CN110296520A - A kind of air conditioner refrigerating and water heater, that is, hot water storage heating and control method and device - Google Patents
A kind of air conditioner refrigerating and water heater, that is, hot water storage heating and control method and device Download PDFInfo
- Publication number
- CN110296520A CN110296520A CN201910493910.0A CN201910493910A CN110296520A CN 110296520 A CN110296520 A CN 110296520A CN 201910493910 A CN201910493910 A CN 201910493910A CN 110296520 A CN110296520 A CN 110296520A
- Authority
- CN
- China
- Prior art keywords
- water
- heating
- temperature
- water tank
- heat exchanger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F1/00—Treatment of water, waste water, or sewage
- C02F1/02—Treatment of water, waste water, or sewage by heating
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/70—Control systems characterised by their outputs; Constructional details thereof
- F24F11/80—Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
- F24F11/86—Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling compressors within refrigeration or heat pump circuits
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/89—Arrangement or mounting of control or safety devices
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F5/00—Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater
- F24F5/0096—Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater combined with domestic apparatus
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H1/00—Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
- F24H1/18—Water-storage heaters
- F24H1/185—Water-storage heaters using electric energy supply
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H4/00—Fluid heaters characterised by the use of heat pumps
- F24H4/02—Water heaters
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H9/00—Details
- F24H9/20—Arrangement or mounting of control or safety devices
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B13/00—Compression machines, plants or systems, with reversible cycle
-
- C—CHEMISTRY; METALLURGY
- C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
- C02F2303/00—Specific treatment goals
- C02F2303/04—Disinfection
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- Combustion & Propulsion (AREA)
- Thermal Sciences (AREA)
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Hydrology & Water Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Water Supply & Treatment (AREA)
- Organic Chemistry (AREA)
- Heat-Pump Type And Storage Water Heaters (AREA)
Abstract
A kind of air conditioner refrigerating of the present invention and water heater, that is, hot water storage method for heating and controlling, include: S1. air conditioner refrigerating rate-determining steps: refrigerant is condensed by the first valve passage through host heat exchanger, it is evaporated again through A/C evaporator, forms air conditioner refrigerating circuit, the host heat exchanger is condenser;S2. water heater heats rate-determining steps: refrigerant is condensed by the second valve passage through hot water heat exchanger, and is evaporated through host heat exchanger, is formed water heater and is heated circuit;Including step S21 and S22, the host heat exchanger is evaporator, and the hot water heat exchanger includes water tank double-tube heat exchanger and connect with the water tank double-tube heat exchanger outer for jacket pipe, and the water tank double-tube heat exchanger is additionally provided with interior for jacket pipe;The present invention gives full play to the advantage of immediately heating water heater and storage-type electric water heater, and the combination of instant heating type and storage-type is obtained important breakthrough together, has great economic value and use value.
Description
Technical field
The present invention relates to air conditioner refrigeratings and water heater technical field of heating, and in particular to a kind of air conditioner refrigerating is with water heater
Hot water storage heating and control method and device.
Background technique
The domestic of water heater is already expired 50 years, from first generation gas heater, second generation electric heater, the third generation sun
Can water heater to forth generation air energy water heater, the occupation rate of market of the first generation to forth generation water heater respectively may be about 41%,
39%, 7%, 3%;As it can be seen that the market share of four generation water heaters is that a generation is fewer than a generation, the Science & Society of this and high speed development
It is economical incompatible.Wherein, the higher seat of having occupied of air energy water heater Zeng Yinqi energy consumption is set, but for many years because its cost is inclined
Height is limited by number of users, and winter is waiting for a long time, and hot water amount is insufficient, and big, the conventional water storage temperature of big water tank occupied space is easy
Make bacterial reproduction, needs the disadvantages such as artificial blowdown that cannot effectively solve for a long time, cause occupation rate of market minimum.
Requirement of the people to water heater is: safety and sanitation, efficient and convenient, save money durable, intelligent control, a tractor serves several purposes, heat
Water is more, unlimited number, cost performance are high, body little Yi dress, is not limited by various installations.Though every generation water heater is each advantageous,
It is difficult to perfection.
The advantages of first generation gas heater, is: hygienic, efficient and convenient, do not limited by number of users, body little Yi dress;Disadvantage
Be: safety is poor, use cost is high, it is inconvenient for use to change coal gas;
The advantages of second generation electric heater, is: it is comparatively safe and economical, reduce the trouble for changing coal gas, body little Yi dress;It lacks
Point is: safety is poor, higher operating costs, hot water health are poor, and hot water amount is limited by number of users, needs long period etc.
It waits;
The advantages of third generation solar water heater is: hot water can be provided free by having when the sun;The disadvantage is that: the high easily wound of water temperature
People, the long water consumption of pipeline are more, and hot water amount is limited by number of users, need to wait for a long time.The poor frequent blowdown of need of health, volume great Zhan
According to space, vulnerable to lightning stroke, the invasion of hail and typhoon natural calamity;
The advantages of forth generation air energy water heater is: safety, efficiency are high, economical;The disadvantage is that: high-temperature heating efficiency is low, heat
Water needs blowdown, and bacterium severely exceeds, and thousandweight water is not drinkable.Number of people design is unable to satisfy hot water supply, and waiting time is long.High temperature
Heat preservation power consumption is big, and service life is short.Volume takes up space greatly, and professional person is needed to install.
Water heater is divided into instant heating type and storage-type.Existing water heater exists always on solving demand of the user to hot water
Many shortcoming.When especially for meeting more people's continuous use hot water, traditional water heater is not using super high power heating side
Method (such as gas heater and instant electric water heater) is exactly method (such as water storage with smaller power long period heating water storage
Formula electric heater and air energy water heater) it tackles.And the common ground of these methods is: the demand not by user to hot water is special
Property and the intrinsic characteristic of feed system organically combine unified thinking to propose solution.
Also occurred air conditioner and water heater before forth generation air energy water heater, traditional air conditioner and water heater is using compression
Machine, hot water heat exchanger, condenser and evaporator three connect to be formed, because annual variation of ambient temperature is larger, various heat exchangers
Intermittent work, when system refrigerant, are few when more, and when pressure is low when high.Existing trilogy supply balances refrigeration by increasing fluid reservoir
Agent is limited, and is increased high pressure bypass, is reduced efficiency.And the trilogy supply of frequency conversion solves the balance of refrigerant by adjustment revolving speed
It is limited, all easily leads to the damage of critical component compressor.
Summary of the invention
The present invention provide in view of the above shortcomings of the prior art the i.e. hot water storage heating of a kind of air conditioner refrigerating and water heater and
Control method and device, present application addresses users to the characteristic of hot water demand, such as collection hot mode, mixed water mode, heated mould
The too many levels such as formula, system structure and control improve, and play the advantage that heat pump efficiency is variable, use when taking high energy efficiency i.e. hot
Fast heating water-storage type when formula, low-energy-efficiency, the technology for efficiently using efficient cryogenic solve the problems, such as that present high temperature is inefficient and bring.
The present invention in order to solve the above problem used by technical solution are as follows:
The present invention provides a kind of air conditioner refrigerating and the i.e. hot water storage method for heating and controlling of water heater, which is characterized in that
Include:
S1. air conditioner refrigerating rate-determining steps: refrigerant is condensed by the first valve passage through host heat exchanger, and is steamed through air-conditioning
Device evaporation is sent out, air conditioner refrigerating circuit is formed, the host heat exchanger is condenser;
S2. water heater heats rate-determining steps: refrigerant is condensed by the second valve passage through hot water heat exchanger, and through host
Heat exchanger evaporation forms water heater and heats circuit;Including step S21 and S22, the host heat exchanger is evaporator, the heat
Water- to-water heat exchanger includes water tank double-tube heat exchanger and connect with the water tank double-tube heat exchanger outer for jacket pipe, the water tank casing
Heat exchanger is additionally provided with interior for jacket pipe;
S21. water heater water storage heating control step: water temperature is lower than given threshold than set temperature in the water tank of water heater
When, controller controls compressor operating, and refrigerant is condensed by the second valve passage through water tank double-tube heat exchanger, and is changed through host
Hot device evaporation, forms water heater water storage heating circuit;
S22. water heater, that is, hot water storage heating control step: when using water, water flow switch is connected, and controller controls compressor work
Make, heated by water tank double-tube heat exchanger, then through carrying out heating using i.e. thermo-electric heaters and rising for jacket pipe heat temperature raising
Temperature, refrigerant is condensed by the second valve passage through water tank double-tube heat exchanger and for jacket pipe, and is evaporated through host heat exchanger, shape
At water heater, that is, hot heating circuit.
Further, in step s 2, water tank double-tube heat exchanger includes water tank, further includes the use being erected in the water tank
In the collection hot coil of the heating higher temperature hot water setting up and down above inner water tank of fluorine water circulation and in water tank
Heating lower temperature hot water below gallbladder is evenly heated coil pipe, and the disk caliber of the collection hot coil is less than described be evenly heated
The disk caliber of coil pipe;The upper end for integrating hot coil as refrigerant input port, in for jacket pipe refrigerant delivery outlet
It is connected, the lower end for integrating hot coil is connected as refrigerant delivery outlet with the refrigerant input port for being evenly heated coil pipe, institute
The connecting copper pipe for being evenly heated the delivery outlet connection water tank of coil pipe bottom end refrigerant is stated, host heat exchanger, the thermal-arrest are reconnected
The top of coil pipe to the bottom end for being evenly heated coil pipe disk in or disk outside be arranged it is described interior for jacket pipe, it is described interior for water jacket
The bottom end of pipe is refrigerant input port, and connects the outer refrigerant delivery outlet for jacket pipe, and described interior one end for jacket pipe exists
The top of the inner water tank, and it is used for the upper water inlet of hot water, the interior other end for jacket pipe is in the inner water tank
Bottom end, and it is provided with lower water inlet, cold water enters from water tank bottom end, flows out from water tank top, collection of the refrigerant from the upper end of water tank
The top of hot coil enters, the bottom end output for being evenly heated coil pipe through water tank bottom end, water (flow) direction and refrigerant flow direction
It, such as water tank casing, is exported by hot water connecting tube supplying hot water, the interior confession for opposite direction in order to form Convective Heating
Caliber of the bore of water inlet no more than the upper water inlet of interior water supply cannula tip, the water tank sleeve heat exchange under jacket pipe bottom end
Be arranged outside device for convey refrigerant and for what is heated when supplying water it is outer for jacket pipe, it is described outer for described in the connection of jacket pipe one end
Four-way valve, is refrigerant input terminal and hot water output port, and the outer hot water outlet for jacket pipe is also connected with i.e. thermoelectricity heating
Device, the outer other end for jacket pipe be output of condenser with it is described it is interior be connected for jacket pipe refrigerant input port, institute
The outer hot water input port for jacket pipe is stated to be connected with the hot water feed water inlet of water tank.
Further, water heater heating operations are that the coil pipe that is evenly heated can individually heat hot water or described
Be evenly heated coil pipe and the collection hot coil, it is interior for jacket pipe, it is outer for jacket pipe, i.e. one or more of thermo-electric heaters
Hot water is heated simultaneously.
Further, the water tank includes liner, insulating layer and shell, the insulating layer setting the liner with it is described
Between shell, it is described it is outer be located at outside the liner for jacket pipe, it is described it is interior be located inside the liner for jacket pipe, S21 heating
Process is static heating, and water tank is stood vertically, and inlet temperature of the refrigerant on the collection hot coil top of tank top is much higher than
The temperature of the refrigerant outlet for being evenly heated coil pipe of water tank bottom makes water to comply with the principle that cold sinking heat rises in water tank
The temperature difference of the water temperature of case liner increases, and S22 heating process is flowing heating, and cold water enters from the water inlet of water tank bottom end, heat
Water is flowed out from the high-end water outlet of water tank, and refrigerant enters from water tank high temperature, is flowed out from water tank low temperature, is formed convection current and is changed
Heat.
A kind of air conditioner refrigerating and water heater, that is, hot water storage heating control apparatus, it is characterised in that:
Including compressor, four-way valve, host heat exchanger, A/C evaporator and hot water heat exchanger, the hot water heat exchanger packet
Include boiler double-tube heat exchanger and outer for jacket pipe;
The compressor successively connect to be formed with host heat exchanger, A/C evaporator by the first valve passage of four-way valve
Air conditioner refrigerating circuit;
The compressor is successively connect and to be formed with hot water heat exchanger, host heat exchanger by the second valve passage of four-way valve
Water heater heats circuit;
Cold water enters water tank and enters water tank bottom through steady flow pipe, intakes up and down through interior for jacket pipe, then through connecting tube and water tank
The heat supply mouth of a river is connected, and the heat supply mouth of a river is connected with outer for jacket pipe again, is finally connected with water flow switch, then arrives user.
Further, four interfaces of the four-way valve include first interface, second interface, third interface and the 4th interface;
First valve passage are as follows:
The refrigerant outlet of the first interface connect compressor, the first interface and the third interface communicate, the
Three interfaces connect host heat exchanger refrigerant entrance, the outlet of host heat exchanger refrigerant and A/C evaporator refrigerant inlet phase
Even, A/C evaporator refrigerant outlet is connect with the second interface, and the second interface is connected to the 4th interface, and the 4th interface connects
Connect the refrigerant inlet of compressor;First throttle valve and the first shut-off valve are connected between A/C evaporator and host heat exchanger;
First check-valve and the second shut-off valve are connected between the refrigerant outlet of A/C evaporator and the second interface of four-way valve;
Further, second valve passage are as follows:
The refrigerant outlet of the first interface connect compressor, the first interface are communicated with the second interface, institute
The refrigerant inlet of second interface connection hot water heating heat exchanger is stated, the refrigerant outlet of hot water heat exchanger connects host heat exchanger
Refrigerant inlet, the refrigerant outlet of host heat exchanger connects the third interface, the 4th interface of third orifice,
The refrigerant inlet of the 4th interface connect compressor;It is connected between second interface and the refrigerant inlet of hot water heat exchanger
Third shut-off valve and outer for jacket pipe;It is connected between the refrigerant outlet of hot water heat exchanger and the refrigerant inlet of host heat exchanger
There are second check-valve, second throttle and the 4th shut-off valve.
When further, into cold water, the cold water input port of the water tank is connected with negative pressure threeway, and the one of the negative pressure threeway
End connection has the check-valves of decompression function, and the other end of the negative pressure threeway is connected with bypass threeway, the bypass threeway
One termination bypass solenoid valve, another to be terminated with return water threeway, the return water threeway one is terminated with return water check-valves, the return water three
It is logical another to be terminated with cold water inlet.
Further, when supplying hot water, cold water enters water tank, and hot water is through the interior water inlet up and down for jacket pipe, then passes through
Connecting tube is connected with water tank supplying hot water water outlet, and hot water outlet is connected through connecting tube with outer water supply cannula input end, outer water supply
Casing output end of hot water connects water pump, and the water pump other end is connected with i.e. thermo-electric heaters, i.e. another termination of thermo-electric heaters
There is water flow threeway, one end of water flow threeway connects bypass solenoid valve, and the other end of water flow threeway connects water flow switch, water flow switch
User's water is connected, return water is needed to take back Water Check Valve.
It further, further include controller, the controller is used to controlling the start and stop of the compressor, the four-way valve
Access switches the opening and closing of water pump, i.e. thermoelectricity heating and the solenoid valve, and the controller is also connected with environment temperature probe, water flow
Switch is popped one's head in water tank temperature, and control flow includes:
(1) fast heating water-storage type starts
Fast heating water-storage type is in heat hot water, when water temperature is lower than given threshold than set temperature in water tank, the controller
Compressor operating is controlled, when user's heat water, the water flow switch is connected, and the controller controls compressor operating, and completion is
Shi Jiare;
(2) pressure balance is heated
Equilibrium process: before the compressor starting up or after closing, the controller controls the four-way valve work, system
Cryogen passes through the first interface communicated and third interface of the four-way valve, the higher refrigerant of pressure and pressure in first interface
Lower host heat exchanger decompression, the second interface communicated and the 4th interface of the four-way valve, the higher water of refrigerant pressure
Housing-case heat exchange of heat pipe completes equilibrium process to the compressor air accumulator pressure release, after pressure balance, described in the controller control
Four-way valve disconnects, and the compressor booting, the aperture of electric expansion valve remains at optimum state, is rapidly heated, reaches i.e.
Hot purpose.
(3) temperature controls:
The fast heating water-storage type way of supplying water is that water tank temperature adds i.e. heat exchanger or electric heating warm-up heating water, and water tank can
Cold water, warm water or hot water are filled, the range of adjusting is wide, to reduce the cumbersome of adjusting, the hot water temperature of water tank convenient for control and energy conservation
It is controlled by set temperature and environment temperature, set temperature is automatically adjusted with the variation of environment temperature.
(5) backwater control:
When fast heating water-storage type air energy water heater needs return water by water flow switch, via controller control back water pump, install
Back water pump is arranged water pump according to the length of return pipe and pressurizes the return water time, completes return water;When user needs with water, water flow is opened
Close and connect, controller controls return water pump working, and after the completion of return water, water pump stops working, second of return water water flow switch not
During connection, settable return water break time is to be subject to hot water to become time of warm water, to be again started up return water in return pipe.
(6) instant heating type electric heating:
Summer, efficiency is high, and water tank dress cold water or warm water, instant-heating only need heat pump to be just able to satisfy Water-heating shower,
In winter, efficiency is low, and water tank fills warm water or hot water, and heat supply coolant-temperature gage is that water tank temperature adds i.e. heat exchanger heating, works as environment temperature
Or water tank temperature, when being lower than 15 DEG C (adjustable), water flow switch is connected, and controller first controls compressor operating, then control again i.e. hot
Formula electric heating work, i.e. thermoelectricity heating equally can complete return water with heating electromagnetic valve, can also complete high temperature with return water water pump
Sterilize and divide Wen Jiare.
(7) heating mode
Air-conditioning fast heating water-storage type water heater changes with water tank temperature variation efficiency, and water temperature is higher, and efficiency is lower, on the contrary
And it is high, the advantage of air-conditioning fast heating water-storage type water heater efficient cryogenic is made full use of, is added at water temperature low temperature with air-conditioning fast heating water-storage type
Heat, higher water temperature i.e. thermoelectricity heating (be also possible to electromagnetic energy) heat hot water constant using calorific value.
(8) divide Wen Jiare
Cold season, the temperature difference is big, and amount of hot water changes greatly, and regulating tank temperature is needed to guarantee hot water supply, and hot water temperature is low
When adjustable 45 DEG C, by single air conditioning fast heating water-storage type water heater heat, medium temperature is adjustable 45-55 DEG C when, by air-conditioning, that is, hot water storage
Formula water heater and i.e. thermoelectricity heating work at the same time completion, high temperature is adjustable 55-75 DEG C when, by individually be thermoelectricity heating complete.
(9) high temperature sterilization
Because water tank cold water is from low side into hot water height is brought out, and sewage is caused to deposit, and forms the nutrient laden of water, adds water temperature
It is lower, just it is suitble to bacterial reproduction, need to periodically sterilizes, water temperature is heated when being lower than adjustable 55 DEG C by air-conditioning fast heating water-storage type water heater,
When greater than or equal to adjustable 55 DEG C, start water pump, open bypass solenoid valve, starting is thermoelectricity heating, forms circulating heater
To adjustable 75 DEG C of high temperature sterilizations.
(10) priority routine
When water tank temperature will be above setting temperature, for protection equipment and energy conservation, it is adjustable 5 DEG C (adjustable) to be higher than setting temperature
When, refrigeration or water flow switch do not convert water heating when connecting, when water tank temperature is adjustable 5 DEG C (adjustable) less than or equal to setting temperature
When, refrigeration conversion water heating or starting device heat hot water when water flow switch is connected.
Air conditioner refrigerating provided by the present invention realizes following with water heater, that is, hot water storage heating and control method and device
The utility model has the advantages that
1, fast heating water-storage type water heater of the invention is different from traditional air conditioner and water heater, before this hot water heat exchanger and evaporation
Device is in parallel, then connects with compressor and condenser, and hot water heat exchanger and evaporator can be separated and be worked independently, not when not working
Such as low pressure gasholder, when being not present more when refrigerant the case where few intermittent work, the equilibrium problem of refrigerant is thoroughly solved,
Water heater will also be melted into a whole with air-conditioning.
2, the present invention gives full play to the advantage of immediately heating water heater and storage-type electric water heater, from air energy water heater test cabinet
Measure the generally acknowledged data of industry: water tank temperature 50-55 degree efficiency is that 2.0,40-45 degree efficiency is that 4.0,30-35 degree efficiency is
6.0, once, efficiency will decline 10% to the every reduction of water temperature.The present invention reduces water tank temperature as far as possible, as long as enough Water-heating showers, water tank
Preferably fill cold water or warm water, being promoted as far as possible is heat heating, using it is multistage (collection hot coil, it is interior for jacket pipe, it is outer for jacket pipe,
That is thermoelectricity heating) i.e. heat superposition, using one or more levels i.e. heat combination, equipment can also be kept long-term according to the demand of user
In efficient cryogenic area operation.
3, the combination of instant heating type and storage-type is obtained important breakthrough by the present invention together: being drilled from press-bearing water tank law of conservation of energy
Calculation can show that is, hot heating once heated up once than water storage, how close 5 times of hot water amount.
Once, hot water amount how close 20% for i.e. hot heating, i.e., hot ten degree of heating, hot water amount how close 400%.Therefore it should mention as far as possible
Rising is heat heating, can replace large water tank with small water tank, replace non-pressure water tank with press-bearing water tank.
4, of the invention that fluorine circulation and water circulation are combined into fluorine water circulation, it gives full play to fluorine circulation simply, stablizes durable
Advantage sum aggregate hot coil disk is small and dense, and heat is layering, and being formed is heat heating.It is high that water circulation efficiency has been played again, heat
The characteristics of concentrating quick heating completes water circulating-heating by the pressure of tap water, simply, stablizes durable, reduce vulnerable part water
Pump and the hydronic mixed water of water.
5, the present invention uses the combination of fast heating water-storage type air energy water heater and i.e. thermoelectricity heating, plays air energy water heater
The advantage of efficient cryogenic, the low-temperature end of heat hot water, the constant feature of performance electric heating calorific value, the high temperature end of heat hot water,
I.e. thermoelectricity heating control by environment temperature and water tank temperature simultaneously, and when relatively low and when hot water amount is insufficient with coolant-temperature gage, starting is i.e. hot
Electric heating.
6, of the invention outer for jacket pipe, when not having to hot water, it is equivalent to the connecting copper pipe of connection host and water tank, with heat
When water, casing heating function is just played.It can be used for the outer hot water of water tank to heat up again, can be used for storage-type air energy water heater
Hot water heating.
7, of the invention interior for jacket pipe, when with hot water, other than i.e. heat heating hot water, it is interior for jacket pipe on water tank top
When a large amount of supplying hot waters, at the other end water tank bottom of casing equally into hot water, hot water exports simultaneously from high low side, and making water tank bottom is stream
Dynamic hot water can not form sewage, while also destroy condition-water nutrient laden of bacterial reproduction, inhibit or kill bacterium.Heat
Water be also while with while the running water that changes, thousandweight water can not be formed, can be met needed for life.
8, collection hot coil caliber of the invention is small, winding density is high, stands vertically in tank top, connects in the middle part of water tank
It is evenly heated coil pipe, the temperature of collection hot coil circle inner coil pipe is higher than the temperature outside circle, and collecting hot coil is tens layers disk pipe
It is formed by stacking, according to the principle that heat rises, cold decline, formation temperature layering is higher than being evenly heated coil-pipe water tank temperature merely, full
Foot is the demand of heat heating, while collecting hot coil always all in heat hot water, economical and stablize.
9, the installation method of water inlet end of the invention is different, and conventional water tank is all to install additional in cold water inlet with load pressure function
Check-valves, be that present water inlet installs threeway additional the main reason for causing water tank to rise brokenly, make tank pressure and tap water with pressing,
Wherein one end loads the check-valves of pressure function, and check valve becomes negative pressure valve, carries imitative only some users of pressure valve before water meter equipped with single
It to valve, shields, while decreasing water tank and installing negative pressure valve gear additional.
10, the present invention is fast heating water-storage type device, needs to start at any time, and air-conditioning system is a pressure vessel, starting pressure
Before contracting machine, high-low pressure pressure balance is needed, therefore after stopping compressor or need to open the four-way valve connection several seconds before compressor, make high-low pressure
It connects, pressure balance.
11, the present invention controls water tank temperature using environment temperature, and common water tank temperature requires manual adjustment, turns down
Hot water is insufficient, and power-consuming, frequent adjusting has been turned up, time-consuming and laborious.And the range that fast heating water-storage type is adjusted expands, it is convenient for energy conservation
Water temperature is controlled using environment temperature.
12, the present invention is quickly heated, usually using quickly heating balance system because being fast heating water-storage type when need to start
It is now to be changed on the basis of delivery temperature on the basis of suction temperature, is rapidly achieved balance, is more suitable for water heating.
13, the application controller has water return function, need to only install return water water pump additional, and user one uses water, and water flow switch works,
Host-initiated, return water water pump also work, and return water water pump is through water flow switch to user terminal, by return pipe connection check-valves, then into
Enter water tank, completes return water, the water pump return water time is controlled by the length of return pipe can set 1-5 minutes, and return water water pump is again started up
Water flow switch is needed to close 5 minutes (adjustable) or more.
14, the present invention can divide Wen Jiare, and low-temperature end air can individually can heat, medium temperature end can air can and i.e. thermoelectricity add
Heat, temperature end can individually be thermoelectricity heating.Electric heating process, first return water water pump and heating electromagnetic valve are opened, and then i.e. thermoelectricity adds
Thermal technology make, from tank hot water's water outlet go out to water tank into cold water into, constitute circulation electric-heating system.
15, the present invention can start high temperature sterilization function.Although water tank is that no sewage is antibacterial, summer water tank dress cold water can be reduced
The reproduction speed of bacterium.As long as water tank temperature is more than 30 degree, water tank can be warming up to setting high temperature sterilization temperature or more, to the greatest extent row
High temperature sterilization.Heating process is carried out by Electric heating.
16, present device starting work is controlled by water tank temperature, when water tank temperature is higher than 5 degree of temperature of setting, water flow
When switch connection, equipment does not work, and when refrigeration does not switch to water heating, when only water tank temperature is less than or equal to 5 degree of temperature of setting,
When water flow switch is connected, equipment just works, and when refrigeration switchs to water heating.Therefore, the application has great economic value and makes
With value.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of air conditioner refrigerating and the i.e. hot water storage heating control apparatus of water heater of the present invention;
Fig. 2 is the water tank double-tube heat exchanger structural schematic diagram of water tank double-tube heat exchanger of the invention;
Fig. 3 is collection hot coil of the invention and the attachment structure schematic diagram for being evenly heated coil pipe;
Fig. 4 is the structural schematic diagram in the present invention for jacket pipe;
Fig. 5 is the outer structural schematic diagram for jacket pipe of the present invention.
Specific embodiment
Specifically illustrate embodiments of the present invention with reference to the accompanying drawing, attached drawing is only for reference and illustrates use, does not constitute pair
The limitation of the invention patent protection scope.
As shown in Figs. 1-5, a kind of air conditioner refrigerating is provided the present embodiment provides the present invention to add with the i.e. hot water storage of water heater
Heat control method, comprising:
S1. air conditioner refrigerating rate-determining steps: refrigerant is condensed by the first valve passage through host heat exchanger, and is steamed through air-conditioning
Device evaporation is sent out, air conditioner refrigerating circuit is formed, the host heat exchanger is condenser;
S2. water heater heats rate-determining steps: refrigerant is condensed by the second valve passage through hot water heat exchanger, and through host
Heat exchanger evaporation forms water heater and heats circuit;Including step S21 and S22, the host heat exchanger is evaporator, the heat
Water- to-water heat exchanger (such as Fig. 2) includes water tank double-tube heat exchanger and connect with the water tank double-tube heat exchanger outer for jacket pipe (such as figure
5), the water tank double-tube heat exchanger is additionally provided with interior for jacket pipe (such as Fig. 4);
S21. water heater water storage heating control step: water temperature is lower than given threshold than set temperature in the water tank of water heater
When, controller controls compressor operating, and refrigerant is condensed by the second valve passage through water tank double-tube heat exchanger, and is changed through host
Hot device evaporation, forms water heater water storage heating circuit;
S22. water heater, that is, hot water storage heating control step: when using water, water flow switch is connected, and controller controls compressor work
Make, heated by water tank double-tube heat exchanger, then through carrying out heating using i.e. thermo-electric heaters and rising for jacket pipe heat temperature raising
Temperature, refrigerant is condensed by the second valve passage through water tank double-tube heat exchanger and for jacket pipe, and is evaporated through host heat exchanger, shape
At water heater, that is, hot heating circuit.
In the present embodiment, in step s 2, water tank double-tube heat exchanger includes water tank, further includes being erected in the water tank
The collection hot coil (Fig. 3) of the heating higher temperature hot water setting up and down above the inner water tank for fluorine water circulation and it is located at
Heating lower temperature hot water below inner water tank is evenly heated coil pipe (Fig. 3), and the disk caliber of the collection hot coil is less than
The disk caliber for being evenly heated coil pipe;The upper end for integrating hot coil is interior for jacket pipe system with institute as refrigerant input port
The delivery outlet of cryogen is connected, and refrigerant delivery outlet is in the lower end for integrating hot coil, with the refrigerant for being evenly heated coil pipe
Input port is connected, and the connecting copper pipe of the delivery outlet connection water tank for being evenly heated coil pipe bottom end refrigerant reconnects host and changes
Hot device, it is described collection hot coil top to the bottom end for being evenly heated coil pipe disk in or disk outside be arranged it is described interior for jacket pipe
(Fig. 4), the interior bottom end for jacket pipe are refrigerant input port, and connect the outer refrigerant delivery outlet for jacket pipe, described
Interior one end for jacket pipe is used for the upper water inlet of hot water on the top of the inner water tank, described interior for the another of jacket pipe
End is provided with lower water inlet in the bottom end of the inner water tank, and cold water enters from water tank bottom end, flows out from water tank top, refrigeration
Agent enters from the top of the collection hot coil of the upper end of water tank, the bottom end output for being evenly heated coil pipe through water tank bottom end, water flow side
, such as water tank casing (Fig. 1 and Fig. 2), pass through heat in order to form Convective Heating for opposite direction to refrigerant flow direction
Water connecting tube supplying hot water exports, and the bore of water inlet is enterprising no more than interior water supply cannula tip under the interior water supply casing shoe
The caliber at the mouth of a river, the water tank double-tube heat exchanger peripheral hardware set for convey refrigerant and for supply water when heat it is outer for jacket pipe
(Fig. 5), it is described outer for jacket pipe one end connection four-way valve, it is refrigerant input terminal and hot water output port, the outer water supply
The hot water outlet of casing (Fig. 5) is also connected with i.e. thermo-electric heaters, and the outer other end for jacket pipe is refrigerant output
End with it is described it is interior be connected for jacket pipe refrigerant input port, the hot water water supply of the outer hot water input port and water tank for jacket pipe
Mouth is connected.
In the present embodiment, water heater heating operations are that the coil pipe that is evenly heated can individually heat hot water or institute
State be evenly heated coil pipe and the collection hot coil, it is interior for jacket pipe, it is outer for jacket pipe, i.e. one of thermo-electric heaters or several
Kind simultaneously heats hot water.
In the present embodiment, the water tank includes liner, insulating layer and shell (Fig. 2), and the insulating layer is arranged described interior
Between gallbladder and the shell, it is described it is outer be located at outside the liner for jacket pipe, it is described it is interior be located inside the liner for jacket pipe,
S21 heating process is static heating, and water tank is stood vertically, and inlet temperature of the refrigerant on the collection hot coil top of tank top is remote
Higher than the temperature of the refrigerant outlet for being evenly heated coil pipe in water tank bottom, to comply with the original that cold sinking heat rises in water tank
Reason, increases the temperature difference of the water temperature of inner water tank, and S22 heating process is flowing heating, water inlet of the cold water from water tank bottom end
Into hot water is flowed out from the high-end water outlet of water tank, and refrigerant enters from water tank high temperature, is flowed out from water tank low temperature, shape
At heat convection.
A kind of air conditioner refrigerating and water heater, that is, hot water storage heating control apparatus, it is characterised in that:
Including compressor, four-way valve, host heat exchanger, A/C evaporator and hot water heat exchanger, the hot water heat exchanger packet
Include boiler double-tube heat exchanger and outer for jacket pipe;
The compressor successively connect to be formed with host heat exchanger, A/C evaporator by the first valve passage of four-way valve
Air conditioner refrigerating circuit;
The compressor is successively connect and to be formed with hot water heat exchanger, host heat exchanger by the second valve passage of four-way valve
Water heater heats circuit;
Cold water enters water tank and enters water tank bottom through steady flow pipe, intakes up and down through interior for jacket pipe, then through connecting tube and water tank
The heat supply mouth of a river is connected, and the heat supply mouth of a river is connected with outer for jacket pipe again, is finally connected with water flow switch, then arrives user.
In the present embodiment, four interfaces of the four-way valve include that first interface, second interface, third interface and the 4th connect
Mouthful;
First valve passage are as follows:
The refrigerant outlet of the first interface connect compressor, the first interface and the third interface communicate, the
Three interfaces connect host heat exchanger refrigerant entrance, the outlet of host heat exchanger refrigerant and A/C evaporator refrigerant inlet phase
Even, A/C evaporator refrigerant outlet is connect with the second interface, and the second interface is connected to the 4th interface, and the 4th interface connects
Connect the refrigerant inlet of compressor;First throttle valve and the first shut-off valve are connected between A/C evaporator and host heat exchanger;
First check-valve and the second shut-off valve are connected between the refrigerant outlet of A/C evaporator and the second interface of four-way valve;
In the present embodiment, second valve passage are as follows:
The refrigerant outlet of the first interface connect compressor, the first interface are communicated with the second interface, institute
The refrigerant inlet of second interface connection hot water heating heat exchanger is stated, the refrigerant outlet of hot water heat exchanger connects host heat exchanger
Refrigerant inlet, the refrigerant outlet of host heat exchanger connects the third interface, the 4th interface of third orifice,
The refrigerant inlet of the 4th interface connect compressor;It is connected between second interface and the refrigerant inlet of hot water heat exchanger
Third shut-off valve and outer for jacket pipe;It is connected between the refrigerant outlet of hot water heat exchanger and the refrigerant inlet of host heat exchanger
There are second check-valve, second throttle and the 4th shut-off valve.
In the present embodiment, when into cold water, the cold water input port of the water tank is connected with negative pressure threeway, the negative pressure threeway
One end connection has the check-valves of decompression function, and the other end of the negative pressure threeway is connected with bypass threeway, the bypass threeway
One termination bypass solenoid valve, another to be terminated with return water threeway, the return water threeway one is terminated with return water check-valves, the return water
The another of threeway is terminated with cold water inlet.
In the present embodiment, when supplying hot water, cold water enters water tank, hot water through the interior water inlet up and down for jacket pipe, then
It is connected through connecting tube with water tank supplying hot water water outlet, hot water outlet is connected through connecting tube with outer water supply cannula input end, outer confession
Jacket pipe output end of hot water connects water pump, and the water pump other end is connected with i.e. thermo-electric heaters, i.e. the thermo-electric heaters other end
It is connected to water flow threeway, one end of water flow threeway connects bypass solenoid valve, and the other end of water flow threeway connects water flow switch, and water flow is opened
Connection connects user's water, and return water is needed to take back Water Check Valve.
It further include controller in the present embodiment, the controller is used to control the start and stop of the compressor, the four-way valve
Access switching water pump, i.e. thermoelectricity heating and the solenoid valve opening and closing, the controller be also connected with environment temperature pop one's head in, water
Stream switch is popped one's head in water tank temperature, and control flow includes:
(1) fast heating water-storage type starts
Fast heating water-storage type is in heat hot water, when water temperature is lower than given threshold than set temperature in water tank, the controller
Compressor operating is controlled, when user's heat water, the water flow switch is connected, and the controller controls compressor operating, and completion is
Shi Jiare;
(2) pressure balance is heated
Equilibrium process: before the compressor starting up or after closing, the controller controls the four-way valve work, system
Cryogen passes through the first interface communicated and third interface of the four-way valve, the higher refrigerant of pressure and pressure in first interface
Lower host heat exchanger decompression, the second interface communicated and the 4th interface of the four-way valve, the higher water of refrigerant pressure
Housing-case heat exchange of heat pipe completes equilibrium process to the compressor air accumulator pressure release, after pressure balance, described in the controller control
Four-way valve disconnects, and the compressor booting, the aperture of electric expansion valve remains at optimum state, is rapidly heated, reaches i.e.
Hot purpose.
(3) temperature controls:
The fast heating water-storage type way of supplying water is that water tank temperature adds i.e. heat exchanger or electric heating warm-up heating water, and water tank can
Cold water, warm water or hot water are filled, the range of adjusting is wide, to reduce the cumbersome of adjusting, the hot water temperature of water tank convenient for control and energy conservation
It is controlled by set temperature and environment temperature, set temperature is automatically adjusted with the variation of environment temperature.
(5) backwater control:
When fast heating water-storage type air energy water heater needs return water by water flow switch, via controller control back water pump, install
Back water pump is arranged water pump according to the length of return pipe and pressurizes the return water time, completes return water;When user needs with water, water flow is opened
Close and connect, controller controls return water pump working, and after the completion of return water, water pump stops working, second of return water water flow switch not
During connection, settable return water break time is to be subject to hot water to become time of warm water, to be again started up return water in return pipe.
(6) instant heating type electric heating:
Summer, efficiency is high, and water tank dress cold water or warm water, instant-heating only need heat pump to be just able to satisfy Water-heating shower,
In winter, efficiency is low, and water tank fills warm water or hot water, and heat supply coolant-temperature gage is that water tank temperature adds i.e. heat exchanger heating, works as environment temperature
Or water tank temperature, when being lower than 15 DEG C (adjustable), water flow switch is connected, and controller first controls compressor operating, then control again i.e. hot
Formula electric heating work, i.e. thermoelectricity heating equally can complete return water with heating electromagnetic valve, can also complete high temperature with return water water pump
Sterilize and divide Wen Jiare.
(7) heating mode
Air-conditioning fast heating water-storage type water heater changes with water tank temperature variation efficiency, and water temperature is higher, and efficiency is lower, on the contrary
And it is high, the advantage of air-conditioning fast heating water-storage type water heater efficient cryogenic is made full use of, is added at water temperature low temperature with air-conditioning fast heating water-storage type
Heat, higher water temperature i.e. thermoelectricity heating (be also possible to electromagnetic energy) heat hot water constant using calorific value.
(8) divide Wen Jiare
Cold season, the temperature difference is big, and amount of hot water changes greatly, and regulating tank temperature is needed to guarantee hot water supply, and hot water temperature is low
When adjustable 45 DEG C, by single air conditioning fast heating water-storage type water heater heat, medium temperature is adjustable 45-55 DEG C when, by air-conditioning, that is, hot water storage
Formula water heater and i.e. thermoelectricity heating work at the same time completion, high temperature is adjustable 55-75 DEG C when, by individually be thermoelectricity heating complete.
(9) high temperature sterilization
Because water tank cold water is from low side into hot water height is brought out, and sewage is caused to deposit, and forms the nutrient laden of water, adds water temperature
It is lower, just it is suitble to bacterial reproduction, need to periodically sterilizes, water temperature is heated when being lower than adjustable 55 DEG C by air-conditioning fast heating water-storage type water heater,
When greater than or equal to adjustable 55 DEG C, start water pump, open bypass solenoid valve, starting is thermoelectricity heating, forms circulating heater
To adjustable 75 DEG C of high temperature sterilizations.
(10) priority routine
When water tank temperature will be above setting temperature, for protection equipment and energy conservation, it is adjustable 5 DEG C (adjustable) to be higher than setting temperature
When, refrigeration or water flow switch do not convert water heating when connecting, when water tank temperature is adjustable 5 DEG C (adjustable) less than or equal to setting temperature
When, refrigeration conversion water heating or starting device heat hot water when water flow switch is connected.
Air conditioner refrigerating provided by the present invention realizes following with water heater, that is, hot water storage heating and control method and device
The utility model has the advantages that
1, fast heating water-storage type water heater of the invention is different from traditional air conditioner and water heater, before this hot water heat exchanger and evaporation
Device is in parallel, then connects with compressor and condenser, and hot water heat exchanger and evaporator can be separated and be worked independently, not when not working
Such as low pressure gasholder, when being not present more when refrigerant the case where few intermittent work, the equilibrium problem of refrigerant is thoroughly solved,
Water heater will also be melted into a whole with air-conditioning.
2, the present invention gives full play to the advantage of immediately heating water heater and storage-type electric water heater, from air energy water heater test cabinet
Measure the generally acknowledged data of industry: water tank temperature 50-55 degree efficiency is that 2.0,40-45 degree efficiency is that 4.0,30-35 degree efficiency is
6.0, once, efficiency will decline 10% to the every reduction of water temperature.The present invention reduces water tank temperature as far as possible, as long as enough Water-heating showers, water tank
Preferably fill cold water or warm water, being promoted as far as possible is heat heating, using it is multistage (collection hot coil, it is interior for jacket pipe, it is outer for jacket pipe,
That is thermoelectricity heating) i.e. heat superposition, using one or more levels i.e. heat combination, equipment can also be kept long-term according to the demand of user
In efficient cryogenic area operation.
3, the combination of instant heating type and storage-type is obtained important breakthrough by the present invention together: being drilled from press-bearing water tank law of conservation of energy
Calculation can show that is, hot heating once heated up once than water storage, how close 5 times of hot water amount.
Once, hot water amount how close 20% for i.e. hot heating, i.e., hot ten degree of heating, hot water amount how close 400%.Therefore it should mention as far as possible
Rising is heat heating, can replace large water tank with small water tank, replace non-pressure water tank with press-bearing water tank.
4, of the invention that fluorine circulation and water circulation are combined into fluorine water circulation, it gives full play to fluorine circulation simply, stablizes durable
Advantage sum aggregate hot coil disk is small and dense, and heat is layering, and being formed is heat heating.It is high that water circulation efficiency has been played again, heat
The characteristics of concentrating quick heating completes water circulating-heating by the pressure of tap water, simply, stablizes durable, reduce vulnerable part water
Pump and the hydronic mixed water of water.
5, the present invention uses the combination of fast heating water-storage type air energy water heater and i.e. thermoelectricity heating, plays air energy water heater
The advantage of efficient cryogenic, the low-temperature end of heat hot water, the constant feature of performance electric heating calorific value, the high temperature end of heat hot water,
I.e. thermoelectricity heating control by environment temperature and water tank temperature simultaneously, and when relatively low and when hot water amount is insufficient with coolant-temperature gage, starting is i.e. hot
Electric heating.
6, of the invention outer for jacket pipe, when not having to hot water, it is equivalent to the connecting copper pipe of connection host and water tank, with heat
When water, casing heating function is just played.It can be used for the outer hot water of water tank to heat up again, can be used for storage-type air energy water heater
Hot water heating.
7, of the invention interior for jacket pipe, when with hot water, other than i.e. heat heating hot water, it is interior for jacket pipe on water tank top
When a large amount of supplying hot waters, at the other end water tank bottom of casing equally into hot water, hot water exports simultaneously from high low side, and making water tank bottom is stream
Dynamic hot water can not form sewage, while also destroy condition-water nutrient laden of bacterial reproduction, inhibit or kill bacterium.Heat
Water be also while with while the running water that changes, thousandweight water can not be formed, can be met needed for life.
8, collection hot coil caliber of the invention is small, winding density is high, stands vertically in tank top, connects in the middle part of water tank
It is evenly heated coil pipe, the temperature of collection hot coil circle inner coil pipe is higher than the temperature outside circle, and collecting hot coil is tens layers disk pipe
It is formed by stacking, according to the principle that heat rises, cold decline, formation temperature layering is higher than being evenly heated coil-pipe water tank temperature merely, full
Foot is the demand of heat heating, while collecting hot coil always all in heat hot water, economical and stablize.
9, the installation method of water inlet end of the invention is different, and conventional water tank is all to install additional in cold water inlet with load pressure function
Check-valves, be that present water inlet installs threeway additional the main reason for causing water tank to rise brokenly, make tank pressure and tap water with pressing,
Wherein one end loads the check-valves of pressure function, and check valve becomes negative pressure valve, carries imitative only some users of pressure valve before water meter equipped with single
It to valve, shields, while decreasing water tank and installing negative pressure valve gear additional.
10, the present invention is fast heating water-storage type device, needs to start at any time, and air-conditioning system is a pressure vessel, starting pressure
Before contracting machine, high-low pressure pressure balance is needed, therefore after stopping compressor or need to open the four-way valve connection several seconds before compressor, make high-low pressure
It connects, pressure balance.
11, the present invention controls water tank temperature using environment temperature, and common water tank temperature requires manual adjustment, turns down
Hot water is insufficient, and power-consuming, frequent adjusting has been turned up, time-consuming and laborious.And the range that fast heating water-storage type is adjusted expands, it is convenient for energy conservation
Water temperature is controlled using environment temperature.
12, the present invention is quickly heated, usually using quickly heating balance system because being fast heating water-storage type when need to start
It is now to be changed on the basis of delivery temperature on the basis of suction temperature, is rapidly achieved balance, is more suitable for water heating.
13, the application controller has water return function, need to only install return water water pump additional, and user one uses water, and water flow switch works,
Host-initiated, return water water pump also work, and return water water pump is through water flow switch to user terminal, by return pipe connection check-valves, then into
Enter water tank, completes return water, the water pump return water time is controlled by the length of return pipe can set 1-5 minutes, and return water water pump is again started up
Water flow switch is needed to close 5 minutes (adjustable) or more.
14, the present invention can divide Wen Jiare, and low-temperature end air can individually can heat, medium temperature end can air can and i.e. thermoelectricity add
Heat, temperature end can individually be thermoelectricity heating.Electric heating process, first return water water pump and heating electromagnetic valve are opened, and then i.e. thermoelectricity adds
Thermal technology make, from tank hot water's water outlet go out to water tank into cold water into, constitute circulation electric-heating system.
15, the present invention can start high temperature sterilization function.Although water tank is that no sewage is antibacterial, summer water tank dress cold water can be reduced
The reproduction speed of bacterium.As long as water tank temperature is more than 30 degree, water tank can be warming up to setting high temperature sterilization temperature or more, to the greatest extent row
High temperature sterilization.Heating process is carried out by Electric heating.
16, present device starting work is controlled by water tank temperature, when water tank temperature is higher than 5 degree of temperature of setting, water flow
When switch connection, equipment does not work, and when refrigeration does not switch to water heating, when only water tank temperature is less than or equal to 5 degree of temperature of setting,
When water flow switch is connected, equipment just works, and when refrigeration switchs to water heating.Therefore, the application has great economic value and makes
With value.
The above embodiment is a preferred embodiment of the present invention, but embodiments of the present invention are not by above-described embodiment
Limitation, other any changes, modifications, substitutions, combinations, simplifications made without departing from the spirit and principles of the present invention,
It should be equivalent substitute mode, be included within the scope of the present invention.
Claims (10)
1. a kind of air conditioner refrigerating and water heater, that is, hot water storage method for heating and controlling characterized by comprising
S1. air conditioner refrigerating rate-determining steps: refrigerant is condensed by the first valve passage through host heat exchanger, and through A/C evaporator
Evaporation, forms air conditioner refrigerating circuit, and the host heat exchanger is condenser;
S2. water heater heats rate-determining steps: refrigerant is condensed by the second valve passage through hot water heat exchanger, and is exchanged heat through host
Device evaporation forms water heater and heats circuit;Including step S21 and S22, the host heat exchanger is evaporator, and the hot water changes
Hot device includes water tank double-tube heat exchanger and connect with the water tank double-tube heat exchanger outer for jacket pipe, the water tank sleeve heat exchange
Device is additionally provided with interior for jacket pipe;
S21. water heater water storage heating control step: when water temperature is lower than given threshold than set temperature in the water tank of water heater,
Controller controls compressor operating, and refrigerant is condensed by the second valve passage through water tank double-tube heat exchanger, and is exchanged heat through host
Device evaporation, forms water heater water storage heating circuit;
S22. water heater, that is, hot water storage heating control step: when using water, water flow switch is connected, and controller controls compressor operating,
It is heated by water tank double-tube heat exchanger, then through carrying out heat temperature raising using i.e. thermo-electric heaters for jacket pipe heat temperature raising,
Refrigerant is condensed by the second valve passage through water tank double-tube heat exchanger and for jacket pipe, and is evaporated through host heat exchanger, is formed
Water heater, that is, hot heating circuit.
2. a kind of air conditioner refrigerating according to claim 1 and water heater, that is, hot water storage method for heating and controlling, it is characterised in that:
In step s 2, water tank double-tube heat exchanger includes water tank, further includes being erected in the water tank to be used for the upper and lower of fluorine water circulation
The collection hot coil for heating higher temperature hot water being arranged above inner water tank and the heating below inner water tank are lower
Temperature hot water is evenly heated coil pipe, and the disk caliber of the collection hot coil is less than the disk caliber for being evenly heated coil pipe;
The upper end for integrating hot coil as refrigerant input port, in be connected for the delivery outlet of jacket pipe refrigerant, the collection hot plate
The lower end of pipe is refrigerant delivery outlet, is connected with the refrigerant input port for being evenly heated coil pipe, described to be evenly heated coil pipe
The connecting copper pipe of the delivery outlet connection water tank of bottom end refrigerant reconnects host heat exchanger, and the top of the collection hot coil is to
It is arranged described interior for jacket pipe in the disk of the bottom end of even heating coil or outside disk, the interior bottom end for jacket pipe is refrigeration
Agent input port, and the outer refrigerant delivery outlet for jacket pipe is connected, described interior one end for jacket pipe is in the inner water tank
Top, and be used for hot water upper water inlet, the interior other end for jacket pipe in the bottom end of the inner water tank, and be provided with down into
The mouth of a river, cold water from water tank bottom end enter, from water tank top flow out, refrigerant from the upper end of water tank collection hot coil top into
Entering, the bottom end output for being evenly heated coil pipe through water tank bottom end, water (flow) direction and refrigerant flow direction are opposite direction, so as to
In forming Convective Heating, such as water tank casing, is exported by hot water connecting tube supplying hot water, intake under the interior water supply casing shoe
The bore of mouth is not more than the caliber of the upper water inlet of interior water supply cannula tip, and the water tank double-tube heat exchanger peripheral hardware is set for conveying
Refrigerant is simultaneously outer for jacket pipe for what is heated when supplying water, it is described it is outer connect the four-way valve for jacket pipe one end, be refrigerant
Input terminal and hot water output port, the outer hot water outlet for jacket pipe are also connected with i.e. thermo-electric heaters, the outer water supply
The other end of casing be output of condenser with it is described it is interior be connected for jacket pipe refrigerant input port, the outer heat for jacket pipe
Water input is connected with the hot water feed water inlet of water tank.
3. a kind of air conditioner refrigerating according to claim 1 or 2 and water heater, that is, hot water storage method for heating and controlling, feature exist
In: water heater heating operations be it is described be evenly heated coil pipe individually hot water can be heated or it is described be evenly heated coil pipe with
The collection hot coil, it is interior for jacket pipe, it is outer for jacket pipe, i.e. one or more of thermo-electric heaters simultaneously to hot water carry out
Heating.
4. a kind of air conditioner refrigerating according to claim 1 or 3 and water heater, that is, hot water storage method for heating and controlling, feature exist
In: the water tank includes liner, insulating layer and shell, and the insulating layer is arranged between the liner and the shell, described
It is outer to be located at outside the liner for jacket pipe, it is described it is interior be located inside the liner for jacket pipe, S21 heating process be it is static plus
Heat, water tank are stood vertically, and inlet temperature of the refrigerant on the collection hot coil top of tank top is much higher than in the equal of water tank bottom
The temperature of the refrigerant outlet of even heating coil makes the water temperature of inner water tank to comply with the principle that cold sinking heat rises in water tank
The temperature difference increase, S22 heating process be flowing heating, cold water from the water inlet of water tank bottom end enter, height of the hot water from water tank
The water outlet at end flows out, and refrigerant enters from water tank high temperature, flows out from water tank low temperature, forms heat convection.
5. a kind of air conditioner refrigerating and water heater, that is, hot water storage heating control apparatus, it is characterised in that:
Including compressor, four-way valve, host heat exchanger, A/C evaporator and hot water heat exchanger, the hot water heat exchanger includes heat
Water tank double-tube heat exchanger and outer for jacket pipe;
The compressor successively connect to form air-conditioning by the first valve passage of four-way valve with host heat exchanger, A/C evaporator
Refrigerating circuit;
The compressor is successively connect with hot water heat exchanger, host heat exchanger by the second valve passage of four-way valve and to form hot water
Device heats circuit;
Cold water enters water tank and enters water tank bottom through steady flow pipe, intakes up and down through interior for jacket pipe, then through connecting tube and water tank heat supply
The mouth of a river is connected, and the heat supply mouth of a river is connected with outer for jacket pipe again, is finally connected with water flow switch, then arrives user.
6. air conditioner refrigerating according to claim 5 and water heater, that is, hot water storage heating control apparatus, it is characterised in that: described
Four interfaces of four-way valve include first interface, second interface, third interface and the 4th interface;
First valve passage are as follows:
The refrigerant outlet of the first interface connect compressor, the first interface and the third interface communicate, and third connects
Mouth connection host heat exchanger refrigerant entrance, the outlet of host heat exchanger refrigerant is connected with A/C evaporator refrigerant inlet, empty
Evaporator refrigerant outlet is adjusted to connect with the second interface, the second interface is connected to the 4th interface, the 4th interface connection pressure
The refrigerant inlet of contracting machine;First throttle valve and the first shut-off valve are connected between A/C evaporator and host heat exchanger;Air-conditioning
First check-valve and the second shut-off valve are connected between the refrigerant outlet of evaporator and the second interface of four-way valve.
7. air conditioner refrigerating according to claim 6 and water heater, that is, hot water storage heating control apparatus, it is characterised in that: described
Second valve passage are as follows:
The refrigerant outlet of the first interface connect compressor, the first interface are communicated with the second interface, and described
Two interfaces connect the refrigerant inlet of hot water heating heat exchanger, and the refrigerant outlet of water tank double-tube heat exchanger connects host heat exchanger
Refrigerant inlet, the refrigerant outlet of host heat exchanger connects the third interface, the 4th interface of third orifice,
The refrigerant inlet of the 4th interface connect compressor;Connect between second interface and the refrigerant inlet of water tank double-tube heat exchanger
It is connected to third shut-off valve and outer for jacket pipe;The refrigerant outlet of water tank double-tube heat exchanger and the refrigerant inlet of host heat exchanger
Between be connected with second check-valve, second throttle and the 4th shut-off valve.
8. air conditioner refrigerating according to claim 5 and water heater, that is, hot water storage heating control apparatus, it is characterised in that: into cold
When water, the cold water input port of the water tank is connected with negative pressure threeway, and one end connection of the negative pressure threeway is with decompression function
Check-valves, the other end of the negative pressure threeway are connected with bypass threeway, and a termination bypass solenoid valve of the bypass threeway is another
Be terminated with return water threeway, the return water threeway one is terminated with return water check-valves, the return water threeway it is another be terminated with cold water into
The mouth of a river.
9. the air conditioner refrigerating according to claim 5 or 8 and water heater, that is, hot water storage heating control apparatus, it is characterised in that:
When supplying hot water, cold water enters water tank, and hot water is through the interior water inlet up and down for jacket pipe, then through connecting tube and water tank supplying hot water
Water outlet is connected, and hot water outlet is connected through connecting tube with outer water supply cannula input end, outer to connect for jacket pipe output end of hot water
Water pump, the water pump other end are connected with i.e. thermo-electric heaters, i.e., thermo-electric heaters are another is terminated with water flow threeway, water flow threeway
One end connect bypass solenoid valve, the other end of water flow threeway connects water flow switch, and water flow switch connects user's water, needs return water
Take back Water Check Valve.
10. air conditioner refrigerating according to any one of the preceding claims and water heater, that is, hot water storage heating control apparatus,
It is characterized in that:
It further include controller, the controller is used to control the start and stop of the compressor, the access of the four-way valve switches water pump,
That is the opening and closing of thermoelectricity heating and the solenoid valve, the controller are also connected with environment temperature probe, water flow switch and water tank temperature
Degree probe, control flow include:
(1) fast heating water-storage type starts
Fast heating water-storage type is in heat hot water, when water temperature is lower than given threshold than set temperature in water tank, the controller control
Compressor operating, when user's heat water, the water flow switch is connected, and the controller controls compressor operating, complete immediately plus
Heat;
(2) pressure balance is heated
Equilibrium process: before the compressor start or after closing, the controller controls the four-way valve work, and refrigerant passes through
The first interface communicated and third interface of the four-way valve, the higher refrigerant of pressure and the lower master of pressure in first interface
Machine heat exchanger decompression, the second interface communicated and the 4th interface of the four-way valve, the higher water tank casing of refrigerant pressure change
Hot device completes equilibrium process to the compressor air accumulator pressure release, and after pressure balance, it is disconnected that the controller controls the four-way valve
It opens, the compressor booting, the aperture of electric expansion valve remains at optimum state, is rapidly heated, and reaches i.e. hot purpose.
(3) temperature controls:
The fast heating water-storage type way of supplying water is that water tank temperature adds i.e. heat exchanger or electric heating warm-up heating water, water tank that can fill cold
The range of water, warm water or hot water, adjusting is wide, to reduce the cumbersome of adjusting, the hot water temperature of water tank is set convenient for control and energy conservation
Determine temperature and environment temperature control, set temperature is automatically adjusted with the variation of environment temperature.
(5) backwater control:
Fast heating water-storage type air energy water heater controls back water pump by water flow switch, via controller, when needing return water, installs return water
Pump is arranged water pump according to the length of return pipe and pressurizes the return water time, completes return water;When user needs with water, water flow switch is connect
Lead to, controller control return water pump working, after the completion of return water, water pump stops working, and second of return water is disconnected in water flow switch
Period, settable return water break time are to be subject to hot water to become time of warm water, to be again started up return water in return pipe.
(6) instant heating type electric heating:
Summer, efficiency is high, and water tank dress cold water or warm water, instant-heating only need heat pump to be just able to satisfy Water-heating shower, winter
In season, efficiency is low, and water tank fills warm water or hot water, and heat supply coolant-temperature gage is that water tank temperature adds i.e. heat exchanger heating, when environment temperature or
When water tank temperature is lower than adjustable 15 DEG C, water flow switch is connected, and controller first controls compressor operating, then controls instant heating type electricity again
Heating work, i.e. thermoelectricity heating equally can complete return water with heating electromagnetic valve, can also complete high temperature sterilization with return water water pump
With divide Wen Jiare.
(7) heating mode
Air-conditioning fast heating water-storage type water heater changes with water tank temperature variation efficiency, and water temperature is higher, and efficiency is lower, otherwise and
Height makes full use of the advantage of air-conditioning fast heating water-storage type water heater efficient cryogenic, is heated at water temperature low temperature with air-conditioning fast heating water-storage type,
Higher water temperature i.e. thermoelectricity heating or the electromagnetic energy heat hot water constant using calorific value.
(8) divide Wen Jiare
Cold season, the temperature difference is big, and amount of hot water changes greatly, needs regulating tank temperature to guarantee hot water supply, hot water temperature is lower than can
When adjusting 45 DEG C, heated by single air conditioning fast heating water-storage type water heater, medium temperature is adjustable 45-55 DEG C when, by air-conditioning fast heating water-storage type heat
Hydrophone and i.e. thermoelectricity heating work at the same time completion, high temperature is adjustable 55-75 DEG C when, by individually be thermoelectricity heating complete.
(9) high temperature sterilization
Because water tank cold water from low side into, hot water height is brought out, and sewage is caused to deposit, form the nutrient laden of water, along with water temperature it is lower,
Just it is suitble to bacterial reproduction, need to periodically sterilizes, when water temperature is lower than adjustable 55 DEG C, is heated, be higher than by air-conditioning fast heating water-storage type water heater
Or when being equal to adjustable 55 DEG C, start water pump, open bypass solenoid valve, starting is thermoelectricity heating, forms circulating heater to can
75 DEG C are adjusted, high temperature sterilization.
(10) priority routine
When water tank temperature will be above setting temperature, for protection equipment and energy conservation, when 5 DEG C adjustable higher than setting temperature, refrigeration or water
Water heating is not converted when flowing switch connection, when water tank temperature is 5 DEG C adjustable less than or equal to setting temperature, when water flow switch is connected
Refrigeration conversion water heating or starting device heat hot water.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910493910.0A CN110296520A (en) | 2019-06-08 | 2019-06-08 | A kind of air conditioner refrigerating and water heater, that is, hot water storage heating and control method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910493910.0A CN110296520A (en) | 2019-06-08 | 2019-06-08 | A kind of air conditioner refrigerating and water heater, that is, hot water storage heating and control method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110296520A true CN110296520A (en) | 2019-10-01 |
Family
ID=68027675
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910493910.0A Pending CN110296520A (en) | 2019-06-08 | 2019-06-08 | A kind of air conditioner refrigerating and water heater, that is, hot water storage heating and control method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110296520A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110822713A (en) * | 2019-10-21 | 2020-02-21 | 江苏迈能高科技有限公司 | Energy-saving sterilization cold and hot water system |
CN111156569A (en) * | 2019-12-25 | 2020-05-15 | 佛山聚阳新能源有限公司 | Direct condensing type air source heat pump floor heating system capable of supplying hot water |
CN114777546A (en) * | 2022-06-21 | 2022-07-22 | 浙江惠笙活科技有限公司 | Cold and hot medium energy storage hot water and hot air combined supply device for solar photovoltaic |
-
2019
- 2019-06-08 CN CN201910493910.0A patent/CN110296520A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110822713A (en) * | 2019-10-21 | 2020-02-21 | 江苏迈能高科技有限公司 | Energy-saving sterilization cold and hot water system |
CN110822713B (en) * | 2019-10-21 | 2021-01-08 | 江苏迈能高科技有限公司 | Energy-saving sterilization cold and hot water system |
CN111156569A (en) * | 2019-12-25 | 2020-05-15 | 佛山聚阳新能源有限公司 | Direct condensing type air source heat pump floor heating system capable of supplying hot water |
CN111156569B (en) * | 2019-12-25 | 2022-04-22 | 佛山聚阳新能源有限公司 | Direct condensing type air source heat pump floor heating system capable of supplying hot water |
CN114777546A (en) * | 2022-06-21 | 2022-07-22 | 浙江惠笙活科技有限公司 | Cold and hot medium energy storage hot water and hot air combined supply device for solar photovoltaic |
CN114777546B (en) * | 2022-06-21 | 2022-09-13 | 浙江惠笙活科技有限公司 | Cold and hot medium energy storage hot water and hot air combined supply device for solar photovoltaic |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100460776C (en) | Heat pump hot-water supply system | |
CN102313326B (en) | Simple, high-efficiency and reliable cold-warm air-conditioning water heater | |
CN201476406U (en) | Low-temperature quasi-two-stage air source heat pump unit | |
CN102889708B (en) | Two source heat pump multifunctional machines | |
CN110296520A (en) | A kind of air conditioner refrigerating and water heater, that is, hot water storage heating and control method and device | |
CN203011004U (en) | Unit type air conditioner floor heating machine | |
CN201244179Y (en) | High-efficient energy-saving heat pump sauna system | |
CN104595967A (en) | Heating device of solar water heater with discrete-type heat pipes | |
CN106500204A (en) | A kind of air conditioning system | |
CN202125983U (en) | Comprehensive warming and heating system of solar air source heat pump | |
CN201170657Y (en) | Capacity stepless regulation air source water heater | |
CN205843128U (en) | The heating refrigeration system that multiple-energy-source is combined with little temperature difference heat exchange end | |
US20120298204A1 (en) | Energy saving system and method for heating water | |
CN201177318Y (en) | Solar energy centralized heat collected separate water tank heat-exchanging and supply system | |
CN206488341U (en) | Multi-energy complementation intelligent control HVAC system | |
CN201322444Y (en) | Water storage type heat pump water heater | |
CN206420075U (en) | A kind of air-conditioning system | |
CN211854375U (en) | Air conditioner refrigeration and water heater instant heating water storage heating control device | |
CN206803389U (en) | A kind of warm integrated heat pump hot-water of floor radiant cooling | |
CN201043802Y (en) | Air source heat pump water heater | |
CN201103949Y (en) | Solar nano-warming low temperature supplying floor board radiation heating equipment | |
CN207555710U (en) | A kind of air source heat pump and thermal storage electric boiler joint central heating system | |
CN106839050B (en) | Energy supply system capable of realizing power grid scale peak shaving | |
CN107166476B (en) | A kind of heating system of high-pressure water tank combined absorption type heat pump | |
CN214791621U (en) | Building 5G comfort system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |