CN109977496A - Efficient information exchange and the architectural engineering artwork integrated system and method to cooperate - Google Patents

Efficient information exchange and the architectural engineering artwork integrated system and method to cooperate Download PDF

Info

Publication number
CN109977496A
CN109977496A CN201910177657.8A CN201910177657A CN109977496A CN 109977496 A CN109977496 A CN 109977496A CN 201910177657 A CN201910177657 A CN 201910177657A CN 109977496 A CN109977496 A CN 109977496A
Authority
CN
China
Prior art keywords
project
design
threedimensional model
participant
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910177657.8A
Other languages
Chinese (zh)
Inventor
何况
郑华河
林锋
陈伟聪
吴丽琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baimouling Information Technology (xiamen) Co Ltd
Original Assignee
Baimouling Information Technology (xiamen) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baimouling Information Technology (xiamen) Co Ltd filed Critical Baimouling Information Technology (xiamen) Co Ltd
Priority to CN201910177657.8A priority Critical patent/CN109977496A/en
Publication of CN109977496A publication Critical patent/CN109977496A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/101Collaborative creation, e.g. joint development of products or services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/02CAD in a network environment, e.g. collaborative CAD or distributed simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Geometry (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Data Mining & Analysis (AREA)
  • Computer Hardware Design (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses the architectural engineering artwork integrated systems a kind of efficient information exchange and cooperated, including collaborative platform and control platform;Collaborative platform optimizes threedimensional model for importing two-dimensional design drawing and being converted to threedimensional model;Control platform is used to carry out real-time or regular communication for all items participant in Whole Life Cycle of Projects, and carries out collection to the information and knowledge that generate in communication process and neutralize system administration, inquires and traces for project participant;It is also used to deeply design three-dimensional construction model and drawing on the basis of threedimensional model for project participant.The information of each side's generation is participated in project in Whole Life Cycle of Projects and knowledge is managed concentratedly, and improve the systematization of problem communication efficiency and record, projects participant is solved, the problem of each design specialist Asymmetry information etc. carries out going deep into design and communication exchange with threedimensional model.

Description

Efficient information exchange and the architectural engineering artwork integrated system and method to cooperate
Technical field
The present invention relates to construction engineering technical fields, particularly relate to a kind of building work efficient information exchange and cooperated Journey artwork integrated system and method.
Background technique
Trade information exchanges pain spot: originally in building design stage using the point-to-point information interchange mode of Fig. 1.According to Statistics in relation to international data is had the disadvantage that using such point-to-point exchange way:
(1) 2/3rds in traditional construction project the problem of, is all related with information interchange;
(2) in construction project 10%~33% increased costs all with information interchange there are the problem of it is related;
(3) in Large Scale Construction Engineering, change in the work caused by information interchange problem and mistake account for about total investment of engineering 3%~5%;
Design phase pain spot: currently, in the building trade construction documents design phase, respectively the side of taking part in building because drawing information it is inconsistent, Communication efficiency is low, causes each side's drawing information inconsistent, seriously affects construction speed and construction quality.It is mainly reflected in:
1, respectively the side's of taking part in building information (drawing version) is inconsistent, and communication efficiency is low;
2, electromechanical speciality design standard is low, and concertedness is low, needs to carry out pipeline layout optimization;
3, multi-specialized coordination is insufficient, and drawing quality is lower, and it is more that scarce problem is touched in mistakes and omissions;
4, change modification is more, and design and management of blueprint difficulty are big;
5, two-dimentional drawing cannot intuitively reflect final version effect, and communication, which is told somebody what one's real intentions are, coordinates inconvenience.
Summary of the invention
The present invention proposes the architectural engineering artwork integrated system and method for a kind of efficient information exchange and collaborative work, to item Project participates in the information of each side's generation in mesh Life cycle and knowledge is managed concentratedly, and improves problem communication efficiency and note The systematization of record, respectively the side of taking part in building, the problem of each design specialist Asymmetry information etc. carry out going deep into design with threedimensional model solution project With communication exchange.
The technical scheme of the present invention is realized as follows:
A kind of architectural engineering artwork integrated system efficient information exchange and cooperated, including collaborative platform and control are put down Platform;
The collaborative platform carries out threedimensional model excellent for importing two-dimensional design drawing and being converted to threedimensional model Change;
The control platform is used to carry out real-time or regular communication for all items participant in Whole Life Cycle of Projects, and Collection is carried out to the information and knowledge that generate in communication process and neutralizes system administration, inquires and traces for project participant;It is also used to Three-dimensional construction model and drawing are deeply designed on the basis of threedimensional model for project participant.
Further, it imports the two-dimentional drawing of Preliminary design and is converted to threedimensional model and refer specifically to set up family of standards library Parameter, and the computer program by writing reads the relevant parameter of the respective members in preliminary drawings, converts it into three Dimension module.
Further, the project participant includes at least project development quotient, project supervision, design side and construction party, institute It states design side and design drawing and design scheme is uploaded to the collaborative platform, the collaborative platform is by two-dimensional design conversion of drawings For threedimensional model, the project development quotient, project supervision and construction party selectively check two-dimensional design drawing or threedimensional model Or design scheme and propose problem and suggestion;The construction party shares field condition, condition of construction to described with rectification situation Control platform inquires for project development quotient, project supervision and design side and proposes problem and suggestion.
Further, the control platform saves, shows the contact method of project participant, reminds periodically or in real time project Participant.
A kind of architectural engineering artwork integrated method efficient information exchange and cooperated, is exchanged and is assisted based on efficient information Architectural engineering artwork integrated system with work realizes that the system comprises collaborative platforms and control platform;It specifically includes following Step:
(1) project is established in control platform, the role for participant of identifying project and permission;
(2) design drawing is uploaded to collaborative platform, is converted to threedimensional model;
(3) project participant judges threedimensional model with the presence or absence of mistake, if need to optimize, if so, modification mistake or Optimize threedimensional model;
(4) in Whole Life Cycle of Projects, project participant is based on control platform and in real time or periodically hand over for project Stream;Control platform to the information and knowledge that are generated in communication process carry out collection neutralize system administration, for project participant inquiry and Retrospect.
Further, design drawing is uploaded to collaborative platform by step (2), is converted to threedimensional model and is specifically included and sets up mark Quasi- race library parameter, and the computer program by writing reads the relevant parameter of the respective members in preliminary drawings, by its turn It is melted into threedimensional model.
Further, the project participant includes at least project development quotient, project supervision, design side and construction party, institute It states design side and design drawing and design scheme is uploaded to the collaborative platform, the collaborative platform is by two-dimensional design conversion of drawings For threedimensional model, the project development quotient, project supervision and construction party selectively check two-dimensional design drawing or threedimensional model Or design scheme and propose problem and suggestion;The construction party shares field condition, condition of construction to described with rectification situation Control platform inquires for project development quotient, project supervision and design side and proposes problem and suggestion.
Further, the control platform saves, shows the contact method of project participant, reminds periodically or in real time project Participant.
The beneficial effects of the present invention are: in Whole Life Cycle of Projects project participate in each side generate information and knowledge into Row centralized management, and improves the systematization of problem communication efficiency and record, and each side of taking part in building of solution project, each design specialist information is not The problem of equity carries out going deep into design and communication exchange with threedimensional model.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the point-to-point information interchange mode that building design stage uses;
Fig. 2 is the functional block diagram for the architectural engineering artwork integrated system that efficient information exchanges and cooperates;
Fig. 3 is using the information interchange mode after present system;
Fig. 4 is the Application Example of present system;
Fig. 5 is the project operation interface of control platform;
Fig. 6 is the task operating interface of control platform;
The problem of Fig. 7 is control platform report list;
Fig. 8 is problem report template;
Fig. 9 is the new problem report embodiment of addition.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
As shown in figs 2-4, the invention proposes the architectural engineering artworks one a kind of efficient information exchange and cooperated System system, including collaborative platform and control platform;
Collaborative platform optimizes threedimensional model for importing two-dimensional design drawing and being converted to threedimensional model;Association With platform the Preliminary design achievement of architectural discipline is converted to threedimensional model by computer automatically, and threedimensional model is carried out excellent Change, model can be used in the construction drawing design of each profession, changes each profession the case where fighting separately the design phase, and And be designed using threedimensional model technology, increase intuitive and improves projected depth.
Control platform is used to carry out real-time or regular communication for all items participant in Whole Life Cycle of Projects, and to friendship The information and knowledge generated during stream carries out collection and neutralizes system administration, inquires and traces for project participant;It is also used to for item Mesh participant deeply designs three-dimensional construction model and drawing on the basis of threedimensional model.Control platform point profession, grade and many Keyword has recorded the exchange and achievement of all items participant in Whole Life Cycle of Projects in detail.It is handed in real time compared to wechat etc. Stream mode also has systematicness and the property related using the exchange way of control platform other than real-time delivery, and manages flat Platform can show threedimensional model to project participant, have private and professional.
It imports the two-dimentional drawing of Preliminary design and is converted to threedimensional model and refer specifically to set up family of standards library parameter, and lead to The relevant parameter that the computer program write reads the respective members in preliminary drawings is crossed, threedimensional model is converted it into.Mark Quasi- race library parameter includes the length, width and height material of beam, length, width and height material of column etc..Following table is the illustration in standard group library.
Project participant includes at least project development quotient, project supervision, design side and construction party, and design side is by design drawing It is uploaded to collaborative platform with design scheme, two-dimensional design conversion of drawings is threedimensional model, project development quotient, engineering by collaborative platform Management and construction party selectively check two-dimensional design drawing or threedimensional model or design scheme and propose problem and suggestion;Construction Side shares field condition, condition of construction to control platform with rectification situation, looks into for project development quotient, project supervision and design side It askes and proposes problem and suggestion.
Control platform saves, shows the contact method of project participant, timing or in real time prompting project participant.
Outstanding management and cooperation is linked up the drawbacks of can reducing under to a certain degree because of point-to-point communication, and market On have the company of being directed to and can replace for the erp management system of other industry.But building trade is directed to the characteristics of project The erp of other industry can not be adapted to completely.The mode that traditional two-dimentional drawing and each profession are fought separately does not have three-dimensional mould The intuitive and collaborative of type.
In implementation process, collaborative platform can be realized based on BIM work station, be three-dimensional mould by two-dimensional design conversion of drawings Type, multiple BIM work stations can work at the same time, and control platform extracts the data of threedimensional model from BIM work station, join for project It inquired, watched and mark etc. with side and operated.Control platform includes client, the end WAP and computer end, realizes a variety of login sides Formula.
The invention also provides the architectural engineering artwork integrated methods a kind of efficient information exchange and cooperated, based on height The architectural engineering artwork integrated system for imitating information interchange and collaborative work realizes that system includes collaborative platform and control platform;Tool Body the following steps are included:
(1) project is established in control platform, the role for participant of identifying project and permission;Specifically, can be in control platform Some projects template is set, the role of default definition project participant and permission in project templet, in the actual operation process Role and permission can be adjusted.In order to facilitate management, several ID are can be preset in control platform, the ID and project participant Role corresponds, and has pre-defined the default privilege of the ID;After the grassroot project in control platform, project participant is true After fixed, ID is distributed into each project participant, after project terminates or project participant is left office, recycles ID, to repeat benefit With for the leaving office of project participant, such as designing institute engineer leaving office or situations such as waiting of having a holiday, the project participant taken over is (newly Designing institute engineer) inherit ID, all information of former project participant can be viewed, avoid loss of learning.
(2) design drawing is uploaded to collaborative platform, is converted to threedimensional model;
(3) project participant judges threedimensional model with the presence or absence of mistake, if need to optimize, if so, modification mistake or Optimize threedimensional model;
(4) in Whole Life Cycle of Projects, project participant is based on control platform and in real time or periodically hand over for project Stream;Control platform to the information and knowledge that are generated in communication process carry out collection neutralize system administration, for project participant inquiry and Retrospect.
Design drawing is uploaded to collaborative platform by step (2), be converted to threedimensional model specifically include set up family of standards library ginseng Number, and the computer program by writing reads the relevant parameter of the respective members in preliminary drawings, converts it into three-dimensional Model.
Project participant includes at least project development quotient, project supervision, design side and construction party, and design side is by design drawing It is uploaded to collaborative platform with design scheme, two-dimensional design conversion of drawings is threedimensional model, project development quotient, engineering by collaborative platform Management and construction party selectively check two-dimensional design drawing or threedimensional model or design scheme and propose problem and suggestion;Construction Side shares field condition, condition of construction to control platform with rectification situation, looks into for project development quotient, project supervision and design side It askes and proposes problem and suggestion.
Control platform saves, shows the contact method of project participant, timing or in real time prompting project participant.
As shown in Fig. 5-Fig. 9, in actual application, the operation interface of control platform includes the project of the leftmost side, appoints Business, workflow, documentation and system administration etc. click project, the operation newly such as can be increased, be deleted to project;Point Task is hit, after selecting a certain project, it may appear that all tasks of the project;Subevent is clicked, new problem report can be issued, Fill in the problem of having set report template.In problem report, the expected event of Resolving probiems can be set and added Each stage is added to execute the personnel of work;In task function choosing-item, the report of EXCEL batch RELEASE PROBLEM can be also imported;It clicks Documentation, it can be achieved that file data downloading.
The present invention participates in the information of each side's generation to project in Whole Life Cycle of Projects and knowledge is managed concentratedly, and mentions The systematization of high problem communication efficiency and record, each side of taking part in building of solution project, the problem of each design specialist Asymmetry information etc., with three Dimension module carries out going deep into design and communication exchange.
The above is merely preferred embodiments of the present invention, be not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (8)

1. a kind of architectural engineering artwork integrated system efficient information exchange and cooperated, it is characterised in that: flat including cooperateing with Platform and control platform;
The collaborative platform optimizes threedimensional model for importing two-dimensional design drawing and being converted to threedimensional model;
The control platform is used to carry out real-time or regular communication for all items participant in Whole Life Cycle of Projects, and to friendship The information and knowledge generated during stream carries out collection and neutralizes system administration, inquires and traces for project participant;It is also used to for item Mesh participant deeply designs three-dimensional construction model and drawing on the basis of threedimensional model.
2. the architectural engineering artwork integrated system according to claim 1 efficient information exchange and cooperated, feature It is: imports the two-dimentional drawing of Preliminary design and be converted to threedimensional model to refer specifically to set up family of standards library parameter, and passes through The computer program write reads the relevant parameter of the respective members in preliminary drawings, converts it into threedimensional model.
3. the architectural engineering artwork integrated system according to claim 1 efficient information exchange and cooperated, feature Be: the project participant includes at least project development quotient, project supervision, design side and construction party, and the design side will be set Meter drawing and design scheme are uploaded to the collaborative platform, and two-dimensional design conversion of drawings is threedimensional model by the collaborative platform, The project development quotient, project supervision and construction party selectively check two-dimensional design drawing or threedimensional model or design scheme simultaneously It is proposed problem and suggestion;The construction party shares field condition, condition of construction to the control platform, for item with rectification situation Mesh developer, project supervision and design side inquire and propose problem and suggestion.
4. the architectural engineering artwork integrated system according to claim 3 efficient information exchange and cooperated, feature Be: the control platform saves, shows the contact method of project participant, timing or in real time prompting project participant.
5. a kind of architectural engineering artwork integrated method efficient information exchange and cooperated, is exchanged and is cooperateed with based on efficient information The architectural engineering artwork integrated system of work realizes that the system comprises collaborative platforms and control platform;It is characterized in that, specific The following steps are included:
(1) project is established in control platform, the role for participant of identifying project and permission;
(2) design drawing is uploaded to collaborative platform, is converted to threedimensional model;
(3) project participant judges threedimensional model with the presence or absence of mistake, if needs to optimize, if so, modification mistake or optimization Threedimensional model;
(4) in Whole Life Cycle of Projects, project participant is based on control platform and carries out real-time or regular communication for project;Pipe Control platform carries out collection to the information and knowledge that generate in communication process and neutralizes system administration, inquires and traces for project participant.
6. the architectural engineering artwork integrated method according to claim 5 efficient information exchange and cooperated, feature Be: design drawing is uploaded to collaborative platform by step (2), is converted to threedimensional model and is specifically included and sets up family of standards library parameter, And the computer program by writing reads the relevant parameter of the respective members in preliminary drawings, converts it into three-dimensional mould Type.
7. the architectural engineering artwork integrated method according to claim 5 efficient information exchange and cooperated, feature Be: the project participant includes at least project development quotient, project supervision, design side and construction party, and the design side will be set Meter drawing and design scheme are uploaded to the collaborative platform, and two-dimensional design conversion of drawings is threedimensional model by the collaborative platform, The project development quotient, project supervision and construction party selectively check two-dimensional design drawing or threedimensional model or design scheme simultaneously It is proposed problem and suggestion;The construction party shares field condition, condition of construction to the control platform, for item with rectification situation Mesh developer, project supervision and design side inquire and propose problem and suggestion.
8. the architectural engineering artwork integrated method according to claim 7 efficient information exchange and cooperated, feature Be: the control platform saves, shows the contact method of project participant, timing or in real time prompting project participant.
CN201910177657.8A 2019-03-09 2019-03-09 Efficient information exchange and the architectural engineering artwork integrated system and method to cooperate Pending CN109977496A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910177657.8A CN109977496A (en) 2019-03-09 2019-03-09 Efficient information exchange and the architectural engineering artwork integrated system and method to cooperate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910177657.8A CN109977496A (en) 2019-03-09 2019-03-09 Efficient information exchange and the architectural engineering artwork integrated system and method to cooperate

Publications (1)

Publication Number Publication Date
CN109977496A true CN109977496A (en) 2019-07-05

Family

ID=67078312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910177657.8A Pending CN109977496A (en) 2019-03-09 2019-03-09 Efficient information exchange and the architectural engineering artwork integrated system and method to cooperate

Country Status (1)

Country Link
CN (1) CN109977496A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110880096A (en) * 2019-11-20 2020-03-13 广西越知网络股份有限公司 Multi-party cooperative office system for constructional engineering
CN111274643A (en) * 2020-02-11 2020-06-12 中国建筑西南设计研究院有限公司 Three-dimensional intelligent design collaboration platform development method
CN112307543A (en) * 2020-10-30 2021-02-02 湖南宝家云建筑工程管理有限公司 Visual model construction method for guiding house construction and house construction system
CN113095641A (en) * 2021-03-29 2021-07-09 中天昊建设管理集团股份有限公司 Project general contract project management system
CN117611101A (en) * 2023-12-15 2024-02-27 济南中建建筑设计院有限公司 Engineering design project flow management system and method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103500372A (en) * 2013-08-08 2014-01-08 机械工业第六设计研究院有限公司 Collaborative design method and system based on SOA
CN103530827A (en) * 2013-09-26 2014-01-22 中铁建设集团有限公司 Assembly type building component intelligent management system based on BIM (building information modeling)
CN108269071A (en) * 2018-03-15 2018-07-10 叶枫 The method that buildings model is shared cloud platform and project management is carried out using platform
CN108776875A (en) * 2018-06-22 2018-11-09 中船第九设计研究院工程有限公司 A kind of cooperative operation system based on design, construction and O&M set
CN109472074A (en) * 2018-10-30 2019-03-15 刘燕 A kind of Design of digital and virtual construction method of implementable positive construction project
CN109885904A (en) * 2019-01-29 2019-06-14 杭州凌望建筑科技有限公司 Multidimensional mould based on BIM examines construction collaborative platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103500372A (en) * 2013-08-08 2014-01-08 机械工业第六设计研究院有限公司 Collaborative design method and system based on SOA
CN103530827A (en) * 2013-09-26 2014-01-22 中铁建设集团有限公司 Assembly type building component intelligent management system based on BIM (building information modeling)
CN108269071A (en) * 2018-03-15 2018-07-10 叶枫 The method that buildings model is shared cloud platform and project management is carried out using platform
CN108776875A (en) * 2018-06-22 2018-11-09 中船第九设计研究院工程有限公司 A kind of cooperative operation system based on design, construction and O&M set
CN109472074A (en) * 2018-10-30 2019-03-15 刘燕 A kind of Design of digital and virtual construction method of implementable positive construction project
CN109885904A (en) * 2019-01-29 2019-06-14 杭州凌望建筑科技有限公司 Multidimensional mould based on BIM examines construction collaborative platform

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110880096A (en) * 2019-11-20 2020-03-13 广西越知网络股份有限公司 Multi-party cooperative office system for constructional engineering
CN110880096B (en) * 2019-11-20 2023-10-31 广西越知网络股份有限公司 Multi-party collaborative office system for building engineering
CN111274643A (en) * 2020-02-11 2020-06-12 中国建筑西南设计研究院有限公司 Three-dimensional intelligent design collaboration platform development method
CN112307543A (en) * 2020-10-30 2021-02-02 湖南宝家云建筑工程管理有限公司 Visual model construction method for guiding house construction and house construction system
CN113095641A (en) * 2021-03-29 2021-07-09 中天昊建设管理集团股份有限公司 Project general contract project management system
CN117611101A (en) * 2023-12-15 2024-02-27 济南中建建筑设计院有限公司 Engineering design project flow management system and method thereof
CN117611101B (en) * 2023-12-15 2024-04-26 济南中建建筑设计院有限公司 Engineering design project flow management system and method thereof

Similar Documents

Publication Publication Date Title
CN109977496A (en) Efficient information exchange and the architectural engineering artwork integrated system and method to cooperate
CN108665248A (en) Architecture information integrated management system based on BIM and construction method
CN107180069A (en) Engineering project information based on IFC data interactions delivers integrated management system
CN105046432A (en) Building dimensional guide construction method
CN114186984B (en) Two-dimensional and three-dimensional integrated collaborative design system for architectural design enterprise
CN102339327A (en) Device for displaying three-dimensional lightweight data format
Penttilä Early architectural design and BIM
CN113378011B (en) Construction method and system of complex product assembly digital twin body
CN110096270A (en) A kind of design drawing method for splitting and system based on .NET plug-in unit
CN104216845A (en) Process-oriented complex product final assembly data information transmitting method
CN111651818A (en) BIM model rapid change method
CN106779620A (en) Digitized Design Platform building method based on IPD systems
CN105243237A (en) Assembly technology structure tree and building method thereof
CN104346669A (en) Business logic modeling system based on 6W
CN103971186A (en) Large-scale amphibious aircraft data information control method based on CIs
CN101009001A (en) Method and system for implementing four-dimensional visualization of engineering model
CN104616073A (en) Precise management system based on digitized two-dimensional animation production
KR100791475B1 (en) Architectural design management system for cooperating with active partners
Liu et al. Research on application of BIM technology in construction project
CN104346441A (en) Dynamic integration and interaction method for information data of power distribution network
Cheng et al. BIM's content and its application in contemporary architectural design
Ni et al. A collaborative engine for enterprise application integration
CN111008427A (en) Method for realizing collaborative design of airplane complex structural part based on MBD
CN105956346A (en) Aluminum alloy template design system and aluminum alloy template design method
Russell et al. The meaning of BIM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination