CN110213812A CN201910485860.1A CN201910485860A CN110213812A CN 110213812 A CN110213812 A CN 110213812A CN 201910485860 A CN201910485860 A CN 201910485860A CN 110213812 A CN110213812 A CN 110213812A
Authority
CN
China
Prior art keywords
network equipment
traffic load
carrier wave
network
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910485860.1A
Other languages
Chinese (zh)
Other versions
CN110213812B (en
Inventor
何明
康乐
张平
李雁
陈孟尝
莫俊彬
陈卓军
邓玲
曾昭才
林铁力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China United Network Communications Group Co Ltd
Original Assignee
China United Network Communications Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China United Network Communications Group Co Ltd filed Critical China United Network Communications Group Co Ltd
Priority to CN201910485860.1A priority Critical patent/CN110213812B/en
Publication of CN110213812A publication Critical patent/CN110213812A/en
Application granted granted Critical
Publication of CN110213812B publication Critical patent/CN110213812B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0203Power saving arrangements in the radio access network or backbone network of wireless communication networks
    • H04W52/0206Power saving arrangements in the radio access network or backbone network of wireless communication networks in access points, e.g. base stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention provides a kind of energy-saving control method, device, the network equipment and storage medium, the first traffic load of second network equipment, the traffic load that the first traffic load communicates between second network equipment and at least one terminal device are obtained by first network equipment;When the first traffic load is less than or equal to the first pre-set business load, the first network equipment controls second network equipment carrier wave shutdown, wherein, second network equipment is the auxiliary service network apparatus of at least one network equipment, the main service network apparatus of at least one terminal device is the third network equipment, and second network equipment is different from the communication standard of the third network equipment.When lower by the traffic load communicated between second network equipment and at least one terminal device, energy-saving purpose is realized in control the second network equipment carrier wave shutdown.In addition, by third network equipment bearer service demand, guaranteeing the business demand of user after the shutdown of the second network equipment carrier wave.

Description

Energy-saving control method, device, the network equipment and storage medium
Technical field
The present invention relates to fields of communication technology more particularly to a kind of energy-saving control method, device, the network equipment and storage to be situated between Matter.
Background technique
In December, 2017, third generation partner program (Third Generation Partnership Project, letter Claim: 3GPP) about the 5th third-generation mobile communication (5G) dependent networking (Non-Standalone, NSA) R15 standard complete.? Under 5G NSA framework, need using in long term evolution (Long Term Evolution, LTE) network base station and LTE in Equipment of the core network, and using LTE as the anchor point of control plane realizes that 5G newly eats dishes without rice or wine (5G new using existing LTE network resource Radio, 5G NR) rapid deployment.
But 5G base station equipment volume is big, weight is heavy, energy consumption is larger, in order to reduce the energy consumption of 5G base station equipment, realizes green The strategy of sustainable development that colour circle is protected passes through new material application, high integration currently, equipment supplier continuously improves research and development The means such as chip application, Novel Filter and optimization cooling system go to reduce the energy consumption of 5G base station equipment, still, for operation For quotient, after the 5G base station equipment of nominal power consumption is deployed to network system, how to further decrease operation energy consumption becomes operation One of significant challenge of quotient.
Summary of the invention
The present invention provides a kind of energy-saving control method, device, the network equipment and storage medium, to realize energy-saving mesh 's.
In a first aspect, the present invention provides a kind of energy-saving control method, comprising:
First network equipment obtains the first traffic load of second network equipment, and first traffic load is described second The traffic load communicated between the network equipment and at least one terminal device;
When first traffic load is less than or equal to the first pre-set business load, described in the first network equipment control The shutdown of second network equipment carrier wave;
Wherein, second network equipment is the auxiliary service network apparatus of at least one terminal device, it is described at least The main service network apparatus of one terminal device is the third network equipment;Second network equipment and the third network equipment Communication standard it is different.
Optionally, described when first traffic load is less than or equal to the first pre-set business load, the first network Equipment controls second network equipment carrier wave shutdown, comprising:
When first traffic load is less than or equal to the load of the first pre-set business and duration is more than or equal to first and presets When duration, the first network equipment controls second network equipment carrier wave shutdown.
Optionally, the method, further includes:
The first network equipment obtains the second traffic load of the third network equipment;
When second traffic load is more than or equal to the second pre-set business load, described in the first network equipment control Second network equipment carrier wave is opened.
Optionally, the first network equipment obtains the first traffic load of second network equipment, comprising:
The first network equipment sends traffic load request message to second network equipment;
The first network equipment receives first traffic load that second network equipment is sent.
Optionally, second network equipment is the base station in 5G network, and the third network equipment is in LTE network Base station.
The first network equipment controls second network equipment carrier wave shutdown, comprising:
The first network equipment sends carrier wave to second network equipment and turns off message, and the carrier wave shutdown message is used Carrier wave shutdown operation is executed in second network equipment.
Optionally, the first network equipment controls second network equipment carrier wave and opens, comprising:
The first network equipment sends carrier wave to second network equipment and opens message, and the carrier wave is opened message and used Carrier wave opening operation is executed in second network equipment.
Second aspect, the present invention provide a kind of energy-saving control device, which includes:
Module is obtained, for obtaining the first traffic load of second network equipment, first traffic load is described the The traffic load communicated between two network equipments and at least one terminal device;
Control module, for controlling described the when first traffic load is less than or equal to the first pre-set business load The shutdown of two network equipment carrier waves;
Wherein, second network equipment is the auxiliary service network apparatus of at least one terminal device, it is described at least The main service network apparatus of one terminal device is the third network equipment;Second network equipment and the third network equipment Communication standard it is different.
The third aspect, the present invention also provides a kind of network equipment, which includes: memory, processor and meter Calculation machine program instruction;
The memory stores the computer program instructions;
The processor executes the computer program instructions, to execute method described in first aspect.
Fourth aspect, the present invention also provides a kind of readable storage medium storing program for executing, comprising: program;
Described program is when being executed by processor, to execute method described in first aspect.
The present invention provides a kind of energy-saving control method, device, the network equipment and storage medium, is obtained by first network equipment The first traffic load of second network equipment is taken, the first traffic load is between second network equipment and at least one terminal device The traffic load of communication;Further, when the first traffic load is less than or equal to the first pre-set business load, the first network is set It is standby to control second network equipment carrier wave shutdown, wherein second network equipment is the auxiliary clothes of at least one network equipment It is engaged in the network equipment, the main service network apparatus of at least one terminal device is the third network equipment, and second network equipment It is different from the communication standard of the third network equipment.Pass through the industry communicated between second network equipment and at least one terminal device When business load is lower, control the second network equipment carrier wave shutdown, to realize energy-saving purpose.In addition, in the second network After the shutdown of equipment carrier wave, by third network equipment bearer service demand, guarantee the business demand of user.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to do one simply to introduce, it should be apparent that, the accompanying drawings in the following description is this hair Bright some embodiments for those of ordinary skill in the art without any creative labor, can be with It obtains other drawings based on these drawings.
Fig. 1 is the application scenarios schematic diagram one of energy-saving control method provided by the invention;
Fig. 2 is the flow diagram of energy-saving control method embodiment one provided by the invention;
Fig. 3 is the flow diagram of energy-saving control method embodiment two provided by the invention;
Fig. 4 is the flow diagram of energy-saving control method embodiment three provided by the invention;
Fig. 5 is the flow diagram of energy-saving control method example IV provided by the invention;
Fig. 6 is the structural schematic diagram of energy-saving control device embodiment one provided by the invention;
Fig. 7 is the structural schematic diagram of network equipment embodiment one provided by the invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art Every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Fig. 1 is the application scenarios schematic diagram one of energy-saving control method provided by the invention.It is wrapped in scene as shown in Figure 1 It includes: first network equipment 1, second network equipment 2, the third network equipment 3 and at least one terminal device, wherein the first net Network equipment 1 is the executing subject of energy-saving control method provided by the invention, and second network equipment 2 is at least one terminal device Auxiliary service network apparatus, the main service network apparatus of at least one terminal device for it of the third network equipment 3, and the second network is set Standby 2 is different from the communication standard of the third network equipment 3.
Under the networking of 5G dependent (NSA) framework, second network equipment is 5G base station equipment, and the third network equipment is LTE Base station (hereinafter referred to as LTE base station equipment) in network, first network equipment can be independent network management controller, the first net Network equipment can with second network equipment, third network device communications, alternatively, first network equipment may be that core net is set It is standby.At least one terminal device eats dishes without rice or wine to connect with LTE base station equipment LTE by LTE, meanwhile, at least one terminal device passes through 5G NR eats dishes without rice or wine to connect with the base station 5G, that is to say, that under 5G NSA framework, terminal device uses dual link mode.
Fig. 2 is the flow diagram of energy-saving control method embodiment one provided by the invention.As shown in Fig. 2, the present embodiment Method include:
S101, first network equipment obtain the first traffic load of second network equipment, and the first traffic load is the second net The traffic load communicated between network equipment and at least one terminal device.
S102, when the first traffic load be less than or equal to the first pre-set business load when, first network equipment control the second net The shutdown of network equipment carrier wave.
Wherein, the first traffic load is used to indicate the loading condition of second network equipment, illustratively, the first traffic load Can be one of following parameter or a variety of: resource block utilization rate (Physical Resource Block, PRB) be called Terminal device quantity, service request quantity etc., certainly, the first traffic load involved in the present invention are not limited to the above ginseng Number can also be other parameters, as long as the loading condition of second network equipment can be indicated.
The first traffic load that first network equipment obtains second network equipment can be accomplished by the following way:
A kind of possible implementation, first network equipment send the acquisition of the first traffic load to second network equipment and ask It asks, the first traffic load request message is used to indicate second network equipment and the first traffic load is sent to first network equipment, After second network equipment receives the first traffic load request message, the first traffic load is sent to first network equipment. Then, first network equipment is according to the first traffic load and the first pre-set business load, it is determined whether executes the second network and sets Standby carrier wave turns off.
Illustratively, first network equipment is according to the first traffic load and the first pre-set business load, it is determined whether control Making the shutdown of the second network equipment carrier wave may be accomplished by: a kind of possible implementation, when the first traffic load is small When being equal to the first pre-set business load, first network equipment controls the shutdown of the second network equipment carrier wave;When the first traffic load When greater than the first pre-set business load, first network equipment controls second network equipment and keeps current carrier open state.It is another Kind possible implementation, when the first traffic load is less than or equal to the first pre-set business load, and the first duration is greater than etc. When the first preset duration, first network equipment controls the shutdown of the second network equipment carrier wave;When the first traffic load is greater than first When pre-set business load, first network equipment controls second network equipment and keeps current carrier open state.
Alternatively possible implementation, second network equipment actively report the first traffic load to first network equipment, First network equipment is according to the first traffic load and the first pre-set business load, it is determined whether executes the second network equipment carrier wave Shutdown.For example, second network equipment is when the first traffic load for monitoring itself is less than or equal to the first pre-set business load, the Two network equipments actively report the first traffic load, the first traffic load that first network equipment receives to first network equipment Afterwards, it determines that the first traffic load is less than or equal to the first pre-set business load, then controls the shutdown of the second network equipment carrier wave.Alternatively, Second network equipment is less than or equal to the first pre-set business load, and the first duration in the first traffic load for monitoring itself When more than or equal to the first preset duration, second network equipment actively reports the first traffic load and first to first network equipment Duration when first network equipment receives the first traffic load and the first duration, determines that the first traffic load is small In be equal to the first pre-set business load, and the first duration be more than or equal to the first preset duration, then control second network equipment Carrier wave shutdown.
Wherein, second network equipment reports the mode of the first traffic load, for example, can be reported to be periodical, alternatively, Can be random reported within some specific periods, alternatively, can also be reported at the time of some specific.
In practical applications, when the first traffic load is less than or equal to the first pre-set business load, alternatively, when the first business Load is less than or equal to the first pre-set business load and when the first duration is more than or equal to the first preset duration, second network equipment The business carried is less, alternatively, second network equipment is only used for carrying out a small amount of Signalling exchange with other network equipments at this time, Such as: second network equipment and the third network equipment carry out a small amount of Signalling exchange, and first network equipment controls the second network and sets Standby carrier wave turns off, and the business and Signalling exchange of second network equipment carrying will be migrated to the third network equipment;When the first business When load is greater than default first traffic load, the business that second network equipment is carried is more, and second network equipment keeps current Carrier wave open state is constant.
Under 5G NSA framework, when the first traffic load of 5G base station equipment is less than or equal to the first pre-set business load, Alternatively, the first traffic load of 5G base station equipment is less than or equal to the first pre-set business load and duration is more than or equal to first in advance If when duration, the business of the base station 5G carrying is less or 5G base station equipment is only used for carrying out a small amount of signaling with other network equipments Interaction, for example, 5G base station equipment and LTE base station equipment carry out a small amount of Signalling exchange, the first network equipment control base station 5G is set Standby to execute carrier wave shutdown, since terminal device uses dual link mode, after the shutdown of 5G base station equipment carrier wave, what is carried thereon lacks Amount business will adjourn to LTE base station equipment, and LTE base station equipment eats dishes without rice or wine to connect with terminal device by LTE, provide clothes for terminal device Business.
In the present embodiment, first network equipment passes through the first traffic load for obtaining second network equipment, and the first business is negative The traffic load that lotus communicates between second network equipment and at least one terminal device;Further, when the first traffic load is small When being equal to the first pre-set business load, the first network equipment controls second network equipment carrier wave shutdown, wherein the Two network equipments are the auxiliary service network apparatus of at least one network equipment, the main service of at least one terminal device The network equipment is the third network equipment, and second network equipment is different from the communication standard of the third network equipment.By second When the traffic load communicated between the network equipment and at least one terminal device is lower, control the second network equipment carrier wave shutdown, To realize energy-saving purpose.In addition, passing through third network equipment bearer service after the shutdown of the second network equipment carrier wave Demand guarantees the business demand of user.
Fig. 3 is the flow diagram of energy-saving control method embodiment two provided by the invention.As shown in figure 3, the present embodiment Method embodiment shown in Fig. 2 on the basis of, step S102, when the first traffic load it is negative less than or equal to the first pre-set business It is further comprising the steps of after first network equipment controls the shutdown of the second network equipment carrier wave when lotus:
S103, first network equipment obtain the second traffic load of the third network equipment.
S104, when the second traffic load be more than or equal to the second pre-set business load when, first network equipment control the second net Network equipment carrier wave is opened.
Wherein, the second traffic load is used to indicate the loading condition of the third network equipment, illustratively, the second traffic load It can be one of following parameter or a variety of: PRB, the terminal device quantity of calling, service request quantity etc., certainly, this hair The second traffic load involved in bright is not limited to the above parameter, can also be other parameters, as long as third can be indicated The loading condition of the network equipment.
The second traffic load that first network equipment obtains the third network equipment can be accomplished by the following way:
A kind of possible implementation, first network equipment send the request of the second traffic load to the third network equipment and disappear Breath, the second traffic load request message are used to indicate the third network equipment and the second traffic load are sent to first network and is set It is standby, after the third network equipment receives the second traffic load acquisition request, the second traffic load is sent to first network and is set It is standby.Then, first network equipment is according to the second traffic load and the second pre-set business load, it is determined whether executes the second network Equipment carrier wave is opened.Illustratively, first network equipment is according to the second traffic load and the second pre-set business load, determination The second network equipment carrier wave of no execution is opened, and may be accomplished by: first network equipment judges that the second traffic load is It is no to be more than or equal to the second pre-set business load, if so, the second network equipment carrier wave of control is opened, if it is not, then controlling second The network equipment keeps carrier wave off state.Alternatively, can also be realized by another way: first network equipment judges the second industry Whether business load is more than or equal to the second pre-set business load and continues the second preset duration.If so, second network equipment of control Carrier wave is opened, if it is not, then controlling second network equipment keeps carrier wave off state.
Alternatively possible implementation, the third network equipment are more than or equal to the in the second traffic load for monitoring itself When two pre-set business loads, the second traffic load of active reporting after first network equipment receives the second traffic load, determines Two traffic loads are more than or equal to the second pre-set business load, then control the unlatching of the second network equipment carrier wave.Alternatively, third network is set It is standby to be more than or equal to the second pre-set business load in the second traffic load for monitoring itself, and the second duration is more than or equal to the When two preset durations, the second traffic load and the second duration, first network equipment actively are reported to first network equipment When receiving the second traffic load and the second duration, determine that the second traffic load is negative more than or equal to the second pre-set business Lotus, and the second duration is more than or equal to the second preset duration, then controls the unlatching of the second network equipment carrier wave.
In practical applications, when the second traffic load is more than or equal to the second pre-set business load, alternatively, the second traffic load More than or equal to the second pre-set business load and when the second duration is more than or equal to the second preset duration, the carrying of the third network equipment Business it is more, first network equipment control the second network equipment carrier wave open, with share the third network equipment carrying business; When the second traffic load is less than the second pre-set business load, the third network equipment can guarantee the business demand of user, be not necessarily to Second network equipment shares business, then, first network equipment controls second network equipment and keeps current carrier off state.
Under 5G NSA framework, when LTE base station equipment the second traffic load be more than or equal to the second pre-set business load, or Person, the second traffic load is more than or equal to the second traffic load and when the second duration is more than or equal to the second preset duration, LTE base Station equipment carrying business it is more, and LTE base station equipment also need carrier signaling interaction, for guarantee user business demand, first The network equipment controls 5G base station equipment carrier wave and opens, after 5G base station carrier is opened, extremely by LTE base station equipment transportation by partial service 5G base station equipment, 5G base station equipment eats dishes without rice or wine to interact with terminal device by 5G NR, to provide service for user.Work as LTE base station When second traffic load of equipment is less than the second pre-set business load, LTE base station equipment can guarantee the business demand of user, then Without opening 5G base station equipment, therefore, first network equipment controls 5G base station equipment and keeps current carrier off state.
It is lower by the traffic load communicated between second network equipment and at least one terminal device in the present embodiment When, first network equipment controls the shutdown of the second network equipment carrier wave, to realize energy-saving purpose.In addition, in the second net After the shutdown of network equipment carrier wave, by third network equipment bearer service demand, guarantee the business demand of user.Further, pass through When the traffic load communicated between the third network equipment and at least one terminal device is higher, the second network equipment carrier wave is controlled It opens, restores the network capabilities of second network equipment, and share partial service, to guarantee customer service demand.
Fig. 4 is the flow diagram of energy-saving control method embodiment three provided by the invention.As shown in figure 4, the present embodiment Method the following steps are included:
S401, the first traffic load request message is sent to second network equipment.
S402, the first traffic load that second network equipment is sent is received.
S403, judge whether the first traffic load is less than or equal to the first pre-set business load.
The first traffic load received is compared by first network equipment with the first pre-set business load, judges first Whether traffic load is less than or equal to the first pre-set business load, if so, S404 is thened follow the steps, if it is not, then terminating currently to grasp Make.
S404, carrier wave shutdown information is sent to second network equipment.
Wherein, the carrier wave shutdown information is used to indicate second network equipment and executes carrier wave shutdown operation.
S405, second network equipment turn off information according to the carrier wave received, execute carrier wave shutdown operation.
S406, first network equipment send the second traffic load request message to the third network equipment.
S407, first network equipment receive the second traffic load that the third network equipment is sent.
S408, judge whether the second traffic load is more than or equal to the second pre-set business load.
The second traffic load received is compared by first network equipment with the second pre-set business load, judges second Whether traffic load is more than or equal to the second pre-set business load, if so, S409 is thened follow the steps, if it is not, then terminating currently to grasp Make.
S409, carrier wave opening imformation is sent to second network equipment.
Wherein, the carrier wave opening imformation is used to indicate second network equipment and executes carrier wave opening operation.
S410, second network equipment execute carrier wave opening operation according to the carrier wave opening imformation received.
It is lower by the traffic load communicated between second network equipment and at least one terminal device in the present embodiment When, first network equipment controls the shutdown of the second network equipment carrier wave, to realize energy-saving purpose.In addition, in the second net After the shutdown of network equipment carrier wave, by third network equipment bearer service demand, guarantee the business demand of user.Further, pass through When the traffic load communicated between the third network equipment and at least one terminal device is higher, the second network equipment carrier wave is controlled It opens, restores the network capabilities of second network equipment, and share partial service, to guarantee customer service demand.
Fig. 5 is the flow diagram of energy-saving control method example IV provided by the invention.As shown in figure 5, the present embodiment Method the following steps are included:
S501, the first traffic load request message is sent to second network equipment.
S502, the first traffic load that second network equipment is sent is received.
S503, judge whether the first traffic load is less than or equal to the first pre-set business load, and continue the first preset duration.
The first traffic load received is compared by first network equipment with the first pre-set business load, judges first Whether traffic load is less than or equal to the first pre-set business load, and at the same time judge whether lasting first preset duration, if so, Step S504 is executed, if it is not, then terminating current operation.
S504, carrier wave shutdown information is sent to second network equipment.
Wherein, the carrier wave shutdown information is used to indicate second network equipment and executes carrier wave shutdown operation.
S505, second network equipment turn off information according to the carrier wave received, execute carrier wave shutdown operation.
S506, first network equipment send the second traffic load request message to the third network equipment.
S507, first network equipment receive the second traffic load that the third network equipment is sent.
S508, judge whether the second traffic load is more than or equal to the second pre-set business load, and continue the second preset duration.
The second traffic load received is compared by first network equipment with the second pre-set business load, judges second Whether traffic load is more than or equal to the second pre-set business load, and at the same time judge whether lasting first preset duration, if so, Step S509 is executed, if it is not, then terminating current operation.
S509, carrier wave opening imformation is sent to second network equipment.
Wherein, the carrier wave opening imformation is used to indicate second network equipment and executes carrier wave opening operation.
S510, second network equipment execute carrier wave opening operation according to the carrier wave opening imformation received.
It is lower by the traffic load communicated between second network equipment and at least one terminal device in the present embodiment When, first network equipment controls the shutdown of the second network equipment carrier wave, to realize energy-saving purpose.In addition, in the second net After the shutdown of network equipment carrier wave, by third network equipment bearer service demand, guarantee the business demand of user.Further, pass through When the traffic load communicated between the third network equipment and at least one terminal device is higher, the second network equipment carrier wave is controlled It opens, restores the network capabilities of second network equipment, and share partial service, to guarantee customer service demand.
It should be noted that using energy-saving control method provided by the invention, according to whole world mobile operator GSMA association Definition rule is shown for 5G terminal device logo, in NSA framework, after 5G base station equipment executes carrier wave shutdown, terminal device Idle state resides in LTE cell, and LTE cell supports NSA, but without (being corresponded in following table in the scene of 5G NR covering The corresponding scene of serial number 2), according to scheme D, terminal device can still be shown as 5G logo, therefore, using section provided by the invention It can control method, can not only realize energy-saving purpose, under the premise of guaranteeing customer service demand, go back effective guarantee The usage experience and perception of user,
The following table 1 be in NSA framework that GSMA is defined terminal device logo show definition rule:
Fig. 6 is the structural schematic diagram of energy-saving control device embodiment one provided by the invention.As shown in fig. 6, the present embodiment The energy-saving control device 60 of offer includes: to obtain module 61 and control module 62.
Wherein, module 61 is obtained, for obtaining the first traffic load of second network equipment, the first traffic load is second The traffic load communicated between the network equipment and at least one terminal device.
Control module 62, for controlling the second network when the first traffic load is less than or equal to the first pre-set business load The shutdown of equipment carrier wave.
Wherein, second network equipment is the auxiliary service network apparatus of at least one terminal device, at least one terminal device Main service network apparatus be the third network equipment, second network equipment is different from the communication standard of the third network equipment.
A kind of possible implementation obtains module 61, obtains the first traffic load in the following manner: firstly, to the Two network equipments send the first traffic load request message, later, receive the first traffic load that second network equipment is sent.
A kind of possible implementation, control module 61 control the shutdown of the second network equipment carrier wave in the following manner: when When the first traffic load is less than or equal to the first pre-set business load, carrier wave is sent to second network equipment and turns off message, carrier wave Shutdown message is used to indicate second network equipment and executes carrier wave shutdown operation.Alternatively possible implementation, control module 61, Control in the following manner the second network equipment carrier wave shutdown: when the first traffic load be less than or equal to the first pre-set business load, And duration be more than or equal to the first preset duration when, to second network equipment send carrier wave turn off message, carrier wave turn off message It is used to indicate second network equipment and executes carrier wave shutdown operation.
The device of the present embodiment can be used for executing the technical solution of embodiment of the method shown in Fig. 2, realization principle and skill Art effect is similar, and details are not described herein again.
Optionally, in some embodiments, module 61 is obtained, the second business for being also used to obtain the third network equipment is negative Lotus.
A kind of possible implementation obtains module 61, obtains the second traffic load in the following manner: firstly, to the Three network equipments send the second traffic load request message, then, receive the second traffic load that the third network equipment is sent.Separately A kind of possible implementation obtains module 61, for obtaining the second traffic load in the following manner: receiving third network and sets Standby the second traffic load of active reporting.
Correspondingly, control module 62 are also used to the control when the second traffic load is more than or equal to the second pre-set business load Second network equipment carrier wave is opened.
A kind of possible implementation, control module 62 are opened for controlling the second network equipment carrier wave in the following manner It opens: when the second traffic load is more than or equal to the second pre-set business load, sending carrier wave to second network equipment and open message, carry Wave opens message and is used to indicate second network equipment execution carrier wave opening operation.Alternatively possible implementation, control module 62, it is opened for controlling the second network equipment carrier wave in the following manner: when the second traffic load is more than or equal to the second default industry Business load, and duration is more than or equal to the second preset duration, sends carrier wave to second network equipment and opens message, carrier wave is opened Message is used to indicate second network equipment and executes carrier wave opening operation.
Device provided in this embodiment, it may also be used for execute the technical solution of embodiment of the method shown in Fig. 3 to Fig. 5, in fact Existing principle is similar with technical effect, and details are not described herein again.
Fig. 7 is the structural schematic diagram of network equipment embodiment one provided by the invention.As shown in fig. 7, the net of the present embodiment Network equipment includes: memory 71, processor 72 and computer program.
Wherein, computer program is stored in memory 71, and is configured as being executed by processor 72 to realize Fig. 2 to figure Energy-saving control method shown in 5 any embodiments.Related description can correspond to referring to fig. 2 and the step of Fig. 5 corresponding phase It closes description and effect is understood, do not do and excessively repeat herein.
Wherein, in the present embodiment, memory 71 and processor 72 are connected by bus 73.
The embodiment of the present invention also provides a kind of computer readable storage medium, is stored thereon with computer program, computer Program is executed by processor to realize energy-saving control method shown in Fig. 2 to Fig. 5 any embodiment of the present invention.
Optionally, the network equipment 70 further includes transceiver (being not shown in Fig. 7), for executing Fig. 2 to embodiment illustrated in fig. 5 In send or receive movement.
In several embodiments provided by the present invention, it should be understood that disclosed device and method can pass through it Its mode is realized.For example, the apparatus embodiments described above are merely exemplary, for example, the division of module, only A kind of logical function partition, there may be another division manner in actual implementation, for example, multiple module or components can combine or Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual Between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication link of device or module It connects, can be electrical property, mechanical or other forms.
Module may or may not be physically separated as illustrated by the separation member, show as module Component may or may not be physical module, it can and it is in one place, or may be distributed over multiple networks In module.Some or all of the modules therein can be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
It, can also be in addition, each functional module in each embodiment of the present invention can integrate in a processing module It is that modules physically exist alone, can also be integrated in two or more modules in a module.Above-mentioned integrated mould Block both can take the form of hardware realization, can also realize in the form of hardware adds software function module.
The program code of method for carrying out the present invention can using any combination of one or more programming languages come It writes.These program codes can be supplied to the place of general purpose computer, special purpose computer or other programmable data processing units Device or controller are managed, so that program code makes defined in flowchart and or block diagram when by processor or controller execution Function/operation is carried out.Program code can be executed completely on machine, partly be executed on machine, as stand alone software Is executed on machine and partly execute or executed on remote machine or server completely on the remote machine to packet portion.
In the context of the present invention, machine readable media can be tangible medium, may include or is stored for The program that instruction execution system, device or equipment are used or is used in combination with instruction execution system, device or equipment.Machine can Reading medium can be machine-readable signal medium or machine-readable storage medium.Machine readable media can include but is not limited to electricity Son, magnetic, optical, electromagnetism, infrared or semiconductor system, device or equipment or above content any conjunction Suitable combination.The more specific example of machine readable storage medium will include the electrical connection of line based on one or more, portable meter Calculation machine disk, hard disk, random access memory (RAM), read-only memory (ROM), Erasable Programmable Read Only Memory EPROM (EPROM Or flash memory), optical fiber, portable compact disk read-only memory (CD-ROM), optical storage device, magnetic storage facilities or Any appropriate combination of above content.
Although this should be understood as requiring operating in this way with shown in addition, depicting each operation using certain order Certain order out executes in sequential order, or requires the operation of all diagrams that should be performed to obtain desired result. Under certain environment, multitask and parallel processing be may be advantageous.Similarly, although containing several tools in being discussed above Body realizes details, but these are not construed as the limitation to the scope of the present disclosure.In the context of individual embodiment Described in certain features can also realize in combination in single realize.On the contrary, in the described in the text up and down individually realized Various features can also realize individually or in any suitable subcombination in multiple realizations.
Finally, it should be noted that although having used the language description specific to structure feature and/or method logical action This theme it should be appreciated that theme defined in the appended claims is not necessarily limited to special characteristic described above Or movement.On the contrary, special characteristic described above and movement are only to realize the exemplary forms of claims;Although reference Invention is explained in detail for foregoing embodiments, those skilled in the art should understand that: it still can be with It modifies the technical solutions described in the foregoing embodiments, or some or all of the technical features is equal Replacement;And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution Range.

Claims (10)

1. a kind of energy-saving control method characterized by comprising
First network equipment obtains the first traffic load of second network equipment, and first traffic load is second network The traffic load communicated between equipment and at least one terminal device;
When first traffic load is less than or equal to the first pre-set business load, the first network equipment control described second The shutdown of network equipment carrier wave;
Wherein, second network equipment is the auxiliary service network apparatus of at least one terminal device, it is described at least one The main service network apparatus of terminal device is the third network equipment;Second network equipment is logical with the third network equipment Believe that standard is different.
2. the method according to claim 1, wherein described when first traffic load is less than or equal to first in advance If when traffic load, the first network equipment controls second network equipment carrier wave shutdown, comprising:
When first traffic load is less than or equal to the load of the first pre-set business and duration more than or equal to the first preset duration When, the first network equipment controls second network equipment carrier wave shutdown.
3. method according to claim 1 or 2, which is characterized in that further include:
The first network equipment obtains the second traffic load of the third network equipment;
When second traffic load is more than or equal to the second pre-set business load, the first network equipment control described second Network equipment carrier wave is opened.
4. method according to claim 1 or 2, which is characterized in that the first network equipment obtains second network equipment The first traffic load, comprising:
The first network equipment sends the first traffic load request message to second network equipment;
The first network equipment receives first traffic load that second network equipment is sent.
5. method according to claim 1 or 2, which is characterized in that second network equipment is the base station in 5G network, The third network equipment is the base station in long term evolution LTE network.
6. the method according to claim 1, wherein it is characterized in that, described in first network equipment control The shutdown of second network equipment carrier wave, comprising:
The first network equipment sends carrier wave to second network equipment and turns off message, and the carrier wave shutdown message is for referring to Show that second network equipment executes carrier wave shutdown operation.
7. according to the method described in claim 3, it is characterized in that, which is characterized in that described in first network equipment control Second network equipment carrier wave is opened, comprising:
The first network equipment sends carrier wave to second network equipment and opens message, and the carrier wave opens message and is used for institute It states second network equipment and executes carrier wave opening operation.
8. a kind of energy-saving control device characterized by comprising
Module is obtained, for obtaining the first traffic load of second network equipment, first traffic load is second net The traffic load communicated between network equipment and at least one terminal device;
Control module, for controlling second net when first traffic load is less than or equal to the first pre-set business load The shutdown of network equipment carrier wave;
Wherein, second network equipment is the auxiliary service network apparatus of at least one terminal device, it is described at least one The main service network apparatus of terminal device is the third network equipment;Second network equipment is logical with the third network equipment Believe that standard is different.
9. a kind of network equipment characterized by comprising memory, processor and computer program instructions;
The memory stores the computer program instructions;
The processor executes the computer program instructions, to execute method as described in any one of claim 1 to 7.
10. a kind of readable storage medium storing program for executing characterized by comprising program;
Described program is when being executed by processor, to execute method as described in any one of claim 1 to 7.
CN201910485860.1A 2019-06-05 2019-06-05 Energy-saving control method, energy-saving control device, network equipment and storage medium Active CN110213812B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910485860.1A CN110213812B (en) 2019-06-05 2019-06-05 Energy-saving control method, energy-saving control device, network equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910485860.1A CN110213812B (en) 2019-06-05 2019-06-05 Energy-saving control method, energy-saving control device, network equipment and storage medium

Publications (2)

Publication Number Publication Date
CN110213812A true CN110213812A (en) 2019-09-06
CN110213812B CN110213812B (en) 2022-01-25

Family

ID=67790958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910485860.1A Active CN110213812B (en) 2019-06-05 2019-06-05 Energy-saving control method, energy-saving control device, network equipment and storage medium

Country Status (1)

Country Link
CN (1) CN110213812B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110856209A (en) * 2019-11-19 2020-02-28 珠海格力电器股份有限公司 Method, apparatus and storage medium for displaying network sign
CN111885685A (en) * 2020-07-22 2020-11-03 中国联合网络通信集团有限公司 Energy-saving method and device for 5G base station, electronic equipment and storage medium
CN112492673A (en) * 2020-11-23 2021-03-12 深圳市飞尚众成科技有限公司 Energy-saving method of 5G base station
WO2021078050A1 (en) * 2019-10-24 2021-04-29 中兴通讯股份有限公司 Signal display method and apparatus, and terminal device
CN112996048A (en) * 2021-03-05 2021-06-18 中国联合网络通信集团有限公司 Power-off control method and device
WO2021189368A1 (en) * 2020-03-26 2021-09-30 Oppo广东移动通信有限公司 Method for reporting release of secondary cell group, and terminal device
CN113573394A (en) * 2021-07-29 2021-10-29 中国联合网络通信集团有限公司 Control method and device
CN114143859A (en) * 2020-09-03 2022-03-04 中国移动通信集团浙江有限公司 Network energy saving method and device, computing equipment and computer storage medium
CN114173400A (en) * 2020-09-11 2022-03-11 中国联合网络通信集团有限公司 Energy-saving method, device and equipment for network equipment
CN114286426A (en) * 2020-09-27 2022-04-05 中国电信股份有限公司 Base station control method, server and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104618956A (en) * 2015-01-12 2015-05-13 中国联合网络通信集团有限公司 Method and device for controlling cell
CN104796930A (en) * 2014-01-17 2015-07-22 中兴通讯股份有限公司 Cell processing method and device
CN105519167A (en) * 2013-07-04 2016-04-20 韩国电子通信研究院 Control method for supporting multiple connections in mobile communication system and apparatus for supporting multiple connections
CN106664734A (en) * 2014-08-08 2017-05-10 Lg 电子株式会社 Method and apparatus for performing autonomous denial for dual connectivity in wireless communication system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105519167A (en) * 2013-07-04 2016-04-20 韩国电子通信研究院 Control method for supporting multiple connections in mobile communication system and apparatus for supporting multiple connections
CN104796930A (en) * 2014-01-17 2015-07-22 中兴通讯股份有限公司 Cell processing method and device
CN106664734A (en) * 2014-08-08 2017-05-10 Lg 电子株式会社 Method and apparatus for performing autonomous denial for dual connectivity in wireless communication system
US20170245199A1 (en) * 2014-08-08 2017-08-24 Lg Electronics Inc. Method and apparatus for performing autonomous denial for dual connectivity in wireless communication system
CN104618956A (en) * 2015-01-12 2015-05-13 中国联合网络通信集团有限公司 Method and device for controlling cell

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021078050A1 (en) * 2019-10-24 2021-04-29 中兴通讯股份有限公司 Signal display method and apparatus, and terminal device
CN110856209A (en) * 2019-11-19 2020-02-28 珠海格力电器股份有限公司 Method, apparatus and storage medium for displaying network sign
CN110856209B (en) * 2019-11-19 2021-06-15 珠海格力电器股份有限公司 Method, apparatus and storage medium for displaying network sign
WO2021189368A1 (en) * 2020-03-26 2021-09-30 Oppo广东移动通信有限公司 Method for reporting release of secondary cell group, and terminal device
CN111885685A (en) * 2020-07-22 2020-11-03 中国联合网络通信集团有限公司 Energy-saving method and device for 5G base station, electronic equipment and storage medium
CN114143859A (en) * 2020-09-03 2022-03-04 中国移动通信集团浙江有限公司 Network energy saving method and device, computing equipment and computer storage medium
CN114143859B (en) * 2020-09-03 2024-03-19 中国移动通信集团浙江有限公司 Network energy saving method, device, computing equipment and computer storage medium
CN114173400A (en) * 2020-09-11 2022-03-11 中国联合网络通信集团有限公司 Energy-saving method, device and equipment for network equipment
CN114173400B (en) * 2020-09-11 2023-05-16 中国联合网络通信集团有限公司 Energy saving method, device and equipment of network equipment
CN114286426A (en) * 2020-09-27 2022-04-05 中国电信股份有限公司 Base station control method, server and system
CN112492673A (en) * 2020-11-23 2021-03-12 深圳市飞尚众成科技有限公司 Energy-saving method of 5G base station
CN112996048A (en) * 2021-03-05 2021-06-18 中国联合网络通信集团有限公司 Power-off control method and device
CN112996048B (en) * 2021-03-05 2023-03-14 中国联合网络通信集团有限公司 Power-off control method and device
CN113573394A (en) * 2021-07-29 2021-10-29 中国联合网络通信集团有限公司 Control method and device
CN113573394B (en) * 2021-07-29 2022-09-27 中国联合网络通信集团有限公司 Control method and device

Also Published As

Publication number Publication date
CN110213812B (en) 2022-01-25

Similar Documents

Publication Publication Date Title
CN110213812A (en) Energy-saving control method, device, the network equipment and storage medium
CN107770794B (en) Network slice configuration method and device
CN102741898B (en) The communication means of a kind of electrical gateway and electrical gateway
CN108811153A (en) Communication means, centralized unit, distributed unit, base station and terminal device
CN104137637B (en) A kind of business transmitting method, equipment, readable storage medium storing program for executing and system
EP2485557A1 (en) Method and system for coordinated scheduling based on cell priority
CN104350785A (en) Mobile communication network distribution system and mobile communication network distribution method
CN108307449B (en) A kind of processing method and equipment of RB rank qos parameter
CN108156628A (en) A kind of method, apparatus and system of resource allocation
CN105406978A (en) Method and apparatus for configuring operating mode of data forwarding device
CN108307512A (en) A kind of restoration methods and device of connected state
CN108696911A (en) A kind of selection method and device of data transmission of internet of things mode
CN104080153A (en) Access point selection method, user equipment and system
CN107708194A (en) A kind of message filtering method and device, terminal and readable storage medium storing program for executing
CN108462596A (en) SLA decomposition methods, equipment and system
CN103563438B (en) Communication means, device and system
CN112804086A (en) 5G network slice end-to-end pull-through method and device
CN106211346A (en) Merge the application data activity from multiple application
CN102480774B (en) Method for eliminating system interference, apparatus thereof, and terminal thereof
CN110324390A (en) A kind of cut-in method, platform of internet of things, application apparatus, service equipment
Chen et al. An energy efficient sleep scheduling considering QoS diversity for IEEE 802.16 e wireless networks
CN108076529A (en) A kind of method for transmitting uplink data, terminal and network side equipment
CN114079927B (en) Control method for sharing mode of base station, sharing base station and communication system
CN105474732B (en) Apparatus control method, equipment and system under a kind of centralization baseband pool framework
CN103747432B (en) Carrying out uplink pre-scheduling processing method, device and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant