CN110231974A - O&M information visuallization method, apparatus, equipment and readable storage medium storing program for executing - Google Patents
O&M information visuallization method, apparatus, equipment and readable storage medium storing program for executing Download PDFInfo
- Publication number
- CN110231974A CN110231974A CN201910498882.1A CN201910498882A CN110231974A CN 110231974 A CN110231974 A CN 110231974A CN 201910498882 A CN201910498882 A CN 201910498882A CN 110231974 A CN110231974 A CN 110231974A
- Authority
- CN
- China
- Prior art keywords
- target
- information
- processing module
- dimension index
- data column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/451—Execution arrangements for user interfaces
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Human Computer Interaction (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of O&M information visuallization method, apparatus, equipment and readable storage medium storing program for executing, it is related to financial technology field, this method comprises: obtaining target monitoring information entrained in the visible instructions when detecting the visible instructions that visualization interface of the user in operation management system triggers;The first processing module for handling the target monitoring information is chosen from each default processing module, and the first processing module mapped target dimension index prestored is obtained, to extract the corresponding target data column information of the target dimension index from the operation management system;Visualize the data column information.The present invention solves the technical issues of existing O&M information visuallization visualizes low efficiency in the process.
Description
Technical field
The present invention relates to financial technology (Fintech) technical field more particularly to a kind of O&M information visuallization method,
Device, equipment and readable storage medium storing program for executing.
Background technique
With financial technology (Fintech), the especially continuous development of internet techno-financial, more and more technologies are answered
Used in financial field.Wherein, the O&M information visuallization management in financial field is related to numerous technical applications, O&M information
Visualization refer to the O&M information that will be extracted with certain general manner, the Visual exhibition form of stage design that can be perceived with the mankind
It shows, currently, needing user repeatedly to sieve either manually or by keyword retrieval mode during to O&M information visuallization
The O&M information needed is selected, then carries out the displaying of O&M information visuallization again, however, since product etc. is often flat in difference
Garrison has all been carried out on platform, thus, manual screening often consumes human and material resources, reduces O&M information visuallization
The efficiency of displaying.
Summary of the invention
The main purpose of the present invention is to provide a kind of O&M information visuallization method, apparatus, equipment and readable storages
Medium, it is intended to solve the technical issues of existing O&M information visuallization visualizes low efficiency in the process.
To achieve the above object, the embodiment of the present invention provides a kind of O&M information visuallization method, the O&M information
Method for visualizing be applied to operation management system, the O&M information visuallization method includes:
When detecting the visible instructions that visualization interface of the user in operation management system triggers, obtain described visual
Change target monitoring information entrained in instruction;
The first processing module for handling the target monitoring information is chosen from each default processing module, and is obtained and prestored
The first processing module mapped target dimension index, to extract the target dimension from the operation management system
The corresponding target data column information of index;
Visualize the data column information.
Optionally, described that the first processing mould for handling the target monitoring information is chosen from each default processing module
Block, and the first processing module mapped target dimension index prestored is obtained, to be mentioned from the operation management system
The step of taking the target dimension index corresponding target data column information include:
Based on the mapping relations of each monitoring information and alignment processing module that prestore, selected from each default processing module
Take the first processing module for handling the target monitoring information;
Obtain target product associated by the preset first processing module and the target where the target product
Work order group;
Obtain the first processing module mapped target dimension index prestored;
From the target dimension index mapped first extracted in the operation management system under the target product
Target data, and the first object data are subjected to column division according to the target work order group, to obtain target data column letter
Breath.
Optionally, the visual presentation data column information step includes:
The data column information is subjected to initial visualization processing according to the classification of the target product, obtains initial treatment
As a result;
The initial treatment result is classified according to the target work order group, obtains the visual of the data column information
Change image.
Optionally, described to obtain the first processing module mapped target dimension index that prestores, with from the fortune
The corresponding target data column information step of the target dimension index is extracted in battalion's management system further include:
The first processing module mapped target dimension index prestored is obtained, and judges the target dimension index
Under whether include sub- dimension index;
When under the target dimension index including sub- dimension index, all products are extracted from the operation management system
Under the corresponding subdata information of every sub- dimension index;
The subdata information is arranged according to preset order, to obtain target data column information.
Optionally, the target monitoring information is multiple;
It is described that the first processing module for handling the target monitoring information is chosen from each default processing module, and obtain
The first processing module mapped target dimension index prestored, to extract the target from the operation management system
The corresponding target data column information step of dimension index further include:
Multiple first processing moulds of the multiple target monitoring information of alignment processing are chosen from each default processing module
Block;
Multiple target dimension indexs that the multiple first processing module prestored maps respectively are obtained, respectively with from institute
It states and extracts corresponding multiple second target datas of the multiple target dimension index in operation management system, by the multiple second
Target data is arranged according to the classification of the target monitoring information, obtains target data column information.
Optionally, described to obtain the first processing module mapped target dimension index that prestores, with from the fortune
The corresponding target data column information step of the target dimension index is extracted in battalion's management system further include:
The first processing module mapped target dimension index prestored is obtained, from the operation management system
Target data column information until extracting the target dimension index corresponding visualization time to current time last time.
Optionally, described that the corresponding target data column letter of the target dimension index is extracted from the operation management system
Include: after the step of breath
Judge whether the data column information is in abnormality, it is defeated when the data column information is when in an abnormal state
Abnormal prompt information out.
The present invention also provides a kind of O&M information visuallization device, the O&M information visuallization device is applied to fortune
Management system is sought, the O&M information visuallization device includes:
Detection module, in the visible instructions for detecting that visualization interface of the user in operation management system triggers
When, obtain target monitoring information entrained in the visible instructions;
Module is chosen, for choosing the first processing mould for handling the target monitoring information from each default processing module
Block, and the first processing module mapped target dimension index prestored is obtained, to be mentioned from the operation management system
Take the corresponding target data column information of the target dimension index;
Visualization model, for visualizing the data column information.
Optionally, the selection module includes:
First selection unit, for the mapping relations based on each monitoring information for prestoring and alignment processing module, from each
The first processing module for handling the target monitoring information is chosen in a default processing module;
First acquisition unit, for obtaining target product associated by the preset first processing module and described
Target work order group where target product;
Second acquisition unit, for obtaining the first processing module mapped target dimension index prestored;
Column division unit, for referring to from the target dimension extracted in the operation management system under the target product
Mapped first object data are marked, and the first object data are subjected to column division according to the target work order group, with
To target data column information.
Optionally, the visualization model includes:
Initial visualization processing unit, it is initial for carrying out the data column information according to the classification of the target product
Visualization processing obtains initial treatment result;
Taxon obtains the number for the initial treatment result to be classified according to the target work order group
According to the visual image of column information.
Optionally, the selection module includes:
Third acquiring unit for obtaining the first processing module mapped target dimension index prestored, and is sentenced
It whether include sub- dimension index under the target dimension index of breaking;
Extraction unit is used for when under the target dimension index including sub- dimension index, from the operation management system
It is middle to extract under all products the corresponding subdata information of every sub- dimension index;
Arrangement units, for arranging the subdata information according to preset order, to obtain target data column letter
Breath.
Optionally, the target monitoring information is multiple;
The selection module further include:
Second selection unit, for choosing the multiple target monitoring information of alignment processing from each default processing module
Multiple first processing modules;
4th acquiring unit, the multiple mesh mapped respectively for obtaining the multiple first processing module prestored respectively
Dimension index is marked, to extract corresponding multiple second number of targets of the multiple target dimension index from the operation management system
According to, the multiple second target data is arranged according to the classification of the target monitoring information, obtain target data column letter
Breath.
Optionally, the selection module further include:
5th acquiring unit, for obtaining the first processing module mapped target dimension index prestored, with from
Mesh until extracting the target dimension index corresponding visualization time to current time last time in the operation management system
Mark data column information.
Optionally, the O&M information visuallization device includes:
Judgment module, for judging whether the data column information is in abnormality, when the data column information is in
When abnormality, output abnormality prompt information.
The present invention also provides a kind of readable storage medium storing program for executing, O&M information visuallization is stored on the readable storage medium storing program for executing
Program is realized when the O&M information visuallization program is executed by processor such as above-mentioned O&M information visuallization method
Step.
The present invention obtains institute when detecting the visible instructions that visualization interface of the user in operation management system triggers
State target monitoring information entrained in visible instructions;It is chosen from each default processing module and handles the target monitoring letter
The first processing module of breath, and obtain the first processing module mapped target dimension index that prestores, with from the fortune
The corresponding target data column information of the target dimension index is extracted in battalion's management system;Visualize the data column letter
Breath.It in this application, is no longer to screen the O&M information of needs in a manner of keyword retrieval manually by user, but runing
Each processing module is previously provided in management system, which is capable of handling corresponding monitoring information, thus,
When detecting the visible instructions that visualization interface of the user in operation management system triggers, that is, it can extract the visualization and refer to
Entrained target monitoring information in order, and obtain corresponding to preset first processing module, and obtain based on first processing module
Target dimension index, to extract the corresponding target data column information of the target dimension index from the operation management system,
And visualize the data column information namely the application visualization process is automation, and it is artificial to participate in few, improve fortune
Information visuallization efficiency is tieed up, thus, present application addresses low efficiency is visualized during existing O&M information visuallization
Technical problem.
Detailed description of the invention
Fig. 1 is the flow diagram of O&M information visuallization method first embodiment of the present invention;
Fig. 2 is selection place from each default processing module in O&M information visuallization method second embodiment of the present invention
The first processing module of the target monitoring information is managed, and obtains the first processing module mapped target dimension prestored
Index, it is thin the step of to extract the corresponding target data column information of the target dimension index from the operation management system
Change flow diagram;
Fig. 3 is the device structure schematic diagram for the hardware running environment that present invention method is related to.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The present invention provides a kind of O&M information visuallization method, in one embodiment of O&M information visuallization method,
Referring to Fig. 3, the O&M information visuallization method is applied to operation management system, the O&M information visuallization method packet
It includes:
Step S10 is obtained when detecting the visible instructions that visualization interface of the user in operation management system triggers
Entrained target monitoring information in the visible instructions;
Step S20 chooses the first processing module for handling the target monitoring information from each default processing module, and
The first processing module mapped target dimension index prestored is obtained, described in extracting from the operation management system
The corresponding target data column information of target dimension index;
Step S30 visualizes the data column information.
Specific step is as follows:
Step S10 is obtained when detecting the visible instructions that visualization interface of the user in operation management system triggers
Entrained target monitoring information in the visible instructions;
It should be noted that in the present embodiment, O&M information visuallization method is applied to operation management system, the fortune
The all types of business of all types of products involved in management system are sought, which can be divided into different work order groups,
Such as A product, B product, C product financial business product (including but not limited to deposit, provide a loan, financing, the products such as payment), can be with
Three customer service work order groups are divided into, in the present embodiment, operation management system is provided with monitoring information, which is root
It is artificially determined according to the demand of the operation management such as current customer service and monitoring, operation management system is corresponding pre- for each monitoring information
First exploitation has processing module to be all correspondingly arranged on processing in operation management system that is, for each specific monitoring information
There are mapping relations one by one in module, the processing module and the specific monitoring information, i.e., specific monitoring information is different, the processing module
It is different, wherein processing module is substantially the API Common Gateway based on the specific monitoring information design of enterprise of a set of preset standard
Interface has the function of different preset rules or function, corresponding single to realize in the different disposal module, such as single
Function can be obtain customer service operation management system online customer service attend a banquet state (monitoring information) or obtain customer service operation pipe
The corresponding data such as the current percent of call completed (monitoring information) that reason system online customer service is attended a banquet.In operation management system, if setting
It attends a banquet the processing module of state for enterprise's online customer service, and there is the business of each product in enterprise on the platforms such as m1, m2, because
And in operation management system, it is to be provided with to connect the online customer services of the platforms such as m1, the m2 and attend a banquet the processing module of state, it should
Processing module can obtain enterprise and currently attend a banquet state for the online customer service of each product on all platforms.
Specifically, in the present embodiment, be provided with visualization interface in operation management system, user visualization interface into
Row needs the selection of visual target monitoring information, in user's selection after visual target monitoring information, operation management
System can correspond to generation visible instructions, and operation management system detects that user triggers in the visualization interface of operation management system
Visible instructions when, obtain in the visible instructions entrained target monitoring information.
Step S20 chooses the first processing module for handling the target monitoring information from each default processing module, and
The first processing module mapped target dimension index prestored is obtained, described in extracting from the operation management system
The corresponding target data column information of target dimension index;
According to the mapping relations of monitoring information and processing module, is chosen from each default processing module and handle the target
The first processing module of monitoring information, specifically, according to the mapping relations of monitoring information title and processing module title, from each
The first processing module for handling the target monitoring information is chosen in default processing module.
The first processing module mapped target dimension index prestored is obtained, in the present embodiment, the first processing
Module may map a target dimension index, it is also possible to map multiple target dimension indexs, wherein under target dimension index also
It may include sub- dimension index, after obtaining the first processing module mapped target dimension index prestored, with from described
The corresponding target data column information of the target dimension index is extracted in operation management system, specifically, due to the first processing mould
Block substantially can be the API common gateway interface based on the specific monitoring information design of enterprise of a set of preset standard, to realize
Corresponding single function, thus, first processing module from pulling the corresponding mesh of the target dimension index dynamic in real time from the background
Mark data column information, for example, first processing module from pull from the background dynamic online customer service is attended a banquet in real time current percent of call completed this
The corresponding target data column information of a dimension index, the target data column information can be the current percent of call completed including all products
Corresponding target data column information, and the target data column information can carry out a point column according to product category, in addition, the target
Data column information can divide column mode to carry out a point column according to other.
It should be noted that in the present embodiment, it is described to obtain the first processing module mapped target prestored
Dimension index, to extract the corresponding target data column information step of the target dimension index from the operation management system also
Include:
The first processing module mapped target dimension index prestored is obtained, from the operation management system
Target data column information until extracting the target dimension index corresponding visualization time to current time last time.
The first processing module mapped target dimension index prestored is obtained, from the operation management system
Extracting the corresponding target data column information of the target dimension index includes obtaining the first processing module prestored to be mapped
Target dimension index, with from the operation management system extract the last fetched time to current time until the target
The corresponding target data column information of dimension index causes the waste of resource to avoid excessive data are pulled.
It should be noted that in addition to until last time visualizes the time to current time (a visualization time interval),
There are also other optional periods, such as multiple visualization time intervals, are mapped that is, obtaining the first processing module prestored
Target dimension index, to extract the target dimension index corresponding multiple visualization times from the operation management system
The target data column information at interval.
Referring to Fig. 2, in the present embodiment, described choose from each default processing module handles the target monitoring information
First processing module, and the first processing module mapped target dimension index that prestores is obtained, with from the operation
The step of corresponding target data column information of the target dimension index is extracted in management system include:
Step S21, based on the mapping relations of each monitoring information and alignment processing module that prestore, from each default processing
The first processing module for handling the target monitoring information is chosen in module;
Step S22 obtains target product and target product institute associated by the preset first processing module
Target work order group;
In the present embodiment, first processing module is also associated with product, and first processing module is not all with enterprise
Product association, but be associated with portioned product and be such as associated with product of the enterprise on a certain platform, or in certain work order groups
Product association, thus, in the present embodiment, obtain target product associated by the preset first processing module, and
Obtain the target work order group where the target product, for example, first processing module it is associated have A1, A2,, the targets such as An produce
Product, the target product belong to M work order group, and the target work order group where determining the target product can for the ease of orderly
It is shown depending on changing.
Step S23 obtains the first processing module mapped target dimension index prestored;
The first processing module mapped target dimension index prestored is obtained, is in the present embodiment to obtain in advance
Data of the correspondence target product that the determined needs of the first processing module deposited pull under target dimension index dimension, tool
Body, obtain A1, A2 that the determined needs of the first processing module that prestore pull,, the target products such as An are in target dimension
Data under index dimension.
Step S24 is reflected from the target dimension index extracted under the target product in the operation management system
The first object data penetrated, and the first object data are subjected to column division according to the target work order group, to obtain target
Data column information.
From the target dimension index mapped first extracted in the operation management system under the target product
Target data, the first object data carry out first row classification according to the classification of target product first, are carrying out first row classification
Afterwards, the sorted first object data of the first row are subjected to column according to the target work order group and divide i.e. progress secondary series point
Class, to obtain target data column information, the present embodiment has the target data of work order group and product relevance convenient for visualization
Column information, convenient for artificial viewing.
Integrally, for example, choosing the of the current percent of call completed attended a banquet of processing online customer service from each default processing module
One processing module;Obtain target product such as A associated by the first processing module for the current percent of call completed that default online customer service is attended a banquet
Target work order group such as the first work group where product, B product, C product and the target product, the second work group, third work
Group;The current percent of call completed dimension index that the first processing module mapped online customer service that prestores is attended a banquet is obtained, from described
The current percent of call completed dimension that the online customer service under the A product, B product, C product is attended a banquet is extracted in operation management system to refer to
Mapped A data, B data, C data are marked, and by the A data, B data, C data according to the first work group, the second work
Group, third work group carry out column division, are respectively three groups: the to obtain target data column information namely the target data column information
One group are as follows: current percent of call completed that online customer service is attended a banquet, A data, A product, the first work group;Second group are as follows: what online customer service was attended a banquet
Current percent of call completed, B data, B product, the second work group, third group are as follows: current percent of call completed that online customer service is attended a banquet, C data, C are produced
Product, third work group.
Step S30 visualizes the data column information.
After obtaining data column information, the data column information is visualized, to be rung when detecting data column information
Should data column information to visualize the data column information, need that program segment is arranged in built-in processor in advance,
The program segment table registration is according to the processing logic of column information, and the processing logic is for when detecting data column information, triggering to be handled
To respond the data column information, visual exhibition method is specifically as follows graphical diagrams and shows such as rectangle diagrammatic representation device.
It is described to visualize the data column information step and include:
The data column information is carried out initial visualization processing according to the classification of the target product, obtained by step S31
Initial treatment result;
Step S32 classifies the initial treatment result according to the target work order group, obtains the data column letter
The visual image of breath.
Visualization process can be divided into two steps, and first the classification based on target product carries out initial visualization processing, obtain just
Beginning processing result obtains target work order group, and according to the pass of target product and target work order group after obtaining initial treatment result
The initial treatment result is classified according to the target work order group, obtains the visual of the data column information by connection relationship
Change image, in the present embodiment, realizes and orderly obtain visual image.
In addition, after display data column information, it is also optional to store data column information cochain into block chain, to prevent from usurping
Change.
The present invention obtains institute when detecting the visible instructions that visualization interface of the user in operation management system triggers
State target monitoring information entrained in visible instructions;It is chosen from each default processing module and handles the target monitoring letter
The first processing module of breath, and obtain the first processing module mapped target dimension index that prestores, with from the fortune
The corresponding target data column information of the target dimension index is extracted in battalion's management system;Visualize the data column letter
Breath.It in this application, is no longer to screen the O&M information of needs in a manner of keyword retrieval manually by user, but runing
Each processing module is previously provided in management system, which is capable of handling corresponding monitoring information, thus,
When detecting the visible instructions that visualization interface of the user in operation management system triggers, that is, it can extract the visualization and refer to
Entrained target monitoring information in order, and obtain corresponding to preset first processing module, and obtain based on first processing module
Target dimension index, to extract the corresponding target data column information of the target dimension index from the operation management system,
And visualize the data column information namely the application visualization process is automation, and it is artificial to participate in few, improve fortune
Information visuallization efficiency is tieed up, thus, present application addresses low efficiency is visualized during existing O&M information visuallization
Technical problem.
Further, the present invention provides another embodiment of O&M information visuallization method, in this embodiment, described to obtain
The first processing module mapped target dimension index prestored is taken, to extract the mesh from the operation management system
Mark the corresponding target data column information step of dimension index further include:
Step S25 obtains the first processing module mapped target dimension index prestored, and judges the target
It whether include sub- dimension index under dimension index;
In the present embodiment, the first processing module mapped target dimension index prestored is obtained, and judges institute
It states and whether includes whether sub- dimension index specifically can carry pre- bidding according to target dimension index under target dimension index
Know and determines under the target dimension index whether include sub- dimension index, the sub- dimension index for including under the target dimension index
It is generally multiple, such as the online customer service corresponding first processing module of state monitoring information of attending a banquet may map online customer service and attend a banquet
Queue number, service request number under state show not busy number, show that the sub- dimensions such as busy number, current service client number, leisure service number refer to
Mark.
Step S26 is extracted from the operation management system when under the target dimension index including sub- dimension index
The corresponding subdata information of every sub- dimension index under all products;
Step S27 arranges the subdata information, according to preset order to obtain target data column information.
When under the target dimension index including sub- dimension index, all products are extracted from the operation management system
Under the corresponding subdata information of every sub- dimension index, for example, from the row extracted in the operation management system under all products
Team's number, shows not busy number under all products, current service client's number under all products etc..By the subdata information according to pre-
If sequence is arranged, to obtain target data column information, in order to subsequent visualization displaying.
In the present embodiment, by obtaining the first processing module mapped target dimension index prestored, and sentence
It whether include sub- dimension index under the target dimension index of breaking;When under the target dimension index including sub- dimension index,
From extracting the corresponding subdata information of every sub- dimension index under all products in the operation management system;By the subdata
Information is arranged according to preset order, to obtain target data column information.Due to precise arrangement corresponding data information, thus,
It lays the foundation for automatic visual corresponding data information.
Further, another embodiment of O&M information visuallization method is provided in the present invention, it is in this embodiment, described
Target monitoring information is multiple;
It is described that the first processing module for handling the target monitoring information is chosen from each default processing module, and obtain
The first processing module mapped target dimension index prestored, to extract the target from the operation management system
The corresponding target data column information step of dimension index further include:
Step S28 chooses multiple the of the multiple target monitoring information of alignment processing from each default processing module
One processing module;
In the present embodiment, target monitoring information can be multiple, when target monitoring information is multiple, be supervised according to target
The title of information is controlled from choose the multiple target monitoring information of alignment processing in each default processing module multiple first
Manage module.
Step S29 obtains multiple target dimensions that the multiple first processing module prestored maps respectively respectively and refers to
Mark, to extract corresponding multiple second target datas of the multiple target dimension index from the operation management system, by institute
It states multiple second target datas to be arranged according to the classification of the target monitoring information, obtains target data column information.
Multiple target dimension indexs that the multiple first processing module prestored maps respectively are obtained, respectively with from institute
It states and extracts corresponding multiple second target datas of the multiple target dimension index in operation management system, by the multiple second
Target data is arranged according to the classification of the target monitoring information, obtains target data column information, particularly, when multiple mesh
When having sub- dimension index there are target dimension index in mark dimension index, by the multiple second target data according to the target
Outside the classification of monitoring information is arranged, each second target data is arranged according to the classification of sub- dimension index also, is obtained
To target data column information.
In the present embodiment, by choosing the multiple target monitoring information of alignment processing from each default processing module
Multiple first processing modules;Multiple target dimensions that the multiple first processing module prestored maps respectively are obtained respectively
Index will to extract corresponding multiple second target datas of the multiple target dimension index from the operation management system
The multiple second target data is arranged according to the classification of the target monitoring information, obtains target data column information.?
The visualization of multiple monitoring informations in the present embodiment, improves visual intelligence.
Further, another embodiment of O&M information visuallization method is provided in the present invention, it is described to be managed from the operation
Include: after the step of extracting the corresponding target data column information of the target dimension index in reason system
Step S01, judges whether the data column information is in abnormality, when the data column information is in abnormal shape
When state, output abnormality prompt information.
In the present embodiment, also judge whether the data column information is in abnormality, specifically, by data column information
It is compared with the limit threshold values of corresponding data column information, when the data column information is not located between otherwise limit threshold values, really
Fixed number is in abnormality according to column information, and when the data column information is when in an abnormal state, output abnormality prompt information needs
Illustrating, abnormal prompt information can be exports prompt information before visualization, it is also possible to export after visualization,
It can also be exported simultaneously in the case where multithreading.
In the present embodiment, judge whether the data column information is in abnormality, when the data column information is in
When abnormality, output abnormality prompt information.Avoid the data of visualization display exception to cause adverse effect.
Referring to Fig. 3, Fig. 3 is the device structure schematic diagram for the hardware running environment that the embodiment of the present invention is related to.
O&M information visuallization equipment of the embodiment of the present invention can be PC, be also possible to smart phone, tablet computer, just
Take the terminal devices such as computer.
As shown in figure 3, the O&M information visuallization equipment may include: processor 1001, such as CPU, memory
1005, communication bus 1002.Wherein, communication bus 1002 is logical for realizing the connection between processor 1001 and memory 1005
Letter.Memory 1005 can be high speed RAM memory, be also possible to stable memory (non-volatile memory), example
Such as magnetic disk storage.Memory 1005 optionally can also be the storage equipment independently of aforementioned processor 1001.
Optionally, the O&M information visuallization equipment can also include target user interface, network interface, camera,
RF (Radio Frequency, radio frequency) circuit, sensor, voicefrequency circuit, WiFi module etc..Target user interface can wrap
Display screen (Display), input unit such as keyboard (Keyboard) are included, optional target user interface can also include standard
Wireline interface, wireless interface.Network interface optionally may include standard wireline interface and wireless interface (such as WI-FI interface).
It will be understood by those skilled in the art that O&M information visuallization device structure shown in Fig. 3 is not constituted pair
The restriction of O&M information visuallization equipment may include components more more or fewer than diagram, or combine certain components, or
The different component layout of person.
As shown in figure 3, as may include that operating system, network are logical in a kind of memory 1005 of computer storage medium
Believe module and O&M information visuallization program.Operating system be manage and control O&M information visuallization device hardware and
The program of software resource supports the operation of O&M information visuallization program and other softwares and/or program.Network communication mould
Block for realizing the communication between each component in the inside of memory 1005, and with other hardware in O&M information visuallization equipment
It is communicated between software.
In O&M information visuallization equipment shown in Fig. 3, processor 1001 stores in memory 1005 for executing
O&M information visuallization program, the step of realizing O&M information visuallization method described in any of the above embodiments.
O&M information visuallization equipment specific embodiment of the present invention and above-mentioned each reality of O&M information visuallization method
It is essentially identical to apply example, details are not described herein.
In addition, the embodiment of the present invention also proposes that a kind of O&M information visuallization device, the device include:
Detection module, in the visible instructions for detecting that visualization interface of the user in operation management system triggers
When, obtain target monitoring information entrained in the visible instructions;
Module is chosen, for choosing the first processing mould for handling the target monitoring information from each default processing module
Block, and the first processing module mapped target dimension index prestored is obtained, to be mentioned from the operation management system
Take the corresponding target data column information of the target dimension index;
Visualization model, for visualizing the data column information.
Optionally, the selection module includes:
First selection unit, for the mapping relations based on each monitoring information for prestoring and alignment processing module, from each
The first processing module for handling the target monitoring information is chosen in a default processing module;
First acquisition unit, for obtaining target product associated by the preset first processing module and described
Target work order group where target product;
Second acquisition unit, for obtaining the first processing module mapped target dimension index prestored;
Column division unit, for referring to from the target dimension extracted in the operation management system under the target product
Mapped first object data are marked, and the first object data are subjected to column division according to the target work order group, with
To target data column information.
Optionally, the visualization model includes:
Initial visualization processing unit, it is initial for carrying out the data column information according to the classification of the target product
Visualization processing obtains initial treatment result;
Taxon obtains the number for the initial treatment result to be classified according to the target work order group
According to the visual image of column information.
Optionally, the selection module includes:
Third acquiring unit for obtaining the first processing module mapped target dimension index prestored, and is sentenced
It whether include sub- dimension index under the target dimension index of breaking;
Extraction unit is used for when under the target dimension index including sub- dimension index, from the operation management system
It is middle to extract under all products the corresponding subdata information of every sub- dimension index;
Arrangement units, for arranging the subdata information according to preset order, to obtain target data column letter
Breath.
Optionally, the target monitoring information is multiple;
The selection module further include:
Second selection unit, for choosing the multiple target monitoring information of alignment processing from each default processing module
Multiple first processing modules;
4th acquiring unit, the multiple mesh mapped respectively for obtaining the multiple first processing module prestored respectively
Dimension index is marked, to extract corresponding multiple second number of targets of the multiple target dimension index from the operation management system
According to, the multiple second target data is arranged according to the classification of the target monitoring information, obtain target data column letter
Breath.
Optionally, the selection module further include:
5th acquiring unit, for obtaining the first processing module mapped target dimension index prestored, with from
Mesh until extracting the target dimension index corresponding visualization time to current time last time in the operation management system
Mark data column information.
Optionally, the O&M information visuallization device includes:
Judgment module, for judging whether the data column information is in abnormality, when the data column information is in
When abnormality, output abnormality prompt information.
The O&M information visuallization device specific embodiment and above-mentioned each embodiment of O&M information visuallization method
Essentially identical, details are not described herein.
In addition, the embodiment of the present invention also proposes that a kind of O&M information visuallization equipment, equipment include: memory 109, place
It manages device 110 and is stored in the O&M information visuallization program that can be run on memory 109 and on processor 110, O&M letter
The visualization procedure of breath realizes the step of each embodiment of above-mentioned O&M information visuallization method when being executed by processor 110.
The O&M information visuallization equipment specific embodiment and above-mentioned each embodiment of O&M information visuallization method
Essentially identical, details are not described herein.
In addition, the present invention also provides a kind of computer readable storage medium, the computer-readable recording medium storage
Having one, perhaps more than one program the one or more programs can also be by one or more than one processor
The step of executing with embodiment each for realizing above-mentioned O&M information visuallization method.
In the expansion of present device and the specific embodiment of readable storage medium storing program for executing (i.e. computer readable storage medium)
Appearance is essentially identical with above-mentioned each embodiment of O&M information visuallization method, and this will not be repeated here.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that the process, method, article or the device that include a series of elements not only include those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do
There is also other identical elements in the process, method of element, article or device.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on this understanding, technical solution of the present invention substantially in other words does the prior art
The part contributed out can be embodied in the form of software products, which is stored in a storage medium
In (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that a terminal (can be mobile phone, computer, service
Device, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited to above-mentioned specific
Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art
Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much
Form, all of these belong to the protection of the present invention.
Claims (10)
1. a kind of O&M information visuallization method, which is characterized in that the O&M information visuallization method is applied to operation
Management system, the O&M information visuallization method include:
When detecting the visible instructions that visualization interface of the user in operation management system triggers, obtains the visualization and refer to
Entrained target monitoring information in order;
The first processing module for handling the target monitoring information is chosen from each default processing module, and obtains the institute prestored
First processing module mapped target dimension index is stated, to extract the target dimension index from the operation management system
Corresponding target data column information;
Visualize the data column information.
2. O&M information visuallization method as described in claim 1, which is characterized in that described from each default processing module
It is middle to choose the first processing module for handling the target monitoring information, and obtain the first processing module mapped prestored
Target dimension index, to extract the corresponding target data column information of the target dimension index from the operation management system
Step includes:
Based on the mapping relations of each monitoring information and alignment processing module that prestore, selection place from each default processing module
Manage the first processing module of the target monitoring information;
Obtain target product associated by the preset first processing module and the target work order where the target product
Group;
Obtain the first processing module mapped target dimension index prestored;
From the target dimension index mapped first object extracted in the operation management system under the target product
Data, and the first object data are subjected to column division according to the target work order group, to obtain target data column information.
3. O&M information visuallization method as claimed in claim 2, which is characterized in that described to visualize the data
Column information step includes:
The data column information is subjected to initial visualization processing according to the classification of the target product, obtains initial treatment knot
Fruit;
The initial treatment result is classified according to the target work order group, obtains the visualization figure of the data column information
Picture.
4. O&M information visuallization method as described in claim 1, which is characterized in that described to obtain described first prestored
Processing module mapped target dimension index, it is corresponding to extract the target dimension index from the operation management system
Target data column information step further include:
Obtain the first processing module mapped target dimension index that prestores, and judge be under the target dimension index
No includes sub- dimension index;
It is every under all products from being extracted in the operation management system when under the target dimension index including sub- dimension index
The corresponding subdata information of a sub- dimension index;
The subdata information is arranged according to preset order, to obtain target data column information.
5. O&M information visuallization method as described in claim 1, which is characterized in that the target monitoring information is more
It is a;
It is described that the first processing module for handling the target monitoring information is chosen from each default processing module, and obtain and prestore
The first processing module mapped target dimension index, to extract the target dimension from the operation management system
The corresponding target data column information step of index further include:
Multiple first processing modules of the multiple target monitoring information of alignment processing are chosen from each default processing module;
Multiple target dimension indexs that the multiple first processing module prestored maps respectively are obtained, respectively with from the fortune
Corresponding multiple second target datas of the multiple target dimension index are extracted in battalion's management system, by the multiple second target
Data are arranged according to the classification of the target monitoring information, obtain target data column information.
6. O&M information visuallization method as described in claim 1, which is characterized in that described to obtain described first prestored
Processing module mapped target dimension index, it is corresponding to extract the target dimension index from the operation management system
Target data column information step further include:
The first processing module mapped target dimension index prestored is obtained, to extract from the operation management system
Target data column information until the target dimension index corresponding visualization time to current time last time.
7. O&M information visuallization method as claimed in any one of claims 1 to 6, which is characterized in that described from the operation
Include: after the step of extracting the corresponding target data column information of the target dimension index in management system
Judge whether the data column information is in abnormality, when the data column information is when in an abnormal state, output is different
Normal prompt information.
8. a kind of O&M information visuallization device, which is characterized in that the O&M information visuallization device is applied to operation
Management system, the O&M information visuallization device include:
Detection module, for obtaining when detecting the visible instructions that visualization interface of the user in operation management system triggers
Take target monitoring information entrained in the visible instructions;
Module is chosen, for choosing the first processing module for handling the target monitoring information from each default processing module,
And the first processing module mapped target dimension index prestored is obtained, to extract institute from the operation management system
State the corresponding target data column information of target dimension index;
Visualization model, for visualizing the data column information.
9. a kind of O&M information visuallization equipment, which is characterized in that the equipment includes: memory, processor and is stored in
On the memory and the O&M information visuallization program that can run on the processor, the O&M information visuallization
Realizing the O&M information visuallization method as described in any one of claims 1 to 7 when program is executed by the processor
Step.
10. a kind of readable storage medium storing program for executing, which is characterized in that be stored with O&M information visuallization journey on the readable storage medium storing program for executing
Sequence realizes the O&M as described in any one of claims 1 to 7 when the O&M information visuallization program is executed by processor
The step of information visuallization method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910498882.1A CN110231974A (en) | 2019-06-06 | 2019-06-06 | O&M information visuallization method, apparatus, equipment and readable storage medium storing program for executing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910498882.1A CN110231974A (en) | 2019-06-06 | 2019-06-06 | O&M information visuallization method, apparatus, equipment and readable storage medium storing program for executing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110231974A true CN110231974A (en) | 2019-09-13 |
Family
ID=67859548
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910498882.1A Pending CN110231974A (en) | 2019-06-06 | 2019-06-06 | O&M information visuallization method, apparatus, equipment and readable storage medium storing program for executing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110231974A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111176930A (en) * | 2019-12-10 | 2020-05-19 | 未鲲(上海)科技服务有限公司 | Component operation data processing method and device, computer equipment and storage medium |
CN112506738A (en) * | 2020-12-03 | 2021-03-16 | 上海哔哩哔哩科技有限公司 | Data visualization processing method and device |
CN113535228A (en) * | 2020-04-14 | 2021-10-22 | 深圳富桂精密工业有限公司 | Method, apparatus and computer readable storage medium for monitoring data link |
CN115774803A (en) * | 2023-02-10 | 2023-03-10 | 中大体育产业集团股份有限公司 | Visual identification method and system for physical examination site |
-
2019
- 2019-06-06 CN CN201910498882.1A patent/CN110231974A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111176930A (en) * | 2019-12-10 | 2020-05-19 | 未鲲(上海)科技服务有限公司 | Component operation data processing method and device, computer equipment and storage medium |
CN111176930B (en) * | 2019-12-10 | 2023-02-07 | 未鲲(上海)科技服务有限公司 | Component operation data processing method and device, computer equipment and storage medium |
CN113535228A (en) * | 2020-04-14 | 2021-10-22 | 深圳富桂精密工业有限公司 | Method, apparatus and computer readable storage medium for monitoring data link |
CN113535228B (en) * | 2020-04-14 | 2024-04-09 | 深圳富桂精密工业有限公司 | Method, apparatus and computer readable storage medium for monitoring data link |
CN112506738A (en) * | 2020-12-03 | 2021-03-16 | 上海哔哩哔哩科技有限公司 | Data visualization processing method and device |
CN115774803A (en) * | 2023-02-10 | 2023-03-10 | 中大体育产业集团股份有限公司 | Visual identification method and system for physical examination site |
CN115774803B (en) * | 2023-02-10 | 2023-04-18 | 中大体育产业集团股份有限公司 | Visual identification method and system for physical examination site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110231974A (en) | O&M information visuallization method, apparatus, equipment and readable storage medium storing program for executing | |
CN105938557A (en) | Image recognition method and image recognition device | |
CN110147722A (en) | A kind of method for processing video frequency, video process apparatus and terminal device | |
CN107730196A (en) | Project scheduling management method and terminal device | |
CN109508388A (en) | A kind of method and apparatus of relational network visualization map | |
CN108229341A (en) | Sorting technique and device, electronic equipment, computer storage media, program | |
CN110383274A (en) | Identify method, apparatus, system, storage medium, processor and the terminal of equipment | |
US20090317056A1 (en) | System and method for managing schedules of monitoring device | |
CN103077070B (en) | Cloud computing management system and management method for cloud computing systems | |
CN109614238A (en) | A kind of recongnition of objects method, apparatus, system and readable storage medium storing program for executing | |
CN108205685A (en) | Video classification methods, visual classification device and electronic equipment | |
CN110442712A (en) | Determination method, apparatus, server and the text of risk try system | |
CN109783757A (en) | Render method and device, the system, storage medium, electronic device of webpage | |
CN107124655A (en) | Virtual present message display method and device | |
CN103532736B (en) | Visual network management method and user terminal | |
CN112700012A (en) | Federal feature selection method, device, equipment and storage medium | |
CN107391540A (en) | A kind of small routine methods of exhibiting, device and grader | |
CN115392501A (en) | Data acquisition method and device, electronic equipment and storage medium | |
CN110347664A (en) | A kind of data visualization processing method and processing device | |
CN108932703A (en) | Image processing method, picture processing unit and terminal device | |
CN116229188B (en) | Image processing display method, classification model generation method and equipment thereof | |
CN117093619A (en) | Rule engine processing method and device, electronic equipment and storage medium | |
US20180196928A1 (en) | Network visualization for access controls | |
CN108932704A (en) | Image processing method, picture processing unit and terminal device | |
CN115270923A (en) | Scene-based visual intelligent decision method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |