CN109669992A - A kind of implementation method of data visualization conversion - Google Patents

A kind of implementation method of data visualization conversion Download PDF

Info

Publication number
CN109669992A
CN109669992A CN201811562579.5A CN201811562579A CN109669992A CN 109669992 A CN109669992 A CN 109669992A CN 201811562579 A CN201811562579 A CN 201811562579A CN 109669992 A CN109669992 A CN 109669992A
Authority
CN
China
Prior art keywords
data
rule
configuration
model
visualization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811562579.5A
Other languages
Chinese (zh)
Inventor
郑博文
徐扬
常荣
耿飞
宋忧乐
牛斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuxi Power Supply Bureau of Yunnan Power Grid Co Ltd
Original Assignee
Yuxi Power Supply Bureau of Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuxi Power Supply Bureau of Yunnan Power Grid Co Ltd filed Critical Yuxi Power Supply Bureau of Yunnan Power Grid Co Ltd
Priority to CN201811562579.5A priority Critical patent/CN109669992A/en
Publication of CN109669992A publication Critical patent/CN109669992A/en
Pending legal-status Critical Current

Links

Abstract

This application discloses a kind of implementation methods of data visualization conversion, it include: disposition data source, configure logic entity, configuration attribute, configuration association table, configuration visualization rendering engine, the rule of allocation models and model, collocation task scheduling, so that the task of the model publication is periodically executed, when executing the task schedule, regulation engine parsing is carried out to the model, data are extracted by the rule of the model, caching, and it is grouped in the buffer based on correlation rule, statistics and convergence, finally it is converted into target data, visualization rendering engine is rendered according to configuration information, it exports to browser engine.The implementation method of data visualization provided by the present application conversion by using Information Technology Methods in the collection of reliability operational indicator data, arrangement, statistics, the links such as analyze and show and realize automation, intelligent and visualization, data statistics in traditional approach can be eliminated, summarize, analyze the technical issues of lagging.

Description

A kind of implementation method of data visualization conversion
Technical field
This application involves the implementation methods that information technology field more particularly to a kind of data visualization are converted.
Background technique
Management of electric power dependability is the safety management of electric system and the total quality control of equipment and overall process, is suitable One of the scientific management methods of modern power industry industry characteristic are an important composition portions of power industry modern management Point.
The content of power supply reliability system index notification is more at present, the frequency is high, and existing statistical indicator still relies on office table Lattice production template is issued to constituent parts and is made a report on, and is collected and is summarized by correlation specific responsibility, counted using excel function, Analysis is shown.
But since data collection, analysis workload are huge and human factor mistake is more, be unfavorable for data preservation, It inquires and shared, index generates sluggish at least production reality 1 week, causes to summarize management of electric power dependability index analysis in industry Lag, can not timely and effectively analyze the problem, be handled.
Summary of the invention
This application provides a kind of implementation methods of data visualization conversion, to solve electric reliability pipe in the prior art The technical issues of reason index analysis summarizes lag.
In order to solve the above-mentioned technical problem, the embodiment of the present application discloses following technical solution:
The embodiment of the present application discloses a kind of implementation method of data visualization conversion, comprising:
Disposition data source: the basic information of data source, test data source connectivity, it is ensured that data source and source database are filled in Information communication;
Configuration logic entity: the ontology of target database, and the object in the logic entity and the source database are configured It is corresponding to manage table;
Configuration attribute: configuring the essential attribute of the ontology of target database, in the essential attribute and the source database The column of physical table are corresponding;
Configuration association table: the contingency table includes logic entity contingency table and Attribute Association table, the logic entity association Table is the mapping relations for establishing physical table in the logic entity and the source database;The Attribute Association table is described in foundation Essential attribute and column of physical table in the source database, column polymerize the mapping relations summarized;
Configuration visualization rendering engine, the table taken various forms to the data in the source database, chart carry out Show;
The rule of allocation models and model: the logic entity for meeting a certain rule is configured using certain rule, and is Logic entity establishes correlation rule, verifies after correlation rule test passes through, the model is issued into independent task;
Collocation task scheduling, so that the task of model publication is periodically executed;
Regulation engine parsing, when executing the task schedule, parses the model, by the model Rule extracts data, is cached, and it is rule-based in the buffer be grouped, statistics and convergence, be finally converted into number of targets According to being rendered according to configuration information, output is to browser engine.
Optionally, the disposition data source, the configuration logic entity, the allocation models and model rule, described match It sets task schedule and regulation engine parsing independently encapsulates.
Optionally, the data source supports multiple mainstream relevant database Oracle, Mysql, postgresql data Source configuration.
Optionally, the basic information includes the username and password for driving title, data source URL, target database.
Optionally, the essential attribute includes the dimension visualized, classification, numerical value.
Optionally, the place when collocation task scheduling includes frequency, the implementation strategy, execution failure that configuration task executes Reason strategy.
Optionally, the rule of the model includes global value variable bound rule, the logic entity and the source data The constraint relationship rule, the classified statistic polymerization analysis rule of physical table in library.
Optionally, the target database is Neo4j chart database.
Compared with prior art, the application has the beneficial effect that
This application provides a kind of implementation methods of data visualization conversion, comprising:
Disposition data source: the basic information of data source, test data source connectivity, it is ensured that data source and source database are filled in Information communication;
Configuration logic entity: the ontology of target database, and the object in the logic entity and the source database are configured It is corresponding to manage table;
Configuration attribute: configuring the essential attribute of the ontology of target database, in the essential attribute and the source database The column of physical table are corresponding;
Configuration association table: the contingency table includes logic entity contingency table and Attribute Association table, the logic entity association Table is the mapping relations for establishing physical table in the logic entity and the source database;The Attribute Association table is described in foundation Essential attribute and column of physical table in the source database, column polymerize the mapping relations summarized;
Configuration visualization rendering engine, the table taken various forms to the data in the source database, chart carry out Show;
The rule of allocation models and model: the logic entity for meeting a certain rule is configured using certain rule, and is Logic entity establishes correlation rule, verifies after correlation rule test passes through, the model is issued into independent task;
Collocation task scheduling, so that the task of model publication is periodically executed;
Regulation engine parsing, when executing the task schedule, parses the model, by the model Rule extracts data, is cached, and is grouped in the buffer based on correlation rule, statistics and convergence, is finally converted into mesh Data are marked, visualization rendering engine is rendered according to configuration information, output to browser engine.Data provided by the present application can Shown depending on changing the implementation method converted with offer data acquisition, model configuration, data pick-up, task schedule, self-service combination, Various dimensions Dynamic Display, the function of graph visualization analysis, according to actual job demand, by using Information Technology Methods can By the collection of property operational indicator data, arrangement, statistics, the links such as analyzes and show and realize automation, intelligent and visualization, energy Data statistics in traditional approach is enough eliminated, summarizes, analyze the technical issues of lag.
It should be understood that above general description and following detailed description be only it is exemplary and explanatory, not The application can be limited.
Specific embodiment
In order to make those skilled in the art better understand the technical solutions in the application, will implement below to the application Technical solution in example is clearly and completely described, it is clear that described embodiment is only that the application a part is implemented Example, rather than whole embodiments.Based on the embodiment in the application, those of ordinary skill in the art are not making creative labor Every other embodiment obtained under the premise of dynamic, shall fall within the protection scope of the present application.
The embodiment of the present application provides a kind of implementation method of data visualization conversion, comprising:
Disposition data source: the basic information of data source, test data source connectivity, it is ensured that data source and source database are filled in Information communication.The basic information includes the username and password for driving title, data source URL, target database.The number Multiple mainstream relevant database Oracle, Mysql, postgresql data source configurations are supported according to source, are met reliable in power supply Property achievement data data analysis field, user is to the analysis of diversified data source requirement.For example stop in relational database Telegram in reply achievement data obtains the data of log analysis again, also to add the data of message event.
Configuration logic entity: the ontology of target database, and the object in the logic entity and the source database are configured It is corresponding to manage table.The logic entity is specifically included in the letter such as some peculiar descriptions, data type, title in target database Breath.
Configuration attribute: configuring the essential attribute of the ontology of target database, in the essential attribute and the source database The column of physical table are corresponding.Configuration attribute described herein can also be in the configuration essential attribute and the source database The polymerization of the column of physical table summarizes corresponding.The essential attribute includes the dimension visualized, classification, numerical value.
Configuration association table: the contingency table includes logic entity contingency table and Attribute Association table, the logic entity association Table is the mapping relations for establishing physical table in the logic entity and the source database;The Attribute Association table is described in foundation The column of physical table in essential attribute and the source database, are also possible to physical table in the essential attribute and the source database Column the mapping relations that summarize of polymerization;
Configuration visualization rendering engine, the table taken various forms to the data in the source database, chart carry out Show.Data visualization is to select suitable visualization rendering engine to be shown in front end according to data structure, visualizes wash with watercolours Dye engine has just specified data structure when persistence architecture, and has been realized in very more visualization wash with watercolours Contaminate template, it is only necessary to select the visualization for supporting the data structure to render template according to data structure.The embodiment of the present application Selection visualization rendering engine, therefore do not need to carry out data structure identification again when the displaying of front end, it does not need to be counted again According to conversion operation, does not need to carry out the operations such as visualization rendering engine identification again yet, improve the performance of front end visual presentation.
The rule of allocation models and model: the logic entity for meeting a certain rule is configured using certain rule, and is Logic entity establishes correlation rule, verifies after correlation rule test passes through, the model is issued into independent task.
The model is the implementation model of data pick-up, conversion, calculating and storage etc., executes reality by scheduler timing The extraction of existing data, conversion are calculated and its are stored.Data with same rule are divided into a major class, that is, one Model, such as power failure index analysis model configure annual power failure index by hierarchical relationship from organization down step by step and summarize, the moon Degree power failure achievement data summarizes, and day degree power failure index, which summarizes, constitutes a power failure achievement data analysis model.
The rule of the model includes the object in global value variable bound rule, the logic entity and the source database The constraint relationship rule, the classified statistic polymerization analysis rule for managing table, are configured, backstage executes in a manner of freeMark template engine The rule parsing of model is carried out data analysis conversion at the instruction that computer can be performed by the rule parsing of model.
Collocation task scheduling, so that the task of model publication is periodically executed.The collocation task scheduling includes matching The processing strategie when frequency, implementation strategy, execution failure of task execution is set, grid operation data is interim, lasting generates , the task based on model configuration publication needs to be periodically executed data pick-up, conversion, more new data.
Regulation engine parsing, when executing the task schedule, parses the model, by the model Rule extracts data, is cached, and is grouped in the buffer based on correlation rule, statistics and convergence, is finally converted into mesh Data are marked, realize the recombination of data multidimensional degree, self-service configuration in real time, target data is stored in target database.Front end is visual It only needs to carry out simple data base querying when change, finds the data of the condition of satisfaction, it is included in target data The information such as the rendering mode of data visualization, data, data for meeting condition that the page can inquire automatically according to this and Its corresponding visualization rendering mode carries out the visual presentation of data, output to browser engine.
The target database provided in the embodiment of the present application is Neo4j chart database, and the map of complex relationship is supported to deposit It stores up, two most basic concepts are node and side in Neo4j.Node presentation-entity, the side then relationship between presentation-entity.Section Point and side can have the attribute of oneself.Different entities are got up by a variety of different relationships, form complicated object diagram. Neo4j provides the function of being searched and traversed in object diagram simultaneously, will be with postponing parsed rule, dimension, visual Change data structure, visualization rendering mode etc. to be respectively stored on node and the attribute on side, visualization only needs when showing Adapter is adapted to visualization renderer and the polymorphic of data can be realized shows.
User when wanting to show some report, necessarily should clearly be shown as what pattern (be line chart, histogram, Or pie chart etc.), and the data structure of these different ways of presentation is often discrepant, it is therefore desirable to it is different data Ways of presentation provides the data structure met the requirements.
Power supply reliability index and widget can be one-to-many, be also possible to one-one relationship, each achievement data source At least one corresponding widget.For example, the monthly data for stopping telegram in reply indicator-specific statistics can both be shown as line chart or show dimension Pie chart.In the embodiment of the present application when configuration visualization rendering engine, the adaptation that is correspondingly configured between achievement data and widget Relationship, in each data source, the widget supported for it respectively provides the fitting relation between one, to look into notebook data source The original JSON ask is converted to the data structure that different widgets can be adapted to.
Disposition data source described in above embodiments, the configuration logic entity, the allocation models and model rule, institute It states collocation task scheduling and regulation engine parsing independently encapsulates.User only needs to configure data source, logic entity, mould Data visualization conversion can be completed in type, the rule of model, visual means, scheduler task and executing rule engine, improves Efficiency of research and development and performance of front end.
This application provides a kind of implementation methods of data visualization conversion, comprising: disposition data source, configuration logic are real Body, configuration attribute, configuration association table, rule, the collocation task scheduling for configuring visualization rendering engine, allocation models and model, So that the task of the model publication is periodically executed, when executing the task schedule, rule is carried out to the model Engine parsing is extracted data by the rule of the model, is cached, and be grouped in the buffer based on correlation rule, Statistics and convergence is finally converted into target data, and visualization rendering engine is rendered according to configuration information, and output to browser is drawn It holds up.The implementation method of data visualization conversion provided by the present application, which has, to be provided data acquisition, model configuration, data pick-up, appoints The function of business scheduling, self-service combination displaying, the analysis of various dimensions Dynamic Display, graph visualization is led to according to actual job demand Cross using Information Technology Methods the collection of reliability operational indicator data, arrangement, statistics, analyze and show etc. links realize from Dynamicization, intelligent and visualization can eliminate data statistics in traditional approach, summarize, analyze the technical issues of lag.
It should be noted that the terms "include", "comprise" or its any other variant are intended in the present specification Non-exclusive inclusion, so that the circuit structure, article or the equipment that include a series of elements not only include those elements, It but also including other elements that are not explicitly listed, or further include solid by this circuit structure, article or equipment Some elements.In the absence of more restrictions, the element for thering is sentence "including a ..." to limit, it is not excluded that including There is also other identical elements in the circuit structure of the element, article or equipment.
Those skilled in the art will readily occur to its of the application after considering specification and practicing the disclosure invented here His embodiment.This application is intended to cover any variations, uses, or adaptations of the invention, these modifications, purposes or Person's adaptive change follows the general principle of the application and including the undocumented common knowledge in the art of the application Or conventional techniques.The description and examples are only to be considered as illustrative, and the true scope and spirit of the application are wanted by right The content asked is pointed out.
Above-described the application embodiment does not constitute the restriction to the application protection scope.

Claims (8)

1. a kind of implementation method of data visualization conversion characterized by comprising
Disposition data source: the basic information of data source, test data source connectivity, it is ensured that the letter of data source and source database are filled in Breath connection;
Configuration logic entity: the ontology of target database, and the physical table in the logic entity and the source database are configured It is corresponding;
Configuration attribute: the essential attribute of the ontology of target database, physics in the essential attribute and the source database are configured The column of table are corresponding;
Configuration association table: the contingency table includes logic entity contingency table and Attribute Association table, and the logic entity contingency table is Establish the mapping relations of physical table in the logic entity and the source database;The Attribute Association table is described basic to establish Attribute and column of physical table in the source database, column polymerize the mapping relations summarized;
Configuration visualization rendering engine, the table taken various forms to the data in the source database, chart show;
The rule of allocation models and model: the logic entity for meeting a certain rule is configured using certain rule, and is logic Entity establishes correlation rule, verifies after correlation rule test passes through, the model is issued into independent task;
Collocation task scheduling, so that the task of model publication is periodically executed;
Regulation engine parsing, when executing the task schedule, parses the model, by the rule of the model Data are extracted, are cached, and are grouped in the buffer based on correlation rule, statistics and convergence, number of targets is finally converted into According to being rendered according to configuration information, output is to browser engine.
2. the implementation method of data visualization conversion according to claim 1, which is characterized in that the disposition data source, The configuration logic entity, the allocation models and model rule, the collocation task scheduling and regulation engine parsing point Other individual packages.
3. the implementation method of data visualization conversion according to claim 1, which is characterized in that the data source is supported more A mainstream relevant database Oracle, Mysql, postgresql data source configuration.
4. the implementation method of data visualization according to claim 1 conversion, which is characterized in that the basic information includes Drive the username and password of title, data source URL, target database.
5. the implementation method of data visualization according to claim 1 conversion, which is characterized in that the essential attribute includes The dimension of visual presentation, classification, numerical value.
6. the implementation method of data visualization conversion according to claim 1, which is characterized in that the collocation task scheduling Including configuration task execute frequency, implementation strategy, execute failure when processing strategie.
7. the implementation method of data visualization conversion according to claim 1, which is characterized in that the rule packet of the model Include global value variable bound rule, the logic entity and the constraint relationship rule of the physical table in the source database, grouping Statistics and convergence analysis rule.
8. the implementation method of data visualization according to claim 1 conversion, which is characterized in that the target database is Neo4j chart database.
CN201811562579.5A 2018-12-20 2018-12-20 A kind of implementation method of data visualization conversion Pending CN109669992A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811562579.5A CN109669992A (en) 2018-12-20 2018-12-20 A kind of implementation method of data visualization conversion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811562579.5A CN109669992A (en) 2018-12-20 2018-12-20 A kind of implementation method of data visualization conversion

Publications (1)

Publication Number Publication Date
CN109669992A true CN109669992A (en) 2019-04-23

Family

ID=66144079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811562579.5A Pending CN109669992A (en) 2018-12-20 2018-12-20 A kind of implementation method of data visualization conversion

Country Status (1)

Country Link
CN (1) CN109669992A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110347974A (en) * 2019-05-30 2019-10-18 重庆金融资产交易所有限责任公司 Data processing method, device, computer equipment and storage medium
CN110780937A (en) * 2019-09-16 2020-02-11 腾讯大地通途(北京)科技有限公司 Task issuing method and device, computer readable storage medium and equipment
CN110825805A (en) * 2019-11-12 2020-02-21 北京东软望海科技有限公司 Data visualization method and device
CN110955717A (en) * 2019-11-19 2020-04-03 深圳市航通智能技术有限公司 Visual dynamic display method and system based on big data
CN110956692A (en) * 2019-11-26 2020-04-03 云南电网有限责任公司玉溪供电局 Method for combining three-dimensional scene visualization based on power supply reliability data analysis
CN111934793A (en) * 2020-07-31 2020-11-13 中国工商银行股份有限公司 Internet architecture full link monitoring method and device
CN112380220A (en) * 2020-11-18 2021-02-19 深圳市极致科技股份有限公司 Data display method, device and equipment
CN112529998A (en) * 2019-09-19 2021-03-19 中国科学院沈阳计算技术研究所有限公司 Real-time rendering method oriented to IT system structure visualization
CN112578679A (en) * 2019-09-30 2021-03-30 北京国双科技有限公司 Control system and method, storage medium, and electronic device
CN112631561A (en) * 2020-12-29 2021-04-09 智慧神州(北京)科技有限公司 Data source docking method and device, processor and data source docking system
CN112685398A (en) * 2020-12-31 2021-04-20 新奥数能科技有限公司 Internet of things data visual display method and device
CN112698971A (en) * 2020-12-30 2021-04-23 平安科技(深圳)有限公司 Rule engine based parameter conversion method, device, equipment and medium
CN113190549A (en) * 2021-03-29 2021-07-30 无锡极数宝大数据科技有限公司 Multidimensional table data calling method, multidimensional table data calling device, server and storage medium
CN113762665A (en) * 2020-06-29 2021-12-07 北京京东振世信息技术有限公司 Method and system for backtracking related real-time data of real-time index
CN114117416A (en) * 2021-09-16 2022-03-01 山东大学 SAT-based visualization method and system for symmetric password automated analysis platform
CN114116826A (en) * 2022-01-26 2022-03-01 树根互联股份有限公司 Index calculation system for working condition of Internet of things equipment

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100088664A1 (en) * 2006-08-14 2010-04-08 Payman Khodabandehloo Design tool and methodology for enterprise software applications
CN101853451A (en) * 2010-06-23 2010-10-06 东软集团股份有限公司 Asset association relation display method and device
CN101893861A (en) * 2004-05-04 2010-11-24 费舍-柔斯芒特系统股份有限公司 Process configuration and control environment in figure integrated
US20120173444A1 (en) * 2011-01-04 2012-07-05 Ory Zik Method and system for energy efficiency and sustainability management
CN102930393A (en) * 2012-10-25 2013-02-13 海南电网公司 Comprehensive power grid information display visualization system
CN103699688A (en) * 2014-01-10 2014-04-02 深圳供电局有限公司 Terminal model for supporting management of reliability in power supply of terminal user
CN104933095A (en) * 2015-05-22 2015-09-23 中国电子科技集团公司第十研究所 Heterogeneous information universality correlation analysis system and analysis method thereof
CN105320690A (en) * 2014-07-30 2016-02-10 北京中海纪元数字技术发展股份有限公司 Metadata based rapid statistic form generation method and system
CN105512139A (en) * 2014-09-26 2016-04-20 阿里巴巴集团控股有限公司 Method and device for implementing data visualization
CN106021389A (en) * 2016-05-12 2016-10-12 新华通讯社 System and method for automatically generating news based on template
CN107256265A (en) * 2017-06-14 2017-10-17 成都四方伟业软件股份有限公司 A kind of search-engine results data visualization methods of exhibiting and system
CN108647049A (en) * 2018-03-18 2018-10-12 平安科技(深圳)有限公司 Configurableization system, method, equipment and the storage medium of rule-based engine

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101893861A (en) * 2004-05-04 2010-11-24 费舍-柔斯芒特系统股份有限公司 Process configuration and control environment in figure integrated
US20100088664A1 (en) * 2006-08-14 2010-04-08 Payman Khodabandehloo Design tool and methodology for enterprise software applications
CN101853451A (en) * 2010-06-23 2010-10-06 东软集团股份有限公司 Asset association relation display method and device
US20120173444A1 (en) * 2011-01-04 2012-07-05 Ory Zik Method and system for energy efficiency and sustainability management
CN102930393A (en) * 2012-10-25 2013-02-13 海南电网公司 Comprehensive power grid information display visualization system
CN103699688A (en) * 2014-01-10 2014-04-02 深圳供电局有限公司 Terminal model for supporting management of reliability in power supply of terminal user
CN105320690A (en) * 2014-07-30 2016-02-10 北京中海纪元数字技术发展股份有限公司 Metadata based rapid statistic form generation method and system
CN105512139A (en) * 2014-09-26 2016-04-20 阿里巴巴集团控股有限公司 Method and device for implementing data visualization
CN104933095A (en) * 2015-05-22 2015-09-23 中国电子科技集团公司第十研究所 Heterogeneous information universality correlation analysis system and analysis method thereof
CN106021389A (en) * 2016-05-12 2016-10-12 新华通讯社 System and method for automatically generating news based on template
CN107256265A (en) * 2017-06-14 2017-10-17 成都四方伟业软件股份有限公司 A kind of search-engine results data visualization methods of exhibiting and system
CN108647049A (en) * 2018-03-18 2018-10-12 平安科技(深圳)有限公司 Configurableization system, method, equipment and the storage medium of rule-based engine

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110347974A (en) * 2019-05-30 2019-10-18 重庆金融资产交易所有限责任公司 Data processing method, device, computer equipment and storage medium
CN110347974B (en) * 2019-05-30 2023-06-23 深圳市鼎为通信有限公司 Data processing method, device, computer equipment and storage medium
CN110780937A (en) * 2019-09-16 2020-02-11 腾讯大地通途(北京)科技有限公司 Task issuing method and device, computer readable storage medium and equipment
CN110780937B (en) * 2019-09-16 2023-12-08 腾讯大地通途(北京)科技有限公司 Task issuing method, device, computer readable storage medium and equipment
CN112529998A (en) * 2019-09-19 2021-03-19 中国科学院沈阳计算技术研究所有限公司 Real-time rendering method oriented to IT system structure visualization
CN112578679A (en) * 2019-09-30 2021-03-30 北京国双科技有限公司 Control system and method, storage medium, and electronic device
CN112578679B (en) * 2019-09-30 2024-02-13 北京国双科技有限公司 Control system and method, storage medium and electronic device
CN110825805A (en) * 2019-11-12 2020-02-21 北京东软望海科技有限公司 Data visualization method and device
CN110825805B (en) * 2019-11-12 2022-07-19 望海康信(北京)科技股份公司 Data visualization method and device
CN110955717A (en) * 2019-11-19 2020-04-03 深圳市航通智能技术有限公司 Visual dynamic display method and system based on big data
CN110956692A (en) * 2019-11-26 2020-04-03 云南电网有限责任公司玉溪供电局 Method for combining three-dimensional scene visualization based on power supply reliability data analysis
CN113762665B (en) * 2020-06-29 2024-04-16 北京京东振世信息技术有限公司 Real-time index related real-time data backtracking method and system
CN113762665A (en) * 2020-06-29 2021-12-07 北京京东振世信息技术有限公司 Method and system for backtracking related real-time data of real-time index
CN111934793A (en) * 2020-07-31 2020-11-13 中国工商银行股份有限公司 Internet architecture full link monitoring method and device
CN112380220A (en) * 2020-11-18 2021-02-19 深圳市极致科技股份有限公司 Data display method, device and equipment
CN112631561A (en) * 2020-12-29 2021-04-09 智慧神州(北京)科技有限公司 Data source docking method and device, processor and data source docking system
CN112698971A (en) * 2020-12-30 2021-04-23 平安科技(深圳)有限公司 Rule engine based parameter conversion method, device, equipment and medium
CN112685398A (en) * 2020-12-31 2021-04-20 新奥数能科技有限公司 Internet of things data visual display method and device
CN113190549A (en) * 2021-03-29 2021-07-30 无锡极数宝大数据科技有限公司 Multidimensional table data calling method, multidimensional table data calling device, server and storage medium
CN114117416A (en) * 2021-09-16 2022-03-01 山东大学 SAT-based visualization method and system for symmetric password automated analysis platform
CN114117416B (en) * 2021-09-16 2024-04-12 山东大学 SAT-based symmetric password automatic analysis platform visualization method and system
CN114116826A (en) * 2022-01-26 2022-03-01 树根互联股份有限公司 Index calculation system for working condition of Internet of things equipment

Similar Documents

Publication Publication Date Title
CN109669992A (en) A kind of implementation method of data visualization conversion
Huang et al. Cloud manufacturing service platform for small-and medium-sized enterprises
CN104268428B (en) A kind of visual configuration method calculated for index
CN110134833A (en) Diagram data modeling and method towards power network topology management
CN103902537B (en) Multi-service log data storage processing and inquiring system and method thereof
CN107169575A (en) A kind of modeling and method for visualizing machine learning training pattern
CN112540975B (en) Multi-source heterogeneous data quality detection method and system based on petri net
CN104050193B (en) Generate the method for message and realize the data handling system of this method
CN111125450A (en) Management method of multilayer topology network resource object
CN113506098A (en) Power plant metadata management system and method based on multi-source data
CN105955814A (en) Event priority scheduling-based complex event detection method
CN107766943A (en) A kind of Knowledge Component automation exchange method under CPS environment
CN116703228B (en) Big data quality evaluation method and system
CN109471957A (en) A kind of metadata conversion method and device based on unified label
CN103383649A (en) Design model of complex virtual instrument system
CN106951636A (en) A kind of power communication static resource automatic identifying method based on AutoCAD
CN103559255B (en) A kind of visualization data processing method of distributed hydraulic system
CN109687592A (en) Substation information display control method, device and electronic equipment
CN104933491A (en) Industrial enterprise energy consumption diagnosis early warning system
Duan Analysis of ERP Enterprise Management Information System based on Cloud Computing Mode
CN110262973B (en) Data maintenance method, device, equipment and computer storage medium
CN114218216A (en) Resource management method, device, equipment and storage medium
CN107729410A (en) A kind of database engine suitable for power equipment big data
CN110222002A (en) A kind of display parameter of display screen poll acquisition method and system based on RS485 serial communication
CN105515822A (en) Internet architecture driven by big data and realization method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned
AD01 Patent right deemed abandoned

Effective date of abandoning: 20230602