CN110136517A - Open-hole logging analogy method - Google Patents

Open-hole logging analogy method Download PDF

Info

Publication number
CN110136517A
CN110136517A CN201910291064.4A CN201910291064A CN110136517A CN 110136517 A CN110136517 A CN 110136517A CN 201910291064 A CN201910291064 A CN 201910291064A CN 110136517 A CN110136517 A CN 110136517A
Authority
CN
China
Prior art keywords
logging
well
instrument
setting
open
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910291064.4A
Other languages
Chinese (zh)
Inventor
方玮
何志敏
周瑞东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Petroleum Equipment Simulation Technology Ltd By Share Ltd
Southwest Petroleum University
Original Assignee
Chengdu Petroleum Equipment Simulation Technology Ltd By Share Ltd
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Petroleum Equipment Simulation Technology Ltd By Share Ltd, Southwest Petroleum University filed Critical Chengdu Petroleum Equipment Simulation Technology Ltd By Share Ltd
Priority to CN201910291064.4A priority Critical patent/CN110136517A/en
Publication of CN110136517A publication Critical patent/CN110136517A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Processing Or Creating Images (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of open-hole logging analogy method, include the following steps: the preparation stage of logging well, logging equipment is installed and carries out parameter setting;Modeling logging process obtains log data;Well logging ends processing, and analog meter goes out well and well head disassembly.The present invention is arranged instrument string by the logging tasks that central control computer selects and combines, and pass through the realtime three dimensional animation mode display scene scene synchronous with operation operating condition, simulation training is carried out before actual job to logging operation personnel, operating personnel is set to familiarize operating procedure, operating efficiency is improved, work accident incidence is reduced.

Description

Open-hole logging analogy method
Technical field
The present invention relates to well logging field more particularly to open-hole logging analogy methods.
Background technique
Open-hole logging is that the well logging carried out when being full of drilling fluid or other fluids in not cased open hole well is made Industry.The well of all new brills will carry out open-hole logging without special circumstances.Open-hole logging measures in reservoir or payzone along pit shaft Various information, each stage for oil-gas exploration and exploitation provides relevant information.With new technology, new process, new material Emergence and development, complete logging equipment function is stronger and stronger, and timeliness is higher and higher, but its operation difficulty is also increasing.Newly The logging operation personnel of registration often lack the experience of practical operation, it is therefore desirable to logging operation personnel carry out actual job it Preceding carry out simulation training.
Summary of the invention
It is an object of the present invention in view of the above-mentioned problems, propose open-hole logging analogy method.
Open-hole logging analogy method, includes the following steps:
S1: the well logging preparation stage installs logging equipment and carries out parameter setting;
S2: modeling logging process obtains log data;
S3: well logging ends processing, and analog meter goes out well and well head disassembly.
The step S1 includes following sub-step:
S11: main control computer connects ground instrument, selection well logging content;
S12: large screen plays logging equipment installation process;
S13: operator connects instrument, and carries out preceding setting of logging well;
S14: equipment placement places marking apparatus in well head, adjusts mud guard.
The step S2 includes following sub-step:
S21: winchman operates winch and simulates console, and simulation decentralization instrument is to locating;
S22: large screen display winch station visual angle and downhole instrument follow visual angle;
S23: winchman is upper to be mentioned instrument and logs well;
S24: operator's display data on the screen acquires the data and curves of equipment acquisition;
S25: mentioning chance card on instrument, winchman carries out unfreezing operation according to Card Type is met.
Further, open-hole logging analogy method, setting includes that teams and groups' training setting and instrument are set before the well logging Standby setting;
Teams and groups' training setting includes that failure investigates point setting, the setting of naked eye well information, formation information setting, is used for modeling logging ring Border;
Instrument and equipment setting, including the setting of LINEAR CONTINUOUS data acquisition equipment and downhole instrument string combination settings, are adopted for simulating Collect equipment and downhole instrument.
Further, open-hole logging analogy method, the visual angle are to receive main control computer by graphic computer Data, and according to the operation drawing three-dimensional real-time animation of student, and be sent to projector, be presented on large screen.
Further, open-hole logging analogy method, the well logging end processing to play instrument and go out well and well head is torn open Unload animation.
Beneficial effects of the present invention: the present invention is arranged instrument string by the logging tasks that central control computer selects and combines, and Through the realtime three dimensional animation mode display scene scene synchronous with operation operating condition, to logging operation personnel before actual job Simulation training is carried out, operating personnel is made to familiarize operating procedure, improves operating efficiency, reduces work accident incidence.
Detailed description of the invention
Fig. 1 is open-hole logging analogy method flow diagram.
Specific embodiment
For a clearer understanding of the technical characteristics, objects and effects of the present invention, this hair of Detailed description of the invention is now compareed Bright specific embodiment
Open-hole logging analogy method, includes the following steps:
S1: the well logging preparation stage installs logging equipment and carries out parameter setting;
S2: modeling logging process obtains log data;
S3: well logging ends processing, and analog meter goes out well and well head disassembly.
The step S1 includes following sub-step:
S11: main control computer connects ground instrument, selection well logging content;
S12: large screen plays logging equipment installation process;
S13: operator connects instrument, and carries out preceding setting of logging well;
S14: equipment placement places marking apparatus in well head, adjusts mud guard.
The step S2 includes following sub-step:
S21: winchman operates winch and simulates console, and simulation decentralization instrument is to locating;
S22: large screen display winch station visual angle and downhole instrument follow visual angle;
S23: winchman is upper to be mentioned instrument and logs well;
S24: operator's display data on the screen acquires the data and curves of equipment acquisition;
S25: mentioning chance card on instrument, winchman carries out unfreezing operation according to Card Type is met.
In the present embodiment, open-hole logging analogy method, setting includes teams and groups' training setting and instrument before the well logging Equipment setting.
Teams and groups' training setting includes that failure investigates point setting, the setting of naked eye well information, formation information setting, is surveyed for simulating Well environment;The failures such as the failure is investigated point and is set as in operating process, and the settable winch chance of teacher blocks, is hampered;The stratum Information includes effective pay thickiness, porosity, hydrocarbon saturation and permeability.
Instrument and equipment setting, including the setting of LINEAR CONTINUOUS data acquisition equipment and downhole instrument string combination settings, are used for mould Quasi- acquisition equipment and downhole instrument;The acquisition equipment setting includes setting device shifting value, state value and minimax control Value;The instrument string combination settings are combined according to the logging tasks setting instrument string of central control computer setting.
In the present embodiment, open-hole logging analogy method, the visual angle is to receive master control by graphic computer to calculate The data of machine, and according to the operation drawing three-dimensional real-time animation of student, and it is sent to projector, it is presented on large screen.
In the present embodiment, open-hole logging analogy method, the well logging ends processing to play instrument and go out well and well head Dismantle animation.
The present invention is arranged instrument string by the logging tasks that central control computer selects and combines, and by synchronous with operation operating condition Realtime three dimensional animation mode display scene scene, simulation training is carried out before actual job to logging operation personnel, makes to make Industry personnel familiarize operating procedure, improve operating efficiency, reduce work accident incidence.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (6)

1. open-hole logging analogy method, which comprises the steps of:
S1: the well logging preparation stage installs logging equipment and carries out parameter setting;
S2: modeling logging process obtains log data;
S3: well logging ends processing, and analog meter goes out well and well head disassembly.
2. open-hole logging analogy method according to claim 1, which is characterized in that the step S1 includes following son Step:
S11: main control computer connects ground instrument, selection well logging content;
S12: large screen plays logging equipment installation process;
S13: operator connects instrument, and carries out preceding setting of logging well;
S14: equipment placement places marking apparatus in well head, adjusts mud guard.
3. open-hole logging analogy method according to claim 1, which is characterized in that the step S2 includes following son Step:
S21: winchman operates winch and simulates console, and simulation decentralization instrument is to locating;
S22: large screen display winch station visual angle and downhole instrument follow visual angle;
S23: winchman is upper to be mentioned instrument and logs well;
S24: operator's display data on the screen acquires the data and curves of equipment acquisition;
S25: mentioning chance card on instrument, winchman carries out unfreezing operation according to Card Type is met.
4. open-hole logging analogy method according to claim 2, which is characterized in that setting includes class before the well logging Group training setting and instrument and equipment setting;
Teams and groups' training setting includes that failure investigates point setting, the setting of naked eye well information, formation information setting, is used for modeling logging ring Border;
Instrument and equipment setting, including the setting of LINEAR CONTINUOUS data acquisition equipment and downhole instrument string combination settings, are adopted for simulating Collect equipment and downhole instrument.
5. open-hole logging analogy method according to claim 3, which is characterized in that the visual angle is by figure meter Calculation machine receives the data of main control computer, and according to the operation drawing three-dimensional real-time animation of student, and is sent to projector, presents On large screen.
6. open-hole logging analogy method according to claim 1, which is characterized in that the well logging ends processing to broadcast It puts instrument and goes out well and well head disassembly animation.
CN201910291064.4A 2019-04-11 2019-04-11 Open-hole logging analogy method Pending CN110136517A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910291064.4A CN110136517A (en) 2019-04-11 2019-04-11 Open-hole logging analogy method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910291064.4A CN110136517A (en) 2019-04-11 2019-04-11 Open-hole logging analogy method

Publications (1)

Publication Number Publication Date
CN110136517A true CN110136517A (en) 2019-08-16

Family

ID=67569624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910291064.4A Pending CN110136517A (en) 2019-04-11 2019-04-11 Open-hole logging analogy method

Country Status (1)

Country Link
CN (1) CN110136517A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102536197A (en) * 2012-01-16 2012-07-04 中国石油大学(华东) Multifunctional induction logging simulated experiment teaching system
CN102646360A (en) * 2012-02-28 2012-08-22 吉林大学 Logging process experiment teaching demonstration device and demonstration method
CN103198748A (en) * 2013-04-11 2013-07-10 中国石油大学(华东) Multifunctional resistivity log experimental device
CN204229746U (en) * 2014-11-18 2015-03-25 西安科技大学 A kind of geophysical well logging experiment device for teaching
CN204242509U (en) * 2014-11-12 2015-04-01 西安科技大学 A kind of geophysical well logging teaching experiment system
CN204288664U (en) * 2014-11-24 2015-04-22 西安科技大学 A kind of resistivity logging flume experiment device affected by country rock and thickness
CN204614347U (en) * 2015-05-09 2015-09-02 吉林大学 A kind of well logging teaching demonstrating board
US9810042B1 (en) * 2014-04-16 2017-11-07 Schlumberger Technology Corporation Oil well simulation tool
CN108470497A (en) * 2018-04-27 2018-08-31 长江大学 A kind of ultrasonic image logging experimental provision containing two-dimentional slip scan platform
CN108694258A (en) * 2017-04-10 2018-10-23 中国石油化工股份有限公司 Drilling well underground dummy emulation method and system for arrangement and method for construction preview optimization

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102536197A (en) * 2012-01-16 2012-07-04 中国石油大学(华东) Multifunctional induction logging simulated experiment teaching system
CN102646360A (en) * 2012-02-28 2012-08-22 吉林大学 Logging process experiment teaching demonstration device and demonstration method
CN103198748A (en) * 2013-04-11 2013-07-10 中国石油大学(华东) Multifunctional resistivity log experimental device
US9810042B1 (en) * 2014-04-16 2017-11-07 Schlumberger Technology Corporation Oil well simulation tool
CN204242509U (en) * 2014-11-12 2015-04-01 西安科技大学 A kind of geophysical well logging teaching experiment system
CN204229746U (en) * 2014-11-18 2015-03-25 西安科技大学 A kind of geophysical well logging experiment device for teaching
CN204288664U (en) * 2014-11-24 2015-04-22 西安科技大学 A kind of resistivity logging flume experiment device affected by country rock and thickness
CN204614347U (en) * 2015-05-09 2015-09-02 吉林大学 A kind of well logging teaching demonstrating board
CN108694258A (en) * 2017-04-10 2018-10-23 中国石油化工股份有限公司 Drilling well underground dummy emulation method and system for arrangement and method for construction preview optimization
CN108470497A (en) * 2018-04-27 2018-08-31 长江大学 A kind of ultrasonic image logging experimental provision containing two-dimentional slip scan platform

Similar Documents

Publication Publication Date Title
CN108694258B (en) Drilling underground virtual simulation method and system for construction scheme rehearsal optimization
CA2675531C (en) System and method for performing oilfield drilling operations using visualization techniques
US20120274664A1 (en) Mobile Device Application for Oilfield Data Visualization
EP2575089A1 (en) Customizable user interface for real-time oilfield data visualization
US8199166B2 (en) Visualization techniques for oilfield operations
US8346695B2 (en) System and method for multiple volume segmentation
US8701012B1 (en) Computer readable medium for creating a near real time well log
US8614713B1 (en) Computer implemented method to create a near real time well log
CA2839340C (en) System for creating a near real time well log
AU9073901A (en) System and method for attaching drilling information to three-dimensional visualizations of earth models
CN102031956B (en) Built-in method of oil deposit physical model mineshaft
CN101710468B (en) Method for simulating pressure control for drilling simulator
CN104658040A (en) Method and device for achieving three-dimensional landform modeling by using BIM
CN101710465A (en) Method for simulating drilling tool lifting for drilling simulator
CN101710467A (en) Method for simulating overflow for drilling simulator
US9599742B1 (en) System for creating a near real time surface log
US9598949B1 (en) System for creating a near real time surface log
CN110136517A (en) Open-hole logging analogy method
CN104637362A (en) Drilling simulation system and method based on non-sequencing operation mode
CN204808639U (en) Land rig virtual assembly system
CN110111625A (en) Open-hole logging simulation system software platform
SA03240387B1 (en) A method and system for supplying well log data to a customer
US11719855B2 (en) Volumetric well production user interface components
CN104575151A (en) Land drilling rig virtual assembling system
CN106537189A (en) Transmitting collision alarms to a remote device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190816