CN109685479A - A kind of methods of exhibiting, computer installation and the computer readable storage medium of construction tunnel progress - Google Patents

A kind of methods of exhibiting, computer installation and the computer readable storage medium of construction tunnel progress Download PDF

Info

Publication number
CN109685479A
CN109685479A CN201811646215.5A CN201811646215A CN109685479A CN 109685479 A CN109685479 A CN 109685479A CN 201811646215 A CN201811646215 A CN 201811646215A CN 109685479 A CN109685479 A CN 109685479A
Authority
CN
China
Prior art keywords
construction
tunnel
information
construction tunnel
gis map
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811646215.5A
Other languages
Chinese (zh)
Inventor
王俊涛
鲜国
刘国强
周宝春
尚尔海
王海亮
陈鹏
陈坤
范时君
孙绍将
钟世武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Huakong Intelligent Traffic Facilities Engineering Co Ltd
Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Sichuan Huakong Intelligent Traffic Facilities Engineering Co Ltd
Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Huakong Intelligent Traffic Facilities Engineering Co Ltd, Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Sichuan Huakong Intelligent Traffic Facilities Engineering Co Ltd
Priority to CN201811646215.5A priority Critical patent/CN109685479A/en
Publication of CN109685479A publication Critical patent/CN109685479A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Instructional Devices (AREA)

Abstract

The present invention provides a kind of methods of exhibiting of construction tunnel progress, this method includes the initial frame construction drawing that the corresponding construction tunnel of Engineering Drawing Information is shown on the display interface of GIS map system, construction tunnel parameter information is sent to engineering survey system, engineering survey system is to tunnel survey coordinate diagram information corresponding to generation construction tunnel after the processing of construction tunnel parameter information, tunnel survey coordinate diagram information is sent to GIS map system, the actual frame structure chart of construction tunnel is shown according to tunnel survey coordinate diagram information in GIS map system display interface, the intersection between the initial frame construction drawing of construction tunnel and actual frame structure chart is subjected to the first color mark on the display interface of GIS map system.The present invention also provides the computer installation of the above method and computer readable storage mediums.The present invention has the characteristics that intuitively to show the construction speed of construction tunnel.

Description

A kind of methods of exhibiting of construction tunnel progress, computer installation and computer-readable Storage medium
Technical field
The present invention relates to construction tunnel map fields, are specifically related to a kind of methods of exhibiting of construction tunnel progress, calculate Machine device and computer readable storage medium.
Background technique
Currently, the methods of exhibiting to the construction speed of construction tunnel is according in tunnel in construction tunnel work progress Condition of construction, first pass through it is artificial draw construction progress figure, then in the enterprising traveling degree identifier declaration of construction progress figure, finally make again Construction speed statistical form is made, construction tunnel dispatcher is by checking that construction speed statistical form carries out corresponding construction dispatching. That there are error rates is high for such construction speed methods of exhibiting to construction tunnel, cannot be straight by the construction progress figure manually drawn See the construction speed for viewing construction tunnel, waste of manpower resource the problems such as.
Summary of the invention
The first object of the present invention is to provide a kind of methods of exhibiting of intuitive construction tunnel progress.
The second object of the present invention is to provide the computer installation for realizing above-mentioned construction tunnel progress display method.
The third object of the present invention is to provide the computer-readable storage medium for realizing above-mentioned construction tunnel progress display method Matter.
In order to realize the first above-mentioned purpose, a kind of methods of exhibiting of construction tunnel progress provided by the invention includes obtaining GIS map system receives the Engineering Drawing Information of the construction tunnel of input, and Engineering Drawing Information is directed into GIS map system, The initial frame construction drawing of the corresponding construction tunnel of Engineering Drawing Information is shown on the display interface of GIS map system, obtains work Journey measuring system, receives the construction tunnel parameter information of input, and construction tunnel parameter information is sent to engineering survey system, work Journey measuring system is to tunnel survey coordinate diagram information corresponding to construction tunnel is generated after the processing of construction tunnel parameter information, by tunnel Measurement coordinate diagram information in road is sent to database purchase, and tunnel survey coordinate diagram information in database is sent to GIS map system System shows the actual frame structure chart of construction tunnel on generalized information system display interface according to tunnel survey coordinate diagram information, By the coincidence part between the initial frame construction drawing of construction tunnel and actual frame structure chart on the display interface of GIS map system Divide and carries out the first color mark.
It can be seen that this programme, which first passes through for the engineering drawing of construction tunnel to imported into GIS map system, shows construction tunnel The initial frame construction drawing in road, is then sent to engineering survey system for construction tunnel parameter information, and engineering survey system passes through Construction tunnel parameter information generates tunnel survey coordinate diagram information after carrying out calculation processing, then again believes tunnel survey coordinate diagram Breath is sent to the actual frame structure chart that construction tunnel is shown in generalized information system, will construction in GIS map system display interface The part being overlapped between tunnel actual frame figure and initial frame diagram carries out the first color mark, the i.e. partial portion of this coincidence It has been completed that, allow dispatcher intuitively to view the progress of construction tunnel.
Further embodiment is, by the initial frame construction drawing of construction tunnel and reality in GIS map system display interface After intersection between frame construction drawing carries out the first color mark, execute: in GIS map system display interface construction tunnel Intersection does not carry out the second color mark, the second face between initial frame construction drawing and the actual frame structure chart of construction tunnel Color is different from the first color.
As it can be seen that will be overlapped between construction tunnel actual frame figure and initial frame diagram in GIS map system display interface Part carry out the second color mark such as Green Marker, and the second color is different from the first color, i.e. this portion not being overlapped Divisional is uncompleted.
Further embodiment is, by the initial frame construction drawing of construction tunnel and construction tunnel on GIS map display interface Actual frame structure chart between not intersection carry out the second color mark after, execute: receive the construction speed document of input Construction speed document information is sent to database purchase by information, construction speed document information include the construction completed daily into Time-consuming information needed for spending information and daily completion construction speed.
As it can be seen that the construction that dispatcher can establish construction tunnel carries out document information.
Further embodiment is, after construction speed document information is sent to database purchase, executes: according to construction speed Document information generates the construction speed information of construction tunnel and shows construction speed information after request is checked in reception.
As it can be seen that can be raw according to the construction speed document information for the construction tunnel that dispatcher establishes by counting statistics At the construction speed information of construction, shown in the display interface so that dispatcher checks.
In order to realize the second above-mentioned purpose, computer installation provided by the invention includes processor and memory, at this Reason device is used to realize each of the methods of exhibiting of above-mentioned construction tunnel progress in memory when executing the computer program stored Step.
In order to realize above-mentioned third purpose, computer readable storage medium provided by the invention is stored thereon with calculating Machine program, and computer program is processed by the processor each step that the methods of exhibiting of above-mentioned construction tunnel progress is realized when execution Suddenly.
Detailed description of the invention
Fig. 1 is the flow chart of the methods of exhibiting embodiment of a kind of pair of construction tunnel progress of the invention.
The invention will be further described with reference to the accompanying drawings and embodiments.
Specific embodiment
A kind of methods of exhibiting of construction tunnel progress provided by the invention apply can to Engineering Drawing Information and construction tunnel On the terminal device that road parameter information is handled, typically apply on the terminal devices such as computer.Computer dress of the invention It sets and can be above-mentioned electronic equipment, computer storage medium can be the various storage mediums with data storage function, such as The nonvolatile memories such as FLAASH, EEPROM.
The methods of exhibiting embodiment of construction tunnel progress:
The preferred terminal device of the present embodiment is the equipment such as desktop computer or server, referring to Fig. 1, the side of the present embodiment Step S1 is first carried out in method, obtains GIS map system.For example, GIS map system is downloaded to terminal device.
Then, step S2 is executed, the Engineering Drawing Information of the construction tunnel of input is received, Engineering Drawing Information is directed into GIS Map system shows the initial frame knot of the corresponding construction tunnel of Engineering Drawing Information on the display interface of GIS map system Composition.Wherein, the engineering drawing of construction tunnel is the construction work design drawing of construction tunnel, in the work progress of construction tunnel, Construction personnel constructs according to the construction work design drawing team construction tunnel of construction tunnel.The tunnel for example, dispatcher will construct After the Engineering Drawing Information in road is input to terminal device, Engineering Drawing Information is directed into GIS map system by terminal device, in this way, Tunnel work when the initial frame construction drawing of construction tunnel completes construction can be directly shown on the display interface of GIS map system The frame construction drawing in tunnel.
Then, step S3 is executed, engineering survey system is obtained.For example, engineering survey system is downloaded to terminal device.
Then, step S4 is executed, the construction tunnel parameter information of input is received, construction tunnel parameter information is sent to work Journey measuring system, engineering survey system sit tunnel survey corresponding to generation construction tunnel after the processing of construction tunnel parameter information It marks on a map information, tunnel survey coordinate diagram information is sent to database purchase.Wherein, construction tunnel parameter information is work progress The parameter information of the construction tunnel of middle actual measurement.For example, the construction tunnel parameter information received is sent to by terminal device Engineering survey system, engineering survey system generate corresponding to construction tunnel after carrying out calculation processing to construction tunnel parameter information Tunnel survey icon figure is sent to data again by the actual measurement coordinate diagram of tunnel survey coordinate diagram, that is, construction tunnel, terminal device Library storage.
Wherein, the database in the present embodiment is the database of terminal device itself.Preferably, dispatcher can basis The actual progress change of construction tunnel is input to the parameter information of terminal device.
Then, step S5 is executed, tunnel survey coordinate diagram information in database is sent to GIS map system, in GIS The actual frame structure chart of construction tunnel is shown on drawing system display interface according to tunnel survey coordinate diagram information.For example, will count It is sent to GIS map system according to the tunnel survey coordinate diagram information in library, in this way, connecing in GIS map system display interface can To directly display the actual frame structure chart of construction tunnel according to tunnel survey figure.
Then, execute step S6, on the display interface of GIS map system by the initial frame construction drawing of construction tunnel with Intersection between actual frame structure chart carries out the first color mark.As it can be seen that GIS map system display interface will simultaneously The initial configuration block diagram and practical structures block diagram of the construction tunnel of display, by the initial frame construction drawing and actual frames of construction tunnel Intersection between frame structure chart carries out the first color mark such as red-label, and dispatcher is intuitively checked To the construction speed of construction tunnel.
Preferably, dispatcher is input to the ginseng of the construction tunnel of terminal device according to the change of the actual progress of construction tunnel After number information, tunnel survey coordinate diagram has also carried out corresponding change according to the parameter information of construction tunnel, so that in the aobvious of GIS Show that the actual frame structure chart of the construction tunnel shown on interface also carries out dynamic adjustment according to the tunnel survey coordinate diagram of change, Reaching dispatcher can also easily apply according to what is shown on the display interface of the actual conditions of construction tunnel dynamic adjustment GIS The purpose of work tunnel actual frame structure chart.
Then, step S7 is executed, by the initial frame construction drawing of construction tunnel and construction in GIS map system display interface Intersection does not carry out the second color mark between the actual frame structure chart in tunnel.Wherein, the second color is different from the first face Color.As it can be seen that the not intersection between the initial frame construction drawing and actual frame structure chart of construction tunnel can also be carried out Second color mark such as Green Marker allows dispatcher further intuitively to view the construction speed of construction tunnel Construction tunnel being viewed, which has partially completed, which be partially it is uncompleted, thus dispatcher according to The construction speed of the construction tunnel viewed further formulates construction plan.
Then, step S8 is executed, the construction speed document information of input is received, construction speed document information is sent to number It is stored according to library.Wherein, construction speed document information includes the construction speed information completed daily and daily completion construction speed institute Need time-consuming information.In this way, being also stored with construction speed document information in database.
Finally, executing step S9, the construction speed information of construction tunnel is generated according to construction speed document information, reception is looked into After seeing request, construction speed information is shown.For example, terminal device identifies construction according to construction speed document information Time-consuming information needed for the construction speed information completed daily and daily completion construction speed in progress document information, is calculated Construction speed information is generated and shown after statistics, so that dispatcher checks.
It can be seen from the above, the present embodiment is first passed through the Engineering Drawing Information importing GIS map system of construction tunnel, and The initial frame construction drawing of construction tunnel corresponding to Engineering Drawing Information is shown in GIS map system display interface.Then lead to again It crosses after engineering survey system carries out calculation processing to construction tunnel parameter information and generates tunnel survey coordinate diagram information, measurement is sat Information of marking on a map is sent to GIS map system, shows in GIS map system display interface and applies corresponding to measurement coordinate diagram information The actual frame structure chart in work tunnel.Finally to the weight between the initial frame construction drawing of construction tunnel and actual frame structure chart It closes part and carries out the first color mark, to not being overlapped between the initial frame construction drawing and actual frame structure chart of construction tunnel Part carries out the second color mark, and dispatcher is allowed intuitively to view the construction speed situation of construction tunnel.
Computer installation embodiment:
The computer installation of the present embodiment include processor, memory and storage in memory and can be in processor The computer program of upper operation, such as the message handling program for realizing above- mentioned information processing method.Processor executes calculating The methods of exhibiting step of above-mentioned construction tunnel progress is realized when machine program.
For example, computer program can be divided into one or more modules, one or more module, which is stored in, is deposited It in reservoir, and is executed by processor, to complete modules of the invention.One or more modules can be can complete it is specific The series of computation machine program instruction section of function, the instruction segment is for describing execution of the computer program in terminal device Journey.
It should be noted that terminal device can be desktop PC, notebook, palm PC and cloud server etc. Calculate equipment.Terminal device may include, but be not limited only to, processor, memory.It will be understood by those skilled in the art that this hair Bright schematic diagram is only the example of terminal device, does not constitute the restriction to terminal device, may include than illustrate it is more or Less component perhaps combines certain components or different components, such as terminal device can also be set including input and output Standby, network access equipment, bus etc..
Processor alleged by the present invention can be central processing unit (Central Processing Unit, CPU), may be used also To be other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor Deng processor is the control centre of terminal device, utilizes the various pieces of various interfaces and the entire terminal device of connection.
Memory can be used for storing computer program and/or module, and processor is stored in memory by operation or execution Interior computer program and/or module, and the data being stored in memory are called, realize the various functions of terminal device. Memory can mainly include storing program area and storage data area, wherein storing program area can storage program area, at least one Application program needed for function (such as sound-playing function, image player function etc.) etc.;Storage data area can be stored according to hand Machine uses created data (such as audio data, phone directory etc.) etc..In addition, memory may include high random access Memory can also include nonvolatile memory, such as hard disk, memory, plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card), at least one disk Memory device, flush memory device or other volatile solid-state parts.
Computer readable storage medium:
If the integrated module of terminal device be realized in the form of SFU software functional unit and as the sale of independent product or In use, can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-mentioned implementation All or part of the process in example method, can also instruct relevant hardware to complete, the computer by computer program Program can be stored in computer readable storage medium, and the computer program is when being executed by processor, it can be achieved that above-mentioned construction Each step of tunnel progress display method.
Wherein, computer program includes computer program code, and computer program code can be source code form, object Code form, executable file or certain intermediate forms etc..Computer-readable medium may include: that can carry computer program Any entity or device of code, recording medium, USB flash disk, mobile hard disk, magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, electricity Believe signal and software distribution medium etc..It should be noted that the content that computer-readable medium includes can be managed according to the administration of justice Local legislation and the requirement of patent practice carry out increase and decrease appropriate, such as in certain jurisdictions, according to legislation and patent Practice, computer-readable medium does not include electric carrier signal and telecommunication signal.
It should be noted that the above is only a preferred embodiment of the present invention, but the design concept invented is not limited thereto, All insubstantial modifications made using this design to the present invention, are also each fallen within the scope of guarantor of the invention.

Claims (6)

1. a kind of methods of exhibiting of construction tunnel progress, which is characterized in that this method comprises:
GIS map system is obtained, the Engineering Drawing Information of the construction tunnel of input is received, the Engineering Drawing Information is directed into described GIS map system shows the corresponding construction of the Engineering Drawing Information on the display interface of the G I S map system The initial frame construction drawing in tunnel;
Engineering survey system is obtained, the construction tunnel parameter information of input is received, the construction tunnel parameter information is sent to The engineering survey system, the engineering survey system generate the construction tunnel after handling the construction tunnel parameter information The tunnel survey coordinate diagram information is sent to database purchase by corresponding tunnel survey coordinate diagram information;
Tunnel survey coordinate diagram information described in the database is sent to the GIS map system, in the GIS map system The actual frame structure chart of the construction tunnel is shown on system display interface according to the tunnel survey coordinate diagram information;
By the initial frame construction drawing of the construction tunnel and actual frame structure on the display interface of the GIS map system Intersection between figure carries out the first color mark.
2. a kind of methods of exhibiting of construction tunnel progress according to claim 1, it is characterised in that:
It is described in the GIS map system display interface by the initial frame construction drawing of the construction tunnel and actual frame structure After intersection between figure carries out the first color mark, execute: by the construction in the GIS map system display interface Intersection does not carry out the second color mark, institute between the initial frame construction drawing in tunnel and the actual frame structure chart of construction tunnel The second color is stated different from first color.
3. a kind of methods of exhibiting of construction tunnel progress according to claim 2, it is characterised in that:
It is described on the GIS map display interface by the actual frames of the construction tunnel initial frame construction drawing and construction tunnel After intersection does not carry out the second color mark between frame structure chart, executes: the construction speed document information of input is received, by institute It states construction speed document information and is sent to the database purchase, the construction speed document information includes the construction completed daily Time-consuming information needed for progress msg and daily completion construction speed.
4. a kind of methods of exhibiting of construction tunnel progress according to claim 3, it is characterised in that:
It is described the construction speed document information is sent to database purchase after, execute: according to the construction speed document believe Breath generates the construction speed information of the construction tunnel and shows the construction speed information after request is checked in reception.
5. a kind of computer installation, including processor and memory, the processor is used to executing to be stored in the memory The step of methods of exhibiting such as the described in any item construction tunnel progresses of Claims 1-4 is realized when computer program.
6. a kind of computer readable storage medium, is stored thereon with computer program, it is characterised in that: the computer program quilt The step of methods of exhibiting such as the described in any item construction tunnel progresses of Claims 1-4 is realized when processor executes.
CN201811646215.5A 2018-12-29 2018-12-29 A kind of methods of exhibiting, computer installation and the computer readable storage medium of construction tunnel progress Pending CN109685479A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811646215.5A CN109685479A (en) 2018-12-29 2018-12-29 A kind of methods of exhibiting, computer installation and the computer readable storage medium of construction tunnel progress

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811646215.5A CN109685479A (en) 2018-12-29 2018-12-29 A kind of methods of exhibiting, computer installation and the computer readable storage medium of construction tunnel progress

Publications (1)

Publication Number Publication Date
CN109685479A true CN109685479A (en) 2019-04-26

Family

ID=66191585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811646215.5A Pending CN109685479A (en) 2018-12-29 2018-12-29 A kind of methods of exhibiting, computer installation and the computer readable storage medium of construction tunnel progress

Country Status (1)

Country Link
CN (1) CN109685479A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110457759A (en) * 2019-07-17 2019-11-15 北京朗道新科智能科技有限公司 A kind of road construction management method, system and computer storage medium
CN111401742A (en) * 2020-03-16 2020-07-10 中冶(贵州)建设投资发展有限公司 System for calculating clear list quantity and material consumption of engineering of each section of any section of tunnel
CN112380596A (en) * 2020-10-27 2021-02-19 基建通(三亚)国际科技有限公司 Tunnel construction progress display method and device and computer readable storage medium
CN114936456A (en) * 2022-05-18 2022-08-23 西南交通大学 Tunnel construction organization scheme simulation method, computer device and computer readable storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160117007A (en) * 2015-03-31 2016-10-10 주식회사아이보우솔루션 PRODUCT LIFE-CYCLE MANAGEMENT SYSTEM FOR FACILITY BASED ON PARTIAL AND POSITIONAL INFORMATION USING u-GIS DATA-BASED TILING TOOL AND WEB MAP TILE SERVICE
CN106384191A (en) * 2016-08-31 2017-02-08 铁道第三勘察设计院集团有限公司 Railway tunnel construction progress management system and method based on 3DGIS and engineering 3D model
CN106803150A (en) * 2017-01-20 2017-06-06 上海市地下空间设计研究总院有限公司 Municipal Engineering Construction progress msg management method and system based on BIM
CN107992700A (en) * 2017-12-14 2018-05-04 北京市轨道交通建设管理有限公司 Track traffic civil construction stage Mining Method progress display methods and device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160117007A (en) * 2015-03-31 2016-10-10 주식회사아이보우솔루션 PRODUCT LIFE-CYCLE MANAGEMENT SYSTEM FOR FACILITY BASED ON PARTIAL AND POSITIONAL INFORMATION USING u-GIS DATA-BASED TILING TOOL AND WEB MAP TILE SERVICE
CN106384191A (en) * 2016-08-31 2017-02-08 铁道第三勘察设计院集团有限公司 Railway tunnel construction progress management system and method based on 3DGIS and engineering 3D model
CN106803150A (en) * 2017-01-20 2017-06-06 上海市地下空间设计研究总院有限公司 Municipal Engineering Construction progress msg management method and system based on BIM
CN107992700A (en) * 2017-12-14 2018-05-04 北京市轨道交通建设管理有限公司 Track traffic civil construction stage Mining Method progress display methods and device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110457759A (en) * 2019-07-17 2019-11-15 北京朗道新科智能科技有限公司 A kind of road construction management method, system and computer storage medium
CN111401742A (en) * 2020-03-16 2020-07-10 中冶(贵州)建设投资发展有限公司 System for calculating clear list quantity and material consumption of engineering of each section of any section of tunnel
CN112380596A (en) * 2020-10-27 2021-02-19 基建通(三亚)国际科技有限公司 Tunnel construction progress display method and device and computer readable storage medium
CN114936456A (en) * 2022-05-18 2022-08-23 西南交通大学 Tunnel construction organization scheme simulation method, computer device and computer readable storage medium

Similar Documents

Publication Publication Date Title
CN109685479A (en) A kind of methods of exhibiting, computer installation and the computer readable storage medium of construction tunnel progress
CN109472524B (en) Information processing method and device
CN110618982B (en) Multi-source heterogeneous data processing method, device, medium and electronic equipment
WO2016141685A1 (en) Telecommunications engineering drawing generation method and drawing design client
CN108388512A (en) Data processing method and server
CN107741904A (en) Test machine method of automatic configuration, device, equipment and storage medium
CN111245642A (en) Method and device for acquiring dependency relationship between multiple systems and electronic equipment
CN105357204A (en) Method and apparatus for generating terminal identifying information
CN108022096A (en) A kind of method of mobile payment, device, terminal and readable storage medium storing program for executing
CN109615290A (en) For obtaining the method, apparatus, system and medium of address for service
CN105247559A (en) Directing communications to semantic bundles of locations
CN109684425A (en) Declaration form station address matching process and device
CN108961406A (en) Geographical information visualization method, apparatus and user terminal
CN109359938A (en) A kind of optimization method of flow chart of data processing, device and terminal device
CN110457407A (en) Method and apparatus for handling point cloud data
CN104599161A (en) Method and device for pricing orders based on GPS (global positioning system) coordinate points of client
CN110082713A (en) Localization method, terminal device and storage medium
CN109118365A (en) Income calculation method, apparatus and computer readable storage medium
CN111651522A (en) Data synchronization method and device
CN110880157A (en) Map data processing method and device, electronic equipment and storage medium
CN108550030A (en) A kind of method, apparatus of examination & approval, system and computer-readable medium
CN110222391A (en) Electrical equipment drawing practice, system and terminal device
CN115268734A (en) Quotation generation method, device, equipment and storage medium based on quotation tool
CN115278529A (en) Mobile terminal distribution visualization method and device
CN114237798A (en) Data processing method, device, server and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190426