CN110007363A - A kind of underground cable report damage system - Google Patents

A kind of underground cable report damage system Download PDF

Info

Publication number
CN110007363A
CN110007363A CN201910396869.5A CN201910396869A CN110007363A CN 110007363 A CN110007363 A CN 110007363A CN 201910396869 A CN201910396869 A CN 201910396869A CN 110007363 A CN110007363 A CN 110007363A
Authority
CN
China
Prior art keywords
cable
data acquisition
air cavity
underground
acquisition components
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910396869.5A
Other languages
Chinese (zh)
Other versions
CN110007363B (en
Inventor
李金格
门宝霞
潘立巍
潘立峰
管天宇
赵梦莹
李卫中
付薇薇
杨国旗
李国良
许金光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Chengde Power Supply Co of State Grid Jibei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Chengde Power Supply Co of State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Chengde Power Supply Co of State Grid Jibei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910396869.5A priority Critical patent/CN110007363B/en
Publication of CN110007363A publication Critical patent/CN110007363A/en
Application granted granted Critical
Publication of CN110007363B publication Critical patent/CN110007363B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L11/00Measuring steady or quasi-steady pressure of a fluid or a fluent solid material by means not provided for in group G01L7/00 or G01L9/00
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/083Locating faults in cables, transmission lines, or networks according to type of conductors in cables, e.g. underground
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V9/00Prospecting or detecting by methods not provided for in groups G01V1/00 - G01V8/00

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geophysics (AREA)
  • Locating Faults (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention discloses a kind of underground cable reports to damage system, and including several cables for being embedded in underground, the cable includes core wire, external insulation layer and the armor layer that from-inner-to-outer is successively set with, and forms air cavity between the external insulation layer and the armor layer;It further include the compressor and air accumulator set gradually along airflow direction, the communicating downstream of the air accumulator has main line, the communicating downstream of the main line has several data acquisition components for corresponding and being connected to each air cavity, and the data acquisition components include baroceptor and data ultramagnifier;It further include the monitor cooperated with each data acquisition components and the compressor.Underground cable report damage system can rapidly and accurately determine the damaged part of cable, to exclude corresponding cable fault in time, guarantee the steady and continuous operation of power transmission and transformation system.

Description

A kind of underground cable report damage system
Technical field
The present invention relates to cable fault detection and malfunction elimination technical fields, in particular to a kind of underground cable report damage system System.
Background technique
Underground cable is the most common way of the distribution facilities such as power transmission and transformation system access cell, factory, in long-term work It is found with practice, cable sheath often causes to damage during construction and road administration construction etc. due to by external force, greatly In most cases, only the crust of damage cable has a power failure without directly resulting in construction, therefore power department can not be found in time, In the case, unit in charge of construction generally can directly backfill construction site, thus give the normal table of power transmission and transformation system Operation and power supply cause great security risk and huge economic losses.
Correspondingly, in subsequent power transmission and transformation system operational process, if leading to entire defeated change because of above-mentioned cable fault position Electric system breaks down, then because cable is embedded in underground, and is backfilled in time, and cable failure position can not be directly determined, therefore This not only the malfunction elimination time it is long, manpower and material resources needed for troubleshooting procedure loss it is larger, also give relevant electricity unit and user Normal work and life cause inconvenience.
Therefore, how rapidly and accurately to determine the damaged part of cable, to exclude corresponding cable fault in time, guarantee defeated The steady and continuous operation of transformer substation system is the important technological problems that those skilled in the art need to solve at present.
Summary of the invention
The object of the present invention is to provide a kind of underground cable reports to damage system, which damages system can be quick and precisely Ground determines the damaged part of cable, to exclude corresponding cable fault in time, guarantees the steady and continuous operation of power transmission and transformation system.
In order to solve the above technical problems, the present invention provides a kind of underground cable report damage system, including several undergrounds that are embedded in Cable, the cable include core wire, external insulation layer and the armor layer that from-inner-to-outer is successively set with, the external insulation layer and the armour Air cavity is formed between first layer;
It further include the compressor and air accumulator set gradually along airflow direction, the communicating downstream of the air accumulator has supervisor Road, the communicating downstream of the main line have several data acquisition components for corresponding and being connected to each air cavity, the number It include baroceptor and data ultramagnifier according to acquisition component;
It further include the monitor cooperated with each data acquisition components and the compressor.
Preferably, the data acquisition components further include combined aural and visual alarm.
Preferably, the connectivity part between the data acquisition components and the air cavity can be opened and closed to be provided with valve gear.
Preferably, the filter device equipped with desiccant is communicated between the air accumulator and the main line.
It preferably, is wire signal connection or wireless signal connection between the data feedback device and the monitor.
Relatively above-mentioned background technique, underground cable report provided by the present invention damage system, arrange in operational process, pass through Compressor cooperation air accumulator is inflated each air cavity via main line, and baroceptor incudes in real time and monitors gas in air cavity Pressure, until air pressure reaches preset pressure value in the air cavity of each cable, baroceptor passes through data feedback device to monitor at this time Feedback signal, and inflation is stopped by monitor control compressor and pressure maintaining is implemented to main pipe and each air cavity;Cable operates normally In use, if because caused by outside construction or other reasons the cables such as armor layer main structure it is damaged, the air cavity meeting of the breakage Gas leak and decompression occurs, if the atmospheric pressure value at the air cavity declines rapidly and reach air pressure lower limit, baroceptor passes through Data feedback device feeds back rapidly decompression signal to monitor, and staff accurately determines current feedback rapidly decompression by monitor The corresponding cable position of data feedback device of signal, and reach scene in time and live trimming and failure are carried out to corresponding damaged cable Exclude operation;If causing air pressure in air cavity slowly to decline and reach because longtime running or part are subtle damaged in cable operational process To air pressure lower limit, then baroceptor feeds back slow decompression signal to monitor by data feedback device, and monitor controls later Compressor cooperates air accumulator to implement tonifying Qi to the corresponding air cavity of the data feedback device for feeding back the slow decompression signal by main line, Until the air pressure of the air cavity restores to preset pressure value, follow-up operation and the breakage failure feedback to guarantee respective cable are accurate Property, when necessary, even if what monitor received is slow decompression signal, staff can also directly rush towards according to anticipation operating condition Feed back at the corresponding cable of data feedback device of the slow decompression signal, so as to carry out cable failure and failure pre- investigation and and When handle, guarantee power transmission and transformation system steady and continuous operation.
In another preferred embodiment of the invention, the data acquisition components further include combined aural and visual alarm.When cable occurs When damaged, which sounds an alarm sound and alarm light, to receive the breakage of data feedback device sending in staff Decompression feedback signal and rushing towards, which can be determined rapidly according to the alarm tone and alarm light behind scene, occurs damaged cable position, from And further shorten the positioning investigation time of staff, damaged maintenance and the fault removal efficiency of respective cable are improved, is reduced Intensity of workers and cost of labor.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the structural schematic diagram that underground cable report provided by a kind of specific embodiment of the present invention damages system.
Wherein, 11- compressor, 111- air accumulator, 112- filter device, 12- main line, 13- data acquisition components, 14- Monitor, 21- external insulation layer, 22- armor layer, 23- air cavity, 231- valve gear.
Specific embodiment
Core of the invention is to provide a kind of underground cable report damage system, which damages system can be quick and precisely Ground determines the damaged part of cable, to exclude corresponding cable fault in time, guarantees the steady and continuous operation of power transmission and transformation system.
In order to enable those skilled in the art to better understand the solution of the present invention, with reference to the accompanying drawings and detailed description The present invention is described in further detail.
Referring to FIG. 1, the structure that Fig. 1 is underground cable report damage system provided by a kind of specific embodiment of the present invention is shown It is intended to.
In a specific embodiment, underground cable report provided by the present invention damages system, including several electricity for being embedded in underground Cable, cable include core wire, external insulation layer and the armor layer that from-inner-to-outer is successively set with, and form gas between external insulation layer and armor layer Chamber;It further include the compressor and air accumulator set gradually along airflow direction, the communicating downstream of air accumulator has main line, main line Communicating downstream has several data acquisition components for corresponding and being connected to each air cavity, and data acquisition components include baroceptor With data ultramagnifier;It further include the monitor cooperated with each data acquisition components and compressor.
It arranges in operational process, cooperates air accumulator to be inflated via main line to each air cavity by compressor, air pressure transmission Sensor incudes in real time and monitors air pressure in air cavity, until air pressure reaches preset pressure value in the air cavity of each cable, air pressure transmission at this time Sensor passes through data feedback device to monitor feedback signal, and stops inflating and to main pipe and respectively by monitor control compressor Air cavity implements pressure maintaining;Cable operates normally in use, if because of the cables main body knot such as armor layer caused by outside construction or other reasons Structure is damaged, then gas leak can occur for the air cavity of the breakage and decompression, if the atmospheric pressure value at the air cavity declines and reaches rapidly Air pressure lower limit, then by data feedback device, to monitor feedback, rapidly decompression signal, staff pass through monitoring to baroceptor Device accurately determines the corresponding cable position of data feedback device of current feedback rapidly decompression signal, and reaches scene in time to corresponding Damaged cable carries out scene trimming and troubleshooting operation;If in cable operational process due to longtime running or part are subtle damaged Air pressure in air cavity is caused slowly to decline and reach air pressure lower limit, then baroceptor is slow to monitor feedback by data feedback device Slow decompression signal, the compressor cooperation air accumulator of monitor control later is by main line to the data for feeding back the slow decompression signal The corresponding air cavity of ultramagnifier implements tonifying Qi, until the air pressure of the air cavity restores to preset pressure value, after guaranteeing respective cable Reforwarding row and breakage failure feed back accuracy, when necessary, even if that monitor receives is slow decompression signal, staff It can be rushed towards according to anticipation operating condition and directly at the corresponding cable of data feedback device for feeding back the slow decompression signal, to carry out electricity The pre- investigation and processing in time of cable breakage and failure, guarantee the steady and continuous operation of power transmission and transformation system.
Further, since cable main structure occurs the subtle breakage in part or slowly corrodes existing in equipment actual moving process As when, air pressure in air cavity can't dramatic decrease, therefore when compressor cooperation air accumulator implements above-mentioned slow decompression situation When ftercompction is handled, if air cavity does not restore yet to preset pressure value after ftercompction processing certain time, baroceptor according to Rapidly decompression situation feeds back corresponding signal, implements investigation so that staff rushes towards construction site in time, avoids occurring because of cable Subtle breakage slowly corrodes and leads to subsequent power transmission and transformation system failure, guarantees power system stability continuous operation.
It should be noted that specific in practical application, it is contemplated that the anti-pressure ability of related equipment and equipment, and meet big Operating condition in most cases needs, and the preset pressure value in above-mentioned air cavity is preferably 2atm (standard atmospheric pressure, 1 standard atmospheric pressure For 101.325kPa), and above-mentioned air pressure lower limit value is preferably 1.5atm, if slow decompression occurs in air cavity, compressor cooperation Air accumulator is corresponding air cavity ftercompction to 2atm, if rapidly decompression occurs in air cavity and be depressurized to 1.5atm rapidly hereinafter, if work Personnel rush towards rapidly at cable failure implementation and handle, and in this case, compressor does not start usually, finish to respective cable repairing Afterwards, then to its corresponding air cavity implement tonifying Qi operation.
Furthermore it should be noted that when cable leads to damage because of construction or municipal construction, by described buried After cable report damage system quickly determines cable failure position in time, staff can be on the scene in time and and associated construction Unit divides cable fault responsibility, in order to avoid cause cable to be tieed up after directly implementing scene backfill because not determining that construction causes damage responsible party The cost repaired independently is undertaken by electric system relevant unit, thus greatly reduce the plant maintenance of electric system relevant unit at This, specifies the divisions of responsibility of cable failure accident, improves the construction efficiency of correlation engineering.
It should be further noted that monitor is set to associate power system operation supervision unit when practical application In monitoring room, so that staff understands cable operating condition in time, and can be fast when decompression alarm occurs for the air cavity of cable Speed obtains relevant information and implements corresponding processing.
Further, data acquisition components further include combined aural and visual alarm.When cable occurs damaged, combined aural and visual alarm hair Alarm tone and alarm light out, to receive the damaged decompression feedback signal of data feedback device sending in staff and to rush towards scene It can be determined rapidly according to the alarm tone and alarm light afterwards and damaged cable position occurs, to further shorten staff's The positioning investigation time improves damaged maintenance and the fault removal efficiency of respective cable, reduces intensity of workers and artificial Cost.
More specifically, the connectivity part between data acquisition components and air cavity can be opened and closed to be provided with valve gear.Cable production In the process, when to implementing to seal at cable armor layer and external insulation layer, valve gear is installed in corresponding position, so as in electricity By the valve gear by air cavity and main line reliable connected when cable is embedded, and the gaseous environment of data acquisition components is effectively ensured Sensing capability, can rapidly and accurately to feed back damaged information when decompression occurs for air cavity, so that staff implements in time Relevant treatment.
On the other hand, the filter device equipped with desiccant is communicated between air accumulator and main line.The filter device can The moisture being mingled in the gas exported in air accumulator is completely removed, in case moist air stream is passed through normally leading to cable after air cavity Electricity operation adversely affects, and guarantees the reliable and stable operation of power transmission and transformation system.
In addition, being wire signal connection or wireless signal connection between data feedback device and monitor.Specifically, above-mentioned Signal can be transmitted using wired connection modes such as data cables between data feedback device and monitor, it can also be using bluetooth etc. Radio connection transmits signal, in practical application, staff can according at cable burial actual environment and correlation apply Type of attachment between work maintenance cost flexible choice data feedback device and monitor, in principle, as long as can satisfy described The actual use that underground cable report damages system needs.
In summary, underground cable report provided in the present invention damages system, arranges in operational process, is matched by compressor It closes air accumulator to be inflated each air cavity via main line, baroceptor incudes in real time and monitor air pressure in air cavity, until each Air pressure reaches preset pressure value in the air cavity of cable, at this time baroceptor by data feedback device to monitor feedback signal, And inflation is stopped by monitor control compressor and pressure maintaining is implemented to main pipe and each air cavity;Cable operate normally in use, if Because the cables such as armor layer main structure is damaged caused by outside construction or other reasons, then the air cavity of the breakage can occur outside gas It lets out and decompression, if the atmospheric pressure value at the air cavity declines rapidly and reach air pressure lower limit, baroceptor passes through data feedback device To monitor feedback rapidly decompression signal, staff accurately determines the data of current feedback rapidly decompression signal by monitor The corresponding cable position of ultramagnifier, and reach scene in time and live trimming and troubleshooting operation are carried out to corresponding damaged cable; If causing air pressure in air cavity slowly to decline and reach under air pressure because of longtime running or local subtle breakage in cable operational process Limit, then baroceptor feeds back slow decompression signal to monitor by data feedback device, and the compressor of monitor control later is matched It closes air accumulator and tonifying Qi is implemented to the corresponding air cavity of the data feedback device for feeding back the slow decompression signal by main line, until the gas The air pressure of chamber restores to preset pressure value, to guarantee the follow-up operation and breakage failure feedback accuracy of respective cable, when necessary, Even if what monitor received is slow decompression signal, staff can also rush towards feedback according to anticipation operating condition and directly, and this is slow At the corresponding cable of data feedback device of decompression signal, to carry out the pre- investigation and processing in time of cable failure and failure, protect Demonstrate,prove the steady and continuous operation of power transmission and transformation system.
Underground cable report provided by the present invention damage system is described in detail above.It is used herein specifically a Principle and implementation of the present invention are described for example, and it is of the invention that the above embodiments are only used to help understand Method and its core concept.It should be pointed out that for those skilled in the art, not departing from the principle of the invention Under the premise of, it can be with several improvements and modifications are made to the present invention, these improvement and modification also fall into the claims in the present invention Protection scope in.

Claims (5)

1. a kind of underground cable report damages system, it is characterised in that: including several cables for being embedded in underground, the cable includes in And core wire, external insulation layer and the armor layer being successively set with outside, air cavity is formed between the external insulation layer and the armor layer;
It further include the compressor and air accumulator set gradually along airflow direction, the communicating downstream of the air accumulator has main line, institute The communicating downstream for stating main line has several data acquisition components for corresponding and being connected to each air cavity, the data acquisition Component includes baroceptor and data ultramagnifier;
It further include the monitor cooperated with each data acquisition components and the compressor.
2. underground cable report as described in claim 1 damages system, it is characterised in that: the data acquisition components further include acousto-optic Alarm.
3. underground cable report as described in claim 1 damages system, it is characterised in that: the data acquisition components and the air cavity Between connectivity part can be opened and closed to be provided with valve gear.
4. underground cable report as described in claim 1 damages system, it is characterised in that: between the air accumulator and the main line It is communicated with the filter device equipped with desiccant.
5. underground cable report as described in claim 1 damages system, it is characterised in that: the data feedback device and the monitor Between for wire signal connection or wireless signal connection.
CN201910396869.5A 2019-05-13 2019-05-13 Buried cable loss reporting system Active CN110007363B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910396869.5A CN110007363B (en) 2019-05-13 2019-05-13 Buried cable loss reporting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910396869.5A CN110007363B (en) 2019-05-13 2019-05-13 Buried cable loss reporting system

Publications (2)

Publication Number Publication Date
CN110007363A true CN110007363A (en) 2019-07-12
CN110007363B CN110007363B (en) 2024-05-17

Family

ID=67176790

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910396869.5A Active CN110007363B (en) 2019-05-13 2019-05-13 Buried cable loss reporting system

Country Status (1)

Country Link
CN (1) CN110007363B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114508702A (en) * 2022-03-01 2022-05-17 青岛西海岸市政新能源热力有限公司 Optimization control method for pressure difference and flow at tail end of main pipe network

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0755871A (en) * 1993-08-23 1995-03-03 Toshiba Corp Fault locating system
JPH0843473A (en) * 1994-08-01 1996-02-16 Hitachi Cable Ltd Fault-section judgment method for power cable
US20080100307A1 (en) * 2006-11-01 2008-05-01 Abb Research Ltd. Cable fault detection
CN101192853A (en) * 2006-12-01 2008-06-04 苏州工业园区大诚电讯科技有限公司 Remote monitoring system and monitoring method for underground communication cable
CN201117088Y (en) * 2007-11-12 2008-09-17 苏州工业园区新大诚科技发展有限公司 Electric cable air pressure collecting equipment
EP2518521A2 (en) * 2011-04-29 2012-10-31 General Electric Company System and device for detecting defects in underground cables
CN106855603A (en) * 2016-12-19 2017-06-16 李庆忠 Feeder line fault independent positioning method, detecting terminal, main website, alignment system
CN209656911U (en) * 2019-05-13 2019-11-19 国网冀北电力有限公司承德供电公司 A kind of underground cable report damage system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0755871A (en) * 1993-08-23 1995-03-03 Toshiba Corp Fault locating system
JPH0843473A (en) * 1994-08-01 1996-02-16 Hitachi Cable Ltd Fault-section judgment method for power cable
US20080100307A1 (en) * 2006-11-01 2008-05-01 Abb Research Ltd. Cable fault detection
CN101192853A (en) * 2006-12-01 2008-06-04 苏州工业园区大诚电讯科技有限公司 Remote monitoring system and monitoring method for underground communication cable
CN201117088Y (en) * 2007-11-12 2008-09-17 苏州工业园区新大诚科技发展有限公司 Electric cable air pressure collecting equipment
EP2518521A2 (en) * 2011-04-29 2012-10-31 General Electric Company System and device for detecting defects in underground cables
CN106855603A (en) * 2016-12-19 2017-06-16 李庆忠 Feeder line fault independent positioning method, detecting terminal, main website, alignment system
CN209656911U (en) * 2019-05-13 2019-11-19 国网冀北电力有限公司承德供电公司 A kind of underground cable report damage system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王立军 等: "城区电缆接头故障在线监测与预警系统", 中国电业(技术版), no. 01, 31 December 2013 (2013-12-31), pages 18 - 21 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114508702A (en) * 2022-03-01 2022-05-17 青岛西海岸市政新能源热力有限公司 Optimization control method for pressure difference and flow at tail end of main pipe network

Also Published As

Publication number Publication date
CN110007363B (en) 2024-05-17

Similar Documents

Publication Publication Date Title
CN104133446A (en) Natural gas station monitoring device
CN209656911U (en) A kind of underground cable report damage system
CN110007363A (en) A kind of underground cable report damage system
CN206818669U (en) Dangerous matter sources gas monitoring system
AU2024203061A1 (en) Monitoring system for a section or a component of a pipeline for the transport of hydrocarbons in a hazard site
CN104199401A (en) Monitoring device for rapidly finding out leakage at natural gas station
CN105221159A (en) Electrically jointly control type shield structure pressure-retaining system
CN103711117A (en) Automatic intelligent vacuum preloading monitoring system
CN105954652A (en) Sheath grounding fault point locating method
CN103185201A (en) Integrated leakage monitoring terminal of manual valve chamber of oil-gas pipeline
CN104122872A (en) Natural gas station yard monitoring method
CN105958356A (en) All-weather underground box-type transformer station
CN105182165A (en) System of mobile power supply ground wire connection state real-time monitoring and fault positioning
CN101476672A (en) Pressure security control and alarm device for water-supply water delivery and distribution ductwork
CN113870538B (en) Communication pipeline monitoring device for intelligent engineering
CN110838218A (en) Intelligent warning protection system for high-voltage overhead electric wire
CN205027847U (en) System for remove power supply ground connection state real -time supervision and fault locating
CN109268073B (en) Mining gas measurement safety monitoring system
CN208174856U (en) A kind of intelligent video monitoring lightning-protection system
CN207298390U (en) Gas pipeline distribution pressure remote monitoring alarm device
CN110778910A (en) Portable full-automatic alarm air supplementing device and using method
CN212379956U (en) Anti-damage wireless alarm system for gas pipe network
CN205647783U (en) Floods alarm system in pit based on image and coal -winning machine monitoring facilities
CN219642350U (en) Anti-electricity-theft device suitable for petroleum drilling, production, power supply and distribution
CN221008364U (en) Fire alarm device of transformer substation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant