, can also be in addition, message transmissions duration can be transmission duration of the uplink message from gateway 151 to server 160
It is transmission duration of the response message from server 160 to gateway 151, is also possible to the sum of both of the aforesaid transmission duration.
If what gateway 151 reported is the transmission duration of one way, server 160 needs the message for reporting gateway 151 to pass
Transmission duration of the defeated duration multiplied by 2, as message in a complete message response period;If what gateway 151 reported is message
One carrys out past the sum of a transmission duration between gateway 151 and server 160, then the message transmissions duration that gateway 151 reports
The transmission duration of message in an as complete message response period.
Server 160 determines propagation delay time t1 according to the transmission duration of at least one message.It is a length of when transmission here
The transmission duration of message in one complete message response period.
Server 160 is according to the transmission duration distribution arrangement serial number that sequence from small to large is at least one message.If
The number for transmitting duration is 15, then the corresponding arrangement serial number 1 of the smallest transmission duration of numerical value, the maximum transmission duration of numerical value
Corresponding arrangement serial number 15.Duration is transmitted by 15 to pass according to the sequence arrangement of arrangement serial number from small to large to get to message
Defeated duration sequence.
The total number for arranging serial number multiplied by ratio P, is obtained selected serial number by server 160 after which is rounded, and
Using the corresponding message transmissions duration of selected serial number as the propagation delay time t of gateway 1511.Here, P is less than 1, to exclude maximum
It is worth the influence of the enchancement factor represented.Moreover, P is greater than 0.5, to cope with forward gateway propagation delay time caused by communication environment deterioration
t1Increase.For example, setting ratio can be 0.8.In this way, the total number 15 for arranging serial number is obtained multiplied by setting ratio 0.8
Product be 12, selected serial number is 12.The corresponding transmission duration of serial number 12 is determined as the propagation delay time t of gateway 1511。
S320, server 160 determine 3 server 160 of cycle T to the processing delay t of uplink message2。
In the embodiment of the present application, the Message processing time of each uplink message in 160 collection period T3 of server.At this
The reason time is that server 160 receives uplink message that the terminal 141 of the upload of gateway 151 is sent to server 160 for response report
Text is sent to the time difference of gateway 151.
Then, server 160 averages to the Message processing time of the uplink message in cycle T 3, obtains processing delay
t2.Here, the number for the Message processing time that server 160 can be acquired according to the needs of setting adjusts the number of cycle T 3
Value, so that the number of uplink message is enough to exclude the influence of random error in cycle T 3.
S330, server 160 determine the gateway time delay GwDelay of gateway 151.
In the embodiment of the present application, server 160 determines gateway time delay GwDelay according to formula (1):
Here,For the function that rounds up, for example, propagation delay time t1With processing delay t2Summation obtain 13.1, by 13.1 to
Upper rounding then obtains 14.Server 160 is first to propagation delay time t1With processing delay t2Summation, then round up, obtain gateway time delay
The integer value of GwDelay.Then gateway time delay GwDelay and 15 are compared, if it is greater than or be equal to 15, then by 15 be used as net
Close time delay GwDelay;If it is less than 15, then the integer value obtained the rounding is as gateway time delay GwDelay.For example, transmission
Time delay t1With processing delay t2And be 11.3,12 will be obtained by rounding up, since 12 less than 15, it is thus determined that gateway time delay
GwDelay is 12.
The setting time delay of terminal 141 is arranged according to gateway time delay GwDelay, carrys out controlling terminal 141 for S340, server 160
The unlatching opportunity of downlink window.
In the embodiment of the present application, according to different phase locating for terminal 141, the unlatching opportunity of downlink window is carried out respectively
Control.
When terminal 141 is in the networking stage, terminal 141 can send the request that networks to server 160 first.Server
After 160 receive networking request, an optimal gateway will be selected to realize that the message between server 160 and terminal 141 forwards.
In the embodiment of the present application, it is illustrated so that gateway 151 realizes message forwarding as an example.That is, server 160 confirmed net
Closing 151 is optimal gateway.
Then, server 160 obtains the gateway time delay GwDelay of gateway 151.The gateway time delay GwDelay of gateway 151 by
The several steps of S310, S320 and S330 obtain.It will be understood by those skilled in the art that although terminal 141 passes through gateway not yet
151 send uplink message to server 160, but there is also other terminals in the communication network.Other terminals are before this
Gateway 151 is passed through and has been transmitted across uplink message to server 160, therefore in S310, can have been passed according to the message of these terminals
The defeated time determines the propagation delay time t of gateway 1511。
When terminal 141 is in the networking stage, there are no carried out message by any one gateway and server 160 to hand over
Mutually, the downlink window unlatching opportunity of terminal 141 carried out adjustment according to the gateway time delay of any one gateway not yet.This
Sample, server 160 can initialize on the downlink window unlatching opportunity to terminal 141.It is, server 160 can incite somebody to action
The gateway time delay GwDelay of gateway 151 is determined as setting time delay, and the setting setting time delay in the response message for the request that networks.
Terminal 141 receives after the response message for the request that networks, so that it may when according to setting unlatching of the time delay to adjust downlink window
Machine.
When terminal 141 is in the stage of communication after networking, it is meant that terminal 141 has passed through gateway 151 to service
Device 160 is transmitted across uplink message.Therefore, server 160 can directly acquire the gateway time delay GwDelay of gateway 151.
Those skilled in the art will be seen that that server 160 obtains is the newest gateway time delay GwDelay of gateway 151.
Before this setting time delay may be arranged according to the gateway time delay GwDelay before gateway 151 in terminal 141, that is,
Adjustment was carried out to the unlatching opportunity of downlink window.But in order to enable terminal 141 downlink window open opportunity can adapt to
The variation of fluctuation and the server load of communication condition, server 160 need to judge the current setting time delay of terminal 141
SnDelay(old)Whether can be adapted with the newest gateway time delay GwDelay of gateway 151.In the embodiment of the present application, server
The 160 setting time delay SnDelay according to formula (2) come setting terminal 141 hereafter(new):
(2)
Here, if it is less than or be equal to, server 160 will be set as the setting time delay SnDelay of terminal 141 hereafter(new);
If it does, server 160 will be set as, terminal 141 is set according to the variation of the gateway time delay of gateway 151 to update
Fixed response time, dynamic adjust the unlatching opportunity of downlink window.
Example IV
Based on embodiment above-mentioned, the embodiment of the present application provides a kind of control device on user equipment downlink window unlatching opportunity, the dress
Included each module is set, can be realized by the processor in computer equipment;Certainly it can also pass through specific logic electricity
It realizes on road;In the process of implementation, processor can be central processing unit (CPU), microprocessor (MPU), Digital Signal Processing
Device (DSP) or field programmable gate array (FPGA) etc..
Fig. 4 is the composed structure schematic diagram for the control device that the embodiment of the present application user equipment downlink window opens opportunity, terminal
When the control device 400 that downlink window opens opportunity includes gateway determining module 401, gateway time delay determining module 402 and sets
Prolong setup module 403, in which:
Gateway determining module 401, for determining the mark of the forward gateway to E-Packet between the terminal and server;
Gateway time delay determining module 402 determines the gateway time delay of the forward gateway for the mark according to the forward gateway;
Wherein, the gateway time delay is for characterizing the speed speed that the server responds the forward gateway;
Time delay setup module 403 is set, for the setting time delay of the terminal to be arranged according to the gateway time delay;Wherein, described
Setting time delay terminates as terminal transmission uplink message to the time difference for opening downlink window, and the downlink window is for described
Terminal receives the downlink message that the server issues.
In some embodiments, the gateway time delay determining module, comprising:
Propagation delay time acquiring unit, for obtaining the propagation delay time between the forward gateway and the server;
Processing delay acquiring unit, for obtaining the server to the processing delay of uplink message;
Gateway time delay determination unit, when determining the gateway of the forward gateway according to the propagation delay time and the processing delay
Prolong.
In some embodiments, the propagation delay time acquiring unit, is specifically used for:
The transmission duration of at least one message reported according to forward gateway described in the period 1 with second round, determine described in
The propagation delay time of forward gateway;Wherein, the second round is less than the period 1.
In some embodiments, the propagation delay time acquiring unit, comprising:
It arranges serial number and distributes subelement, for being distributed according to the transmission duration that sequence from small to large is at least one message
Arrange serial number;
Sorting subunit obtains message for sorting according to transmission duration of the arrangement serial number at least one message
Transmit duration sequence;
Serial number selectes subelement, for the total number of the arrangement serial number to be rounded multiplied by setting ratio, and by product, is selected
Sequencing number;
Propagation delay time determines subelement, for the corresponding transmission duration of the selected serial number to be determined as to the biography of the forward gateway
Defeated time delay.
In some embodiments, the processing delay acquiring unit, comprising:
Time acquisition subelement is handled, for determining the message of the server received each uplink message within the period 3
Handle the time;
Processing delay determines subelement, for the average value of the Message processing time of the uplink message to be determined as the processing
Time delay.
In some embodiments, the gateway time delay determination unit, is specifically used for:
Practical time delay is determined according to the propagation delay time and the processing delay;
If the practical time delay is less than or equal to default time delay, the practical time delay is determined as gateway time delay;
If the practical time delay is greater than default time delay, the default time delay is determined as gateway time delay.
In some embodiments, the gateway determining module, comprising:
Optimal gateway selecting unit, if being in the networking stage for the terminal, when receiving the networking request of the terminal,
Optimal gateway is selected at least one gateway between the terminal and the server;
Gateway determination unit is determined as the mark of the forward gateway for the mark by the optimal gateway.
Accordingly, the setting time delay setup module, comprising:
Time delay determination unit is set, for the gateway time delay to be determined as the setting time delay;
Time delay setting unit is set, for the setting time delay to be arranged in the response message for networking request.
In some embodiments, the gateway determining module, comprising:
Gateway determination unit will forward the uplink of the terminal if being in the stage of communication after networking for the terminal
The mark of the gateway of message is determined as the mark of forward gateway.
Accordingly, the setting time delay setup module, comprising:
It sets time delay determination unit and obtains both fixed response times for obtaining the current setting time delay of the terminal;
If the gateway time delay is less than both fixed response times, both fixed response times are subtracted into a setting numerical value, when obtaining setting
Prolong;
If the gateway time delay is greater than or equal to both fixed response times, the gateway time delay is determined as to set time delay;
Time delay setting unit is set, for the setting time delay to be arranged in the transmitting order to lower levels for being sent to the terminal.
The description of apparatus above embodiment, be with the description of above method embodiment it is similar, have same embodiment of the method
Similar beneficial effect.For undisclosed technical detail in the application Installation practice, the application embodiment of the method is please referred to
Description and understand.
It should be noted that in the embodiment of the present application, if realized in the form of software function module under above-mentioned terminal
Row window opens the control method on opportunity, and when sold or used as an independent product, also can store in a computer
In read/write memory medium.Based on this understanding, the technical solution of the embodiment of the present application is substantially in other words to the prior art
The part to contribute can be embodied in the form of software products, which is stored in a storage medium
In, including some instructions use is so that a computer equipment (can be personal computer, server or network equipment etc.)
Execute all or part of each embodiment the method for the application.And storage medium above-mentioned include: USB flash disk, mobile hard disk, only
Read the various media that can store program code such as memory (Read Only Memory, ROM), magnetic or disk.In this way,
The embodiment of the present application is not limited to any specific hardware and software and combines.
Accordingly, the embodiment of the present application provides a kind of control equipment that user equipment downlink window opens opportunity (such as computer
Equipment), including memory and processor, the memory be stored with the computer program that can be run on a processor, the place
Reason device realizes that the user equipment downlink window provided in above-described embodiment opens the step in the control method on opportunity when executing described program
Suddenly.
Accordingly, the embodiment of the present application provides a kind of computer readable storage medium, which is characterized in that the computer can
It reads to be stored with computer executable instructions in storage medium, which is configured to execute and mention in above-described embodiment
The user equipment downlink window of confession opens the step in the control method on opportunity.
It need to be noted that: the description of medium stored above and apparatus embodiments, with retouching for above method embodiment
It is similar for stating, and has with embodiment of the method similar beneficial effect.For in the application storage medium and apparatus embodiments not
The technical detail of disclosure please refers to the description of the application embodiment of the method and understands.
Fig. 5 is a kind of hardware entities signal for the control equipment that user equipment downlink window opens opportunity in the embodiment of the present application
Figure, as shown in figure 5, the hardware entities that the user equipment downlink window opens the control equipment 500 on opportunity include: processor 501, communication
Interface 502 and memory 503, wherein
The usual controlling terminal downlink window of processor 501 opens the overall operation of the control equipment 500 on opportunity.
The control equipment 500 that communication interface 502 can make user equipment downlink window open opportunity passes through network and other equipment
Communication.
Memory 503 is configured to store the instruction and application that can be performed by processor 501, can also cache device to be processed
501 and user equipment downlink window open that each module in the control equipment 500 on opportunity is to be processed or processed data, Ke Yitong
It crosses flash memory (FLASH) or random access storage device (Random Access Memory, RAM) is realized.
It should be understood that " one embodiment " or " embodiment " that specification is mentioned in the whole text mean it is related with embodiment
A particular feature, structure, or characteristic includes at least one embodiment of the application.Therefore, occur everywhere in the whole instruction
" in one embodiment " or " in one embodiment " not necessarily refer to identical embodiment.In addition, these specific features, knot
Structure or characteristic can combine in any suitable manner in one or more embodiments.It should be understood that in the various implementations of the application
In example, magnitude of the sequence numbers of the above procedures are not meant that the order of the execution order, the execution sequence Ying Yiqi function of each process
It can be determined with internal logic, the implementation process without coping with the embodiment of the present application constitutes any restriction.Above-mentioned the embodiment of the present application
Serial number is for illustration only, does not represent the advantages or disadvantages of the embodiments.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that the process, method, article or the device that include a series of elements not only include those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do
There is also other identical elements in the process, method of element, article or device.
In several embodiments provided herein, it should be understood that disclosed device and method can pass through it
Its mode is realized.Apparatus embodiments described above are merely indicative, for example, the division of the unit, only
A kind of logical function partition, there may be another division manner in actual implementation, such as: multiple units or components can combine, or
It is desirably integrated into another system, or some features can be ignored or not executed.In addition, shown or discussed each composition portion
Mutual coupling or direct-coupling or communication connection is divided to can be through some interfaces, the INDIRECT COUPLING of equipment or unit
Or communication connection, it can be electrical, mechanical or other forms.
Above-mentioned unit as illustrated by the separation member, which can be or may not be, to be physically separated, aobvious as unit
The component shown can be or may not be physical unit;Both it can be located in one place, and may be distributed over multiple network lists
In member;Some or all of units can be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
In addition, each functional unit in each embodiment of the application can be fully integrated in one processing unit, it can also
To be each unit individually as a unit, can also be integrated in one unit with two or more units;It is above-mentioned
Integrated unit both can take the form of hardware realization, can also realize in the form of hardware adds SFU software functional unit.
Those of ordinary skill in the art will appreciate that: realize that all or part of the steps of above method embodiment can pass through
The relevant hardware of program instruction is completed, and program above-mentioned can store in computer-readable storage medium, which exists
When execution, step including the steps of the foregoing method embodiments is executed;And storage medium above-mentioned includes: movable storage device, read-only deposits
The various media that can store program code such as reservoir (Read Only Memory, ROM), magnetic or disk.
If alternatively, the above-mentioned integrated unit of the application is realized in the form of software function module and as independent product
When selling or using, it also can store in a computer readable storage medium.Based on this understanding, the application is implemented
Substantially the part that contributes to existing technology can be embodied in the form of software products the technical solution of example in other words,
The computer software product is stored in a storage medium, including some instructions are used so that a measuring instrument controls equipment
(can be personal computer, server or network equipment etc.) execute each embodiment the method for the application whole or
Part.And storage medium above-mentioned includes: that movable storage device, ROM, magnetic or disk etc. are various can store program code
Medium.
The above, only presently filed embodiment, but the protection scope of the application is not limited thereto, it is any to be familiar with
Those skilled in the art within the technical scope of the present application, can easily think of the change or the replacement, and should all cover
Within the protection scope of the application.Therefore, the protection scope of the application should be based on the protection scope of the described claims.
Claims (11)
1. the control method that a kind of user equipment downlink window opens opportunity characterized by comprising
Determine the mark of the forward gateway to E-Packet between the terminal and server;
According to the mark of the forward gateway, the gateway time delay of the forward gateway is determined;Wherein, the gateway time delay is used for table
Levy the speed speed that the server responds the forward gateway;
According to the gateway time delay, the setting time delay of the terminal is set;Wherein, the time delay that sets is sent as the terminal
For row the message ends to the time difference for opening downlink window, the downlink window receives what the server issued for the terminal
Downlink message.
2. the method according to claim 1, wherein the gateway time delay of the determination forward gateway, comprising:
Obtain the propagation delay time between the forward gateway and the server;
The server is obtained to the processing delay of uplink message;
The gateway time delay of the forward gateway is determined according to the propagation delay time and the processing delay.
3. according to the method described in claim 2, it is characterized in that, between the acquisition forward gateway and the server
Propagation delay time, comprising:
The transmission duration of at least one message reported according to forward gateway described in the period 1 with second round, determine described in
The propagation delay time of forward gateway;Wherein, the second round is less than the period 1.
4. according to the method described in claim 3, it is characterized in that, described report according to forward gateway described in the period 1
The transmission duration of at least one message, determines the propagation delay time of the forward gateway, comprising:
According to the transmission duration distribution arrangement serial number that sequence from small to large is at least one message;
It is sorted according to transmission duration of the arrangement serial number at least one message, obtains message transmissions duration sequence;
The total number of the arrangement serial number is rounded multiplied by setting ratio, and by product, obtains selected serial number;
By the corresponding propagation delay time transmitted duration and be determined as the forward gateway of the selected serial number.
5. according to the method described in claim 2, it is characterized in that, when the processing for obtaining the server to uplink message
Prolong, comprising:
Determine the Message processing time of the server received each uplink message within the period 3;
The average value of the Message processing time of the uplink message is determined as the processing delay.
6. according to the method described in claim 2, it is characterized in that, described true according to the propagation delay time and the processing delay
The gateway time delay of the fixed forward gateway, comprising:
Practical time delay is determined according to the propagation delay time and the processing delay;
If the practical time delay is less than or equal to default time delay, the practical time delay is determined as gateway time delay;
If the practical time delay is greater than default time delay, the default time delay is determined as gateway time delay.
7. method according to any one of claims 1 to 6, which is characterized in that the determination is in the terminal and server
Between the mark of forward gateway that E-Packets, comprising:
If the terminal is in the networking stage, when receiving the networking request of the terminal, from the terminal and the service
Optimal gateway is selected at least one gateway between device;
The mark of the optimal gateway is determined as to the mark of the forward gateway;
Accordingly, described according to the gateway time delay, the setting time delay of the terminal is set, comprising:
The gateway time delay is determined as the setting time delay;
The setting time delay is set in the response message for networking request.
8. method according to any one of claims 1 to 6, which is characterized in that the determination is in the terminal and server
Between the mark of forward gateway that E-Packets, comprising:
If the terminal is in the stage of communication after networking, the mark of the gateway of the uplink message of the terminal will be forwarded true
It is set to the mark of forward gateway;
Accordingly, described according to the gateway time delay, the setting time delay of the terminal is set, comprising:
The current setting time delay of the terminal is obtained, both fixed response times are obtained;
If the gateway time delay is less than both fixed response times, both fixed response times are subtracted into a setting numerical value, when obtaining setting
Prolong;
If the gateway time delay is greater than or equal to both fixed response times, the gateway time delay is determined as to set time delay;
The setting time delay is set in the transmitting order to lower levels for being sent to the terminal.
9. the control device that a kind of user equipment downlink window opens opportunity characterized by comprising
Gateway determining module, for determining the mark of the forward gateway to E-Packet between the terminal and server;
Gateway time delay determining module determines the gateway time delay of the forward gateway for the mark according to the forward gateway;Its
In, the gateway time delay is for characterizing the speed speed that the server responds the forward gateway;
Time delay setup module is set, for the setting time delay of the terminal to be arranged according to the gateway time delay;Wherein, described to set
Fixed response time is that terminal transmission uplink message terminated to the time difference for opening downlink window, and the downlink window is for the end
End receives the downlink message that the server issues.
10. the control equipment that a kind of user equipment downlink window opens opportunity, which is characterized in that the equipment includes: memory, processing
Device, the memory are stored with the computer program that can be run on a processor, and the processor executes the computer program
The user equipment downlink window that any one of Shi Shixian the claims 1 to 8 provide opens the control method on opportunity.
11. a kind of computer readable storage medium, which is characterized in that be stored with computer in the computer readable storage medium
Executable instruction, the computer executable instructions are configured to execute the user equipment downlink that any one of the claims 1 to 8 provide
The control method on window unlatching opportunity.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910947746.6A CN110446227B (en) | 2019-10-08 | 2019-10-08 | Method, device, equipment and medium for controlling opening time of downlink window of terminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910947746.6A CN110446227B (en) | 2019-10-08 | 2019-10-08 | Method, device, equipment and medium for controlling opening time of downlink window of terminal |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110446227A true CN110446227A (en) | 2019-11-12 |
CN110446227B CN110446227B (en) | 2020-01-07 |
Family
ID=68440620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910947746.6A Active CN110446227B (en) | 2019-10-08 | 2019-10-08 | Method, device, equipment and medium for controlling opening time of downlink window of terminal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110446227B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110690953A (en) * | 2019-12-06 | 2020-01-14 | 武汉慧联无限科技有限公司 | Downlink gateway selection method, device and computer storage medium |
CN110708763A (en) * | 2019-12-02 | 2020-01-17 | 武汉慧联无限科技有限公司 | Scheduling method, device and computer storage medium |
CN111414255A (en) * | 2020-03-24 | 2020-07-14 | 武汉慧联无限科技有限公司 | Data issuing control method, device and equipment and computer storage medium |
CN112165353A (en) * | 2020-09-24 | 2021-01-01 | 天宸星通(深圳)科技有限公司 | Satellite Internet of things terminal network access authentication method |
WO2021098807A1 (en) * | 2019-11-21 | 2021-05-27 | 华为技术有限公司 | Method and device for updating mapping |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107071836A (en) * | 2017-03-03 | 2017-08-18 | 国动物联网技术(上海)有限公司 | A kind of compatible CLASSA and CLASSB data downstream method |
CN107343032A (en) * | 2017-06-21 | 2017-11-10 | 武汉慧联无限科技有限公司 | The offline detection method and device of terminal node in remote low power consumption network |
CN107612668A (en) * | 2017-09-06 | 2018-01-19 | 深圳天珑无线科技有限公司 | Communication means, device, terminal, server and storage medium based on LoRa |
CN108235404A (en) * | 2016-12-22 | 2018-06-29 | 上海未来宽带技术股份有限公司 | A kind of realization method and system of wireless network relaying |
CN108471642A (en) * | 2018-03-26 | 2018-08-31 | 厦门四信通信科技有限公司 | A kind of infusion pump network of LoRa transmission |
US10178617B2 (en) * | 2017-05-01 | 2019-01-08 | Mueller International, Llc | Hail and acceptance for battery-powered devices |
CN109511154A (en) * | 2018-12-28 | 2019-03-22 | 东信和平科技股份有限公司 | A kind of terminal access method, device and medium |
CN110278617A (en) * | 2019-06-21 | 2019-09-24 | 浙江理工大学 | A kind of LoRaWAN channel confliction bypassing method based on time division multiple acess |
-
2019
- 2019-10-08 CN CN201910947746.6A patent/CN110446227B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108235404A (en) * | 2016-12-22 | 2018-06-29 | 上海未来宽带技术股份有限公司 | A kind of realization method and system of wireless network relaying |
CN107071836A (en) * | 2017-03-03 | 2017-08-18 | 国动物联网技术(上海)有限公司 | A kind of compatible CLASSA and CLASSB data downstream method |
US10178617B2 (en) * | 2017-05-01 | 2019-01-08 | Mueller International, Llc | Hail and acceptance for battery-powered devices |
CN107343032A (en) * | 2017-06-21 | 2017-11-10 | 武汉慧联无限科技有限公司 | The offline detection method and device of terminal node in remote low power consumption network |
CN107612668A (en) * | 2017-09-06 | 2018-01-19 | 深圳天珑无线科技有限公司 | Communication means, device, terminal, server and storage medium based on LoRa |
CN108471642A (en) * | 2018-03-26 | 2018-08-31 | 厦门四信通信科技有限公司 | A kind of infusion pump network of LoRa transmission |
CN109511154A (en) * | 2018-12-28 | 2019-03-22 | 东信和平科技股份有限公司 | A kind of terminal access method, device and medium |
CN110278617A (en) * | 2019-06-21 | 2019-09-24 | 浙江理工大学 | A kind of LoRaWAN channel confliction bypassing method based on time division multiple acess |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021098807A1 (en) * | 2019-11-21 | 2021-05-27 | 华为技术有限公司 | Method and device for updating mapping |
CN110708763A (en) * | 2019-12-02 | 2020-01-17 | 武汉慧联无限科技有限公司 | Scheduling method, device and computer storage medium |
CN110690953A (en) * | 2019-12-06 | 2020-01-14 | 武汉慧联无限科技有限公司 | Downlink gateway selection method, device and computer storage medium |
CN110690953B (en) * | 2019-12-06 | 2020-04-24 | 武汉慧联无限科技有限公司 | Downlink gateway selection method, device and computer storage medium |
CN111414255A (en) * | 2020-03-24 | 2020-07-14 | 武汉慧联无限科技有限公司 | Data issuing control method, device and equipment and computer storage medium |
CN111414255B (en) * | 2020-03-24 | 2023-05-23 | 武汉慧联无限科技有限公司 | Data issuing control method, device, equipment and computer storage medium |
CN112165353A (en) * | 2020-09-24 | 2021-01-01 | 天宸星通(深圳)科技有限公司 | Satellite Internet of things terminal network access authentication method |
Also Published As
Publication number | Publication date |
---|---|
CN110446227B (en) | 2020-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110446227A (en) | Control method and device, the equipment, medium on user equipment downlink window unlatching opportunity | |
CN108337698B (en) | Multilink-based data stream adjusting method, device, equipment and medium | |
Lai et al. | Performance modeling and analysis of TCP and UDP flows over software defined networks | |
KR101153970B1 (en) | Routing method for wireless mesh networks and wireless mesh network system using the same | |
CN106507696A (en) | It is used to determine whether to initiate the first network node of the second multi-path transmission control protocol connection and method therein | |
WO2019157855A1 (en) | Quality of service (qos) parameter processing method, network element, system, and storage medium | |
CN104040917A (en) | System and Method for Quality of Service Control | |
US20190364440A1 (en) | Role selection method in wireless communication networks | |
Chaporkar et al. | An adaptive strategy for maximizing throughput in mac layer wireless multicast | |
Zhao et al. | Exploiting link correlation for core-based dissemination in wireless sensor networks | |
Liu et al. | Delay-aware multipath source routing protocol to providing QoS support for wireless ad hoc networks | |
Hou et al. | A delay‐based transport layer mechanism for fair TCP throughput over 802.11 multihop wireless mesh networks | |
WO2021082732A1 (en) | Communication method and communication apparatus | |
Lee et al. | Opportunistic downlink data delivery for mobile collaborative communities | |
US20220124539A1 (en) | Information configuration method, network apparatus, and terminal | |
Jamshaid et al. | Mechanisms for centralized flow rate control in 802.11-based wireless mesh networks | |
CN113170352B (en) | Multi-band communication in wireless mesh networks | |
CN110519778B (en) | Downlink message sending method and device, equipment and medium | |
Makarevitch | Jamming resistant architecture for WiMAX mesh network | |
US11785497B2 (en) | First node, second node, third node, and methods performed thereby, for handling data traffic | |
Kipnis et al. | The angel IEEE 802.15. 4 enhancement layer: Coupling priority queueing and service differentiation | |
Nguyen et al. | Packet size variability affects collisions and energy efficiency in WLANs | |
Chowdhury et al. | XCHARM: A routing protocol for multi-channel wireless mesh networks | |
Cui et al. | Buffer-aware opportunistic routing for wireless sensor networks | |
Zhong et al. | Adaptive load balancing algorithm for multi-homing mobile nodes in local domain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Control method, device, equipment and medium of opening time of terminal downlink window Effective date of registration: 20220324 Granted publication date: 20200107 Pledgee: China Construction Bank Corporation Wuhan Guanggu Free Trade Zone Branch Pledgor: WUHAN EASYLINKIN TECHNOLOGY CO.,LTD Registration number: Y2022420000077 |