CN109753430A - A kind of interface test method of Ground Data Processing System - Google Patents

A kind of interface test method of Ground Data Processing System Download PDF

Info

Publication number
CN109753430A
CN109753430A CN201811556428.9A CN201811556428A CN109753430A CN 109753430 A CN109753430 A CN 109753430A CN 201811556428 A CN201811556428 A CN 201811556428A CN 109753430 A CN109753430 A CN 109753430A
Authority
CN
China
Prior art keywords
test
data processing
processing system
interface
tested object
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811556428.9A
Other languages
Chinese (zh)
Other versions
CN109753430B (en
Inventor
关键
赵生林
成恩伟
崔亮
黄伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Leinas Technology (beijing) Ltd By Share Ltd
Original Assignee
Leinas Technology (beijing) Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Leinas Technology (beijing) Ltd By Share Ltd filed Critical Leinas Technology (beijing) Ltd By Share Ltd
Priority to CN201811556428.9A priority Critical patent/CN109753430B/en
Publication of CN109753430A publication Critical patent/CN109753430A/en
Application granted granted Critical
Publication of CN109753430B publication Critical patent/CN109753430B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Debugging And Monitoring (AREA)

Abstract

The present invention relates to a kind of interface test methods of Ground Data Processing System, suitable for the maintenance, upgrading and breakdown judge of satellite ground data processing system, the especially operation maintenance management of space industry satellite ground data processing system.The method of the present invention transports control system by analog satellite and presses true each data processing system of process command scheduling, layout executes process, operating parameter is configured for each processing system, is ready for processing file, and monitor its data processing operational process in real time, last parameters and performance indicator during obtain the assessment of science, automation follow-on test and monitoring are realized, interrupt output technical indicator, can not keep track system under test (SUT) situation.By trend, scientific basis is provided for system operation, maintenance, fault pre-alarming etc., improves system reliability and service life.

Description

A kind of interface test method of Ground Data Processing System
Technical field
The present invention relates to a kind of interface test methods of Ground Data Processing System, are suitable for satellite ground data processing system Maintenance, upgrading and the breakdown judge of system, the especially operation maintenance management of space industry satellite ground data processing system.
Background technique
With socio-economic development, the transmitting quantity of the satellites such as commercial, military is all increasing, adopting behind satellite heaven daily The mass data of collection sends back ground, and corresponding ground is also required to analyze processing phase using various and complicated data processing system Data are closed, with long-play, each subsystem, component etc. gradually expose the shadows such as design defect and incipient fault, performance degradation Ring the problem of function operates normally.Existing test method uses this test simultaneously on a data processing system before line and after online Method, which carries out test, can preferably ensure that each data processing system operates normally, and improve system up-time, extend system Service life and assistance related personnel provide scientific basis and malfunction elimination positioning.
Summary of the invention
Technical problem solved by the present invention is having overcome the deficiencies of the prior art and provide a kind of Ground Data Processing System Interface test method, analog satellite transport control system press true each data processing system of process command scheduling, layout execute process, Operating parameter is configured for each processing system, is ready for processing file, and monitors its data processing operational process in real time, finally According in the process parameters and performance indicator obtain science assessment.
The technical solution of the invention is as follows: a kind of test method of Ground Data Processing System interface, including walks as follows It is rapid:
Test data file needed for the operation of tested object is stored in server by S1;The test data file includes Test input data file and test output data file;
S2 creates emulation interface template according to the configuration item of tested object in simulation software;The configuration item includes Computer when the test input data of tested object and the type and number of test output data and tested object are run Minimalist configuration and other softwares rely on, the interface model is that the data model of the configuration item is characterized in computer;
S3 creates the interface instance of tested object, root according to the emulation interface template and the test data file Test assignment list is generated according to the interface instance;
S4 is relied on according to the minimalist configuration and other softwares the test assignment list being decomposed into each subtask, and Each subtask, test data file are distributed into corresponding test node computer;The test node computer is held The subtask that row receives, and operating condition real-time display is showed into user in browser end;The test assignment list executes After the completion, output test result report, refers to for user.
Further, the tested object is there are two more than, and there are when operation flow relationship between tested object, The interface instance of object, product process example are each tested according to the operation flow composition of relations;It is real according to the process Example product process test assignment list simultaneously executes, and test starts;The flow instance is the interface instance of each tested object Combination.
Further, if there is some tested object not to be available in the flow instance, mould is judged whether by user It draws up the test object to output and input, interrupts the execution of flow testing job order not, and send dummy instruction, the simulation Instruction includes needing all information of tested object to be simulated.
Further, the method for simulating tested object input are as follows: dummy instruction is received, according to dummy instruction imitative Creation needs the simulation stake of tested object to be simulated in true software;Simulation stake packing is uploaded onto the server;Receive mould After pseudoinstruction, test node computer corresponding address from server is downloaded the simulation stake and is executed.
Further, the method simulating tested object and executing are as follows: according to configuration item calculating simulation handling duration;Into The simulation process of row simulation process duration;Export simulation process log and progress in real time simultaneously.
Further, the method for simulating tested object output are as follows: at the end of the simulation process duration, output Output file is to designated position;The designated position is the input for being modeled the next process of test object
Further, corresponding to generate difference there are many interface instances that tested object is created according to interface model Test assignment list and execute.
Further, the test starts to test during terminating, and generates test log in real time, supervises for tester Depending on and with reference to the test assignment list executive condition.
The advantages of the present invention over the prior art are that:
(1) present invention can be realized automation follow-on test and monitoring, and interrupt output technical indicator, can not keep track System under test (SUT) situation.By trend, scientific basis is provided for system operation, maintenance, fault pre-alarming etc., it is reliable to improve system Property and service life;
(2) the method for the present invention is by recording, tracking, managing each test configurations project testing situation, it is ensured that each test Configuration item result correctness, Interface Matching, test item all standing, running environment completeness form standardized test and check and accept Process.Verifying means are provided for each software quality of system, maintain strict control over gate of the quality monitoring, preventing error software enters production system, causes to give birth to Production accident;
(3) the method for the present invention passes through outputting and inputting interface, simulating for the Ground Data Processing System that simulation is broken down Runing time, the other data processing systems in seamless connection front and back of forming a connecting link make it possible to operate normally.
(4) management function is B/S mode, is easy to dispose and safeguard, test node system is that C/S model supports elasticity to expand Exhibition, each node can support different operating system to adapt to the system under test (SUT) of different requirements, be more convenient as test object More test cases are generated, are allowed to that Test coverage face is wider, what single node test can be convenient is combined into more complicated polyphyly System meets test case.
Detailed description of the invention
Fig. 1 is the method for the present invention flow diagram;
Fig. 2 is test assignment scheduling flow figure of the invention;
Fig. 3 is Gitlab of embodiment of the present invention bibliographic structure figure.
Specific embodiment
A kind of test method of Ground Data Processing System interface, including emulation testing management (SMS), Interface Controller and imitative Very (ISS), operation flow emulate (OSS), test data management (TDS), test assignment management (TMS), emulation testing container tube It manages (STC).
Emulation testing management (SMS) is transported by user management, Basic Information Management, Simulation Test Environment management, emulation testing Row management, emulation testing process monitoring and information are collected, emulation testing report management module forms;
Interface Controller and emulation (ISS) are by interface model management, interface case management function, simulation stake management function, day Will management function module composition.
Operation flow emulation (OSS) is made of flow template management, process case management, log management module.
Test data management (TDS) is by external data management, the data management of scatterometer scientific simulations, data synchronization, log Management module composition.
Test assignment management (TMS) by test assignment menu manager, the building of test assignment deployment scheme, engine driving function, Failure discs function, log management module composition.
Emulation testing Container Management (STC) is adopted by system under test (SUT) installation and deployment, test data collection, clustered node overview Collection, log management composition.
Such as Fig. 1,2, detailed process is as follows:
The user management stage
1) administrator's login system, the corresponding relationship of creation and maintenance user, role, permission point and three.
System set-up stage
1) administrator's creation and maintenance system configuration information, test environment (emulation testing cluster) information;
2) tester's creation and maintenance measurand, the basic information of test data and the corresponding relationship of the two.
Test the preparation stage
1) administrator can safeguard built-in interface model, simulation stake and flow template;
2) tester can create with maintenance test data entity, interface model, interface use-case, simulation stake, flow template, Process use-case.
The test-schedule stage
1) tester's creation and maintenance test job order, test assignment list are several interface use-cases, the combination of process use-case Made of a test assignment plan.
The test execution stage
1) the operation resource needed according to measurand is automatically formed according to the resource service condition of emulation testing cluster The deployment scheme of measurand;
2) user can be adjusted the deployment scheme that system is autonomously formed, and be executed by emulation testing Container Management software Tested software is deployed in the specified node of emulation testing cluster by final deployment scheme;
3) test assignment list is executed: interface use-case, process Testcase execution in driving test assignment list;
4) monitoring/control test assignment implementation procedure: tester can real time inspection test assignment execution state, actual measurement number Accordingly and the information such as emulation testing group of planes working condition.Meanwhile can according to the demand of test to comprehensive simulating test subsystem into The specific operation control (including start, terminate) of row;
5) software automatically saves test result to database after the completion of testing.
Test evaluation stage
1) administrator can check system log;
2) tester can check test result, compare the test result of multiple similar test assignments, and make according to specification File template is determined, according to the report template output emulation testing report of unified format.
Some tested object is unavailable if it exists, to guarantee that overall flow is not interrupted, then needs to be judged by tester Whether need to simulate not available tested object.Analogy method is as follows:
IPF is created under linux environment and simulates stake engineering, is introduced required for IPF exploitation and is relied on library (PIK), according to IPF Development specifications defines IPF development process subclass, and relevant interface, dry run log output, file input are realized in subclass The functions such as output file conversion and simulation delay.
After the completion of IPF simulates stake exploitation, IPF is simulated into stake and its dependence library is packaged and uploads to git server.Testing engine According to the IPF component download address that use-case configures, it is sent to Container Management program (note: if being configured so that IPF simulation stake Download address is directed toward the address git where simulation stake, and otherwise download address is directed toward the true address IPF component git).
Container Management program is when receiving the request of test IPF component, from the git server address of testing engine instruction It downloads IPF component and its relies on library, be deployed to the catalogue arranged in calculate node, start IPF assembly operating.If it is IPF mould Quasi- stake, IPF is simulated can simulation output running log in stake operational process (comprising operation progress percentage).IPF simulates stake can root According to input-output file information, copy input file and be renamed as output file (note: input file should be ready in advance).Such as The setting that fruit has simulation to be delayed, IPF simulation stake such as can be delayed at the delay time to be placed.
A specific embodiment of the invention is as follows.
The first step is opened and logs in emulation test system.
Second step adds tested object.The measurand is created in system configuration management-measurand management.Point Addition button is hit, newly-built measurand forms is popped up, inputs measurand title, select said system, component code name, version Number, system under test (SUT) is selected, input delivers organization, delivers unit contact person, delivers WorkPhone and deliver unit designator code, protects Deposit data.
Third step adds test data.In system configuration management-external data management function, automatically scanning is arrived Data through importing choose click addition pop-up next step operation interface.
4th step creates IPF interface model.IPF interface model is created in test preparation-IPF interface model management.Point Hit addition icon, pop up new interface template, input belonging to measurand title, interface model title, version number, remarks, Job_Order template and environmental requirement monitoring process.
5th step creates IPF interface use-case.IPF interface use-case is created in test preparation-IPF interface case management.Point Hit addition icon, pop up new interface use-case forms, input interface template name, IPF interface use-case title, version number, remarks, Job_Order template and path.
6th step creates IPF flow template.IPF flow template is created in test preparation-IPF flow template management.Root Factually in the process of border each measurand upstream-downstream relationship, draw corresponding flow chart, and new flow template title is set.
7th step creates IPF flow instance.IPF flow instance is created in test preparation-IPF flow instance management.? First select a flow template in following interface, then for the template each node specified interface use-case or when simulation stake etc. Information.
8th step creates test assignment list.Test assignment list is created in test execution-task menu manager.Click addition Icon, pops up newly-built job order forms, and incoming task single-character given name claims, test purpose, remarks, selection flow instance, selects interface real Example and selection simulation stake example, save data.
9th step executes job order.The job order is chosen and executed in test execution-task menu manager and starts to monitor Test process.
Test assessment: the secondary test report is downloaded in test assessment-test report is checked.Upload tested software and input After file is successfully tested to Gitlab archive, gitlab is opened and logs in, the IPF program and input data passed through after tested File uploads in gitlab.The bibliographic structure of the inside is as shown in Figure 3 after newly-built project.
The content that description in the present invention is not described in detail belongs to the well-known technique of those skilled in the art.

Claims (8)

1. a kind of test method of Ground Data Processing System interface, which comprises the steps of:
Test data file needed for the operation of tested object is stored in server by S1;The test data file includes test Input data file and test output data file;
S2 creates emulation interface template according to the configuration item of tested object in simulation software;The configuration item includes tested Try object test input data and test output data type and number and tested object operation when computer most Low configuration and other softwares rely on, and the interface model is the data model that the configuration item is characterized in computer;
S3 creates the interface instance of tested object according to the emulation interface template and the test data file, according to institute It states interface instance and generates test assignment list;
S4 is relied on according to the minimalist configuration and other softwares the test assignment list being decomposed into each subtask, and by institute State each subtask, test data file distributes to corresponding test node computer;The test node computer execution connects The subtask received, and operating condition real-time display is showed into user in browser end;The test assignment list executes completion Afterwards, output test result report, refers to for user.
2. a kind of test method of Ground Data Processing System interface according to claim 1, it is characterised in that: the quilt Test object is there are two more than, and there are when operation flow relationship between tested object, according to the operation flow relationship group Close the interface instance of each tested object, product process example;Simultaneously according to the flow instance product process test assignment list It executes, test starts;The flow instance is the combination of the interface instance of each tested object.
3. a kind of test method of Ground Data Processing System interface according to claim 2, it is characterised in that: if described There is some tested object not to be available in flow instance, then judges whether to simulate test object input and defeated by user Out, it interrupts the execution of flow testing job order not, and sends dummy instruction, the dummy instruction includes needing to be simulated be tested Try all information of object.
4. a kind of test method of Ground Data Processing System interface according to claim 3, which is characterized in that the mould The method of quasi- tested object input are as follows: receive dummy instruction, creating in simulation software according to dummy instruction need to be to be simulated The simulation stake of tested object;Simulation stake packing is uploaded onto the server;After receiving dummy instruction, the test node meter Calculation machine corresponding address from server is downloaded the simulation stake and is executed.
5. a kind of test method of Ground Data Processing System interface according to claim 4, which is characterized in that the mould The method that quasi- tested object executes are as follows: according to configuration item calculating simulation handling duration;At the simulation for carrying out simulation process duration Reason;Export simulation process log and progress in real time simultaneously.
6. a kind of test method of Ground Data Processing System interface according to claim 5, which is characterized in that the mould The method of quasi- tested object output are as follows: at the end of the simulation process duration, output output file to designated position;It is described Designated position is the input for being modeled the next process of test object.
7. a kind of test method of described in any item Ground Data Processing System interfaces, feature exist according to claim 1~6 In: there are many interface instances that tested object is created according to interface model, corresponding to generate different test assignment lists simultaneously It executes.
8. a kind of test method of described in any item Ground Data Processing System interfaces, feature exist according to claim 1~6 In: during the test starts to test to terminate, test log is generated in real time, and the survey is monitored and referred to for tester Try the executive condition of job order.
CN201811556428.9A 2018-12-19 2018-12-19 Interface test method of ground data processing system Active CN109753430B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811556428.9A CN109753430B (en) 2018-12-19 2018-12-19 Interface test method of ground data processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811556428.9A CN109753430B (en) 2018-12-19 2018-12-19 Interface test method of ground data processing system

Publications (2)

Publication Number Publication Date
CN109753430A true CN109753430A (en) 2019-05-14
CN109753430B CN109753430B (en) 2022-07-29

Family

ID=66402824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811556428.9A Active CN109753430B (en) 2018-12-19 2018-12-19 Interface test method of ground data processing system

Country Status (1)

Country Link
CN (1) CN109753430B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110321288A (en) * 2019-06-21 2019-10-11 北京机电工程研究所 A kind of emulation test method of the information processing system on aircraft
CN111611444A (en) * 2020-04-22 2020-09-01 国家卫星气象中心(国家空间天气监测预警中心) Universal fault diagnosis system for polar orbit meteorological satellite
CN112834966A (en) * 2020-12-31 2021-05-25 中国科学院微小卫星创新研究院 Automatic test system for satellite electrical interface
CN114297084A (en) * 2021-12-31 2022-04-08 北京航天驭星科技有限公司 Method and device for testing satellite test, operation and control data interface, electronic equipment and medium
CN114817063A (en) * 2022-05-17 2022-07-29 中国联合网络通信集团有限公司 Simulation test method, device and storage medium
CN116627849A (en) * 2023-07-24 2023-08-22 中邮消费金融有限公司 System test method, device, equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102541725A (en) * 2010-12-09 2012-07-04 中国科学院沈阳计算技术研究所有限公司 Simulation test method of numerical control system functional module
CN104461854A (en) * 2013-09-12 2015-03-25 中国船舶工业综合技术经济研究院 General simulation testing platform for software of ship equipment and construction method of general simulation testing platform
US20150269057A1 (en) * 2014-03-19 2015-09-24 International Business Machines Corporation Self verifying device driver for multi-version compatible data manipulation devices
CN105487977A (en) * 2015-11-30 2016-04-13 北京锐安科技有限公司 Agility-oriented automatic test management system and method
CN108121657A (en) * 2017-11-29 2018-06-05 北京京航计算通讯研究所 Programmable logic device software simulation verification system based on system model

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102541725A (en) * 2010-12-09 2012-07-04 中国科学院沈阳计算技术研究所有限公司 Simulation test method of numerical control system functional module
CN104461854A (en) * 2013-09-12 2015-03-25 中国船舶工业综合技术经济研究院 General simulation testing platform for software of ship equipment and construction method of general simulation testing platform
US20150269057A1 (en) * 2014-03-19 2015-09-24 International Business Machines Corporation Self verifying device driver for multi-version compatible data manipulation devices
CN105487977A (en) * 2015-11-30 2016-04-13 北京锐安科技有限公司 Agility-oriented automatic test management system and method
CN108121657A (en) * 2017-11-29 2018-06-05 北京京航计算通讯研究所 Programmable logic device software simulation verification system based on system model

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110321288A (en) * 2019-06-21 2019-10-11 北京机电工程研究所 A kind of emulation test method of the information processing system on aircraft
CN110321288B (en) * 2019-06-21 2023-05-12 北京机电工程研究所 Simulation test method for information processing system on aircraft
CN111611444A (en) * 2020-04-22 2020-09-01 国家卫星气象中心(国家空间天气监测预警中心) Universal fault diagnosis system for polar orbit meteorological satellite
CN112834966A (en) * 2020-12-31 2021-05-25 中国科学院微小卫星创新研究院 Automatic test system for satellite electrical interface
CN114297084A (en) * 2021-12-31 2022-04-08 北京航天驭星科技有限公司 Method and device for testing satellite test, operation and control data interface, electronic equipment and medium
CN114817063A (en) * 2022-05-17 2022-07-29 中国联合网络通信集团有限公司 Simulation test method, device and storage medium
CN116627849A (en) * 2023-07-24 2023-08-22 中邮消费金融有限公司 System test method, device, equipment and storage medium
CN116627849B (en) * 2023-07-24 2024-01-26 中邮消费金融有限公司 System test method, device, equipment and storage medium

Also Published As

Publication number Publication date
CN109753430B (en) 2022-07-29

Similar Documents

Publication Publication Date Title
CN109753430A (en) A kind of interface test method of Ground Data Processing System
CN103235756B (en) A kind of emulation test method of embedded system subregion application software
US7895565B1 (en) Integrated system and method for validating the functionality and performance of software applications
CN107463362B (en) Method and system for continuous deployment based on multiple Jenkins
CN106354642A (en) Onboard central maintenance system software testing method and its system
CN102141962A (en) Safety distributed test framework system and test method thereof
KR20080065936A (en) Systems and methods for turbine control simulation
WO2019020514A1 (en) Edge devices and associated networks utilising microservices
US20060129892A1 (en) Scenario based stress testing
CN110471831A (en) A kind of automatic method and device of compatibility test
CN105718369A (en) Computer software test abnormity processing system and test method
CN109634843A (en) A kind of distributed automatization method for testing software and platform towards AI chip platform
CN108089976A (en) A kind of method for building flight management system software virtual testing environment
CN107562969A (en) The integrated approach and device of aeroengine control system software
CN107992411A (en) A kind of method for building task management system software virtual testing environment
CN102566443A (en) Simulation verification system and method for integrated avionics system model based on artifact design description language (ADDL)
CN102799709B (en) System simulation test environment building and configuring system and method based on extensive markup language (XML)
CN108089975A (en) A kind of method of constructing environment Control System Software virtual testing environment
US20180113796A1 (en) Automatic generation of data coupling and control coupling test conditions
Winkler et al. Automation component aspects for efficient unit testing
CN101765129A (en) Network access test system and method for data value-added service
US10890621B2 (en) Systems and methods for testing an embedded controller
Hummer et al. Automated testing of chef automation scripts
Leonard et al. Model-based development of interactive multimedia system
Yim Norming to performing: Failure analysis and deployment automation of big data software developed by highly iterative models

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant