CN109648768A - A kind of steel combination process such as steel lining tetrafluoro cage hoop - Google Patents

A kind of steel combination process such as steel lining tetrafluoro cage hoop Download PDF

Info

Publication number
CN109648768A
CN109648768A CN201811388122.7A CN201811388122A CN109648768A CN 109648768 A CN109648768 A CN 109648768A CN 201811388122 A CN201811388122 A CN 201811388122A CN 109648768 A CN109648768 A CN 109648768A
Authority
CN
China
Prior art keywords
steel
pipe
cage
pressure
ptfe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811388122.7A
Other languages
Chinese (zh)
Other versions
CN109648768B (en
Inventor
李传红
吴三发
李艳龙
李俊俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xuanzhen Antiseptic Engineering Co Ltd
Original Assignee
Jiangsu Xuanzhen Antiseptic Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Xuanzhen Antiseptic Engineering Co Ltd filed Critical Jiangsu Xuanzhen Antiseptic Engineering Co Ltd
Priority to CN201811388122.7A priority Critical patent/CN109648768B/en
Priority claimed from CN201811388122.7A external-priority patent/CN109648768B/en
Publication of CN109648768A publication Critical patent/CN109648768A/en
Application granted granted Critical
Publication of CN109648768B publication Critical patent/CN109648768B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/006Pressing and sintering powders, granules or fibres
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/02Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor of articles of definite length, i.e. discrete articles
    • B29C43/18Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor of articles of definite length, i.e. discrete articles incorporating preformed parts or layers, e.g. compression moulding around inserts or for coating articles
    • B29C43/183Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor of articles of definite length, i.e. discrete articles incorporating preformed parts or layers, e.g. compression moulding around inserts or for coating articles the preformed layer being a lining, e.g. shaped in the mould before compression moulding, or a preformed shell adapted to the shape of the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C43/58Measuring, controlling or regulating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L41/00Branching pipes; Joining pipes to walls
    • F16L41/02Branch units, e.g. made in one piece, welded, riveted
    • F16L41/021T- or cross-pieces
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L41/00Branching pipes; Joining pipes to walls
    • F16L41/02Branch units, e.g. made in one piece, welded, riveted
    • F16L41/026Branch units, e.g. made in one piece, welded, riveted with a layer protecting against erosion
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L58/00Protection of pipes or pipe fittings against corrosion or incrustation
    • F16L58/18Protection of pipes or pipe fittings against corrosion or incrustation specially adapted for pipe fittings
    • F16L58/188Protection of pipes or pipe fittings against corrosion or incrustation specially adapted for pipe fittings for branching pipes; for joining pipes to walls
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C2043/3205Particular pressure exerting means for making definite articles
    • B29C2043/3238Particular pressure exerting means for making definite articles pressurized liquid acting directly or indirectly on the material to be formed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C43/58Measuring, controlling or regulating
    • B29C2043/5808Measuring, controlling or regulating pressure or compressing force
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C43/58Measuring, controlling or regulating
    • B29C2043/585Measuring, controlling or regulating detecting defects, e.g. foreign matter between the moulds, inaccurate position, breakage
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29KINDEXING SCHEME ASSOCIATED WITH SUBCLASSES B29B, B29C OR B29D, RELATING TO MOULDING MATERIALS OR TO MATERIALS FOR MOULDS, REINFORCEMENTS, FILLERS OR PREFORMED PARTS, e.g. INSERTS
    • B29K2027/00Use of polyvinylhalogenides or derivatives thereof as moulding material
    • B29K2027/12Use of polyvinylhalogenides or derivatives thereof as moulding material containing fluorine
    • B29K2027/18PTFE, i.e. polytetrafluorethene, e.g. ePTFE, i.e. expanded polytetrafluorethene

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

The invention belongs to the steel composite technology such as steel lining tetrafluoro cage hoop fields, the steel combination process such as especially a kind of steel lining tetrafluoro cage hoop, it falls off for existing PTFE lining, play flat, the dilatancy problem of drum suction, it is comprised the following steps that, molding, again by hydraulic pressure interface pressure water injection into workpiece shell, pressure is set to reach the peak of setting, and pressure will be kept 3-4 hours;Intumescent filler object, then polytetrafluoroethylene (PTFE) powder is injected between the gap in S6;Sintering, shove charge sintering;It is preheated 6 hours in furnace, polytetrafluoroethylene ethylene layer is made to reach synchronous thermal change coefficient with metalwork, gradually heated up, temperature-rise period slowly will be carried out orderly, finally reach 385 degrees Celsius, keep the temperature 6 hours, and then cooling slowly stage by stage is sintered overall process 36 hours.The present invention passes through the steel lining tetrafluoro cage hoop pipe-line equipment of equal steel combination process production, and anticorrosion effect is good, and composite effect is good, will not Automatic-falling, will not more play drum and inhale flat, dilatancy.

Description

A kind of steel combination process such as steel lining tetrafluoro cage hoop
Technical field
The present invention relates to the steel composite technology fields such as steel lining tetrafluoro cage hoop more particularly to a kind of steel lining tetrafluoro cage hoop etc. Steel combination process.
Background technique
Deep-etching, high/low temperature and the special pipeline of negative pressure area, need corrosion-resistant, high temperature resistance pipeline, existing Pipeline integraty is poor, and internal anti-corrosion layer adsorption capacity is weak;Polytetrafluoroethylene (PTFE) (is abbreviated as PTFE), commonly referred to as " not snearing Layer " or " material easy to clean ".This material has the characteristics that antiacid alkali resistant, resists various organic solvents, is practically insoluble in all Solvent.Meanwhile polytetrafluoroethylene (PTFE) has the characteristics that resistant to high temperature, its coefficient of friction is extremely low, so after lubricating action being made, also Become the ideal coating of water pipe internal layer easy to clean.
How polytetrafluoroethylene (PTFE) to be served as a contrast on the inner wall of steel pipe, moreover it is possible to adapt in positive/negative-pressure, high-temperature, deep-etching, quenching It is used under shock heating or hot and cold alternation adverse circumstances, not will lead to PTFE lining and fall off, play phenomena such as flat drum suction, dilatancy, The present invention proposes that the steel such as implementation are compound on the basis of molding, handled by internal structure, enhances adhesive force, lining structure increases Steel band makes it while equal steel are compound, steel modeling adhesive strength is substantially increased, for this purpose, the present invention proposes a kind of steel lining tetrafluoro The steel combination process such as cage hoop.
Summary of the invention
A kind of steel combination process such as steel lining tetrafluoro cage hoop proposed by the present invention solve existing PTFE lining and fall off, play drum Inhale flat, dilatancy problem.
To achieve the goals above, present invention employs following technical solutions:
A kind of steel combination process such as steel lining tetrafluoro cage hoop, comprise the following steps that,
S1, shell production make workpiece shell, rubber inner membrance and qualitative internal model according to the geometry of workpiece;
S2 makes cage hoop, prepares the cyclic annular steel plate to match with workpiece inner walls, in the peripheral surface etc. of cyclic annular steel plate Distance offers aperture;
S3, will be on the equidistant inner wall for being welded on workpiece shell of multiple cyclic annular steel plates;
S4 is examined for the first time, and welding makes standard, strict control production process according to high-pressure bottle;
S5, sandblasting, any shell and the component for needing Fluorine-lined, it is necessary to before Fluorine-lined, blasting treatment is carried out to metal surface, Grease on cleared all metal surfaces, oxide skin, corrosion product and all sundries reach metal surface without any visible residual Object is presented uniform metal true qualities, and has roughness, should reach in HGJ34-90Technical requirements standard, metal Shell can reach lining construction requirement;
S6, assembling, workpiece shell, rubber inner membrance and qualitative internal model is assembled together, then gets up with workpiece overall package, root It is calculated according to thickness requirements, has spacing between workpiece shell and workpiece, polytetrafluoroethylene (PTFE) powder is uniformly added between gap;
S7, molding, then by hydraulic pressure interface pressure water injection into workpiece shell, pressure carries out stage by stage, to make polytetrafluoro Gas in ethylene powder is gradually discharged, and so that pressure is reached the peak of setting, and pressure will be kept 3-4 hours;
S8, second of inspection of semifinished product, tests to semi-finished product after pressure release, including density, thickness and electric spark leak hunting It examines, is reloaded into rubber inner membrance and qualitative internal model;
S9, intumescent filler object, then polytetrafluoroethylene (PTFE) powder is injected between the gap in S6;
S10, sintering, shove charge sintering;It is preheated 6 hours in furnace, polytetrafluoroethylene ethylene layer is made to reach synchronous thermal change system with metalwork Number, is gradually being heated up, and temperature-rise period slowly will be carried out orderly, finally reaches 385 degrees Celsius, keeps the temperature 6 hours, then slowly Cooling stage by stage is sintered overall process 36 hours;
S11, turning sealing surface remove mold, then carry out finished product treatment, flange sealing surface polytetrafluoroethylene ethylene layer vehicle It cuts, electricity consumption Spark plug optical fiber sensor instrument carries out micropore detection to backing layer, detects mass defect, is exported according to teflon lined thickness Voltage 20kV-30kV, probe moves above speed in corrosion protective lining layer and detects no more than 100mm/s, not puncture as qualification, inspection It tests qualified product and carries out metal shell spray painting processing, then tested by quality department to finished product, finished product qualification wrap It is packed into library.
Preferably, in the S3, it will be pre-filled with tetrafluoro powder in the aperture of cyclic annular steel plate, it is attached to form polytetrafluoroethylene (PTFE) Layer.
Preferably, in the S7, using hydraulic press pressure water injection, make membrane swelling in internal rubber, pressure to 10MPa- 22MPa;Under pressure, make to reach 2.16-2.27g/cm3Density and form.
Preferably, in the S11, according to tetrafluoro liner thickness output voltage 25kV, probe moves on corrosion protective lining layer Dynamic speed 50mm/s detection.
Preferably, in the S7, using hydraulic press pressure water injection, make membrane swelling in internal rubber, pressure to 18MPa;? Under pressure effect, make to reach 2.20g/cm3Density and form.
A kind of steel lining tetrafluoro cage hoop pipe-line equipment, including pipe-line equipment main body, the both ends outer wall of the pipe-line equipment main body On be welded with connecting flange, the pipe-line equipment main body includes stainless-steel pipe, along pipe-line equipment main body length direction and It is equidistant on the inner wall of stainless-steel pipe to be welded with multiple cage hoop steels, and cage hoop steel banded structure annular in shape, it is described The inner wall of cage hoop steel is circumferentially equidistant from aperture is equipped with, and is filled with the attached layer of polytetrafluoroethylene (PTFE) in the aperture, is located at polytetrafluoroethyl-ne Polytetrafluoroethylene (PTFE) lining is provided on the inner wall of the stainless-steel pipe of the attached layer of alkene and cage hoop iron belt surface.
Preferably, the central axis of the cage hoop steel and stainless-steel pipe is on same central axis, cage hoop iron The outer wall of band is welded on the inner wall of stainless-steel pipe.
Preferably, the outer wall two sides of the pipe-line equipment main body are welded with saddle.
Preferably, nameplate is fixed with by screw in the middle part of the outer wall of the pipe-line equipment main body.
Preferably, the outer wall of the connecting flange is circumferentially equidistant from equipped with mounting hole.
Compared with prior art, it the beneficial effects of the present invention are: making mold using geometrical principle, reserves and needs lining thick PTFE powder is uniformly put into, is pressurizeed using hydraulic press by the gap of degree, expands internal rubber mold, pressure to 10MPa- 22MPa.Under pressure, the gas in PTFE powder is discharged, and reaches 2.16-2.27/m3Density and form, thus It superior can achieve the effect that impermeabilisation, high temperature and high pressure;Under the action of high temperature, PTFE molecular structure is made to combine closely;It is high The lower rubber inner membrance automatic expansion of temperature, in combination with the anti-expansive force of PTFE itself, the secondary compression of workpiece lining, while in high temperature PTFE is in a molten state, and PTFE molecular structure in a molten state is made to combine closely, while being compounded in one with cyclic annular steel plate It rises, so that reaching steel moulds integrated effect, it is even closer compound with shell to make PTFE, to reach the effect of high temperature resistant vacuum Fruit, by the steel lining tetrafluoro cage hoop pipe-line equipment of equal steel combination process production, anticorrosion effect is good, and composite effect is good, will not be certainly It is dynamic to fall off, it will not more play drum and inhale flat, dilatancy.
Detailed description of the invention
Fig. 1 is a kind of tooling structural map of the steel combination process such as steel lining tetrafluoro cage hoop proposed by the present invention;
Fig. 2 is a kind of structural schematic diagram of steel lining tetrafluoro cage hoop pipe-line equipment proposed by the present invention;
Fig. 3 is the enlarged drawing of part A in Fig. 2;
Fig. 4 is the structural schematic diagram of cage hoop steel in a kind of steel lining tetrafluoro cage hoop pipe-line equipment proposed by the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-4, the steel combination process such as a kind of steel lining tetrafluoro cage hoop, comprises the following steps that,
S1, shell production make workpiece shell, rubber inner membrance and qualitative internal model according to the geometry of workpiece;
S2 makes cage hoop, prepares the cyclic annular steel plate to match with workpiece inner walls, in the peripheral surface etc. of cyclic annular steel plate Distance offers aperture;
S3, will be on the equidistant inner wall for being welded on workpiece shell of multiple cyclic annular steel plates;
S4 is examined for the first time, and welding makes standard, strict control production process according to high-pressure bottle;
S5, sandblasting, any shell and the component for needing Fluorine-lined, it is necessary to before Fluorine-lined, blasting treatment is carried out to metal surface, Grease on cleared all metal surfaces, oxide skin, corrosion product and all sundries reach metal surface without any visible residual Object is presented uniform metal true qualities, and has roughness, should reach in HGJ34-90Technical requirements standard, metal Shell can reach lining construction requirement;
S6, assembling, workpiece shell, rubber inner membrance and qualitative internal model is assembled together, then gets up with workpiece overall package, root It is calculated according to thickness requirements, has spacing between workpiece shell and workpiece, polytetrafluoroethylene (PTFE) powder is uniformly added between gap;
S7, molding, then by hydraulic pressure interface pressure water injection into workpiece shell, pressure carries out stage by stage, to make polytetrafluoro Gas in ethylene powder is gradually discharged, and so that pressure is reached the peak of setting, and pressure will be kept 3-4 hours;
S8, second of inspection of semifinished product, tests to semi-finished product after pressure release, including density, thickness and electric spark leak hunting It examines, is reloaded into rubber inner membrance and qualitative internal model;
S9, intumescent filler object, then polytetrafluoroethylene (PTFE) powder is injected between the gap in S6;
S10, sintering, shove charge sintering;It is preheated 6 hours in furnace, polytetrafluoroethylene ethylene layer is made to reach synchronous thermal change system with metalwork Number, is gradually being heated up, and temperature-rise period slowly will be carried out orderly, finally reaches 385 degrees Celsius, keeps the temperature 6 hours, then slowly Cooling stage by stage is sintered overall process 36 hours;
S11, turning sealing surface remove mold, then carry out finished product treatment, flange sealing surface polytetrafluoroethylene ethylene layer vehicle It cuts, electricity consumption Spark plug optical fiber sensor instrument carries out micropore detection to backing layer, detects mass defect, is exported according to teflon lined thickness Voltage 20kV-30kV, probe moves above speed in corrosion protective lining layer and detects no more than 100mm/s, not puncture as qualification, inspection It tests qualified product and carries out metal shell spray painting processing, then tested by quality department to finished product, finished product qualification wrap It is packed into library.
In present embodiment, in the S3, it will be pre-filled with tetrafluoro powder in the aperture of cyclic annular steel plate, form polytetrafluoro The attached layer of ethylene.
In present embodiment, in the S7, using hydraulic press pressure water injection, make membrane swelling in internal rubber, pressure is extremely 10MPa-22MPa;Under pressure, make to reach 2.16-2.27g/cm3Density and form.
In present embodiment, in the S11, according to tetrafluoro liner thickness output voltage 25kV, pop one's head in corrosion protective lining layer Move above speed 50mm/s detection.
In present embodiment, in the S7, using hydraulic press pressure water injection, make membrane swelling in internal rubber, pressure is extremely 18MPa;Under pressure, make to reach 2.20g/cm3Density and form.
A kind of steel lining tetrafluoro cage hoop pipe-line equipment, including pipe-line equipment main body 1, outside the both ends of the pipe-line equipment main body 1 Connecting flange 2 is welded on wall, the pipe-line equipment main body 1 includes stainless-steel pipe 101, along the length of pipe-line equipment main body 1 Degree direction and be located at it is equidistant on the inner wall of stainless-steel pipe 101 be welded with multiple cage hoop steels 102, and cage hoop steel 102 is in Cyclic annular banded structure, the inner wall of the cage hoop steel 102 is circumferentially equidistant from aperture 103 is equipped with, and is filled in the aperture 103 poly- The attached layer 104 of tetrafluoroethene, on the inner wall of the stainless-steel pipe 101 on the attached layer 104 of polytetrafluoroethylene (PTFE) and 102 surface of cage hoop steel It is provided with polytetrafluoroethylene (PTFE) lining 105.
In present embodiment, the central axis of the cage hoop steel 102 and stainless-steel pipe 101 is in same central axis On line, the outer wall of cage hoop steel 102 is welded on the inner wall of stainless-steel pipe 101.
In present embodiment, the outer wall two sides of the pipe-line equipment main body 1 are welded with saddle 3.
In present embodiment, nameplate 4 is fixed with by screw in the middle part of the outer wall of the pipe-line equipment main body 1.
In present embodiment, the outer wall of the connecting flange 2 is circumferentially equidistant from equipped with mounting hole.
In the use of the present invention, making mold using geometrical principle, the gap for needing liner thickness is reserved, by PTFE powder Uniformly distributed investment, is pressurizeed using hydraulic press, expands internal rubber mold, pressure to 10MPa-22MPa.Under pressure, make Gas discharge in PTFE powder, and reach 2.16-2.27/m3Density and form, reach impermeabilisation, height so as to superior The effect of mild high pressure;Under the action of high temperature, PTFE molecular structure is made to combine closely;Rubber inner membrance automatic expansion under high temperature, In combination with the anti-expansive force of PTFE itself, the secondary compression of workpiece lining, while the PTFE in high temperature is in a molten state, makes to locate It combines closely in the PTFE molecular structure of molten condition, while being combined with each other with cyclic annular steel plate, to reach steel modeling integration Effect, it is even closer compound with shell to make PTFE, to achieve the effect that high temperature resistant vacuum, passes through equal steel combination process system The steel lining tetrafluoro cage banded penstock road of work, anticorrosion effect is good, and composite effect is good, will not Automatic-falling, will not more rise drum inhale it is flat, expansion Deformation.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (10)

1. steel combination process such as a kind of steel lining tetrafluoro cage hoops, which is characterized in that it comprises the following steps that,
S1, shell production make workpiece shell, rubber inner membrance and qualitative internal model according to the geometry of workpiece;
S2 makes cage hoop, prepares the cyclic annular steel plate to match with workpiece inner walls, equidistant in the peripheral surface of cyclic annular steel plate Offer aperture;
S3, will be on the equidistant inner wall for being welded on workpiece shell of multiple cyclic annular steel plates;
S4 is examined for the first time, and welding makes standard, strict control production process according to high-pressure bottle;
S5, sandblasting, any shell and the component for needing Fluorine-lined, it is necessary to before Fluorine-lined, blasting treatment is carried out to metal surface, it is cleared Grease on all metal surfaces, oxide skin, corrosion product and all sundries reach metal surface without any visible residue, Uniform metal true qualities are presented, and have roughness, should reach in HGJ34-90Technical requirements standard, metal-back Body can reach lining construction requirement;
S6, assembling, workpiece shell, rubber inner membrance and qualitative internal model is assembled together, then gets up with workpiece overall package, according to thickness Degree demand calculates, and has spacing between workpiece shell and workpiece, polytetrafluoroethylene (PTFE) powder is uniformly added between gap;
S7, molding, then by hydraulic pressure interface pressure water injection into workpiece shell, pressure carries out stage by stage, to make polytetrafluoroethylene (PTFE) Gas in powder is gradually discharged, and so that pressure is reached the peak of setting, and pressure will be kept 3-4 hours;
S8, second of inspection of semifinished product, tests to semi-finished product after pressure release, including density, thickness and electric spark leak hunting inspection, It is reloaded into rubber inner membrance and qualitative internal model;
S9, intumescent filler object, then polytetrafluoroethylene (PTFE) powder is injected between the gap in S6;
S10, sintering, shove charge sintering;It is preheated 6 hours in furnace, polytetrafluoroethylene ethylene layer is made to reach synchronous thermal change coefficient with metalwork, It is gradually heated up, temperature-rise period slowly will be carried out orderly, finally reach 385 degrees Celsius, keep the temperature 6 hours, then slowly sublevel The cooling of section is sintered overall process 36 hours;
S11, turning sealing surface remove mold, then carry out finished product treatment, flange sealing surface polytetrafluoroethylene ethylene layer turning, use Electric spark detector carries out micropore detection to backing layer, mass defect is detected, according to teflon lined thickness output voltage 20kV-30kV, probe move above speed in corrosion protective lining layer and detect no more than 100mm/s, not puncture as qualification, examine and close The product of lattice carries out metal shell spray painting processing, then is tested by quality department to finished product, and finished product qualification be packaged into Library.
2. steel combination process such as a kind of steel lining tetrafluoro cage hoops according to claim 1, which is characterized in that, will in the S3 It is pre-filled with tetrafluoro powder in the aperture of cyclic annular steel plate, forms the attached layer of polytetrafluoroethylene (PTFE).
3. steel combination process such as a kind of steel lining tetrafluoro cage hoops according to claim 1, which is characterized in that in the S7, make With hydraulic press pressure water injection, make membrane swelling in internal rubber, pressure to 10MPa-22MPa;Under pressure, make to reach 2.16-2.27g/cm3Density and form.
4. steel combination process such as a kind of steel lining tetrafluoro cage hoops according to claim 1, which is characterized in that in the S11, root According to tetrafluoro liner thickness output voltage 25kV, probe moves above speed 50mm/s detection in corrosion protective lining layer.
5. steel combination process such as a kind of steel lining tetrafluoro cage hoops according to claim 3, which is characterized in that in the S7, make With hydraulic press pressure water injection, make membrane swelling in internal rubber, pressure to 18MPa;Under pressure, make to reach 2.20g/cm3 Density and form.
6. a kind of steel lining tetrafluoro cage hoop pipe-line equipment, which is characterized in that including pipe-line equipment main body (1), the pipe-line equipment master It being welded on the both ends outer wall of body (1) connecting flange (2), the pipe-line equipment main body (1) includes stainless-steel pipe (101), It is equidistant on length direction along pipe-line equipment main body (1) and the inner wall positioned at stainless-steel pipe (101) to be welded with multiple cage hoops Steel band (102), and cage hoop steel (102) banded structure annular in shape, the inner wall of the cage hoop steel (102) are circumferentially equidistant from being equipped with Aperture (103) is filled with the attached layer of polytetrafluoroethylene (PTFE) (104) in the aperture (103), be located at the attached layer of polytetrafluoroethylene (PTFE) (104) and Polytetrafluoroethylene (PTFE) lining (105) are provided on the inner wall of the stainless-steel pipe (101) on cage hoop steel (102) surface.
7. a kind of steel lining tetrafluoro cage hoop pipe-line equipment according to claim 6, which is characterized in that the cage hoop steel (102) it is on same central axis with the central axis of stainless-steel pipe (101), the outer wall welding of cage hoop steel (102) On the inner wall of stainless-steel pipe (101).
8. a kind of steel lining tetrafluoro cage hoop pipe-line equipment according to claim 6, which is characterized in that the pipe-line equipment main body (1) outer wall two sides are welded with saddle (3).
9. a kind of steel lining tetrafluoro cage hoop pipe-line equipment according to claim 6, which is characterized in that the pipe-line equipment main body (1) nameplate (4) are fixed with by screw in the middle part of outer wall.
10. a kind of steel lining tetrafluoro cage hoop pipe-line equipment according to claim 6, which is characterized in that the connecting flange (2) Outer wall it is circumferentially equidistant from be equipped with mounting hole.
CN201811388122.7A 2018-11-21 Steel lining tetrafluoro cage hoop and other steel compounding process Active CN109648768B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811388122.7A CN109648768B (en) 2018-11-21 Steel lining tetrafluoro cage hoop and other steel compounding process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811388122.7A CN109648768B (en) 2018-11-21 Steel lining tetrafluoro cage hoop and other steel compounding process

Publications (2)

Publication Number Publication Date
CN109648768A true CN109648768A (en) 2019-04-19
CN109648768B CN109648768B (en) 2024-05-31

Family

ID=

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110815683A (en) * 2019-10-18 2020-02-21 温州大学 PTFE composite grid plate
CN110884012A (en) * 2019-11-28 2020-03-17 浙江特塑龙化工设备有限公司 Die pressing grid plate manufacturing process
CN112893837A (en) * 2021-01-20 2021-06-04 陈烈 Method for manufacturing high-pressure-resistant and negative-pressure-resistant lining of composite steel mesh
CN114571649A (en) * 2022-03-11 2022-06-03 北京玻钢院复合材料有限公司 Rapid pressing method for integrally formed heat-proof product with large length-diameter ratio heat-proof layer and metal piece for aerospace vehicle and product thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4913951A (en) * 1988-07-26 1990-04-03 Garlock Inc. Fabrication of reinforced PTFE gasketing material
JPH0971908A (en) * 1995-06-30 1997-03-18 Yoshiyuki Ogushi Bridge pier structure
JP2004205020A (en) * 2002-12-26 2004-07-22 Ise Kogyo:Kk Regenerative working method for steel pipe by stainless steel plate
JP2005226819A (en) * 2004-02-13 2005-08-25 Intes Co Ltd Construction method for lining inner surface of existing pipe
CN105003751A (en) * 2015-07-20 2015-10-28 潍坊亿斯特管业科技有限公司 Inside-epoxy outside-3PE corrosion-preventing pipeline with inner corrosion-preventing layer free of repairing after welding and manufacturing process of inside-epoxy outside-3PE corrosion-preventing pipeline
CN105240627A (en) * 2015-09-18 2016-01-13 南京联众建设工程技术有限公司 Prefabricated assembled steel-concrete composite steel pipe and a manufacturing method thereof
CN108644512A (en) * 2018-07-09 2018-10-12 南京氟源化工管道设备有限公司 A kind of steel lining polytetrafluoroethylene tee and its mould pressing process
CN108644515A (en) * 2018-07-09 2018-10-12 南京氟源化工管道设备有限公司 A kind of steel lining polytetrafluoroethylene (PTFE) bend pipe and its mould pressing process
CN209146601U (en) * 2018-11-21 2019-07-23 江苏宣臻防腐工程有限公司 A kind of steel lining tetrafluoro cage hoop pipe-line equipment

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4913951A (en) * 1988-07-26 1990-04-03 Garlock Inc. Fabrication of reinforced PTFE gasketing material
JPH0971908A (en) * 1995-06-30 1997-03-18 Yoshiyuki Ogushi Bridge pier structure
JP2004205020A (en) * 2002-12-26 2004-07-22 Ise Kogyo:Kk Regenerative working method for steel pipe by stainless steel plate
JP2005226819A (en) * 2004-02-13 2005-08-25 Intes Co Ltd Construction method for lining inner surface of existing pipe
CN105003751A (en) * 2015-07-20 2015-10-28 潍坊亿斯特管业科技有限公司 Inside-epoxy outside-3PE corrosion-preventing pipeline with inner corrosion-preventing layer free of repairing after welding and manufacturing process of inside-epoxy outside-3PE corrosion-preventing pipeline
WO2017012131A1 (en) * 2015-07-20 2017-01-26 潍坊亿斯特管业科技有限公司 Anticorrosive pipeline having inner epoxy and outer 3pe without inner anticorrosive layer repairing after welding and preparation process therefor
CN105240627A (en) * 2015-09-18 2016-01-13 南京联众建设工程技术有限公司 Prefabricated assembled steel-concrete composite steel pipe and a manufacturing method thereof
CN108644512A (en) * 2018-07-09 2018-10-12 南京氟源化工管道设备有限公司 A kind of steel lining polytetrafluoroethylene tee and its mould pressing process
CN108644515A (en) * 2018-07-09 2018-10-12 南京氟源化工管道设备有限公司 A kind of steel lining polytetrafluoroethylene (PTFE) bend pipe and its mould pressing process
CN209146601U (en) * 2018-11-21 2019-07-23 江苏宣臻防腐工程有限公司 A kind of steel lining tetrafluoro cage hoop pipe-line equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110815683A (en) * 2019-10-18 2020-02-21 温州大学 PTFE composite grid plate
CN110884012A (en) * 2019-11-28 2020-03-17 浙江特塑龙化工设备有限公司 Die pressing grid plate manufacturing process
CN112893837A (en) * 2021-01-20 2021-06-04 陈烈 Method for manufacturing high-pressure-resistant and negative-pressure-resistant lining of composite steel mesh
CN112893837B (en) * 2021-01-20 2022-08-26 陈烈 Method for manufacturing high-pressure-resistant and negative-pressure-resistant lining of composite steel mesh
CN114571649A (en) * 2022-03-11 2022-06-03 北京玻钢院复合材料有限公司 Rapid pressing method for integrally formed heat-proof product with large length-diameter ratio heat-proof layer and metal piece for aerospace vehicle and product thereof
CN114571649B (en) * 2022-03-11 2024-03-08 北京玻钢院复合材料有限公司 Method for rapidly pressing heat-proof product formed by integrally forming heat-proof layer with metal piece and large length-diameter ratio for aerospace vehicle and heat-proof product formed by integrally forming heat-proof layer with metal piece

Similar Documents

Publication Publication Date Title
CN106903901B (en) Low temperature-resistanflexible flexible connector forming method for solid propellant rocket
CN203099209U (en) Gas pipeline leakage gap isobaric electric hot melting plugging mechanism
CN112108840A (en) Manufacturing method of light truck 80L compressed natural gas normal-temperature high-pressure gas cylinder
CN106002103B (en) The forming method of iron-base superalloy flow splitter
CN203532027U (en) Welding-free screw seal type catalytic silencer
CN109648768A (en) A kind of steel combination process such as steel lining tetrafluoro cage hoop
CN112077324A (en) Horizontal extrusion integrated sheath for powder high-temperature alloy and manufacturing method thereof
CN103817488A (en) Method for processing butterfly-shaped sealing head
CN105921589A (en) Manufacturing method of bimetal composite pipe with uniformly deformed whole pipe body
CN104948901A (en) Manufacturing method of high-temperature and high-pressure gas cylinder with thin-wall metal lining structure
CN112590092A (en) Pipeline polytetrafluoroethylene lining isobaric preparation process
CN109648768B (en) Steel lining tetrafluoro cage hoop and other steel compounding process
CN204729782U (en) A kind of heavy caliber steel pipe fittings
CN105864427A (en) Ultrahigh pressure container and manufacturing method
CN110792529A (en) Solid rocket engine front head inner heat insulation layer and forming method thereof
CN107695154B (en) Method for improving high-temperature internal pressure forming qualification rate of aluminum alloy cylinder
CN206429652U (en) The special sealing ring of dry coke quenching bottom hopper
CN111844833A (en) Manufacturing process of internal and external anti-corrosion polytetrafluoroethylene pipe fitting
CN216280029U (en) Tight lining polytetrafluoroethylene metal bellows compensator and manufacturing device thereof
CN210154938U (en) Steam heater pressure testing auxiliary device
CN110927059A (en) Rubber adhesion detection method
CN104259244A (en) Forming process of Nb pipes
CN102628151A (en) Zirconium plate flange production method
WO2023039932A1 (en) Method for calculating diameter reduction amount of fluorosilicone-modified pert barrier liner pipe by using finite element algorithm
CN113062980B (en) PTFE lining pressure container and manufacturing method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant