CN109695451A - A kind of open coal mine highwall coal excavation apparatus running gear - Google Patents

A kind of open coal mine highwall coal excavation apparatus running gear Download PDF

Info

Publication number
CN109695451A
CN109695451A CN201811635302.0A CN201811635302A CN109695451A CN 109695451 A CN109695451 A CN 109695451A CN 201811635302 A CN201811635302 A CN 201811635302A CN 109695451 A CN109695451 A CN 109695451A
Authority
CN
China
Prior art keywords
assembly
sleeve
travelling platform
briquetting
inner sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811635302.0A
Other languages
Chinese (zh)
Inventor
张学瑞
马凯
丁永成
宋明江
张强
李永安
任晓力
郑吉�
陈庆贺
郭进彬
梁大海
桑盛远
康鹏
王文华
林广旭
鲁鹤鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan Institute of China Coal Technology and Engineering Group
Shanxi Tiandi Coal Mining Machinery Co Ltd
Original Assignee
Taiyuan Institute of China Coal Technology and Engineering Group
Shanxi Tiandi Coal Mining Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan Institute of China Coal Technology and Engineering Group, Shanxi Tiandi Coal Mining Machinery Co Ltd filed Critical Taiyuan Institute of China Coal Technology and Engineering Group
Priority to CN201811635302.0A priority Critical patent/CN109695451A/en
Publication of CN109695451A publication Critical patent/CN109695451A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C47/00Machines for obtaining or the removal of materials in open-pit mines
    • E21C47/02Machines for obtaining or the removal of materials in open-pit mines for coal, brown coal, or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C29/00Propulsion of machines for slitting or completely freeing the mineral from the seam
    • E21C29/02Propulsion of machines for slitting or completely freeing the mineral from the seam by means on the machine exerting a thrust against fixed supports
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C35/00Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
    • E21C35/08Guiding the machine

Abstract

The invention discloses a kind of open coal mine highwall coal excavation apparatus running gears, including interlude travelling platform assembly and walking assembly;The walking assembly includes guide assembly, take a step oil cylinder and two sleeve elevating mechanisms;The sleeve elevating mechanism includes inner sleeve cartridge module, housing cartridge module and lifting cylinder;The piston rod of the oil cylinder of taking a step is fixed on guide assembly one end, and the cylinder body other end for oil cylinder of taking a step then with the inner sleeve attached components in adjacent sleeve elevating mechanism;Two sleeve elevating mechanisms on same guide assembly are symmetrically set, for installing interlude travelling platform assembly.The running gear not only realizes step-by-step movement travelling platform and adopts the position transfer between hole and 360 ° of the original place steering work of entire travelling platform relative to difference;The height adjustment that the forward and backward head bottom part of step-by-step movement travelling platform be can also be achieved relative to ground works, and the fluctuating on stope ground is preferably adapted to convenient for step-by-step movement travelling platform, enhances the applicability of equipment.

Description

A kind of open coal mine highwall coal excavation apparatus running gear
Technical field
The present invention relates to open coal mine equipment technical fields, and in particular to a kind of open coal mine highwall coal excavation apparatus walking Device.
Background technique
In recent years with national economy fast development, energy-output ratio is significantly increased, primary consumption of the coal as China The energy, national coal production since 2015 continuous 3 years more than 3,300,000,000 tons.With the adjustment of national relevant policies, national coal Though downward trend is presented in mine quantity sum, large-scale, ultra-large type coal mine quantity is increased, and wherein open coal mine quantity continues Increase, open coal mine yield is substantially improved, and gross annual output amount accounting is increased to by original 5% close to 10%.Coal production increase is not The demand of traditional coal excavation apparatus is only increased, and is suitable for opencast novel coal excavation apparatus and also welcomes new development machine It meets.
At present for rich reserves, bury shallow coalfield and generally use strip mining transformation, strip mining transformation have production scale it is big, The advantages such as labor efficiency is high, construction speed is fast, cost of ton coal is low, but it is big etc. scarce there is also more, pollution environment, equipment investment is taken up an area Point.Strip mining transformation need to peel away the ground above coal seam, and transport to refuse dump with truck and dump, to the charcoal that can mine reveal in vitro with Afterwards, then pass through the large-scale coal excavation apparatus coal mining such as monobucket shovel, power shovel.Field dividing is usually several by strip mining transformation Horizontal slice, layer-by-layer mining from top to bottom, spatially formed it is ladder-like, it is about 300 meters to 600 meters of mining depth, gentle highwall, big Adopting the productive prospectings such as deep means open coal mine there are a large amount of highwalls to press coal, and according to incompletely statistics, the annual highwall in China presses coal More than 20,000,000 tons, highwall mining pressed coal be easy to cause the waste of coal resources not in time.Traditional Opencut coal mine mining equipment Running gear has been all made of thrust wheel or without thrust wheel creeper undercarriage, and structure is complicated for the walking mechanism, cost is high, no Suitable for highwall mining pressed coal work flow and stope environment, therefore a set of completely new winning apparatus need to be developed to meet highwall pressure coal Exploitation.
Summary of the invention
The purpose of the present invention is to solve above-mentioned technical problems, provide a kind of open coal mine highwall coal excavation apparatus row Walking apparatus, the running gear not only realize the position that step-by-step movement travelling platform is adopted relative to difference between hole and transfer and entirely walk 360 ° of the original place steering work of platform;It can also be achieved height tune of the forward and backward head bottom part of step-by-step movement travelling platform relative to ground Work is saved, the fluctuating on stope ground is preferably adapted to convenient for step-by-step movement travelling platform, enhances the applicability of equipment.
To achieve the above object, The technical solution adopted by the invention is as follows:
A kind of open coal mine highwall coal excavation apparatus running gear, including interlude travelling platform assembly, and it is located at interlude row Walk two walking assemblies for walking before and after platform assembly;The walking assembly includes guide assembly, take a step oil cylinder and two A sleeve elevating mechanism;The sleeve elevating mechanism includes inner sleeve cartridge module, housing cartridge module and lifting cylinder, the inner sleeve Cartridge module is slidably arranged on guide assembly, and the outer sleeve component is set in inner sleeve component upper outer, the lifting oil The cylinder piston end is fixed on inside inner sleeve, lifting cylinder cylinder body is fixed on inside outer sleeve;The piston rod of the oil cylinder of taking a step is solid Be scheduled on guide assembly one end, and the cylinder body other end for oil cylinder of taking a step then with the inner sleeve cartridge module phase in adjacent sleeve elevating mechanism It connects;Two sleeve elevating mechanisms on same guide assembly are symmetrically set, for installing interlude travelling platform assembly.
Specifically, the inner sleeve cartridge module includes inner sleeve welding assembly, axletree gland and running wheel, it is described in Sleeve weld is total integral in type row, the interconnecting piece of cannulated sleeve and lower part including top, the piston of the lifting cylinder Bar is fixed in cannulated sleeve by inner sleeve lifting cylinder pin shaft, 12 spring washers, M12 bolt, is equipped in the interconnecting piece At least two running wheels to match with guide assembly, interconnecting piece side are then equipped with the wheel through-hole opposite with running wheel, Wheel through-hole is externally provided with the axletree gland being inserted into running wheel after wheel through-hole.
Specifically, the running wheel two sides are respectively equipped with bearing mounting hole and seal receptacle mounting hole, the bearing peace Fill and be equipped with self-contained bearing in hole, equipped with seal receptacle in the seal receptacle mounting hole, and running wheel be additionally provided with it is close for completing Seal retaining ring of the seat with respect to the axially position of running wheel;Reinforced seal is installed in the seal receptacle.
More specifically, the axletree gland is equipped with gland pump nozzle, to pass through gland pump nozzle to corresponding row Walk wheel grease up.
Further, the housing cartridge module includes outer sleeve welding assembly and briquetting component, and the outer sleeve welding is total At including the hollow and vertical section that matches with interior cannulated sleeve, and at least two be fixed in vertical section are for installing centre The mounting plate of section travelling platform assembly;The briquetting component at least there are four and be uniformly fixedly mounted in vertical section.
Further, the vertical section is equipped with mounting hole for installing briquetting component, the briquetting component include with The briquetting seat that mounting hole matches, the briquetting being fixed in the middle part of briquetting seat, and the briquetting pump nozzle being arranged on briquetting seat.
Further, the briquetting seat is additionally provided with towards the side inside vertical section for adjusting vertical section and cannulated sleeve Between gap adjusting pad.
Further, the mounting plate includes the sleeve being set in outside vertical section, and is arranged on sleeve simultaneously in Between section travelling platform assembly vertical plate;The interlude travelling platform assembly passes through 30 spring washers and M30 bolt and erects Straight panel is fixed.
Compared with prior art, the invention has the following advantages:
(1) present invention applicant devises a set of highwall mining pressed coal in the status exploitation for combining highwall mining pressed coal construction technology Equipment, and that innovates proposes new production practice and exploitation process, and wherein, running gear of the invention is this Mining Equipment One of the key components of component devices " step-by-step movement travelling platform " rely on a whole set of Mining Equipment to realize the machinery of highwall pressure coal Change, the unmanned exploitation of working face, eliminates the stripping operation of ground on coal body, save removing cost, solve current side The mining problem of side pressure coal, not only increases the coal production of open coal mine, creates new economic benefit for coal enterprise, It improves the rate of recovery of entire mine coal resources, can be utilized effectively, avoid the wasting of resources.
(2) running gear of the present invention not only realize step-by-step movement travelling platform relative to difference adopt positions between hole transfer and 360 ° of the original place steering work of entire travelling platform;The forward and backward head bottom part of step-by-step movement travelling platform be can also be achieved relative to ground Height adjustment work, the fluctuating on stope ground is preferably adapted to convenient for step-by-step movement travelling platform, enhances the applicability of equipment, phase Than traditional creeper undercarriage, the design structure is simpler, cost is lower, more adapts to the operating environment of highwall mining.
(3) running gear of the present invention is rolled using the superpower bearing capacity track of van-type, running wheel relative orbit walks, is interior The design scheme of the flexible adjustment of outer sleeve height, both ensure that super large bearing strength when step-by-step movement travelling platform position is transferred, Also reduce frictional resistance when step-by-step movement travelling platform takes a step to shift.
(4) running gear housing cartridge module surrounding of the present invention is uniformly equipped with briquetting component, it can be achieved that inner and outer sleeves combine The real-time adjustment in face gap, compact materials select compound Copper base material matter and designing have lubrication channel can grease up, lower in, Frictional resistance when outer sleeve relative motion reduces the abrasion of briquetting faying face, extends the service life of briquetting.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is walking assembly structural schematic diagram of the present invention;
Fig. 3 is outer sleeve structure schematic diagram of the present invention;
Fig. 4 is I structural schematic diagram of inner sleeve cartridge module of the present invention;
Fig. 5 is II structural schematic diagram of inner sleeve cartridge module of the present invention;
Fig. 6 is running gear workflow schematic diagram of the present invention.
Wherein, the corresponding title of appended drawing reference are as follows:
1- walking assembly, 2- interlude travelling platform assembly, 3- guide assembly, 4- inner sleeve cartridge module I, 5- inner sleeve cartridge module II, 6- housing cartridge module, 7- take a step oil cylinder, 8- lifting cylinder, 9- outer sleeve lifting cylinder pin shaft, 10- inner sleeve lifting cylinder pin Axis, 11-30 spring washer, 12-M30 bolt, 13- take a step oil cylinder pin shaft, 14- backing pin plate, 15-12 spring washer, 16-M12 spiral shell Bolt, 17- outer sleeve weldment assembly, 18- briquetting component, 19- briquetting seat, 20-NL24 gasket, 21-M24 bolt, 22- adjustment Pad, 23- briquetting, 24- reinforced seal, 25- inner sleeve weldment assembly, 26-NL16 gasket, 27-M16 bolt, 28- axletree pressure Lid, 29- retaining ring, 30- bearing, 31- running wheel, 32- seal receptacle, 33- reinforced seal.
Specific embodiment
The invention will be further described with embodiment for explanation with reference to the accompanying drawing, and mode of the invention includes but not only limits In following embodiment.
The present embodiment is a set of highwall mining pressed coal dress of the status exploitation design in conjunction with highwall mining pressed coal construction technology Critical component-highwall coal excavation apparatus running gear in standby.The device relies on a whole set of Mining Equipment to realize that highwall presses the machine of coal The unmanned exploitation of tool, working face, eliminates the stripping operation of ground on coal body, saves removing cost, solves at present Highwall presses the mining problem of coal, not only increases the coal production of open coal mine, creates new economic benefit for coal enterprise, It also improves the rate of recovery of entire mine coal resources, can be utilized effectively, avoid the wasting of resources.
Referring to Fig. 1 and Fig. 2, which includes interlude travelling platform assembly 2 and walking assembly 1;Wherein, this implementation Example the structure and function of interlude travelling platform assembly are not improved, and only be provided with for walking assembly 1 it Between mutually fixed connecting plate, therefore its structure is not described herein.And walking assembly 1 is the invention of the present embodiment Core, walking assembly 1 altogether there are two, and walking assembly is integrally in inverted F shape and is located at interlude travelling platform assembly Front and back, to drive it that the movement of horizontal direction or vertical direction occurs.
Specifically, the walking assembly includes the guide assembly 3 being laterally arranged, and taking a step for guide assembly one end is arranged in Oil cylinder 7, and two sleeve elevating mechanisms being disposed longitudinally on guide assembly;Two sleeve elevators on same guide assembly Structure is symmetrically set, for installing interlude travelling platform assembly 2.The structure and work of described two sleeve elevating mechanisms Principle is identical, includes inner sleeve cartridge module, housing cartridge module 6 and lifting cylinder 8, due to the sleeve lifting close to oil cylinder 7 of taking a step Mechanism needs connect with oil cylinder of taking a step, therefore connection end can be arranged, for the inner sleeve group for the oil cylinder that convenient for differentiation, will be close to take a step Part is labeled as inner sleeve cartridge module I 4, another is then labeled as inner sleeve cartridge module II 5.The piston rod for taking a step oil cylinder 7 is fixed on Guide assembly one end, and the cylinder body other end for oil cylinder of taking a step then connects with inner sleeve cartridge module I 4.
Referring to fig. 4 and Fig. 5, the inner sleeve cartridge module include inner sleeve welding assembly 34, axletree gland 28 and moving trolley Wheel 31, the inner sleeve welding assembly are integrally in type row, the cannulated sleeve of the rectangular-shape including top and lower part it is rectangular The interconnecting piece of body shape, whole i.e. being slidably connected by interconnecting piece realization and guide assembly 3.The piston of the lifting cylinder 8 Bar is fixed in cannulated sleeve by inner sleeve lifting cylinder pin shaft 10,12 spring washers 15, M12 bolt 16, the interconnecting piece Inside it is equipped at least two running wheels 31 to match with guide assembly;31 two sides of running wheel are respectively equipped with bearing installation Hole and seal receptacle mounting hole, the bearing mounting hole is interior to be equipped with self-contained bearing 30, is equipped with seal receptacle in the seal receptacle mounting hole 32, and running wheel 31 is additionally provided with for completing retaining ring 29 of the seal receptacle with respect to the axially position of running wheel 31;It is described close Reinforced seal 24 is installed in envelope seat.And interconnecting piece side is then equipped with the wheel through-hole opposite with running wheel both ends, wheel is logical Hole is externally provided with the axletree gland 28 being inserted into running wheel after wheel through-hole, and axletree gland passes through M16 bolt respectively 27, NL16 gasket 26 is fixed on interconnecting piece.In addition, the axletree gland 28 is equipped with gland pump nozzle, to pass through gland Pump nozzle is to corresponding running wheel grease up.
Referring to Fig. 3, the outer sleeve component is set in inner sleeve component upper outer, and the housing cartridge module 6 includes outer Sleeve weld assembly 17 and briquetting component 18, the outer sleeve welding assembly include hollow and match with interior cannulated sleeve perpendicular Straight section, and be fixed in vertical section at least two for installing the mounting plate of interlude travelling platform assembly 2;Wherein, vertically Section matches with cannulated sleeve, and can move up and down along cannulated sleeve, and lifting cylinder cylinder body passes through outer sleeve lifting cylinder pin Axis is fixed on inside vertical section, for driving vertical section moving up and down with respect to cannulated sleeve;And mounting plate then includes being set in The sleeve fixed with vertical section is used for outside vertical section, and be arranged on sleeve and section travelling platform assembly 2 towards the middle it is vertical Plate, the connecting plate on the interlude travelling platform assembly 2 passes through 30 spring washers 11 and M30 bolt 12 and vertical plate is solid It is fixed, to realize the fixation of interlude travelling platform assembly 2 Yu walking assembly 1.Rubbing when to extend inner and outer sleeves relative motion Resistance is wiped, the briquetting component 18 is equipped with upper and lower two circle altogether, and every four, circle is simultaneously arranged on four faces of vertical section.It is described perpendicular Straight section is equipped with the mounting hole for installing briquetting component 18, and the briquetting component includes briquetting seat 19, briquetting 23 and briquetting note Oil nozzle;The briquetting seat 19 matches with mounting hole, and can partially be caught in mounting hole, is then fixed with NL24 gasket, M24 bolt In vertical section, after the briquetting 23 is packed into the middle part of briquetting seat, briquetting 23 is consolidated with 4 NL24 gaskets, 20,4 M24 bolts 21 Determine onto briquetting seat 19, and briquetting pump nozzle is then arranged into preset threaded hole on briquetting seat 19.In addition, the briquetting Seat 19 is additionally provided with the adjusting pad 22 for adjusting gap between vertical section and cannulated sleeve towards the side inside vertical section, to subtract The abrasion of few briquetting faying face, extends the service life of briquetting.
In addition, the present embodiment additionally provides the assembly method of above-mentioned running gear, specifically includes the following steps:
Step 1: the assembly of " 2 inner sleeve cartridge modules I 4 " is first ready in 2 according to shown in I 4 structure chart 4 of inner sleeve cartridge module 28,8, axletree gland, 30,4, bearing, 31,8 seal receptacles of running wheel of retaining ring 29,8 of sleeve weld part assembly 25,8 32, the components such as 8 reinforced seals, 24,64 NL16 gaskets, 26,64 M16 bolts 27.2 bearings 30 are first respectively charged into 1 A 31 arranged on left and right sides bearing of running wheel, 30 mounting hole respectively takes 1 reinforced seal 24 to be packed into 2 seal receptacles 32, and 2 are installed The seal receptacle 32 of good reinforced seal 24 is respectively charged into 31 arranged on left and right sides seal receptacle 32 of the running wheel installation for having installed bearing 30 Hole, and opposite 31 axially position of running wheel of seal receptacle 32 respectively is completed with 2 retaining rings 29, matching between attention part in installation process The adjustment of conjunction relationship and bearing clearance completes the assembly of 1 running wheel component 35 to this, similarly completes other 1 moving trolley The assembly of wheel assembly 35;Then 1 running wheel component assembled, 35,2 axletree glands 28 are taken, running wheel component 35 are put into the intermediate neutral gear of inner sleeve weldment assembly 25, and it is total that two sides use 1 axletree gland 28 to pass through inner sleeve weldment respectively At the through-hole processed on 25, and 2 axletree glands 28 penetrate 1 running wheel component 35 from two sides respectively, and use respectively 16 M16 bolts, 27,16 NL16 pad 26 and 2 axletree glands 28 are fixed on inner sleeve weldment assembly 25, similarly Complete the installation of other 1 running wheel component 35 and 2 axletree gland 28, inner sleeve weldment assembly 25;Finally take 4 Gland pump nozzle is respectively installed on 4 axletree glands 28, and is moistened by gland pump nozzle to 2 running wheel component filling Consistent lubricant completes the assembly of 1 inner sleeve cartridge module I 34 to this, similarly completes the assembly of another 1 inner sleeve cartridge module I 34.
Second step, the assembly of " 2 inner sleeve cartridge modules II 5 ", shown in foundation II 5 structure chart 5 of inner sleeve cartridge module, referring to step One completes.
Third step, the assembly of " 4 housing cartridge modules 6 " first get out 4 according to shown in 6 structure chart 3 of housing cartridge module 20,384, NL24 gasket, 21,32, the M24 bolt of briquetting seat 19,384 of outer sleeve weldment assembly 17,32 adjusting pad 22, The components such as 32 briquettings, 23,32 briquetting pump nozzles 24.1 briquetting 23 is first taken to be packed into 1 briquetting seat 19, and with 4 NL24 Briquetting 23 is fixed on briquetting seat 19 by 20,4 M24 bolts 21 of gasket, then 1 briquetting pump nozzle 24 is taken to be installed to briquetting seat 19 Corresponding threaded hole completes the assembly of 1 briquetting component 18 to this, similarly completes the assembly of remaining 31 briquetting components 18;So 8 mounted briquetting components 18 are taken to be packed into corresponding 8 installation sites on 1 outer sleeve weldment assembly 17 respectively afterwards, and Briquetting component 18 is fixed on outer sleeve weldment assembly 17 with 8 NL24 gaskets, 20,8 M24 bolts 21 1 installs It is fixed similarly to complete remaining 7 briquetting components 18 for hole;Finally remaining 3 housing cartridge modules 6 are completed according to above-mentioned installation steps Assembly.
4th step, the assembly of " 2 running gears 1 " first get out 4 housings according to shown in 1 structure chart 2 of running gear The guide assembly 3,2 of inner sleeve cartridge module II 5,2 of inner sleeve cartridge module I 4,2 of cartridge module 6,2 is taken a step oil cylinder 7,4 liftings oil 8,4, cylinder outer sleeve lifting cylinder pin shaft 9,4 inner sleeve lifting cylinder pin shaft 10,4 is taken a step 13,12 backing pins of oil cylinder pin shaft Plate 14,24 12 spring washers, 15,24 16 components of M12 bolt.It first takes 1 guide assembly 3 to be placed on ground, then distinguishes 1 inner sleeve cartridge module, I 4,1 inner sleeve cartridge modules II 5 are placed on the guide pass of guide assembly 3;Secondly 2 lifting cylinders 8 are respectively charged into the inner sleeve cartridge module I 4 placed, in inner sleeve cartridge module II 5, and with 2 inner sleeve lifting cylinder pin shafts 10,4 12 spring washers, 15,4 M12 bolts 16 complete 8 piston rod of lifting cylinder and inner sleeve cartridge module I 4, inner sleeve cartridge module II 5 fixation;Then 2 housing cartridge modules 6 are respectively charged into inner sleeve cartridge module I 4, the inner sleeve that upper step installs lifting cylinder 8 On component II 5, and lifting cylinder is completed with 2 M12 bolts 16 of 12 spring washer 15,4 of outer sleeve lifting cylinder pin shaft 9,4 The fixation of 8 cylinder bodies and housing cartridge module 6;1 oil cylinder 7 of taking a step finally is taken to be put between guide assembly 3 and inner sleeve cartridge module I 4, respectively 2 parts such as 12 15,4 M12 bolts 16 of spring washer of the backing pin plate 14,4 of oil cylinder pin shaft 13,2 of taking a step are taken to be respectively completed advanced in years Walk the fixation between 7 both ends of oil cylinder and guide assembly 3, inner sleeve cartridge module I 4.The assembly of 1 running gear 1 is completed to this, similarly Complete the assembly of other 1 running gear 1.
5th step, the assembly of " walking assembly and interlude travelling platform assembly ", according to 1 institute of running gear entirety installation diagram Show, first gets out 2 walking assemblies 1,1,30 spring washer, 11,64 M30 bolts 12 of interlude travelling platform assembly 2,64 Equal components.1 running gear 1 is first taken, 32 30 spring washers, 11,32 M30 bolts 12 are passed through into 2 outer sleeve groups respectively The assembly of 6 peace assembly apparatus 1 and interlude travelling platform assembly 2, similarly completes other 1 walking assembly 1 and centre on part The installation of section travelling platform assembly 2, the entire assembling process of this secondary design running gear is completed to this.
After walking assembly 1 and interlude travelling platform assembly 2 complete assembly, as shown in Fig. 1.2 walking assemblies are each logical The joint face crossed on 4 housing cartridge modules 6 has been bolted to 4 joint faces corresponding on interlude travelling platform assembly 2 At fixation, interlude travelling platform assembly 2 and 4 housing cartridge module 6 is rigidly connected at this time, passes through lifting cylinder 8 It acts on, it can be achieved that interlude travelling platform assembly 2 and 4 housing cartridge modules 6 are in interior sleeve assembly I 4, II 5 phase of inner sleeve cartridge module Movement to ground upper and lower direction, by the effect for oil cylinder 7 of taking a step, it can be achieved that 2,4 outer sleeves of interlude travelling platform assembly The assembly of component 6,2 inner sleeve cartridge modules, I 4,2 inner sleeve cartridge modules II 5 composition gets on the right track in rail assembly 3, and face is opposite to be moved It is dynamic.
I.e., it can be achieved that following 3 kinds of working conditions under the collective effect of lifting cylinder 8 and oil cylinder 7 of taking a step: 1. taking a step for 2 8 collective effect of oil cylinder 7 and 4 lifting cylinder, the position for realizing that step-by-step movement travelling platform 2 is adopted relative to difference between hole are transferred;②1 A movement of oil cylinder 7 of taking a step, another 1 oil cylinder 7 of taking a step is stationary, realizes 360 ° of the original place steering work of step-by-step movement travelling platform; 3. when 48 disagglutinating actions of lifting cylinder in the 2 walking assemblies 1, it can be achieved that forward and backward end of step-by-step movement travelling platform relative to The height adjustment on ground works, and the fluctuating on stope ground is preferably adapted to convenient for step-by-step movement travelling platform, enhances being applicable in for equipment Property.
Herein, it is noted that 4 inner sleeve cartridge modules II 5 of inner sleeve cartridge module I 4,2 of housing cartridge module 6,2 are completed After first assembly, housing cartridge module 6 and 2 inner sleeve cartridge module I 4 and 2 inner sleeve cartridge modules can be adjusted in real time by adjusting pad 22 Faying face gap between II 5.In later period use process, when equipment maintenance, encounters after briquetting 23 becomes larger because of wearing clearance, Adjusting pad 22 can be crossed and adjust inner and outer sleeves faying face gap.
In addition, the present embodiment additionally provides the walking workflow of 2 assembly of walking assembly 1 and interlude travelling platform assembly For journey as shown in fig. 6, can be divided into 5 operating attitudes, each walking operations process of running gear is exactly the circulation adjustment of this 5 postures Process.Each posture workflow is done as described below:
One, posture 1: initial attitude figure, lifting cylinder 8 are withdrawn completely, and oil cylinder 7 of taking a step is withdrawn completely, and interlude travelling platform is total It is kept in contact at 2 forward and backward head bottom parts and ground, the bottom and ground of rail assembly 3 are kept at a distance.
Two, posture 2: lifting cylinder 8 is fully extended, and oil cylinder 7 of taking a step is withdrawn completely, and interlude travelling platform assembly 2 is forward and backward Head bottom part and ground are kept at a distance, and the bottom and ground of rail assembly 3 are kept in contact.When this posture, only 2 rail assemblies There is contact in 3 bottom and ground, interlude travelling platform assembly 2 leaves ground under the castering action of lifting cylinder 8.
Three, posture 3: lifting cylinder 8 is fully extended, and oil cylinder 7 of taking a step is fully extended, and interlude travelling platform assembly 2 is forward and backward Head bottom part and ground are kept at a distance, and the bottom and ground of rail assembly 3 are kept in contact.When this posture, only 2 rail assemblies There is contact in 3 bottom and ground, interlude travelling platform assembly 2 starts under the traction for oil cylinder 7 of taking a step along orbital plane Movement.
Four, posture 4: lifting cylinder 8 is withdrawn completely, and oil cylinder 7 of taking a step is fully extended, and interlude travelling platform assembly 2 is forward and backward Head bottom part and ground are kept in contact, and the bottom and ground of rail assembly 3 are kept at a distance.When this posture, interlude travelling platform Assembly 2 starts to reduce vertical height with withdrawing for lifting cylinder 8, until the forward and backward head bottom part of interlude travelling platform assembly 2 It is kept in contact with ground.
Five, posture 5: lifting cylinder 8 is withdrawn completely, and oil cylinder 7 of taking a step is withdrawn completely, and interlude travelling platform assembly 2 is forward and backward Head bottom part and ground are kept in contact, and the bottom and ground of rail assembly 3 are kept at a distance.When this posture, rail assembly 3 is with advanced in years Step oil cylinder 7 withdraws the lower horizontal movement of effect, and until taking a step, oil cylinder 7 reaches range.
By the adjustment of above-mentioned continuous 5 postures, 2 horizontal direction of interlude travelling platform assembly realizes oil cylinder 7 of taking a step The relative displacement of range, in real work 7 amount of movement of passage oil cylinder number need to be in conjunction with needed for entire exploitation process depending on, The cycle operation of 5 postures realizes the forward or backward of similar creeper undercarriage, and 1 movement of oil cylinder 7 of taking a step, another 1 steps Walk oil cylinder 7 it is stationary, it can be achieved that step-by-step movement travelling platform 2 the steering work of 360 ° of original place.
It can be seen that the present embodiment running gear not only realizes step-by-step movement travelling platform relative to the different positions adopted between hole Set 360 ° of the original place steering work of transfer and entire travelling platform;It can also be achieved the forward and backward head bottom part phase of step-by-step movement travelling platform Height adjustment work for ground, the fluctuating on stope ground is preferably adapted to convenient for step-by-step movement travelling platform, enhances equipment Applicability.The running gear is combined into a whole set of Mining Equipment production practice and work flow, can effectively realize highwall pressure coal work Unmanned, the mechanization production in face.
Above-described embodiment is only one of the preferred embodiment of the present invention, should not be taken to limit protection model of the invention It encloses, as long as that in body design thought of the invention and mentally makes has no the change of essential meaning or polishing, is solved The technical issues of it is still consistent with the present invention, should all be included within protection scope of the present invention.

Claims (8)

1. a kind of open coal mine highwall coal excavation apparatus running gear, which is characterized in that including interlude travelling platform assembly (2), two walking assemblies (1) for walking and before and after interlude travelling platform assembly;The walking assembly includes Guide assembly (3), oil cylinder of taking a step (7) and two sleeve elevating mechanisms;The sleeve elevating mechanism includes inner sleeve cartridge module, outer Sleeve assembly (6) and lifting cylinder (8), the inner sleeve component slippage are arranged on guide assembly (3), the housing cartridge module It is set in inner sleeve cartridge module upper outer, the lifting cylinder piston end is fixed on inside inner sleeve, lifting cylinder cylinder body is fixed In outer sleeve inner;The piston rod of the oil cylinder of taking a step (7) is fixed on guide assembly one end, and the cylinder body other end for oil cylinder of taking a step Then with the inner sleeve attached components in adjacent sleeve elevating mechanism;Two sleeve elevating mechanisms on same guide assembly are mutual It is symmetrical arranged, for installing interlude travelling platform assembly (2).
2. a kind of open coal mine highwall coal excavation apparatus running gear according to claim 1, which is characterized in that in described Sleeve assembly includes inner sleeve welding assembly (34), axletree gland (28) and running wheel (31), and the inner sleeve welding is total Integral is in type row, and the interconnecting piece of cannulated sleeve and lower part including top, the piston rod of the lifting cylinder (8) passes through interior Sleeve lifting cylinder pin shaft (10), 12 spring washers (15), M12 bolt (16) are fixed in cannulated sleeve, in the interconnecting piece The running wheel (31) to match equipped at least two with guide assembly, interconnecting piece side is then equipped with the vehicle opposite with running wheel Through-hole is taken turns, wheel through-hole is externally provided with the axletree gland (28) being inserted into running wheel after wheel through-hole.
3. a kind of open coal mine highwall coal excavation apparatus running gear according to claim 2, which is characterized in that the row It walks wheel (31) two sides and is respectively equipped with bearing mounting hole and seal receptacle mounting hole, be equipped with self-contained bearing in the bearing mounting hole (30), seal receptacle (32) are equipped in the seal receptacle mounting hole, and running wheel (31) is additionally provided with for completing seal receptacle phase To the retaining ring (29) of the axially position of running wheel (31);Reinforced seal (24) are installed in the seal receptacle.
4. a kind of open coal mine highwall coal excavation apparatus running gear according to claim 3, which is characterized in that the vehicle Wheel shaft gland (28) is equipped with gland pump nozzle, to pass through gland pump nozzle to corresponding running wheel grease up.
5. a kind of open coal mine highwall coal excavation apparatus running gear, feature according to claim 2 ~ 4 any one It is, the housing cartridge module (6) includes outer sleeve welding assembly (17) and briquetting component (18), the outer sleeve welding assembly Including vertical section that is hollow and matching with interior cannulated sleeve, and be fixed in vertical section at least two for installing interlude The mounting plate of travelling platform assembly (2);The briquetting component (18) at least there are four and be uniformly fixedly mounted in vertical section.
6. a kind of open coal mine highwall coal excavation apparatus running gear according to claim 5, which is characterized in that described perpendicular Straight section is equipped with the mounting hole for installing briquetting component (18), and the briquetting component includes the briquetting seat to match with mounting hole (19), the briquetting (23) being fixed in the middle part of briquetting seat, and the briquetting pump nozzle being arranged on briquetting seat.
7. a kind of open coal mine highwall coal excavation apparatus running gear according to claim 6, which is characterized in that the pressure Block (19) is additionally provided with the adjusting pad for adjusting gap between vertical section and cannulated sleeve towards the side inside vertical section (22).
8. a kind of open coal mine highwall coal excavation apparatus running gear according to claim 7, which is characterized in that the peace Loading board includes the sleeve being set in outside vertical section, and the vertical of on sleeve and towards the middle section travelling platform assembly (2) is arranged Plate;The interlude travelling platform assembly (2) is fixed by 30 spring washers (11) and M30 bolt (12) with vertical plate.
CN201811635302.0A 2018-12-29 2018-12-29 A kind of open coal mine highwall coal excavation apparatus running gear Pending CN109695451A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811635302.0A CN109695451A (en) 2018-12-29 2018-12-29 A kind of open coal mine highwall coal excavation apparatus running gear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811635302.0A CN109695451A (en) 2018-12-29 2018-12-29 A kind of open coal mine highwall coal excavation apparatus running gear

Publications (1)

Publication Number Publication Date
CN109695451A true CN109695451A (en) 2019-04-30

Family

ID=66233047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811635302.0A Pending CN109695451A (en) 2018-12-29 2018-12-29 A kind of open coal mine highwall coal excavation apparatus running gear

Country Status (1)

Country Link
CN (1) CN109695451A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112065399A (en) * 2020-09-25 2020-12-11 中国煤炭科工集团太原研究院有限公司 Open pit coal mine side coal mining equipment and protection device thereof
CN112727458A (en) * 2021-01-11 2021-04-30 中国煤炭科工集团太原研究院有限公司 Sliding assembly and coal mining equipment walking device
CN112761641A (en) * 2021-01-11 2021-05-07 中国煤炭科工集团太原研究院有限公司 Pusher carriage and open pit coal mining equipment

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1108187A (en) * 1965-11-02 1968-04-03 Mining Engineering Company Mec Improvements relating to coal-mining face installations and conveyors for installation therein
US4646906A (en) * 1984-09-06 1987-03-03 Fairchild Incorporated Apparatus for continuously conveying coal from a continuous miner to a remote floor conveyor
CN1130931A (en) * 1993-07-12 1996-09-11 布罗肯希尔有限公司 Highwall mining system
US5667279A (en) * 1995-04-26 1997-09-16 Arch Mineral Corporation Apparatus and method for continuous mining
US6224163B1 (en) * 1998-09-05 2001-05-01 Man Takraf Fodertechnik Gmbh Milling roller module for a surface miner
CN1727638A (en) * 2005-06-08 2006-02-01 潘家烺 Technique for mining specified dimension stone in stone quarry directly and cutting apparatus
CN203130084U (en) * 2013-03-23 2013-08-14 西安煤矿机械有限公司 Running mechanism of thin seam coal shearer
CN104564112A (en) * 2014-12-13 2015-04-29 中国煤炭科工集团太原研究院有限公司 Single-arm onboard roof bolter for underground coal mine
US20150184466A1 (en) * 2012-05-18 2015-07-02 Phillip Rivera, Sr. System and Method for Moving a Drilling Rig
CN105201552A (en) * 2015-09-30 2015-12-30 中国煤炭科工集团太原研究院有限公司 Train with reducing resistance moving mechanism for stepping self-moving tail
WO2016191900A1 (en) * 2015-06-04 2016-12-08 唐忠盛 Vibrating surface mining machine
US20170198581A1 (en) * 2016-01-07 2017-07-13 Heintzmann Corporation Highwall mining equipment retrieval and extraction apparatus
CN108590660A (en) * 2018-05-04 2018-09-28 太原科技大学 A kind of outdoor highwall coal mining transport device and its fast transfer working face method
CN209469431U (en) * 2018-12-29 2019-10-08 中国煤炭科工集团太原研究院有限公司 A kind of open coal mine highwall coal excavation apparatus running gear

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1108187A (en) * 1965-11-02 1968-04-03 Mining Engineering Company Mec Improvements relating to coal-mining face installations and conveyors for installation therein
US4646906A (en) * 1984-09-06 1987-03-03 Fairchild Incorporated Apparatus for continuously conveying coal from a continuous miner to a remote floor conveyor
CN1130931A (en) * 1993-07-12 1996-09-11 布罗肯希尔有限公司 Highwall mining system
US5609397A (en) * 1993-07-12 1997-03-11 The Broken Hill Proprietary Company Limited Highwall mining system with driven conveyor units
US5667279A (en) * 1995-04-26 1997-09-16 Arch Mineral Corporation Apparatus and method for continuous mining
US6224163B1 (en) * 1998-09-05 2001-05-01 Man Takraf Fodertechnik Gmbh Milling roller module for a surface miner
CN1727638A (en) * 2005-06-08 2006-02-01 潘家烺 Technique for mining specified dimension stone in stone quarry directly and cutting apparatus
US20150184466A1 (en) * 2012-05-18 2015-07-02 Phillip Rivera, Sr. System and Method for Moving a Drilling Rig
CN203130084U (en) * 2013-03-23 2013-08-14 西安煤矿机械有限公司 Running mechanism of thin seam coal shearer
CN104564112A (en) * 2014-12-13 2015-04-29 中国煤炭科工集团太原研究院有限公司 Single-arm onboard roof bolter for underground coal mine
WO2016191900A1 (en) * 2015-06-04 2016-12-08 唐忠盛 Vibrating surface mining machine
CN105201552A (en) * 2015-09-30 2015-12-30 中国煤炭科工集团太原研究院有限公司 Train with reducing resistance moving mechanism for stepping self-moving tail
US20170198581A1 (en) * 2016-01-07 2017-07-13 Heintzmann Corporation Highwall mining equipment retrieval and extraction apparatus
CN108590660A (en) * 2018-05-04 2018-09-28 太原科技大学 A kind of outdoor highwall coal mining transport device and its fast transfer working face method
CN209469431U (en) * 2018-12-29 2019-10-08 中国煤炭科工集团太原研究院有限公司 A kind of open coal mine highwall coal excavation apparatus running gear

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112065399A (en) * 2020-09-25 2020-12-11 中国煤炭科工集团太原研究院有限公司 Open pit coal mine side coal mining equipment and protection device thereof
CN112065399B (en) * 2020-09-25 2023-02-24 中国煤炭科工集团太原研究院有限公司 Open pit coal mine side coal mining equipment and protection device thereof
CN112727458A (en) * 2021-01-11 2021-04-30 中国煤炭科工集团太原研究院有限公司 Sliding assembly and coal mining equipment walking device
CN112761641A (en) * 2021-01-11 2021-05-07 中国煤炭科工集团太原研究院有限公司 Pusher carriage and open pit coal mining equipment
CN112761641B (en) * 2021-01-11 2024-02-06 中国煤炭科工集团太原研究院有限公司 Pushing vehicle and open pit coal mining equipment

Similar Documents

Publication Publication Date Title
CN109695451A (en) A kind of open coal mine highwall coal excavation apparatus running gear
CN209469431U (en) A kind of open coal mine highwall coal excavation apparatus running gear
CN108678667B (en) Articulated self-propelled raise boring machine
CN101846235B (en) Electric grease bearing oil injecting machine
CN104816921A (en) Double side drive transport system
CN106223970A (en) A kind of tunneler
CN201343080Y (en) Bottom walking type hydrothermal sulfide mining vehicle
DE102007007996B4 (en) Drive for the grave drum of an open pit mining machine
CN105944818B (en) The dual-purpose movement of rail is broken to select platform
CN105645074B (en) A kind of efficient earth pressure balanced shield, EPBS belt conveyor scrapes mud system
CN109736810B (en) Trolley pushing device for open coal mine coal mining equipment
CN110374498A (en) A kind of crawler type girdle roofboltier
CN200986022Y (en) Combination type automatic lubrication and self-sealing drilled packing ring
CN207131742U (en) A kind of gate-type bucket wheel machine guide roller set dust guard
CN207889181U (en) A kind of wear-resisting type metal hydraulic baler
CN205471372U (en) Efficient earth pressure balance shield band conveyer scrapes mud system
CN202440749U (en) Walking thrust wheel applied to road surface milling machine of needle bearing
CN208268751U (en) A kind of mobile tunnel development machine multifunction hydraulic pumping plant
CN203035196U (en) Transverse rotary drum connection device of coal mining machine
CN201715218U (en) Electric grease injection machine for greasing bearing
CN108468546A (en) It is a kind of to feed piece machine based on combination walking jacking system
CN217976291U (en) Spray dust removal device for coal mining
CN204725125U (en) Chain type engine assembly line
CN203189017U (en) Micro-drilling vehicle suitable for mechanical mining of extremely thin ore vein
CN205678067U (en) A kind of driving speed reducer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination