CN109670743A - A kind of management method of battery material - Google Patents

A kind of management method of battery material Download PDF

Info

Publication number
CN109670743A
CN109670743A CN201811400555.XA CN201811400555A CN109670743A CN 109670743 A CN109670743 A CN 109670743A CN 201811400555 A CN201811400555 A CN 201811400555A CN 109670743 A CN109670743 A CN 109670743A
Authority
CN
China
Prior art keywords
management method
information
outbound
battery
registration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811400555.XA
Other languages
Chinese (zh)
Inventor
梁光照
梁星河
龙世隆
王威
李载波
陈劲松
杨山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Li Wei Amperex Technology Ltd
Huizhou Liwinon Energy Technology Co Ltd
Original Assignee
Huizhou Li Wei Amperex Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Li Wei Amperex Technology Ltd filed Critical Huizhou Li Wei Amperex Technology Ltd
Priority to CN201811400555.XA priority Critical patent/CN109670743A/en
Publication of CN109670743A publication Critical patent/CN109670743A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • G06Q10/0875Itemisation or classification of parts, supplies or services, e.g. bill of materials

Abstract

The invention belongs to technical field of battery production, more particularly to a kind of management method of battery material, include the steps that inbound registration, position distribution, information shows, early warning and alarm, confirmation are outbound, finished product verifies, pass through above-mentioned processing step, the present invention realizes intelligent management, instead of manually-operated mode in the prior art, production efficiency is improved;By display module, make that operator quickly grasps the current static condition of material and judge whether well can be outbound, realizes visualized management;Pass through main control module, effectively the time of repose of material is monitored, meanwhile, the function of prompting and alarm is also played to operator, to allow operator to be preferably scheduled use to the material not exceeded the time limit and avoid the quality for improving battery core finished product using the material to exceed the time limit;In addition, also being verified after material is outbound, substandard products probability is further reduced.

Description

A kind of management method of battery material
Technical field
The invention belongs to technical field of battery production, and in particular to a kind of management method of battery material.
Background technique
In intelligent manufacturing industry, it is of great significance for the timeliness control of material involved in processing procedure, product.Especially In polymer lithium ion battery cell production, battery core after completion of assembly, needs to stand a period of time, makes electrolyte complete wetting for it Pole piece is to cooperate formation process to form SEI film, thus the charging/discharging function for making battery core bring into normal play, and the material in battery core processing procedure If very big influence may be caused to battery core end properties by standing time-out, thus cause battery core quality that cannot ensure, flow Enter and is likely to result in biggish security risk in client.
In the production process of existing battery core, the material logistics of battery core rely primarily on manually by the data of materiel warehouse-in, when Between be recorded on process paper, and human control material is carried out with this, still, mistake is once lost or filled in these process paper will It is difficult accurate judgement material current state;And stringent verification, material timeout expirations are not carried out in the production process of battery core Probability it is very high.
Therefore, it is badly in need of efficient, the accurate material management system of one kind to solve problem above.
Summary of the invention
It is an object of the invention to: in view of the deficiencies of the prior art, and a kind of management method of the battery material provided, it should Method is able to achieve paperless management, accurately carries out control to the time of repose of battery core, meanwhile, also realization visual control, pole The earth improves production efficiency, ensure that the quality of material.
To achieve the above object, the present invention adopts the following technical scheme:
A kind of management method of battery material, comprising the following steps:
S1: it inbound registration: is scanned using two dimensional code of the information reading module to material, obtains the information of material and to the object Material is registered;
S2: position distribution: main control module is allocated according to the position that the material information of acquisition stands material and passes through artificial Material is pushed away to put to corresponding position and is stood;
S3: information is shown: the static condition information of material is fed back to display module by main control module, and is carried out by display module Display;
S4: early warning and alarm: during material is stood, main control module is monitored the actual time of repose of material, and according to The standing time limit of setting, in setting stand the time limit in material give warning in advance, and to already exceed setting stand when The material of limit state is alarmed;
S5: confirmation is outbound: after the completion of material standing, whether operator may be used by the material state validation of information shown in S3 With outbound;
S6: finished product verification: it is verified after material is outbound and before entering next process, if noting abnormalities, there will be reports It is alert to prompt and the information of material be retrieved, trace the step of going wrong.
The improvement of management method as battery material of the present invention, the information reading module are barcode scanning gun or tool There are the smart phone, plate or computer of barcode scanning function.
The improvement of management method as battery material of the present invention, the display module are computer, plate, intelligence TV or smart phone.
The improvement of management method as battery material of the present invention, when the status information of material includes inbound in S3 Between, bar code information, position number, model, the standing time limit for standing environment, the practical time of repose of material and setting.
The improvement of management method as battery material of the present invention, gives warning in advance in S4 or time-out alarm passes through The status information of material is pushed to the smart machine of operator by the form of mail or short message.
The improvement of management method as battery material of the present invention enters the station to the registration of material according to material in S1 Sequencing arranged.
The shipment sequence of the improvement of management method as battery material of the present invention, material is stepped on according to material inbound The sequence of note carries out preferential outbound.
The improvement of management method as battery material of the present invention enters the station to the registration of material according to material in S1 Batch carry out unified registration.
The improvement of management method as battery material of the present invention, the shipment sequence of material is according to unified registration Sequence carries out unified outbound.
The beneficial effects of the present invention are: by above-mentioned processing step, the present invention realizes intelligent management, instead of Manually-operated mode in the prior art, improves production efficiency;By display module, so that operator is quickly grasped material and work as Preceding static condition and judge whether well can be outbound, realizes visualized management;It is effectively right by main control module The time of repose of material is monitored, meanwhile, the function of prompting and alarm is also played to operator, thus allow operator preferably Use is scheduled to the material not exceeded the time limit and avoids the quality for improving battery core finished product using the material to exceed the time limit;In addition, also It is verified after material is outbound, further reduces substandard products probability.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes a part of the invention, this hair Bright exemplary embodiment and its explanation is used to explain the present invention, and is not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is work flow diagram of the invention.
Specific embodiment
As used some vocabulary to censure specific components in the specification and claims.Those skilled in the art answer It is understood that hardware manufacturer may call the same component with different nouns.This specification and claims are not with name The difference of title is as the mode for distinguishing component, but with the difference of component functionally as the criterion of differentiation.Such as logical The "comprising" of piece specification and claim mentioned in is an open language, therefore should be construed to " include but do not limit In "." substantially " refer within an acceptable error range, those skilled in the art can within a certain error range solve described in Technical problem basically reaches the technical effect.
In the description of the present invention, it is to be understood that, term " on ", "lower", "front", "rear", "left", "right", level " The orientation or positional relationship of equal instructions is to be based on the orientation or positional relationship shown in the drawings, be merely for convenience of the description present invention and Simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific orientation construction And operation, therefore be not considered as limiting the invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can be Mechanical connection, is also possible to be electrically connected;It can be directly connected, two can also be can be indirectly connected through an intermediary Connection inside element.For the ordinary skill in the art, above-mentioned term can be understood at this as the case may be Concrete meaning in invention.
Below in conjunction with attached drawing, invention is further described in detail, but not as a limitation of the invention.
Embodiment 1
As shown in Figure 1, a kind of management method of battery material, it is characterised in that: the following steps are included:
S1: it inbound registration: is scanned using two dimensional code of the information reading module to material, obtains the information of material and to the object Material is registered;
S2: position distribution: main control module is allocated according to the position that the material information of acquisition stands material, and by artificial Cart, which pushes away material, to be put to corresponding position, then stands material, and material stands timing and starts;
S3: information is shown: main control module by the inbound time of material, bar code information, position number, model, stand environment, material The standing time limit of practical time of repose and setting feeds back to display module, and is shown by display module;
S4: early warning and alarm: during material is stood, main control module is monitored the actual time of repose of material, and according to The standing time limit of setting, in setting stand the time limit in material give warning in advance, and to already exceed setting stand when The material of limit state is alarmed, and the status information of material is pushed to the intelligence of operator by way of mail or short message Equipment, operator make material and dispatch and prevent the material to exceed the time limit from using accordingly, reduce substandard products by information above Rate;
S5: confirmation is outbound: after the completion of material standing, whether operator may be used by the material state validation of information shown in S3 With outbound;
S6: finished product verification: it is verified after material is outbound and before entering next process, if noting abnormalities, there will be reports It is alert to prompt and the information of material be retrieved, the specifying information of each step of material is inquired, the step of going wrong is traced.
Preferably, information reading module is barcode scanning gun or smart phone, plate or computer with barcode scanning function.
Preferably, display module is computer, plate, smart television or smart phone.
Preferably, the registration of material is arranged according to the sequencing that material enters the station in S1.
Preferably, the shipment sequence of material carries out preferential outbound according to the sequence of material inbound registration.
Embodiment 2
As shown in Figure 1, unlike the first embodiment, S1 in the registration to material is entered the station according to material in the present embodiment Batch carries out unified registration, and carries out according to the sequence of unified registration unified outbound, other steps are same as Example 1, here It repeats no more.
Embodiment 3
As shown in Figure 1, the present embodiment is that the time of repose stored to battery core pole piece under low temperature and low humidity environment is managed, step is such as Under:
S1: inbound registration: being scanned using two dimensional code of the barcode scanning gun to material, is obtained the information of material and is carried out to the material Registration;
S2: position distribution: material is assigned to low temperature and low humidity standing area according to the material information of acquisition and passes through people by main control module Work cart, which pushes away material, to be put to corresponding position, then stands material, and material stands timing and starts;
S3: information is shown: main control module by the inbound time of material, bar code information, position number, model, stand environment, material In the standing time limit of practical time of repose and setting feedback to smart television, and shown by smart television;
S4: early warning and alarm: during material is stood, main control module is monitored the actual time of repose of material, and according to The standing time limit of setting, in setting stand the time limit in material give warning in advance, and to already exceed setting stand when The material of limit state is alarmed, and the status information of material is pushed to the intelligence of operator by way of mail or short message Equipment, operator make material and dispatch and prevent the material to exceed the time limit from using accordingly, reduce substandard products by information above Rate;
S5: confirmation is outbound: after the completion of material standing, whether operator may be used by the material state validation of information shown in S3 With outbound;
S6: finished product verification: it is verified after material is outbound and before entering next process, if noting abnormalities, there will be reports It is alert to prompt and the information of material be retrieved, the specifying information of each step of material is inquired, the step of going wrong is traced.
In the present embodiment, the erect-position color setting stood for material is as follows: display grey indicates idle, can be used for carrying out The standing of material;Erect-position display green indicates that material can be lower turn, since low temperature and low humidity storage time is by under technique requirement not Limit gauge is fixed, therefore is set as 0, and the one inbound state of material in the present embodiment, that is, shown in green goes out goods area, when can go out goods area Domain shows that remaining time is negative, and preferred shipment trivial position should be selected when outbound;Erect-position shows that yellow has indicated battery core material It is prompted in early warning, and with sound-light alarm, shows the material practical time stood already close to the upper limit gauge of setting time of repose It is fixed, remind operator to handle the material as early as possible as required;Erect-position is displayed in red, and indicates the practical time of repose of battery core pole piece material The time of repose of setting is had timed, out, which cannot lower turn of use.The state shown by erect-position, allows one mesh of operator So, the risk for preventing material time-out standing, improves the excellent rate of product.
Embodiment 4
As shown in Figure 1, as different from Example 3, the present embodiment is the standing for carrying out room temperature to fluid injection battery core, the material of battery core It is assigned to room temperature and stands area, and the registration of material is arranged according to the sequencing that material enters the station in S1, and object The shipment sequence of material carries out preferential outbound according to the sequence.
In the present embodiment, the erect-position stood for material is shown as five kinds of states: erect-position shows that grey indicates idle, can use In the standing for carrying out material;Erect-position is displayed in blue expression and is standing;Erect-position display green indicates that material can be made with outbound lower turn With;Erect-position shows that yellow indicates that battery core material in early warning, and with sound-light alarm, has shown the material practical time stood Through the upper limit regulation close to setting time of repose, operator is reminded to handle material as early as possible;Erect-position is displayed in red, and indicates battery core pole piece The practical time of repose of material has timed, out the time of repose of setting, which cannot lower turn of use.
Other steps are same as Example 3, and which is not described herein again.
Embodiment 5
As shown in Figure 1, as different from Example 4, the present embodiment is to carry out (the OCV1 representative of OCV1 room temperature stewing process to battery core The open-circuit voltage that the t1 time measures, OCV2 represent the open-circuit voltage measured the t2 time, and generally this is the K value for calculating lithium battery (pressure drop in the unit time, for measuring lithium battery self discharge), K=OCV2-OCV1.), the material of battery core is assigned to OCV1 Room temperature stand area stood, other steps are same as Example 4, this is repeated no more.
Embodiment 6
As shown in Figure 1, as different from Example 4, the present embodiment is to carry out (the OCV1 representative of OCV2 room temperature stewing process to battery core The open-circuit voltage that the t1 time measures, OCV2 represent the open-circuit voltage measured the t2 time, and generally this is the K value for calculating lithium battery (pressure drop in the unit time, for measuring lithium battery self discharge), K=OCV2-OCV1.), the material of battery core is assigned to OCV2 Room temperature stand area and stood, in addition, for S1 by scanning the two-dimensional code, acquisition is that battery core carries out OCV1 test in the present embodiment The time of completion, other steps are same as Example 4, this is repeated no more.
Embodiment 7
As shown in Figure 1, as different from Example 4, the present embodiment is the stewing process for carrying out high temperature and humidity to battery core, battery core Material is assigned to high temperature and humidity and stands area, and since each high temperature and humidity room includes multiple positions, can accommodate more agings Vehicle.The material for needing to be stood need to be scanned when inbound, the unified high temperature and humidity that starts is stood, unified outbound after standing.Other Step is same as Example 4, and which is not described herein again.
Several preferred embodiments of the invention have shown and described in above description, but as previously described, it should be understood that this hair It is bright to be not limited to forms disclosed herein, it is not to be taken as the exclusion to other embodiments, and can be used for various other Combination, modification and environment, and can within that scope of the inventive concept describe herein, by the technology of above-mentioned introduction or related fields or Knowledge is modified.And changes and modifications made by those skilled in the art do not depart from the spirit and scope of the present invention, then it all should be In the protection scope of appended claims of the present invention.

Claims (9)

1. a kind of management method of battery material, it is characterised in that: the following steps are included:
S1: it inbound registration: is scanned using two dimensional code of the information reading module to material, obtains the information of material and to the object Material is registered;
S2: position distribution: main control module is allocated according to the position that the material information of acquisition stands material and passes through artificial Material is pushed away to put to corresponding position and is stood;
S3: information is shown: the static condition information of material is fed back to display module by main control module, and is carried out by display module Display;
S4: early warning and alarm: during material is stood, main control module is monitored the actual time of repose of material, and according to The standing time limit of setting, in setting stand the time limit in material give warning in advance, and to already exceed setting stand when The material of limit state is alarmed;
S5: confirmation is outbound: after the completion of material standing, whether operator may be used by the material state validation of information shown in S3 With outbound;
S6: finished product verification: it is verified after material is outbound and before entering next process, if noting abnormalities, there will be reports It is alert to prompt and the information of material be retrieved, trace the step of going wrong.
2. the management method of battery material according to claim 1, it is characterised in that: the information reading module is barcode scanning Rifle or smart phone, plate or computer with barcode scanning function.
3. the management method of battery material according to claim 1, it is characterised in that: the display module is computer, puts down Plate, smart television or smart phone.
4. the management method of battery material according to claim 1, it is characterised in that: the status information of material includes in S3 The inbound time, position number, model, stands environment, the practical time of repose of material and the standing time limit of setting at bar code information.
5. the management method of battery material according to claim 1, it is characterised in that: give warning in advance in S4 or time-out is alarmed The status information of material is pushed to by way of mail or short message the smart machine of operator.
6. the management method of battery material according to claim 1, it is characterised in that: to the registration of material according to object in S1 Expect that the sequencing to enter the station is arranged.
7. the management method of battery material according to claim 6, it is characterised in that: the shipment sequence of material is according to material The sequence of inbound registration carries out preferential outbound.
8. the management method of battery material according to claim 1, it is characterised in that: to the registration of material according to object in S1 Expect that the batch to enter the station carries out unified registration.
9. the management method of battery material according to claim 8, it is characterised in that: the shipment sequence of material is according to unified The sequence of registration carries out unified outbound.
CN201811400555.XA 2018-11-22 2018-11-22 A kind of management method of battery material Pending CN109670743A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811400555.XA CN109670743A (en) 2018-11-22 2018-11-22 A kind of management method of battery material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811400555.XA CN109670743A (en) 2018-11-22 2018-11-22 A kind of management method of battery material

Publications (1)

Publication Number Publication Date
CN109670743A true CN109670743A (en) 2019-04-23

Family

ID=66142161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811400555.XA Pending CN109670743A (en) 2018-11-22 2018-11-22 A kind of management method of battery material

Country Status (1)

Country Link
CN (1) CN109670743A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110282385A (en) * 2019-06-20 2019-09-27 格力电器(武汉)有限公司 Automatically control the duration control method and time controlled system for applying the glue sticking time
CN111814934A (en) * 2020-07-22 2020-10-23 四川爱联科技有限公司 Electronic product aging management method and system
CN117725389A (en) * 2024-02-08 2024-03-19 宁德时代新能源科技股份有限公司 Battery outbound method and battery outbound system
CN117808026A (en) * 2024-02-29 2024-04-02 宁德时代新能源科技股份有限公司 Outbound method and system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104681885A (en) * 2014-12-26 2015-06-03 东莞锂威能源科技有限公司 Timing method for lithium-ion cell standing and aging
CN106372777A (en) * 2016-08-23 2017-02-01 苏州博众精工科技有限公司 Product production information and process management control method
CN107404809A (en) * 2017-07-21 2017-11-28 郑州云海信息技术有限公司 The time management and control method and system of OSP surface treatments are carried out to PCB

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104681885A (en) * 2014-12-26 2015-06-03 东莞锂威能源科技有限公司 Timing method for lithium-ion cell standing and aging
CN106372777A (en) * 2016-08-23 2017-02-01 苏州博众精工科技有限公司 Product production information and process management control method
CN107404809A (en) * 2017-07-21 2017-11-28 郑州云海信息技术有限公司 The time management and control method and system of OSP surface treatments are carried out to PCB

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110282385A (en) * 2019-06-20 2019-09-27 格力电器(武汉)有限公司 Automatically control the duration control method and time controlled system for applying the glue sticking time
CN110282385B (en) * 2019-06-20 2021-02-02 格力电器(武汉)有限公司 Time control method and time control system for automatically controlling gluing and bonding time
CN111814934A (en) * 2020-07-22 2020-10-23 四川爱联科技有限公司 Electronic product aging management method and system
CN117725389A (en) * 2024-02-08 2024-03-19 宁德时代新能源科技股份有限公司 Battery outbound method and battery outbound system
CN117808026A (en) * 2024-02-29 2024-04-02 宁德时代新能源科技股份有限公司 Outbound method and system

Similar Documents

Publication Publication Date Title
CN109670743A (en) A kind of management method of battery material
CN106796267B (en) Storage battery evaluation device, storage battery system, and storage battery evaluation method
CN108861420B (en) Fool-proof feeding control method and device and computer readable storage medium
US11474153B2 (en) Battery pack maintenance system
WO2020010828A1 (en) Method for returning product in open vending machine, and device for same
CN108564442A (en) Unmanned retail trade system and its control method, goods selling equipment and Cloud Server
US9798990B2 (en) Material management and control system
US20130049794A1 (en) Extended systems and methods for testing power supplies
CN104568301B (en) Method and device for detecting equipment vacuum degree
CN109903828A (en) A kind of vaccine inoculation management system
CN112712186B (en) Equipment full-life-cycle management method based on intelligent substation digital twin system
CN108614217A (en) A kind of battery management system full-automatic test system and implementation method
CN108829090A (en) A kind of vehicle control unit of electric vehicle off-line detection system and detection method
CN106526457A (en) Circuit board detection instrument and system
CN101976401A (en) Scanning test method used before delivery of batteries and system thereof
CN109472297A (en) Medicine-chest drug intelligent positioning management method and system
CN107545875A (en) A kind of collocation method, device, terminal and machinable medium
CN109345694A (en) A kind of commodity management-control method and counter
CN106743022A (en) Intensive fine electronic indicates shelf warehousing system
CN106597339A (en) Battery charging state correction method and battery charging state correction device
CN211453799U (en) Full-protocol quick-charging and quick-discharging aging test equipment
CN110580513A (en) Tool management system and method for simultaneous use of multiple persons
CN107356882B (en) A kind of PD power supply product ageing testing method
CN107069846B (en) Correct the method and battery system of the voltage and current of battery
CN115447436A (en) Intelligent electric vehicle power-exchanging cabinet system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190423