CN110332795A - Three control timing of one kind goes out panel control system - Google Patents

Three control timing of one kind goes out panel control system Download PDF

Info

Publication number
CN110332795A
CN110332795A CN201910553669.6A CN201910553669A CN110332795A CN 110332795 A CN110332795 A CN 110332795A CN 201910553669 A CN201910553669 A CN 201910553669A CN 110332795 A CN110332795 A CN 110332795A
Authority
CN
China
Prior art keywords
roll segments
plate
roll
frame body
plasterboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910553669.6A
Other languages
Chinese (zh)
Other versions
CN110332795B (en
Inventor
张文见
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing New Building Material Group Co Ltd
Original Assignee
Beijing New Building Material Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing New Building Material Group Co Ltd filed Critical Beijing New Building Material Group Co Ltd
Priority to CN201910553669.6A priority Critical patent/CN110332795B/en
Publication of CN110332795A publication Critical patent/CN110332795A/en
Application granted granted Critical
Publication of CN110332795B publication Critical patent/CN110332795B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G43/00Control devices, e.g. for safety, warning or fault-correcting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G49/00Conveying systems characterised by their application for specified purposes not otherwise provided for
    • B65G49/05Conveying systems characterised by their application for specified purposes not otherwise provided for for fragile or damageable materials or articles
    • B65G49/08Conveying systems characterised by their application for specified purposes not otherwise provided for for fragile or damageable materials or articles for ceramic mouldings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B25/00Details of general application not covered by group F26B21/00 or F26B23/00
    • F26B25/001Handling, e.g. loading or unloading arrangements
    • F26B25/003Handling, e.g. loading or unloading arrangements for articles
    • F26B25/004Handling, e.g. loading or unloading arrangements for articles in the shape of discrete sheets

Abstract

The embodiment of the invention discloses three control timings of one kind to go out panel control system, including the frame body that works, the top right side of work frame body is equipped with drying machine, the top left side of work frame body, which is provided with, accelerates roller-way for three controls, it includes the first roll segments that three controls, which accelerate roller-way, second roll segments and third roll segments, first roll segments, plate levelling structure is respectively arranged on second roll segments and third roll segments, speed adjustment structure and equidistant at the uniform velocity control structure, the side of work frame body is provided with control cabinet, when the system can make ejecting plate, the time interval and distance of two groups of front and back plate are consistent, avoid the occurrence of three controls frequently random plate phenomenon, simultaneously, the direction of the plasterboard of conveying can be adjusted, enable plasterboard and transfer roller conveying direction keeping parallelism, it avoids influencing the dry effect of plasterboard, furthermore, the system can make stone Cream plate carries out selective deceleration in the second half section of conveying, and plasterboard is avoided to knock the front plasterboard to be dried such as.

Description

Three control timing of one kind goes out panel control system
Technical field
The present embodiments relate to plasterboard manufacturing technology fields, and in particular to three control timing of one kind goes out panel control system.
Background technique
Plasterboard is using building gypsum as a kind of material made of primary raw material, it is that one kind is light-weight, intensity is higher, thick The construction material for spending the better performances such as relatively thin, easy to process and sound insulation insulation and fire prevention is the novel light of current development emphatically One of lumber.Plasterboard be widely used in the various buildings such as house, office building, shop, hotel and industrial premises it is interior every Wall, wall cladding boards (instead of floated coat), ceiling, abatvoix, ground layer plate and various decorative panels etc., for interior Be not advantageously mounted at bathroom or kitchen.
Plasterboard mainly has Thistle board, without Thistle board, decorated gypsum board, gypsum hollow lath, fibrous plaster Plate, plaster board, locating-point plasterboard etc..In addition to traditional plasterboard, there are also new products to be continuously increased, such as gypsum sound-absorbing Plate, refractory slab, heat-insulating shield and gypsum composite board etc., the specification of plasterboard also develop to Gao Houdu, large scale direction.In addition, stone The purposes of cream product is also being widened, except make base lining in addition to, also serve as surface decoration material, even serving as floor tile, exterior wall substrate and Wall core material etc..
Gypsum board production line is the relatively high producing line of a set of automation, entire producing line from molding, fixed length cutting, drying, Stacking all realizes automated production.During the drying process, it needs to control out panel control system by three and controls one piece of block gypsum plate It is dried by drying machine.
But when actually controlling ejecting plate, often there are following problems:
(1) when ejecting plate, the time interval of two groups of front and back plate and apart from when it is big when it is small, raise speed in production line to 50 meters or more When easily cause random plate phenomenon, not only delay the process of production line, be also easy to cause the damage of plasterboard;
(2) plasterboard is not parallel with transfer roller conveying direction in actual shipment mostly, but towards various directions Inclination, the phenomenon that will affect dry effect in this way, and be easy to appear snap-gauge;
(3) plasterboard before it is dried, be accelerate roller-ways to carry out acceleration conveying by three controls, but enter drying machine it Before, it is easy to the plasterboards to be dried such as front are knocked because speed is excessively high.
Summary of the invention
For this purpose, the embodiment of the present invention, which provides three control timing of one kind, goes out panel control system, when which can make ejecting plate, front and back The time interval and distance of two groups of plates are consistent, and are avoided the occurrence of three controls frequently random plate phenomenon, are advantageously ensured that the suitable of production line Benefit carries out, and plasterboard is avoided to damage, meanwhile, it is capable to be adjusted to the direction of the plasterboard of conveying, enable plasterboard with Transfer roller conveying direction keeping parallelism avoids influencing dry effect, and can be avoided and the phenomenon that snap-gauge occur, in addition, should System can make plasterboard carry out selective deceleration in the second half section of conveying, avoid plasterboard from knocking front etc. to be dried Plasterboard, to solve the problems of the prior art.
To achieve the goals above, the embodiment of the present invention provides the following technical solutions: one kind three controls timing ejecting plate control system System, including work frame body, the top right side of the work frame body are equipped with the drying machine of drying plaster boards, and the top for the frame body that works Be provided on the left of portion and three controls that plasterboard is delivered to drying machine accelerated into roller-ways, three control accelerate roller-way include from left to right according to The first roll segments, the second roll segments and the third roll segments of secondary setting;
Plate levelling structure, speed tune are respectively arranged on first roll segments, the second roll segments and third roll segments Section structure and equidistant at the uniform velocity control structure, the side of the work frame body is provided with control plate levelling structure, speed adjusts knot The control cabinet of structure and equidistant at the uniform velocity control structure operation.
The embodiment of the present invention is further characterized in that: first roll segments, the second roll segments and third roll segments include Several equally distributed roll shafts, and the both ends of roll shaft pass through bearing and connect with work frame body, first roll segments, second The side of roll segments and third roll segments is fixedly installed with servo motor, and the output end of servo motor is respectively connected with driving Axis, the drive shaft both pass through work frame body and connect with a roll shaft.
The embodiment of the present invention is further characterized in that: the end of the roll shaft is arranged with gear, first roll segments, The outside of two roll segments and third roll segments corresponding gear is arranged with conveyor chain respectively.
The embodiment of the present invention is further characterized in that: the equidistant at the uniform velocity control structure include setting third roll segments just under The output end of side and the driving cylinder for being fixed on work frame body bottom, the driving cylinder is connected with lifting shaft, and lifting shaft Top is fixedly connected with the EV baffle between two roll shafts.
The embodiment of the present invention is further characterized in that: the top two sides of the EV baffle are separately installed with photoelectric sensor switch hair End and photoelectric sensor switch receiving end are penetrated, and photoelectric sensor switch transmitting terminal, photoelectric sensor switch receiving end connect with control cabinet It connects.
The embodiment of the present invention is further characterized in that: the plate levelling structure includes being separately positioned on the first roll segments two sides Air cylinder group, the air cylinder group includes first cylinder parallel with the first roll segments, and vertical with the first roll segments Two cylinders, and the first cylinder and the second cylinder are each attached on work frame body.
The embodiment of the present invention is further characterized in that: the vertical adjustment bar that the output end of first cylinder is respectively connected with, and The telescopic direction of two vertical adjustment bars is on the contrary, the end of the vertical adjustment bar is respectively connected with longitudinal push plate, second gas The output end of cylinder is respectively connected with lateral adjustments bar, and the end of the lateral adjustments bar is respectively connected with lateral push plate, and two transverse directions Push plate is oppositely arranged.
The embodiment of the present invention is further characterized in that: the speed adjustment structure includes being arranged two right above the second roll segments The guide plate of side, and guide plate passes through fixed frame and is fixedly connected with work frame body, is respectively connected with out on the left of the guide plate Oralia, and the top of two guide plates is connected by support plate, the inside left-end of the guide plate is equipped with to be connect with control cabinet Velocity sensor.
The embodiment of the present invention is further characterized in that: several regulation cylinders are fixedly installed at the top of the support plate, and The output end of regulation cylinder is connected with regulation axis, and the regulation axis both passes through support plate, and the bottom end for regulating and controlling axis is connected with pressing plate, The bottom surface of the pressing plate is provided with felt mattress.
The embodiment of the present invention is further characterized in that: the surface of the roll shaft is arranged with rubber layer, and the surface of rubber layer It is provided with several salient points.
The embodiment of the present invention has the advantages that
(1) when the present invention can make ejecting plate, the time interval and distance of two groups of front and back plate are consistent, and avoid the occurrence of three controls Frequently unrest plate phenomenon, advantageously ensures that going on smoothly for production line, plasterboard is avoided to damage;
(2) present invention can be adjusted the direction of the plasterboard of conveying, enable plasterboard defeated with transfer roller Direction keeping parallelism is sent, avoids influencing the dry effect of plasterboard, and can be avoided and the phenomenon that snap-gauge occur;
(3) present invention can make plasterboard carry out selective deceleration in the second half section of conveying, and plasterboard is avoided to knock front The plasterboard to be dried such as.
Detailed description of the invention
It, below will be to embodiment party in order to illustrate more clearly of embodiments of the present invention or technical solution in the prior art Formula or attached drawing needed to be used in the description of the prior art are briefly described.It should be evident that the accompanying drawings in the following description is only It is merely exemplary, it for those of ordinary skill in the art, without creative efforts, can also basis The attached drawing of offer, which is extended, obtains other implementation attached drawings.
Structure depicted in this specification, ratio, size etc., only to cooperate the revealed content of specification, for Those skilled in the art understands and reads, and is not intended to limit the invention enforceable qualifications, therefore does not have technical Essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influencing the function of the invention that can be generated Under effect and the purpose that can reach, should all still it fall in the range of disclosed technology contents obtain and can cover.
Fig. 1 is whole overlooking structure diagram of the invention;
Fig. 2 is lateral push plate side structure schematic view of the invention;
Fig. 3 is EV baffle side structure schematic view of the invention;
Fig. 4 is support plate side structure schematic view of the invention.
In figure:
1- work frame body;2- drying machine;The control of 3- tri- accelerates roller-way;The first roll segments of 4-;The second roll segments of 5-;6- third roller Road section;7- plate aligns structure;8- speed adjustment structure;The equidistant at the uniform velocity control structure of 9-;10- control cabinet;11- roll shaft;12- axis It holds;13- servo motor;14- drive shaft;15- gear;16- conveyor chain;17- rubber layer;18- salient point;
701- air cylinder group;The first cylinder of 702-;The second cylinder of 703-;704- vertical adjustment bar;The push plate of the longitudinal direction 705-;706- Lateral adjustments bar;707- transverse direction push plate;
801- guide plate;802- fixed frame;803- open plate;804- support plate;805- velocity sensor;806- regulates and controls gas Cylinder;807- regulates and controls axis;808- pressing plate;809- felt mattress;
901- drives cylinder;902- lifting shaft;903-EV baffle;904- photoelectric sensor switch transmitting terminal;905- light inductance Inductive switch receiving end.
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this explanation Content disclosed by book is understood other advantages and efficacy of the present invention easily, it is clear that described embodiment is the present invention one Section Example, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not doing Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
As shown in Figures 1 to 4, the present invention provides three control timings of one kind to go out panel control system, including work frame body 1, work The top right side for making frame body 1 is equipped with the drying machine 2 of drying plaster boards, and the top left side for the frame body 1 that works is provided with gypsum Three controls that plate is delivered to drying machine 2 accelerate roller-way 3, the process that three controls accelerate roller-way 3 that can convey to plasterboard, and convey In plasterboard is accelerated, enable plasterboard gradually enter drying machine 2 in, complete the drying of plasterboard.
It includes the first roll segments 4, the second roll segments 5 and the third roller-way being set gradually from left to right that three controls, which accelerate roller-way 3, Section 6, the first roll segments 4, the second roll segments 5 and third roll segments 6 include several equally distributed roll shafts 11, and roll shaft 11 Both ends pass through bearing 12 with work frame body 1 connect, the side of the first roll segments 4, the second roll segments 5 and third roll segments 6 It is fixedly installed with servo motor 13, and the output end of servo motor 13 is respectively connected with drive shaft 14, drive shaft 14 both passes through work Make frame body 1 to connect with a roll shaft 11.
The end of roll shaft 11 is arranged with gear 15,6 corresponding teeth of the first roll segments 4, the second roll segments 5 and third roll segments The outside of wheel 15 is arranged with conveyor chain 16, three equal independent controls of servo motor 13, so that in the band of servo motor 13 respectively Under dynamic, the first roll segments 4, the second roll segments 5 and third roll segments 6 can be made to convey plasterboard at different rates respectively.
The surface of roll shaft 11 is arranged with rubber layer 17, and the surface of rubber layer 17 is provided with several salient points 18, leads to Setting rubber layer 17 and salient point 18 are crossed, the friction of roll shaft 11 Yu plasterboard can not only be increased, facilitates the conveying of plasterboard, moreover it is possible to Plasterboard is enough protected, plasterboard is avoided to damage during conveying.
Plate levelling structure 7, speed tune are respectively arranged on first roll segments 4, the second roll segments 5 and third roll segments 6 Section structure 8 and equidistant at the uniform velocity control structure 9, the side of work frame body 1 is provided with control plate levelling structure 7, speed adjusts knot The control cabinet 10 that structure 8 and equidistant at the uniform velocity control structure 9 are run, control cabinet 10 are provided with the control member such as relay, time relay Part.
Plate levelling structure 7 is used to align the plasterboard in conveying, avoids plasterboard from tilting, influences dry effect, and It can be avoided and the phenomenon that snap-gauge occur, speed adjustment structure 8 is used to adjust plasterboard in the speed for conveying last journey, avoids plasterboard Excessive velocities knock the plate that front waits, and equidistantly at the uniform velocity control structure 9 is for controlling the time interval of ejecting plate, so that front and back The time interval of two groups of plasterboards is able to maintain consistent with distance, avoids the occurrence of three controls frequently random plate phenomenon, advantageously ensures that life Going on smoothly for producing line, avoids plasterboard from damaging.
Equidistantly at the uniform velocity control structure 9 includes being arranged in immediately below third roll segments 6 and being fixed on the drive of 1 bottom of work frame body It takes offence cylinder 901, the output end of driving cylinder 901 is connected with lifting shaft 902, and the top of lifting shaft 902 is fixedly connected with and is located at EV baffle 903 between two roll shafts 11, flushes with the top surface of third roll segments 6 when the top of EV baffle 903 is initial, works as driving Cylinder 901 can be such that EV baffle 903 rises in the control cabinet work of control cabinet 10.
The top two sides of EV baffle 903 are separately installed with photoelectric sensor switch transmitting terminal 904 and photoelectric sensor switch receives End 905, and photoelectric sensor switch transmitting terminal 904, photoelectric sensor switch receiving end 905 are connect with control cabinet 10, optoelectronic induction Whether the top that switch transmitting terminal 904 and photoelectric sensor switch receiving end 905 are able to detect third roll segments 6 has conveyed gypsum Plate, when plasterboard moves above EV baffle 903, photoelectric sensor switch receiving end 905 can not receive photoelectric sensor switch The signal that transmitting terminal 904 emits, and when plasterboard is across EV baffle 903 or without plate, photoelectric sensor switch receiving end 905 can Receive the signal of the transmitting of photoelectric sensor switch transmitting terminal 904.
In the drying process of plasterboard, when the first block gypsum plate enters drying machine 2 by EV baffle 903, control cabinet 10 can receive the signal that plasterboard passes through, when plasterboard passes completely through EV baffle 903, the control driving cylinder of control cabinet 10 901 work, enable EV baffle 903 to rise under the drive of lifting shaft 902, so that later plasterboard is blocked, by setting Surely the operating interval for driving cylinder 901, can make EV baffle 903 constantly rise, fall within interval time, so as to Make the time interval of two groups of front and back plasterboard and apart from always consistent.
Plate levelling structure 7 includes being separately positioned on the air cylinder group 701 of 4 two sides of the first roll segments, and air cylinder group 701 includes First cylinder 702 parallel with the first roll segments 4, and second cylinder 703 vertical with the first roll segments 4, and the first cylinder 702 and second cylinder 703 be each attached on work frame body 1.
The vertical adjustment bar 704 that the output end of first cylinder 702 is respectively connected with, and two vertical adjustment bars 704 is flexible Contrary, the end of vertical adjustment bar 704 is respectively connected with longitudinal push plate 705, and the output end of the second cylinder 703 is respectively connected with cross To adjusting rod 706, the end of lateral adjustments bar 706 is respectively connected with lateral push plate 707, and two lateral push plates 707 are oppositely arranged.
When plasterboard conveys on the first roll segments 4, two the first cylinders 702 can work respectively, and make longitudinal direction Push plate 705 can move back and forth, and during longitudinal push plate 705 is mobile, longitudinal to push away if plasterboard magnitude of inclination is excessive Plate 705 can push plasterboard, reduce plasterboard magnitude of inclination, at the same time, two second gas in 701 front of the first cylinder Cylinder 702 can work asynchronously, and two lateral push plates 707 is enabled to push plasterboard together, enable plasterboard and conveying Orbit transports direction keeping parallelism avoids snap-gauge or influences the drying effect of plasterboard.
Speed adjustment structure 8 includes the guide plate 801 that 5 surface two sides of the second roll segments are arranged in, and guide plate 801 is equal It is fixedly connected by fixed frame 802 with work frame body 1, the left side of guide plate 801 is respectively connected with open plate 803,801 energy of guide plate Enough to be oriented to the movement of plasterboard, open plate 803 can facilitate plasterboard under the action of plate aligns structure 7 from first Roll segments 4 are moved on the second roll segments 5.
The top of two guide plates 801 is connected by support plate 804, and the inside left-end of guide plate 801 is equipped with and controls The velocity sensor 805 that case 10 connects, velocity sensor 805 can to the speed by the plasterboard on the second roll segments 5 into Row detection.
The top of support plate 804 is fixedly installed with several regulation cylinders 806, and regulates and controls the output end connection of cylinder 806 There is regulation axis 807, regulation axis 807 both passes through support plate 804, and the bottom end for regulating and controlling axis 807 is connected with pressing plate 808, pressing plate 808 Bottom surface is provided with felt mattress 809.
In the transmission process of plasterboard, if the plasterboard on third roll segments 6 is blocked by EV baffle 903, control cabinet 10 control regulation cylinders 806 work, and pressing plate 808 is moved down under the drive of regulation axis 807, enables felt mattress 809 It is enough to be contacted with plasterboard, so that the movement speed of plasterboard reduces, if velocity sensor 805 measures the mobile speed of plasterboard Height is spent, and control cabinet 10 drives more regulation cylinders 806 to work, and the speed of plasterboard is substantially reduced, when the Plasterboard on three roll segments 6 is passed through without plate on EV baffle 903 or third roll segments 6, then pressing plate 808 is in regulation cylinder 806 It is moved up under drive, avoids the conveying for influencing plasterboard.
Although above having used general explanation and specific embodiment, the present invention is described in detail, at this On the basis of invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Therefore, These modifications or improvements without departing from theon the basis of the spirit of the present invention are fallen within the scope of the claimed invention.

Claims (10)

1. three control timing of one kind goes out panel control system, including work frame body (1), it is characterised in that: the top of the work frame body (1) The drying machine (2) of drying plaster boards is installed, and the top left side of work frame body (1) is provided with and is delivered to plasterboard on the right side of portion Three controls of drying machine (2) accelerate roller-way (3), and it includes the first roller-way being set gradually from left to right that three control, which accelerates roller-way (3), Section (4), the second roll segments (5) and third roll segments (6);
Plate levelling structure is respectively arranged on first roll segments (4), the second roll segments (5) and third roll segments (6) (7), speed adjustment structure (8) and equidistant at the uniform velocity control structure (9), the side of the work frame body (1) are provided with control plate Align the control cabinet (10) of structure (7), speed adjustment structure (8) and equidistant at the uniform velocity control structure (9) operation.
2. a kind of three controls timing according to claim 1 goes out panel control system, it is characterised in that: first roll segments (4), the second roll segments (5) and third roll segments (6) include several equally distributed roll shafts (11), and the two of roll shaft (11) End is connect by bearing (12) with work frame body (1), first roll segments (4), the second roll segments (5) and third roll segments (6) side is fixedly installed with servo motor (13), and the output end of servo motor (13) is respectively connected with drive shaft (14), institute It states drive shaft (14) and both passes through work frame body (1) and connect with a roll shaft (11).
3. a kind of three controls timing according to claim 2 goes out panel control system, it is characterised in that: the end of the roll shaft (11) Portion is arranged with gear (15), first roll segments (4), the second roll segments (5) and third roll segments (6) corresponding gear (15) Outside be arranged with conveyor chain (16) respectively.
4. a kind of three controls timing according to claim 1 goes out panel control system, it is characterised in that: described equidistantly at the uniform velocity to control Structure (9) includes the driving cylinder (901) for being arranged immediately below third roll segments (6) and being fixed on work frame body (1) bottom, institute The output end for stating driving cylinder (901) is connected with lifting shaft (902), and the top of lifting shaft (902) is fixedly connected with positioned at two EV baffle (903) between a roll shaft (11).
5. a kind of three controls timing according to claim 4 goes out panel control system, it is characterised in that: the EV baffle (903) Top two sides be separately installed with photoelectric sensor switch transmitting terminal (904) and photoelectric sensor switch receiving end (905), and light inductance Inductive switch transmitting terminal (904), photoelectric sensor switch receiving end (905) are connect with control cabinet (10).
6. a kind of three controls timing according to claim 1 goes out panel control system, it is characterised in that: the plate aligns structure It (7) include the air cylinder group (701) for being separately positioned on the first roll segments (4) two sides, the air cylinder group (701) includes and the first roller Parallel the first cylinder (702) of road section (4), and second cylinder (703) vertical with the first roll segments (4), and the first cylinder (702) it is each attached on work frame body (1) with the second cylinder (703).
7. a kind of three controls timing according to claim 6 goes out panel control system, it is characterised in that: first cylinder (702) the vertical adjustment bar (704) that output end is respectively connected with, and the telescopic direction of two vertical adjustment bars (704) is on the contrary, institute The end for stating vertical adjustment bar (704) is respectively connected with longitudinal push plate (705), and the output end of second cylinder (703) is all connected with Have lateral adjustments bar (706), the end of the lateral adjustments bar (706) is respectively connected with lateral push plate (707), and two transverse directions push away Plate (707) is oppositely arranged.
8. a kind of three controls timing according to claim 1 goes out panel control system, it is characterised in that: the speed adjustment structure It (8) include guide plate (801) of the setting in the second roll segments (5) surface two sides, and guide plate (801) passes through fixed frame (802) it is fixedly connected with work frame body (1), is respectively connected with open plate (803) on the left of the guide plate (801), and two are led It is connected to the top of plate (801) by support plate (804), the inside left-end of the guide plate (801) is equipped with and control cabinet (10) velocity sensor (805) connected.
9. a kind of three controls timing according to claim 8 goes out panel control system, it is characterised in that: the support plate (804) Top be fixedly installed with several regulation cylinder (806), and regulate and control cylinder (806) output end be connected with regulation axis (807), The regulation axis (807) both passes through support plate (804), and the bottom end for regulating and controlling axis (807) is connected with pressing plate (808), the pressing plate (808) bottom surface is provided with felt mattress (809).
10. a kind of three controls timing according to claim 2 goes out panel control system, it is characterised in that: the roll shaft (11) Surface is arranged with rubber layer (17), and the surface of rubber layer (17) is provided with several salient points (18).
CN201910553669.6A 2019-06-25 2019-06-25 Three-control timing board-out control system Active CN110332795B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910553669.6A CN110332795B (en) 2019-06-25 2019-06-25 Three-control timing board-out control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910553669.6A CN110332795B (en) 2019-06-25 2019-06-25 Three-control timing board-out control system

Publications (2)

Publication Number Publication Date
CN110332795A true CN110332795A (en) 2019-10-15
CN110332795B CN110332795B (en) 2020-12-22

Family

ID=68142790

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910553669.6A Active CN110332795B (en) 2019-06-25 2019-06-25 Three-control timing board-out control system

Country Status (1)

Country Link
CN (1) CN110332795B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109213060A (en) * 2017-06-30 2019-01-15 北新集团建材股份有限公司 A kind of roller way drying kiln ejecting plate control method and system
CN110733857A (en) * 2019-11-13 2020-01-31 中冶建工集团有限公司 Rectangular frame reinforcing bar centre gripping conveyer
CN110774195A (en) * 2019-11-12 2020-02-11 安徽持家汉家居工艺品有限公司 Limiting mechanism for processing household plates and using method thereof
CN112705971A (en) * 2020-12-16 2021-04-27 福建中维动力科技股份有限公司 Feeding mechanism for heavy truck plate-shaped part overturning and positioning device
CN114200859A (en) * 2021-11-25 2022-03-18 台衡精密测控(昆山)股份有限公司 Power saving method for flow line production
WO2024087372A1 (en) * 2022-10-24 2024-05-02 中建材创新科技研究院有限公司 Positioning and conveying system for layered distribution of gypsum plaster board, and conveying method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103508239A (en) * 2013-09-25 2014-01-15 江苏海大印染机械有限公司 Novel cloth feeding adjusting device for stenter
CN204096554U (en) * 2014-07-31 2015-01-14 宁波北新建材有限公司 A kind of plasterboard brake equipment
CN204255051U (en) * 2014-09-28 2015-04-08 苏州北新矿棉板有限公司 A kind of turnover plate monitoring system of drying kiln
CN204368992U (en) * 2014-11-20 2015-06-03 北新集团建材股份有限公司 A kind of plasterboard enters the autonomous cruise speed system of plate
CN205448585U (en) * 2016-03-24 2016-08-10 北新集团建材股份有限公司 Gypsum board desiccator with push away neat device
CN206750740U (en) * 2017-03-30 2017-12-15 镇江北新建材有限公司 A kind of live-roller gear of plaster tablet drying machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103508239A (en) * 2013-09-25 2014-01-15 江苏海大印染机械有限公司 Novel cloth feeding adjusting device for stenter
CN204096554U (en) * 2014-07-31 2015-01-14 宁波北新建材有限公司 A kind of plasterboard brake equipment
CN204255051U (en) * 2014-09-28 2015-04-08 苏州北新矿棉板有限公司 A kind of turnover plate monitoring system of drying kiln
CN204368992U (en) * 2014-11-20 2015-06-03 北新集团建材股份有限公司 A kind of plasterboard enters the autonomous cruise speed system of plate
CN205448585U (en) * 2016-03-24 2016-08-10 北新集团建材股份有限公司 Gypsum board desiccator with push away neat device
CN206750740U (en) * 2017-03-30 2017-12-15 镇江北新建材有限公司 A kind of live-roller gear of plaster tablet drying machine

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109213060A (en) * 2017-06-30 2019-01-15 北新集团建材股份有限公司 A kind of roller way drying kiln ejecting plate control method and system
CN110774195A (en) * 2019-11-12 2020-02-11 安徽持家汉家居工艺品有限公司 Limiting mechanism for processing household plates and using method thereof
CN110774195B (en) * 2019-11-12 2021-05-18 安徽持家汉家居工艺品有限公司 Limiting mechanism for processing household plates and using method thereof
CN110733857A (en) * 2019-11-13 2020-01-31 中冶建工集团有限公司 Rectangular frame reinforcing bar centre gripping conveyer
CN110733857B (en) * 2019-11-13 2021-09-28 中冶建工集团有限公司 Rectangular frame reinforcing bar centre gripping conveyer
CN112705971A (en) * 2020-12-16 2021-04-27 福建中维动力科技股份有限公司 Feeding mechanism for heavy truck plate-shaped part overturning and positioning device
CN114200859A (en) * 2021-11-25 2022-03-18 台衡精密测控(昆山)股份有限公司 Power saving method for flow line production
CN114200859B (en) * 2021-11-25 2024-03-08 台衡精密测控(昆山)股份有限公司 Method for saving electric power in pipeline production
WO2024087372A1 (en) * 2022-10-24 2024-05-02 中建材创新科技研究院有限公司 Positioning and conveying system for layered distribution of gypsum plaster board, and conveying method

Also Published As

Publication number Publication date
CN110332795B (en) 2020-12-22

Similar Documents

Publication Publication Date Title
CN110332795A (en) Three control timing of one kind goes out panel control system
CN206857650U (en) Sheet material turn-over rig
CN103240800A (en) Composite insulation board production line
WO2022199094A1 (en) Gypsum board conveying and steering device
CN110332896B (en) Gypsum board thickness monitoring device
CN202272445U (en) Template pushing device for conveying templates
CN209364910U (en) A kind of building wall board scraper
CN207684409U (en) Plasterboard turns to panel turnover mechanism
CN202967518U (en) Plasterboard conveyer structure
CN209588981U (en) A kind of gypsum board product diagonal line on-line measuring device
CN204094927U (en) A kind of lead angle belt shoe
CN111981823A (en) Drying device for gypsum board production line
CN203769337U (en) Supporting plate assembly system capable of achieving automatic horizontal moving and locating mounting
CN204475757U (en) A kind of colored diatom ooze gypsum plank
CN209635430U (en) A kind of plate stack device for building board production line
CN210100397U (en) Gypsum board thickness adjusting device
CN107813407B (en) A kind of plaster board production equipment for correcting mold offset
CN202079676U (en) Material distributing equipment for producing ceramic tiles
CN206901244U (en) A kind of plasterboard three is controlled into the conveying device before saw
CN204665892U (en) For the production of the novel burning equipment of crystallite foaming fire-retardant heat-insulation material
CN205167175U (en) Make gypsum board device fast
CN110481850B (en) Brick stacking machine
CN211544829U (en) Gypsum board glass welt shaping belt feeder
CN209112901U (en) A kind of plasterboard braking equipment
CN110625770A (en) Production line of ceramic plates with ultra-large specifications

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant