CN109726940A - A kind of ornamental plant maintenance management method and system - Google Patents

A kind of ornamental plant maintenance management method and system Download PDF

Info

Publication number
CN109726940A
CN109726940A CN201910113898.6A CN201910113898A CN109726940A CN 109726940 A CN109726940 A CN 109726940A CN 201910113898 A CN201910113898 A CN 201910113898A CN 109726940 A CN109726940 A CN 109726940A
Authority
CN
China
Prior art keywords
maintenance
plant
strategy
database
time value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910113898.6A
Other languages
Chinese (zh)
Inventor
冯伟伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Muya Garden Ltd By Share Ltd
Original Assignee
Shenzhen Muya Garden Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Muya Garden Ltd By Share Ltd filed Critical Shenzhen Muya Garden Ltd By Share Ltd
Priority to CN201910113898.6A priority Critical patent/CN109726940A/en
Publication of CN109726940A publication Critical patent/CN109726940A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to ornamental plant maintenance management methods, its implementation is as follows: setting corresponding maintenance strategy according to plant variety, and plant region is marked to maintenance strategy, maintenance strategy includes multiple timing nodes and the multiple and one-to-one maintenance operations of timing node;It collects the corresponding maintenance strategy of all plants in compass of competency and stores to database;Database is monitored, pre-set time value on the basis of current time plus a setting is as comparison time value, when the timing node in comparison time value and database matches, maintenance assignment instructions are generated, maintenance assignment instructions include timing node, maintenance operations and plant region;Maintenance assignment instructions are sent to maintenance personnel;Way to manage is more reasonable, is no longer rely on artificial experience and is managed, and worker's skill requirement of practical maintenance operations is also greatly reduced, and has substantially saved management cost and cost of labor, improves management quality and efficiency.

Description

A kind of ornamental plant maintenance management method and system
Technical field
The present invention relates to plant maintenance technical field, more specifically to a kind of ornamental plant maintenance management method and System.
Background technique
For larger gardens, it can be designed into the plant compared with multi items, plant maintenance relies on artificial experience pipe The mode of reason is difficult to take into account in place, and easily occurs forgeing situation;In addition, plant will do it position according to the needs of design often It changes, so that the difficulty of plant maintenance and management further increases.
Summary of the invention
The technical problem to be solved in the present invention is that in view of the above drawbacks of the prior art, it is feeding to provide a kind of ornamental plant Protect management method;
Additionally provide a kind of ornamental plant maintenance management system.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of ornamental plant maintenance management method is constructed, its implementation is as follows:
Step 1: setting corresponding maintenance strategy according to plant variety, and plant location is marked to maintenance strategy Domain, the maintenance strategy include multiple timing nodes and the multiple and one-to-one maintenance operations of timing node;
Step 2: collecting the corresponding maintenance strategy of all plants in compass of competency and storing to database;
Step 3: being monitored to database, plus the pre-set time value conduct of a setting on the basis of current time Comparison time value generates maintenance assignment instructions, the maintenance when the timing node in comparison time value and database matches Assignment instructions include timing node, maintenance operations and plant region;
Step 4: maintenance assignment instructions are sent to maintenance personnel.
Ornamental plant maintenance management method of the present invention, wherein further include method: maintenance personnel are collected and are conserved The plant growth information fed back when operation carries out adaptation to the corresponding maintenance strategy in database according to the growth information Adjustment.
Ornamental plant maintenance management method of the present invention, wherein maintenance strategy is sent to cloud platform, and records and deposits The corresponding plant growth information of storage is sent to cloud platform, learns for tradesman or advises.
Ornamental plant maintenance management method of the present invention, wherein the maintenance strategy further includes urgent trigger condition; When that emergency will occur, by the emergency in the database with it is each it is described maintenance strategy in urgent trigger condition It is compared, emergent management assignment instructions is made when comparing successfully to conserving personnel.
Ornamental plant maintenance management method of the present invention, wherein the emergency include heavy snow, frost, low temperature, High temperature, strong wind and continuous rainfall.
Ornamental plant maintenance management method of the present invention, wherein the maintenance operations include cold-proof protection, sun-proof guarantor Shield, high temperature-proof protection, soil improvement, watering, fertilising and trimming.
A kind of ornamental plant maintenance management system, according to above-mentioned ornamental plant maintenance management method, which is characterized in that packet Include data processing platform (DPP), multiple plant data collection terminals and multiple maintenance mobile terminals;
The plant data collection terminal, for setting corresponding maintenance strategy according to plant variety, and to maintenance it is tactful into Line flag plant region, maintenance strategy include multiple timing nodes and multiple support correspondingly with timing node Shield operation;
The data processing platform (DPP), including communication module, data processing module and database;
The communication module, for being communicated with the plant data collection terminal and the maintenance mobile terminal;
The database, for storing the corresponding maintenance strategy of all plants in compass of competency;
The data processing module is set on the basis of current time plus one for being monitored to the database Fixed pre-set time value is generated and is supported when the timing node in comparison time value and database matches as comparison time value Shield assignment instructions are simultaneously distributed to the maintenance mobile terminal, and the maintenance assignment instructions include timing node, maintenance operations and plant Region;
The maintenance mobile terminal, by maintenance, personnel are held, for receiving and showing the maintenance assignment instructions.
Ornamental plant maintenance management system of the present invention, wherein the maintenance mobile terminal is also used to for maintenance personnel Carry out the plant growth information of feedback when maintenance work.
Ornamental plant maintenance management system of the present invention, wherein further include cloud platform;The cloud platform is for receiving The maintenance strategy and the plant growth information that the data processing platform (DPP) is sent are stored, for learning for tradesman or mentioning Suggest out.
Ornamental plant maintenance management system of the present invention, wherein the maintenance strategy further includes urgent trigger condition; When that emergency will occur, by the emergency in the database with it is each it is described maintenance strategy in urgent trigger condition It is compared, emergent management assignment instructions is made when comparing successfully to conserving personnel;The emergency include heavy snow, frost, Low temperature, high temperature, strong wind and continuous rainfall.
The beneficial effects of the present invention are: corresponding maintenance strategy is set according to plant variety, and maintenance strategy is marked Remember plant region, maintenance strategy includes multiple timing nodes and the multiple and one-to-one maintenance operations of timing node; It collects the corresponding maintenance strategy of all plants in compass of competency and stores to database;Database is monitored, current Time of the pre-set time value as comparison time value, in comparison time value and database on the basis of time plus a setting When node matches, maintenance assignment instructions are generated, maintenance assignment instructions include timing node, maintenance operations and plant location Domain;Maintenance assignment instructions are sent to maintenance personnel;Way to manage is more reasonable, no longer fully relies on artificial experience and carries out pipe Reason, and worker's skill requirement of practical maintenance operations is also greatly reduced, management cost and cost of labor have substantially been saved, has been improved Management quality and efficiency;In addition, directly changing to the plant region in maintenance strategy when plant position changes It is dynamic, it is easy to operate.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below in conjunction with attached drawing and reality Applying example, the invention will be further described, and the accompanying drawings in the following description is only section Example of the invention, for this field For those of ordinary skill, without creative efforts, it can also be obtained according to these attached drawings other accompanying drawings:
Fig. 1 is the ornamental plant maintenance management method flow diagram of present pre-ferred embodiments;
Fig. 2 is the ornamental plant maintenance management system functional block diagram of present pre-ferred embodiments.
Specific embodiment
In order to keep the purposes, technical schemes and advantages of the embodiment of the present invention clearer, implement below in conjunction with the present invention Technical solution in example carries out clear, complete description, it is clear that and described embodiment is section Example of the invention, and It is not all of embodiment.Based on the embodiment of the present invention, those of ordinary skill in the art are not before making the creative labor Every other embodiment obtained is put, protection scope of the present invention is belonged to.
The ornamental plant maintenance management method of present pre-ferred embodiments, as shown in Figure 1, its implementation is as follows:
S01: setting corresponding maintenance strategy according to plant variety, and plant region be marked to maintenance strategy, Maintenance strategy includes multiple timing nodes and the multiple and one-to-one maintenance operations of timing node;
S02: it collects the corresponding maintenance strategy of all plants in compass of competency and stores to database;
S03: being monitored database, and pre-set time value on the basis of current time plus a setting is as comparison Time value generates maintenance assignment instructions, conserves assignment instructions when the timing node in comparison time value and database matches Including timing node, maintenance operations and plant region;
S04: maintenance assignment instructions are sent to maintenance personnel;
Way to manage is more reasonable, is no longer rely on artificial experience and is managed, and to worker's experience of practical maintenance operations It is required that being also greatly reduced, management cost and cost of labor have substantially been saved, has improved management quality and efficiency;In addition, in plant position It sets when changing, directly the plant region in maintenance strategy is modified, it is easy to operate.
Preferably, further include method: the plant growth information that maintenance personnel carry out feedback when maintenance work is collected, according to this Growth information carries out adaptation adjustment to the corresponding maintenance strategy in database.
Preferably, maintenance strategy is sent to cloud platform, and the corresponding plant growth information of record storage is sent to cloud Platform learns or is advised for tradesman.
Preferably, maintenance strategy further includes urgent trigger condition;When that emergency will occur, which is existed It is compared in database with the urgent trigger condition in each maintenance strategy, emergent management assignment instructions is made when comparing successfully To maintenance personnel;Matching early warning is carried out when convenient for there is urgent weather to occur, plant is targetedly protected, and protection is improved Quality.
Preferably, emergency includes the bad weathers such as heavy snow, frost, low temperature, high temperature, strong wind and continuous rainfall or artificial Factor.
Preferably, maintenance operations include cold-proof protection, preventing coating protection, high temperature-proof protection, soil improvement, watering, fertilising and The operation such as trimming.
A kind of ornamental plant maintenance management system, according to above-mentioned ornamental plant maintenance management method, as shown in Fig. 2, packet Include data processing platform (DPP) 1, multiple plant data collection terminals 2 and multiple maintenance mobile terminals 3;
Plant data collection terminal 2 for setting corresponding maintenance strategy according to plant variety, and is marked maintenance strategy Remember plant region, maintenance strategy includes multiple timing nodes and the multiple and one-to-one maintenance operations of timing node;
Data processing platform (DPP) 1, including communication module 10, data processing module 11 and database 12;
Communication module 10, for being communicated with plant data collection terminal 2 and maintenance mobile terminal 3;
Database 12, for storing the corresponding maintenance strategy of all plants in compass of competency;
Data processing module 11, for being monitored to database 12, plus a setting on the basis of current time Pre-set time value is as comparison time value, when the timing node in comparison time value and database matches, generates maintenance and appoints Business instructs and is distributed to maintenance mobile terminal, and maintenance assignment instructions include timing node, maintenance operations and plant region;
Mobile terminal 3 is conserved, personnel hold by maintenance, for receiving and showing maintenance assignment instructions;
Corresponding maintenance strategy is set according to plant variety, and plant region is marked to maintenance strategy, conserves plan It slightly include multiple timing nodes and the multiple and one-to-one maintenance operations of timing node;Collect all plants in compass of competency The corresponding maintenance strategy of object is simultaneously stored to database;Database is monitored, plus a setting on the basis of current time Pre-set time value as comparison time value, when the timing node in comparison time value and database matches, generate maintenance Assignment instructions, maintenance assignment instructions include timing node, maintenance operations and plant region;Maintenance assignment instructions are sent to Maintenance personnel;Way to manage is more reasonable, no longer fully relies on artificial experience and is managed, and to the worker of practical maintenance operations Skill requirement is also greatly reduced, and has substantially saved management cost and cost of labor, improves management quality and efficiency;In addition, planting When object location changes, directly the plant region in maintenance strategy is modified, it is easy to operate.
Preferably, maintenance mobile terminal is also used to carry out the plant growth information of feedback when maintenance work for maintenance personnel;Just In the adjustment for carrying out maintenance strategy according to the actual situation.
It preferably, further include cloud platform 4;Cloud platform 4 be used for receive storing data processing platform transmission maintenance strategy and Plant growth information, for learning for tradesman or advising;It is convenient for carrying out exchange study with related personnel, mention High maintenance level.
Preferably, maintenance strategy further includes urgent trigger condition;When that emergency will occur, which is existed It is compared in database with the urgent trigger condition in each maintenance strategy, emergent management assignment instructions is made when comparing successfully To maintenance personnel;Emergency includes heavy snow, frost, low temperature, high temperature, strong wind and continuous rainfall;Convenient for there is urgent weather to send out Matching early warning is carried out when raw, plant is targetedly protected, protection quality is improved.
It should be understood that for those of ordinary skills, it can be modified or changed according to the above description, And all these modifications and variations should all belong to the protection domain of appended claims of the present invention.

Claims (10)

1. a kind of ornamental plant maintenance management method, which is characterized in that implementation method is as follows:
Step 1: setting corresponding maintenance strategy according to plant variety, and plant region, institute are marked to maintenance strategy Stating maintenance strategy includes multiple timing nodes and the multiple and one-to-one maintenance operations of timing node;
Step 2: collecting the corresponding maintenance strategy of all plants in compass of competency and storing to database;
Step 3: being monitored to database, pre-set time value on the basis of current time plus a setting is as comparison Time value generates maintenance assignment instructions, the maintenance task when the timing node in comparison time value and database matches Instruction includes timing node, maintenance operations and plant region;
Step 4: maintenance assignment instructions are sent to maintenance personnel.
2. ornamental plant maintenance management method according to claim 1, which is characterized in that further include method: collecting maintenance Personnel carry out the plant growth information of feedback when maintenance work, according to the growth information to the corresponding maintenance strategy in database into The adjustment of row adaptation.
3. ornamental plant maintenance management method according to claim 2, which is characterized in that maintenance strategy is sent to cloud and is put down Platform, and the corresponding plant growth information of record storage is sent to cloud platform, learns for tradesman or advises.
4. ornamental plant maintenance management method according to claim 1, which is characterized in that the maintenance strategy further includes tight Anxious trigger condition;When that emergency will occur, by the emergency in the database and in each maintenance strategy Urgent trigger condition is compared, and production emergent management assignment instructions are to conserving personnel when comparing successfully.
5. ornamental plant maintenance management method according to claim 4, which is characterized in that the emergency includes big Snow, frost, low temperature, high temperature, strong wind and continuous rainfall.
6. ornamental plant maintenance management method according to claim 1, which is characterized in that the maintenance operations include cold-proof Protection, preventing coating protection, high temperature-proof protection, soil improvement, watering, fertilising and trimming.
7. a kind of ornamental plant maintenance management system, -6 any ornamental plant maintenance management method according to claim 1, It is characterised in that it includes data processing platform (DPP), multiple plant data collection terminals and multiple maintenance mobile terminals;
The plant data collection terminal for setting corresponding maintenance strategy according to plant variety, and is marked maintenance strategy Remember plant region, the maintenance strategy includes that multiple timing nodes and multiple and timing node conserve behaviour correspondingly Make;
The data processing platform (DPP), including communication module, data processing module and database;
The communication module, for being communicated with the plant data collection terminal and the maintenance mobile terminal;
The database, for storing the corresponding maintenance strategy of all plants in compass of competency;
The data processing module, for being monitored to the database, plus a setting on the basis of current time Pre-set time value is as comparison time value, when the timing node in comparison time value and database matches, generates maintenance and appoints Business instructs and is distributed to the maintenance mobile terminal, and the maintenance assignment instructions include timing node, maintenance operations and plant place Region;
The maintenance mobile terminal, by maintenance, personnel are held, for receiving and showing the maintenance assignment instructions.
8. ornamental plant maintenance management system according to claim 7, which is characterized in that the maintenance mobile terminal is also used to The plant growth information of feedback when for maintenance personnel's progress maintenance work.
9. ornamental plant maintenance management system according to claim 8, which is characterized in that further include cloud platform;The cloud Platform is used to receive the maintenance strategy and the plant growth information for storing that the data processing platform (DPP) is sent, for for tradesman Learnt or is advised.
10. ornamental plant maintenance management system according to claim 7, which is characterized in that the maintenance strategy further includes Urgent trigger condition;When that emergency will occur, by the emergency in the database and in each maintenance strategy Urgent trigger condition be compared, emergent management assignment instructions are made when comparing successfully to conserving personnel;The emergency Including heavy snow, frost, low temperature, high temperature, strong wind and continuous rainfall.
CN201910113898.6A 2019-02-14 2019-02-14 A kind of ornamental plant maintenance management method and system Pending CN109726940A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910113898.6A CN109726940A (en) 2019-02-14 2019-02-14 A kind of ornamental plant maintenance management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910113898.6A CN109726940A (en) 2019-02-14 2019-02-14 A kind of ornamental plant maintenance management method and system

Publications (1)

Publication Number Publication Date
CN109726940A true CN109726940A (en) 2019-05-07

Family

ID=66300429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910113898.6A Pending CN109726940A (en) 2019-02-14 2019-02-14 A kind of ornamental plant maintenance management method and system

Country Status (1)

Country Link
CN (1) CN109726940A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110447445A (en) * 2019-08-22 2019-11-15 合肥尘洁清洁技术服务有限公司 A kind of maintenance management method of road green belt
CN111837793A (en) * 2020-08-14 2020-10-30 华艺生态园林股份有限公司 Southern magnolia winter planting and maintaining method
CN113506017A (en) * 2021-07-26 2021-10-15 南京林业大学 Campus is managed with digit gardens and is supported system
CN114912894A (en) * 2022-05-12 2022-08-16 上海丰麓园林绿化建设有限公司 Big data-based intelligent garden management method, system, terminal and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105608554A (en) * 2015-09-29 2016-05-25 宇龙计算机通信科技(深圳)有限公司 Information display method, information display device and terminal
CN105844408A (en) * 2016-03-24 2016-08-10 苏州绿色植物全栈信息科技有限公司 Plant management system and method for garden and landscape engineering based on two-dimensional codes
CN107077650A (en) * 2014-09-12 2017-08-18 克莱米特公司 Method and system for managing rural activity
CN107506940A (en) * 2017-09-08 2017-12-22 重庆辛骅科技发展有限公司 A kind of garden management system and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107077650A (en) * 2014-09-12 2017-08-18 克莱米特公司 Method and system for managing rural activity
CN105608554A (en) * 2015-09-29 2016-05-25 宇龙计算机通信科技(深圳)有限公司 Information display method, information display device and terminal
CN105844408A (en) * 2016-03-24 2016-08-10 苏州绿色植物全栈信息科技有限公司 Plant management system and method for garden and landscape engineering based on two-dimensional codes
CN107506940A (en) * 2017-09-08 2017-12-22 重庆辛骅科技发展有限公司 A kind of garden management system and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110447445A (en) * 2019-08-22 2019-11-15 合肥尘洁清洁技术服务有限公司 A kind of maintenance management method of road green belt
CN111837793A (en) * 2020-08-14 2020-10-30 华艺生态园林股份有限公司 Southern magnolia winter planting and maintaining method
CN113506017A (en) * 2021-07-26 2021-10-15 南京林业大学 Campus is managed with digit gardens and is supported system
CN113506017B (en) * 2021-07-26 2022-05-24 南京林业大学 Campus is managed with digit gardens and is supported system
CN114912894A (en) * 2022-05-12 2022-08-16 上海丰麓园林绿化建设有限公司 Big data-based intelligent garden management method, system, terminal and storage medium

Similar Documents

Publication Publication Date Title
CN109726940A (en) A kind of ornamental plant maintenance management method and system
Sales et al. Wireless sensor and actuator system for smart irrigation on the cloud
CN107451754A (en) A kind of trans-regional Operations of Farm Machines dispatching method and system
CN114568265B (en) Afforestation maintains intelligent monitoring management system based on artificial intelligence
CN108011955A (en) A kind of intelligent greenhouse monitoring system based on cloud service
CN111109057B (en) Irrigation method and device for greening and maintaining gardens
CN109258417B (en) Automatic irrigation method
CN109601045B (en) Rock slope repairing method
CN104012364A (en) Direct-sowing afforestation method for desert haloxylon of arid and extremely arid areas in growing season
CN104091075A (en) Tree management and transportation path planning system based on Internet of Things and achieving method thereof
CN204989838U (en) Crops management system based on internet
CN202735831U (en) Vineyard intelligent monitoring device
CN108665192A (en) A kind of roadside greening management platform and method
Chattopadhyay et al. Usability of extended range and seasonal weather forecast in Indian agriculture
CN106605530B (en) Automatic monitoring and cultivating method for potted plant and intelligent flowerpot
CN109145137B (en) Agricultural big data platform
CN103607829A (en) Intelligent network type plant growth LED lamp capable of adjusting light quality automatically
Sharma MERLIN: Smart Framework for Agriculture in India
Liu et al. The analysis on land use change in urban fringe area based on the GIS technology
CN114287320A (en) Root cliff stone cultivation system and method
CN109937855A (en) Intelligent irrigation method and device, system
Cervera-Gascó et al. An intelligent irrigation management model for direct injection of solar pumping systems
Annie et al. Enhancing agricultural risk management through weather forecasting and agrometeorological advisory services
Quicho et al. Application of remote sensing and crop modeling for rice in Andhra Pradesh, India
CN215581550U (en) Agricultural thing networking monitoring device with No. three short message communication functions of big dipper

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190507