CN109548161A - A kind of method, apparatus and terminal device of wireless resource scheduling - Google Patents

A kind of method, apparatus and terminal device of wireless resource scheduling Download PDF

Info

Publication number
CN109548161A
CN109548161A CN201811543040.5A CN201811543040A CN109548161A CN 109548161 A CN109548161 A CN 109548161A CN 201811543040 A CN201811543040 A CN 201811543040A CN 109548161 A CN109548161 A CN 109548161A
Authority
CN
China
Prior art keywords
controlling equipment
equipment
cluster
clustered
coordinate value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811543040.5A
Other languages
Chinese (zh)
Other versions
CN109548161B (en
Inventor
管明祥
吴舟
崔英杰
叶剑锋
王乐
曹雪梅
杨文霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Institute of Information Technology
Original Assignee
Shenzhen Institute of Information Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Institute of Information Technology filed Critical Shenzhen Institute of Information Technology
Priority to CN201811543040.5A priority Critical patent/CN109548161B/en
Publication of CN109548161A publication Critical patent/CN109548161A/en
Application granted granted Critical
Publication of CN109548161B publication Critical patent/CN109548161B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/56Allocation or scheduling criteria for wireless resources based on priority criteria
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/56Allocation or scheduling criteria for wireless resources based on priority criteria
    • H04W72/566Allocation or scheduling criteria for wireless resources based on priority criteria of the information or information source or recipient
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/53Allocation or scheduling criteria for wireless resources based on regulatory allocation policies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/535Allocation or scheduling criteria for wireless resources based on resource usage policies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/54Allocation or scheduling criteria for wireless resources based on quality criteria
    • H04W72/542Allocation or scheduling criteria for wireless resources based on quality criteria using measured or perceived quality
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention be suitable for wireless communication technical field, provide a kind of method and device of wireless resource scheduling, comprising: obtain it is multiple in controlling equipment each to the dispatching priority of controlling equipment;According to the dispatching priority to it is multiple it is described be ranked up from high to low to controlling equipment, will sort described in forward preset quantity to controlling equipment as initial clustering point device;Using not as described in the initial clustering point device to controlling equipment as equipment to be clustered;By the equipment to be clustered, the cluster initial clustering point device nearest to distance forms cluster;The coordinate value iteration of each cluster is updated, when the coordinate value of each cluster does not change or reaches maximum number of iterations, the scheduling radio resource to controlling equipment.The cluster to be formed is clustered to controlling equipment by priority size is similar, according to the cluster scheduling radio resources of formation, in the case where guaranteeing each to controlling equipment business service quality, and can take into account fairness.

Description

A kind of method, apparatus and terminal device of wireless resource scheduling
Technical field
The invention belongs to the method, apparatus and end of the technical field of wireless communication more particularly to a kind of wireless resource scheduling End equipment.
Background technique
With the arrival of 5G technology, i.e. the 5th third-generation mobile communication technology.But 5G, unlike 4G, 3G, 2G, 5G is not It is independent, completely new wireless access technology, but to the technology of existing wireless access technology (including 2G, 3G, 4G and WiFi) The general name of solution after evolution and some newly-increased complementarity wireless access technologys are integrated.In 5G system, it will exist Using multiple standards, the user equipment of multiple types exists, such as 4G, 5G, wifi or satellite communication etc..Various criterion simultaneously It is also different with the type of service of the user equipment of standard, such as video traffic, live broadcast service, game service etc., due to each use Data caused by channel circumstance locating for the length difference of the business data packet of family equipment and each user equipment is different pass The problem of defeated delay is different, these factors will cause user's scheduling fairness.
Traditional solution is that system is analyzed and simulated based on domain knowledge and experience, so that making has It is targetedly regular.The effect of the method depends primarily on the design phase, once design is completed, system will be according to being previously set Rule running.Under current network environment, flow shows the development trend of diversification and mobilism, and network and money The framework in source all becomes more complicated, therefore this method is faced with increasing challenge, is not able to satisfy complicated network and money Communication requirement under the framework of source.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of method of wireless resource scheduling and terminal device, it is existing to solve There is the problem of battery health is predicted in technology.
The first aspect of the embodiment of the present invention provides a kind of method of wireless resource scheduling, comprising:
Obtain it is multiple in controlling equipment each to the dispatching priority of controlling equipment;
According to the dispatching priority to it is multiple it is described be ranked up from high to low to controlling equipment, will sort forward pre- If quantity it is described to controlling equipment as initial clustering point device, by not as described in the initial clustering point device wait adjust Equipment is spent as equipment to be clustered;
By the equipment to be clustered, the cluster initial clustering point device nearest to distance forms cluster;
The coordinate value iteration of each cluster is updated, when the coordinate value of each cluster does not change or reach greatest iteration time Number, the scheduling radio resource to controlling equipment.
The second aspect of the embodiment of the present invention provides a kind of device of wireless resource scheduling, comprising:
Acquiring unit, for obtain it is multiple in controlling equipment each to the dispatching priority of controlling equipment;
Selecting unit, according to the dispatching priority to it is multiple it is described be ranked up from high to low to controlling equipment, will arrange The forward preset quantity of sequence it is described to controlling equipment as initial clustering point device, the initial clustering point device will be used as It is described to controlling equipment as equipment to be clustered;
Cluster cell, for by the equipment to be clustered, the cluster initial clustering point device nearest to distance to be formed Cluster;
Calculating and scheduling unit are updated for the coordinate value iteration to each cluster, when the coordinate value of each cluster does not become Change or reach maximum number of iterations, the scheduling radio resource to controlling equipment.
The third aspect of the embodiment of the present invention provides a kind of terminal device, including memory, processor and is stored in In the memory and the computer program that can run on the processor, when the processor executes the computer program The step of realizing above-mentioned first aspect and/or second aspect the method.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, the computer-readable storage Media storage has computer program, and the computer program realizes above-mentioned first aspect and/or second party when being executed by processor The step of face the method.
Existing beneficial effect is the embodiment of the present invention compared with prior art: waiting for dispatching concentration each wait adjust according to system The channel circumstance of equipment, business datum length and average transmission delay are spent, is calculated each to the dispatching priority of controlling equipment, Therefrom select preset quantity to controlling equipment as initial clustering point device, to dispatching concentration, other wait for controlling equipment to cluster. Intelligent selection user equipment is scheduled in the user equipment with different delayed time, is guaranteeing each user apparatus service Service quality, and fairness can be taken into account, so that different channels environment and different data lengths have the user of different delayed time all The fair acquisition transmission opportunity of energy.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is a kind of method implementation flow chart of wireless resource scheduling provided in an embodiment of the present invention;
Fig. 2 is the implementation process signal of step 101 in a kind of method of wireless resource scheduling provided in an embodiment of the present invention Figure;
Fig. 3 is the implementation process signal of step S103 in a kind of method of wireless resource scheduling provided in an embodiment of the present invention Figure;
Fig. 4 is the implementation process signal of step S301 in a kind of method of wireless resource scheduling provided in an embodiment of the present invention Figure;
Fig. 5 is the implementation process signal of step S104 in a kind of method of wireless resource scheduling provided in an embodiment of the present invention Figure;
Fig. 6 is a kind of schematic diagram of the device of wireless resource scheduling provided in an embodiment of the present invention;
Fig. 7 is a kind of schematic diagram of wireless resource scheduling device/terminal device provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are some of the embodiments of the present invention, instead of all the embodiments.Based on this hair Embodiment in bright, every other implementation obtained by those of ordinary skill in the art without making creative efforts Example, shall fall within the protection scope of the present invention.
It should be appreciated that ought use in this specification and in the appended claims, term " includes " and "comprising" instruction Described feature, entirety, step, operation, the presence of element and/or component, but one or more of the other feature, whole is not precluded Body, step, operation, the presence or addition of element, component and/or its set.
It is also understood that mesh of the term used in this description of the invention merely for the sake of description specific embodiment And be not intended to limit the present invention.As description of the invention and it is used in the attached claims, unless on Other situations are hereafter clearly indicated, otherwise " one " of singular, "one" and "the" are intended to include plural form.
It will be further appreciated that the term "and/or" used in description of the invention and the appended claims is Refer to any combination and all possible combinations of one or more of associated item listed, and including these combinations.
As used in this specification and in the appended claims, term " if " can be according to context quilt Be construed to " when ... " or " once " or " in response to determination " or " in response to detecting ".Similarly, phrase " if it is determined that " or " if detecting [described condition or event] " can be interpreted to mean according to context " once it is determined that " or " in response to true It is fixed " or " once detecting [described condition or event] " or " in response to detecting [described condition or event] ".
Wireless communication of the present invention, which refers to, carries out letter using the characteristic that electromagnetic wave signal can be propagated in free space Cease a kind of communication mode of exchange.And wirelessly communicate and need to be scheduled distribution to radio resource by communication system end, in order to Under complicated network environment, the fairness of multi-subscriber dispatching is solved the problems, such as, the present invention proposes a kind of wireless resource scheduling Method, referring to Figure 1, Fig. 1 are a kind of method implementation flow charts of wireless resource scheduling provided in an embodiment of the present invention.Such as Fig. 1 Shown in a kind of method of wireless resource scheduling include:
S101, obtain it is multiple in controlling equipment each to the dispatching priority of controlling equipment.
Wherein described to controlling equipment includes but is not limited to the communication equipments such as mobile terminal.The priority refers to described more A sequencing that priority scheduling is enjoyed to controlling equipment.It is all according to communication system within unified dispatching cycle of communication system Described to be delayed to the channel circumstance of controlling equipment, business datum length and average transmission, training is the multiple to controlling equipment, Respective dispatching priority is obtained, and is ranked up according to priority.
Illustratively, within a dispatching cycle, if described good to controlling equipment channel condition, its transmission is prolonged When it is also smaller, will make its priority improve;If described poor to controlling equipment channel condition, signal-to-noise ratio is lower for a long time, It cannot get transmission opportunity, then the average transmission delay to controlling equipment just will increase, its priority can equally improved, Obtain transmission opportunity.When the acquisition of long grouping user is more serviced than short grouping user, the average transmission of short grouping user Delay will will increase, its priority can similarly improved, and obtain transmission opportunity.High described preferential to controlling equipment of priority Scheduling radio resources, guarantee its communication quality, and priority is lower described to controlling equipment, need to wait for priority it is high it is described to After the completion of controlling equipment scheduling, then carry out the scheduling of radio resource.
S102, according to the dispatching priority to it is multiple it is described be ranked up from high to low to controlling equipment, sequence is leaned on Preceding preset quantity it is described to controlling equipment as initial clustering point device, by the institute not as the initial clustering point device It states to controlling equipment as equipment to be clustered.
Described in the initial clustering point device refers to corresponding to the cluster point chosen before the cluster to controlling equipment To controlling equipment.And the selection of the initial clustering point device preset quantity is incited somebody to action according to different clustering algorithms or artificial decision The class for being divided into preset quantity to controlling equipment in cluster set.In the present invention for the initial clustering point device Choose, according to it is the multiple in controlling equipment priority orders choose preset quantity priority it is high described in controlling equipment. Wherein, cluster refers to the process of that the set by physics or abstract object is divided into and is referred to as poly- by multiple classes that similar object forms Class, by clustering the set that cluster generated is one group of data object, these objects and the object in the same cluster are similar to each other, with Object in other clusters is different.Similar channel circumstance, business datum length and average transmission are delayed in the present embodiment Cluster to controlling equipment into same a cluster, i.e., will similar in priority to controlling equipment cluster to together.
S103, by the equipment to be clustered, the cluster initial clustering point device nearest to distance forms cluster.
According to the initial clustering point that step S102 is obtained, by the waiting transmission delay of the equipment to be clustered and averagely Transmission delay calculates the equipment to be clustered at a distance from the initial clustering point device as coordinate value.It is described to be clustered to set The standby cluster initial clustering point device nearest to distance, forms cluster.Cluster described herein refers to the multiple wait adjust It spends equipment to complete after clustering, and forms the similar collection to controlling equipment of multiple priority sizes and be collectively referred to as cluster.It is being formed After cluster, the cluster formed according to cluster is to controlling equipment scheduling radio resources.
S104 updates the coordinate value iteration of each cluster, when each cluster coordinate value maximum that do not change or reach changes Generation number, the scheduling radio resource to controlling equipment.
The coordinate value of each cluster refers to each cluster for clustering to be formed to controlling equipment in step s 103, the institute in cluster Need the average value size of controlling equipment coordinate value.
Wherein, the coordinate value iteration of each cluster is updated, including two repetition steps:
Step 1: the coordinate value of obtained each cluster will be iterated to calculate every time by referring to, replace last iterative calculation The coordinate value of obtained each cluster forms new cluster point.
Step 2: according to the new coordinate value for clustering point, described clustered again to controlling equipment to distance is nearest is gathered Class point forms new cluster.
Realize that the iteration of the coordinate value of cluster updates by step 1 and step 2.Each cluster is obtained in the present invention new Cluster, calculate a cluster point coordinate value using new cluster, clustered to controlling equipment to distance by new cluster point coordinate value by described Nearest cluster point forms new cluster, and so on update each cluster coordinate value, until each cluster coordinate value is not sent out Changing reaches maximum number of iterations, that is, completes cluster.
When each cluster coordinate value does not change or reach maximum number of iterations, obtained according to step S101 excellent First grade sequence is to described to controlling equipment scheduling radio resources.High described of priority wirelessly provides to controlling equipment priority scheduling Source, guarantees its communication quality, and priority is lower described to controlling equipment, needs to wait for high described to controlling equipment tune of priority After the completion of degree, then carry out the scheduling of radio resource.The radio resource includes but is not limited to frequency, power, time, space, code The communication resources such as resource.And the scheduling is the distribution principle of a kind of pair of wireless communication resources, refers specifically to the item in finite bandwidth Under part, wirelessly to provide quality of service guarantee to controlling equipment in network, basic point of departure is distributed not in network traffic Uniformly, for the characteristic of channel due to channel is weak and interference when fluctuations, flexible allocation and dynamic adjust wireless transmission means Divide the available resources with network, farthest improves wireless frequency spectrum utilization rate.
In embodiments of the present invention, according to described to the channel circumstance of controlling equipment, business datum length and transmission delay, The priority size to controlling equipment is obtained, priority size is similar described after controlling equipment clusters cluster, root Priority size according to each cluster described in each cluster to, to controlling equipment scheduling radio resources, ensure that in limited wireless money The fairness of resource is distributed under source.
Optionally, step S101 in above-mentioned embodiment illustrated in fig. 1 is realized especially by following steps S201 to S207, is asked Referring to fig. 2, Fig. 2 is the implementation process signal of step S101 in a kind of method of wireless resource scheduling provided in an embodiment of the present invention Figure.As shown in Fig. 2, step S101 includes:
S201 is obtained each to the channel equalization matrix of controlling equipment.
The channel equalization refers to the equilibrium to the characteristic of channel, i.e. the balanced device of receiving end generates opposite with the characteristic of channel Characteristic, for reducing or eliminating the time-varying multipath transmisstion characteristic because of channel caused by intersymbol interference.And channel equalization is to pass through Balanced device is realized in terminal receiver, including MMSE receiver, CCMC receiver etc., and the present invention uses MMSE receiver, This is without limitation.For MMSE receiver, each channel equalization matrix to controlling equipment of the present embodiment can pass through letter Numerical expressionEach channel equalization matrix to controlling equipment is obtained, wherein HpIndicate channel square Battle array,Indicate that the conjugate matrices of channel matrix, I indicate that unit matrix, Es indicate to receive power.
S202 obtains each transmission signal to controlling equipment according to the channel equalization matrix.
Each channel equalization matrix to controlling equipment is obtained according to step S201, passes through functional expression:Each transmission signal by channel equalization to controlling equipment is obtained, wherein It indicates to send power, r, which is represented, receives signal, and n indicates that noise, s indicate to send signal.
S203 obtains each signal-to-noise ratio to controlling equipment according to the transmission signal.
The signal-to-noise ratio refers to the ratio of signal and noise in an electronic equipment or electronic system.Here signal Refer to the electronic signal for needing to be handled by this equipment from device external, noise refers to by generating after the equipment Original signal in not existing random extra (or information), and this kind of signal not with the variation of original signal and Variation.It is to determine dispatching concentration each to the communication quality of controlling equipment that the present embodiment, which calculates signal-to-noise ratio,.It is of the present invention Multiple signal-to-noise ratio to controlling equipment can obtain the multiple hair by channel equalization to controlling equipment according to step S202 The number of delivering letters obtains the ratio for sending signal power and noise power, passes through the functional expression of signal-to-noise ratioThe multiple signal-to-noise ratio to controlling equipment of dispatching concentration is obtained, whereinIt indicates The m row of matrix G, m maximum value are the quantity of communication system antenna, and n maximum value is the multiple number to controlling equipment antenna Amount, hn,mRepresenting matrix HPM column, hn,jRepresenting matrix HPJth column, j be not equal to m, N0Indicate noise power spectral density.
S204 obtains the transmission rate to controlling equipment according to the signal-to-noise ratio.
The transmission rate refers to the number of the data volume of transmitted per unit time.The present embodiment dispatching concentration is each wait adjust Spend the transmission rate of equipment, can be obtained according to step S203 institute it is each described in signal-to-noise ratio to controlling equipment, pass through functional expression: R =log2(1+γn,m), obtain each transmission rate to controlling equipment.
S205 obtains each business datum length to controlling equipment, according to each biography to controlling equipment Defeated rate obtains each waiting transmission delay to controlling equipment.
Wherein the business datum length refers to the data length for the various communication services that wireless communication provides, and business number According to length corresponding data can be obtained by communication system.It waits transmission delay to refer under conditions of finite bandwidth, is set wait dispatch Delay caused by standby waiting system scheduling radio resources.The business datum length currently to controlling equipment is assumed in the present embodiment For Fi, wherein i indicates i-th of dispatching concentration to controlling equipment, and i maximum value is the quantity to controlling equipment, the present embodiment Each waiting transmission delay to controlling equipment, can be according to the transmission speed to controlling equipment each in step S204 Rate passes through functional expression:Each waiting transmission delay to controlling equipment is obtained, wherein FjAnd RjIt indicates System is selected the multiple to be not equal to j-th in the controlling equipment business datum length and transmission rate and j to controlling equipment I, j maximum value are the quantity to controlling equipment.
S206 is obtained according to each waiting transmission delay to controlling equipment and dynamic update is each described Average transmission to controlling equipment is delayed.
Transmission delay refers in message transmitting procedure since the distance to be passed through is remote or some failures lead to transmission not The time for thering is end of achieving the goal on time to generate.And the delay of average transmission described in the present embodiment refers to that some waits for that controlling equipment is every It is secondary from transmit a signal to destination receive signal caused by average time.It is obtained according to step S205 described to controlling equipment Transmission delay is waited, functional expression is passed through:Obtain and dynamic update in it is each described to The average transmission of controlling equipment is delayed, and wherein T indicates time constant,Show that each average transmission to controlling equipment is prolonged When,Indicate that each average transmission to controlling equipment is delayed at t time point.
S207 is delayed according to each average transmission to controlling equipment, obtains each described to controlling equipment Dispatching priority.
Each waiting transmission delay and average transmission to controlling equipment is obtained according to step S205 and S206 Delay, passes through functional expression:Obtain each dispatching priority to controlling equipment.
In embodiments of the present invention, according to described to the channel circumstance of controlling equipment, business datum length and transmission delay, The priority size to controlling equipment is obtained, the cluster for the subsequent equipment to be clustered provides foundation.
Optionally, on the basis of embodiment shown in Fig. 2, step S203 in above-mentioned embodiment illustrated in fig. 1, especially by with Lower step S301 to S303 is realized, refers to Fig. 3, Fig. 3 is a kind of method of wireless resource scheduling provided in an embodiment of the present invention The implementation process schematic diagram of middle step S103.As shown in figure 3, step S103 includes:
S301, by each waiting transmission delay T to controlling equipmentiIt is delayed with the average transmissionCombination At coordinate value.
In step S207, priority size is obtained according to each to the waiting transmission delay and average transmission of controlling equipment Delay calculates priority.And it is described there is mobility to controlling equipment, and because of factors shadows such as channel circumstance, business datum length It rings, so that reality does not have relevance apart from the adjacent priority size to controlling equipment.Therefore the present embodiment passes through each wait adjust Spend the waiting transmission delay T of equipmentiWith average transmission delay TiAs coordinate value, calculate each to controlling equipment and initial clustering The priority similarity distance of point device.
Specifically, as shown in figure 4, Fig. 4 is step in a kind of method of wireless resource scheduling provided in an embodiment of the present invention The implementation process schematic diagram of S301, step S301 include step S401 to S402:
S401 generates the coordinate value of each initial clustering point device.
According to the waiting transmission delay and average transmission delay of initial clustering point device, the initial clustering point device is generated Coordinate value.The coordinate value of each initial clustering point device is denoted asWherein k Maximum value is initial clustering point device quantity.Tk-1For the waiting transmission delay of initial clustering point device,For initial clustering point The average transmission of equipment is delayed.
S402 generates the coordinate value of each equipment to be clustered.
According to the waiting transmission delay and average transmission delay of equipment to be clustered, the seat of the initial clustering point device is generated Scale value.The coordinate value of each equipment to be clustered is recorded asWherein p maximum value is To the quantity of controlling equipment, Tp-1For the waiting transmission delay of equipment to be clustered,It is delayed for the average transmission of equipment to be clustered.
S302 calculates separately the distance between each equipment to be clustered and each initial clustering point device.
It should be noted that the distance of the present embodiment meaning is not showing between equipment to be clustered and initial clustering point device Actual distance from, but it is a kind of according to it is multiple between controlling equipment wait transmission delays and average transmission delay be coordinate it is excellent First grade phase knowledge and magnanimity distance, including but not limited to Euclidean distance and manhatton distance etc..And transmission delay and average transmission is waited to prolong When be the basis calculated to controlling equipment priority, therefore really to calculate priority size similar to be clustered for coordinates computed value Equipment, the cluster between subsequent equipment to be clustered and initial clustering point device provide foundation.
As an embodiment of the present invention, distance uses Euclidean distance.Specifically, it is calculated using the following equation Euclidean distance:
According to above-mentioned formula, dispatching concentration equipment to be clustered is obtained at a distance from initial clustering point device.
S303, according to the calculated result of the distance, by each equipment to be clustered cluster to distance recently described in Initial clustering point device forms cluster.
The equipment to be clustered clusters the initial clustering point device nearest to distance, and apart from it is nearest represent it is described to It clusters equipment and the initial clustering point device priority size is close, so each cluster and one group of priority that are formed are big It is small similar to controlling equipment set.
In embodiments of the present invention, according to the priority size, priority size is similar to controlling equipment progress Cluster is clustered, provides foundation for wireless resource scheduling.
Optionally, on the basis of embodiment shown in Fig. 3, step S104 in above-mentioned embodiment illustrated in fig. 1, as shown in figure 5, Fig. 5 is the implementation process schematic diagram of step S104 in a kind of method of wireless resource scheduling provided in an embodiment of the present invention, including Step S501 to S502.
S501 iterates to calculate the coordinate value of each cluster.
Pass through functional expression: Ti'=∑ Tm/ M (m=1,2 ..., M) andObtain each race Coordinate value, wherein M represents the quantity to controlling equipment that each cluster includes, TmRepresent in each cluster m-th etc. it is to be passed Defeated delay,M-th of average transmission delay in each cluster is represented, m is integer and maximum value is M.
S502 will iterate to calculate the obtained coordinate value every time, replace the coordinate that last iterative calculation obtains Value, the maximum number of iterations until coordinate value of each cluster does not change or reaches then dispatch the nothing to controlling equipment Line resource.
When the coordinate value of iterative calculation to each cluster does not change or reach maximum number of iterations, indicate all Priority size is similar to be completed to cluster to controlling equipment, forms several clusters.According to the size of each cluster priority, scheduling to The radio resource of controlling equipment.While guaranteeing communication quality, the fairness of wireless resource scheduling is also ensured.
In embodiments of the present invention, it ensure that according to k-means algorithm according to the initial clustering point device chosen in advance The cluster result of k-means algorithm is divided according to fairness, is avoided because caused by random selection initial clustering point Locally optimal solution problem is caused, the fairness problem of wireless resource scheduling is increased.
It should be noted that the present embodiment improves traditional k-means, due to traditional k-means algorithm Selection to initial mass center is very sensitive, it is possible to cause locally optimal solution, and be unable to get global optimal solution, in order to gram This problem is taken, the present embodiment improves traditional k-means algorithm, in step S201 into S207, according to system Channel circumstance, business datum length and the average transmission delay of needed controlling equipment, calculate excellent to the scheduling of controlling equipment First grade sequence, therefrom select preset quantity after controlling equipment is as initial clustering point.Further according to traditional k-means algorithm Clustering to controlling equipment for initial clustering point device unselected to dispatching concentration, cluster does not change or reaches most Big the number of iterations completes the scheduling for treating controlling equipment radio resource.It avoids in traditional k-means algorithm and randomly chooses just Begin to cluster point and cause locally optimal solution problem.Using in the present invention, in the Service Quality for guaranteeing each user apparatus service Amount, and fairness can be taken into account, so that different channels environment and different data lengths have the user of different delayed time can be fair Acquisition transmission opportunity.
If the present invention provides a kind of devices 6 of wireless resource scheduling by Fig. 6, Fig. 6 is referred to, Fig. 6 is the embodiment of the present invention A kind of schematic diagram of the device of the wireless resource scheduling provided, as shown in Figure 6 a kind of square law device of wireless resource scheduling include:
Acquiring unit 61, for obtain it is multiple in controlling equipment each to the dispatching priority of controlling equipment;
Selecting unit 62, for described being arranged from high to low to controlling equipment according to the dispatching priority to multiple Sequence will sort described in forward preset quantity to controlling equipment as initial clustering point device;It will be not as described initial poly- Class point device it is described to controlling equipment as equipment to be clustered;
Cluster cell 63, for by the equipment to be clustered, cluster to be to apart from the nearest initial clustering point device, shape Cluster.
Calculating and scheduling unit 64 are updated for the coordinate value iteration to each cluster, when the coordinate value of each cluster does not occur Change or reach maximum number of iterations, the scheduling radio resource to controlling equipment.
Optionally, acquiring unit 61 are specifically used for:
It obtains each to the channel equalization matrix of controlling equipment;
According to the channel equalization matrix, each transmission signal to controlling equipment is obtained;
According to the transmission signal, each signal-to-noise ratio to controlling equipment is obtained;
According to the signal-to-noise ratio, each transmission rate to controlling equipment is obtained;
Each business datum length to controlling equipment is obtained, according to each transmission speed to controlling equipment Rate obtains each waiting transmission delay to controlling equipment;
According to each waiting transmission delay to controlling equipment, obtain and dynamic update it is each described wait adjust Spend the average transmission delay of equipment;
It is delayed according to each average transmission to controlling equipment, obtains each scheduling to controlling equipment Priority.
Optionally, the cluster cell 63, is specifically used for:
By each waiting transmission delay T to controlling equipmentiWith average transmission delay TiIt is combined into coordinate Value;
Calculate separately the distance between each equipment to be clustered and each initial clustering point device;
According to the calculated result of the distance, each equipment to be clustered is clustered to initial poly- apart from recently described Class point device forms cluster.
Optionally, the calculating and scheduling unit 64, are specifically used for:
Iterate to calculate the coordinate value of each cluster;
The obtained coordinate value will be iterated to calculate every time, replaces the coordinate value that last iterative calculation obtains, directly The coordinate value to each cluster does not change or reaches maximum number of iterations, then wireless money of the scheduling to controlling equipment Source.
The device of wireless resource scheduling provided by the invention, can be selected in the user equipment of different condition it is described to Controlling equipment is scheduled, and is guaranteeing each service quality to controlling equipment business, and can take into account fairness, so that Different channels environment and different data lengths have the acquisition transmission opportunity that can be fair to controlling equipment of different delayed time.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit It is fixed.
Fig. 7 is a kind of device/terminal device schematic diagram for wireless resource scheduling that one embodiment of the invention provides.Such as figure Shown in 7, a kind of device/terminal device 7 of wireless resource scheduling of the embodiment includes: processor 70, memory 71 and deposits Store up the computer program 72 that can be run in the memory 71 and on the processor 70, such as a kind of wireless resource scheduling Program.The processor 70 realizes that above-mentioned a kind of each method of wireless resource scheduling is real when executing the computer program 72 Apply the step in example, such as step S101 to S104 shown in FIG. 1.Alternatively, the processor 70 executes the computer program The function of each unit in above-mentioned each Installation practice, such as the function of unit 61 to 64 shown in Fig. 6 are realized when 72.
Illustratively, the computer program 72 can be divided into one or more units, one or more of Unit is stored in the memory 71, and is executed by the processor 70, to complete the present invention.One or more of lists Member can be the series of computation machine program instruction section that can complete specific function, and the instruction segment is for describing the computer journey Implementation procedure of the sequence 72 in a kind of device/terminal device 7 of wireless resource scheduling.For example, the computer program 72 Acquiring unit, selecting unit, cluster cell, calculating and scheduling unit can be divided into, each unit concrete function is as follows:
Acquiring unit, for obtain it is multiple in controlling equipment each to the dispatching priority of controlling equipment;
Selecting unit, for according to the dispatching priority to it is multiple it is described be ranked up from high to low to controlling equipment, It will sort described in forward preset quantity to controlling equipment as initial clustering point device;It will not be used as the initial clustering point Equipment it is described to controlling equipment as equipment to be clustered;
Cluster cell, for by the equipment to be clustered, the cluster initial clustering point device nearest to distance to be formed Cluster.
Calculating and scheduling unit are updated for the coordinate value iteration to each cluster, when the coordinate value of each cluster does not become Change or reach maximum number of iterations, the scheduling radio resource to controlling equipment.
A kind of device/terminal device 7 of wireless resource scheduling can be desktop PC, notebook, palm electricity Brain and cloud server etc. calculate equipment.A kind of device/terminal device of wireless resource scheduling may include, but not only limit In processor 70, memory 71.It will be understood by those skilled in the art that Fig. 7 be only a kind of wireless resource scheduling device/ The example of terminal device 7 does not constitute the restriction to a kind of device/terminal device 7 of wireless resource scheduling, may include than figure Show more or fewer components, perhaps the certain components of combination or different components, such as a kind of wireless resource scheduling Device/terminal device can also include input-output equipment, network access equipment, bus etc..
Alleged processor 70 can be central processing unit (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor Deng.
The memory 71 can be a kind of internal storage unit of device/terminal device 7 of wireless resource scheduling, Such as the hard disk or memory of a kind of device/terminal device 7 of wireless resource scheduling.The memory 71 is also possible to described one kind The External memory equipment of device/terminal device 7 of wireless resource scheduling, such as a kind of device/end of wireless resource scheduling The plug-in type hard disk being equipped in end equipment 7, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card) etc..Further, the memory 71 can also both include described one kind The internal storage unit of device/terminal device 7 of wireless resource scheduling also includes External memory equipment.The memory 71 is used for Store other program sum numbers needed for device/terminal device of the computer program and a kind of wireless resource scheduling According to.The memory 71 can be also used for temporarily storing the data that has exported or will export.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by different Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completing The all or part of function of description.Each functional unit in embodiment, module can integrate in one processing unit, can also To be that each unit physically exists alone, can also be integrated in one unit with two or more units, it is above-mentioned integrated Unit both can take the form of hardware realization, can also realize in the form of software functional units.In addition, each function list Member, the specific name of module are also only for convenience of distinguishing each other, the protection scope being not intended to limit this application.Above system The specific work process of middle unit, module, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, it can be with It realizes by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute The division of module or unit is stated, only a kind of logical function partition, there may be another division manner in actual implementation, such as Multiple units or components can be combined or can be integrated into another system, or some features can be ignored or not executed.Separately A bit, shown or discussed mutual coupling or direct-coupling or communication connection can be through some interfaces, device Or the INDIRECT COUPLING or communication connection of unit, it can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated module/unit be realized in the form of SFU software functional unit and as independent product sale or In use, can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-mentioned implementation All or part of the process in example method, can also instruct relevant hardware to complete, the meter by computer program Calculation machine program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that on The step of stating each embodiment of the method.Wherein, the computer program includes computer program code, the computer program Code can be source code form, object identification code form, executable file or certain intermediate forms etc..Computer-readable Jie Matter may include: can carry the computer program code any entity or device, recording medium, USB flash disk, mobile hard disk, Magnetic disk, CD, computer storage, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that the meter The content that calculation machine readable medium includes can carry out increase and decrease appropriate according to the requirement made laws in jurisdiction with patent practice, It such as does not include electric carrier signal and telecommunications according to legislation and patent practice, computer-readable medium in certain jurisdictions Signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all Between protection scope of the present invention.

Claims (10)

1. a kind of method of wireless resource scheduling, which comprises the following steps:
Obtain it is multiple in controlling equipment each to the dispatching priority of controlling equipment;
According to the dispatching priority to it is multiple it is described be ranked up from high to low to controlling equipment, by the forward present count that sorts Amount it is described to controlling equipment as initial clustering point device, will not set as described in the initial clustering point device wait dispatch It is standby to be used as equipment to be clustered;
By the equipment to be clustered, the cluster initial clustering point device nearest to distance forms cluster;
The coordinate value iteration of each cluster is updated, when the coordinate value of each cluster does not change or reaches maximum number of iterations, The scheduling radio resource to controlling equipment.
2. the method as described in claim 1, which is characterized in that it is described obtain it is multiple in controlling equipment each to controlling equipment Dispatching priority, comprising:
It obtains each to the channel equalization matrix of controlling equipment;
According to the channel equalization matrix, each transmission signal to controlling equipment is obtained;
According to the transmission signal, each signal-to-noise ratio to controlling equipment is obtained;
According to the signal-to-noise ratio, each transmission rate to controlling equipment is obtained;
Each business datum length to controlling equipment is obtained to be obtained according to each transmission rate to controlling equipment Obtain each waiting transmission delay to controlling equipment;
According to each waiting transmission delay to controlling equipment, obtains and dynamic update is each described to controlling equipment Average transmission delay;
It is delayed according to each average transmission to controlling equipment, obtains each dispatching priority to controlling equipment Grade.
3. method according to claim 2, which is characterized in that described by the equipment to be clustered, cluster is nearest to distance The initial clustering point device forms cluster, comprising:
By each waiting transmission delay T to controlling equipmentiWith average transmission delay TiIt is combined into coordinate value;
Calculate separately the distance between each equipment to be clustered and each initial clustering point device;
According to the calculated result of the distance, each equipment to be clustered is clustered to the initial clustering point nearest to distance Equipment forms cluster.
4. method as claimed in claim 3, described by each waiting transmission delay T to controlling equipmentiWith it is described Average transmission delayIt is combined into coordinate value, comprising:
Generate the coordinate value of each initial clustering point deviceWherein k is positive Integer, maximum value are the quantity of the initial clustering point device;
Generate the coordinate value of each equipment to be clusteredWherein p is positive integer, most Big value is the quantity of the equipment to be clustered;
Correspondingly, calculating separately the distance between each equipment to be clustered and each initial clustering point device, comprising:
Pass through functional expression:Calculate separately it is each it is described to Cluster the distance between equipment and each initial clustering point device.
5. method as claimed in claim 3, which is characterized in that the coordinate value iteration to each cluster updates, when each cluster Coordinate value does not change or reaches maximum number of iterations, the scheduling radio resource to controlling equipment, comprising:
Pass through functional expression: Ti'=∑ Tm/ M (m=1,2 ..., M) andIterate to calculate each cluster Coordinate value, wherein M represents the quantity to controlling equipment that each cluster includes, TmRepresent in each cluster m-th etc. it is to be transmitted Delay,M-th of average transmission delay in each cluster is represented, m maximum value is M;
The obtained coordinate value will be iterated to calculate every time, replaces the coordinate value that last iterative calculation obtains, until every The coordinate value of a cluster does not change or reaches maximum number of iterations, then radio resource of the scheduling to controlling equipment.
6. a kind of device of wireless resource scheduling characterized by comprising
Acquiring unit, for obtain it is multiple in controlling equipment each to the dispatching priority of controlling equipment;
Selecting unit, according to the dispatching priority to it is multiple it is described be ranked up from high to low to controlling equipment, sequence is leaned on Preceding preset quantity it is described to controlling equipment as initial clustering point device, by the institute not as the initial clustering point device It states to controlling equipment as equipment to be clustered;
Cluster cell, for by the equipment to be clustered, the cluster initial clustering point device nearest to distance to form cluster;
Calculate and scheduling unit, updated for the coordinate value iteration to each cluster, do not change when the coordinate value of each cluster or Person reaches maximum number of iterations, the scheduling radio resource to controlling equipment.
7. a kind of device of wireless resource scheduling as claimed in claim 6, which is characterized in that the acquiring unit is specifically used for:
It obtains each to the channel equalization matrix of controlling equipment;
According to the channel equalization matrix, each transmission signal to controlling equipment is obtained;
According to the transmission signal, each signal-to-noise ratio to controlling equipment is obtained;
According to the signal-to-noise ratio, each transmission rate to controlling equipment is obtained;
Each business datum length to controlling equipment is obtained to be obtained according to each transmission rate to controlling equipment Obtain each waiting transmission delay to controlling equipment;
According to each waiting transmission delay to controlling equipment, it obtains and dynamic updates each described set wait dispatch Standby average transmission delay;
It is delayed according to each average transmission to controlling equipment, obtains each dispatching priority to controlling equipment Grade.
8. a kind of device of wireless resource scheduling as claimed in claim 6, which is characterized in that the cluster cell is specifically used for:
Calculate separately the distance between each equipment to be clustered and each initial clustering point device;
According to the calculated result of the distance, each equipment to be clustered is clustered to the initial clustering point nearest to distance Equipment forms cluster.
9. a kind of device/terminal device of wireless resource scheduling, including memory, processor and storage are in the memory And the computer program that can be run on the processor, which is characterized in that when the processor executes the computer program It realizes such as the step of any one of claim 1 to 5 the method.
10. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists In when the computer program is executed by processor the step of any one of such as claim 1 to 5 of realization the method.
CN201811543040.5A 2018-12-17 2018-12-17 Method, device and terminal equipment for scheduling wireless resources Active CN109548161B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811543040.5A CN109548161B (en) 2018-12-17 2018-12-17 Method, device and terminal equipment for scheduling wireless resources

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811543040.5A CN109548161B (en) 2018-12-17 2018-12-17 Method, device and terminal equipment for scheduling wireless resources

Publications (2)

Publication Number Publication Date
CN109548161A true CN109548161A (en) 2019-03-29
CN109548161B CN109548161B (en) 2023-02-17

Family

ID=65855314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811543040.5A Active CN109548161B (en) 2018-12-17 2018-12-17 Method, device and terminal equipment for scheduling wireless resources

Country Status (1)

Country Link
CN (1) CN109548161B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110730461A (en) * 2019-09-17 2020-01-24 中国联合网络通信集团有限公司 Equipment model selection method and device
CN111541486A (en) * 2020-04-08 2020-08-14 深圳供电局有限公司 Distributed system for 5G communication service
CN112035234A (en) * 2020-09-02 2020-12-04 中国银行股份有限公司 Distributed batch job distribution method and device
CN112532298A (en) * 2020-11-17 2021-03-19 南京融星智联信息技术有限公司 Wireless resource scheduling method and architecture system based on low-earth-orbit constellation satellite communication
CN112867168A (en) * 2019-11-27 2021-05-28 中国移动通信集团陕西有限公司 High-concurrency access method and device for narrow-band Internet of things, computing equipment and storage medium

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101568156A (en) * 2008-04-25 2009-10-28 中国移动通信集团公司 Method and device for radio resource scheduling and base station
CN102264147A (en) * 2011-08-26 2011-11-30 东南大学 Statistical channel information assisted downlink multiuser proportional fair scheduling methods
CN105075158A (en) * 2013-03-20 2015-11-18 Lg电子株式会社 Method for transmitting and receiving signal using device-to-device communication in wireless communication system, and device for same
US20160004985A1 (en) * 2014-07-02 2016-01-07 International Business Machines Corporation Prioritizing Proposal Development Under Resource Constraints
CN105517179A (en) * 2015-12-25 2016-04-20 上海华为技术有限公司 Wireless resource scheduling method and scheduler
US20160117379A1 (en) * 2014-10-24 2016-04-28 Yahoo! Inc. Taxonomy-Based System for Discovering and Annotating Geofences from Geo-Referenced Data
US20160248559A1 (en) * 2013-10-08 2016-08-25 Zte Corporation Inter-Node Interference Reduction Method, Node and System
CN105992381A (en) * 2015-03-06 2016-10-05 鼎桥通信技术有限公司 Scheduling method
CN106954232A (en) * 2017-04-05 2017-07-14 北京邮电大学 A kind of resource allocation methods of time delay optimization
CN107205211A (en) * 2017-05-19 2017-09-26 北京交通大学 Method for channel allocation in unauthorized frequency range communicates with the D2D that WiFi coexists
CN107846369A (en) * 2016-09-19 2018-03-27 中兴通讯股份有限公司 Business scheduling method and device and corresponding base station
CN108021619A (en) * 2017-11-13 2018-05-11 星潮闪耀移动网络科技(中国)有限公司 A kind of event description object recommendation method and device
CN108990114A (en) * 2017-05-31 2018-12-11 安移通网络公司 By the subset allocation of the access point in wireless network to high priority level

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101568156A (en) * 2008-04-25 2009-10-28 中国移动通信集团公司 Method and device for radio resource scheduling and base station
CN102264147A (en) * 2011-08-26 2011-11-30 东南大学 Statistical channel information assisted downlink multiuser proportional fair scheduling methods
CN105075158A (en) * 2013-03-20 2015-11-18 Lg电子株式会社 Method for transmitting and receiving signal using device-to-device communication in wireless communication system, and device for same
US20160248559A1 (en) * 2013-10-08 2016-08-25 Zte Corporation Inter-Node Interference Reduction Method, Node and System
US20160004985A1 (en) * 2014-07-02 2016-01-07 International Business Machines Corporation Prioritizing Proposal Development Under Resource Constraints
US20160117379A1 (en) * 2014-10-24 2016-04-28 Yahoo! Inc. Taxonomy-Based System for Discovering and Annotating Geofences from Geo-Referenced Data
CN105992381A (en) * 2015-03-06 2016-10-05 鼎桥通信技术有限公司 Scheduling method
CN105517179A (en) * 2015-12-25 2016-04-20 上海华为技术有限公司 Wireless resource scheduling method and scheduler
CN107846369A (en) * 2016-09-19 2018-03-27 中兴通讯股份有限公司 Business scheduling method and device and corresponding base station
CN106954232A (en) * 2017-04-05 2017-07-14 北京邮电大学 A kind of resource allocation methods of time delay optimization
CN107205211A (en) * 2017-05-19 2017-09-26 北京交通大学 Method for channel allocation in unauthorized frequency range communicates with the D2D that WiFi coexists
CN108990114A (en) * 2017-05-31 2018-12-11 安移通网络公司 By the subset allocation of the access point in wireless network to high priority level
CN108021619A (en) * 2017-11-13 2018-05-11 星潮闪耀移动网络科技(中国)有限公司 A kind of event description object recommendation method and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郭凤羽等: "云计算环境下对资源聚类的工作流任务调度算法", 《计算机应用》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110730461A (en) * 2019-09-17 2020-01-24 中国联合网络通信集团有限公司 Equipment model selection method and device
CN110730461B (en) * 2019-09-17 2023-04-07 中国联合网络通信集团有限公司 Equipment model selection method and device
CN112867168A (en) * 2019-11-27 2021-05-28 中国移动通信集团陕西有限公司 High-concurrency access method and device for narrow-band Internet of things, computing equipment and storage medium
CN112867168B (en) * 2019-11-27 2024-03-22 中国移动通信集团陕西有限公司 High concurrency access method, device, computing equipment and storage medium for narrowband Internet of things
CN111541486A (en) * 2020-04-08 2020-08-14 深圳供电局有限公司 Distributed system for 5G communication service
CN112035234A (en) * 2020-09-02 2020-12-04 中国银行股份有限公司 Distributed batch job distribution method and device
CN112035234B (en) * 2020-09-02 2023-08-22 中国银行股份有限公司 Distributed batch job distribution method and device
CN112532298A (en) * 2020-11-17 2021-03-19 南京融星智联信息技术有限公司 Wireless resource scheduling method and architecture system based on low-earth-orbit constellation satellite communication

Also Published As

Publication number Publication date
CN109548161B (en) 2023-02-17

Similar Documents

Publication Publication Date Title
CN109548161A (en) A kind of method, apparatus and terminal device of wireless resource scheduling
Zhang et al. Joint service caching, computation offloading and resource allocation in mobile edge computing systems
CN108063830B (en) Network slice dynamic resource allocation method based on MDP
CN111628855B (en) Industrial 5G dynamic multi-priority multi-access method based on deep reinforcement learning
CN110928654B (en) Distributed online task unloading scheduling method in edge computing system
Hoang et al. Performance optimization for cooperative multiuser cognitive radio networks with RF energy harvesting capability
CN111367657B (en) Computing resource collaborative cooperation method based on deep reinforcement learning
CN111246586A (en) Method and system for distributing smart grid resources based on genetic algorithm
CN109905888A (en) Combined optimization migration decision and resource allocation methods in mobile edge calculations
CN110096362A (en) A kind of multitask discharging method based on Edge Server cooperation
CN108566242B (en) Spatial information network resource scheduling system for remote sensing data transmission service
Ko et al. Joint client selection and bandwidth allocation algorithm for federated learning
WO2023005448A1 (en) Wireless resource utilization rate determination method and apparatus, electronic device and storage medium
CN108055701B (en) Resource scheduling method and base station
CN106598727B (en) A kind of computational resource allocation method and system of communication system
CN111328146A (en) Service scheduling method for optimizing transmission rate weight based on genetic algorithm
CN113094180A (en) Wireless federal learning scheduling optimization method and device
Wang et al. Joint heterogeneous tasks offloading and resource allocation in mobile edge computing systems
CN103152382B (en) Towards the multifile concurrent transmission control method of multi-host network
Wang et al. I-CSMA: A link-scheduling algorithm for wireless networks based on Ising model
CN116939866A (en) Wireless federal learning efficiency improving method based on collaborative computing and resource allocation joint optimization
CN106060945A (en) LTE resource scheduling algorithm based on RB feedback
CN112532427B (en) Planning and scheduling method of time-triggered communication network
Rengarajan et al. Analyzing queueing systems with coupled processors through semidefinite programming
Pan et al. Energy-efficient multiuser and multitask computation offloading optimization method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant