CN109548079A - A kind of method and device for the user-plane function management resource indicating communication system - Google Patents

A kind of method and device for the user-plane function management resource indicating communication system Download PDF

Info

Publication number
CN109548079A
CN109548079A CN201710867699.5A CN201710867699A CN109548079A CN 109548079 A CN109548079 A CN 109548079A CN 201710867699 A CN201710867699 A CN 201710867699A CN 109548079 A CN109548079 A CN 109548079A
Authority
CN
China
Prior art keywords
user
plane function
resource
upf
permission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710867699.5A
Other languages
Chinese (zh)
Inventor
马鑫
林凯
侯利昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201710867699.5A priority Critical patent/CN109548079A/en
Publication of CN109548079A publication Critical patent/CN109548079A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/0231Traffic management, e.g. flow control or congestion control based on communication conditions
    • H04W28/0236Traffic management, e.g. flow control or congestion control based on communication conditions radio quality, e.g. interference, losses or delay
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/0005Control or signalling for completing the hand-off
    • H04W36/0011Control or signalling for completing the hand-off for data sessions of end-to-end connection

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a kind of method and devices of user-plane function management resource for indicating communication system, it is related to mobile communication field, the described method includes: UPF determines that the user face resource of user occupancy is in the permission duration of Idle state when creating the connection of user face;The UPF detects whether the user has business progress in the permission duration;If the user is not detected within the permission time business progress, the UPF notifies control plane function entity, and discharges user face resource according to the instruction of the control plane function entity.The embodiment of the present invention is according to permission time of user occupancy Internet resources free time, it is determined whether release resource, it is possible to reduce the occupancy of Internet resources promotes the resource utilization of network, while UL CL and Muti-homing can discharge old UPF anchor point.

Description

A kind of method and device for the user-plane function management resource indicating communication system
Technical field
The present invention relates to mobile communication field, in particular to a kind of user-plane function for indicating communication system manages resource Method, apparatus, equipment, system and storage medium.
Background technique
Fig. 1 is the general frame schematic diagram of the 5th generation communication system (5G), as shown in Figure 1, the 5G framework includes: access tube It manages function (Access Management Function, AMF), conversation management functional (Session Management Function, SMF), user-plane function (User Plane Function, UPF), uniform data management (Unified Data Management, UDM), policy control functions (Policy Control Function, PCF), wherein the connection in user face is UE to UPF, the connection of control plane are that UE to AMF arrives SMF, and control plane and medium surface are separation architectures, and UPF is managed by SMF.
When user initiates network service, data network (Data Network, DN) only can be connected to by a UPF and carried out Normal business uses, as shown in Figure 1.Multiple business can also be initiated simultaneously by a session, access different DN, as When access public network service (such as Internet) and the local service business of offer (such as operator).It is flat that there are two types of users in 5G at present Face connects framework (referring to 23.501 agreement of 3GPP), i.e. uplink classifier (Uplink Classifier, UL CL) and more hosts (Multi-homing), as shown in Figure 2.
In Uplink Classifier scheme, SMF is only that user distributes an address, while enabling multiple UPF.Its In a UPF user uplink message is classified, other are distributed to according to the destination address of user's message as UL CL UPF, while user's downlink message being converged, user is transmitted to by front end network element.Other UPF are as anchor point (UPF Anchor), user's message is forwarded to corresponding DN.
In Multi-homing scheme, SMF is that user distributes multiple addresses, while enabling multiple UPF.One of them User uplink message is distributed to it according to the source address of user's message as branch point (Branching Point, BP) by UPF He is UPF, while user's downlink message being converged, and is transmitted to user by front end network element.Other UPF will be used as anchor point Family message is forwarded to corresponding DN.
After the Path Setup of user face, there are some users always to deposit and do not initiate data service whithin a period of time, at this time net Network resource can be prolonged occupied.The case where for UL CL, connects when user only does local service as non-local business The UPF anchor point entered still occupies the resource of user plane.The case where for Muti-homing, when new UPF is used only in user After anchor point, old UPF anchor point still occupies user-plane resources.
Summary of the invention
A kind of method, apparatus of user-plane function management resource indicating communication system provided in an embodiment of the present invention, Equipment, system and storage medium solve the problems, such as user for a long time without business but still occupancy Internet resources.
A kind of method of the user-plane function management resource of the instruction communication system provided according to embodiments of the present invention, packet It includes:
UPF determines that the user face resource of user occupancy is in the permission duration of Idle state when creating the connection of user face;
The UPF detects whether the user has business progress in the permission duration;
If the user is not detected within the permission time business progress, the UPF notice control plane function Energy entity, and user face resource is discharged according to the instruction of the control plane function entity.
Preferably, the control plane function entity includes SMF with UPF described in PCF when creating user face and connect, determination The permission duration that the user face resource of user occupancy is in Idle state includes:
The permission duration for being pre-configured in local is determined as user occupancy and led to by the UPF when creating the connection of user face Letter resource is in the permission duration of Idle state;
Alternatively, the UPF obtains the permission duration being pre-configured on the SMF or institute when creating the connection of user face The permission duration that PCF is issued is stated, and acquired permission duration is determined as the user occupancy communication resource and is in permitting for Idle state Perhaps duration.
Preferably, the control plane function entity includes SMF and PCF, and the UPF is when creating the connection of user face, really The user face resource for determining user occupancy is in the permission duration of Idle state and includes:
The UPF obtains the permission duration being pre-configured on the SMF or the PCF when creating the connection of user face The permission duration issued;
The UPF is according to the permission duration of acquisition and is pre-configured in local permission duration, determines user occupancy User face resource be in the permission duration of Idle state.
Preferably, if described the user is not detected within the permission time has a business progress, the UPF notice Control plane function entity, and user face resource is discharged according to the instruction of the control plane function entity and includes:
If the user is not detected within the permission time business progress, the UPF is actively sent out to the SMF Application release user face resource request is sent, and receives the application that the SMF is determined and replied according to the request and discharges user face Resource response message;
If the application release user face resource response message, which carries, agrees to release instruction, the UPF is according to described same Meaning release instruction, discharges user face resource.
Preferably, further includes:
If the user is not detected within the permission time a business progress, the UPF is via the SMF by institute Stating, which allows to have timed out the message reached, is sent to the PCF, and receives the PCF and disappeared according to the policy update that the message issues Breath;
The UPF executes corresponding policy update operation according to the policy update message.
Preferably, further includes:
After discharging user face resource according to the instruction of the control plane function entity, the control plane function Energy entity determines whether to discharge the user face connection.
A kind of device of the user-plane function management resource of the instruction communication system provided according to embodiments of the present invention, packet It includes:
Duration determining module, for determining user occupancy when user-plane function entity UPF creation user face connects User face resource is in the permission duration of Idle state;
Business detection module, for detecting whether the user has business progress in the permission duration;
Resource release module notifies if having business progress for the user to be not detected within the permission time Control plane function entity, and user face resource is discharged according to the instruction of the control plane function entity.
A kind of system of the user-plane function management resource of the instruction communication system provided according to embodiments of the present invention, packet It includes:
User-plane function entity, for determining that the user face resource of user occupancy is in when creating the connection of user face The permission duration of Idle state notifies control plane if the user is not detected within the permission time business progress Functional entity;
Control plane function entity, for according to the notice from the user-plane function entity, it is determined whether release User face resource;
Wherein, the user-plane function entity discharges the user face according to the instruction of the control plane function entity Resource.
A kind of equipment of the user-plane function management resource of the instruction communication system provided according to embodiments of the present invention, packet It includes: processor, and the memory with processor coupling;Be stored on the memory to run on the processor Instruction communication system user-plane function management resource program, it is described instruction communication system user-plane function management The program of resource realizes the side of the user-plane function management resource of above-mentioned instruction communication system when being executed by the processor The step of method.
A kind of storage medium provided according to embodiments of the present invention is stored thereon with the user plane function of instruction communication system The program of resource can be managed, the program of the user-plane function management resource of the instruction communication system is real when being executed by processor The step of method of the user-plane function management resource of existing above-mentioned instruction communication system.
Technical solution provided in an embodiment of the present invention has the following beneficial effects:
The embodiment of the present invention is according to permission time of user occupancy Internet resources free time, it is determined whether release resource, it can be with The occupancy for reducing Internet resources, promotes the resource utilization of network, while UL CL and Muti-homing can discharge old UPF anchor Point.
Detailed description of the invention
Fig. 1 is the general frame schematic diagram of the 5th generation communication system;
Fig. 2 is the schematic diagram based on UL CL or Muti-homing framework;
Fig. 3 is the method flow of the user-plane function management resource of instruction communication system provided in an embodiment of the present invention Figure;
Fig. 4 is the device block diagram of the user-plane function management resource of instruction communication system provided in an embodiment of the present invention;
Fig. 5 is the first interaction signal of the method for instruction user-plane function management resource provided in an embodiment of the present invention Figure;
Fig. 6 is the second interaction signal of the method for instruction user-plane function management resource provided in an embodiment of the present invention Figure;
Fig. 7 is the third interaction signal of the method for instruction user-plane function management resource provided in an embodiment of the present invention Figure.
Specific embodiment
Below in conjunction with attached drawing to a preferred embodiment of the present invention will be described in detail, it should be understood that described below is excellent Select embodiment only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
Fig. 3 is the method flow of the user-plane function management resource of instruction communication system provided in an embodiment of the present invention Figure, as shown in figure 3, step includes:
Step S101:UPF determines that the user face resource of user occupancy is in permitting for Idle state when creating the connection of user face Perhaps duration.
When creating user face and connecting, the UPF, which will be pre-configured in local permission duration and be determined as user occupancy, to be led to Letter resource is in the permission duration of Idle state.
Alternatively, the UPF obtains the permission duration being pre-configured on the SMF or institute when creating the connection of user face The permission duration that PCF is issued is stated, and acquired permission duration is determined as the user occupancy communication resource and is in permitting for Idle state Perhaps duration.
Alternatively, the UPF obtains the permission duration being pre-configured on the SMF or institute when creating the connection of user face The permission duration that PCF is issued is stated, and according to the permission duration of acquisition and is pre-configured in local permission duration, determines and uses The user face resource that family occupies is in the permission duration of Idle state.
Wherein, control plane function entity includes SMF and PCF.
Step S102: the UPF detects whether the user has business progress in the permission duration.
Step S103: if the user is not detected within the permission time business progress, the UPF notice control Plane functional entity processed, and user face resource is discharged according to the instruction of the control plane function entity.
When the user, which is not detected, within the permission time business, the UPF is to the SMF active transmission application User face resource request is discharged, and receives the application release user face resource that the SMF is determined and replied according to the request and rings Message is answered, if application release user face resource response message, which carries, is agreed to release instruction, the UPF is according to the agreement Release instruction, discharges user face resource.
Further, when the user is not detected within the permission time has business progress, the UPF is via described SMF allows described to have timed out the message reached and is sent to the PCF, and receives the plan that the PCF is issued according to the message Slightly update message executes corresponding policy update operation then according to the policy update message.
SMF is also wrapped after discharging user face resource according to the instruction of the control plane function entity Include: the control plane function entity determines whether to discharge the user face connection.
It will appreciated by the skilled person that implement the method for the above embodiments be can be with Relevant hardware is instructed to complete by program, the program can store in computer-readable storage medium.Into One step says that the present invention can also provide a kind of storage medium, is stored thereon with the user-plane function management of instruction communication system The program of the program of resource, the user-plane function management resource of the instruction communication system is realized above-mentioned when being executed by processor Instruction communication system user-plane function management resource method the step of.Wherein, the storage medium may include ROM/RAM, magnetic disk, CD, USB flash disk.
Fig. 4 is the device block diagram of the user-plane function management resource of instruction communication system provided in an embodiment of the present invention, As shown in Figure 4, comprising:
Duration determining module, for determining user occupancy when user-plane function entity UPF creation user face connects User face resource is in the permission duration of Idle state;
Business detection module, for detecting whether the user has business progress in the permission duration;
Resource release module notifies if having business progress for the user to be not detected within the permission time Control plane function entity, and user face resource is discharged according to the instruction of the control plane function entity.
Wherein, duration determining module determines that the user occupancy communication resource is in the concrete mode packet of the permission duration of Idle state It includes:
1. the permission duration for being pre-configured in local is determined as the user occupancy communication resource when creating the connection of user face Permission duration in Idle state;
2. when creating the connection of user face, what the permission duration or the PCF that acquisition is pre-configured on the SMF issued Allow duration, and acquired permission duration is determined as the permission duration that the user occupancy communication resource is in Idle state;
3. when creating the connection of user face, what the permission duration or the PCF that acquisition is pre-configured on the SMF issued Allow duration, and according to the permission duration of acquisition and be pre-configured in local permission duration, determines the use of user occupancy Family face resource is in the permission duration of Idle state, such as is determined according to priority, or determined according to duration size.
Wherein, the resource release module discharges user face resource request to the SMF active transmission application, and receives institute It states the application that SMF is determined and replied according to the request and discharges user face resource response message, if the application discharges user face Resource response message, which carries, agrees to release instruction, then is discharged and indicated according to the agreement, discharge user face resource.
Further, the resource release module can also be via the SMF by the message that allows to have timed out and reach It is sent to the PCF, and receives the policy update message that the PCF is issued according to the message, then more according to the strategy New information executes corresponding policy update operation.
Described device can be set on UPF.
The present embodiment provides it is a kind of indicate communication system user-plane function management resource equipment, processor, and With the memory of processor coupling;The instruction communication system that can be run on the processor is stored on the memory User-plane function management resource program, it is described instruction communication system user-plane function management resource program by institute The step of stating the method for the user-plane function management resource that above-mentioned instruction communication system is realized when processor executes.
The embodiment of the present invention specifically provides a kind of instruction user-plane function management resource based on packet switch telecommunication system Method.In summary, when SMF creates the connection of user face by N4 mouthfuls of notice UPF, carrying allows the user plane of the user to provide The time (i.e. permission duration or period) of source free time gives UPF, when UPF has found that the user carries out without business within the time period When, SMF is notified by UPF, SMF according to strategy decision whether discharge resource on the UPF with whether initiate what user conversation connected Release.The time granularity of user-plane resources free time is divided into session level, Flow grades of Qos, service level, which can be by PCF is issued, and can also directly be configured on SMF, UPF.
The embodiment of the invention also provides a kind of system of user-plane function management resource for indicating communication system, packets It includes:
User-plane function entity, for determining that the user face resource of user occupancy is in when creating the connection of user face The permission duration of Idle state notifies control plane if the user is not detected within the permission time business progress Functional entity;
Control plane function entity, for according to the notice from the user-plane function entity, it is determined whether release User face resource;
Wherein, the user-plane function entity discharges the user face according to the instruction of the control plane function entity Resource.
Further, described after discharging user face resource according to the instruction of the control plane function entity Control plane function entity is also used to determine whether to discharge the user face connection.
Wherein, the control plane function entity includes AMF entity, SMF entity and PCF entity, below by Fig. 5 to figure 7 are further described.
The entity that the embodiment of Fig. 5 to Fig. 7 is related to includes AMF entity, SMF entity, UPF entity, PCF entity, (wireless) Access network ((R) AN), user terminal (UE).
Fig. 5 is the first interaction signal of the method for instruction user-plane function management resource provided in an embodiment of the present invention Figure, as shown in figure 5, there is only a UPF for the user face connection of user in the present embodiment.SMF establishes user face in notice UPF When connection, the time of session level free time is carried, when UPF discovery user's session carries out within the period of setting without business When, actively apply for that Session Resources discharge, discharges process from whether SMF decision initiates session to wireless side.This example includes as follows Step:
Step 301, UE is requested to AMF initiation protocol data cell (Protocol Data Unit, PDU) session establishment.
Step 302, AMF initiates the request of PDU session establishment to SMF.
Step 303, SMF initiates acquisition strategy request to PCF.
Step 304, PCF replys SMF acquisition strategy response, and carries session free time instruction (optional).
Step 305, SMF initiates user face to UPF and establishes request, if PCF carries free time instruction, according to local Priority decisions are issued using PCF or use local, or negotiate minimum value, and the session after carrying decision is idle Time is indicated to user face.User face receives request message, if SMF issues the instruction of session free time, according to UPF sheet Ground priority decisions are issued using SMF or use the local UPF, or negotiate minimum value.
Step 306, UPF replys SMF user face and establishes response.
Step 307, SMF replys the response of AMF PDU session establishment.
Step 308, AMF replys the response of UE PDU session establishment.
Step 309, UPF is indicated according to free time, it is found that the session of user is no within this period of setting and appointed What business carries out, and the release request application of UPF active transmission user-plane resources is to SMF.
Step 310, SMF receive UPF user-plane resources release application after, according to strategic decision-making whether consenting user meeting Talk about the release request of resource.If SMF decision agrees to release, is carried in the response replied and agree to that release user face resource refers to Show.After UPF receives response message, user face resource is discharged according to instruction.
If SMF decision releasing session, also has the following steps:
Step 311, SMF notifies AMF to discharge PDU session.
Step 312, AMF notifies UE to discharge PDU session.
Step 313, UE replys AMF release PDU conversational response.
Step 314, AMF replys SMF release PDU conversational response.At this point, the Internet resources release of user finishes.
Step 315, SMF sends releasing session strategy request to PCF.
Step 316, PCF replys SMF releasing session policy response.
Fig. 6 is the second interaction signal of the method for instruction user-plane function management resource provided in an embodiment of the present invention Figure, as shown in fig. 6, there is only a UPF for the user face connection of user in the present embodiment.SMF creates Qos in notice UPF When Flow, Qos Flow grades or/and the instruction of service level free time are carried, when UPF has found Qos Flow grades or/and service level sky Whether more when reaching between idle, active reporting free time reaches application, by PCF decision new strategy.This example includes following step It is rapid:
Step 401, PCF initiates more new strategy to SMF, and strategy can indicate to establish new Qos Flow, and carry the Qos Flow, or/and update the instruction of service level free time.
Step 402, SMF is requested in person to UPF initiation update user and is asked, if PCF carries free time instruction, according to local Priority decisions are issued using PCF or use local, or negotiate minimum value, the Qos Flow after carrying decision And/or service level free time is indicated to user face.
Step 403, UPF, which is replied, updates the response of user face.
If the strategy that PCF is issued is the newly-built Qos Flow of newly-built instruction, there is step 404 to 407, otherwise do not have.
Step 404, SMF is sent to AMF establishes new Qos Flow request.
Step 405, AMF is sent to UE establishes new Qos Flow request.
Step 406, UE replys AMF and establishes new Qos Flow response.
Step 407, AMF replys SMF and establishes new Qos Flow response.
Step 408, SMF replys PCF update policy response.
Step 409, UPF is indicated according to free time, it is found that the Qos Flow of user or/and service level free time are arrived It reaches, UPF active reporting Qos Flow free time reaches to SMF.
Step 410, SMF reports Qos Flow free time to reach to PCF.
Step 411, PCF issues the policy update for the Qos Flow.
Step 412, SMF issues Qos Flow strategy to UPF.If the strategy that PCF is issued is to delete the Qos Flow, UPF executes delete operation.
If the strategy that PCF is issued is to delete the Qos Flow, also comprise the following steps:
Step 413, SMF notifies AMF to discharge Qos flow.
Step 414, AMF notifies UE to discharge Qos flow.
Step 415, UE replys AMF release PDU conversational response.
Step 416, AMF replys SMF release PDU conversational response.At this point, the Internet resources release of user finishes.
Fig. 7 is the third interaction signal of the method for instruction user-plane function management resource provided in an embodiment of the present invention Figure, as shown in fig. 7, in the present embodiment, there are three UPF in the user face connection of user, one of UPF for UL CL or The Branching Point of Muti-homing, other two UPF are user plane anchor point.SMF is notifying each UPF foundation use When the plane of family, the time for allowing the user face resource free time of the user is carried, when customer service is only in newly-established new UPF anchor When point carries out, when old anchor point UPF discovery user carries out within the period of the setting without business, actively apply for user resources Release, whether SMF agrees to that old anchor point UPF discharges the user face resource bid of the user according to strategic decision-making, if strategic decision-making To agree to, then SMF notifies old UPF to discharge user face resource of the user on old anchor point UPF.This example includes the following steps:
Step 501, UE initiates the request of PDU session establishment to AMF.
Step 502, AMF initiates the request of PDU session establishment to SMF.
Step 503, SMF initiates user face to UPF and establishes request, and carries the user face resource free time for allowing the user Time instruction.
Step 504, UPF replys SMF user face and establishes response.
Step 505, SMF replys the response of AMF PDU session establishment.
Step 506, AMF replys the response of UE PDU session establishment.
Step 507, the triggering of mobile or new business occurs for user, and due to the requirement of conversation continuity, SMF establishes UPF Branching Point/UL CL and new UPF (with reference to the process of 23502 agreement of 3GPP).
Step 508, old anchor point UPF is indicated according to free time, finds user within this period of setting without task Business carries out, and old anchor point UPF active transmission user face resource release application is to SMF.
Step 509, SMF according to strategic decision-making, whether request by the release of consenting user Session Resources.If SMF decision is agreed to It discharges, is then carried in the response replied and agree to release user face resource instruction.After UPF receives response message, discharged according to instruction User face resource.
The method that the embodiment of the present invention realizes instruction user-plane function management resource can be adapted for controlling plane and use A variety of connection scenes of family plane, by the user plane free time of control plane instruction user, when user plane is in the sky of instruction When being carried out in idle without business, is actively initiated to discharge by user plane or report application, whether discharged by control plane decision Internet resources issue new strategy, can only discharge user-plane resources, can also discharge all moneys of user in a network Source can also according to circumstances update user face strategy.
For the embodiment of the present invention in the service of core net network when the connection of creation user face, instruction allows the user face of user to provide The time of source free time, UPF actively initiate the release application of user face resource according to the time, should by whether SMF decision needs to discharge Resource on UPF and whether initiate user session connection release, the occupancy of resources of core network can be reduced, promote core net Resource utilization, also provide a kind of method for discharging old UPF anchor point for UL CL and Muti-homing.
Although describing the invention in detail above, but the invention is not restricted to this, those skilled in the art of the present technique It can be carry out various modifications with principle according to the present invention.Therefore, all to be modified according to made by the principle of the invention, all it should be understood as Fall into protection scope of the present invention.

Claims (10)

1. a kind of method for the user-plane function management resource for indicating communication system characterized by comprising
User-plane function entity UPF determines that the user face resource of user occupancy is in Idle state when creating the connection of user face Permission duration;
The UPF detects whether the user has business progress in the permission duration;
If the user is not detected within the permission time business progress, the UPF notice control plane function is real Body, and user face resource is discharged according to the instruction of the control plane function entity.
2. the method according to claim 1, wherein the control plane function entity includes conversation management functional Entity SMF, when creation user face connects, determines the user face money of user occupancy with UPF described in policy control functions entity PCF The permission duration that source is in Idle state includes:
The UPF will be pre-configured in local permission duration and be determined as user occupancy communication money when creating the connection of user face Source is in the permission duration of Idle state;
Alternatively, the UPF obtains the permission duration being pre-configured on the SMF or the PCF when creating the connection of user face The permission duration issued, and when acquired permission duration being determined as the user occupancy communication resource being in the permission of Idle state It is long.
3. the method according to claim 1, wherein the control plane function entity includes SMF and PCF, institute UPF is stated when creating user face and connecting, determines that the user face resource of user occupancy is in the permission duration of Idle state and includes:
The UPF obtains the permission duration being pre-configured on the SMF or the PCF is issued when creating the connection of user face Permission duration;
The UPF is according to the permission duration of acquisition and is pre-configured in local permission duration, determines the use of user occupancy Family face resource is in the permission duration of Idle state.
4. according to the method in claim 2 or 3, which is characterized in that if described be not detected institute within the permission time Stating user has business progress, then the UPF notifies control plane function entity, and according to the finger of the control plane function entity Show that release user face resource includes:
If the user is not detected within the permission time a business progress, the UPF is to SMF active transmission Shen User face resource request please be discharge, and receives the application that the SMF is determined and replied according to the request and discharges user face resource Response message;
If the application release user face resource response message, which carries, agrees to release instruction, the UPF is released according to the agreement Instruction is put, user face resource is discharged.
5. according to the method in claim 2 or 3, which is characterized in that further include:
If the user is not detected within the permission time business progress, the UPF permits via the SMF by described Permitted to have timed out the message reached and be sent to the PCF, and receives the policy update message that the PCF is issued according to the message;
The UPF executes corresponding policy update operation according to the policy update message.
6. according to the method described in claim 4, it is characterized by further comprising:
After discharging user face resource according to the instruction of the control plane function entity, the control plane function is real Body determines whether to discharge the user face connection.
7. a kind of device for the user-plane function management resource for indicating communication system characterized by comprising
Duration determining module, for determining the user of user occupancy when user-plane function entity UPF creation user face connects Face resource is in the permission duration of Idle state;
Business detection module, for detecting whether the user has business progress in the permission duration;
Resource release module notifies to control if having business progress for the user to be not detected within the permission time Plane functional entity, and user face resource is discharged according to the instruction of the control plane function entity.
8. a kind of system for the user-plane function management resource for indicating communication system characterized by comprising
User-plane function entity, for when creating the connection of user face, determining that the user face resource of user occupancy is in the free time The permission duration of state notifies control plane function if the user is not detected within the permission time business progress Entity;
Control plane function entity, for according to the notice from the user-plane function entity, it is determined whether described in release User face resource;
Wherein, the user-plane function entity discharges the user face according to the instruction of the control plane function entity and provides Source.
9. a kind of equipment for the user-plane function management resource for indicating communication system characterized by comprising processor, with And the memory with processor coupling;The instruction communication system that can be run on the processor is stored on the memory The program of the user-plane function management resource of system, the program quilt of the user-plane function management resource of the instruction communication system The user-plane function pipe of the instruction communication system as described in any one of claims 1 to 5 is realized when the processor executes The step of managing the method for resource.
10. a kind of storage medium, which is characterized in that be stored thereon with the user-plane function management resource of instruction communication system The program of program, the user-plane function management resource of the instruction communication system realizes such as claim when being executed by processor The step of method of the user-plane function management resource of instruction communication system described in any one of 1 to 5.
CN201710867699.5A 2017-09-22 2017-09-22 A kind of method and device for the user-plane function management resource indicating communication system Pending CN109548079A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710867699.5A CN109548079A (en) 2017-09-22 2017-09-22 A kind of method and device for the user-plane function management resource indicating communication system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710867699.5A CN109548079A (en) 2017-09-22 2017-09-22 A kind of method and device for the user-plane function management resource indicating communication system

Publications (1)

Publication Number Publication Date
CN109548079A true CN109548079A (en) 2019-03-29

Family

ID=65830759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710867699.5A Pending CN109548079A (en) 2017-09-22 2017-09-22 A kind of method and device for the user-plane function management resource indicating communication system

Country Status (1)

Country Link
CN (1) CN109548079A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112106425A (en) * 2020-08-11 2020-12-18 北京小米移动软件有限公司 Resource processing method and device, communication equipment and storage medium
WO2020253735A1 (en) * 2019-06-17 2020-12-24 华为技术有限公司 Congestion control method and device
CN113282410A (en) * 2021-05-14 2021-08-20 中国联合网络通信集团有限公司 Resource allocation method and device
WO2021208803A1 (en) * 2020-04-13 2021-10-21 中兴通讯股份有限公司 Resource management method and apparatus, server, and storage medium
CN114339804A (en) * 2020-09-29 2022-04-12 中国移动通信有限公司研究院 Service registration method, device, equipment and readable storage medium

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100227621A1 (en) * 2008-01-21 2010-09-09 Huawei Technologies Co., Ltd. Method and device of network resource release processing
EP2509386A1 (en) * 2011-04-05 2012-10-10 Panasonic Corporation Improved release of radio resources for machine-type-communication devices
US20130295936A1 (en) * 2011-01-10 2013-11-07 Huawei Technologies Co., Ltd Method and Device for Releasing Context-Related Resource of User Equipment
WO2014085965A1 (en) * 2012-12-03 2014-06-12 华为技术有限公司 Method for managing hardware resources of communication board, communication board and base station
CN103945535A (en) * 2013-01-18 2014-07-23 中兴通讯股份有限公司 Paging optimizing method, device and system, and quick path releasing method and device
US20140226576A1 (en) * 2011-08-11 2014-08-14 Maruti Gupta Reduced signaling overhead during radio resource control (rrc) state transitions
US20150223252A1 (en) * 2012-08-20 2015-08-06 Zte Corporation Resource Allocation Method and Device
CN107018542A (en) * 2017-03-27 2017-08-04 中兴通讯股份有限公司 The processing method of status information, device and storage medium in network system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100227621A1 (en) * 2008-01-21 2010-09-09 Huawei Technologies Co., Ltd. Method and device of network resource release processing
US20130295936A1 (en) * 2011-01-10 2013-11-07 Huawei Technologies Co., Ltd Method and Device for Releasing Context-Related Resource of User Equipment
EP2509386A1 (en) * 2011-04-05 2012-10-10 Panasonic Corporation Improved release of radio resources for machine-type-communication devices
US20140226576A1 (en) * 2011-08-11 2014-08-14 Maruti Gupta Reduced signaling overhead during radio resource control (rrc) state transitions
US20150223252A1 (en) * 2012-08-20 2015-08-06 Zte Corporation Resource Allocation Method and Device
WO2014085965A1 (en) * 2012-12-03 2014-06-12 华为技术有限公司 Method for managing hardware resources of communication board, communication board and base station
CN103945535A (en) * 2013-01-18 2014-07-23 中兴通讯股份有限公司 Paging optimizing method, device and system, and quick path releasing method and device
CN107018542A (en) * 2017-03-27 2017-08-04 中兴通讯股份有限公司 The processing method of status information, device and storage medium in network system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周茜等: "eMLPP业务中资源抢占过程的资源释放机制", 《铁道通信信号》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020253735A1 (en) * 2019-06-17 2020-12-24 华为技术有限公司 Congestion control method and device
WO2021208803A1 (en) * 2020-04-13 2021-10-21 中兴通讯股份有限公司 Resource management method and apparatus, server, and storage medium
CN112106425A (en) * 2020-08-11 2020-12-18 北京小米移动软件有限公司 Resource processing method and device, communication equipment and storage medium
CN112106425B (en) * 2020-08-11 2023-11-07 北京小米移动软件有限公司 Resource processing method and device, communication equipment and storage medium
CN114339804A (en) * 2020-09-29 2022-04-12 中国移动通信有限公司研究院 Service registration method, device, equipment and readable storage medium
CN113282410A (en) * 2021-05-14 2021-08-20 中国联合网络通信集团有限公司 Resource allocation method and device
CN113282410B (en) * 2021-05-14 2023-06-23 中国联合网络通信集团有限公司 Resource allocation method and device

Similar Documents

Publication Publication Date Title
CN109548079A (en) A kind of method and device for the user-plane function management resource indicating communication system
CN107919969B (en) Policy control method and device
CN107251643B (en) Method and apparatus and computer-readable medium for radio resource control
CN110169140A (en) System and method for session management
CN107743307A (en) A kind of location-based MEC processing method and equipment
CN110366132A (en) Communication means and device
CN105264948B (en) For the method and system that dynamic spectrum arbitrates subscriber profile management
CN102149215A (en) Method for transmitting keep-alive information, terminal and network equipment
CN102098759A (en) Method and device for access control
CN103634746B (en) Method and apparatus for keeping PoC continuous connection handling capacity
CN103843430B (en) A kind of control method of paging, device, entity and the network equipment
CN105813119B (en) Disaster-tolerant recovery method, network element and communication system
CN102440030B (en) Service implementation method, device and system
CN109150808B (en) Communication method, device and system
CN102577449B (en) Method, device and system for activation and deactivation of priority service
CN105359573B (en) Method and apparatus for unloading data service in a wireless communication system
CN101534495B (en) Method for establishing the service bearing of user equipment and device thereof
TW201338605A (en) Communication system and communication method thereof
CN108307512A (en) A kind of restoration methods and device of connected state
CN101977405A (en) Delayed-release method and device for temporary block flow
WO2014086320A1 (en) Packet data connection processing method, terminal device, network-side device and system
CN109587677A (en) Restoration methods, terminal, base station and the equipment of the core network of Data Radio Bearer
CN105493533A (en) Online charging method, gateway device and online charging device
CN107528931A (en) A kind of adaptive keeping method of IP address based on user behavior, apparatus and system
CN106464538A (en) Service aware admission control of radio bearers

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190329