CN110359645A - Roofing cornices support system and its construction method - Google Patents

Roofing cornices support system and its construction method Download PDF

Info

Publication number
CN110359645A
CN110359645A CN201910506984.3A CN201910506984A CN110359645A CN 110359645 A CN110359645 A CN 110359645A CN 201910506984 A CN201910506984 A CN 201910506984A CN 110359645 A CN110359645 A CN 110359645A
Authority
CN
China
Prior art keywords
bar
support bracket
boats
tree
triangular support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910506984.3A
Other languages
Chinese (zh)
Inventor
曹伟
吴静
周旭
文建
王鹏程
吉德昌
李兵
周翔
许多
金柏吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN201910506984.3A priority Critical patent/CN110359645A/en
Publication of CN110359645A publication Critical patent/CN110359645A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/15Trimming strips; Edge strips; Fascias; Expansion joints for roofs
    • E04D13/155Trimming strips; Edge strips; Fascias; Expansion joints for roofs retaining the roof sheathing

Abstract

The present invention provides a kind of roofing and cornices support system and its construction method, is related to the technical field of roofing construction equipment.The roofing support system that cornices includes triangular support bracket, main stupefied rod piece, the wooden a tree, used in making timber for boats layer and template;The vertical bar of triangular support bracket is connected to concrete structure side elevation, formwork bracing system of the triangular support bracket as top cornice structure;Main stupefied rod piece is connected to the top of the horizon bar of triangular support bracket, and the wooden a tree, used in making timber for boats layer is laid on the top of main stupefied rod piece, and template is laid on the top of the wooden a tree, used in making timber for boats layer.It solves in the prior art, the construction work amount of cross-layer brace support is big, sets up and remove arduously, and the applicable depth of building of whole outrigger support is lower, and I-steel overhangs support period long, at high cost technical problem.Triangular support bracket of the invention, which is fixed by bolts, to be formed triangle in the side elevation that concrete structure is completed and spreads out the independent support system of frame, and short construction period is small to the demand of the materials such as steel tube fastener, applied widely, does not influence subsequent construction.

Description

Roofing cornices support system and its construction method
Technical field
The present invention relates to the technical field of roofing construction equipment, cornices and support system and its apply more particularly, to a kind of roofing Work method.
Background technique
In the realm of building construction, roofing long cornice is structure lines indispensable in Neo Chinese style building, for large span Roofing cornices, and traditional form of construction work mainly has: the support of cross-layer brace, whole outrigger support and I-steel overhanging support.
It is above-mentioned that by the way of the support of cross-layer brace, construction technical requirement is low in the prior art, still, the engineering of construction Amount is big, and setting up and removing for support frame is relatively elaborate, and materials demand amount is big, causes at high cost.The side supported using whole outrigger Formula, work progress is simple, and Technical comparing is mature, still, is merely capable of the building suitable for one to two layer height, whole height is not Building more than eight meters is more than eight meters of building for whole height, just very not applicable.Using the side of I-steel overhanging support The technics comparing of formula, construction is simple, the technology maturation of construction, still, is also only suitable for of length no more than 1.5 meters of the knot of bridging piece Structure, and the demand of I-steel is big, and long construction period is at high cost, meanwhile, also inconvenience is brought to subsequent construction.
Summary of the invention
It cornices support system the purpose of the present invention is to provide a kind of roofing, cross-layer existing in the prior art to solve The construction work amount of brace support is big, sets up and remove arduously, and the applicable depth of building of whole outrigger support is lower, I-steel Overhanging supports period long, at high cost technical problem.
A kind of roofing provided by the invention cornices support system, including triangular support bracket, main stupefied rod piece, the wooden a tree, used in making timber for boats layer and mould Plate;
The vertical bar of triangular support bracket is connected to concrete structure side elevation, and triangular support bracket is as top cornice structure Formwork bracing system;
Main stupefied rod piece is connected to the top of the horizon bar of triangular support bracket, and the wooden a tree, used in making timber for boats layer is laid on the top of main stupefied rod piece, mould Plate is laid on the top of the wooden a tree, used in making timber for boats layer.
Further, it between vertical bar and concrete structure, is from top to bottom successively tethered using through-wall bolt, expanding screw It connects.
Further, the first fixing pipe and the second fixing pipe are vertically welded on horizon bar, on the brace of triangular support bracket It is vertically welded with third fixing pipe;
First fixing pipe, the second fixing pipe, third fixing pipe pass through first level support rod, second horizontally-supported respectively Bar, third horizontal support bar are connected to and cornice on outrigger;
It is connected between second horizontal support bar and third horizontal support bar by the 4th horizontal support bar.
Further, it is connected between horizon bar and brace by the first web member,
The point of intersection of horizon bar and vertical bar is connect between brace by the second web member.
Further, the weighted base for further including hound and being connected in shear wall;
The brace of the upper end connection triangular support bracket of hound, the lower end of hound connects weighted base.
It further, further include external corner tripod;
The vertical section of external corner tripod is connected on shear wall, and the reinforcing bar of vertical welding is logical on the horizontal segment of external corner tripod It crosses steel pipe and is connected to and cornice on outrigger.
Further, the wooden a tree, used in making timber for boats layer includes the wooden a tree, used in making timber for boats, the quantity of the wooden a tree, used in making timber for boats be it is multiple, the distance between neighboring trees a tree, used in making timber for boats range exists Between 190mm-210mm;
The sectional dimension * length value of the wooden a tree, used in making timber for boats is 90mm*40mm*2000mm.
Further, the Thickness range of template is between 10mm-15mm.
It cornices the construction method of support system, includes the following steps: the present invention also provides a kind of roofing
(a) pre-buried tripod screw rod hole to be provided
PVC30 casing penetrates the side for the outrigger that cornices, pre-buried PVC30 casing, to form the hole to be provided of firm screw rod;
Turned over inside and outside beam in roofing, a C12 reinforcing bar is respectively added in casing two sides, C12 reinforcing bar first with tied silk binding with On beam stirrup, after service sleeve leveling, beam stirrup is welded, the both ends reinforcement of weld at least two of each service sleeve welds Point;
Using logical line leveling is drawn when service sleeve is pre-buried, when drawing logical line, prolongs logical line length and one horizontal mark is set every 5 meters High control point, it is ensured that when sleeve pipe pre-embedding in same elevation line;
(b) in roofing reversed beam casting concrete
The at the uniform velocity casting concrete on roofing reversed beam, is arranged construction joint cornicing, to reversed beam concrete construction circle on outrigger After the hardening of face, sealing rod is installed;
Water seasoning is carried out on the surface of concrete, curing time at least 14 days, reaches the intensity of reversed beam concrete 20MPa;
(c) installation adjusts and sets triangular support bracket
The vertical bar of triangular support bracket is fixed on the concrete structure below that cornices using through-wall bolt, expansion bolt It is interior, the verticality of triangular support bracket is adjusted, after tightening through-wall bolt, expansion bolt respectively, adjusts hanging down for triangular support bracket again Straight degree, then installs the lower anchor slab expansion bolt of triangular support bracket;
(d) three horizontal support bars are installed
Using first level support rod, the second horizontal support bar, third horizontal support bar respectively to the first fixing pipe, second Fixing pipe, third fixing pipe position be fixed;
(e) the main stupefied rod piece of installation
The inner end of main stupefied rod piece is connected to the horizon bar inner end of triangular support bracket, first level support rod, the second water Flat support rod is respectively fixed the position of the stupefied rod piece of master;
The upper end of 4th horizontal support bar connects the second horizontal support bar, and the lower end of the 4th horizontal support bar connects third water Flat support rod;
When the stupefied rod piece of master encounters shear wall, weighted base is installed in shear wall side elevation, the upper end of hound is connected to On brace, the lower end of hound connects weighted base;
(f) the wooden a tree, used in making timber for boats layer, template are installed
It is laid with the wooden a tree, used in making timber for boats layer on the stupefied rod piece of master, is laid with template above the wooden a tree, used in making timber for boats layer;
(g) assembling reinforcement
According to construction drawing, the reinforcing bar for the beam slab that cornices is installed;
(h) casting concrete
Uniform casting concrete from the inside to the outside, and pour and put outward from the position of the anchor point close to triangular support bracket Material;
(i) curing concrete
The surface of concrete is conserved, curing time at least 14 days;
(j) triangular support bracket is removed
It checks whether the intensity of entire support system reaches 100%, after reaching, first tears the template of not load-bearing open, then tear load-bearing open Template, remove the lateral support of triangular support bracket, remove the vertical supporting of triangular support bracket.
Further, in above-mentioned steps, when encountering the position of corner, external corner tripod is installed on shear wall.
A kind of roofing provided by the invention cornices support system, and the vertical bar connection concrete structure of triangular support bracket is edge-on Face is supported fixation using vertical direction of the vertical bar to triangular support bracket, triangular support bracket is enable to cornice as top The formwork bracing system of structure;Main stupefied rod piece is connected to the top of the horizon bar of triangular support bracket, and the wooden a tree, used in making timber for boats layer is laid on main stupefied bar The top of part is supported fixation using top position of the wooden a tree, used in making timber for boats layer to the stupefied rod piece of master;Template is laid on the top of the wooden a tree, used in making timber for boats layer, benefit Fixation is supported to the wooden a tree, used in making timber for boats layer with template;Triangular support bracket of the invention be fashioned iron weld tripod, be fixed by bolts in Concrete structure side elevation forms triangle and spreads out the independent support system of frame, and short construction period, construction technology is simple, buckles steel pipe The demand of the materials such as part is small, applied widely, does not influence subsequent construction.
It cornices the construction method of support system the present invention also provides a kind of roofing, it is successively reserved using pre-buried tripod screw rod Hole, in roofing reversed beam casting concrete, installation adjusts and sets triangular support bracket, installs three horizontal support bars, the main stupefied rod piece of installation, peace The wooden a tree, used in making timber for boats layer of dress, template, assembling reinforcement, casting concrete, curing concrete, dismounting triangular support bracket and etc., work progress letter Single, short construction period reduces construction cost.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 sets up figure for the outrigger provided in an embodiment of the present invention that cornices;
Fig. 2 is finished product triangular support bracket drawing provided in an embodiment of the present invention;
Fig. 3 is that roof support system provided in an embodiment of the present invention completes elevation;
Fig. 4 is that triangular support bracket provided in an embodiment of the present invention welds drawing;
Fig. 5 is external corner tripod drawing provided in an embodiment of the present invention;
Fig. 6 is eaves construction joint indwelling figure provided in an embodiment of the present invention;
Fig. 7 is that water expandable waterstop provided in an embodiment of the present invention installs node diagram one;
Fig. 8 is that water expandable waterstop provided in an embodiment of the present invention installs node diagram two;
Fig. 9 is that triangular support bracket provided in an embodiment of the present invention connect drawing with cornicing;
Figure 10 is the portion the A enlarged drawing in Fig. 9;
Figure 11 is the drawing after connection triangular support bracket and external corner tripod provided in an embodiment of the present invention;
Figure 12 is that provided in an embodiment of the present invention cornice sets up relationship section between outrigger and triangular support bracket, hound Figure;
Figure 13 is the partial structural diagram of weighted base provided in an embodiment of the present invention.
Icon: 100- triangular support bracket;The stupefied rod piece of 200- master;300- wood a tree, used in making timber for boats layer;400- template;500- hound;600- Weighted base;700- external corner tripod;101- vertical bar;102- horizon bar;103- through-wall bolt;104- expansion bolt;105- First fixing pipe;The second fixing pipe of 106-;107- brace;108- third fixing pipe;109- first level support rod;110- second Horizontal support bar;111- third horizontal support bar;The 4th horizontal support bar of 112-;The first web member of 113-;The second web member of 114-; 301- wood a tree, used in making timber for boats;701- vertical section;702- horizontal segment;703- reinforcing bar;704- steel pipe.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
As shown in figure 1-9, a kind of roofing provided by the invention cornices support system, including triangular support bracket 100, master are stupefied Rod piece 200, the wooden a tree, used in making timber for boats layer 300 and template 400;
The vertical bar 101 of triangular support bracket 100 is connected to concrete structure side elevation, and triangular support bracket 100 is used as top The formwork bracing system of cornice structure;
Main stupefied rod piece 200 is connected to the top of the horizon bar 102 of triangular support bracket 100, and the wooden a tree, used in making timber for boats layer 300 is laid on main stupefied bar The top of part 200, template 400 are laid on the top of the wooden a tree, used in making timber for boats layer 300.
Triangular support bracket 100 of the invention is bolted to concrete knot using the structure of fashioned iron welding tripod Structure side elevation connects tripod using steel tube fastener, is spread out the independent support system of frame with forming triangle.Entire triangular support bracket 100 construction period is 45 days or so, and including 28 days curing cycles of concrete, construction technology is compared to traditional approach letter It is single, it is small to the demand of the materials such as steel tube fastener much and applied widely in work progress, it will not influence subsequent Construction, overcome the problems of the prior art well.
Further, between vertical bar 101 and concrete structure, through-wall bolt 103, expanding screw are from top to bottom successively used Bolt 104 connects.
Through-wall bolt 103 using M28 bolt, expansion bolt 104 using M12 bolt, with using through-wall bolt 103, The position of vertical bar 101 is fixed in expansion bolt 104.
Further, the first fixing pipe 105 and the second fixing pipe 106, triangular support bracket are vertically welded on horizon bar 102 Third fixing pipe 108 is vertically welded on 100 brace 107;
First fixing pipe 105, the second fixing pipe 106, third fixing pipe 108 pass through first level support rod 109, the respectively Two horizontal support bars 110, third horizontal support bar 111 are connected to and cornice on outrigger;
It is connected between second horizontal support bar 110 and third horizontal support bar 111 by the 4th horizontal support bar 112.
In the present embodiment, horizon bar 102, vertical bar 101 and brace 107 are all made of round steel pipe, the first fixing pipe 105, Second fixing pipe 106, third fixing pipe 108 also use round steel pipe, are connected between steel pipe using fastener.
First level support rod 109 is laid on horizon bar 102, and first level support rod 109 is then welded on first In fixing pipe 105;Second horizontal support bar 110 is laid on horizon bar 102, is then welded on the second horizontal support bar 110 In second fixing pipe 106;Third horizontal support bar 111 is laid on the outside of brace 107, then by third horizontal support bar 111 It is welded in third fixing pipe 108.
The upper end of 4th horizontal support bar 112 is welded on the second horizontal support bar 110, the 4th horizontal support bar 112 Lower end is welded on third horizontal support bar 111.
Further, it is connected between horizon bar 102 and brace 107 by the first web member 113,
The point of intersection of horizon bar 102 and vertical bar 101 is connect between brace 107 by the second web member 114.
First web member 113, the second web member 114 are all made of square steel tube, and square steel tube can be improved entire triangular support bracket 100 Internal stress.
Further, the weighted base 600 for further including hound 500 and being connected in shear wall;
The upper end of hound 500 is welded to connect the brace 107 of triangular support bracket 100, and the lower end of hound 500 connects stress Pedestal 600.
Weighted base 600 uses the 10# channel steel of 500mm thickness, and it is interior to use M12 expansion bolt to be fixed in shear wall.
It further, further include external corner tripod 700;
The vertical section 701 of external corner tripod 700 is connected on shear wall, vertical on the horizontal segment 702 of external corner tripod 700 The reinforcing bar 703 of welding is connected to by steel pipe 704 and is corniced on outrigger.
Vertical section 701 is fixed on shear wall using through-wall bolt, expansion bolt.
Through-wall bolt uses the bolt of M28, and expansion bolt uses the bolt of M12.
There are two reinforcing bars 703, two reinforcing bars 703 to be arranged in parallel for vertical welding on horizontal segment 702, each reinforcing bar 703 Outside is socketed with a steel pipe 704, and the lower end of each steel pipe 704 is welded on horizontal segment 702, the upper end of each steel pipe 704 It is both connected to and cornices on outrigger.
Entire external corner tripod 700 is using the structure of round steel pipe, and the outside of two reinforcing bars 703 is using the knot for being socketed round steel pipe Structure improves whole stress.
Further, the wooden a tree, used in making timber for boats layer 300 includes the wooden a tree, used in making timber for boats 301, the quantity of the wooden a tree, used in making timber for boats 301 be it is multiple, between neighboring trees a tree, used in making timber for boats 301 away from From range between 190mm-210mm;
The sectional dimension * length value of the wooden a tree, used in making timber for boats 301 is 90mm*40mm*2000mm.
In the present embodiment, the distance between neighboring trees a tree, used in making timber for boats 301 value is 200mm.
Further, the Thickness range of template 400 is between 10mm-15mm.
In an embodiment of the present invention, the Thickness of template 400 is 12mm.
It cornices the construction method of support system, includes the following steps: the present invention also provides a kind of roofing
As shown in Figure 1, the top layer's horizon bar and cross bar for the outrigger that cornices are chosen with roofing to guarantee having enough operating spaces The distance between eaves board needs to control between 1500mm-1800mm.
Outermost eaves are 100mm apart from single protective frame and the distance between the collar extension that cornices, and height needs to protect Card is 1500mm higher than eaves, and the outrigger wall-connecting piece that cornices carries out two steps two across setting.
As shown in Fig. 2, Fig. 3, Fig. 4, Fig. 5, triangular support bracket 100 leads to welding production using the steel side Q235, and vertical bar 101 is adopted Logical with the steel side Q235 of 80*60*4mm, the steel side Q235 that horizon bar 102, brace 107 are all made of 50*50*4mm is logical, the first web member 113, the second web member 114 be all made of 40*40*3mm the steel side Q235 it is logical, tripod at external corner, as shown in figure 5, using I-steel+ Channel steel welding production, lateral stressed bar use the Q235 anchor slab of 10# I-steel+8mm thickness, and vertical bar and brace use 10# channel steel.
When welding, using the welding rod of the carbon steel structure of E43 series, groove arc welding, in Fig. 4, all weld seams are four sides It is fully welded, weld seam 6mm, weld seam grade is three-level.
The welding process requirement of triangular support bracket 100 is as follows:
Cleaning weld bond: check whether groove, assembly clearance meet the requirements before weldering, whether tack welding is secured, around weld seam not Must there are greasy dirt, rust object.
Striking: fillet weld acnode of rising and falling should not should at will beat arc in end of welding bead, preferably greater than 10mm, answer after striking of striking sparks Welding rod is pulled open from weld metal zone immediately, makes to keep the gap 2-4mm to generate electric arc between welding rod and component.Butt weld connects in time and angle Composite welds is connect, sets run-on tab and end tab at weld seam both ends, it is necessary to be soldered to weld metal zone after striking again on run-on tab, connect halfway Head should then strike sparks striking at 15-20mm in front of welding line joint, and welding rod is returned to weld seam section start again after weldment is preheated, It, can welding forward after molten bath is filled up to the thickness of requirement.
Speed of welding: it is required that constant speed is welded, guaranteeing that throat depth, even width are consistent, from seeing molten iron in molten bath in mask Keeping equidistant with slag is advisable, and the distance controlling is in 2-3mm.
Soldering angle: welding rod and the angle for welding direction of advance are 60 ° -75 °;
Receive arc: every weld seam is soldered to end, and after should filling up arc crater, the direction band arc opposite toward welding direction makes arc crater It gets rid of inside welding bead, stings meat to prevent arc crater.Welding finishes, and Ying Caiyong gas cutting cuts off arc plate, and reconditioning is smooth, hammering not allowable It falls.
Scarfing cinder: whole weld seam removes slag after being soldered, through welder's self-test, including appearance and weld size etc., true no problem Afterwards, can transfer location continue to weld.
(a) pre-buried tripod screw rod hole to be provided
PVC30 casing penetrates the side for the outrigger that cornices, pre-buried PVC30 casing, to form the hole to be provided of firm screw rod;
It is arranged according to the spacing of triangular support bracket 100, spacing≤1500mm;Beam need to be avoided when meeting overhanging Cantilever Beams, Apart from each pre-buried PVC30 casing of beam two sides 250mm.
Turned over inside and outside beam in roofing, a C12 reinforcing bar is respectively added in casing two sides, C12 reinforcing bar first with tied silk binding with On beam stirrup, after service sleeve leveling, beam stirrup is welded, the both ends reinforcement of weld at least two of each service sleeve welds Point, the reinforcing for fixed sleeving and tripod stress point;
Using logical line leveling is drawn when service sleeve is pre-buried, when drawing logical line, prolongs logical line length and one horizontal mark is set every 5 meters High control point, it is ensured that when sleeve pipe pre-embedding in same elevation line;
(b) in roofing reversed beam casting concrete
At the uniform velocity casting concrete is arranged on outrigger for the stress for guaranteeing triangular support bracket 100 cornicing on roofing reversed beam Construction joint, cornice structure construction is divided into constructs twice, and the indwelling of construction joint is as shown in fig. 6, the position of the x1 meaning in Fig. 6 is to apply Work seam.
After the hardening of reversed beam concrete construction interface, cleaning dross, dust, sundries etc. expose rigid base.
Sealing rod is installed, to make sealing rod fixation, horizontal joint is fixed every 400mm with cement steel nail, and sealing rod is taken Spreading degree is no less than 100mm;
As shown in fig. 7, the position x2 is beam center line, the position x3 is water expandable waterstop, and the position x4 is cement steel nail, x5 Position is to pick prosposition to set, and the position x6 is dabbing position.
As shown in figure 8, structural schematic diagram when being installed for water expandable waterstop;
After the completion of reversed beam concreting, water seasoning is carried out on the surface of concrete, curing time at least 14 days, is made anti- The intensity of beam concrete reaches 20MPa, then installs triangular support bracket 100.
(c) installation adjusts and sets triangular support bracket
The vertical bar 101 of triangular support bracket 100 is fixed on using through-wall bolt 103, expansion bolt 104 cornice it is below In concrete structure, the verticality of triangular support bracket 100 is adjusted, after tightening through-wall bolt 103, expansion bolt 104 respectively, again The verticality of triangular support bracket 100 is adjusted, then the lower anchor slab expansion bolt of triangular support bracket 100 is installed;
When triangular support bracket 100 is installed, it is necessary to keep vertical vertical, vertical angle is not greater than 3 °.
If 104 anchor bar of expansion bolt can not aperture when, expansion bolt 104 can be fixed on outside anchor slab fixed Afterwards, it is welded in anchor slab.
As shown in Fig. 9, Figure 10, Figure 11, triangular support bracket 100 is connected by screw bolts in structure, and joint steel pipe is using straight The connection of angle fastener.
(d) three horizontal support bars are installed
As shown in Fig. 2, the horizontal support bar for connecting triangular support bracket 100 shares three, respectively first level branch Strut 109, the second horizontal support bar 110, third horizontal support bar 111 when horizontal support bar is installed, first install third level branch Strut 111, then the second horizontal support bar 110, first level support rod 109 are installed, all horizontal support bars use right-angle coupler Be connected on the short steel pipes of tripod welding, between tripod in point be arranged parallel to the horizon bar 102 and the first water of tripod Flat support rod 109, the second horizontal support bar 110 are connected.
It is fixed using position of the first level support rod 109 to the first fixing pipe 105, the second horizontal support bar 110 The position of second fixing pipe 106 is fixed, the position of third fixing pipe 108 is fixed in third horizontal support bar 111, First level support rod 109, the second horizontal support bar 110, third horizontal support bar 111 are all made of right-angle coupler and are connected to triangle On the short steel pipes of support frame 100;
Three horizontal support bars make the structure of 100 1 entirety of triangular support bracket.
(e) the main stupefied rod piece of installation
The inner end of main stupefied rod piece 200 is connected to 102 inner end of horizon bar of triangular support bracket 100, first level support Bar 109, the second horizontal support bar 110 are respectively fixed the position of the stupefied rod piece of master 200;Utilize 200 pairs of the stupefied rod piece of the master wooden a tree, used in making timber for boats The position of layer 300 is supported fixation.
The upper end of 4th horizontal support bar 112 connects the second horizontal support bar 110, the lower end of the 4th horizontal support bar 112 Third horizontal support bar 111 is connected, using the 4th horizontal support bar 112 to the second horizontal support bar 110, third horizontal support bar Position between 111 is fixed.
Triangular support bracket 100 is locked on diagonal brace steel pipe to next layer of beam using fastener, one, lock below diagonal brace steel pipe Longitudinal steel pipe, and guarantee that the same side tripod-shaped is integral;
As shown in figure 12, triangular support bracket 100 must not be connected with outrigger.
Further, it in step (e), as shown in figure 13, when the stupefied rod piece 200 of master encounters shear wall, needs shearing Wall side elevation installs weighted base 600, and the upper end of hound 500 connects triangular support bracket 100, hound using welding manner 500 lower end connects weighted base 600 using welding manner.
(f) the wooden a tree, used in making timber for boats layer, template are installed
After triangular support bracket 100 is installed, the wooden a tree, used in making timber for boats layer 300, the section ruler of the wooden a tree, used in making timber for boats 301 are laid on the stupefied rod piece 200 of master Very little * length value is 90mm*40mm*2000mm,
The wooden a tree, used in making timber for boats 301 is laid with perpendicular to 100 direction of triangular support bracket, spacing 200mm.The effect of the wooden a tree, used in making timber for boats 301 is to make template 400 stress equalizations will not bend.
After the completion of the wooden a tree, used in making timber for boats 301 is laid with, template 400 is laid with above the wooden a tree, used in making timber for boats layer 300, the Thickness of template 400 is 12mm. When template 400 is laid with, longitudinal direction is parallel to 100 direction of triangular support bracket, and template 400 ensure that piece is tight, and slit width must not Greater than 2mm.
(g) assembling reinforcement
After the completion of triangular support bracket 100 and template 400 install, according to construction drawing, the reinforcing bar for the beam slab that cornices is installed;
When reinforcement installation, reinforcing bar should be avoided and concentrate and stack, lead to Load concentration.
(h) casting concrete
When concreting, according to sequence of construction from the inside to the outside, uniform casting concrete, and from close to triangular support bracket The position of 100 anchor point pours blowing outward;
It when concreting, answers and vibrates when pouring, control dispensing speed, avoiding concrete, onboard thickness is more than 250mm。
(i) curing concrete
After the completion of concreting, by the way of watering, the surface of concrete is conserved, curing time at least 14 It, in the present embodiment, curing time is 15 days;
(j) triangular support bracket is removed
Belong to Long-span Cantilever structure due to cornicing, support system need to can after concrete reaches 100% intensity It removes, the sequence that template 400 is removed should follow first to prop up tears open afterwards, and rear branch is first torn open.
It checks whether the intensity of entire support system reaches 100%, after reaching, first tears the template 400 of not load-bearing open, then tear open and hold The template 400 of weight first removes the lateral support of triangular support bracket 100 from top to bottom, removes the vertical branch of triangular support bracket 100 Support.
Further, in above-mentioned steps f, when encountering the position of corner, external corner tripod is installed on shear wall 700。
The vertical section 701 of external corner tripod 700 is successively connected on shear wall using through-wall bolt, expansion bolt, external corner There are two reinforcing bars 703, two reinforcing bars 703 to be arranged in parallel for vertical welding on the horizontal segment 702 of tripod 700, and each reinforcing bar 703 is It is socketed a steel pipe 704, each steel pipe 704, which is both connected to, to cornice on outrigger.
During entire construction, it to be also monitored monitoring:
For the safety and firmness for guaranteeing support system, meet construction usage requirement, avoids the sedimentation for occurring to exceed code requirement And cave-in accident occurs, and must carry out effective settlement observation to frame body, be adjusted reinforcing in time, it should be noted that the following:
(1) horizontal displacement for settling flexing and frame body to triangular support bracket 100 carries out emphasis monitoring.
(2) monitoring scheme arranges 10 monitoring points by every building, and 1 checkpoint is arranged in about 15m spacing, and each vertex angle part must It must one point of setting.
(3) monitoring zero point must be set before concrete, and is arranged surveyor special messenger to be responsible for protecting monitoring point and supervised It surveys, load front and back pays attention to and records sinking data.As notice Project Technical responsible person and frame body designer, and stop loading, After analyzing sunken plaza, it can be reloaded after taking effective strengthening measure.
(4) after the completion of frame body is set up, it is necessary to it is stringent to be checked and accepted by regulation tissue, and lower part can be carried out after improving signature confirmation Process.
(5) by construction site sole duty security official, work progress frame body safe is monitored.Monitoring content are as follows:
1) deformation of triangular support bracket 100, verticality situation;
2) construction loads situation.
(6) during 100 installation of triangular support bracket, special administrative staff is sent to be joined a regular shift or class with scaffolder.
(7) 100 sedimentation and deformation of triangular support bracket is controlled by the 0.1% of height, early warning value 2cm, verticality early warning Value is 2cm, should stop concreting when reaching early warning value, take emergency measures, and related personnel's research is organized to handle, Ensure to reinforce support system in the case where safety.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (10)

  1. The support system 1. a kind of roofing cornices, which is characterized in that including triangular support bracket (100), main stupefied rod piece (200), the wooden a tree, used in making timber for boats Layer (300) and template (400);
    The vertical bar (101) of the triangular support bracket (100) is connected to concrete structure side elevation, the triangular support bracket (100) formwork bracing system as top cornice structure;
    The stupefied rod piece of master (200) is connected to the top of the horizon bar (102) of the triangular support bracket (100), the wood a tree, used in making timber for boats layer (300) it is laid on the top of the stupefied rod piece of the master (200), the template (400) is laid on the top of the wooden a tree, used in making timber for boats layer (300).
  2. The support system 2. roofing according to claim 1 cornices, which is characterized in that the vertical bar (101) and concrete Between structure, from top to bottom successively connected using through-wall bolt (103), expansion bolt (104).
  3. The support system 3. roofing according to claim 2 cornices, which is characterized in that vertical welding on the horizon bar (102) It is connected to the first fixing pipe (105) and the second fixing pipe (106), vertical welding on the brace (107) of the triangular support bracket (100) There are third fixing pipe (108);
    First fixing pipe (105), the second fixing pipe (106), third fixing pipe (108) pass through first level support rod respectively (109), the second horizontal support bar (110), third horizontal support bar (111) are connected to and cornice on outrigger;
    Pass through the 4th horizontal support bar between second horizontal support bar (110) and the third horizontal support bar (111) (112) it connects.
  4. The support system 4. roofing according to claim 3 cornices, which is characterized in that the horizon bar (102) and it is described tiltedly It is connected between bar (107) by the first web member (113),
    The point of intersection of the horizon bar (102) and the vertical bar (101) passes through the second web member between the brace (107) (114) it connects.
  5. The support system 5. roofing according to claim 4 cornices, which is characterized in that further include hound (500) and connection Weighted base (600) in shear wall;
    The upper end of the hound (500) connects the brace (107) of the triangular support bracket (100), the hound (500) Lower end connects the weighted base (600).
  6. The support system 6. roofing according to claim 5 cornices, which is characterized in that further include external corner tripod (700);
    The vertical section (701) of the external corner tripod (700) is connected on shear wall, the level of the external corner tripod (700) The reinforcing bar (703) of vertical welding is connected to by steel pipe (704) and is corniced on outrigger in section (702).
  7. The support system 7. roofing according to claim 6 cornices, which is characterized in that the wood a tree, used in making timber for boats layer (300) includes the wooden a tree, used in making timber for boats (301), the quantity of the wooden a tree, used in making timber for boats (301) is multiple, and the distance between adjacent described wooden a tree, used in making timber for boats (301) range is in 190mm-210mm Between;
    The sectional dimension * length value of the wood a tree, used in making timber for boats (301) is 90mm*40mm*2000mm.
  8. The support system 8. roofing according to claim 7 cornices, which is characterized in that the Thickness of the template (400) Range is between 10mm-15mm.
  9. The construction method of support system 9. a kind of roofing as claimed in claim 8 cornices, which is characterized in that including walking as follows It is rapid:
    (a) pre-buried tripod screw rod hole to be provided
    PVC30 casing penetrates the side for the outrigger that cornices, pre-buried PVC30 casing, to form the hole to be provided of firm screw rod;
    It is turned over inside and outside beam in roofing, a C12 reinforcing bar is respectively added in casing two sides, and C12 reinforcing bar is first with tied silk binding and beam hoop On muscle, after service sleeve leveling, beam stirrup is welded, at least two solder joint of both ends reinforcement of weld of each service sleeve;
    Using drawing logical line to level when service sleeve is pre-buried, when drawing logical line, prolong logical line length every 5 meters of settings, one horizontal absolute altitude control Point processed, it is ensured that when sleeve pipe pre-embedding in same elevation line;
    (b) in roofing reversed beam casting concrete
    The at the uniform velocity casting concrete on roofing reversed beam, is arranged construction joint cornicing on outrigger, hard to reversed beam concrete construction interface After change, sealing rod is installed;
    Water seasoning is carried out on the surface of concrete, curing time at least 14 days, the intensity of reversed beam concrete is made to reach 20MPa;
    (c) installation adjusts and sets triangular support bracket
    The vertical bar (101) of triangular support bracket (100) is fixed on using through-wall bolt (103), expansion bolt (104) cornice with Under concrete structure in, adjust triangular support bracket (100) verticality, tighten through-wall bolt (103), expansion bolt respectively (104) after, the verticality of triangular support bracket (100) is adjusted again, and the lower anchor slab expanding screw of triangular support bracket (100) is then installed Bolt;
    (d) three horizontal support bars are installed
    Using first level support rod (109), the second horizontal support bar (110), third horizontal support bar (111) respectively to first Fixing pipe (105), the second fixing pipe (106), third fixing pipe (108) position be fixed;
    (e) the main stupefied rod piece of installation
    The inner end of main stupefied rod piece (200) is connected to horizon bar (102) inner end of triangular support bracket (100), first level branch Strut (109), the second horizontal support bar (110) are respectively fixed the position of the stupefied rod piece of master (200);
    The upper end of 4th horizontal support bar (112) connects the second horizontal support bar (110), under the 4th horizontal support bar (112) End connection third horizontal support bar (111);
    When the stupefied rod piece of master (200) encounters shear wall, weighted base (600) are installed in shear wall side elevation, hound (500) Upper end is connected on brace (107), and the lower end of hound (500) connects weighted base (600);
    (f) the wooden a tree, used in making timber for boats layer, template are installed
    It is laid with the wooden a tree, used in making timber for boats layer (300) on the stupefied rod piece of master (200), is laid with template (400) above the wooden a tree, used in making timber for boats layer (300);
    (g) assembling reinforcement
    According to construction drawing, the reinforcing bar for the beam slab that cornices is installed;
    (h) casting concrete
    Uniform casting concrete from the inside to the outside, and pour and put outward from the position of the anchor point close to triangular support bracket (100) Material;
    (i) curing concrete
    The surface of concrete is conserved, curing time at least 14 days;
    (j) triangular support bracket is removed
    It checks whether the intensity of entire support system reaches 100%, after reaching, first tears the template (400) of not load-bearing open, then tear load-bearing open Template (400), remove triangular support bracket (100) lateral support, remove triangular support bracket (100) vertical supporting.
  10. The construction method of support system 10. roofing according to claim 9 cornices, which is characterized in that in above-mentioned steps, When encountering the position of corner, external corner tripod (700) are installed on shear wall.
CN201910506984.3A 2019-06-12 2019-06-12 Roofing cornices support system and its construction method Pending CN110359645A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910506984.3A CN110359645A (en) 2019-06-12 2019-06-12 Roofing cornices support system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910506984.3A CN110359645A (en) 2019-06-12 2019-06-12 Roofing cornices support system and its construction method

Publications (1)

Publication Number Publication Date
CN110359645A true CN110359645A (en) 2019-10-22

Family

ID=68215804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910506984.3A Pending CN110359645A (en) 2019-06-12 2019-06-12 Roofing cornices support system and its construction method

Country Status (1)

Country Link
CN (1) CN110359645A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441577A (en) * 2020-04-17 2020-07-24 中建一局集团第一建筑有限公司 Reinforcing structure and method for ultra-thick cantilever plate side mold
CN113719118A (en) * 2021-08-20 2021-11-30 中建科工集团有限公司 Steel structure concrete floating plate pouring support frame and construction method thereof
CN113914476A (en) * 2021-10-19 2022-01-11 广东宏茂建设管理有限公司 Construction method of long-size overhanging floating plate

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050247013A1 (en) * 2004-05-04 2005-11-10 Polycrete Systems, Ltd Reinforced polymer panel and method for building construction
CN201310183Y (en) * 2008-11-20 2009-09-16 中国第二冶金建设有限责任公司 Convenient support device for cornice on silo roof
CN205531267U (en) * 2016-04-07 2016-08-31 中国建筑第二工程局有限公司 Integrated configuration support body convenient to building is draped over one's shoulders eaves and is decorated construction
CN205935659U (en) * 2016-08-24 2017-02-08 仇国辉 Cast in situ concrete eave are chosen outward and are hung movable formwork device
CN206128603U (en) * 2016-09-29 2017-04-26 上海江河幕墙系统工程有限公司 Curtain mounting structure that leads a wandering life cornices
CN207847151U (en) * 2018-02-02 2018-09-11 青岛一建集团有限公司 The telescopic support device to cornice for installing exterior wall
CN208220028U (en) * 2018-05-18 2018-12-11 中铁建工集团装饰工程有限公司 A kind of assembled decorative concrete cornice component
CN109138415A (en) * 2018-09-14 2019-01-04 五冶集团上海有限公司 The formwork erecting structure and its construction method of eaves gutter are overhang outside silo

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050247013A1 (en) * 2004-05-04 2005-11-10 Polycrete Systems, Ltd Reinforced polymer panel and method for building construction
CN201310183Y (en) * 2008-11-20 2009-09-16 中国第二冶金建设有限责任公司 Convenient support device for cornice on silo roof
CN205531267U (en) * 2016-04-07 2016-08-31 中国建筑第二工程局有限公司 Integrated configuration support body convenient to building is draped over one's shoulders eaves and is decorated construction
CN205935659U (en) * 2016-08-24 2017-02-08 仇国辉 Cast in situ concrete eave are chosen outward and are hung movable formwork device
CN206128603U (en) * 2016-09-29 2017-04-26 上海江河幕墙系统工程有限公司 Curtain mounting structure that leads a wandering life cornices
CN207847151U (en) * 2018-02-02 2018-09-11 青岛一建集团有限公司 The telescopic support device to cornice for installing exterior wall
CN208220028U (en) * 2018-05-18 2018-12-11 中铁建工集团装饰工程有限公司 A kind of assembled decorative concrete cornice component
CN109138415A (en) * 2018-09-14 2019-01-04 五冶集团上海有限公司 The formwork erecting structure and its construction method of eaves gutter are overhang outside silo

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441577A (en) * 2020-04-17 2020-07-24 中建一局集团第一建筑有限公司 Reinforcing structure and method for ultra-thick cantilever plate side mold
CN113719118A (en) * 2021-08-20 2021-11-30 中建科工集团有限公司 Steel structure concrete floating plate pouring support frame and construction method thereof
CN113914476A (en) * 2021-10-19 2022-01-11 广东宏茂建设管理有限公司 Construction method of long-size overhanging floating plate
CN113914476B (en) * 2021-10-19 2022-10-04 广东宏茂建设管理有限公司 Construction method of long-size overhanging floating plate

Similar Documents

Publication Publication Date Title
CN110359645A (en) Roofing cornices support system and its construction method
CN108915725B (en) A kind of small template lining construction method in double -side approach tunnel
CN202227476U (en) High-altitude large-span overhung corridor-type reinforced concrete structure
CN105714684B (en) Prestress concrete variable cross-section fish-belly continuous box beam construction method
CN105040970A (en) Comprehensive gymnasium high formwork support system and construction method of comprehensive gymnasium high formwork support system
CN102444203A (en) High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN106284089A (en) A kind of steel trestle rapid constructing method
CN105350454B (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
CN103498425B (en) One completely knocks down multifunctional assembled bearing bracket structure and construction method thereof
CN205444887U (en) Slope roofing template system
CN104060629A (en) Covered top-down excavation subway station overlapped wall construction method and movable side wall formwork jumbo
CN112095439B (en) Method for constructing transportation platform between canyon tunnels and structure of transportation platform
CN108360380A (en) A kind of bridge pier column construction operation platform and its construction method
CN111764621A (en) Overhanging scaffold and construction method
CN108625485A (en) A kind of steel bar girder plate end connecting joint structure and construction method
CN108677962A (en) A kind of subway comes in and goes out line segment foundation pit fixing of the forming frame and method for dismounting
CN107724540A (en) Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates
CN110485742A (en) A kind of positioning device and construction method of the pre-buried pedestal anchor bolt in isolated footing
CN109235280A (en) The operation platform and construction method of bridge coping
CN105971110A (en) Construction method for fire control corridor steel structure supporting system
CN103758045A (en) Box girder wet joint formwork construction method under space limitation condition
CN103243912A (en) Multilayer no-board frame structure constructing method
CN113026950A (en) Construction method for separating steel structure from core tube concrete in advance
CN209194347U (en) The operation platform of bridge coping
JPH06173339A (en) Constructing method for joining section for column/beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191022