CN110130660A - A kind of assembled architecture execution management method therefor and system based on hologram - Google Patents

A kind of assembled architecture execution management method therefor and system based on hologram Download PDF

Info

Publication number
CN110130660A
CN110130660A CN201910313659.5A CN201910313659A CN110130660A CN 110130660 A CN110130660 A CN 110130660A CN 201910313659 A CN201910313659 A CN 201910313659A CN 110130660 A CN110130660 A CN 110130660A
Authority
CN
China
Prior art keywords
assembled architecture
hologram
target
prefabricated components
mathematical model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910313659.5A
Other languages
Chinese (zh)
Inventor
朱宝
余龙
林秋怡
徐邹影
王先恕
谭启明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chuzhou Vocational and Technical College
Original Assignee
Chuzhou Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuzhou Vocational and Technical College filed Critical Chuzhou Vocational and Technical College
Priority to CN201910313659.5A priority Critical patent/CN110130660A/en
Publication of CN110130660A publication Critical patent/CN110130660A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of assembled architecture execution management method therefor and system based on hologram, this method comprises: establishing the mathematical model of target assembled architecture;The mathematical model of target assembled architecture is converted to the hologram signal of target assembled architecture;The hologram of target assembled architecture is projected in the construction site of assembled architecture according to the hologram signal of target assembled architecture, auxiliary construction worker carries out prefabricated components assembly, so, by the hologram for projecting target assembled architecture in the construction site of assembled architecture, it is referred to construction worker one, auxiliary construction worker carries out prefabricated components positioning in the assembling process of assembled architecture, it installs, setting-out, reduce rigging error, to avoid the later period to the correction work amount of prefabricated components, with the working time of less construction worker and labor intensity, improve the benefit of assembled architecture enterprise.

Description

A kind of assembled architecture execution management method therefor and system based on hologram
Technical field
The present invention relates to line holographic projections technical fields more particularly to a kind of assembled architecture based on hologram to construct and manage Manage method and system.
Background technique
Line holographic projections technology belongs to one kind of 3D technology, refers to that simultaneously reconstructed object is true using interference and diffraction principle record The technology of 3-D image, hologram technology are to show the technology of 3-D image using interference and diffraction principle, reproduction it is complete Retire into private life as being further processed, removes digital interference, obtain clearly image.
On the other hand, assembled architecture refers to based on the prefabricated components of use the factorial production, by site-assembled The structure class building construction of mode design-build is assembled up prefabricated components using various reliable connection types.However, dress With formula building during prefabricated components, prefabricated components assembly majority of case is that manual operation is assembled after worker sees drawing, is held Easily there is rigging error, and then increases working time and the labor intensity of construction worker.
Summary of the invention
Technical problems based on background technology, the invention proposes a kind of assembled architectures based on hologram to apply Work management method and system;
A kind of assembled architecture execution management method therefor based on hologram proposed by the present invention, comprising:
Establish the mathematical model of target assembled architecture;
The mathematical model of target assembled architecture is converted to the hologram signal of target assembled architecture;
Target assembled is projected in the construction site of assembled architecture according to the hologram signal of target assembled architecture The hologram of building, auxiliary construction worker carry out prefabricated components assembly.
Preferably, the auxiliary construction worker carries out prefabricated components assembly, specifically includes: auxiliary construction worker carries out prefabricated Component positions, installs, setting-out.
A kind of assembled architecture construction management system based on hologram, comprising:
Mathematical model constructs module, for establishing the mathematical model of target assembled architecture;
Signal conversion module, for the mathematical model of target assembled architecture to be converted to the holography of target assembled architecture Video signal;
Projection module, for being thrown according to the hologram signal of target assembled architecture in the construction site of assembled architecture The hologram of target assembled architecture is penetrated, auxiliary construction worker carries out prefabricated components assembly.
Preferably, the projection module, is specifically used for: auxiliary construction worker carries out prefabricated components positioning, installs, setting-out.
The present invention initially sets up the mathematical model of target assembled architecture, and the mathematical model of target assembled architecture is turned It is changed to the hologram signal of target assembled architecture, then according to the hologram signal of target assembled architecture in assembled The hologram of the construction site projection target assembled architecture of building, auxiliary construction worker carry out prefabricated components assembly, in this way, It is auxiliary to construction worker one reference by projecting the hologram of target assembled architecture in the construction site of assembled architecture It helps construction worker to carry out prefabricated components positioning in the assembling process of assembled architecture, install, setting-out, reduces rigging error, from And the later period is avoided to the correction work amount of prefabricated components, with the working time of less construction worker and labor intensity, improve assembly The benefit of formula building enterprise.
Detailed description of the invention
Fig. 1 is a kind of process signal of assembled architecture execution management method therefor based on hologram proposed by the present invention Figure;
Fig. 2 is a kind of module signal of assembled architecture construction management system based on hologram proposed by the present invention Figure.
Specific embodiment
Referring to Fig.1, a kind of assembled architecture execution management method therefor based on hologram proposed by the present invention, comprising:
Establish the mathematical model of target assembled architecture.
The mathematical model of target assembled architecture is converted to the hologram signal of target assembled architecture.
Target assembled is projected in the construction site of assembled architecture according to the hologram signal of target assembled architecture The hologram of building, auxiliary construction worker carry out prefabricated components assembly.
In this step, auxiliary construction worker carries out prefabricated components assembly, specifically includes: auxiliary construction worker carries out prefabricated structure Part positions, installs, setting-out.
In concrete scheme, the mathematical model for needing the building assembled is constructed first, then translates into hologram Signal, and hologram is projected on the construction site for needing the building assembled, hologram is in the construction process as fixed Position installs, the foundation of setting-out, and auxiliary construction worker assembles, and can simultaneously serve as the foundation of prefabricated components production, and auxiliary is applied The production of work worker progress prefabricated components.
Referring to Fig. 2, a kind of assembled architecture construction management system based on hologram proposed by the present invention, comprising:
Mathematical model constructs module, for establishing the mathematical model of target assembled architecture;
Signal conversion module, for the mathematical model of target assembled architecture to be converted to the holography of target assembled architecture Video signal;
Projection module, for being thrown according to the hologram signal of target assembled architecture in the construction site of assembled architecture The hologram of target assembled architecture is penetrated, auxiliary construction worker carries out prefabricated components assembly.
Projection module is specifically used for: auxiliary construction worker carries out prefabricated components positioning, installs, setting-out.
In concrete scheme, the mathematical model for needing the building assembled is constructed first, then translates into hologram Signal, and hologram is projected on the construction site for needing the building assembled, hologram is in the construction process as fixed Position installs, the foundation of setting-out, and auxiliary construction worker assembles, and can simultaneously serve as the foundation of prefabricated components production, and auxiliary is applied The production of work worker progress prefabricated components.
Present embodiment initially sets up the mathematical model of target assembled architecture, and by the digital mould of target assembled architecture Type is converted to the hologram signal of target assembled architecture, is then being filled according to the hologram signal of target assembled architecture The hologram of construction site projection target assembled architecture with formula building, auxiliary construction worker carry out prefabricated components assembly, In this way, by the hologram for projecting target assembled architecture in the construction site of assembled architecture, to construction worker one ginseng It examines, auxiliary construction worker carries out prefabricated components positioning in the assembling process of assembled architecture, installs, setting-out, reduces assembly and misses Difference, so that the later period be avoided to improve the correction work amount of prefabricated components with the working time of less construction worker and labor intensity The benefit of assembled architecture enterprise.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (4)

1. a kind of assembled architecture execution management method therefor based on hologram characterized by comprising
Establish the mathematical model of target assembled architecture;
The mathematical model of target assembled architecture is converted to the hologram signal of target assembled architecture;
Target assembled architecture is projected in the construction site of assembled architecture according to the hologram signal of target assembled architecture Hologram, auxiliary construction worker carry out prefabricated components assembly.
2. the assembled architecture execution management method therefor according to claim 1 based on hologram, which is characterized in that described Auxiliary construction worker carries out prefabricated components assembly, specifically includes: auxiliary construction worker carries out prefabricated components positioning, installs, setting-out.
3. a kind of assembled architecture construction management system based on hologram characterized by comprising
Mathematical model constructs module, for establishing the mathematical model of target assembled architecture;
Signal conversion module, for the mathematical model of target assembled architecture to be converted to the hologram of target assembled architecture Signal;
Projection module, for projecting mesh in the construction site of assembled architecture according to the hologram signal of target assembled architecture The hologram of assembled architecture is marked, auxiliary construction worker carries out prefabricated components assembly.
4. the assembled architecture construction management system according to claim 3 based on hologram, which is characterized in that described Projection module is specifically used for: auxiliary construction worker carries out prefabricated components positioning, installs, setting-out.
CN201910313659.5A 2019-04-18 2019-04-18 A kind of assembled architecture execution management method therefor and system based on hologram Pending CN110130660A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910313659.5A CN110130660A (en) 2019-04-18 2019-04-18 A kind of assembled architecture execution management method therefor and system based on hologram

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910313659.5A CN110130660A (en) 2019-04-18 2019-04-18 A kind of assembled architecture execution management method therefor and system based on hologram

Publications (1)

Publication Number Publication Date
CN110130660A true CN110130660A (en) 2019-08-16

Family

ID=67570198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910313659.5A Pending CN110130660A (en) 2019-04-18 2019-04-18 A kind of assembled architecture execution management method therefor and system based on hologram

Country Status (1)

Country Link
CN (1) CN110130660A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111428082A (en) * 2020-03-10 2020-07-17 广东技术师范大学天河学院 Building construction video guidance method and system based on holographic image technology
CN111951398A (en) * 2020-07-27 2020-11-17 中建三局第二建设工程有限责任公司 Intelligent lofting construction method based on unmanned aerial vehicle oblique image technology
CN112097070A (en) * 2020-07-22 2020-12-18 南京工业大学 Auxiliary device and method for producing prefabricated parts of assembly type building with movable portal frame

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102013007070A1 (en) * 2013-04-23 2014-10-23 Gerhard Führer Holographically assisted creation of objects
CN105446069A (en) * 2016-01-07 2016-03-30 江苏建筑职业技术学院 BIM-based holographic imaging full-decoration simulation display method and display system
CN107863049A (en) * 2017-11-14 2018-03-30 湖北聚注通用技术研究有限公司 A kind of finishing outpost display system based on line holographic projections technology
CN108683848A (en) * 2018-05-15 2018-10-19 中国十七冶集团有限公司 A kind of 720 ° of panorama construction methods based on BIM+MR
EP3457253A1 (en) * 2017-09-15 2019-03-20 Trimble Inc. Collaboration methods to improve use of 3d models in mixed reality environments

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102013007070A1 (en) * 2013-04-23 2014-10-23 Gerhard Führer Holographically assisted creation of objects
CN105446069A (en) * 2016-01-07 2016-03-30 江苏建筑职业技术学院 BIM-based holographic imaging full-decoration simulation display method and display system
EP3457253A1 (en) * 2017-09-15 2019-03-20 Trimble Inc. Collaboration methods to improve use of 3d models in mixed reality environments
CN107863049A (en) * 2017-11-14 2018-03-30 湖北聚注通用技术研究有限公司 A kind of finishing outpost display system based on line holographic projections technology
CN108683848A (en) * 2018-05-15 2018-10-19 中国十七冶集团有限公司 A kind of 720 ° of panorama construction methods based on BIM+MR

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111428082A (en) * 2020-03-10 2020-07-17 广东技术师范大学天河学院 Building construction video guidance method and system based on holographic image technology
CN112097070A (en) * 2020-07-22 2020-12-18 南京工业大学 Auxiliary device and method for producing prefabricated parts of assembly type building with movable portal frame
CN111951398A (en) * 2020-07-27 2020-11-17 中建三局第二建设工程有限责任公司 Intelligent lofting construction method based on unmanned aerial vehicle oblique image technology

Similar Documents

Publication Publication Date Title
CN110130660A (en) A kind of assembled architecture execution management method therefor and system based on hologram
CN104102765A (en) BIM (Building Information Modeling)-based curtain wall parametrization design method
CN111119480A (en) Assembly type building panoramic construction management method based on BIM + MR technology
CN101799754A (en) Method and system for developing web application
CN114417466A (en) BIM-based electromechanical system assembling and managing method, system, storage medium and equipment
WO2022222432A1 (en) Bim-based dynamic and intelligent building lifecycle management system and method
US20080082214A1 (en) Method for animating a robot
CN104281753A (en) Two-dimension and three-dimension integration based transmission line corridor parameterized building method and system
CN111625971A (en) Assembling method for prefabricated components of assembled concrete bridge
CN107092764A (en) A kind of concrete assembled construction method based on BIM
EP1530128A3 (en) Method and system for installing software in a network
CN103745067A (en) Power generator stator end parameterization automatic modeling system and method
CN116341069A (en) BIM-based construction method for optimizing efficient collection, water storage and water storage of rainwater in artificial lake
CN106874014B (en) Three-layer code generation method based on model and framework
CN116186821A (en) AI (automatic construction) automatic construction method based on BIM (building information modeling) technology
Piaia et al. Plug-and-Play and innovative process technologies (Mapping/Modelling/Making/Monitoring) in deep renovation interventions
CN109284935A (en) A kind of task processing system based on micro- assistance the superior and the subordinate office group
CN115526988A (en) Special-shaped pipeline template manufacturing and installing method based on BIM model
Xu et al. Study on construction planning for bridge structure based on BIM technology
CN113742824A (en) Lightweight steel structure smart collaborative design cloud platform and operation method thereof
CN111460671A (en) Construction management and control method combining BIM simulation and environmental conditions
Bocciarelli et al. A Methodological Template for Model Driven Systems Engineering.
CN117034409A (en) Ancient tower construction method based on BIM+three-dimensional laser scanning technology
CN204754442U (en) Precast prestressed enclosure subassembly
CN115081086A (en) Optimization method of independent support system of casting belt based on BIM technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190816