CN109784704A - Appraisal procedure, system and the relevant apparatus of resource needed for a kind of ERP system - Google Patents

Appraisal procedure, system and the relevant apparatus of resource needed for a kind of ERP system Download PDF

Info

Publication number
CN109784704A
CN109784704A CN201910002210.7A CN201910002210A CN109784704A CN 109784704 A CN109784704 A CN 109784704A CN 201910002210 A CN201910002210 A CN 201910002210A CN 109784704 A CN109784704 A CN 109784704A
Authority
CN
China
Prior art keywords
parameter
erp system
target
resource
assessment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910002210.7A
Other languages
Chinese (zh)
Inventor
杨宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inspur Power Commercial Systems Co Ltd
Original Assignee
Inspur Power Commercial Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inspur Power Commercial Systems Co Ltd filed Critical Inspur Power Commercial Systems Co Ltd
Priority to CN201910002210.7A priority Critical patent/CN109784704A/en
Publication of CN109784704A publication Critical patent/CN109784704A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This application discloses a kind of appraisal procedures of resource needed for ERP system, it is based not only on from user side through investigating obtained basis expectation parameter and upgrading expectation parameter, also in combination with the operating parameter for the running environment that will be used for operational objective ERP system, so that carrying out more accurate assessment to the actually required resource of target ERP system under the collective effect for the parameter set that these species parameters are constituted.I.e. by that will influence actual motion environment caused by target ERP system to be included in scope of assessment together with desired parameter, to eliminate because actual motion environment will be consequent effects caused by the actually available resource of target ERP system, consideration is more thoughtful, and more comprehensively, actual effect is more preferably.Assessment system, device and the computer readable storage medium of resource needed for the application further simultaneously discloses a kind of ERP system have above-mentioned beneficial effect.

Description

Appraisal procedure, system and the relevant apparatus of resource needed for a kind of ERP system
Technical field
This application involves ERP system constructing technology field, in particular to the appraisal procedure of resource needed for a kind of ERP system, System, device and computer readable storage medium.
Background technique
ERP (Enterprise Resource Planning, Enterprise Resources Plan) system, it is special in modern enterprise user It is not to play very important effect in manufacturing user's IT environment, it can be by the material flow of enterprise, cash flow and information Stream is efficiently integrated, and the central role formed a connecting link is played.
Current most enterprises when carrying out ERP system construction, either it is current using have ERP system needs with The expansion of scale carries out one ERP system of subsequent upgrade or completely new installation, often since the user capacity to business needs It asks investigation unclear, or enough expections is lacked to Future Services Development ability, so that target ERP system institute can not accurately be measured The truth of IT resource is needed, so that the reference frame inaccuracy when carrying out basic platform buying, leads to hardware planning occur Situation insufficient or that planning is excessive.
Therefore, how to provide that a kind of consideration is more thoughtful, versatility is higher, actual demand assessment more accurately assessment for enterprise Mechanism instructs enterprise to be determined for compliance with the ERP system of own situation, is those skilled in the art's urgent problem to be solved.
Summary of the invention
A kind of appraisal procedure of resource needed for the purpose of the application is to provide ERP system, is based not only on from user side through adjusting The basis expectation parameter and upgrading expectation parameter ground, also in combination with the running environment that will be used for operational objective ERP system Operating parameter so that these species parameters constitute parameter set collective effect under, to the actually required money of target ERP system Source carries out more accurate assessment.I.e. by that will influence actual motion environment caused by target ERP system with desired parameter It is included in scope of assessment, together to eliminate because actual motion environment will be the later period caused by the actually available resource of target ERP system It influences, consideration is more thoughtful, and more comprehensively, actual effect is more preferably.
Assessment system, device and the computer of resource needed for the another object of the application is the provision of a kind of ERP system Readable storage medium storing program for executing.
To achieve the above object, a kind of appraisal procedure of resource needed for the application provides ERP system, the appraisal procedure packet It includes:
User is obtained to the basis expectation parameter and upgrading expectation parameter of target ERP system;
Obtain the environmental parameter of target operating environment;Wherein, the target operating environment is that the target ERP system is being pacified The running environment that will be in after the completion of dress;
Parameter set is constructed using the basis expectation parameter, upgrading expectation parameter and the environmental parameter;
It is commented simultaneously using actually required resource of the every kind of parameter in the parameter set to the target ERP system Estimate.
Optionally, at the same time using every kind of parameter in the parameter set to the actually required money of the target ERP system Before source is assessed, further includes:
It obtains the target ERP system and is localized the system resource that needs occupy;
It will be localized that the system resource that needs occupy is added to the parameter set as new parameter.
Optionally, at the same time using every kind of parameter in the parameter set to the actually required money of the target ERP system Before source is assessed, further includes:
For the target ERP system, performance redundancy is set;
The parameter set is added to using the performance redundancy as new parameter.
Optionally, the appraisal procedure further include:
Corresponding weight is respectively set to constitute every kind of parameter in the parameter set;
It is corresponding, while using every kind of parameter in the parameter set to the actually required resource of the target ERP system It is assessed, comprising:
By every kind of parameter in the parameter set according to weighted calculation method to the actually required resource of the target ERP system It is assessed.
Optionally, it is described basis expectation parameter include: number of users, user line frequency, desired system response time, At least one of in operation time delay, use habit.
To achieve the above object, present invention also provides a kind of assessment system of resource needed for ERP system, the assessment systems Include:
User it is expected parameter acquiring unit, for obtaining user to the basis expectation parameter of target ERP system and upgrading phase Hope parameter;
Environmental parameter acquiring unit, for obtaining the environmental parameter of target operating environment;Wherein, the target operating environment The running environment that will be in after installation is complete for the target ERP system;
Parameter set construction unit, for being joined using the basis expectation parameter, upgrading expectation parameter and the environment Number building parameter set;
The common assessment unit of multi-parameter, for simultaneously using every kind of parameter in the parameter set to target ERP system The actually required resource of system is assessed.
Optionally, the assessment system further include:
Localization occupies resource acquisition unit, for utilizing every kind of parameter in the parameter set to the target at the same time Before the actually required resource of ERP system is assessed, obtains the target ERP system and be localized the system that needs occupy Resource;
Localized resources adding unit, for that will be localized that the system resource that needs occupy is added as new parameter Into the parameter set.
Optionally, the assessment system further include:
Redundancy setting unit, for utilizing every kind of parameter in the parameter set to the target ERP system at the same time Before actually required resource is assessed, performance redundancy is set for the target ERP system;
Redundancy adding unit, for being added to the parameter set for the performance redundancy as new parameter.
Optionally, the assessment system further include:
Weight setting unit, for corresponding weight to be respectively set to constitute every kind of parameter in the parameter set;
Corresponding, the common assessment unit of multi-parameter includes:
Weighting assessment subelement, for by every kind of parameter in the parameter set according to weighted calculation method to constituting the mesh The actual parameter of mark ERP system is assessed.
To achieve the above object, present invention also provides a kind of assessment device of resource needed for ERP system, the assessment devices Include:
Memory, for storing computer program;
Processor realizes the appraisal procedure as described in above content when for executing the computer program.
To achieve the above object, described computer-readable to deposit present invention also provides a kind of computer readable storage medium It is stored with computer program on storage media, realizes when the computer program is executed by processor and is commented as described in above content The step of estimating method.
Obviously, the appraisal procedure of resource needed for a kind of ERP system provided herein, is based not only on from user side through adjusting The basis expectation parameter and upgrading expectation parameter ground, also in combination with the running environment that will be used for operational objective ERP system Operating parameter so that these species parameters constitute parameter set collective effect under, to the actually required money of target ERP system Source carries out more accurate assessment.I.e. by that will influence actual motion environment caused by target ERP system with desired parameter It is included in scope of assessment, together to eliminate because actual motion environment will be the later period caused by the actually available resource of target ERP system It influences, consideration is more thoughtful, and more comprehensively, actual effect is more preferably.
Assessment system, device and the computer-readable storage of resource needed for the application additionally provides a kind of ERP system simultaneously Medium has above-mentioned beneficial effect, and details are not described herein.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of application for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is the flow chart of the appraisal procedure of resource needed for a kind of ERP system provided by the embodiments of the present application;
Fig. 2 is the flow chart of the appraisal procedure of resource needed for another ERP system provided by the embodiments of the present application;
Fig. 3 is a kind of showing for BULOCUR model that can be used for resource needed for assessing ERP system provided by the embodiments of the present application It is intended to;
Fig. 4 is the structural block diagram of the assessment system of resource needed for a kind of ERP system provided by the embodiments of the present application;
Fig. 5 is the structural schematic diagram of the assessment device of resource needed for a kind of ERP system provided by the embodiments of the present application.
Specific embodiment
The appraisal procedure of resource needed for the core of the application is to provide ERP system a kind of, system, device and computer-readable Storage medium, be based not only on from user side through investigate obtain basis expectation parameter and upgrading expectation parameter, also in combination with will The operating parameter of running environment for operational objective ERP system so that these species parameters constitute parameter set it is common Under effect, more accurate assessment is carried out to the actually required resource of target ERP system.I.e. by will be to mesh by actual motion environment It influences to be included in scope of assessment together with desired parameter caused by mark ERP system, to eliminate because actual motion environment will be to the target Consequent effects caused by the actually available resource of ERP system, consideration is more thoughtful, and more comprehensively, actual effect is more preferably.
To keep the purposes, technical schemes and advantages of the embodiment of the present application clearer, below in conjunction with the embodiment of the present application In attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is Some embodiments of the present application, instead of all the embodiments.Based on the embodiment in the application, those of ordinary skill in the art All other embodiment obtained without making creative work, shall fall in the protection scope of this application.
Embodiment one
Referring to Figure 1, Fig. 1 is the process of the appraisal procedure of resource needed for a kind of ERP system provided by the embodiments of the present application Figure comprising following steps:
S101: user is obtained to the basis expectation parameter and upgrading expectation parameter of target ERP system;
This step is intended to investigate the user for obtaining target ERP system future via user and it is expected parameter and liter to its basis Grade expectation parameter, i.e. user it is expected the assessment parameter provided based on the use of itself, represent user itself to target ERP system The demand of the basic understandings for performance of uniting.It wherein, may include such as number of users, user in line frequency, expectation based on desired parameter System response time, operation time delay, the underlying parameters such as use habit;Upgrading expectation parameter refer to early period investigation when to whether There is the demand to additional additional functional modules in a short time, for example whether also needing to install financial management module or stock control mould Block etc..
This part is ERP system scene when being currently widely used in doing newly-built ERP system or upgrading existing ERP system Content is investigated in the use issued to its user, and is based only upon this part and is assessed resource needed for target ERP system.
Just as illustrated in background technique, the above-mentioned basis expectation parameter investigated via user side and upgrading phase Hoping parameter often can only include the use demand of user itself, but when an ERP system is really landed, there are also it is many other because Element will account for range, so that the ERP system finally landed can really meet actual demand as expected.Lift one Very vivid example just looks like to build a naval vessels or aircraft, and the money finally spent and initially estimated money often differ very Far, exactly because what is be considered in advance is not thoughtful enough, the purpose of the application is how to consider more influence when making a budget Factor, as close as actual conditions.
S102: the environmental parameter of target operating environment is obtained;
This step is intended to obtain target ERP system after installation is complete for the environmental parameter for the running environment being in, i.e., should Target operating environment is the running environment that target ERP system will be in after installation is complete.Such as what kind of the ERP will operate in On hardware, the model of hardware, whether there is enough optimization etc. to by the ERP system of installation, it is therefore an objective to can be by this step Suddenly the environmental parameter obtained is eliminated because of actual motion environment and ideal running environment (or being properly termed as with reference to running environment) It is influenced caused by difference resource needed for the target ERP system.In other words, this part, which obtains parameter, can be referred to as customization Change, i.e. an ERP system is when under landing to specifically used environment, it is also necessary to be bonded practical service environment and demand to practical fortune Capable process is customized and considers its brought extra resource expense.
For example, a user needs to be embedded in the communication applications of its enterprise itself in ERP system, whether this communication applications Resource needed for ERP system can be tied up, conflict whether can be generated, whether response speed can be impacted etc., this is all desirable The content in need of consideration in customizing step.
S103: parameter set is constructed using basis expectation parameter, upgrading expectation parameter and environmental parameter;
On the basis of S101 and S102, this step is intended to according to basis expectation parameter, upgrading expectation parameter and environment ginseng Number is to construct a parameter set.It further, can also be to the three classes parameter for currently including during constructing the parameter set By how in the form of or using which kind of degree as a part of the parameter set, preferably to utilize each seed ginseng for including in parameter set The actually required resource of several pairs of target ERP systems is assessed.
A kind of feasible mode is, according to the statistics that the historical data under long-term record carries out, according to above-mentioned a few class parameters The influence degree caused by the actually required resource of target ERP system carrys out corresponding distribution weight, to pass through weighted calculation method Form makes every class parameter be able to be assessed according to actual influence parameter.
Another feasible mode is, using by the sample data that is selected in historical data as the defeated of deep learning algorithm Enter data to be trained so that under the special tectonic of deep learning algorithm, affecting parameters and reality based on input data Required resource voluntarily excavates the connection for lying in data behind, suitable weight is voluntarily calculated.Certainly, such mode meter The order of accuarcy of obtained weight with training sample data number, quality it is closely related, when sample data is enough When, more preferably using such mode.
Further, the target ERP system additionally provided except S102 during customization to overhead the considerations of, Other factors that can also impact to ERP system when finally landing can also be added, such as obtain target ERP system and carry out The system resource and performance redundancy is set for target ERP system that localization needs to occupy, i.e., respectively from localization angle and redundancy From the point of view of whether additional influence can be caused to resource needed for the ERP system finally landed.
Wherein, localization includes the language that may also need to carry out when using the ERP system for the text all over Britain introduced at home Say conversion and interface transformation operation, when service provider does not provide language support directly, the conversion of language is also needed using additional Plug-in unit complete, and such plug-in unit will also result in certain influence to resource needed for final;And interface transformation operation is then logical Cross the layout at the modification interface UI to make it closer to the use habit of user under practical application scene, in addition to this, it is also necessary to examine Consider additional effect of the localization operation to final required resource of other every aspects.
Performance redundancy, then by as the another kind of of upgrading expectation parameter is different from, the response in order to ensure ERP system is fast The extra resource reserved required for the peak traffic occurred under degree and emergency case, also extremely important, otherwise the ERP system then exists During scope of the enterprise increases, occur Caton with increasing for business, and any not right Caton all would be possible to make At serious consequence.
Further, above-mentioned two classes parameter can also be also added in the parameter set eventually for resource needed for assessing, Make it includes parameter type reach 5 classes.Certainly, the above-mentioned manual allocation weight provided, using deep learning algorithm building can Two classes additionally provided can also be accounted for range by the mode for voluntarily obtaining the assessment models of weight.
S104: while being assessed using the actually required resource of every kind of parameters on target ERP system in parameter set.
On the basis of S103, this step is intended to utilize the reality of every kind of parameters on target ERP system in parameter set simultaneously Resource needed for border is assessed, specifically, using manual allocation weight given by S103 or can utilize deep learning algorithm The mode for constructing the assessment models that can voluntarily obtain weight is realized, herein and is not specifically limited.
Based on the above-mentioned technical proposal, the appraisal procedure of resource needed for a kind of ERP system provided by the embodiments of the present application, not only Based on from user side through investigating obtained basis expectation parameter and upgrading expectation parameter, also in combination with operational objective will be used for The operating parameter of the running environment of ERP system, so that under the collective effect for the parameter set that these species parameters are constituted, to target The actually required resource of ERP system carries out more accurate assessment.I.e. by the way that actual motion environment will be caused to target ERP system Influence be included in scope of assessment together with desired parameter, will actually may be used to the target ERP system with eliminating because of actual motion environment The consequent effects caused by resource, consideration is more thoughtful, and more comprehensively, actual effect is more preferably.
Embodiment two
Fig. 2 is referred to, Fig. 2 is the stream of the appraisal procedure of resource needed for another ERP system provided by the embodiments of the present application Cheng Tu, in order to provide a kind of more preferably implementation relatively, the present embodiment will provide a kind of to be commented jointly using including 5 class parameters The implementation of resource needed for estimating target ERP system, includes the following steps:
S201: user is obtained to the basis expectation parameter and upgrading expectation parameter of target ERP system;
S202: the environmental parameter of target operating environment is obtained;
S203: it obtains target ERP system and is localized the system resource that needs occupy;
S204: performance redundancy is set for target ERP system;
It should be noted that the performance redundancy being arranged can be based on some default rules herein, these rules can basis The growth rate equal proportion of business demand or higher proportion of formulation obtain under practical application scene, can also be wanted according to special Flexible formulation is asked, herein and is not specifically limited.
S205: it is constructed using basis expectation parameter, upgrading expectation parameter, environmental parameter, system resource and performance redundancy Parameter set;
S206: corresponding weight is respectively set to constitute every kind of parameter in parameter set;
Specifically, the weight of setting can be manually according to long-term experience according to every kind of parameter to final required resource Influence degree is correspondingly arranged to obtain, and can also obtain assessment models after the training of great amount of samples data by deep learning algorithm In obtain, wherein convolutional neural networks can be used in herein as a kind of using wider deep learning algorithm.
Specifically, the assessment models for having this 5 class parameter to be built into can customize according to the upper-case first letters of its English name Be referred to as " BULOCUR model ", reference can be made to Fig. 3.Wherein, B corresponds to Basic, i.e., basis expectation parameter, U are corresponding Upgrade, i.e. upgrading expectation parameter, LO correspond to Localization, that is, localize shared system resource, and CU is corresponding Customization, that is, the environmental parameter needed when customizing, R correspond to Redundancy, that is, the performance redundancy being arranged.
The following are several parts to provide some actual examples, such as in the part Upgrade, if according to the planning of user, It is able to subsequent needs and increases finance and execution module, therefore be by additionally increase by 2 modules in the demand of target ERP system System expense;In the part Localization and Customization, learn the service logic of user it is complicated and with it is more from Exploration project, and combine a large amount of report business, therefore consider influence of these parts to ERP system performance, need by Increase in demand 70% of the target ERP system to resource;In the part Redundancy, custom system is standby machine redundancy loop border, and Demand to system is to ensure that responding ability requires system utilization rate under full load condition to be no more than 80%, therefore any list Machine utilization rate is no more than 40%, has carried out the amendment of system requirements according to these parameters.
S207: by every kind of parameter in parameter set according to weighted calculation method to the actually required resource of target ERP system into Row assessment.
Based on the considerations of the present embodiment to 5 kinds of parameters of resource needed for influencing target ERP system, can comprehensively cover each The assessment of the ERP user demand of seed type can receive the difference of different the provided products of ERP system provider and landing process Enter limit of consideration, so that finally obtained assessment result is closer to actual conditions.By the actual use of such method, can compare Systematically consumer-oriented ERP assessment strategy, to accurately complete the need assessment of ERP system.It is accurately selected for user It selects equipment platform and the relevant technologies brings great convenience.
Because situation is complicated, it can not enumerate and be illustrated, those skilled in the art should be able to recognize according to the application The basic skills principle combination actual conditions of offer may exist many examples, in the case where not paying enough creative works, It should within the scope of protection of this application.
Embodiment three
Fig. 4 is referred to below, and Fig. 4 is the assessment system of resource needed for a kind of ERP system provided by the embodiments of the present application Structural block diagram, the assessment system may include:
User it is expected parameter acquiring unit 100, for obtaining user to the basis expectation parameter of target ERP system and upgrading It is expected that parameter;
Environmental parameter acquiring unit 200, for obtaining the environmental parameter of target operating environment;Wherein, target operating environment The running environment that will be in after installation is complete for target ERP system;
Parameter set construction unit 300, for constructing parameter using basis expectation parameter, upgrading expectation parameter and environmental parameter Collection;
The common assessment unit 400 of multi-parameter, for utilizing the reality of every kind of parameters on target ERP system in parameter set simultaneously Resource needed for border is assessed.
Further, which can also include:
Localization occupies resource acquisition unit, for utilizing every kind of parameters on target ERP system in parameter set at the same time Actually required resource assessed before, obtain target ERP system be localized the system resource that needs occupy;
Localized resources adding unit, for that will be localized that the system resource that needs occupy is added as new parameter Into parameter set.
Further, which can also include:
Redundancy setting unit, for utilizing the actually required of every kind of parameters on target ERP system in parameter set at the same time Before resource is assessed, performance redundancy is set for target ERP system;
Redundancy adding unit, for being added to parameter set for performance redundancy as new parameter.
Further, which can also include:
Weight setting unit, for corresponding weight to be respectively set to constitute every kind of parameter in parameter set;
Corresponding, the common assessment unit 400 of the multi-parameter may include:
Weighting assessment subelement, for by every kind of parameter in parameter set according to weighted calculation method to constitute target ERP system The actual parameter of system is assessed.
Fig. 5 is the block diagram of the assessment device 500 of resource needed for a kind of ERP system shown according to an exemplary embodiment. As shown in figure 5, assessment device 500 may include: processor 501, memory 502.Assessing device 500 can also include multimedia Component 503, information input/information export one or more of (I/O) interface 504 and communication component 505.
Wherein, processor 501 is used to control the integrated operation of assessment device 500, to complete above scheme embodiment method In all or part of the steps;Memory 502 is used to store various types of data to support the operation in assessment device 500, These data for example may include the instruction of any application or method for operating on assessment device 500, Yi Jiying With the relevant data of program, such as contact data, the message of transmitting-receiving, picture, audio, video etc..The memory 502 can be with It is realized by any kind of volatibility or non-volatile memory device or their combination, such as static random access memory (Static Random Access Memory, abbreviation SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, abbreviation EEPROM), Erasable Programmable Read Only Memory EPROM (Erasable Programmable Read-Only Memory, abbreviation EPROM), programmable read only memory (Programmable Read-Only Memory, abbreviation PROM), and read-only memory (Read-Only Memory, referred to as ROM), magnetic memory, flash memory, disk or CD.
Multimedia component 503 may include screen and audio component.Wherein screen for example can be touch screen, audio component For output and/or input audio signal.For example, audio component may include a microphone, microphone is for receiving outside Audio signal.The received audio signal can be further stored in memory 502 or be sent by communication component 505.Sound Frequency component further includes at least one loudspeaker, is used for output audio signal.I/O interface 504 is processor 501 and other interface moulds Interface is provided between block, other above-mentioned interface modules can be keyboard, mouse, button etc..These buttons can be virtual push button Or entity button.Communication component 505 carries out wired or wireless communication for assessing between device 500 and other equipment.Wirelessly Communication, such as Wi-Fi, bluetooth, near-field communication (Near Field Communication, abbreviation NFC), 2G, 3G or 4G or it One or more of combination, therefore the corresponding communication component 505 may include: Wi-Fi module, bluetooth module, NFC Module.
In one exemplary embodiment, assessment device 500 can be by one or more application specific integrated circuit (Application Specific Integrated Circuit, abbreviation ASIC), digital signal processor (Digital Signal Processor, abbreviation DSP), digital signal processing appts (Digital Signal Processing Device, Abbreviation DSPD), programmable logic device (Programmable Logic Device, abbreviation PLD), field programmable gate array (Field Programmable Gate Array, abbreviation FPGA), controller, microcontroller, microprocessor or other electronics member Part is realized, for executing the above-mentioned data transmission method provided.
In a further exemplary embodiment, a kind of computer readable storage medium including program instruction is additionally provided, it should The step of above-mentioned closed loop detection method is realized when program instruction is executed by processor.For example, the computer readable storage medium can Think the above-mentioned memory 502 including program instruction, above procedure instruction can be executed by the processor 501 of assessment device 500 with Complete above-mentioned appraisal procedure.
Specific examples are used herein to illustrate the principle and implementation manner of the present application, and between each embodiment For progressive relationship, each embodiment focuses on the differences from other embodiments, identical between each embodiment Similar portion may refer to each other.For the device disclosed in the embodiment, reference can be made to corresponding method part illustration.The above reality The explanation for applying example is merely used to help understand the present processes and its core concept.For the ordinary skill people of the art Member for, under the premise of not departing from the application principle, can also to the application, some improvement and modification can also be carried out, these improve and Modification is also fallen into the protection scope of the claim of this application.
It should also be noted that, in the present specification, the terms "include", "comprise" or its any other variant are intended to contain Lid non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also other elements including being not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including element.

Claims (10)

1. a kind of appraisal procedure of resource needed for ERP system characterized by comprising
User is obtained to the basis expectation parameter and upgrading expectation parameter of target ERP system;
Obtain the environmental parameter of target operating environment;Wherein, the target operating environment is that the target ERP system is installing The running environment that will be in after;
Parameter set is constructed using the basis expectation parameter, upgrading expectation parameter and the environmental parameter;
It is assessed simultaneously using actually required resource of the every kind of parameter in the parameter set to the target ERP system.
2. appraisal procedure according to claim 1, which is characterized in that utilize every kind of parameter in the parameter set at the same time Before assessing the actually required resource of the target ERP system, further includes:
It obtains the target ERP system and is localized the system resource that needs occupy;
It will be localized that the system resource that needs occupy is added to the parameter set as new parameter.
3. appraisal procedure according to claim 1, which is characterized in that utilize every kind of parameter in the parameter set at the same time Before assessing the actually required resource of the target ERP system, further includes:
For the target ERP system, performance redundancy is set;
The parameter set is added to using the performance redundancy as new parameter.
4. appraisal procedure according to any one of claims 1 to 3, which is characterized in that further include:
Corresponding weight is respectively set to constitute every kind of parameter in the parameter set;
It is corresponding, while being carried out using actually required resource of the every kind of parameter in the parameter set to the target ERP system Assessment, comprising:
Every kind of parameter in the parameter set is carried out according to actually required resource of the weighted calculation method to the target ERP system Assessment.
5. appraisal procedure according to claim 4, which is characterized in that the basis expectation parameter includes: number of users, uses At least one of family in line frequency, desired system response time, operation time delay, use habit.
6. a kind of assessment system of resource needed for ERP system characterized by comprising
User it is expected parameter acquiring unit, for obtaining user to the basis expectation parameter and upgrading expectation ginseng of target ERP system Number;
Environmental parameter acquiring unit, for obtaining the environmental parameter of target operating environment;Wherein, the target operating environment is institute State the running environment that target ERP system will be in after installation is complete;
Parameter set construction unit, for utilizing the basis expectation parameter, upgrading expectation parameter and the environmental parameter structure Build parameter set;
The common assessment unit of multi-parameter, for simultaneously using every kind of parameter in the parameter set to the target ERP system Actually required resource is assessed.
7. assessment system according to claim 6, which is characterized in that further include:
Localization occupies resource acquisition unit, for utilizing every kind of parameter in the parameter set to the target ERP at the same time Before the actually required resource of system is assessed, obtains the target ERP system and be localized the system money that needs occupy Source;
Localized resources adding unit, for will be localized that the system resource that needs occupy is added to institute as new parameter State parameter set.
8. assessment system according to claim 6, which is characterized in that further include:
Redundancy setting unit, for utilizing every kind of parameter in the parameter set to the reality of the target ERP system at the same time Before required resource is assessed, performance redundancy is set for the target ERP system;
Redundancy adding unit, for being added to the parameter set for the performance redundancy as new parameter.
9. a kind of assessment device of resource needed for ERP system characterized by comprising
Memory, for storing computer program;
Processor realizes such as appraisal procedure described in any one of claim 1 to 5 when for executing the computer program.
10. a kind of computer readable storage medium, which is characterized in that be stored with computer on the computer readable storage medium Program realizes such as appraisal procedure described in any one of claim 1 to 5 when the computer program is executed by processor.
CN201910002210.7A 2019-01-02 2019-01-02 Appraisal procedure, system and the relevant apparatus of resource needed for a kind of ERP system Pending CN109784704A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910002210.7A CN109784704A (en) 2019-01-02 2019-01-02 Appraisal procedure, system and the relevant apparatus of resource needed for a kind of ERP system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910002210.7A CN109784704A (en) 2019-01-02 2019-01-02 Appraisal procedure, system and the relevant apparatus of resource needed for a kind of ERP system

Publications (1)

Publication Number Publication Date
CN109784704A true CN109784704A (en) 2019-05-21

Family

ID=66499708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910002210.7A Pending CN109784704A (en) 2019-01-02 2019-01-02 Appraisal procedure, system and the relevant apparatus of resource needed for a kind of ERP system

Country Status (1)

Country Link
CN (1) CN109784704A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101882109A (en) * 2010-07-16 2010-11-10 中国工商银行股份有限公司 Software performance analysis system and method based on banking business
CN102063299A (en) * 2010-12-21 2011-05-18 东莞宇龙通信科技有限公司 Method and device for assessing application running condition of mobile terminal, mobile terminal
CN102662757A (en) * 2012-03-09 2012-09-12 浪潮通信信息系统有限公司 Resource demand pre-estimate method for cloud computing program smooth transition
US20180204171A1 (en) * 2017-01-17 2018-07-19 International Business Machines Corporation Estimation of node processing capacity for order fulfillment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101882109A (en) * 2010-07-16 2010-11-10 中国工商银行股份有限公司 Software performance analysis system and method based on banking business
CN102063299A (en) * 2010-12-21 2011-05-18 东莞宇龙通信科技有限公司 Method and device for assessing application running condition of mobile terminal, mobile terminal
CN102662757A (en) * 2012-03-09 2012-09-12 浪潮通信信息系统有限公司 Resource demand pre-estimate method for cloud computing program smooth transition
US20180204171A1 (en) * 2017-01-17 2018-07-19 International Business Machines Corporation Estimation of node processing capacity for order fulfillment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周承诚: "系统处理能力TP C估算方法探讨", 《邮电设计技术》 *
张靖 等: "综合网管服务器处理能力及内存需求估算方法浅析", 《移动通信》 *

Similar Documents

Publication Publication Date Title
Capilla et al. An overview of Dynamic Software Product Line architectures and techniques: Observations from research and industry
CN106484622A (en) Method of testing, apparatus and system
CN103984626B (en) A kind of method and device for generating test case script
EP3751787B1 (en) Techniques to generate network simulation scenarios
CN106464529A (en) Techniques to isolate a portion of an online computing service
CN105393226A (en) Automated Generation Of Scripted And Manual Test Cases
EP3091487A1 (en) Network deployment for cellular, backhaul, fiber optic and other network infrastructure
CN106599398A (en) Simulation method and apparatus of space-ground integrated management system
CN101951298B (en) Method and system for consistency test of an air ground communication system
CN103634147A (en) Network topology management method and equipment
EP3614264B1 (en) Performance engineering
CN110162464A (en) Mcok test method and system, electronic equipment and readable storage medium storing program for executing
CN105075228B (en) The dynamic power management of context-aware service
CN105956422B (en) For controlling the method and system of the software program on mobile computing device used
CN105487970A (en) Interface display method and apparatus
CN109598427A (en) Management method, device and the electronic equipment of robot
CN107577542A (en) Log information report method, device, storage medium and mobile terminal
CN113191880A (en) Bank teller terminal cash adding suggestion determination method and device
CN109784704A (en) Appraisal procedure, system and the relevant apparatus of resource needed for a kind of ERP system
CN117093862A (en) Model training method and device, electronic equipment and storage medium
CN112416700A (en) Analyzing initiated predictive failures and SMART logs
CN107179916A (en) A kind of application development method, device, equipment and development frame
CN112882934B (en) Test analysis method and system based on defect growth
CN109471916A (en) Weather forecast generation method and device
CN104007896B (en) A kind of information processing method and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190521