CN109829558A - The management method of underground communal facility based on GIS and RFID - Google Patents

The management method of underground communal facility based on GIS and RFID Download PDF

Info

Publication number
CN109829558A
CN109829558A CN201711184382.8A CN201711184382A CN109829558A CN 109829558 A CN109829558 A CN 109829558A CN 201711184382 A CN201711184382 A CN 201711184382A CN 109829558 A CN109829558 A CN 109829558A
Authority
CN
China
Prior art keywords
communal facility
bim
underground
information
underground communal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711184382.8A
Other languages
Chinese (zh)
Inventor
邓逸川
郑展鹏
王明珠
元钟声
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HKUST Shenzhen Research Institute
Hong Kong University of Science and Technology HKUST
Original Assignee
HKUST Shenzhen Research Institute
Hong Kong University of Science and Technology HKUST
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HKUST Shenzhen Research Institute, Hong Kong University of Science and Technology HKUST filed Critical HKUST Shenzhen Research Institute
Priority to CN201711184382.8A priority Critical patent/CN109829558A/en
Publication of CN109829558A publication Critical patent/CN109829558A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses the management methods and device of a kind of underground communal facility based on BIM and GIS.The described method includes: establishing the BIM-GIS platform of integrated BIM system and generalized information system by the data sharing between BIM system and generalized information system;Underground communal facility information is obtained from BIM-GIS platform;According to preset machine learning algorithm, the State Forecasting Model of underground communal facility is established;According to the State Forecasting Model of communal facility and underground communal facility information, the physical state of underground communal facility is predicted, and active maintenance is carried out to underground communal facility according to prediction result.The management method of underground communal facility provided by the invention, using the strategy of active maintenance, active maintenance is carried out according to respective priority to underground communal facility according to prediction result, the reliability that can effectively safeguard the work of underground communal facility in this way, substantially reduces adverse effect of the underground communal facility catastrophic failure to people's life and work.

Description

The management method of underground communal facility based on GIS and RFID
Technical field
The present invention relates to underground public facility management technical field, in particular to a kind of underground based on BIM and GIS is public The management method and device of facility.
Background technique
Underground communal facility is in city for conveying water, natural gas, electric power, the pass of communication cable and other basic services Key facility is the essential infrastructure service facility of people's life, safeguards that its normal running work is an important city City's management work.
In the prior art, the maintenance management about underground communal facility, mainly when underground communal facility breaks down, Equipment failure state is judged by the detection on the spot of staff, and equipment is repaired accordingly.But suchly Lower corporate facility management method, belongs to post, and the daily work life of people usually will receive equipment fault bring shadow It rings, for this reason, it may be necessary to a kind of management method of more efficient underground communal facility, to adapt to the urban life section accelerated increasingly It plays.
Summary of the invention
In order to solve problems in the prior art, it sets the embodiment of the invention provides a kind of underground based on BIM and GIS is public The management method and device applied.The technical solution is as follows:
On the one hand, the embodiment of the invention provides a kind of management method of underground communal facility based on BIM and GIS, institutes The method of stating includes:
Pass through Building Information Model (Building Information Modeling, referred to as " BIM ") system and geographical letter Data sharing between breath system (Geographic Information System, referred to as " GIS ") system, establishes integrated BIM The BIM-GIS platform of system and generalized information system;
Underground communal facility information is obtained from BIM-GIS platform, the underground communal facility information, which includes: that underground is public, to be set Structural information, material information and the geographical location information applied;
According to preset machine learning algorithm, the State Forecasting Model of underground communal facility is established, the underground is public to be set The State Forecasting Model applied is used to predictably descend the physical state in future time section of communal facility;
According to the State Forecasting Model of communal facility and underground communal facility information, to the physical state of underground communal facility It is predicted, and active maintenance is carried out to underground communal facility according to prediction result.
It is described to pass through in the management method of the above-mentioned underground communal facility based on BIM and GIS of the embodiment of the present invention The BIM-GIS platform of integrated BIM system and generalized information system is established in data sharing between BIM system and generalized information system, comprising:
By the classification of industrial foundation used by BIM system (Industry Foundation Classes, referred to as " IFC ") Formatted data is converted into CityGML formatted data used by generalized information system, realizes that the data between BIM system and generalized information system are total It enjoys.
In the management method of the above-mentioned underground communal facility based on BIM and GIS of the embodiment of the present invention, the BIM- GIS platform is also integrated with for managing the data base management system (Database with communal facility information under storage place Management System, referred to as " DBMS ") system.
In the management method of the above-mentioned underground communal facility based on BIM and GIS of the embodiment of the present invention, the basis is pre- If machine learning algorithm, establish the State Forecasting Model of underground communal facility, comprising:
Using at least one machine learning algorithm in artificial neural network, support vector machines and random forest, establish ground The State Forecasting Model of lower communal facility.
In the management method of the above-mentioned underground communal facility based on BIM and GIS of the embodiment of the present invention, further includes:
When newly adding underground communal facility, collision detection is carried out using the BIM-GIS platform of foundation, the collision detection is used Newly add whether underground communal facility mutually conflicts with original underground communal facility in examining.
On the other hand, the embodiment of the invention provides a kind of managing device of underground communal facility based on BIM and GIS, Described device includes:
Module is established, for establishing integrated BIM system and GIS by the data sharing between BIM system and generalized information system The BIM-GIS platform of system;
Module is obtained, for obtaining underground communal facility information, the underground communal facility packet from BIM-GIS platform It includes: structural information, material information and the geographical location information of underground communal facility;
It is described to establish module, it is also used to establish the status predication of underground communal facility according to preset machine learning algorithm Model, the State Forecasting Model of the underground communal facility are used to predictably descend the physics in future time section of communal facility State;
Processing module, it is public to underground for the State Forecasting Model and underground communal facility information according to communal facility The physical state of facility is predicted, and carries out active maintenance to underground communal facility according to prediction result.
It is described to establish mould in the managing device of the above-mentioned underground communal facility based on BIM and GIS of the embodiment of the present invention Block is also used to convert CityGML formatted data used by generalized information system for IFC formatted data used by BIM system, real The BIM-GIS platform of integrated BIM system and generalized information system is established in data sharing between existing BIM system and generalized information system.
In the managing device of the above-mentioned underground communal facility based on BIM and GIS of the embodiment of the present invention, the BIM- GIS platform is also integrated with for managing the DBMS system with communal facility information under storage place.
It is described to establish mould in the managing device of the above-mentioned underground communal facility based on BIM and GIS of the embodiment of the present invention Block is also used to establish using at least one machine learning algorithm in artificial neural network, support vector machines and random forest The State Forecasting Model of underground communal facility.
In the managing device of the above-mentioned underground communal facility based on BIM and GIS of the embodiment of the present invention, the processing mould Block is also used to when newly adding underground communal facility, carries out collision detection, the collision detection using the BIM-GIS platform of foundation Newly add whether underground communal facility mutually conflicts with original underground communal facility for examining.
In the managing device of the above-mentioned underground communal facility based on BIM and GIS of the embodiment of the present invention, can be used The device of RFID/IoT.RFID full name is Radio Frequency Identification Technology, and specific objective can be identified by radio signals and reads and writes phase Data are closed, without establishing mechanical or optical contact between identifying system and specific objective.RFID is read with remote data It takes, the features such as high amount of data storage, stronger persistence, there is important value to the promotion of IoT.In the sampling apparatus of RFID/IoT RFID have a sampling apparatus ID, and penetrate wired or wireless guiding principle network, can provide that accurate individual sample point underground is public to be set Apply structural information, material information and geographical location information.IoT sensor in the sampling apparatus of RFID/IoT can provide Communal facility physical state information is immediately descended, realizes dynamic facility data management.The individual sample point that RFID has Lower communal facility structural information, material information and geographical location information can confirm with the BIM-GIS platform data of foundation, The attribute information of component can be provided for frastructure state prediction model simultaneously, a part as model training data.IoT sensing Device, which can provide, immediately descends communal facility physical state information, can be to artificial neural network, support vector machines and random The reliability of the State Forecasting Model confirmation algorithm of the established underground communal facility of at least one machine learning algorithm in forest.I.e. When information data can be carried out by timeliness and ground for the reliability of underground communal facility State Forecasting Model in different sampling periods Study carefully, it is ensured that the stability of model.The real time data that the component information and IoT sensor stored in RFID obtains, can store In the database of BIM-GIS comprehensive platform, as the historical data of each component, for the facility shape based on machine learning algorithm The retraining and reinforcement of state prediction model provide richer data source.
Technical solution provided in an embodiment of the present invention has the benefit that
By the data sharing between BIM system and generalized information system, the BIM-GIS of integrated BIM system and generalized information system is established Platform;Then underground communal facility information is obtained from BIM-GIS platform, and according to preset machine learning algorithm, establishes underground The State Forecasting Model of communal facility;Finally according to the State Forecasting Model of communal facility and underground communal facility information, over the ground The physical state of lower communal facility is predicted, using the strategy of active maintenance, the attribute of facility component is provided using RFID Information can be provided using the sampling apparatus of IoT and accurately immediately descend communal facility information, it is ensured that the reliability and stabilization of model Property, while promotion for the performance of model and extension provide more data.According to prediction result to underground communal facility according to phase It answers priority to carry out active maintenance, can effectively safeguard the reliability of underground communal facility work in this way, it is public to substantially reduce underground Adverse effect of the facility catastrophic failure to people's life and work.The present invention utilizes the sampling apparatus of RFID/IoT, provides accurately i.e. When underground communal facility information, it is ensured that the reliability and stability of model.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, embodiment of the present invention will be made into one below Step ground detailed description.
Embodiment one
The embodiment of the invention provides a kind of management method of underground communal facility based on BIM and GIS, this method can be with Include:
Step S11 establishes integrated BIM system and generalized information system by the data sharing between BIM system and generalized information system BIM-GIS platform.
It should be noted that existing BIM system is mainly used for building field, and do not support that City-level underground is public The model foundation of facility altogether, but due to its building advantage in buildings model, it would be desirable to it is public that it is applied to underground Come on facility.
Therefore, in the present embodiment, data sharing will be realized between BIM system and generalized information system, by institute's energy in BIM system The structural information (such as: threedimensional model) and material information of the underground communal facility of offer, it is shared with generalized information system, to construct one The BIM-GIS platform of a integrated BIM system and generalized information system.
Specifically, in the present embodiment, above-mentioned steps S11 can be accomplished in that
CityGML formatted data used by generalized information system is converted by IFC formatted data used by BIM system, is realized Data sharing between BIM system and generalized information system.
In the present embodiment, IFC format is a kind of disclosed, structuring, object-based information exchange in BIM system Format.CityGML format is a kind of format for virtual three-dimensional city model data exchange and storage, is normal in generalized information system Use data format.Therefore, it can use based on being mapped between IFC format and CityGML format, Lai Shixian BIM system and GIS system Data sharing between system.
In practical applications, IFC is extended, mainly includes following four part: structural solid, chief component Entity, secondary part entity and maintenance information entity.Wherein, the structure that structural solid is represented underground communal facility by developing is set Information is counted, after existing space structure entity, IfcUtility and IfcUtilitySpace can indicate respectively entity class Type, such as water supply communal facility drain communal facility, combustion gas communal facility etc..It is indicated by IfcUtilitySolidElement Primary clustering be required entity program component, such as pipeline, wellhole, terminal etc., and IfcUtilitySegment is entity The section of the corresponding reference curve of program.Secondary component be included in be added to or be connected between effectiveness element or between item Mesh.Maintenance information entity is for recording relevant maintenance information, such as last maintenance time, checking tool, maintenance personnel's name Deng.By the above-mentioned means, the data that may be implemented in BIM system are shared in generalized information system.
Further, occur the case where loss of data in order to prevent and more efficiently data are managed, the BIM- GIS platform be also integrated with for manage and storage place under communal facility information DBMS system, the DBMS system respectively with BIM system System and generalized information system communication connection.
In the present embodiment, DBMS system be it is a kind of manipulation and management database large software, for establishing, using and Safeguard database, it carries out unification to database and manages and controls, to guarantee the safety and integrality of database.
Step S12 obtains underground communal facility information from BIM-GIS platform, which may include: Structural information, material information and geographical location information of underground communal facility etc..
In the present embodiment, the underground communal facility information obtained from BIM-GIS platform, is mainly used for public to underground The prediction of the physical state of facility, such as: whether aging, whether corrode, whether rupture.
Step S13 establishes the State Forecasting Model of underground communal facility according to preset machine learning algorithm, the underground The State Forecasting Model of communal facility is used to predictably descend the physical state in future time section of communal facility.
In the present embodiment, above-mentioned steps S13 can be accomplished in that
Using at least one machine learning algorithm in artificial neural network, support vector machines and random forest, establish ground The State Forecasting Model of lower communal facility.
In the present embodiment, artificial neural network (Artificial Neural Network, referred to as " ANN ") is from letter Breath process angle is abstracted human brain neuroid, establishes certain naive model, forms by different connection types different Network, it is a kind of operational model, is constituted by being coupled to each other between a large amount of node (or neuron).Support vector machines (Support Vector Machine, referred to as " SVM ") is supervised learning model related to relevant learning algorithm, Ke Yifen Data are analysed, recognition mode, for classification and regression analysis, it is showed in solution small sample, the identification of non-linear and high dimensional pattern Many distinctive advantages out.Random forest refers to a kind of classifier for being trained and predicting to sample using more trees, In machine learning, random forest is the classifier comprising multiple decision trees, and classification of its output is defeated by setting individually Depending on the mode of classification out.Using above-mentioned machine learning algorithm, a kind of state of effective underground communal facility can be constructed Prestore model, such as ageing state, corrosion state etc..
Step S14, according to the State Forecasting Model of communal facility and underground communal facility information, to underground communal facility Physical state is predicted, and carries out active maintenance to underground communal facility according to prediction result.
In the present embodiment, public to underground according to the State Forecasting Model of communal facility and underground communal facility information The physical state of facility is predicted, using the strategy of active maintenance, according to prediction result to underground communal facility according to corresponding Priority carries out active maintenance, can effectively safeguard the reliability of underground communal facility work in this way, substantially reduce that underground is public to be set Apply adverse effect of the catastrophic failure to people's life and work.
Optionally, this method can also include:
Step S15 carries out collision detection, the collision using the BIM-GIS platform of foundation when newly adding underground communal facility Detection newly adds whether underground communal facility mutually conflicts with original underground communal facility for examining.
In the present embodiment, the BIM-GIS platform of building can be also used for touching newly added underground communal facility Detection is hit, effectively avoids newly adding and apply during installation, the damage to existing facility occur, realize and newly add the smooth laying applied.
It needs, most of underground communal facility information preservations are in two-dimentional (2D) CAD (CAD) figure In paper, but two-dimentional drawing is difficult to reflect the spatial positional information of underground communal facility, for example, with identical longitude and latitude Two lines may be embedded in the position of same depth.Therefore, it is necessary to convert two-dimentional drawing information to three for effective use Location information is tieed up, we can use BIM-GIS platform and carry out 3 d structure model remodeling to 2DCAD initial data here.? In the present embodiment, using these 3 d structure models after remodeling, collision detection can be more efficiently carried out.
In addition, updating about the data in BIM-GIS platform, user can modify to IFC model, this can be returned To BIM integrating engine, and be converted to CityGML format.By utilizing BIM-GIS platform, it can store periodic maintenance, be based on shape The more new information of maintenance and the preventive maintenance of state, in this way can be predictably to descend the performance management of communal facility to provide effectively History inspection data information.
In addition, information technology used by different Urban Buried Pipeline Network implementation management departments is not quite similar, information management System also belongs to distributed management system.There are information due to application technology and information format disunity between each distributed system Island phenomenon.It, will be above-mentioned using the Deep integrating application technology of generalized information system and BIM system as the information management transfer mode of core Two kinds of technologies realize integrated application from data and system level, solve the mutual conversion of the data information format between not homologous ray Problem breaks each system, interdepartmental information barrier, realizes data interaction and information sharing.It is integrated using skill based on this The information management mode of art is to ensure smart city underground pipe network science, efficient, safe operation effective model.
The embodiment of the present invention establishes integrated BIM system and GIS system by the data sharing between BIM system and generalized information system The BIM-GIS platform of system;Then underground communal facility information is obtained from BIM-GIS platform, and is calculated according to preset machine learning Method establishes the State Forecasting Model of underground communal facility;The sampling apparatus that more can use RFID/IoT provides detailed facility It while component information, provides and accurately immediately descends communal facility information, it is ensured that the reliability and stability of model are model It expands and the promotion of performance provides more data.Finally believed according to the State Forecasting Model of communal facility and underground communal facility Breath, predicts the physical state of underground communal facility, public to underground according to prediction result using the strategy of active maintenance Facility carries out active maintenance according to respective priority, can effectively safeguard the reliability of underground communal facility work in this way, drop significantly Adverse effect of the communal facility catastrophic failure to people's life and work under low land.
Embodiment two
The embodiment of the invention provides a kind of managing devices of underground communal facility based on BIM and GIS, use and implement Method described in example one, the apparatus may include: it establishes module, obtain module, processing module.
Module is established, for establishing integrated BIM system and GIS by the data sharing between BIM system and generalized information system The BIM-GIS platform of system.
It should be noted that existing BIM system is mainly used for building field, and do not support that City-level underground is public The model foundation of facility altogether, but due to its building advantage in buildings model, it would be desirable to it is public that it is applied to underground Come on facility.
Therefore, in the present embodiment, data sharing will be realized between BIM system and generalized information system, by institute's energy in BIM system The structural information (such as: threedimensional model) and material information of the underground communal facility of offer, it is shared with generalized information system, to construct one The BIM-GIS platform of a integrated BIM system and generalized information system.
Module is obtained, for obtaining underground communal facility information from BIM-GIS platform, which can be with It include: structural information, material information and the geographical location information etc. of underground communal facility.
In the present embodiment, the underground communal facility information obtained from BIM-GIS platform, is mainly used for public to underground The prediction of the physical state of facility, such as: whether aging, whether corrode, whether rupture.
Module is established, is also used to establish the State Forecasting Model of underground communal facility according to preset machine learning algorithm, The State Forecasting Model of the underground communal facility is used to predictably descend the physical state in future time section of communal facility.
Processing module, it is public to underground for the State Forecasting Model and underground communal facility information according to communal facility The physical state of facility is predicted, and carries out active maintenance to underground communal facility according to prediction result.
In the present embodiment, public to underground according to the State Forecasting Model of communal facility and underground communal facility information The physical state of facility is predicted, using the strategy of active maintenance, according to prediction result to underground communal facility according to corresponding Priority carries out active maintenance, can effectively safeguard the reliability of underground communal facility work in this way, substantially reduce that underground is public to be set Apply adverse effect of the catastrophic failure to people's life and work.
Specifically, module is established, is also used to convert generalized information system for IFC formatted data used by BIM system and is used CityGML formatted data, realize the data sharing between BIM system and generalized information system, establish integrated BIM system and generalized information system BIM-GIS platform.
In the present embodiment, IFC format is a kind of disclosed, structuring, object-based information exchange in BIM system Format.CityGML format is a kind of format for virtual three-dimensional city model data exchange and storage, is normal in generalized information system Use data format.Therefore, it can use based on being mapped between IFC format and CityGML format, Lai Shixian BIM system and GIS system Data sharing between system.
In practical applications, IFC is extended, mainly includes following four part: structural solid, chief component Entity, secondary part entity and maintenance information entity.Wherein, the structure that structural solid is represented underground communal facility by developing is set Information is counted, after existing space structure entity, IfcUtility and IfcUtilitySpace can indicate respectively entity class Type, such as water supply communal facility drain communal facility, combustion gas communal facility etc..It is indicated by IfcUtilitySolidElement Primary clustering be required entity program component, such as pipeline, wellhole, terminal etc., and IfcUtilitySegment is entity The section of the corresponding reference curve of program.Secondary component be included in be added to or be connected between effectiveness element or between item Mesh.Maintenance information entity is for recording relevant maintenance information, such as last maintenance time, checking tool, maintenance personnel's name Deng.By the above-mentioned means, the data that may be implemented in BIM system are shared in generalized information system.
Further, occur the case where loss of data in order to prevent and more efficiently data are managed, the BIM- GIS platform be also integrated with for manage and storage place under communal facility information DBMS system, the DBMS system respectively with BIM system System and generalized information system communication connection.
In the present embodiment, DBMS system be it is a kind of manipulation and management database large software, for establishing, using and Safeguard database, it carries out unification to database and manages and controls, to guarantee the safety and integrality of database.
Specifically, module is established, is also used to use in artificial neural network, support vector machines and random forest at least One machine learning algorithm, establishes the State Forecasting Model of underground communal facility.
In the present embodiment, artificial neural network (Artificial Neural Network, referred to as " ANN ") is from letter Breath process angle is abstracted human brain neuroid, establishes certain naive model, forms by different connection types different Network, it is a kind of operational model, is constituted by being coupled to each other between a large amount of node (or neuron).Support vector machines (Support Vector Machine, referred to as " SVM ") is supervised learning model related to relevant learning algorithm, Ke Yifen Data are analysed, recognition mode, for classification and regression analysis, it is showed in solution small sample, the identification of non-linear and high dimensional pattern Many distinctive advantages out.Random forest refers to a kind of classifier for being trained and predicting to sample using more trees, In machine learning, random forest is the classifier comprising multiple decision trees, and classification of its output is defeated by setting individually Depending on the mode of classification out.Using above-mentioned machine learning algorithm, a kind of state of effective underground communal facility can be constructed Prestore model, such as ageing state, corrosion state etc..
Optionally, processing module is also used to when newly adding underground communal facility, is carried out using the BIM-GIS platform of foundation Collision detection, the collision detection newly add whether underground communal facility mutually conflicts with original underground communal facility for examining.
In the present embodiment, the BIM-GIS platform of building can be also used for touching newly added underground communal facility Detection is hit, effectively avoids newly adding and apply during installation, the damage to existing facility occur, realize and newly add the smooth laying applied.
It needs, most of underground communal facility information preservations are in two-dimentional (2D) CAD (CAD) figure In paper, but two-dimentional drawing is difficult to reflect the spatial positional information of underground communal facility, for example, with identical longitude and latitude Two lines may be embedded in the position of same depth.Therefore, it is necessary to convert two-dimentional drawing information to three for effective use Location information is tieed up, we can use BIM-GIS platform and carry out 3 d structure model remodeling to 2DCAD initial data here.? In the present embodiment, using these 3 d structure models after remodeling, collision detection can be more efficiently carried out.
In addition, updating about the data in BIM-GIS platform, user can modify to IFC model, this can be returned To BIM integrating engine, and be converted to CityGML format.By utilizing BIM-GIS platform, it can store periodic maintenance, be based on shape The more new information of maintenance and the preventive maintenance of state, in this way can be predictably to descend the performance management of communal facility to provide effectively History inspection data information.
In addition, information technology used by different Urban Buried Pipeline Network implementation management departments is not quite similar, information management System also belongs to distributed management system.There are information due to application technology and information format disunity between each distributed system Island phenomenon.It, will be above-mentioned using the Deep integrating application technology of generalized information system and BIM system as the information management transfer mode of core Two kinds of technologies realize integrated application from data and system level, solve the mutual conversion of the data information format between not homologous ray Problem breaks each system, interdepartmental information barrier, realizes data interaction and information sharing.It is integrated using skill based on this The information management mode of art is to ensure smart city underground pipe network science, efficient, safe operation effective model.
The embodiment of the present invention establishes integrated BIM system and GIS system by the data sharing between BIM system and generalized information system The BIM-GIS platform of system;Then underground communal facility information is obtained from BIM-GIS platform, and is calculated according to preset machine learning Method establishes the State Forecasting Model of underground communal facility;The sampling apparatus that more can use RFID/IoT provides detailed facility It while component information, provides and accurately immediately descends communal facility information, it is ensured that the reliability and stability of model are model It expands and the promotion of performance provides more data.Finally believed according to the State Forecasting Model of communal facility and underground communal facility Breath, predicts the physical state of underground communal facility, public to underground according to prediction result using the strategy of active maintenance Facility carries out active maintenance according to respective priority, can effectively safeguard the reliability of underground communal facility work in this way, drop significantly Adverse effect of the communal facility catastrophic failure to people's life and work under low land.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
It should be understood that the managing device of the underground communal facility provided by the above embodiment based on BIM and GIS is in reality Now when the management method of the underground communal facility based on BIM and GIS, only illustrate with the division of above-mentioned each functional module It is bright, in practical application, it can according to need and be completed by different functional modules above-mentioned function distribution, i.e., by the inside of equipment Structure is divided into different functional modules, to complete all or part of the functions described above.In addition, above-described embodiment provides The underground communal facility based on BIM and GIS managing device and the underground communal facility based on BIM and GIS management method Embodiment belongs to same design, and specific implementation process is detailed in embodiment of the method, and which is not described herein again.
Those of ordinary skill in the art will appreciate that realizing that all or part of the steps of above-described embodiment can pass through hardware It completes, relevant hardware can also be instructed to complete by program, the program can store in a kind of computer-readable In storage medium, storage medium mentioned above can be read-only memory, disk or CD etc..
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (11)

1. a kind of management method of the underground communal facility based on BIM and GIS, which is characterized in that the described method includes:
By the data sharing between BIM system and generalized information system, the BIM-GIS platform of integrated BIM system and generalized information system is established;
Underground communal facility information is obtained from BIM-GIS platform, the underground communal facility information includes: underground communal facility Structural information, material information and geographical location information;
According to preset machine learning algorithm, the State Forecasting Model of underground communal facility is established, the underground communal facility State Forecasting Model is used to predictably descend the physical state in future time section of communal facility;
According to the State Forecasting Model of communal facility and underground communal facility information, the physical state of underground communal facility is carried out Prediction, and active maintenance is carried out to underground communal facility according to prediction result.
2. the method according to claim 1, wherein described total by the data between BIM system and generalized information system It enjoys, establishes the BIM-GIS platform of integrated BIM system and generalized information system, comprising:
CityGML formatted data used by generalized information system is converted by IFC formatted data used by BIM system, realizes BIM Data sharing between system and generalized information system.
3. according to the method described in claim 2, it is characterized in that, the BIM-GIS platform is also integrated with for managing and storing up Deposit the DBMS system of underground communal facility information.
4. establishing underground the method according to claim 1, wherein described according to preset machine learning algorithm The State Forecasting Model of communal facility, comprising:
Using at least one machine learning algorithm in artificial neural network, support vector machines and random forest, underground public affairs are established The State Forecasting Model of facility altogether.
5. method according to claim 1-4, which is characterized in that further include:
When newly adding underground communal facility, collision detection is carried out using the BIM-GIS platform of foundation, the collision detection is for examining It tests and newly adds whether underground communal facility mutually conflicts with original underground communal facility.
6. a kind of managing device of the underground communal facility based on BIM and GIS, which is characterized in that described device includes:
Module is established, for establishing integrated BIM system and generalized information system by the data sharing between BIM system and generalized information system BIM-GIS platform;
Module is obtained, for obtaining underground communal facility information from BIM-GIS platform, the underground communal facility information includes: Structural information, material information and the geographical location information of underground communal facility;
It is described to establish module, it is also used to establish the State Forecasting Model of underground communal facility according to preset machine learning algorithm, The State Forecasting Model of the underground communal facility is used to predictably descend the physical state in future time section of communal facility;
Processing module, for the State Forecasting Model and underground communal facility information according to communal facility, to underground communal facility Physical state predicted, and according to prediction result to underground communal facility carry out active maintenance.
7. device according to claim 6, which is characterized in that described to establish module, being also used to will be used by BIM system IFC formatted data is converted into CityGML formatted data used by generalized information system, realizes the number between BIM system and generalized information system According to shared, the BIM-GIS platform of foundation integrated BIM system and generalized information system.
8. device according to claim 7, which is characterized in that the BIM-GIS platform is also integrated with for managing and storing up Deposit the DBMS system of underground communal facility information.
9. device according to claim 6, which is characterized in that it is described to establish module, be also used to using artificial neural network, At least one machine learning algorithm in support vector machines and random forest, establishes the State Forecasting Model of underground communal facility.
10. according to the described in any item devices of claim 6-9, which is characterized in that the processing module is also used to add ground newly When lower communal facility, collision detection is carried out using the BIM-GIS platform of foundation, the collision detection newly adds underground public affairs for examining Whether facility mutually conflicts with original underground communal facility altogether.
11. the device of RFID/IoT can be used on different facilities and ground according to the described in any item devices of claim 6-9 Dian obtains Precise structural information, material information and the geographical location of the underground communal facility of the BIM and GIS of individual Cai Yang Dian Information, physical state information;And in artificial neural network according to claim 6, support vector machines and random forest The reliability of the State Forecasting Model confirmation algorithm of the established underground communal facility of at least one machine learning algorithm.
CN201711184382.8A 2017-11-23 2017-11-23 The management method of underground communal facility based on GIS and RFID Pending CN109829558A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711184382.8A CN109829558A (en) 2017-11-23 2017-11-23 The management method of underground communal facility based on GIS and RFID

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711184382.8A CN109829558A (en) 2017-11-23 2017-11-23 The management method of underground communal facility based on GIS and RFID

Publications (1)

Publication Number Publication Date
CN109829558A true CN109829558A (en) 2019-05-31

Family

ID=66859038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711184382.8A Pending CN109829558A (en) 2017-11-23 2017-11-23 The management method of underground communal facility based on GIS and RFID

Country Status (1)

Country Link
CN (1) CN109829558A (en)

Similar Documents

Publication Publication Date Title
Sharma et al. Regional resilience analysis: A multiscale approach to optimize the resilience of interdependent infrastructure
CN108269212A (en) The management method and device of underground communal facility based on BIM and GIS
Saeidian et al. Evaluation and comparison of Genetic Algorithm and Bees Algorithm for location–allocation of earthquake relief centers
Ouyang et al. Critical infrastructure vulnerability to spatially localized failures with applications to Chinese railway system
CN107292989A (en) High voltage power transmission cruising inspection system based on 3DGIS technologies
Loggins et al. CRISIS: Modeling the restoration of interdependent civil and social infrastructure systems following an extreme event
Mundia et al. Modeling spatial processes of urban growth in African cities: A case study of Nairobi City
CN113268531B (en) CIM system working method based on BIM and GIS technologies
CN106251240A (en) Power transmission network method for early warning based on big data
Gunduz et al. Integration of BIM, web maps and IoT for supporting comfort analysis
Wang et al. A resilience assessment framework for distribution systems under typhoon disasters
CN110490361A (en) The digital emergency planning system and its design method of urban distribution network contingency management
CN111027004A (en) Construction method and application method of off-line earthquake disaster damage assessment system
CN115792505B (en) Rail transit power supply management method and system
CN105335478B (en) The method and apparatus for building urban land space multistory survey data semantic association
CN106126694A (en) The support of a kind of impurely Rehabilitation decision and the construction method of online evaluation platform
Little et al. CLARC: An artificial community for modeling the effects of extreme hazard events on interdependent civil and social infrastructure systems
Baharmand et al. A Framework for Shelter Location Decisions by Ant Colony Optimization.
Yi et al. Development of the public safety system and a security-guaranteed society
Boyes et al. Enabling intelligent cities through cyber security of building information and building systems
CN109829558A (en) The management method of underground communal facility based on GIS and RFID
CN115424212A (en) Electric power operation field violation identification system and application thereof
CN114399159A (en) Engineering field progress identification method based on full-time-space monitoring
Feardous et al. Evaluation of Modern Smart Cities in South Asian Countries: Advanced Applications of Internet of Things (IoT)
Bolouri et al. Investigating the effect of capacity criterion on the optimal allocation of emergency facilities in GIS environment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190531