CN109583792A - Informatization management and control method and system for static-dynamic risk of in-building project - Google Patents

Informatization management and control method and system for static-dynamic risk of in-building project Download PDF

Info

Publication number
CN109583792A
CN109583792A CN201811610701.1A CN201811610701A CN109583792A CN 109583792 A CN109583792 A CN 109583792A CN 201811610701 A CN201811610701 A CN 201811610701A CN 109583792 A CN109583792 A CN 109583792A
Authority
CN
China
Prior art keywords
risk
under construction
project under
data
event
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811610701.1A
Other languages
Chinese (zh)
Inventor
梁伟
施钟淇
周英平
谭朝勋
金典琦
张勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Technology Institute of Urban Public Safety Co Ltd
Original Assignee
Shenzhen Technology Institute of Urban Public Safety Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Technology Institute of Urban Public Safety Co Ltd filed Critical Shenzhen Technology Institute of Urban Public Safety Co Ltd
Priority to CN201811610701.1A priority Critical patent/CN109583792A/en
Publication of CN109583792A publication Critical patent/CN109583792A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of risk early warning, in particular to a static-dynamic risk informatization management and control method and system for an in-construction project. The method comprises the following steps: risk identification, risk informatization, risk prompt and risk early warning. The on-construction static-dynamic risk informatization management and control system carries out risk identification in a construction preparation stage, carries out static risk assessment according to a risk identification result, and carries out informatization on the risk identification result and the static risk assessment result; in the construction stage, risk prompt and dynamic risk early warning are carried out by combining field monitoring data on the basis of an informationized risk identification result and a risk evaluation result, so that the risk evaluation datamation, automation, indexing, quantification and standardization are realized.

Description

Project under construction static state-dynamic risk informationization management-control method and system
Technical field
The present invention relates to Risk-warning technical fields, and in particular to a kind of project under construction static state-dynamic risk informationization pipe Control method and system.
Background technique
In the prior art, static risk assessment is general by the way of establishing Mathematic Model of Risk Evaluation, to each of identification Kind risk factors are assessed.Dynamic risk assessment is usually in practical projects, according to monitoring data and site operation personnel Micro-judgment, construction safety is largely determined by the experience level and sense of responsibility of site operation personnel.In the prior art Static risk evaluation process and dynamic risk evaluation process is opposite isolates.
Summary of the invention
It is an object of the invention in view of the above drawbacks of the prior art, provide a kind of project under construction static state-dynamic risk Information-based management-control method and system.
The present invention provides a kind of project under construction static state-dynamic risk informationization management-control methods, this method comprises:
Project under construction is analyzed, constructs multiple security risk events based on the analysis results for the project under construction, and Static risk assessment is carried out to the security risk event;
The security risk event and static risk assessment data are digitized, to establish vulnerability database, and Project under construction risk data dictionary is generated according to the security risk event and static risk assessment data;
Typing project under construction work information obtains applying for the project under construction according to the project under construction risk data dictionary Work progress and corresponding prompt information;
Typing and research and application data, obtain monitoring point of transfiniting, and are obtained according to the project under construction risk data dictionary super Limit the corresponding security risk event information in monitoring point.
Preferably, the step of described " constructing multiple security risk events based on the analysis results for the project under construction ", wraps It includes:
The risk source for identifying the project under construction building based on the analysis results, is divided at least one wind for each risk source Dangerous unit constructs at least one security risk event for each risk unit.
Preferably, described " project under construction risk to be generated according to the security risk event and static risk assessment data The step of data dictionary " includes:
Data are assessed according to the security risk event and static risk, security risk event is split into multiple bases Attribute data;
Corresponding association description information is added to each primary attribute data, to generate project under construction risk data dictionary.
Preferably, this method further include:
Data and monitoring data are assessed to the corresponding security risk in monitoring point of transfiniting according to the static risk for monitoring point of transfiniting Event carries out dynamic evaluation;
And/or obtain Correlation monitoring report and the video monitoring data for monitoring point of transfiniting;
And/or live inspection report is obtained and analyzes, exception monitoring point is obtained, according to the project under construction risk data Dictionary obtains the security risk event information of the exception monitoring point;
And/or by the construction speed of project under construction and correspond to prompt information and/or the corresponding security risk in monitoring point of transfiniting Event information carries out visualization and shows.
Preferably, the step of described " typing and research and application data, obtain monitoring point of transfiniting " includes:
Typing monitoring data calculate the aggregate-value of monitoring point and the rate of change of the last measurement according to monitoring data;
Judge whether the monitoring point meets default aggregate-value alert if according to the aggregate-value, when judging result is yes When, judge the monitoring point for monitoring point of transfiniting, and according to default aggregate-value alarm rule carry out warning note;
Judge whether the monitoring point meets default rate of change alarm according to the rate of change of the last measurement Condition, when the judgment result is yes, judge the monitoring point for monitoring point of transfiniting, and according to default rate of change alarm rule into Row warning note.
Preferably, described " according to the project under construction risk data dictionary obtain the project under construction construction speed and The step of corresponding risk information " includes:
The construction speed of the project under construction is obtained according to the project under construction risk data dictionary;
The corresponding security risk event of current construction speed is obtained, risk case list is established;
The static risk assessment data and pre- prevention and control of corresponding security risk event are obtained according to the risk case list Measure processed.
Preferably, described " the corresponding security risk in monitoring point that transfinites to be obtained according to the project under construction risk data dictionary The step of event information " includes:
The corresponding security risk event in monitoring point that transfinites is obtained according to the project under construction risk data dictionary, establishes early warning List;
The monitoring data of corresponding security risk event are obtained according to the early warning list;
It is for statistical analysis to the monitoring data of acquisition, obtain statistical result.
Preferably, this method further include:
The monitoring data of corresponding security risk event are obtained according to the risk case list.
Preferably, described " security risk of the exception monitoring point to be obtained according to the project under construction risk data dictionary The step of event information " includes:
The corresponding security risk event of exception monitoring point is obtained according to the project under construction risk data dictionary, establishes early warning List;
The monitoring data of corresponding security risk event are obtained according to the early warning list;
It is for statistical analysis to the monitoring data of acquisition, obtain statistical result.
The present invention also provides a kind of project under construction static state-dynamic risk informationization managing and control system, which includes:
Risk Identification module constructs based on the analysis results for the project under construction more for analyzing project under construction A security risk event, and static risk assessment is carried out to the security risk event;
Data dictionary module, for the security risk event and static risk assessment data to be digitized, and Project under construction risk data dictionary is generated according to the security risk event and static risk assessment data;
Vulnerability database, for storing the security risk event and static risk assessment data;
Indicating risk module is used for typing project under construction work information, is obtained according to the project under construction risk data dictionary Take the construction speed and corresponding prompt information of the project under construction;And
Risk-warning module obtains monitoring point of transfiniting, according to the project under construction wind for typing and research and application data Dangerous data dictionary obtains the corresponding security risk event information in monitoring point that transfinites.
Project under construction static state-dynamic risk informationization control and system of the invention carries out risk in the construction preproduction phase and distinguishes Know, static risk assessment is carried out according to Risk Identification result, and Risk Identification result and static risk assessment result are subjected to letter Breathization;In the construction stage, based on information-based Risk Identification result and risk evaluation result, in conjunction with field monitoring data into Row indicating risk and dynamic risk early warning, realize risk assessment data, automation, indexing, quantification and standardization.
Detailed description of the invention
Fig. 1 is project under construction static state-dynamic risk informationization management-control method flow chart of the embodiment of the present invention.
Fig. 2 be the embodiment of the present invention project under construction static state-dynamic risk informationization management-control method in analyze assessment models Hierarchical structure schematic diagram.
Fig. 3 is that data dictionary is illustrated in project under construction static state-dynamic risk informationization management-control method of the embodiment of the present invention Figure.
Fig. 4 is overload alarm rule in project under construction static state-dynamic risk informationization management-control method of the embodiment of the present invention Figure.
Fig. 5 is monitoring point surface chart in project under construction static state-dynamic risk informationization management-control method of the embodiment of the present invention.
Fig. 6 is that monitoring data summarize in project under construction static state-dynamic risk informationization management-control method of the embodiment of the present invention Display diagram.
Fig. 7 is that monitoring data summarize in project under construction static state-dynamic risk informationization management-control method of the embodiment of the present invention Display diagram.
Fig. 8 is data of monitoring point exhibition in project under construction static state-dynamic risk informationization management-control method of the embodiment of the present invention Diagram.
Fig. 9 is project under construction static state-dynamic risk informationization management-control method risk warning information of the embodiment of the present invention Send figure.
Figure 10 is project under construction static state-dynamic risk informationization managing and control system functional block diagram of the embodiment of the present invention.
Figure 11 is project under construction static state-dynamic risk informationization managing and control system hardware configuration frame of the embodiment of the present invention Figure.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawing and specific implementation Invention is further described in detail for example.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, It is not intended to limit the present invention.
In order to keep the narration of this disclosure more detailed with it is complete, below for embodiments of the present invention and specific real It applies example and proposes illustrative description;But this not implements or uses the unique forms of the specific embodiment of the invention.Embodiment In cover multiple specific embodiments feature and to construction with operate these specific embodiments method and step it is suitable with it Sequence.However, can also reach identical or impartial function and sequence of steps using other specific embodiments.
Project under construction static state-dynamic risk informationization management-control method of the embodiment of the present invention is firstly, in the construction preproduction phase Risk Identification is carried out, and static risk assessment is carried out according to Risk Identification result;Then by Risk Identification result and static risk Assessment result carries out information-based;Finally, in the construction stage, using information-based Risk Identification result and risk evaluation result as base Plinth carries out indicating risk and dynamic risk early warning in conjunction with field monitoring data.
Fig. 1 is according to a kind of project under construction static state-dynamic risk informationization management-control method shown in the embodiment of the present invention Flow chart, refering to Figure 1, the project under construction static state-dynamic risk informationization management-control method includes:
S101 analyzes project under construction, constructs multiple security risk events based on the analysis results for the project under construction, And static risk assessment is carried out to the security risk event.
S102 digitizes the security risk event and static risk assessment data, to establish vulnerability database, And project under construction risk data dictionary is generated according to the security risk event and static risk assessment data.
S103, typing project under construction work information obtain the project under construction according to the project under construction risk data dictionary Construction speed and corresponding prompt information.
S104, typing and research and application data, obtain monitoring point of transfiniting, and are obtained according to the project under construction risk data dictionary Transfinite the corresponding security risk event information in monitoring point.
In step s101, firstly, analyzing project under construction, project under construction building is identified based on the analysis results Each risk source is divided at least one risk unit by risk source, constructs at least one security risk for each risk unit Event.
Specifically, in Construction in Preparatory Stage, risk discrimination is carried out to Transportation Infrastructure Construction engineering, to historical risk number According to tentatively being concluded, analyzing and being arranged, so that risk source is obtained, for example, risk source can include but is not limited to: geology, ring Border, design, construction technology equipment and construction and management.Each risk source according to category division at several risk units, for example, Construction and management risk source can be divided into owner's risk administrative unit, construction party risk management unit, management side's risk pipe Manage unit, design side's risk management unit and material supply risk management unit.Several safety are constructed again for each risk unit Risk case, security risk event are that possible occur, influence the idol of engineering inherently safe and Environmental security in engineering construction Right sexual behavior part.
Specifically, please refer to shown in Fig. 2, establish step analysis assessment models, be divided into risk active layer, risk unit layer and Risk case layer, each risk unit layer include that at least one risk unit formed is divided by same risk source, each Risk case layer includes at least one security risk event for the building of same risk unit, and risk source is top layer's factor, wind Dangerous unit is middle layer factor, and security risk event is lowest level factor.For example, risk source A has k risk unit: wind Dangerous unit A1, risk unit A2 ..., risk unit Ak, risk unit A1 have t security risk event: security risk thing Part A11, security risk event A12 ..., security risk event A1t.Risk source B and risk source C are also similar setting.
Then, static evaluation is carried out to each security risk event, specifically, each safety is acquired using expert survey The evaluation data of risk case calculate the static risk index of security risk event, the evaluation data packet according to the evaluation data It includes probability of happening value and consequence value occurs.That is, needing the probability of happening value to security risk event and consequence value occurring It gives a mark, risk index=probability of happening value × generation consequence value of the security risk event, wherein probability of happening value is beaten Dividing includes 1,2,3,4 and 5 point, and the marking that consequence value occurs includes 1,2,3,4 and 5 point, the possibility occurrence of security risk event Higher, probability of happening value is higher;Consequence seriousness and influence property after the generation of security risk event is bigger, and consequence value occurs It is bigger.Risk index can be 1 to 25 natural number.Its static risk etc. is determined according to the risk index of the security risk event Grade.
It is commented finally, carrying out static risk to risk unit and risk source according to the static evaluation result of security risk event Estimate, the first step, is calculated by the static risk index and relative weighting of all security risk events of risk unit lower layer each The static risk index of risk unit determines its static risk grade according to the static risk index of the risk unit;Second step, The static risk of each risk source is calculated by the static risk index and relative weighting of all risk units of risk source lower layer Index determines its static risk grade according to the static risk index of the risk source.
Wherein, security risk event is to the relative weighting and risk unit of upper layer risk unit to upper layer risk source The calculating process of relative weighting is as follows:
S1011, two-by-two on more same level each factor importance, importance comparison result is according to Saaty1-9 scale Method is quantified, according to the quantitative values development of judgment matrix A=[a of importance comparison resultij] n × n, wherein i=1,2 ..., N, j=1,2 ..., n are the quantity of factor.
The judgment matrix is normalized in S1012, to obtain each factor to the relative weighting of upper layer factor ωi
S1013 calculates the maximum eigenvalue λ of the judgment matrixmax
S1014 carries out consistency check to the judgment matrix according to CR=CI/RI, whereinCI is Consistency check parameter, RI are Aver-age Random Consistency Index, and n is the matrix order of judgment matrix, and CR is that judgment matrix is consistent Sex rate, when CR is less than or equal to 0.1, the judgment matrix is with uniformity.
In step S1011, judge that factor compares the relative importance of its upper layer factor two-by-two on every level one by one The importance of each factor on same level quantifies importance comparison result according to table 1, to construct sentencing for each layer of factor Disconnected matrix.
1 factor important ratio of table is compared with score table
Specifically, judgment matrix A ginseng is shown in Table 2, and by taking a risk unit as an example, which has 8 peaces Full risk case.
2 judgment matrix of table
Event 1 Event 2 Event 3 Event 4 Event 5 Event 6 Event 7 Event 8
Event 1 a11 a12 a13 a14 a15 a16 a17 a18
Event 2 a21 a22 a23 a24 a25 a26 a27 a28
Event 3 a31 a32 a33 a34 a35 a36 a37 a38
Event 4 a41 a42 a43 a44 a45 a46 a47 a48
Event 5 a51 a52 a53 a54 a55 a56 a57 a58
Event 6 a61 a62 a63 a64 a65 a66 a67 a68
Event 7 a71 a72 a73 a74 a75 a76 a77 a78
Event 8 a81 a82 a83 a84 a85 a86 a87 a88
In step S1012, firstly, calculating the geometrical mean of every row all elements according to the judgment matrixWherein, aijFor the i-th row, jth column element in judgment matrix A, n is the quantity of factor;Then, according to The geometrical mean calculating of every row all elements calculates separately each factor to the relative weighting of upper layer factor
In step S1013, the maximum eigenvalue of judgment matrix
In step S1014, when CR is greater than 0.1, i.e., when judgment matrix does not have consistency, return step S1011, Again the importance comparison result is quantified, is adjusted with the consistency to judgment matrix, until CR is less than or equal to 0.1 Until.
Calculate the relative weighting ω of each security risk eventiAfterwards, risk unit DiFor the static risk index of corresponding i-th of security risk event of the risk unit.
Calculate the relative weighting ω ' of each risk unitiAfterwards, risk source EiFor the static risk index of corresponding i-th of the risk unit of the risk source.
In step s 102, the hierarchical model of above-mentioned steps building and static risk assessment data are digitized, is built Vertical vulnerability database, regenerates risk data dictionary, to be managed concentratedly.Specifically, the step of generating data dictionary is as follows:
Firstly, assessing data according to the security risk event and static risk, security risk event is split into multiple Primary attribute data;Then, corresponding association description information is added to each primary attribute data, to generate project under construction risk number According to dictionary.Wherein, primary attribute data include region, risk Source Type, risk source, risk factors, management and control measures, branch point One of item, risk case type or risk case are a variety of, please refer to shown in Fig. 3.
In a preferred embodiment, this method further includes following steps:
S105, by the construction speed of project under construction and corresponding prompt information and/or the corresponding security risk in monitoring point of transfiniting Event information carries out visualization and shows.
In step s 103, project under construction work information is building-site information, mainly includes construction speed information and applying Work information will be in the primary attribute data of the work information and project under construction risk data dictionary after typing work information Primary attribute data are matched, and association work information corresponds to the contents such as pile No., branch, subitem, risk source, obtain current working The corresponding construction speed of information and prompt information corresponding with current construction speed, the prompt information include different processes Job content, surrounding enviroment risk, in the construction process security risk event that may be present, potential security risk event it is quiet One of state risk assessment data or the Control Measure of potential security risk event are a variety of.
In a preferred embodiment, step S103 specifically comprises the following steps:
S1031 obtains the construction speed of the project under construction according to the project under construction risk data dictionary.
S1032 obtains the corresponding security risk event of current construction speed, establishes risk case list.
S1033, according to the static risk assessment data of the corresponding security risk event of risk case list acquisition and in advance Anti- control measure.
It please refers to shown in Fig. 6, in the current construction speed of the first level display, risk source risk case list.
In step S104, firstly, typing monitoring data, and monitoring data are analyzed, obtain monitoring point of transfiniting.Tool Body includes the following steps:
S1041, typing monitoring data calculate the aggregate-value of monitoring point and the variation of the last measurement according to monitoring data Rate.
S1042 judges whether the monitoring point meets default aggregate-value alert if according to the aggregate-value, when judging result is When being, judge the monitoring point for transfinite monitoring point and according to default aggregate-value alarm rule carry out warning note.
Aggregate-value threshold value is preset to the data of monitoring point, presetting aggregate-value alert if can be with are as follows: aggregate-value is greater than Or it is equal to 70% × aggregate-value threshold value, also, reach default aggregate-value alert and if be judged as monitoring point of transfiniting.Correspondingly, Default aggregate-value alarm rule can be with are as follows: aggregate-value is greater than or equal to 70% × aggregate-value threshold value and less than 80% × aggregate-value threshold When value, shown in systems in practice with yellow;Aggregate-value be greater than or equal to 80% × aggregate-value threshold value and less than 100% × When aggregate-value threshold value, shown in systems in practice with orange;When aggregate-value is greater than or equal to 100% × aggregate-value threshold value, It is shown in systems in practice with red;Further, when aggregate-value is less than 70% × aggregate-value threshold value, in systems in practice It is shown, is please referred to shown in Fig. 4 with blue.
S1043 judges whether the monitoring point meets default rate of change report according to the rate of change that the last time measures Alert condition, when the judgment result is yes, judge the monitoring point for transfinite monitoring point and according to default rate of change alarm rule into Row warning note.
Rate-valve value is preset to the data of monitoring point, presetting rate of change alert if can be with are as follows: the last time surveys The rate of change of amount is greater than or equal to rate-valve value, also, reaches default rate of change alert and if be judged as monitoring of transfiniting Point.Correspondingly, rate of change alarm rule is preset are as follows: when the rate of change of the last time measurement is greater than or equal to rate-valve value, Flashing is carried out to show;Further, it when the rate of change of the last measurement is less than rate-valve value, carries out being always on display, please join It reads shown in Fig. 4.
Further, two kinds of above-mentioned threshold values can controlling value and property right list according to as defined in design controlling value, specification The controlling value that position requires is set, and using the absolute value of controlling value when threshold calculations, and is arranged according to the actual situation positive and negative Number indicate direction, drawing/pressure etc., threshold value utilizes the selection of following formula:
{ controlling value as defined in design controlling value, specification, property right unit require (aggregate-value/rate of change) threshold value=min Controlling value }.
In addition, same monitoring measuring point may be simultaneously present, construction monitoring, third party monitoring, other monitor tripartite altogether and report and submit Data, transfinite judge when, should the data to each party judged respectively, determine alarm level, and will monitoring points According to being visualized.
For example, please referring to shown in Fig. 5, construction area surface subsidence monitoring point DBC-14-1, the aggregate-value of construction monitoring data Reach 90% (being shown as in systems in practice orange) of threshold value, rate of change reaches 107% (flashing display) of rate-valve value; 75% (being shown as yellow in systems in practice) rate of change that the aggregate-value of third party monitoring data reaches threshold value reaches rate 90% (being always on display) of threshold value;What the aggregate-value of other monitoring data reached threshold value 105% (is shown as red in systems in practice Color) rate of change reaches 93% (being always on display) of rate-valve value.So, aggregate-value is carried out according to other monitoring data red Alarm, carries out flashing according to the rate of change of construction monitoring data and shows, western seven area surface subsidence monitoring point DBC-14- of open excavation section 1 final display state is red alarm and flashes display.
Then, the corresponding security risk event information in monitoring point that transfinites is obtained according to the project under construction risk data dictionary.
Specifically, by the primary attribute in the primary attribute data of the monitoring point of transfiniting and project under construction risk data dictionary Data are matched, and the corresponding security risk event information in monitoring point that transfinites is associated with.Security risk event information may include peace Full risk case, security risk event static risk assessment data, all monitoring data of the security risk event or the peace One of all monitoring data statistical results of full risk case are a variety of.Further, the association for monitoring point of transfiniting is obtained Monitoring report and video monitoring data.
In a preferred embodiment, above-mentioned steps specifically include:
S1044 obtains the corresponding security risk event in monitoring point that transfinites according to the project under construction risk data dictionary, establishes Early warning list.
S1045 obtains the monitoring data of corresponding security risk event according to the early warning list.
S1046, it is for statistical analysis to the monitoring data of acquisition, obtain statistical result.
Further, in step S104, after typing monitoring data, for the risk case established in step S1032 List please refers to shown in Fig. 6, can execute following steps:
S1047 obtains the monitoring data of corresponding security risk event according to the risk case list.
It please refers to shown in Fig. 6, if there is risk case triggers, shows early warning list, while showing early warning risk case Count pie chart.It please referring to shown in Fig. 7, click checks that, into second-level menu, second level top is monitoring point overall distribution situation map, In conjunction with limit value, is shown by " blood orange champac " and (contain pie chart);Remaining is each monitoring project summary view (containing pie chart), with three-dimensional/two dimension Form shows to classification (sedimentation, deformation, water level etc.) change of sometime point (defaulting to the time that a newest data update) Shape figure, distribution map, polar plot etc. and Correlation monitoring report and video monitoring.It please refers to shown in Fig. 8, data of monitoring point provides Number list and figure two ways are shown.
In a preferred embodiment, the project under construction static state-dynamic risk informationization management-control method further includes as follows Step:
S106 obtains and analyzes live inspection report, exception monitoring point obtained, according to the project under construction risk data dictionary Obtain the security risk event information of the exception monitoring point.
S107 assesses data and monitoring data to transfiniting according to the static risk of transfinite monitoring point and/or exception monitoring point Monitoring point and/or the corresponding security risk event of exception monitoring point carry out dynamic evaluation.
In step s 106, firstly, the live inspection based on staff is reported, exception monitoring point is determined;Then, to different Normal monitoring point information extracts.Security risk event information may include security risk event, security risk event static state All monitoring data of risk assessment data, all monitoring data of the security risk event or the security risk event count knot One of fruit is a variety of.Further, Correlation monitoring report and the video monitoring data of exception monitoring point are obtained.
Specifically, the extraction step of above-mentioned exception monitoring point information includes:
Step S1061 obtains the corresponding security risk event of exception monitoring point according to the project under construction risk data dictionary, Establish early warning list.
Step S1062 obtains the monitoring data of corresponding security risk event according to the early warning list.
Step S1063, it is for statistical analysis to the monitoring data of acquisition, obtain statistical result.
In step s 107, by static risk assessment data in conjunction with monitoring data, to monitoring point and/or the abnormal prison of transfiniting The corresponding security risk event of measuring point carries out dynamic evaluation, sends risk assessment warning information according to dynamic evaluation data, will be each The dynamic risk grade of security risk event, each risk unit and each risk source reports to corresponding regulatory agency respectively, please refers to Shown in Fig. 9.
Dynamic risk evaluation process is as follows:
Firstly, according to monitoring data, to transfiniting monitoring point or the corresponding security risk event of exception monitoring point re-starts Risk assessment obtains the dynamic risk index of security risk event;The dynamic risk index of other security risk events is should The static risk index of security risk event.
Then, wind is calculated according to the dynamic risk index of the corresponding security risk event of each risk unit and relative weighting The dynamic risk index and risk class of dangerous unit.
Finally, according to the dynamic risk index of the corresponding risk unit of each risk source and relative weighting calculation risk source Dynamic risk index and risk class.
Specifically, after the dynamic risk index for calculating each security risk event, before the step of in counted Calculate the relative weighting ω of each security risk eventi, risk unit D′i For the dynamic risk index of corresponding i-th of security risk event of the risk unit.It has been calculated in front of the step of every The relative weighting ω ' of a risk uniti, risk source E′iFor the risk source pair The dynamic risk index for i-th of the risk unit answered.
Based on the same inventive concept, a kind of project under construction static state-dynamic risk information is additionally provided in the embodiment of the present invention Change managing and control system, such as the following examples.The original solved the problems, such as due to project under construction static state-dynamic risk informationization managing and control system Reason is similar to above-mentioned project under construction static state-dynamic risk informationization management-control method, therefore project under construction static state-dynamic risk letter The implementation of breathization managing and control system may refer to the implementation of above-mentioned project under construction static state-dynamic risk informationization management-control method, weight Multiple place repeats no more.Used below, either " submodule " or " module " predetermined function may be implemented in term " unit " Software and/or hardware combination.Although the functional module of mobile terminal described in following embodiment is preferably come with software It realizes, but the realization of the combination of hardware or software and hardware is also that may and be contemplated.
Figure 10 is the project under construction static state-dynamic risk informationization managing and control system of one embodiment provided by the invention The functional block diagram.The project under construction static state of the present embodiment-dynamic risk informationization managing and control system 100 includes: Risk Identification Module 10 constructs multiple security risk events based on the analysis results for analyzing project under construction for the project under construction, and Static risk assessment is carried out to the security risk event;Data dictionary module 20 is used for the security risk event and static state Risk assessment data is digitized, and generates project under construction wind according to the security risk event and static risk assessment data Dangerous data dictionary;Vulnerability database 30, for storing the security risk event and static risk assessment data;Indicating risk mould Block 40 is used for typing project under construction work information, the construction of the project under construction is obtained according to the project under construction risk data dictionary Progress and corresponding prompt information;First Risk-warning module 50 obtains monitoring point of transfiniting for typing and research and application data, The corresponding security risk event information in monitoring point that transfinites is obtained according to the project under construction risk data dictionary;Visualize module 60, for the construction speed of project under construction and the corresponding security risk event of corresponding prompt information and/or monitoring point of transfiniting to be believed Breath carries out visualization and shows;Second Risk-warning module 70 obtains exception monitoring for obtaining and analyzing live inspection report Point obtains the security risk event information of the exception monitoring point according to the project under construction risk data dictionary;Dynamic evaluation module 80, for the static risk assessment data and monitoring data according to transfinite monitoring point and/or exception monitoring point to monitoring point of transfiniting And/or the corresponding security risk event of exception monitoring point carries out dynamic evaluation.
Figure 11 is the signal of project under construction static state provided by the invention-dynamic risk informationization managing and control system hardware module Figure.The system 100 may include: processor 1001, such as CPU, communication bus 1002, memory 1003.
Wherein, communication bus 1002 is for realizing the connection communication between these components.Memory 1003 can be high speed RAM memory is also possible to stable memory (non-volatile memory), such as magnetic disk storage.Memory 1003 It optionally can also be the storage device independently of aforementioned processor 1001.
It, can be with it will be understood by those skilled in the art that the restriction of the not structure paired terminal of terminal structure shown in Figure 11 Including perhaps combining certain components or different component layouts than illustrating more or fewer components.
As shown in figure 11, as may include operating system in a kind of memory 1003 of computer storage medium and building Program is managed in engineering static state-dynamic risk informationization.Processor 1001 can be used for calling what is stored in memory 1003 building Program is managed in engineering static state-dynamic risk informationization, and is executed in project under construction static state-dynamic risk informationization management-control method Operating procedure.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of project under construction static state-dynamic risk informationization management-control method, which is characterized in that this method comprises:
Project under construction is analyzed, constructs multiple security risk events based on the analysis results for the project under construction, and to institute It states security risk event and carries out static risk assessment;
The security risk event and static risk assessment data are digitized, to establish vulnerability database, and according to The security risk event and static risk assessment data generate project under construction risk data dictionary;
Typing project under construction work information, according to the project under construction risk data dictionary obtain the construction of the project under construction into Degree and corresponding prompt information;
Typing and research and application data, obtain monitoring point of transfiniting, and obtain the prison that transfinites according to the project under construction risk data dictionary The corresponding security risk event information of measuring point.
2. project under construction static state according to claim 1-dynamic risk informationization management-control method, which is characterized in that described The step of " being based on the analysis results that the project under construction constructs multiple security risk events " includes:
The risk source for identifying the project under construction building based on the analysis results, is divided at least one risk list for each risk source Member constructs at least one security risk event for each risk unit.
3. project under construction static state according to claim 1-dynamic risk informationization management-control method, which is characterized in that described " according to the security risk event and static risk assessment data generate project under construction risk data dictionary " the step of include:
Data are assessed according to the security risk event and static risk, security risk event is split into multiple primary attributes Data;
Corresponding association description information is added to each primary attribute data, to generate project under construction risk data dictionary.
4. project under construction static state according to claim 1-dynamic risk informationization management-control method, which is characterized in that the party Method further include:
Data and monitoring data are assessed to the corresponding security risk event in monitoring point of transfiniting according to the static risk for monitoring point of transfiniting Carry out dynamic evaluation;
And/or obtain Correlation monitoring report and the video monitoring data for monitoring point of transfiniting;
And/or live inspection report is obtained and analyzes, exception monitoring point is obtained, according to the project under construction risk data dictionary Obtain the security risk event information of the exception monitoring point;
And/or by the construction speed of project under construction and correspond to prompt information and/or the corresponding security risk event in monitoring point of transfiniting Information carries out visualization and shows.
5. project under construction static state according to claim 1-dynamic risk informationization management-control method, which is characterized in that described The step of " typing and research and application data, obtain monitoring point of transfiniting " includes:
Typing monitoring data calculate the aggregate-value of monitoring point and the rate of change of the last measurement according to monitoring data;
Judge whether the monitoring point meets default aggregate-value alert if according to the aggregate-value, when the judgment result is yes, Judge the monitoring point for monitoring point of transfiniting, and according to default aggregate-value alarm rule carry out warning note;
Judge whether the monitoring point meets default rate of change alert if according to the rate of change of the last measurement, When the judgment result is yes, judge that the monitoring point for monitoring point of transfiniting, and is reported according to default rate of change alarm rule Alert prompt.
6. project under construction static state according to claim 1-dynamic risk informationization management-control method, which is characterized in that described The step of " construction speed of the project under construction is obtained according to the project under construction risk data dictionary and corresponds to risk information " Include:
The construction speed of the project under construction is obtained according to the project under construction risk data dictionary;
The corresponding security risk event of current construction speed is obtained, risk case list is established;
The static risk assessment data of corresponding security risk event are obtained according to the risk case list and prevention and control are arranged It applies.
7. project under construction static state according to claim 1-dynamic risk informationization management-control method, which is characterized in that described The step of " being transfinited the corresponding security risk event information in monitoring point according to project under construction risk data dictionary acquisition " includes:
The corresponding security risk event in monitoring point that transfinites is obtained according to the project under construction risk data dictionary, establishes early warning column Table;
The monitoring data of corresponding security risk event are obtained according to the early warning list;
It is for statistical analysis to the monitoring data of acquisition, obtain statistical result.
8. project under construction static state according to claim 7-dynamic risk informationization management-control method, which is characterized in that the party Method further include:
The monitoring data of corresponding security risk event are obtained according to the risk case list.
9. project under construction static state according to claim 4-dynamic risk informationization management-control method, which is characterized in that described The step of " the security risk event information of the exception monitoring point is obtained according to the project under construction risk data dictionary " includes:
The corresponding security risk event of exception monitoring point is obtained according to the project under construction risk data dictionary, establishes early warning column Table;
The monitoring data of corresponding security risk event are obtained according to the early warning list;
It is for statistical analysis to the monitoring data of acquisition, obtain statistical result.
10. a kind of project under construction static state-dynamic risk informationization managing and control system, which is characterized in that the system includes:
Risk Identification module constructs multiple peaces based on the analysis results for analyzing project under construction for the project under construction Full risk case, and static risk assessment is carried out to the security risk event;
Data dictionary module, for the security risk event and static risk assessment data to be digitized, and according to The security risk event and static risk assessment data generate project under construction risk data dictionary;
Vulnerability database, for storing the security risk event and static risk assessment data;
Indicating risk module is used for typing project under construction work information, obtains institute according to the project under construction risk data dictionary State the construction speed and corresponding prompt information of project under construction;And
Risk-warning module obtains monitoring point of transfiniting, according to the project under construction risk number for typing and research and application data The corresponding security risk event information in monitoring point that transfinites is obtained according to dictionary.
CN201811610701.1A 2018-12-27 2018-12-27 Informatization management and control method and system for static-dynamic risk of in-building project Pending CN109583792A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811610701.1A CN109583792A (en) 2018-12-27 2018-12-27 Informatization management and control method and system for static-dynamic risk of in-building project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811610701.1A CN109583792A (en) 2018-12-27 2018-12-27 Informatization management and control method and system for static-dynamic risk of in-building project

Publications (1)

Publication Number Publication Date
CN109583792A true CN109583792A (en) 2019-04-05

Family

ID=65932104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811610701.1A Pending CN109583792A (en) 2018-12-27 2018-12-27 Informatization management and control method and system for static-dynamic risk of in-building project

Country Status (1)

Country Link
CN (1) CN109583792A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110533276A (en) * 2019-07-12 2019-12-03 浙江电力建设工程咨询有限公司 Project of transmitting and converting electricity construction risk early warning system
CN113487212A (en) * 2021-06-07 2021-10-08 广联达科技股份有限公司 Risk monitoring method and device
CN115239039A (en) * 2021-04-23 2022-10-25 中国石油化工股份有限公司 Chemical device risk correction early warning method and device based on process safety indexes

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521709A (en) * 2011-12-22 2012-06-27 上海建科工程咨询有限公司 Building construction quality safety online risk management system
CN102521710A (en) * 2011-12-22 2012-06-27 上海建科工程咨询有限公司 Building construction quality safety online risk assessment system
CN106251085A (en) * 2016-08-10 2016-12-21 中交公局海威工程建设有限公司 A kind of methods of risk assessment and device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521709A (en) * 2011-12-22 2012-06-27 上海建科工程咨询有限公司 Building construction quality safety online risk management system
CN102521710A (en) * 2011-12-22 2012-06-27 上海建科工程咨询有限公司 Building construction quality safety online risk assessment system
CN106251085A (en) * 2016-08-10 2016-12-21 中交公局海威工程建设有限公司 A kind of methods of risk assessment and device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110533276A (en) * 2019-07-12 2019-12-03 浙江电力建设工程咨询有限公司 Project of transmitting and converting electricity construction risk early warning system
CN115239039A (en) * 2021-04-23 2022-10-25 中国石油化工股份有限公司 Chemical device risk correction early warning method and device based on process safety indexes
CN115239039B (en) * 2021-04-23 2023-06-30 中国石油化工股份有限公司 Chemical device risk correction early warning method and device based on process safety index
CN113487212A (en) * 2021-06-07 2021-10-08 广联达科技股份有限公司 Risk monitoring method and device

Similar Documents

Publication Publication Date Title
CN109583792A (en) Informatization management and control method and system for static-dynamic risk of in-building project
Chainey et al. When is a hotspot a hotspot? A procedure for creating statistically robust hotspot maps of crime
CN108275524B (en) A kind of elevator maintenance operation monitoring and guiding device based on the assessment of the first multi-view video series of operations
US20110213788A1 (en) Information fusion for multiple anomaly detection systems
Zhou et al. A hybrid approach for safety assessment in high-risk hydropower-construction-project work systems
CN110390465A (en) Air control analysis and processing method, device and the computer equipment of business datum
CN103413016B (en) A kind of aircaft configuration safe life based on test and use data fusion of being on active service determines method
US10437696B2 (en) Proactive information technology infrastructure management
CN104376400A (en) Risk assessment method based on fuzzy matrix and analytic hierarchy process
CN108470138A (en) Method for target detection and device
US10984518B2 (en) Methods and systems for assessing the quality of geospatial data
Chandler Distance sampling analysis in unmarked
CN113792453A (en) Partial discharge monitoring system, method and device based on digital twins
CN109858389A (en) Vertical ladder demographic method and system based on deep learning
US20170249559A1 (en) Apparatus and method for ensembles of kernel regression models
CN114997682B (en) Construction site safety monitoring system and method based on big data
CN107544460B (en) Consider the diagnosticability quantization method of spacecraft control non-fully failure of removal
US10295435B1 (en) Model-based damage detection technique for a structural system
CN111612346A (en) Fire safety monitoring method and device, computer equipment and storage medium
CN111898839A (en) Importance degree classification method and device for power consumers
CN111314173A (en) Monitoring information abnormity positioning method and device, computer equipment and storage medium
CN112766301A (en) Similarity judgment method for indicator diagram of oil extraction machine
CN111768022A (en) Equipment detection method and device for coal machine production equipment
CN114254879A (en) Multi-sensor information fusion power equipment safety diagnosis method and device
CN113823396A (en) Medical equipment management method and device, computer equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190405