CN109995584A - A kind of fault diagnosis auxiliary system and its method based on intelligent gateway - Google Patents
A kind of fault diagnosis auxiliary system and its method based on intelligent gateway Download PDFInfo
- Publication number
- CN109995584A CN109995584A CN201910206030.0A CN201910206030A CN109995584A CN 109995584 A CN109995584 A CN 109995584A CN 201910206030 A CN201910206030 A CN 201910206030A CN 109995584 A CN109995584 A CN 109995584A
- Authority
- CN
- China
- Prior art keywords
- intelligent gateway
- gateway
- record
- remote
- recorded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 69
- 238000003745 diagnosis Methods 0.000 title claims abstract description 32
- 230000008569 process Effects 0.000 claims abstract description 28
- 230000005540 biological transmission Effects 0.000 claims description 6
- 238000003780 insertion Methods 0.000 claims description 6
- 230000037431 insertion Effects 0.000 claims description 6
- 239000013307 optical fiber Substances 0.000 claims description 6
- 238000004321 preservation Methods 0.000 claims description 4
- 230000006399 behavior Effects 0.000 claims description 2
- 238000009472 formulation Methods 0.000 claims description 2
- 239000000203 mixture Substances 0.000 claims description 2
- 238000012423 maintenance Methods 0.000 description 14
- 238000011017 operating method Methods 0.000 description 3
- 238000011084 recovery Methods 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/66—Arrangements for connecting between networks having differing types of switching systems, e.g. gateways
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/02—Standardisation; Integration
- H04L41/0246—Exchanging or transporting network management information using the Internet; Embedding network management web servers in network elements; Web-services-based protocols
- H04L41/0273—Exchanging or transporting network management information using the Internet; Embedding network management web servers in network elements; Web-services-based protocols using web services for network management, e.g. simple object access protocol [SOAP]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/069—Management of faults, events, alarms or notifications using logs of notifications; Post-processing of notifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/02—Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
- H04L67/025—Protocols based on web technology, e.g. hypertext transfer protocol [HTTP] for remote control or remote monitoring of applications
Abstract
The present invention relates to gateway technique field, in particular to a kind of fault diagnosis auxiliary system and its method based on intelligent gateway, system includes that intelligent gateway and the WEB management of process end connecting with the intelligent gateway and gateway remote manage platform;WEB management of process end, for formulating record time parameter method, local operation recording strategy, remote operation recording strategy and internal operation key parameter recording strategy for intelligent gateway;Intelligent gateway, for according to above-mentioned strategy, corresponding local operation record, remote operation record, internal operation key parameter record to be uploaded to WEB management of process end;Gateway remote management platform is for remotely operating intelligent gateway.Present invention mainly solves existing gateway equipment in use, it is difficult to reappear its failure environment and failure problems, and operational order when user is difficult to precise expression failure, cause the failure problems of gateway to be difficult to reappear and be difficult to the problem of thoroughly excluding.
Description
Technical field
The present invention relates to gateway technique field, in particular to a kind of fault diagnosis auxiliary system based on intelligent gateway and its
Method.
Background technique
Gateway is also known as gateway, protocol converter, is most complicated net in network layer implementation above network interconnection
Network interconnection equipment is only used for two different network interconnections of upper-layer protocol.Gateway both can be used for wide area network interconnection, can also use
In local area network interconnection.It is a kind of computer system or equipment for serving as conversion important task, using in different communication protocol, data lattice
Between formula or language or even the entirely different two kinds of systems of architecture.
Fault diagnosis refers to the process of the failure for searching equipment or system, and wherein system fault diagnosis is run to system
State and abnormal conditions judge, and are judged according to diagnosis and provide foundation for system failure recovery.System is carried out
Fault diagnosis it may first have to it be detected, in generating system failure, fault type, trouble location and reason are carried out
Diagnosis finally provides solution, realizes fault recovery.
In use, failure can disappear existing gateway after restarting when breaking down, but solve there is no basic
Failure, and remaining test environment and the true use environment of gateway have deviation, it is difficult to reappear the failure problems of user, and user by
In professional ability deficiency, it is difficult to clearly describe operating procedure of the gateway before failure, the failure problems of gateway is caused to be difficult to reappear
And it is difficult to the problem of excluding.
Summary of the invention
Summary of the invention of the invention is to provide a kind of fault diagnosis auxiliary system and its method based on intelligent gateway, main
Solve existing gateway equipment in use, it is difficult to reappear its failure environment and failure problems, and user is difficult to accurately
Operational order when failure is stated, the failure problems of gateway is caused to be difficult to reappear and be difficult to the problem of thoroughly excluding.
The fault diagnosis auxiliary system based on intelligent gateway that the invention proposes a kind of, including intelligent gateway and with the intelligence
The WEB management of process end of energy gateway connection and gateway remote manage platform;WEB management of process end is equipped with WEB management page
Face, for formulating record time parameter method, local operation recording strategy, remote operation recording strategy and interior for the intelligent gateway
Portion runs key parameter recording strategy;The intelligent gateway, for recording plan according to the record time parameter method, local operation
Slightly, remote operation recording strategy, internal operation key parameter recording strategy record local operation, remote operation, internal operation close
Bond parameter is also used to upload to corresponding local operation record, remote operation record, internal operation key parameter record described
WEB management of process end carries out preservation and management;The gateway remote management platform is for remotely grasping the intelligent gateway
Make, the intelligent gateway is then recorded as the remote operation to the remote operation of gateway remote management platform and records.
Preferably, the record time parameter method is specifically, only save the record in a nearest preset time period;The inside
Operation key parameter recording strategy specifically includes, and when the intelligent gateway, when CPU usage reaches presetting threshold values, carries out
Record;When memory usage reaches presetting threshold values, recorded;When master chip temperature reaches presetting threshold values, recorded;
When reception power, transmission power reach presetting threshold values, recorded.
Preferably, the local operation recording strategy specifically includes: to the operation setting content of the WEB administration page into
Row record;The received button operation of the intelligent gateway, optical fiber plug operation, USB flash disk insertion operation are recorded;To passing through
The WIFI signal for stating intelligent gateway sending is connected to domestic consumer's usage quantity of the intelligent gateway and records.
Preferably, the remote operation recording strategy specifically includes: by gateway remote management platform to the intelligence
The configuration operation that gateway carries out is recorded;The updating operation that gateway remote management platform carries out the intelligent gateway
And upgrade file size is recorded.
Preferably, the intelligent gateway records local operation, remote operation, internal operation key parameter, specifically: it is described
The local operation, remote operation, internal operation key parameter are recorded separately in a predetermined flash subarea by intelligent gateway;
For the local operation, remote operation, recorded after receiving concrete operations request, before actually accomplishing operation,
After the completion of record, then execute concrete operations.
The fault diagnosis householder method based on intelligent gateway that the invention also provides a kind of, comprising the following steps: S1 is intelligence
It can gateway formulation record time parameter method, local operation recording strategy, remote operation recording strategy and internal operation key parameter
Recording strategy;S2, the intelligent gateway is according to the record time parameter method, local operation recording strategy, remote operation record plan
Slightly, internal operation key parameter recording strategy records local operation, remote operation, internal operation key parameter;S3, the intelligence
Gateway records local operation, remote operation record, internal operation key parameter record upload to WEB management of process end and protect
It deposits and manages.
Preferably, in the step S2, the record time parameter method specifically: only save in a nearest preset time period
Record;The internal operation key parameter recording strategy specifically includes, when the intelligent gateway: CPU usage reaches pre-
When setting threshold values, recorded;When memory usage reaches presetting threshold values, recorded;Master chip temperature reaches presetting
When threshold values, recorded;When reception power, transmission power reach presetting threshold values, recorded.
Preferably, in the step S2, the local operation recording strategy is specifically included, to the behaviour of WEB administration page
It is recorded as set content;The received button operation of the intelligent gateway, optical fiber plug operation, USB flash disk insertion operation are carried out
Record;The domestic consumer's usage quantity for being connected to the intelligent gateway to the WIFI signal issued by the intelligent gateway carries out
Record.
Preferably, in the step S2, the local operation recording strategy is specifically included: the gateway remote is managed
Platform records the configuration operation that the intelligent gateway carries out;By gateway remote management platform to the intelligent gateway
The updating operation and upgrade file size of progress are recorded.
Preferably, in the step S2, the intelligent gateway closes the local operation, remote operation, internal operation
Bond parameter is recorded separately in a predetermined flash subarea;For the local operation, remote operation, the intelligent gateway is being connect
Receive a concrete operations request after, actually accomplish operation before recorded, after the completion of record, then execute concrete operations.
From the foregoing, it will be observed that it is available following using technical solution provided by the invention the utility model has the advantages that
First, all operations executed on intelligent gateway are recorded in fault diagnosis auxiliary system proposed by the present invention, to rise
To the effect of data backup, when in the event of failure, maintenance personnel can be directly viewable operation of the intelligent gateway before failure, and then intuitive
Ground judges the failure cause of intelligent gateway, in order to the failure for directly solving intelligent gateway, enables the maintenance process of intelligent gateway more
Efficiently;
Second, the fault diagnosis auxiliary system that proposes is provided with gateway remote management platform in the present invention namely user can
Remote operation is executed to intelligent gateway by remote management platform, expands the mode of operation to intelligent gateway;
Third only saves the record of a nearest preset time period in the present invention namely system can be removed automatically beyond default
The data of period reduce nothing under the premise of ensure that failure problems of the auxiliary system for auxiliary judgment intelligent gateway
With the memory space of data, the normal operation of auxiliary system ensure that;
4th, for local and remote operation in the present invention, it can be recorded, be carried out again after the completion of record before operation
Operation, ensure that the operation recorded in auxiliary system is the operation executed conscientiously, is further ensured that auxiliary system can be used for accurately
Ground judges the failure problems of intelligent gateway;
5th, fault diagnosis householder method proposed by the present invention, to the operating procedure and relevant parameter in intelligent gateway
Variation make duplicated record, facilitate the failure problems that maintenance personnel intuitively judges intelligent gateway, maintenance personnel can set in advance
Required relevant parameter is set, to guarantee that the householder method can definitely judge the failure problems of intelligent gateway.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention without any creative labor, may be used also for those of ordinary skill in the art
To obtain other drawings based on these drawings.
Fig. 1 is that the system of fault diagnosis auxiliary system in the embodiment of the present invention connects block diagram;
Fig. 2 is the method partial process view of fault diagnosis householder method in the embodiment of the present invention;
Fig. 3 is the built-in system key parameter recording strategy of fault diagnosis householder method in the embodiment of the present invention;
Fig. 4 is the local operation recording strategy of fault diagnosis householder method and remote operation record plan in the embodiment of the present invention
Slightly.
Detailed description of the invention: intelligent gateway 10;WEB management of process end 20 (WEB administration page 21);Remote management platform 30.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description.Obviously, described embodiment is only section Example of the present invention, instead of all the embodiments.Based on this
Embodiment in invention, those of ordinary skill in the art's every other reality obtained under that premise of not paying creative labor
Example is applied, shall fall within the protection scope of the present invention.
Existing gateway equipment is in use, it is difficult to reappear its failure environment and failure problems, and user is difficult to accurately
Operational order when failure is stated, the failure problems of gateway is caused to be difficult to reappear and be difficult to the problem of thoroughly excluding.
As shown in Figure 1, to solve the above-mentioned problems, the present embodiment proposes a kind of fault diagnosis based on intelligent gateway 10
Auxiliary system mainly includes intelligent gateway 10, and the WEB management of process end 20 connecting with intelligent gateway 10 and gateway remote
Manage platform 30;WEB management of process end 20 is equipped with WEB administration page 21, for formulating record time plan for intelligent gateway 10
Summary, local operation recording strategy, remote operation recording strategy and internal operation key parameter recording strategy;Intelligent gateway 10,
For also using according to record time parameter method, local operation recording strategy, remote operation recording strategy, internal operation key parameter
It records in by corresponding local operation record, remote operation record, internal operation key parameter and uploads to WEB management of process end 20
Carry out preservation and management;Gateway remote management platform 30 is for remotely operating intelligent gateway 10,10 pairs of nets of intelligent gateway
The remote operation for closing remote management platform 30 is recorded as remote operation record.
In the present embodiment, auxiliary system is provided with relevant operation and corresponding parameter for backup intelligence gateway 10
The WEB management of process end 20 of variation, if intelligent gateway 10 breaks down, maintenance personnel, can by checking WEB management of process end 20
Know the step of intelligent gateway 10 is executed before failure, with judge intelligent gateway 10 be generated when executing which part operation therefore
Barrier, and then judge the failure cause of intelligent gateway 10, and solution is formulated with regard to exact failure cause, improve intelligent gateway
10 maintenance efficiency, and guarantee that maintenance personnel can definitely know failure cause, and accurately carry out according to the reason to failure
It solves.
Wherein, record time parameter method is specifically, only save the record in a nearest preset time period;Internal operation key ginseng
Number recording strategy specifically includes, and when the CPU usage of intelligent gateway 10 reaches pre-set threshold, is recorded;Work as intelligent network
When the memory usage of pass 10 reaches pre-set threshold, recorded;When the master chip temperature of intelligent gateway 10 reaches presetting
When threshold value, recorded;When reception power, transmission power reach pre-set threshold, recorded.
In the present embodiment, preset time period can be set according to the actual situation according to maintenance personnel or user of service,
If the internal storage space at WEB management of process end 20 is larger, preset time period can be elongated, if WEB management of process end 20
When internal storage space is smaller, preset time period can be shortened, but the setting of preset time period, need to be guaranteed within a preset period of time
The data of record can enable maintenance personnel judge the failure cause of intelligent gateway 10.
The selection of internal operation key parameter should also meet before maintenance personnel judges failure cause by Parameters variation
It mentions, when above-mentioned all kinds of parameters reach record standard, is recorded, guarantee that maintenance personnel can judge intelligence by the above parameter
The failure of gateway 10 shows, the corresponding failure problems for excluding intelligent gateway 10 after the associated operating steps in conjunction with intelligent gateway 10.
In addition, local operation recording strategy specifically includes: being recorded to the operation setting content of WEB administration page 21;
The received button operation of intelligent gateway 10, optical fiber plug operation, USB flash disk insertion operation are recorded;Intelligent gateway 10 is issued
WIFI signal be connected to domestic consumer's usage quantity of intelligent gateway 10 and record.
Remote operation recording strategy specifically includes: gateway remote management platform 30 grasps the configuration that intelligent gateway 10 carries out
It is recorded;Updating operation and upgrade file size that gateway remote management platform 30 carries out intelligent gateway 10 are remembered
Record.
Intelligent gateway 10 records local operation, remote operation, internal operation key parameter, specifically: intelligent gateway 10 will
Local operation, remote operation, internal operation key parameter are recorded separately in a predetermined flash subarea;For local operation, far
Journey operation is recorded after receiving concrete operations request, before actually accomplishing operation, after the completion of record, then executes tool
Gymnastics is made.
In the present embodiment, to local operation and remote operation, using first recording, the mode executed afterwards is recorded,
It ensure that the operating procedure recorded at WEB management of process end 20 is the operation that intelligent gateway 10 definitely executes, avoid intelligent gateway
10 after executing any operation software it is not normal, cause record lose the case where.
As shown in Figures 2 to 4, the present embodiment also proposed a kind of fault diagnosis householder method based on intelligent gateway,
It mainly comprises the steps that
S1 formulates record time parameter method, local operation recording strategy, remote operation recording strategy and interior for intelligent gateway
Portion runs key parameter recording strategy;
S2, intelligent gateway is according to record time parameter method, local operation recording strategy, remote operation recording strategy, internal fortune
Row key parameter recording strategy records local operation, remote operation, internal operation key parameter;
S3, intelligent gateway records local operation, remote operation record, internal operation key parameter record upload to WEB
Management of process end carries out preservation and management.
In the present embodiment, intelligent gateway is according to record time parameter method, local operation recording strategy, remote operation record plan
Slightly with internal operation key parameter recording strategy, keeps a record to parameter and is uploaded to WEB management of process end, checked to save,
And recording strategy can by maintenance personnel or user of service according to the needs of use or the memory space at WEB process end is set, with
Adapt to different intelligent gateway or WEB management of process end.
Wherein, time parameter method is recorded in step S2 specifically: only save the record in a nearest preset time period;Inside fortune
Row key parameter recording strategy specifically includes, and when the CPU usage of intelligent gateway reaches pre-set threshold, is recorded;When
When the memory usage of intelligent gateway reaches pre-set threshold, recorded;When the master chip temperature of intelligent gateway reaches default
When determining threshold value, recorded;When the reception power of intelligent gateway, transmission power reach pre-set threshold, recorded.
In the present embodiment, it is set with preset time period, can be used for limiting in WEB management of process end for recording each data
Space size, guarantee that record data will not influence the normal operation of intelligent gateway, avoid low memory and lead to intelligent gateway
The not normal situation of system.In addition, being set with record condition, only detect that above-mentioned data reach pre-set threshold in intelligent gateway
When, it just will do it record, guarantee that the data of intelligent gateway record are effective data, guarantee that maintenance personnel can be by standby
The data of part judge failure problems.
Wherein, in step s 2, local operation recording strategy specifically include to the operation setting content of WEB administration page into
Row record;The received button operation of intelligent gateway, optical fiber plug operation, USB flash disk insertion operation are recorded;To passing through intelligent network
Domestic consumer's usage quantity that the WIFI signal that pass issues is connected to intelligent gateway records.
In addition, in step s 2, local operation recording strategy specifically includes: by gateway remote management platform to intelligent gateway
The configuration operation of progress is recorded;The updating operation and upgrade file that gateway remote management platform carries out intelligent gateway are big
It is small to be recorded.
In addition, in step s 2, intelligent gateway individually records local operation, remote operation, internal operation key parameter
In a predetermined flash subarea;For local operation, remote operation, intelligent gateway is after receiving concrete operations request, reality
Border completes to be recorded before operation, after the completion of record, then executes concrete operations.
In the present embodiment, execute local operation or remote operation before, first recorded, redoed, avoid because
Any operation causes Intelligent gateway system is not normal to be difficult to upload relevant parameter, and caused failure cause is difficult to the problem of recording.
In conclusion a kind of fault diagnosis auxiliary system and its method based on intelligent gateway is proposed in the present embodiment,
It saves intelligent gateway for backing up and operates whithin a period of time and the variation of parameter, so that maintenance personnel checks Backup Data simultaneously
The failure problems of intelligent gateway are judged according to data, and are directly solved according to failure problems, guarantee the solution efficiency of failure,
And accuracy.
Embodiments described above does not constitute the restriction to the technical solution protection scope.It is any in above-mentioned implementation
Made modifications, equivalent substitutions and improvements etc., should be included in the protection model of the technical solution within the spirit and principle of mode
Within enclosing.
Claims (10)
1. a kind of fault diagnosis auxiliary system based on intelligent gateway, it is characterised in that: including intelligent gateway and with the intelligence
The WEB management of process end of gateway connection and gateway remote manage platform;
WEB management of process end is used for for intelligent gateway formulation record time parameter method, originally equipped with WEB administration page
Ground operation note strategy, remote operation recording strategy and internal operation key parameter recording strategy;
The intelligent gateway, for according to the record time parameter method, local operation recording strategy, remotely operate recording strategy,
Internal operation key parameter recording strategy records local operation, remote operation, internal operation key parameter, and being also used to will be corresponding
Local operation record, remote operation record, internal operation key parameter record upload to WEB management of process end and are saved
And management;
The gateway remote management platform is for remotely operating the intelligent gateway, and the intelligent gateway is to the gateway
The remote operation of remote management platform is then recorded as the remote operation record.
2. a kind of fault diagnosis auxiliary system based on intelligent gateway according to claim 1, it is characterised in that:
The record time parameter method is specifically, only save the record in a nearest preset time period;
The internal operation key parameter recording strategy specifically includes, when the intelligent gateway,
When CPU usage reaches presetting threshold values, recorded;
When memory usage reaches presetting threshold values, recorded;
When master chip temperature reaches presetting threshold values, recorded;
When reception power, transmission power reach presetting threshold values, recorded.
3. a kind of fault diagnosis auxiliary system based on intelligent gateway according to claim 1, which is characterized in that described
Ground operation note strategy specifically includes:
The operation setting content of the WEB administration page is recorded;
The received button operation of the intelligent gateway, optical fiber plug operation, USB flash disk insertion operation are recorded;
The domestic consumer's usage quantity for being connected to the intelligent gateway to the WIFI signal issued by the intelligent gateway carries out
Record.
4. a kind of fault diagnosis auxiliary system based on intelligent gateway according to claim 1, which is characterized in that described remote
Journey operation note strategy specifically includes:
Gateway remote management platform records the configuration operation that the intelligent gateway carries out;
Updating operation and upgrade file size that gateway remote management platform carries out the intelligent gateway are recorded.
5. a kind of fault diagnosis auxiliary system based on intelligent gateway according to claim 1, which is characterized in that the intelligence
Energy gateway records local operation, remote operation, internal operation key parameter, specifically:
The local operation, remote operation, internal operation key parameter are recorded separately in a predetermined flash by the intelligent gateway
In subregion;
For the local operation, remote operation, remembered after receiving concrete operations request, before actually accomplishing operation
It records, after the completion of record, then executes concrete operations.
6. a kind of fault diagnosis householder method based on intelligent gateway, which comprises the following steps:
S1 formulates record time parameter method, local operation recording strategy, remote operation recording strategy and internal fortune for intelligent gateway
Row key parameter recording strategy;
S2, the intelligent gateway is according to the record time parameter method, local operation recording strategy, remote operation recording strategy, interior
Portion runs key parameter recording strategy and records local operation, remote operation, internal operation key parameter;
S3, the intelligent gateway records local operation, remote operation record, internal operation key parameter record upload to WEB
Management of process end carries out preservation and management.
7. a kind of fault diagnosis householder method based on intelligent gateway according to claim 6, which is characterized in that described
In step S2, the record time parameter method specifically: only save the record in a nearest preset time period;
The internal operation key parameter recording strategy specifically includes, when the intelligent gateway:
When CPU usage reaches presetting threshold values, recorded;
When memory usage reaches presetting threshold values, recorded;
When master chip temperature reaches presetting threshold values, recorded;
When reception power, transmission power reach presetting threshold values, recorded.
8. a kind of fault diagnosis householder method based on intelligent gateway according to claim 6, it is characterised in that: described
In step S2, the local operation recording strategy is specifically included,
The operation setting content of WEB administration page is recorded;
The received button operation of the intelligent gateway, optical fiber plug operation, USB flash disk insertion operation are recorded;
The domestic consumer's usage quantity for being connected to the intelligent gateway to the WIFI signal issued by the intelligent gateway carries out
Record.
9. a kind of fault diagnosis householder method based on intelligent gateway according to claim 8, which is characterized in that described
In step S2, the local operation recording strategy is specifically included:
Gateway remote management platform records the configuration operation that the intelligent gateway carries out;
Updating operation and upgrade file size that gateway remote management platform carries out the intelligent gateway are recorded.
10. a kind of fault diagnosis householder method based on intelligent gateway according to claim 9, it is characterised in that:
In the step S2, the intelligent gateway individually remembers the local operation, remote operation, internal operation key parameter
Record is in a predetermined flash subarea;
For the local operation, remote operation, the intelligent gateway receive a concrete operations request after, actually accomplish behaviour
It is recorded before making, after the completion of record, then executes concrete operations.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910206030.0A CN109995584A (en) | 2019-03-19 | 2019-03-19 | A kind of fault diagnosis auxiliary system and its method based on intelligent gateway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910206030.0A CN109995584A (en) | 2019-03-19 | 2019-03-19 | A kind of fault diagnosis auxiliary system and its method based on intelligent gateway |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109995584A true CN109995584A (en) | 2019-07-09 |
Family
ID=67130689
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910206030.0A Pending CN109995584A (en) | 2019-03-19 | 2019-03-19 | A kind of fault diagnosis auxiliary system and its method based on intelligent gateway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109995584A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111404778A (en) * | 2020-03-12 | 2020-07-10 | 深圳市吉祥腾达科技有限公司 | Gateway testing method and device and computer readable storage medium |
CN112600736A (en) * | 2020-12-15 | 2021-04-02 | 安徽长泰信息安全服务有限公司 | Remote operation and maintenance management system for intelligent gateway |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070162245A1 (en) * | 2006-01-11 | 2007-07-12 | Honeywell International Inc. | Remote remediation monitoring system |
US20080165789A1 (en) * | 2006-12-29 | 2008-07-10 | Prodea Systems, Inc. | Billing, Alarm, Statistics and Log Information Handling in Multi-Services Gateway Device at User Premises |
JP2011250008A (en) * | 2010-05-25 | 2011-12-08 | Toyota Motor Corp | Gateway apparatus |
CN103166777A (en) * | 2011-12-13 | 2013-06-19 | 成都勤智数码科技有限公司 | Operation method and device for equipment remote operation and maintenance |
US8639989B1 (en) * | 2011-06-30 | 2014-01-28 | Amazon Technologies, Inc. | Methods and apparatus for remote gateway monitoring and diagnostics |
CN104580233A (en) * | 2015-01-16 | 2015-04-29 | 重庆邮电大学 | Internet of Things smart home security gateway system |
CN106789305A (en) * | 2016-12-30 | 2017-05-31 | 中科同德(北京)生态科技有限公司 | The intelligent gateway and control method of a kind of long-range adjusting parameter |
CN107947956A (en) * | 2016-10-13 | 2018-04-20 | 深圳市中兴微电子技术有限公司 | Analyze method, gateway device, server and the system of user's operation behavior |
CN108768724A (en) * | 2018-05-30 | 2018-11-06 | 上海顺舟智能科技股份有限公司 | Gateway control method and intelligent gateway |
-
2019
- 2019-03-19 CN CN201910206030.0A patent/CN109995584A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070162245A1 (en) * | 2006-01-11 | 2007-07-12 | Honeywell International Inc. | Remote remediation monitoring system |
US20080165789A1 (en) * | 2006-12-29 | 2008-07-10 | Prodea Systems, Inc. | Billing, Alarm, Statistics and Log Information Handling in Multi-Services Gateway Device at User Premises |
JP2011250008A (en) * | 2010-05-25 | 2011-12-08 | Toyota Motor Corp | Gateway apparatus |
US8639989B1 (en) * | 2011-06-30 | 2014-01-28 | Amazon Technologies, Inc. | Methods and apparatus for remote gateway monitoring and diagnostics |
CN103166777A (en) * | 2011-12-13 | 2013-06-19 | 成都勤智数码科技有限公司 | Operation method and device for equipment remote operation and maintenance |
CN104580233A (en) * | 2015-01-16 | 2015-04-29 | 重庆邮电大学 | Internet of Things smart home security gateway system |
CN107947956A (en) * | 2016-10-13 | 2018-04-20 | 深圳市中兴微电子技术有限公司 | Analyze method, gateway device, server and the system of user's operation behavior |
CN106789305A (en) * | 2016-12-30 | 2017-05-31 | 中科同德(北京)生态科技有限公司 | The intelligent gateway and control method of a kind of long-range adjusting parameter |
CN108768724A (en) * | 2018-05-30 | 2018-11-06 | 上海顺舟智能科技股份有限公司 | Gateway control method and intelligent gateway |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111404778A (en) * | 2020-03-12 | 2020-07-10 | 深圳市吉祥腾达科技有限公司 | Gateway testing method and device and computer readable storage medium |
CN112600736A (en) * | 2020-12-15 | 2021-04-02 | 安徽长泰信息安全服务有限公司 | Remote operation and maintenance management system for intelligent gateway |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103123484B (en) | Transformer station's Condition Monitoring Data standardization connecting system and method | |
CN102571498B (en) | Fault injection control method and device | |
CN103326465B (en) | A kind of power distribution network terminal cut-in method based on IEC61850 standard | |
CN109995584A (en) | A kind of fault diagnosis auxiliary system and its method based on intelligent gateway | |
CN103699063B (en) | The harvester of off-line data and method in a kind of Manufacturing Executive System MES | |
CN110428533B (en) | Intelligent lockset management system for realizing integration of misoperation-preventive lock control based on Internet of things | |
CN102929224B (en) | Condition acquisition controller (CAC) for power transformer equipment and system control method | |
CN104880629B (en) | The remote diagnosis method of dispatching terminal protection element action behavior | |
CN104125085B (en) | A kind of data management-control method and device based on ESB | |
CN106304136B (en) | Method, system, controller and simulated mobile equipment for acquiring network state information | |
CN103166776A (en) | Access network device total management system | |
CN106249727A (en) | A kind of management system of lithium battery pole slice assembly line | |
CN209545248U (en) | A kind of intelligent Substation System of visualized O&M | |
CN103581622A (en) | Method and system for remote video monitoring of intelligent terminal | |
CN104281976A (en) | Power secondary system reliability assessment information processing method | |
CN101489151A (en) | Television network monitoring system, monitoring device and monitoring method thereof | |
CN108289130B (en) | Intelligent terminal for water conservancy Internet of things sensing and controlling platform and data transmission method | |
CN104065503A (en) | Discriminant analysis method for fault sourcing of facilities in intelligent traffic internet of things | |
CN109857765A (en) | Client's power failure data analysing method and device | |
CN106899436A (en) | A kind of cloud platform failure predication diagnostic system | |
CN106878441A (en) | Ice machine control method, apparatus and system | |
CN102222980A (en) | Transient wave-recording playback system of series capacitor compensation device or fault current limiter device | |
CN106888128A (en) | A kind of transformer station's Intranet monitoring system and its monitoring method | |
CN206698240U (en) | A kind of transformer station's Intranet monitoring system | |
CN111665771A (en) | Infrastructure monitoring system and monitoring method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190709 |