CN109976733A - Software systems demand file generation method, device and terminal device - Google Patents

Software systems demand file generation method, device and terminal device Download PDF

Info

Publication number
CN109976733A
CN109976733A CN201910141944.3A CN201910141944A CN109976733A CN 109976733 A CN109976733 A CN 109976733A CN 201910141944 A CN201910141944 A CN 201910141944A CN 109976733 A CN109976733 A CN 109976733A
Authority
CN
China
Prior art keywords
project
file
software systems
paragraph
fields
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910141944.3A
Other languages
Chinese (zh)
Inventor
任晓德
许国杰
刘晓鹏
安平凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongke Hengyun Co Ltd
Original Assignee
Zhongke Hengyun Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongke Hengyun Co Ltd filed Critical Zhongke Hengyun Co Ltd
Priority to CN201910141944.3A priority Critical patent/CN109976733A/en
Publication of CN109976733A publication Critical patent/CN109976733A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/30Creation or generation of source code
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Software Systems (AREA)
  • Strategic Management (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention is suitable for technical field of information processing, disclose a kind of software systems demand file generation method, device and terminal device, this method comprises: receiving the project fields and project objective of user's input, the project flow file of preset format is obtained according to the project fields, obtain employee's professional ability rank of user's input, and software systems proto file is arranged according to employee's professional ability rank and the project flow file, the software systems proto file is assessed, if the software systems proto file meets the project objective, software systems demand file is then generated according to the software systems proto file.The project fields that this method can be inputted according to user generate the software systems demand file for meeting project objective, and high-efficient and accuracy is high.

Description

Software systems demand file generation method, device and terminal device
Technical field
The invention belongs to technical field of information processing more particularly to a kind of software systems demand file generation methods, device And terminal device.
Background technique
Project demands analysis is the incipient stage of project development, and the software systems demand file that it is exported is project construction The purpose reached finally it is expected by side, and the result close relation that the result and a project that project demands are analyzed are completed, therefore such as It is very crucial that, which generates software systems demand file,.
Carrying out demand analysis to project at present is the file analyzed relevant information by manual research and corresponding format is made It completes, and manually carries out investigation and analysis and there is a situation where that many inadequate specification even inaccuracy occur, it is likely that cause final Differ larger between the software systems demand file of output and actual items demand.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of software systems demand file generation method, device and terminals to set It is standby, there is a situation where that many inadequate specifications even inaccuracy occurs and may cause final to solve manually to carry out investigation and analysis Larger problem is differed between the project demands file of output and actual items demand.
The first aspect of the embodiment of the present invention provides a kind of software systems demand file generation method, comprising:
The project fields and project objective of user's input are received, the project fields carry out project demands point for characterizing Field described in the task items of analysis, the project objective characterize the task items purpose to be achieved;
The project flow file of preset format, the project process text of the preset format are obtained according to the project fields Part prestores in the database, and is stored with multiple and disparity items field in the database and presets lattice correspondingly The software systems flow file of formula;
The employee's professional ability rank for obtaining user's input, according to employee's professional ability rank and the stream of items Software systems proto file is arranged in journey file;
The software systems proto file is assessed, if the software systems proto file meets the project mesh Mark, then generate software systems demand file according to the software systems proto file, and the software systems demand file is used for table The corresponding function of software systems needed for showing user and process.
Optionally, the project objective be include task items problem to be solved and effect to be achieved File.
Optionally, after the project fields and project objective of the reception user input, the method also includes:
Information site corresponding with the project fields is jumped to, and the target domain is obtained by crawler algorithm Procedure information;The corresponding relationship of the project fields and the information site prestores in the database, and each project Field corresponds to more than one information site.
Optionally, the project process document generating method of the preset format includes;
According to the procedure information of the target domain got, the project flow file of preset format is generated.
Optionally, the procedure information for the target domain that the basis is got, generates the project process of preset format File, comprising:
Extract process keyword in the procedure information of the target domain got and with each process keyword Corresponding sentence;
Process keyword is matched with predetermined keyword, the project of the predetermined keyword and the preset format Flow file is corresponding, for characterizing each flow nodes;
Will sentence corresponding with the matched process keyword of some predetermined keyword, it is corresponding as the predetermined keyword Flow nodes content;
Using all predetermined keywords and corresponding sentence as entire project flow file.
Optionally, the process keyword extracted in the procedure information of the target domain got and with it is each The corresponding sentence of a process keyword, comprising:
According to the html label in procedure information web page code, procedure information web page contents are divided into multiple paragraphs;
The character length of each paragraph, the spacing distance of adjacent paragraph and paragraph inside concentration are counted as feature Value;Under the type that the spacing distance of the adjacent paragraph includes has a paragraph at a distance from a paragraph thereon and the paragraph and its The distance of one paragraph;The spacing distance of the adjacent paragraph is defined as the number of characters+M between paragraph, and wherein the value of M is according to one The end-tag of the previous paragraph of paragraph and the beginning label of the paragraph determine;
The core feature value of each paragraph is calculated according to the characteristic value;According to paragraph each in procedure information webpage Core feature Distribution value situation obtains the range that core feature value is concentrated the most, section of the core feature value in this threshold range Fall sentence corresponding as each process keyword.
The second aspect of the embodiment of the present invention provides a kind of project demands file creating apparatus, comprising:
Information receiving module, for receiving the project fields and project objective of user's input, the project fields are used for table Sign carries out field described in the task items of project demands analysis, and the project objective characterizes the task items to be reached Purpose;
File acquisition module, it is described default for obtaining the project flow file of preset format according to the project fields The project flow file of format prestores in the database, and multiple and disparity items field is stored in the database The software systems flow file of one-to-one preset format;
Setup module, for obtaining employee's professional ability rank of user's input, according to employee's professional ability rank With the project flow file, software systems proto file is set;
File generating module, for assessing the software systems proto file, if the software systems prototype is literary Part meets the project objective, then generates software systems demand file, the software system according to the software systems proto file System demand file is for the corresponding function of software systems and process needed for indicating user.
Optionally, further includes:
Jump module is obtained for jumping to information site corresponding with the project fields, and by crawler algorithm The procedure information of the target domain;The corresponding relationship of the project fields and the information site prestores in the database, and Each project fields correspond to more than one information site.
The third aspect of the embodiment of the present invention provides a kind of terminal device, including memory, processor and is stored in In memory and the computer program that can run on a processor, processor realize such as first aspect when executing computer program The step of software systems demand file generation method.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, computer-readable storage medium Matter is stored with computer program, and software as described in relation to the first aspect is realized when computer program is executed by one or more processors The step of system requirements document generating method.
Existing beneficial effect is the embodiment of the present invention compared with prior art: the embodiment of the present invention, first reception user The project fields and project objective of input, then obtain the project flow file of preset format according to the project fields, then obtain Employee's professional ability rank of family input is taken, and is set according to employee's professional ability rank and the project flow file Software systems proto file is set, then the software systems proto file is assessed, if the software systems proto file Meet the project objective, then software systems demand file is generated according to the software systems proto file, it can be according to user The project fields of input generate the software systems demand file for meeting project objective, and high-efficient and accuracy is high.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, embodiment or the prior art will be retouched below Attached drawing needed in stating is briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention one A little embodiments for those of ordinary skill in the art without any creative labor, can also basis These attached drawings obtain other attached drawings.
Fig. 1 is the implementation process schematic diagram of software systems demand file generation method provided in an embodiment of the present invention;
Fig. 2 is the procedure information for the target domain that basis provided in an embodiment of the present invention is got, and generates default lattice The implementation process schematic diagram of the project flow file of formula;
Fig. 3 is the implementation process schematic diagram of step 201 in Fig. 2;
Fig. 4 is the schematic block diagram for the software systems demand file generating means that one embodiment of the invention provides;
Fig. 5 is the schematic block diagram for the terminal device that one embodiment of the invention provides.
Specific embodiment
In being described below, for illustration and not for limitation, such as particular system structure, technology etc are proposed Detail, so as to provide a thorough understanding of the present application embodiment.However, it will be clear to one skilled in the art that in these no tools The application also may be implemented in the other embodiments of body details.In other situations, omit to well-known system, device, The detailed description of circuit and method, so as not to obscure the description of the present application with unnecessary details.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
Fig. 1 is the implementation process schematic diagram for the software systems demand file generation method that one embodiment of the invention provides, and is Convenient for explanation, only parts related to embodiments of the present invention are shown.The executing subject of the embodiment of the present invention can be terminal Equipment.
As shown in Figure 1, the software systems demand file generation method may comprise steps of:
Step 101, the project fields and project objective of user's input are received, the project fields carry out item for characterizing Field described in the task items of mesh demand analysis, the project objective characterize the task items purpose to be achieved.
Wherein, the project fields can be any one field, such as financial field, agriculture field, patent application neck Domain etc. not limits this.The project objective can be include task items problem to be solved and being reached Effect file.
Furthermore it is possible to count good each project fields that may relate in advance, each project fields are then made into choosing The form for selecting input selects to input for user;There can certainly be user to directly input text relevant to project fields, then Extract the keyword in the text, then and database in the keyword set corresponding with project fields that prestores, determine and extract The corresponding project fields of keyword.
Likewise, the project objective that each project fields may relate to can have been counted in advance, then by each project The form that field and project objective are made into selection input selects to input for user;There can certainly be user to directly input and item Mesh field and the relevant text of project objective, then extract the keyword in the text, then with the key that is prestored in database Word, project fields and the corresponding set of project objective determine the corresponding project fields of keyword and project objective extracted.
Optionally, after step 101, the above method can also include:
Information site corresponding with the project fields is jumped to, and the target domain is obtained by crawler algorithm Procedure information;The corresponding relationship of the project fields and the information site prestores in the database, and each project Field corresponds to more than one information site.
Wherein, information site corresponding to the project fields can be the website of related government affairs department, such as pass through Jump to include the information such as national policy regulation, power inventory, responsibility schedules information site, download relevant information for User understands the relevant policies of the project fields in advance.Meanwhile it can jump to and be loaded with related service system Construction side The information site of case, case study understands before carrying out.
It, can be according to above-mentioned policy method after getting relevant policies and regulations and related service system Construction scheme Rule and preceding case prepare investigation problem list, and the demand and business drive manner of project construction side are checked on by question formulation, Convenient for obtaining project objective, i.e., the described task items problem to be solved and effect to be achieved deeper into accurate.
Step 102, the project flow file of preset format, the item of the preset format are obtained according to the project fields Mesh flow file prestores in the database, and is stored with multiple and disparity items field in the database and corresponds Preset format software systems flow file.
In this step, the generation method of the project flow file of the preset format can be;According to getting The procedure information of target domain generates the project flow file of preset format.
Referring to fig. 2, in some embodiments, the procedure information for the target domain that the basis is got is generated default The project flow file of format, may comprise steps of:
Step 201, extract process keyword in the procedure information of the target domain got and with each stream The corresponding sentence of journey keyword.
Step 202, process keyword is matched with predetermined keyword, the predetermined keyword and the default lattice The project flow file of formula is corresponding, for characterizing each flow nodes.
Step 203, will sentence corresponding with the matched process keyword of some predetermined keyword, as the default key The corresponding flow nodes content of word.
Step 201 is repeated to 203, using all predetermined keywords and corresponding sentence as entire project process text Part.
Referring to Fig. 3, in some embodiments, step 201 can be realized by following below scheme:
Step 301, according to the html label in procedure information web page code, procedure information web page contents are divided into more A paragraph.
Step 302, the character length of each paragraph, the spacing distance of adjacent paragraph and paragraph inside concentration are counted As characteristic value;The type that the spacing distance of the adjacent paragraph includes has a paragraph at a distance from a paragraph thereon and the section It falls at a distance from its next paragraph;The spacing distance of the adjacent paragraph is defined as the number of characters+M between paragraph, wherein M Value is determined according to the end-tag of the previous paragraph of a paragraph and the beginning label of the paragraph.
Step 303, the core feature value of each paragraph is calculated according to the characteristic value;According to each in procedure information webpage The core feature Distribution value situation of a paragraph obtains the range that core feature value is concentrated the most, and core feature value is in this threshold value model Paragraph in enclosing is the corresponding sentence of each process keyword.
Step 103, the employee's professional ability rank for obtaining user's input, according to employee's professional ability rank and institute Project flow file is stated, software systems proto file is set.
Step 104, the software systems proto file is assessed, if the software systems proto file meets institute Project objective is stated, then software systems demand file, the software systems demand text are generated according to the software systems proto file Part is for the corresponding function of software systems and process needed for indicating user.
The above method is further described below by way of a specific example.
The process of requirement investigation is broadly divided into following five stages: preparation stage, investigation stage, design phase, confirmation rank Section evaluates the stage, and there are specific action and output content in each stage.
One, the preparation stage
In the preparation stage, need clearly to investigate purpose, it can be by, by determining investigation purpose, thinking with project construction side It is solved the problems, such as with software systems, needs target to be achieved after building software systems.As project construction side there is not problem above There is specific thinking, then the operation system built can be used and demonstrated to project construction side, guides user or developing item Mesh Construction Party's thinking.
After problem above confirmation, so that it may which the purposeful preparation for carrying out investigation understands some back of target of investication and study Scape knowledge, specific preparation are as follows:
According to the real work of target of investication and study, searches national policy regulation, power inventory, responsibility schedules and carry out in advance Solution;
It searches existing related service system Construction scheme and carries out study understanding, form the scheme of initial communication, there is standby nothing Suffer from;
With the object of the logical investigation of investigation tissue box drain, planning investigation planning chart and timetable;
To help to investigate progress, it is ready for investigation problem list, the need of project construction side are checked on by question formulation Summation business drive manner.
The approach that information is obtained before investigation includes internet, existing operation system and the business for having similar traffic process System schema.
If target of investication and study is a completely new field, then it can pass through other side official website, higher level website and power inventory, duty Appoint inventory, organization design, working process etc. for information about, be investigated again after grasping partial information, in investigation Interaction has very great help.
Output content includes: investigation planning chart, requirement investigation table, investigation questionnaire, the power inventory of target of investication and study, responsibility The essential informations such as inventory, organization, and similar traffic system prototype or example for demonstration.
Two, the stage is investigated
After preparation is done before investigating, enters business department according to schedule and carry out requirement investigation work, can refer to A few class methods in requirement investigation brief introduction collect demand.Problem can be carried out using cut-and-dried questionnaire, guide project construction Difficult point and pain spot in work at present are said by side, and are expected that by information-based solve the problems, such as.Collection and business are paid attention to simultaneously It is relevant all kinds of to make a report on the Table Header informations such as table, report.Two emphasis of requirement investigation are first is that data, second is that operation flow.It adjusts The information for needing to collect emphatically during grinding is as follows:
The computer operation of business department staff is horizontal;
Whether current existing operation system meets need of work, is such as unsatisfactory for, and has which place to have improvedly Side;
Existing business system is operated when project construction side is agreed to, and key content is taken pictures or cut Figure;
The content that current operation system is made a report on, being capable of derived content (as possible, the gauge outfit of collection export data);
Such as without carrying out informatization, then what the difficult point in work and main points are at present;
Business datum whether concerning security matters;
Whether there are data to dock demand, where is data source, how to dock, and how to store;
All records collected are filled into investigation table, the signature confirmation of project construction side, and designated contact is asked, leaves Contact method is seeked advice from for the later period;
After the completion of primary investigation, if project construction side's demand is still unintelligible or effect is bad, it can arrange repeatedly to be adjusted It grinds or has an informal discussion, or leave staff's phone and be convenient for linking up after leaving the theatre;
Part committee does an innings province, city-level organ is merely responsible for professional guidance work, and specific business needs district to carry out, investigates Visiting for district several times or base's level is arranged as far as possible.
The field information and data source for the database that data refer mainly to, responsible department, mode of submitting, storage position Deng generally handling in the working table such as application, registration, change, cancellation, reward, punishment and obtain from infrastructure.Except field is believed Breath, it will be appreciated that operation system need manage or service subject population quantity, the frequency of business operation, every Business Stream or The data such as information storage space needed for business object, to estimate that storage, operation, the network bandwidth etc. of basic environment provide ginseng It examines.It can be obtained according to data investigation table in terms of the data exchange being related to.
Operation flow, can also be by application form by base in addition to reference business department or the Sign Board of working window suspension How layer clerical worker's explanation commences business.After business process map is drawn, except the confirmation of administrative body, base is unexpected, also answer Process is authorized by professional guidance mechanism (higher level department), verifies process true and accurate.
This stage output content include: target of investication and study go out collect make a report on table, business consolidated statement and operation system export Report etc.;Business process map;The raw informations such as policies and regulations, file, report, the picture collected from from project construction side;It needs Seek specification;Minutes;It investigates daily paper (weekly);Data investigate table.
Three, the design phase
It is confirmed whether that incoming traffic system prototype is needed to design according to project actual demand, prototype can be helped more effectively It helps project construction side to understand the operating procedure and interface alternation effect of operation system, facilitates confirmation demand.Export content packet It includes: effect picture, static page and system prototype.
Four, confirmation stage
After the completion of requirement investigation, needs the construction scheme with design to return to business department and confirmed that business department is one by one After confirmation is verified, each operation system construction scheme is summarized, the platform construction scheme an of entirety is designed, by project Construction Party's organization of examination and comment meeting explains investigation content and operation system construction scheme in meeting room.
Project construction scheme is confirmed to business department, and is signed and confirmed by department responsible person;
Independent operation system construction scheme is summarized, forms the project Preliminary design of a completion according to reference format Scheme;
The association between each business datum is excavated, design data interaction is excavated, analysis;
First set is evaluated by Construction Party's organizes expert, is achieved after suggesting modification according to evaluation.
If project construction includes hardware or construction, then should be put on record in advance.
The content of output includes: that PPT is reported in feasibility study report, preliminary project and investigation.
Five, the stage is evaluated
After the completion of project application for developing and preliminary project, need that local project authorities is submitted to be examined (hair Change committee, work letter committee, cultural industry management board, big data management board etc.), some areas require to need the company of design qualification Design object application for developing and preliminary project.It is evaluated by local project authorities organizes expert, expert in evaluation Unreasonable place in scheme can be criticized, carry out minutes work.After evaluation passes through, according to experts' evaluation opinion It modifies, complete final draft and achieves to design scheme, convenient for being referred in project construction.
The content of output includes: that experts' evaluation understands minutes, experts' evaluation opinion, project feasibility studies report (eventually Original text) and project preliminary project (final draft).
The embodiment of the present invention, the first project fields and project objective of reception user input, then lead according to the project Domain obtains the project flow file of preset format, then obtains employee's professional ability rank of user's input, and according to the employee Software systems proto file is arranged in professional ability rank and the project flow file, then to the software systems prototype text Part is assessed, if the software systems proto file meets the project objective, according to the software systems proto file Software systems demand file is generated, the project fields that can be inputted according to user generate the software systems need for meeting project objective File is sought, high-efficient and accuracy is high.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit It is fixed.
The embodiment of the present invention is shown corresponding to software systems demand file generation method, Fig. 4 described in foregoing embodiments The schematic diagram of the software systems demand file generating means of offer.For ease of description, it illustrates only related to the present embodiment Part.
Referring to Fig. 4, the apparatus may include information receiving module 401, file acquisition module 402,403 and of setup module File generating module 404.
Information receiving module 401, for receiving the project fields and project objective of user's input, the project fields are used Field described in the task items of project demands analysis is carried out in characterization, the project objective characterizes the task items and wanted The purpose reached;
File acquisition module 402, it is described for obtaining the project flow file of preset format according to the project fields The project flow file of preset format prestores in the database, and multiple and disparity items is stored in the database The software systems flow file of the one-to-one preset format in field;
Setup module 403, for obtaining employee's professional ability rank of user's input, according to employee's professional ability Software systems proto file is arranged in rank and the project flow file;
File generating module 404, for assessing the software systems proto file, if the software systems are former Type file meets the project objective, then generates software systems demand file according to the software systems proto file, described soft Part system requirements file is for the corresponding function of software systems and process needed for indicating user.
Optionally, the project objective can be include task items problem to be solved and to be achieved The file of effect.
Optionally, described device further include:
Jump module is obtained for jumping to information site corresponding with the project fields, and by crawler algorithm The procedure information of the target domain;The corresponding relationship of the project fields and the information site prestores in the database, and Each project fields correspond to more than one information site.
Optionally, the generation method of the project flow file of the preset format includes;
According to the procedure information of the target domain got, the project flow file of preset format is generated.
Optionally, the procedure information for the target domain that the basis is got, generates the project process of preset format File, comprising:
Step A, extract process keyword in the procedure information of the target domain got and with each process The corresponding sentence of keyword;
Step B matches process keyword with predetermined keyword, the predetermined keyword and the preset format Project flow file it is corresponding, for characterizing each flow nodes;
Step C, will sentence corresponding with the matched process keyword of some predetermined keyword, as the predetermined keyword Corresponding flow nodes content;
Step A to C is repeated, using all predetermined keywords and corresponding sentence as entire project flow file.
Optionally, the process keyword extracted in the procedure information of the target domain got and with it is each The corresponding sentence of a process keyword, comprising:
According to the html label in procedure information web page code, procedure information web page contents are divided into multiple paragraphs;
The character length of each paragraph, the spacing distance of adjacent paragraph and paragraph inside concentration are counted as feature Value;Under the type that the spacing distance of the adjacent paragraph includes has a paragraph at a distance from a paragraph thereon and the paragraph and its The distance of one paragraph;The spacing distance of the adjacent paragraph is defined as the number of characters+M between paragraph, and wherein the value of M is according to one The end-tag of the previous paragraph of paragraph and the beginning label of the paragraph determine;
The core feature value of each paragraph is calculated according to the characteristic value;According to paragraph each in procedure information webpage Core feature Distribution value situation obtains the range that core feature value is concentrated the most, section of the core feature value in this threshold range Fall sentence corresponding as process keyword.
The embodiment of the present invention, the first project fields and project objective of reception user input, then lead according to the project Domain obtains the project flow file of preset format, then obtains employee's professional ability rank of user's input, and according to the employee Software systems proto file is arranged in professional ability rank and the project flow file, then to the software systems prototype text Part is assessed, if the software systems proto file meets the project objective, according to the software systems proto file Software systems demand file is generated, the project fields that can be inputted according to user generate the software systems need for meeting project objective File is sought, high-efficient and accuracy is high.
Fig. 5 is the schematic diagram for the terminal device that one embodiment of the invention provides.As shown in figure 5, the terminal of the embodiment is set Standby 5 include: processor 50, memory 51 and are stored in the memory 51 and can run on the processor 50 Computer program 52, such as program.The processor 50 realizes that above-mentioned each method is implemented when executing the computer program 52 Step in example, such as step 101 shown in FIG. 1 is to 104.Alternatively, when the processor 50 executes the computer program 52 Realize the function of each module/unit in above-mentioned each Installation practice, such as the function of module 101 to 104 shown in Fig. 4.
Illustratively, the computer program 52 can be divided into one or more module/units, it is one or Multiple module/the units of person are stored in the memory 51, and are executed by the processor 50, to complete the present invention.It is described One or more module/units can be the series of computation machine program instruction section that can complete specific function, which uses In implementation procedure of the description computer program 52 in the terminal device 5.
The terminal device 5 can be the calculating such as desktop PC, notebook, palm PC and cloud server and set It is standby.The terminal device may include, but be not limited only to, processor 50, memory 51.It will be understood by those skilled in the art that figure 5 be only the example of terminal device 5, does not constitute the restriction to terminal device 5, may include more more or fewer than illustrating Component, perhaps combines certain components or different components, for example, the terminal device can also include input-output equipment, Network access equipment, bus, display etc..
Alleged processor 50 can be central processing unit (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic device Part, discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processing Device etc..
The memory 51 can be the internal storage unit of the terminal device 5, for example, terminal device 5 hard disk or Memory.The memory 51 is also possible to the External memory equipment of the terminal device 5, such as is equipped on the terminal device 5 Plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, Flash card (Flash Card) etc..Further, the memory 51 can also have been deposited both the inside including the terminal device 5 Storage unit also includes External memory equipment.The memory 51 is for storing the computer program and the terminal device Other required programs and data.The memory 51, which can be also used for temporarily storing, have been exported or will export Data.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by difference Functional unit, module complete, i.e., the internal structure of described device is divided into different functional unit or module, with complete All or part of function described above.Each functional unit in embodiment, module can integrate in a processing unit In, it is also possible to each unit and physically exists alone, can also be integrated in one unit with two or more units, on It states integrated unit both and can take the form of hardware realization, can also realize in the form of software functional units.In addition, Each functional unit, module specific name be also only for convenience of distinguishing each other, the protection model being not intended to limit this application It encloses.The specific work process of unit in above system, module, can refer to corresponding processes in the foregoing method embodiment, This is repeated no more.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that described in conjunction with the examples disclosed in the embodiments of the present disclosure Unit and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions It is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Professional technique Personnel can use different methods to achieve the described function each specific application, but this realization should not be recognized It is beyond the scope of this invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, it can be with It realizes by another way.For example, device described above/terminal device embodiment is only schematical, for example, The division of the module or unit, only a kind of logical function partition, there may be another division manner in actual implementation, Such as multiple units or components can be combined or can be integrated into another system, or some features can be ignored, or not hold Row.Another point, shown or discussed mutual coupling or direct-coupling or communication connection can be to be connect by some Mouthful, the INDIRECT COUPLING or communication connection of device or unit can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, as unit The component of display may or may not be physical unit, it can and it is in one place, or may be distributed over more In a network unit.Some or all of unit therein can be selected to realize this embodiment scheme according to the actual needs Purpose.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated module/unit is realized in the form of SFU software functional unit and sells as independent product Or it in use, can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-mentioned All or part of the process in embodiment method can also instruct relevant hardware to complete by computer program, described Computer program can be stored in a computer readable storage medium, which, can be real when being executed by processor The step of existing above-mentioned each embodiment of the method.Wherein, the computer program includes computer program code, the computer Program code can be source code form, object identification code form, executable file or certain intermediate forms etc..The computer Readable medium may include: any entity or device, recording medium, USB flash disk, the shifting that can carry the computer program code Dynamic hard disk, magnetic disk, CD, computer storage, read-only memory (Read-Only Memory, ROM), random access memory Device (Random Access Memory, RAM), electric carrier signal, telecommunication signal and software distribution medium etc..It needs to illustrate , content that the computer-readable medium includes can according to make laws in jurisdiction and the requirement of patent practice into Row increase and decrease appropriate, such as do not include being according to legislation and patent practice, computer-readable medium in certain jurisdictions Electric carrier signal and telecommunication signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all It is included within protection scope of the present invention.

Claims (10)

1. a kind of software systems demand file generation method characterized by comprising
The project fields and project objective of user's input are received, the project fields, which are used to characterize, carries out appointing for project demands analysis Field described in business project, the project objective characterize the task items purpose to be achieved;
The project flow file of preset format is obtained according to the project fields, the project flow file of the preset format prestores In the database, and in the database the multiple and one-to-one preset format in disparity items field software systems are stored with Flow file;
The employee's professional ability rank for obtaining user's input, according to employee's professional ability rank and project process text Software systems proto file is arranged in part;
The software systems proto file is assessed, if the software systems proto file meets the project objective, Software systems demand file is generated according to the software systems proto file, the software systems demand file is for indicating user The corresponding function of required software systems and process.
2. software systems demand file generation method according to claim 1, which is characterized in that the project objective is packet Include the file of task items problem to be solved and effect to be achieved.
3. software systems demand file generation method according to claim 1, which is characterized in that defeated in the reception user After the project fields and project objective that enter, the method also includes:
Information site corresponding with the project fields is jumped to, and obtains the process of the target domain by crawler algorithm Information;The corresponding relationship of the project fields and the information site prestores in the database, and each project fields pair Answer more than one information site.
4. software systems demand file generation method according to claim 3, which is characterized in that the item of the preset format The generation method of mesh flow file includes;
According to the procedure information of the target domain got, the project flow file of preset format is generated.
5. software systems demand file generation method according to claim 4, which is characterized in that the basis was got The procedure information of the target domain generates the project flow file of preset format, comprising:
Step A extracts process keyword in the procedure information of the target domain got and crucial with each process The corresponding sentence of word;
Step B matches process keyword with predetermined keyword, the project of the predetermined keyword and the preset format Flow file is corresponding, for characterizing each flow nodes;
Step C, will sentence corresponding with the matched process keyword of some predetermined keyword, it is corresponding as the predetermined keyword Flow nodes content;
Step A to C is repeated, using all predetermined keywords and corresponding sentence as entire project flow file.
6. software systems demand file generation method according to claim 5, which is characterized in that the extraction was got Process keyword and sentence corresponding with each process keyword in the procedure information of the target domain, comprising:
According to the html label in procedure information web page code, procedure information web page contents are divided into multiple paragraphs;
The character length of each paragraph, the spacing distance of adjacent paragraph and paragraph inside concentration are counted as characteristic value;Institute Stating the type that the spacing distance of adjacent paragraph includes has a paragraph at a distance from a paragraph thereon and the paragraph and its next paragraph Distance;The spacing distance of the adjacent paragraph is defined as the number of characters+M between paragraph, before wherein the value of M is according to a paragraph The end-tag of one paragraph and the beginning label of the paragraph determine;
The core feature value of each paragraph is calculated according to the characteristic value;It is special according to the core of paragraph each in procedure information webpage Value indicative distribution situation, obtains the range that core feature value is concentrated the most, and paragraph of the core feature value in this threshold range is The corresponding sentence of process keyword.
7. a kind of software systems demand file generating means characterized by comprising
Information receiving module, for receive user input project fields and project objective, the project fields for characterize into Field described in the task items of row project demands analysis, the project objective characterize the task items mesh to be achieved 's;
File acquisition module, for obtaining the project flow file of preset format, the preset format according to the project fields Project flow file prestore in the database, and be stored in the database multiple one-to-one with disparity items field The software systems flow file of preset format;
Setup module, for obtaining employee's professional ability rank of user's input, according to employee's professional ability rank and institute Project flow file is stated, software systems proto file is set;
File generating module, for assessing the software systems proto file, if the software systems proto file is full The foot project objective, then generate software systems demand file according to the software systems proto file, and the software systems need Ask file for the corresponding function of software systems and process needed for indicating user.
8. software systems demand file generating means according to claim 7, which is characterized in that further include:
Jump module, for jumping to information site corresponding with the project fields, and by described in crawler algorithm acquisition The procedure information of target domain;The corresponding relationship of the project fields and the information site prestores in the database, and each The project fields correspond to more than one information site.
9. a kind of terminal device, including memory, processor and storage are in the memory and can be on the processor The computer program of operation, which is characterized in that the processor realizes such as claim 1 to 6 when executing the computer program The step of any one software systems demand file generation method.
10. a kind of computer readable storage medium, which is characterized in that the computer-readable recording medium storage has computer journey Sequence realizes the software systems as described in any one of claim 1 to 6 when the computer program is executed by one or more processors The step of demand file generation method.
CN201910141944.3A 2019-02-26 2019-02-26 Software systems demand file generation method, device and terminal device Pending CN109976733A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910141944.3A CN109976733A (en) 2019-02-26 2019-02-26 Software systems demand file generation method, device and terminal device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910141944.3A CN109976733A (en) 2019-02-26 2019-02-26 Software systems demand file generation method, device and terminal device

Publications (1)

Publication Number Publication Date
CN109976733A true CN109976733A (en) 2019-07-05

Family

ID=67077396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910141944.3A Pending CN109976733A (en) 2019-02-26 2019-02-26 Software systems demand file generation method, device and terminal device

Country Status (1)

Country Link
CN (1) CN109976733A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111427544A (en) * 2020-04-06 2020-07-17 中信银行股份有限公司 Software requirement document generation method and device, storage medium and electronic equipment
CN111859886A (en) * 2020-06-22 2020-10-30 远光软件股份有限公司 Document generation method and device based on product prototype interface
CN113327061A (en) * 2021-06-25 2021-08-31 苏州麦赫建筑装饰设计有限公司 Design process management method, system, terminal and storage medium

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111427544A (en) * 2020-04-06 2020-07-17 中信银行股份有限公司 Software requirement document generation method and device, storage medium and electronic equipment
CN111427544B (en) * 2020-04-06 2022-09-06 中信银行股份有限公司 Software requirement document generation method and device, storage medium and electronic equipment
CN111859886A (en) * 2020-06-22 2020-10-30 远光软件股份有限公司 Document generation method and device based on product prototype interface
CN111859886B (en) * 2020-06-22 2024-02-02 远光软件股份有限公司 Document generation method and device based on product prototype interface
CN113327061A (en) * 2021-06-25 2021-08-31 苏州麦赫建筑装饰设计有限公司 Design process management method, system, terminal and storage medium

Similar Documents

Publication Publication Date Title
Othman et al. Development and validation of a Disaster Management Metamodel (DMM)
Alvarez-Rodríguez et al. New trends on e-Procurement applying semantic technologies: Current status and future challenges
CN103971226B (en) Network interaction platform and its application method
CN107491547A (en) Searching method and device based on artificial intelligence
CN109976733A (en) Software systems demand file generation method, device and terminal device
CN109345417A (en) The on-line examination method and terminal device of the business personnel of identity-based certification
CN109033342A (en) Applied to the service providing method of service system, device and service model
CN107526718A (en) Method and apparatus for generating text
CN113326028B (en) Micro-service decomposition method based on domain-driven design and service panoramic event storm
CN109033266A (en) Information distribution method, device, electronic equipment and computer-readable medium
CN107346344A (en) The method and apparatus of text matches
CN114303140A (en) Analysis of intellectual property data related to products and services
Feldman Subject librarians in the changing academic library
Seo et al. Integrating web-based simulation on IT systems with finite probabilistic DEVS
Spring Information technology standards
Nacheva Digital Inclusion Through Sustainable Web Accessibility
Deshpande et al. Web site auditing: first step towards re-engineering
US20020049724A1 (en) Information publicizing system and information publicizing method
CN112527609A (en) Early warning information pushing method and device, electronic equipment and storage medium
Axhausen et al. Public use of travel surveys: The metadata perspective
CN110674403A (en) Multifunctional information platform for laboratory
Amadi et al. Extent of the public university librarians' agreement on the utilisation of online information resources for effective services delivery in public university libraries in South-East, Nigeria
Pichler et al. Feature modeling for business document models
Karlsson Managing large amounts of natural language requirements through natural language processing and information retrieval support
Hübner et al. Last‐Minute Travel Application

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190705