CN110012535A - Tracing section updating cycle determination method, user equipment and network side equipment - Google Patents
Tracing section updating cycle determination method, user equipment and network side equipment Download PDFInfo
- Publication number
- CN110012535A CN110012535A CN201810009466.6A CN201810009466A CN110012535A CN 110012535 A CN110012535 A CN 110012535A CN 201810009466 A CN201810009466 A CN 201810009466A CN 110012535 A CN110012535 A CN 110012535A
- Authority
- CN
- China
- Prior art keywords
- tau
- period
- tau period
- user equipment
- network side
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W60/00—Affiliation to network, e.g. registration; Terminating affiliation with the network, e.g. de-registration
- H04W60/02—Affiliation to network, e.g. registration; Terminating affiliation with the network, e.g. de-registration by periodical registration
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The present invention provides a kind of tracing section updating cycle determination method, user equipment and network side equipment, is related to field of communication technology.This method comprises: sending for the first tracing section updating TAU period to network side equipment, the first TAU period was greater than the data transmitting period of user equipment;Receive the 2nd TAU period that network side equipment is sent;If the first TAU period is different from the 2nd TAU period, the target TAU period of the user equipment is issued to network side equipment request, the target TAU period is greater than the data transmitting period.The problem of the solution of the present invention solves in available data transmission flow, exists simultaneously TAU process, the power consumption for the user equipment for having demand to long continuation of the journey will be made to increase, influence the use of user equipment.
Description
Technical field
The present invention relates to field of communication technology, particularly relate to a kind of tracing section updating cycle determination method, user equipment and
Network side equipment.
Background technique
In LTE (Long Term Evolution, long term evolution) system, for the location management convenient for user equipment (UE),
TA (Tracking Area, the concept of tracking area) is proposed, be defined as that UE do not need more new demand servicing moves freely area
Domain.TA function is the management realized to terminal location, can be divided into paging management and location updating management.Therefore, when mobile station by
When one TA is moved to another TA, it is necessary to location register is re-started on new TA, to notify network to be deposited to change her
The location information of the mobile station of storage, this process are exactly TAU (Tracking Area Update, tracing section updating).
And in TAU switching flow, the trigger condition of TAU is additionally provided with TAU timing in addition to UE the is moved to new region TA
Device, UE will initiate TAU process in TAU timer expiry.If UE needs to send data at this time, data transmission is also initiated
Process.In this way, existing simultaneously TAU process in data transmission flow, the function for the user equipment for having demand to long continuation of the journey will be made
Consumption increases, and influences the use of user equipment.
Summary of the invention
The object of the present invention is to provide a kind of tracing section updating cycle determination method, user equipment and network side equipments, lead to
It crosses and negotiates to obtain the new tracing section updating period with network side equipment, avoid additional TAU process from generating, set to reduce user
Standby power consumption.
In order to achieve the above objectives, the embodiment of the present invention provides a kind of tracing section updating cycle determination method, comprising:
Sent for the first tracing section updating TAU period to network side equipment, the data that the first TAU period was greater than user equipment are sent out
Send the period;
Receive the 2nd TAU period that network side equipment is sent;
If the first TAU period is different from the 2nd TAU period, issued to network side equipment request described
The target TAU period of user equipment, the target TAU period are greater than the data transmitting period.
Wherein, the step of sending the first tracing section updating TAU period to network side equipment, comprising:
According to the data transmitting period of user equipment, generated for the first TAU period;
TAU message or booting up attachment message are sent to network side equipment;Wherein, the TAU message or booting up attachment
Message carries the first TAU period.
Wherein, if the first TAU period is different from the 2nd TAU period, under network side equipment request
The step of target TAU period for sending out user equipment described, comprising:
The transmission TAU period negotiates request to ability open system;
It receives the network side equipment and the third that request generates is negotiated according to the TAU period that the ability open system forwards
TAU period, the 3rd TAU period are greater than the data transmitting period;
The 3rd TAU period is determined as to the target TAU period of the user equipment.
Wherein, the TAU period negotiation request packet include the user equipment device identification and the first TAU period.
Wherein, the method also includes:
If the first TAU period is identical as the 2nd TAU period, the first TAU period is determined as described
The target TAU period of user equipment.
In order to achieve the above objectives, the embodiments of the present invention also provide a kind of tracing section updating cycle determination methods, comprising:
The TAU period for receiving user equipment transmission negotiates request;
Negotiate request according to the TAU period, generated for the 3rd TAU period, the 3rd TAU period is greater than the user and sets
Standby data transmitting period;
The 3rd TAU period is sent to the user equipment.
Wherein, the TAU period for receiving the user equipment transmission negotiates the step of requesting, comprising:
The TAU period for receiving the user equipment transmission through capability development system forwards negotiates request;Wherein, described
TAU period negotiation request packet includes device identification and the first TAU period of the user equipment.
Wherein, the step of request being negotiated according to the TAU period, generating for the 3rd TAU period, comprising:
Based on preset TAU period generation strategy and the first TAU period, generated for the 3rd TAU period.
Wherein, the method also includes:
Before the TAU period for receiving the user equipment transmission negotiates request, pass through if receiving the user equipment
The first TAU period that TAU message or booting up attachment message are sent, then sending the preset 2nd TAU period sets to the user
It is standby.
In order to achieve the above objectives, the embodiments of the present invention also provide a kind of user equipment, including processor and transceiver,
Wherein,
For sending for the first tracing section updating TAU period to network side equipment, the first TAU period was greater than to be used the transceiver
The data transmitting period of family equipment;Receive the 2nd TAU period that network side equipment is sent;
If the processor is different from the 2nd TAU period for the first TAU period, set to the network side
Standby request issues the target TAU period of the user equipment, and the target TAU period is greater than the data transmitting period.
Wherein, the processor is also used to the data transmitting period according to network side equipment, generates for the first TAU period;
The transceiver is also used to send TAU message or booting up attachment message to network side equipment;Wherein, the TAU
Message or booting up attachment message carry the first TAU period.
Wherein, the transceiver is also used to send the TAU period and negotiates request to ability open system;Receive the network side
Equipment is negotiated the 3rd TAU period that request generates according to the TAU period that the ability open system forwards, and the described 3rd TAU weeks
Phase is greater than the data transmitting period;
The processor is also used to for being determined as in the 3rd TAU period target TAU period of the user equipment.
Wherein, the TAU period negotiation request packet include the user equipment device identification and the first TAU period.
It wherein, will be described if to be also used to the first TAU period identical as the 2nd TAU period for the processor
First TAU period was determined as the target TAU period of the user equipment.
In order to achieve the above objectives, the embodiments of the present invention also provide a kind of network side equipments, including processor and transmitting-receiving
Device, wherein
The TAU period that the transceiver is used to receive user equipment transmission negotiates request;
The processor is used to negotiate request according to the TAU period, generates the 3rd TAU period, the 3rd TAU period
Greater than the data transmitting period of the user equipment;
The transceiver is also used to the 3rd TAU period being sent to the user equipment.
Wherein, the transceiver is also used to receive TAU weeks of the transmission of the user equipment through capability development system forwards
Phase negotiates request;Wherein, the TAU period negotiation request packet includes device identification and the first TAU period of the user equipment.
Wherein, the processor is also used to generate based on preset TAU period generation strategy and the first TAU period
3rd TAU period.
Wherein, the transceiver is also used to before the TAU period for receiving the user equipment transmission negotiates request, if connecing
The first TAU period that the user equipment is sent by TAU message or booting up attachment message is received, then sends preset second
The TAU period is to the user equipment.
In order to achieve the above objectives, the embodiments of the present invention also provide a kind of user equipment, including transceiver, memory,
Processor and it is stored in the computer program that can be run on the memory and on the processor;The processor executes institute
The tracing section updating cycle determination method for being applied to user equipment as described above is realized when stating computer program.
In order to achieve the above objectives, the embodiments of the present invention also provide a kind of network side equipments, including transceiver, storage
Device, processor and it is stored in the computer program that can be run on the memory and on the processor;The processor is held
The tracing section updating cycle determination method for being applied to network side equipment as described above is realized when the row computer program.
In order to achieve the above objectives, it the embodiments of the present invention also provide a kind of computer readable storage medium, stores thereon
There is computer program, the tracking area for being applied to user equipment as described above is realized when the computer program is executed by processor
Update cycle determines the step in method.
In order to achieve the above objectives, it the embodiments of the present invention also provide a kind of computer readable storage medium, stores thereon
There is computer program, the tracking for being applied to network side equipment as described above is realized when the computer program is executed by processor
Area determines the step in method the update cycle.
The advantageous effects of the above technical solutions of the present invention are as follows:
Present invention method will send the first TAU period to the network side for being greater than its data transmitting period first and set
The TAU period that is standby, being currently applicable in the informing network side apparatus user equipment.Then the of network side equipment transmission will be received
Two TAU periods.Different from the 2nd TAU period in the first TAU period later, i.e., the TAU period set in network side equipment is not
When suitable for user equipment, user equipment will issue the target TAU period of the user equipment to network side equipment request.In this way,
User equipment can please look for novelty when the TAU period for recognizing that network side equipment has been set is not applicable to network side equipment
The TAU period, the TAU process when TAU period to avoid network side equipment from setting is less than data transmitting period outside amount incurred, thus
Reduce the power consumption of user equipment.
Detailed description of the invention
Fig. 1 be the embodiment of the present invention the tracing section updating cycle determination method applied to user equipment flow chart it
One;
Fig. 2 be the embodiment of the present invention the tracing section updating cycle determination method applied to user equipment flow chart it
Two;
Fig. 3 is the application schematic diagram of present invention method;
Fig. 4 is the flow chart of the tracing section updating cycle determination method applied to network side equipment of the embodiment of the present invention;
Fig. 5 is the structural schematic diagram of the user equipment of the embodiment of the present invention;
Fig. 6 is the structural schematic diagram of the network side equipment of the embodiment of the present invention;
Fig. 7 is the structural schematic diagram of the user equipment of another embodiment of the present invention;
Fig. 8 is the structural schematic diagram of the network side equipment of another embodiment of the present invention.
Specific embodiment
To keep the technical problem to be solved in the present invention, technical solution and advantage clearer, below in conjunction with attached drawing and tool
Body embodiment is described in detail.
There is user equipment power consumption and consumes biggish ask for TAU process is carried out in the transmission of existing data in the present invention
Topic, provides a kind of tracing section updating cycle determination method, obtains new tracing section updating week by negotiating with network side equipment
Phase avoids additional TAU process from generating, to reduce user equipment power consumption.
As shown in Figure 1, a kind of tracing section updating cycle determination method of the embodiment of the present invention, comprising:
Step 101, sent for the first tracing section updating TAU period to network side equipment, the first TAU period was greater than user equipment
Data transmitting period;
Step 102, the 2nd TAU period that network side equipment is sent is received;
Step 103, it if the first TAU period is different from the 2nd TAU period, is requested to the network side equipment
The target TAU period of the user equipment is issued, the target TAU period is greater than the data transmitting period.
101- step 103 through the above steps applies the tracing section updating cycle determination method of the embodiment of the present invention
User equipment will send the first TAU period for being greater than its data transmitting period to network side equipment, to accuse first such as step 101
Know the TAU period that the network side equipment user equipment is currently applicable in.And network side equipment is after receiving for the first TAU period,
The 2nd TAU period set can then be informed in user equipment, therefore, such as step 102, user equipment will receive network side and set
The 2nd TAU period that preparation is sent.Later, such as step 103, different from the 2nd TAU period in the first TAU period, i.e., network side is set
When the TAU period set in standby is not suitable for user equipment, user equipment will issue the user to network side equipment request and set
The standby target TAU period.In this way, user equipment can when recognizing that TAU period that network side equipment has been set is not applicable,
The TAU period that please be look for novelty to network side equipment, hair when the TAU period to avoid network side equipment from setting is less than data transmitting period
Raw additional TAU process, to reduce the power consumption of user equipment.
Specifically, step 101 includes:
According to the data transmitting period of user equipment, generated for the first TAU period;
TAU message or booting up attachment message are sent to network side equipment;Wherein, the TAU message or booting up attachment
Message carries the first TAU period.
Here, first by according to the data transmitting period of user equipment, to generate first greater than the data transmitting period
Then the TAU period carried for the first TAU period by TAU message or booting up attachment message, the first TAU period was sent to
Network side equipment.In this way, in such a way that existing TAU message or booting up attachment message complete the transmission in the first TAU period,
It avoids and increases new process, improve resource utilization.
Correspondingly, network side equipment will carry the 2nd TAU weeks by TAU response message or booting up attachment response message
Phase is to user equipment.
It should be appreciated that different from the 2nd TAU period in the first TAU period, user equipment is to network side equipment
When request issues the target TAU period of the user equipment, although user equipment can be by the transport stream between network side equipment
Journey directly carries out new TAU periodic request, but in view of the realization in practical application, it is preferred that as shown in Fig. 2, step 103 is wrapped
It includes:
Step 1031, the transmission TAU period negotiates request to ability open system;
Step 1032, it receives the network side equipment and request is negotiated according to the TAU period that the ability open system forwards
The 3rd TAU period generated, the 3rd TAU period are greater than the data transmitting period;
Step 1033, the 3rd TAU period is determined as to the target TAU period of the user equipment.
Here, it in the TAU period that is forwarded to network side equipment and please look for novelty of user equipment handling capacity open system, not only protects
The success for having demonstrate,proved request is sent to, and is avoided caused by occupying to the transmission flow between user equipment and network side equipment
It influences.Later, the 3rd TAU period greater than the data transmitting period of generation is just handed down to user equipment by network side equipment.
Specifically, the shown TAU period negotiates request to guarantee that the 3rd TAU period that network side equipment generates is suitable for the user equipment
Device identification and the first TAU period including the user equipment.
Negotiate after requesting in this way, network side equipment receives the TAU period forwarded through ability open system, it will be able to be based on
Preset TAU period generation strategy and the first TAU period in the network side equipment, generate the third for being greater than data transmitting period
The TAU period is issued to the user equipment by the device identification of the user equipment later.
Preset TAU period generation strategy in network side equipment can be and generate the third that value was equal to for the first TAU period
The TAU period is also possible to be greater than or equal to the default TAU period, etc. in the first TAU period using value in network side equipment.
And network side equipment equally will carry for the 3rd TAU period to user by TAU response message or booting up attachment response message
Equipment.
Specifically, as shown in figure 3, S301, user equipment will negotiate request the transmission TAU period to ability open system, be somebody's turn to do
TAU period negotiation request packet includes device identification and the first TAU period of UE;In next step, S302, the forwarding of ability open system should
The TAU period negotiates request to network side equipment;In next step, S303, network side equipment are raw according to default TAU period generation strategy
At the 3rd TAU period;In next step, the 3rd TAU period of generation is issued to user equipment by S304.
In addition, on the basis of the above embodiment of the present invention, the method also includes:
If the first TAU period is identical as the 2nd TAU period, the first TAU period is determined as described
The target TAU period of user equipment.
In this way, understanding when the 2nd TAU period that user equipment receives network side equipment is identical as the first TAU period
To network side equipment the 2nd TAU period suitable for the user equipment, therefore, the first TAU period can be determined as institute
State the target TAU period of user equipment.
In conclusion the tracing section updating cycle determination method of the embodiment of the present invention, will send be greater than its data hair first
Send the first TAU period in period to network side equipment, the TAU period being currently applicable in the informing network side apparatus user equipment.
Then user equipment will receive the 2nd TAU period of network side equipment transmission.Later, the first TAU period and the 2nd TAU weeks
Phase is different, i.e., when the TAU period set in network side equipment is not suitable for user equipment, user equipment will be to network side equipment
Request issues the target TAU period of the user equipment.In this way, user equipment can recognize what network side equipment had been set
When the TAU period is not suitable for, the TAU period that please be looked for novelty to network side equipment, the TAU period to avoid network side equipment from setting is less than
TAU process when data transmitting period outside amount incurred, to reduce the power consumption of user equipment.
As shown in figure 4, the tracing section updating cycle determination method of the embodiment of the present invention, comprising:
Step 401, the TAU period for receiving user equipment transmission negotiates request;
Step 402, request is negotiated according to the TAU period, generated for the 3rd TAU period, the 3rd TAU period is greater than institute
State the data transmitting period of user equipment;
Step 403, the 3rd TAU period is sent to the user equipment.
401- step 403 through the above steps, using the net of the tracing section updating cycle determination method of the embodiment of the present invention
Network side apparatus will negotiate request in the TAU period for receiving user equipment transmission, and request network side equipment request issues the user
After the TAU period greater than its data transmitting period of equipment, request is negotiated according to the TAU period and generates what the user equipment was applicable in
Then 3rd TAU period was sent to the user equipment by the 3rd TAU period.In this way, network side equipment can be for use
The demand of the family equipment TAU period applicable for its setting, come avoid because the TAU period is less than data transmitting period when amount incurred outside
TAU process, to reduce the power consumption of user equipment.
Wherein, the realization in conjunction with the user equipment of a upper embodiment in practical applications preferably turns through ability open system
The TAU period of hair negotiates the mode of request, and step 401 includes:
The TAU period for receiving the user equipment transmission through capability development system forwards negotiates request;Wherein, described
TAU period negotiation request packet includes device identification and the first TAU period of the user equipment.
User equipment is to be suitable for itself in the TAU period for guaranteeing to request to network side equipment, and the TAU period of transmission negotiates
Request by include the user equipment device identification and the first TAU period.In this way, after network side equipment generated for the 3rd TAU period,
It can be disappeared by the device identification of the user equipment in the TAU response message or booting up attachment response for sending the user equipment
It carried for the 3rd TAU period in breath, completes issuing for the 3rd TAU period.
In this embodiment, to generate the 3rd applicable TAU period of user equipment, step 402 includes:
Based on preset TAU period generation strategy and the first TAU period, generated for the 3rd TAU period.
It should be understood that applying in the network side equipment of the method for the embodiment of the present invention, it is preset with the specific TAU period
Therefore generation strategy is receiving after the TAU period negotiates request, by base in the inner preset TAU period generation strategy and this
One TAU period generated for the 3rd TAU period.
For example, preset TAU period generation strategy in network side equipment, can be and generate value equal to the first TAU period
The 3rd TAU period, then the 3rd TAU period was directly generated by the value in the first TAU period received;Network side equipment
In preset TAU period generation strategy, be also possible to using value in network side equipment be greater than or equal to the first TAU period it is pre-
If the TAU period, then in network side equipment in preset multiple TAU periods, inquiry value was greater than or equal to for the first TAU period
The TAU period is preset as the 3rd TAU period.Certainly, TAU period generation strategy is not limited to above content, and details are not described herein.
It should also be understood that user equipment in an embodiment as above, will be sent out before the transmission TAU period negotiates request
Send the first TAU period of the data transmitting period greater than user equipment to network side equipment, with the informing network side apparatus user
The TAU period that equipment is currently applicable in.Therefore, the method also includes:
Before the TAU period for receiving the user equipment transmission negotiates request, pass through if receiving the user equipment
The first TAU period that TAU message or booting up attachment message are sent, then sending the preset 2nd TAU period sets to the user
It is standby.
Here, network side equipment can then inform the 2nd TAU period set after receiving for the first TAU period
In user equipment, so that user equipment judges whether the TAU period of current network side apparatus setting is applicable in, i.e., at the first TAU weeks
When phase is identical as the 2nd TAU period, TAU process just is carried out using the first TAU period subsequent;If the first TAU period and the
Two TAU periods are different, then issue the new TAU period greater than its data transmitting period to network side equipment request.Realization avoids
TAU process when the TAU period of network side equipment setting is less than data transmitting period outside amount incurred, and reduce the consumption of user equipment
The purpose of electricity.
Wherein, corresponding to user equipment in such a way that TAU message or booting up attachment message sent for the first TAU period,
Network side equipment will send for the 2nd TAU period by TAU response message or booting up attachment response message, reduce transfer resource
It occupies.
In this embodiment, which is preferably the mobility management entity MME of core net.
In conclusion the tracing section updating cycle determination method of the embodiment of the present invention, will send receiving user equipment
The TAU period negotiate request, request network side equipment request issues TAU weeks greater than its data transmitting period of the user equipment
After phase, request is negotiated according to the TAU period and generates the 3rd applicable TAU period of the user equipment, then by the 3rd TAU period
It is sent to user equipment.In this way, the TAU period that network side equipment can be applicable in for the demand of user equipment for its setting,
Come avoid because the TAU period be less than data transmitting period when amount incurred outside TAU process, to reduce the power consumption of user equipment.
It should be noted that the tracing section updating cycle determination method of the embodiment of the present invention is applied to network side equipment, with
The above-mentioned tracing section updating cycle determination method cooperation applied to user equipment realizes that the tracing section updating period determines, therefore,
In the realization of the embodiment of the above-mentioned tracing section updating cycle determination method applied to user equipment, the realization side of network side equipment
Formula can also reach identical technical effect suitable for the embodiment, and details are not described herein.
As shown in figure 5, a kind of user equipment 500 of the embodiment of the present invention, including processor 510 and transceiver 520,
In,
For the transceiver 520 for sending for the first tracing section updating TAU period to network side equipment, the first TAU period is big
In the data transmitting period of user equipment;Receive the 2nd TAU period that network side equipment is sent;
If the processor 510 is different from the 2nd TAU period for the first TAU period, to the network
Side apparatus requests to issue the target TAU period of the user equipment, and the target TAU period is greater than the data transmitting period.
Wherein, the processor is also used to the data transmitting period according to network side equipment, generates for the first TAU period;
The transceiver is also used to send TAU message or booting up attachment message to network side equipment;Wherein, the TAU
Message or booting up attachment message carry the first TAU period.
Wherein, the transceiver is also used to send the TAU period and negotiates request to ability open system;Receive the network side
Equipment is negotiated the 3rd TAU period that request generates according to the TAU period that the ability open system forwards, and the described 3rd TAU weeks
Phase is greater than the data transmitting period;
The processor is also used to for being determined as in the 3rd TAU period target TAU period of the user equipment.
Wherein, the TAU period negotiation request packet include the user equipment device identification and the first TAU period.
It wherein, will be described if to be also used to the first TAU period identical as the 2nd TAU period for the processor
First TAU period was determined as the target TAU period of the user equipment.
The user equipment of the embodiment will send the first TAU period for being greater than its data transmitting period to network side first
Equipment, the TAU period being currently applicable in the informing network side apparatus user equipment.Then user equipment will receive network side and set
The 2nd TAU period that preparation is sent.Later, different from the 2nd TAU period in the first TAU period, i.e., it has been set in network side equipment
TAU period when not being suitable for user equipment, user equipment will request to issue the target TAU of the user equipment to network side equipment
Period.In this way, user equipment can be set when the TAU period for recognizing that network side equipment has been set is not applicable to network side
The standby TAU period that please be look for novelty, when the TAU period to avoid network side equipment from setting is less than data transmitting period outside amount incurred
TAU process, to reduce the power consumption of user equipment.
As shown in fig. 6, a kind of network side equipment 600 of the embodiment of the present invention, including processor 610 and transceiver 620,
In,
The TAU period that the transceiver 620 is used to receive user equipment transmission negotiates request;
The processor 610 is used to negotiate request according to the TAU period, generates the 3rd TAU period, the 3rd TAU
Period is greater than the data transmitting period of the user equipment;
The transceiver 620 is also used to the 3rd TAU period being sent to the user equipment.
Wherein, the transceiver is also used to receive TAU weeks of the transmission of the user equipment through capability development system forwards
Phase negotiates request;Wherein, the TAU period negotiation request packet includes device identification and the first TAU period of the user equipment.
Wherein, the processor is also used to generate based on preset TAU period generation strategy and the first TAU period
3rd TAU period.
Wherein, the transceiver is also used to before the TAU period for receiving the user equipment transmission negotiates request, if connecing
The first TAU period that the user equipment is sent by TAU message or booting up attachment message is received, then sends preset second
The TAU period is to the user equipment.
The network side equipment of the embodiment will negotiate request in the TAU period for receiving user equipment transmission, request network
After the TAU period greater than its data transmitting period that side apparatus request issues the user equipment, request is negotiated according to the TAU period
The 3rd applicable TAU period of the user equipment is generated, the 3rd TAU period was then sent to user equipment.In this way, network side
The TAU period that equipment can be applicable in for the demand of user equipment for its setting, to avoid sending because of the TAU period less than data
TAU process when the period outside amount incurred, to reduce the power consumption of user equipment.
A kind of user equipment of another embodiment of the present invention, as shown in fig. 7, comprises transceiver 710, memory 720, processing
Device 700 and it is stored in the computer program that can be run on the memory 720 and on the processor 700;The processor
The above-mentioned tracing section updating cycle determination method applied to user equipment is realized when the 700 execution computer program.
The transceiver 710, for sending and receiving data under the control of processor 700.
Wherein, in Fig. 7, bus architecture may include the bus and bridge of any number of interconnection, specifically by processor 700
The various circuits for the memory that the one or more processors and memory 720 of representative represent link together.Bus architecture is also
Various other circuits of such as peripheral equipment, voltage-stablizer and management circuit or the like can be linked together, these are all
It is it is known in the art, therefore, it will not be further described herein.Bus interface provides interface.Transceiver 710 can
To be multiple element, that is, includes transmitter and receiver, the list for communicating over a transmission medium with various other devices is provided
Member.For different user equipmenies, user interface 730, which can also be, external the interface for needing equipment is inscribed, and connection is set
Standby including but not limited to keypad, display, loudspeaker, microphone, control stick etc..
Processor 700, which is responsible for management bus architecture and common processing, memory 720, can store processor 700 and is holding
Used data when row operation.
The network side equipment of another embodiment of the present invention, as shown in figure 8, including transceiver 810, memory 820, processor
800 and it is stored in the computer program that can be run on the memory 820 and on the processor 800;The processor 800
The above-mentioned tracing section updating cycle determination method applied to network side equipment is realized when executing the computer program.
The transceiver 810, for sending and receiving data under the control of processor 800.
Wherein, in fig. 8, bus architecture may include the bus and bridge of any number of interconnection, specifically by processor 800
The various circuits for the memory that the one or more processors and memory 820 of representative represent link together.Bus architecture is also
Various other circuits of such as peripheral equipment, voltage-stablizer and management circuit or the like can be linked together, these are all
It is it is known in the art, therefore, it will not be further described herein.Bus interface provides interface.Transceiver 810 can
To be multiple element, that is, includes transmitter and transceiver, the list for communicating over a transmission medium with various other devices is provided
Member.Processor 800, which is responsible for management bus architecture and common processing, memory 820, can store processor 800 and is executing operation
When used data.
A kind of computer readable storage medium of the embodiment of the present invention is stored thereon with computer program, the computer
It is realized when program is executed by processor as described above applied to the step in the tracing section updating cycle determination method of user equipment
Suddenly, and identical technical effect can be reached, to avoid repeating, which is not described herein again.Wherein, the computer-readable storage medium
Matter, such as read-only memory (Read-Only Memory, abbreviation ROM), random access memory (Random Access
Memory, abbreviation RAM), magnetic or disk etc..
A kind of computer readable storage medium of the embodiment of the present invention is stored thereon with computer program, the computer
It is realized when program is executed by processor as described above applied in the tracing section updating cycle determination method of network side equipment
Step, and identical technical effect can be reached, to avoid repeating, which is not described herein again.Wherein, the computer-readable storage
Medium, such as read-only memory (Read-Only Memory, abbreviation ROM), random access memory (Random Access
Memory, abbreviation RAM), magnetic or disk etc..
Explanation is needed further exist for, this user equipment described in this description includes but is not limited to smart phone, puts down
Plate computer etc., and described many functional components are all referred to as module, specifically to emphasize the only of its implementation
Vertical property.
In the embodiment of the present invention, module can use software realization, to be executed by various types of processors.Citing comes
It says, the executable code module of a mark may include the one or more physics or logical block of computer instruction, citing
For, object, process or function can be built as.Nevertheless, the executable code of institute's mark module is without physically
It is located together, but may include the different instructions being stored in different positions, be combined together when in these command logics
When, it constitutes module and realizes the regulation purpose of the module.
In fact, executable code module can be the either many item instructions of individual instructions, and can even be distributed
It on multiple and different code segments, is distributed in distinct program, and is distributed across multiple memory devices.Similarly, it grasps
Making data can be identified in module, and can realize according to any form appropriate and be organized in any appropriate class
In the data structure of type.The operation data can be used as individual data collection and be collected, or can be distributed on different location
(including in different storage device), and at least partly can only be present in system or network as electronic signal.
When module can use software realization, it is contemplated that the level of existing hardware technique, it is possible to implemented in software
Module, without considering the cost, those skilled in the art can build corresponding hardware circuit to realize correspondence
Function, the hardware circuit includes conventional ultra-large integrated (VLSI) circuit or gate array and such as logic core
The existing semiconductor of piece, transistor etc either other discrete elements.Module can also use programmable hardware device, such as
Field programmable gate array, programmable logic array, programmable logic device etc. are realized.
Above-mentioned exemplary embodiment is described with reference to those attached drawings, many different forms and embodiment be it is feasible and
Without departing from spirit of that invention and teaching, therefore, the present invention should not be construed the limitation become in this proposed exemplary embodiment.
More precisely, these exemplary embodiments are provided so that the present invention can be perfect and complete, and can be by the scope of the invention
It is communicated to those those of skill in the art.In those schemas, size of components and relative size be perhaps based on it is clear for the sake of
And it is exaggerated.Term used herein is based only on description particular example embodiment purpose, and being not intended to, which becomes limitation, uses.Such as
Ground is used at this, unless the interior text clearly refers else, otherwise the singular " one ", "one" and "the" be intended to by
Those multiple forms are also included in.Those term "comprising"s and/or " comprising " will become further apparent when being used in this specification,
It indicates the presence of the feature, integer, step, operation, component and/or component, but is not excluded for one or more other features, whole
Number, step, operation, component, component and/or the presence of its group or increase.Unless otherwise indicated, narrative tense, a value range packet
Bound containing the range and any subrange therebetween.
The above is a preferred embodiment of the present invention, it is noted that for those skilled in the art
For, without departing from the principles of the present invention, it can also make several improvements and retouch, these improvements and modifications
It should be regarded as protection scope of the present invention.
Claims (22)
1. a kind of tracing section updating cycle determination method characterized by comprising
Sent for the first tracing section updating TAU period to network side equipment, the data that the first TAU period was greater than user equipment send week
Phase;
Receive the 2nd TAU period that network side equipment is sent;
If the first TAU period is different from the 2nd TAU period, the user is issued to network side equipment request
The target TAU period of equipment, the target TAU period are greater than the data transmitting period.
2. tracing section updating cycle determination method according to claim 1, which is characterized in that send the first tracing section updating
The step of TAU period to network side equipment, comprising:
According to the data transmitting period of user equipment, generated for the first TAU period;
TAU message or booting up attachment message are sent to network side equipment;Wherein, the TAU message or booting up attachment message
Carry the first TAU period.
3. tracing section updating cycle determination method according to claim 1, which is characterized in that if the first TAU period
It is different from the 2nd TAU period, then the step in the target TAU period of the user equipment is issued to network side equipment request
Suddenly, comprising:
The transmission TAU period negotiates request to ability open system;
It receives the network side equipment and the 3rd TAU that request generates is negotiated according to the TAU period that the ability open system forwards
Period, the 3rd TAU period are greater than the data transmitting period;
The 3rd TAU period is determined as to the target TAU period of the user equipment.
4. tracing section updating cycle determination method according to claim 3, which is characterized in that the TAU period negotiates to ask
Ask the device identification including the user equipment and the first TAU period.
5. tracing section updating cycle determination method according to claim 1, which is characterized in that the method also includes:
If the first TAU period is identical as the 2nd TAU period, the first TAU period is determined as the user
The target TAU period of equipment.
6. a kind of tracing section updating cycle determination method characterized by comprising
The TAU period for receiving user equipment transmission negotiates request;
Negotiate request according to the TAU period, generated for the 3rd TAU period, the 3rd TAU period is greater than the user equipment
Data transmitting period;
The 3rd TAU period is sent to the user equipment.
7. tracing section updating cycle determination method according to claim 6, which is characterized in that the reception user sets
The TAU period that preparation is sent negotiates the step of request, comprising:
The TAU period for receiving the user equipment transmission through capability development system forwards negotiates request;Wherein, described TAU weeks
Phase negotiation request packet includes device identification and the first TAU period of the user equipment.
8. tracing section updating cycle determination method according to claim 7, which is characterized in that described according to described TAU weeks
The step of phase negotiates request, generates for the 3rd TAU period, comprising:
Based on preset TAU period generation strategy and the first TAU period, generated for the 3rd TAU period.
9. tracing section updating cycle determination method according to claim 6, which is characterized in that the method also includes:
Before the TAU period for receiving the user equipment transmission negotiates request, disappeared if receiving the user equipment by TAU
The first TAU period that breath or booting up attachment message are sent, then the preset 2nd TAU period is sent to the user equipment.
10. a kind of user equipment, which is characterized in that including processor and transceiver, wherein
For sending for the first tracing section updating TAU period to network side equipment, the first TAU period set the transceiver greater than user
Standby data transmitting period;Receive the 2nd TAU period that network side equipment is sent;
If the processor is different from the 2nd TAU period for the first TAU period, asked to the network side equipment
The target TAU period for issuing the user equipment is asked, the target TAU period is greater than the data transmitting period.
11. user equipment according to claim 10, which is characterized in that the processor is also used to according to network side equipment
Data transmitting period, generate the first TAU period;
The transceiver is also used to send TAU message or booting up attachment message to network side equipment;Wherein, the TAU message
Or booting up attachment message carries the first TAU period.
12. user equipment according to claim 10, which is characterized in that the transceiver is also used to send the TAU period and assists
It consults and request and asks to ability open system;The network side equipment is received to be negotiated according to the TAU period that the ability open system forwards
It requests the 3rd TAU period generated, the 3rd TAU period is greater than the data transmitting period;
The processor is also used to for being determined as in the 3rd TAU period target TAU period of the user equipment.
13. user equipment according to claim 12, which is characterized in that the TAU period negotiation request packet includes the use
The device identification of family equipment and the first TAU period.
14. user equipment according to claim 10, which is characterized in that if the processor is also used to the first TAU
Period is identical as the 2nd TAU period, then the first TAU period is determined as to the target TAU period of the user equipment.
15. a kind of network side equipment, which is characterized in that including processor and transceiver, wherein
The TAU period that the transceiver is used to receive user equipment transmission negotiates request;
The processor is used to negotiate request according to the TAU period, generates for the 3rd TAU period, and the 3rd TAU period is greater than
The data transmitting period of the user equipment;
The transceiver is also used to the 3rd TAU period being sent to the user equipment.
16. network side equipment according to claim 15, which is characterized in that the transceiver is also used to receive and open through ability
The TAU period that the user equipment of hair system forwards is sent negotiates request;Wherein, the TAU period negotiation request packet includes institute
State device identification and the first TAU period of user equipment.
17. network side equipment according to claim 16, which is characterized in that the processor is also used to based on preset
TAU period generation strategy and the first TAU period generated for the 3rd TAU period.
18. network side equipment according to claim 15, which is characterized in that the transceiver is also used to receiving the use
Before the TAU period that family equipment is sent negotiates request, disappeared if receiving the user equipment by TAU message or booting up attachment
The first TAU period sent is ceased, then sends the preset 2nd TAU period to the user equipment.
19. a kind of user equipment, including transceiver, memory, processor and it is stored on the memory and can be at the place
The computer program run on reason device;It is characterized in that, being realized when the processor executes the computer program as right is wanted
Seek the described in any item tracing section updating cycle determination methods of 1-5.
20. a kind of network side equipment, including transceiver, memory, processor and it is stored on the memory and can be described
The computer program run on processor;It is characterized in that, the processor realizes such as right when executing the computer program
It is required that the described in any item tracing section updating cycle determination methods of 6-9.
21. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program
The step in tracing section updating cycle determination method as described in any one in claim 1-5 is realized when being executed by processor.
22. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program
The step in tracing section updating cycle determination method as claim in any one of claims 6-9 is realized when being executed by processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810009466.6A CN110012535B (en) | 2018-01-05 | 2018-01-05 | Tracking area update period determination method, user equipment and network side equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810009466.6A CN110012535B (en) | 2018-01-05 | 2018-01-05 | Tracking area update period determination method, user equipment and network side equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110012535A true CN110012535A (en) | 2019-07-12 |
CN110012535B CN110012535B (en) | 2022-06-07 |
Family
ID=67164443
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810009466.6A Active CN110012535B (en) | 2018-01-05 | 2018-01-05 | Tracking area update period determination method, user equipment and network side equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110012535B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111083754A (en) * | 2019-11-27 | 2020-04-28 | 成都天奥集团有限公司 | Method for maintaining terminal tracking area irrelevant to cell switching under low-earth-orbit satellite communication system |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120208472A1 (en) * | 2011-02-15 | 2012-08-16 | Samsung Electronics Co., Ltd. | Apparatus and method for controlling tracking area update in wireless communication system |
GB2507619A (en) * | 2012-11-05 | 2014-05-07 | Broadcom Corp | Resetting a periodic location registration timer when a user equipment transitions between radio access technologies |
CN104247556A (en) * | 2012-04-27 | 2014-12-24 | 三菱电机株式会社 | Communication system |
US20160353313A1 (en) * | 2015-05-28 | 2016-12-01 | Verizon Patent And Licensing Inc. | Dynamic modification of the tracking area update period for machine-to-machine communication |
CN107087301A (en) * | 2017-06-14 | 2017-08-22 | 中国联合网络通信集团有限公司 | A kind of power-economizing method, device and mobile management nodes |
CN107197426A (en) * | 2017-07-14 | 2017-09-22 | 中国联合网络通信集团有限公司 | A kind of method, device and mobile management nodes for reducing network signaling overhead |
CN107306443A (en) * | 2016-04-22 | 2017-10-31 | 中国移动通信有限公司研究院 | A kind of information processing method and terminal |
-
2018
- 2018-01-05 CN CN201810009466.6A patent/CN110012535B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120208472A1 (en) * | 2011-02-15 | 2012-08-16 | Samsung Electronics Co., Ltd. | Apparatus and method for controlling tracking area update in wireless communication system |
CN104247556A (en) * | 2012-04-27 | 2014-12-24 | 三菱电机株式会社 | Communication system |
GB2507619A (en) * | 2012-11-05 | 2014-05-07 | Broadcom Corp | Resetting a periodic location registration timer when a user equipment transitions between radio access technologies |
US20160353313A1 (en) * | 2015-05-28 | 2016-12-01 | Verizon Patent And Licensing Inc. | Dynamic modification of the tracking area update period for machine-to-machine communication |
CN107306443A (en) * | 2016-04-22 | 2017-10-31 | 中国移动通信有限公司研究院 | A kind of information processing method and terminal |
CN107087301A (en) * | 2017-06-14 | 2017-08-22 | 中国联合网络通信集团有限公司 | A kind of power-economizing method, device and mobile management nodes |
CN107197426A (en) * | 2017-07-14 | 2017-09-22 | 中国联合网络通信集团有限公司 | A kind of method, device and mobile management nodes for reducing network signaling overhead |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111083754A (en) * | 2019-11-27 | 2020-04-28 | 成都天奥集团有限公司 | Method for maintaining terminal tracking area irrelevant to cell switching under low-earth-orbit satellite communication system |
CN111083754B (en) * | 2019-11-27 | 2021-11-16 | 成都天奥集团有限公司 | Method for maintaining terminal tracking area irrelevant to cell switching under low-earth-orbit satellite communication system |
Also Published As
Publication number | Publication date |
---|---|
CN110012535B (en) | 2022-06-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6076480B2 (en) | Service processing method and apparatus | |
TW202015388A (en) | Method for handling always-on pdu session and an apparatus thereof | |
CN107613481A (en) | Handle the dual priority configuration in cordless communication network | |
CN110268751A (en) | Method and system for selection access and mobile management function to ps domain in access net environment | |
CN106031222A (en) | Queueing mechanism for client-side network traffic to reduce radio power consumption on mobile clients | |
CN107968848B (en) | A kind of method, terminal device and storage medium obtaining IP address | |
CN110012535A (en) | Tracing section updating cycle determination method, user equipment and network side equipment | |
US20200344725A1 (en) | Data transmission method and apparatus, and computer storage medium | |
CN112653531B (en) | Base station and method for delivering time-sensitive network clock information | |
JP7206390B2 (en) | Data transmission methods and devices | |
US20230164728A1 (en) | Wireless communication service delivery to user equipment (ue) using an access and mobility management function (amf) | |
WO2023116786A1 (en) | Registration method and apparatus of internet of things device, communication device, core network device, storage medium and system | |
US8855693B2 (en) | Method and apparatus for controlling wireless devices | |
EP3920585A1 (en) | Communication system handover method, network device, apparatus and medium | |
US11363561B2 (en) | Method and apparatus for reporting information by terminal, and computer storage medium | |
JP6858887B2 (en) | IP address setting method and device | |
CN109417770A (en) | Position management method, control plane node and user equipment | |
US11882538B1 (en) | Wireless user equipment (UE) registration with networking data responsive to external control | |
JP2001229147A (en) | Inter-cpu communication control method and portable information terminal | |
US20230319653A1 (en) | Wireless data service delivery to a wireless ue based on a security policy for the wireless ue | |
US11985501B2 (en) | Third generation partnership project (3GPP) service delivery to non-3GPP user devices over 3GPP N1 links | |
WO2023125870A1 (en) | Communication method and apparatus, communication device, and readable storage medium | |
CN115397033B (en) | Wireless communication method, wireless communication device, wireless communication module, medium, and program product | |
EP4138481A1 (en) | Resource management method and apparatus, server, and storage medium | |
CN108112040B (en) | Configuration method and device of double-connection waiting determination timer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |