CN109523190A - A kind of management method of electric energy meter, managing device and terminal - Google Patents

A kind of management method of electric energy meter, managing device and terminal Download PDF

Info

Publication number
CN109523190A
CN109523190A CN201811441537.6A CN201811441537A CN109523190A CN 109523190 A CN109523190 A CN 109523190A CN 201811441537 A CN201811441537 A CN 201811441537A CN 109523190 A CN109523190 A CN 109523190A
Authority
CN
China
Prior art keywords
electric energy
energy meter
health assessment
management method
failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811441537.6A
Other languages
Chinese (zh)
Inventor
冯波
史轮
陶鹏
王毅
孙勇强
韩永禄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
State Grid Hebei Energy Technology Service Co Ltd
Marketing Service Center of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
State Grid Hebei Energy Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd, State Grid Hebei Energy Technology Service Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811441537.6A priority Critical patent/CN109523190A/en
Publication of CN109523190A publication Critical patent/CN109523190A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F18/00Pattern recognition
    • G06F18/20Analysing
    • G06F18/21Design or setup of recognition systems or techniques; Extraction of features in feature space; Blind source separation
    • G06F18/214Generating training patterns; Bootstrap methods, e.g. bagging or boosting
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F18/00Pattern recognition
    • G06F18/20Analysing
    • G06F18/24Classification techniques
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor

Abstract

The present invention is suitable for technical field of electric power, provides management method, managing device, terminal and the computer readable storage medium of a kind of electric energy meter, and the management method includes: to carry out failure predication to electric energy meter;It is based on failure predication as a result, to the electric energy meter carry out health assessment;Based on health assessment as a result, determining the management strategy of the electric energy meter.The present invention is conducive to the electric energy meter timely judging to be likely to occur failure and being replaced, and the timeliness of replacement failure electric energy meter can be improved, and ensures the interests of Utilities Electric Co. or power consumer.

Description

A kind of management method of electric energy meter, managing device and terminal
Technical field
The invention belongs to technical field of electric power more particularly to a kind of management method of electric energy meter, managing device, terminal and meters Calculation machine readable storage medium storing program for executing.
Background technique
Electric energy meter is the instrument for measuring electric energy, also known as kilowatt-hour meter.Currently, electric energy meter is usually to be found the presence of event Corresponding management strategy is taken again after barrier, for example, carrying out sampling observation in electric power personnel finds that certain electric energy meter has metering class failure, Metering can just not replace the electric energy meter on time.
However, current this electric energy meter way to manage is not prompt enough to the replacement of failure electric energy meter, when discovery electric energy meter Failure when, failure have existed a period of time, this may result in Utilities Electric Co. or individual benefit damage.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of management method of electric energy meter, managing device, terminal and computers Readable storage medium storing program for executing is not prompt enough to the replacement of failure electric energy meter in the prior art to solve the problems, such as.
The first aspect of the embodiment of the present invention provides a kind of management method of electric energy meter, and the management method includes:
Failure predication is carried out to electric energy meter;
It is based on failure predication as a result, to the electric energy meter carry out health assessment;
Based on health assessment as a result, determining the management strategy of the electric energy meter.
The second aspect of the embodiment of the present invention provides a kind of managing device of electric energy meter, and the managing device includes:
Failure predication unit, for carrying out failure predication to electric energy meter;
Health assessment unit, for based on failure predication unit carry out failure predication as a result, to the electric energy meter carry out Health assessment;
Management strategy determination unit, for based on health assessment unit carry out health assessment as a result, determining the electric energy The management strategy of table.
The third aspect of the embodiment of the present invention provides a kind of terminal, including memory, processor and is stored in described In memory and the computer program that can run on the processor, the processor are realized when executing the computer program As described in any one the step of the management method of electric energy meter.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, the computer-readable storage Media storage has computer program, and the management of the electric energy meter as described in any one is realized when the computer program is executed by processor The step of method.
Existing beneficial effect is the present invention compared with prior art:
The present invention by electric energy meter carry out failure predication, can find the failure that electric energy meter is likely to occur in advance, for The failure that electric energy meter is likely to occur may further carry out health assessment, and the fortune of electric energy meter is reflected by the result of health assessment Row health status, and then according to the operation health status of electric energy meter, determine the management strategy of the electric energy meter, namely determine if It is replaced.Therefore, the present invention is conducive to the electric energy meter timely judging to be likely to occur failure and being replaced, The timeliness of replacement failure electric energy meter can be improved, ensure the interests of Utilities Electric Co. or power consumer.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is the implementation flow chart of the management method of electric energy meter provided in an embodiment of the present invention;
Fig. 2 is the implementation flow chart of the management method of electric energy meter provided in an embodiment of the present invention;
Fig. 3 is the schematic diagram of terminal provided in an embodiment of the present invention.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific The present invention also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity The detailed description of road and method, in case unnecessary details interferes description of the invention.
To make the object, technical solutions and advantages of the present invention clearer, pass through specific embodiment below in conjunction with attached drawing To be illustrated.
Referring to Fig. 1, it illustrates the implementation flow charts of the management method of electric energy meter provided in an embodiment of the present invention, are described in detail such as Under:
In a step 101, failure predication is carried out to electric energy meter.
In embodiments of the present invention, it is necessary first to which electric energy meter progress failure predication is needed to carry out failure predication herein Electric energy meter refer to the electric energy meter in the operation phase.In power marketing professional system, exists and largely can be used for electric energy meter event Hinder the data of trend analysis.For example, metering production scheduling platform has the full performance data before the electric energy meter supply of material, electric energy meter arrival Afterwards sample comparison, sampling observation, full inspection, the acceptance of the bid batch for each link gauging error data and each supplier such as tearing back open, receipt lot, The data such as the fault message that return of goods batch information and operation link occur;In power information acquisition system, there is electric energy meter metering electricity Amount, operating condition and logout and sales service application system tear table reason open, bug list note complains the data such as work order.Also It is to say, in existing electric system, can be relatively easy to and get electric energy meter in the Life Cycles such as factory stage and operation phase The calibrating data and operational monitoring data of phase.
Statistics and analysis is carried out using these data, the prediction of the failure of electric energy meter may be implemented, for example, can be with CART Based on algorithm, by analyzing multiple attributes relevant to electrical energy meter fault, simultaneously Optimal Decision-making tree is established, to calculate electric energy meter Fault rate.
Optionally, above-mentioned steps 101 can be realized based on following steps:
Step A1 obtains the characteristic when electric energy meter is in different life stages;
Step A2 carries out fusion treatment to the characteristic, obtains the feature vector for characterizing the electric energy meter;
Described eigenvector is inputted trained fault prediction model in advance, obtains the event of the electric energy meter by step A3 Hinder probability of happening.
In embodiments of the present invention, characteristic when available electric energy meter is in different life stages, these features Data are data relevant to electrical energy meter fault;By carrying out fusion treatment to these characteristics, to obtain for characterizing electricity The feature vector of the operation characteristic of energy table;Obtained feature vector is inputted into trained fault prediction model in advance later, it can To obtain the fault rate of the electric energy meter.
In embodiments of the present invention, fault prediction model can be based on XGBOOST (extreme Gradient Boosting) algorithm constructs.
Optionally, before above-mentioned steps A3, can also include:
Step B1 obtains the fault message for tearing back electric energy meter open;
Step B2 tears back characteristic when electric energy meter is in different life stages described in acquisition open;
Step B3, using it is described tear open back electric energy meter in different life stages when characteristic and the fault message Form training set;
Step B4 is trained the fault prediction model for being in advance based on the building of XGBOOST algorithm using the training set, Obtain trained fault prediction model.
Fault prediction model based on the building of XGBOOST algorithm has the various atypical characteristics of learning data Ability needs to carry out the parameter adjustment of model for lift scheme effect.In embodiments of the present invention, it can use and tear telegram in reply open The relevant information of energy table, is formed training set, is trained to the fault prediction model constructed based on XGBOOST algorithm, and then To trained fault prediction model.
Electric energy meter can be split back due to failure rotation, business change, application verification etc., tear telegram in reply open by obtaining these Can table fault message and these tear back electric energy meter open in the operation information of operation phase, formation training set, both to tearing telegram in reply energy open The relevant information of table has accomplished effective use, and realizes the training and parameter adjustment to fault prediction model.
Optionally, above-mentioned steps B1 can be realized based on following steps:
Step B11 is obtained and is torn back electric energy meter picture library open as training sample set with mark and label, wherein is described Label is used to indicate the fault message for tearing back electric energy meter open, described to be noted for indicating to tear back the fault bit on the picture of electric energy meter open It sets;
Step B12 is trained the electric energy meter appearance fault identification model pre-established using the training sample set, Obtain trained electric energy meter appearance fault identification model, wherein the electric energy meter appearance fault identification model is based on Fast- The convolutional neural networks of Rcnn algorithm;
Step B13 obtains the image information to be identified for tearing back electric energy meter open, will train described in described image information input Electric energy meter appearance fault identification model, obtain the fault message to be identified for tearing back electric energy meter open.
Usually longer due to tearing back electric energy meter runing time open, the fault type being related to is more, needs manually to pass through appearance Detect the fault message, such as fault type etc. for determining electric energy meter.In embodiments of the present invention, it can be based on by establishing The convolutional neural networks of Fast-Rcnn algorithm identify and judge electric energy meter progress failure to be identified of tearing open back.To may be used also To improve the recognition efficiency for the failure for tearing back electric energy meter open.
In embodiments of the present invention, may include: by the failure that electric energy meter appearance fault identification model can recognize The scarce picture of blank screen, liquid crystal, rainbow screen, tripping lamp are bad, programming key is gone bad and the failures such as liquid crystal leakage.
Optionally, in embodiments of the present invention, the different life stages may include factory stage and operation phase, institute Stating characteristic includes at calibrating information and component information, the electric energy meter when electric energy meter is in the factory stage Weather information, electrical work information and abnormal events information when the operation phase.
In embodiments of the present invention, meteorologic factor to a certain degree can impact the malfunction of electric energy meter, therefore, need Fully consider that the regional disparity of electric energy meter, the weather information may include temperature, rainfall (humidity), illumination, interior/room Outside, the information such as one-storey house/building.
In embodiments of the present invention, abnormal events information may include over-voltage events, overcurrent events, under-voltage event, Tai Qu The information such as rate of qualified voltage, each batch operation troubles rate.
In embodiments of the present invention, electrical work information may include the statistical information of electricity consumption, thus analyze electricity consumption Measure big, the small influence to electric energy table function of electricity consumption.Such as: it is better that the big electric energy meter of electricity consumption may be used more, and electricity consumption is small Electric energy meter does not have to high failure rate instead for a long time.
In embodiments of the present invention, it for component information, can establish for electric energy meter producer, electric energy meter component type Number assessment of fault model, realizes the accident analysis based on component rank, can be applied to component management and Lectotype Decision Making, prevents Only there is familial defect.
In embodiments of the present invention, it can also study and establish electrical energy meter fault related degree model, utilize clustering algorithm and skin Ademilson correlation analysis algorithm research influence factor and failure modes correlation.
In a step 102, based on failure predication as a result, to the electric energy meter carry out health assessment.
In embodiments of the present invention, the result of failure predication includes the probability of happening of various failures, for example, non-metering class The probability of happening of failure, the probability of happening for measuring class failure.It, can be in the case of certain fault rates are lower than designated value Think that the operating status of the electric energy meter is good.
In embodiments of the present invention, according to failure predication as a result, can the current health state to electric energy meter comment Valence obtains the health assessment score of the electric energy meter.
Optionally, above-mentioned steps 102 can be realized based on following manner:
The result of the failure predication of the electric energy meter is inputted into preset Topsis health assessment model, obtains the electric energy The health assessment score of table.
TOPSIS(Technique for Order Preference by Similarity to an Ideal Solution) method is the method being ranked up according to the degree of closeness of limited evaluation object and idealization target, is existing Object in carry out relative superior or inferior evaluation method.
In embodiments of the present invention, according to the failure predication of electric energy meter as a result, and preassigned various results refer to Target weight can be obtained by the way that the result of the failure predication of the electric energy meter is inputted preset Topsis health assessment model To the health assessment score of the electric energy meter.
In step 103, based on health assessment as a result, determining the management strategy of the electric energy meter.
In embodiments of the present invention, the result of health assessment includes health assessment score, and health assessment score can be anti- The operating status of electric energy meter is answered, the higher electric energy meter operating status of health assessment score is good, can reduce to this kind of electric energy meter Concern, advantageously reduces the workload of base electric power personnel.
Optionally, above-mentioned steps 103 can be realized based on following manner:
Electric energy meter to the health assessment score lower than the first preset value carries out batch replacement;
First preset value is not less than to the health assessment score, and, the electric energy meter lower than the second preset value carries out Emphasis monitoring.
In embodiments of the present invention, the lower electric energy meter of health assessment score needs to carry out more there may be operation problem It changes or emphasis monitors.
From the foregoing, it will be observed that the present invention can have found in advance what electric energy meter was likely to occur by carrying out failure predication to electric energy meter Failure may further carry out health assessment for the failure that electric energy meter is likely to occur, and reflect electricity by the result of health assessment The operation health status of energy table, and then according to the operation health status of electric energy meter, determine the management strategy of the electric energy meter, namely really Whether fixed its is replaced.Therefore, the present invention is conducive to timely judge to be likely to occur failure and replace Electric energy meter, the timeliness of replacement failure electric energy meter can be improved, ensure the interests of Utilities Electric Co. or power consumer.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit It is fixed.
The following are the device of the invention embodiments can refer to above-mentioned corresponding the details of wherein not detailed description Embodiment of the method.
Fig. 2 shows the structural schematic diagrams of the managing device of electric energy meter provided in an embodiment of the present invention, for ease of description, Only parts related to embodiments of the present invention are shown, and details are as follows:
As shown in Fig. 2, the managing device 2 of electric energy meter includes: failure predication unit, health assessment unit and management strategy are true Order member.
Failure predication unit 21, for carrying out failure predication to electric energy meter;
Health assessment unit 22, for based on failure predication unit 21 carry out failure predication as a result, to the electric energy meter Carry out health assessment;
Management strategy determination unit 23, for based on health assessment unit 22 carry out health assessment as a result, determine described in The management strategy of electric energy meter.
Optionally, the managing device 2 of electric energy meter further include:
Characteristic acquiring unit, for obtaining the characteristic when electric energy meter is in different life stages;
Characteristic integrated unit is obtained for carrying out fusion treatment to the characteristic for characterizing the electric energy The feature vector of table;
Failure predication unit 21 is also used to, and described eigenvector is inputted trained fault prediction model in advance, is obtained The fault rate of the electric energy meter.
Optionally, the managing device 2 of electric energy meter further include:
Fault message acquiring unit, for obtaining the fault message for tearing back electric energy meter open;
Training set acquiring unit, for obtaining the characteristic torn open back when electric energy meter is in different life stages;And Using it is described tear open back electric energy meter in different life stages when characteristic and fault message composition training set;
Training unit instructs the fault prediction model for being in advance based on the building of XGBOOST algorithm using the training set Practice, obtains trained fault prediction model.
Optionally, the managing device 2 of electric energy meter further include:
Sample acquisition unit, for obtain have mark and a label tear back electric energy meter picture library open as training sample set, Wherein, the label is used to indicate the fault message for tearing back electric energy meter open, described to be noted for indicating to tear open back on the picture of electric energy meter Abort situation;
Appearance fault identification model training unit, for using the training sample set to the electric energy meter appearance pre-established Fault identification model is trained, and obtains trained electric energy meter appearance fault identification model, wherein the electric energy meter appearance event Barrier identification model is the convolutional neural networks based on Fast-Rcnn algorithm;
Fault message acquiring unit is specifically used for, and the image information to be identified for tearing back electric energy meter open is obtained, by described image Trained electric energy meter appearance fault identification model described in information input obtains the failure letter to be identified for tearing back electric energy meter open Breath.
Optionally, the different life stages include factory stage and operation phase, and the characteristic includes the electricity It can calibrating information and component information of the table when being in the factory stage, the gas when electric energy meter is in the operation phase Image information, electrical work information and abnormal events information.
Optionally, health assessment unit 22 is specifically used for, and the result input of the failure predication of the electric energy meter is preset Topsis health assessment model obtains the health assessment score of the electric energy meter.
Optionally, management strategy determination unit 23 is specifically used for, to the health assessment score lower than the first preset value Electric energy meter carries out batch replacement;
First preset value is not less than to the health assessment score, and, the electric energy meter lower than the second preset value carries out Emphasis monitoring.
From the foregoing, it will be observed that the present invention can have found in advance what electric energy meter was likely to occur by carrying out failure predication to electric energy meter Failure may further carry out health assessment for the failure that electric energy meter is likely to occur, and reflect electricity by the result of health assessment The operation health status of energy table, and then according to the operation health status of electric energy meter, determine the management strategy of the electric energy meter, namely really Whether fixed its is replaced.Therefore, the present invention is conducive to timely judge to be likely to occur failure and replace Electric energy meter, the timeliness of replacement failure electric energy meter can be improved, ensure the interests of Utilities Electric Co. or power consumer.
Fig. 3 is the schematic diagram for the terminal that one embodiment of the invention provides.As shown in figure 3, the terminal 3 of the embodiment includes: Processor 30, memory 31 and it is stored in the computer program that can be run in the memory 31 and on the processor 30 32.The processor 30 realizes the step in the management method embodiment of above-mentioned each electric energy meter when executing the computer program 32 Suddenly, such as step 101 shown in FIG. 1 is to step 103.Alternatively, realization when the processor 30 executes the computer program 32 The function of each module/unit in above-mentioned each Installation practice, such as the function of unit 21 to 23 shown in Fig. 2.
Illustratively, the computer program 32 can be divided into one or more module/units, it is one or Multiple module/units are stored in the memory 31, and are executed by the processor 30, to complete the present invention.Described one A or multiple module/units can be the series of computation machine program instruction section that can complete specific function, which is used for Implementation procedure of the computer program 32 in the terminal 3 is described.For example, the computer program 32 can be divided into Failure predication unit, health assessment unit and management strategy determination unit, each unit concrete function are as follows:
Failure predication unit, for carrying out failure predication to electric energy meter;
Health assessment unit, for based on failure predication unit carry out failure predication as a result, to the electric energy meter carry out Health assessment;
Management strategy determination unit, for based on health assessment unit carry out health assessment as a result, determining the electric energy The management strategy of table.
The terminal 3 can be desktop PC, notebook, palm PC and cloud server etc. and calculate equipment.Institute Stating terminal may include, but be not limited only to, processor 30, memory 31.It will be understood by those skilled in the art that Fig. 3 is only eventually The example at end 3, the not restriction of structure paired terminal 3 may include than illustrating more or fewer components, or the certain portions of combination Part or different components, such as the terminal can also include input-output equipment, network access equipment, bus etc..
Alleged processor 30 can be central processing unit (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), field programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor Deng.
The memory 31 can be the internal storage unit of the terminal 3, such as the hard disk or memory of terminal 3.It is described Memory 31 is also possible to the External memory equipment of the terminal 3, such as the plug-in type hard disk being equipped in the terminal 3, intelligence Storage card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card) Deng.Further, the memory 31 can also both include the internal storage unit of the terminal 3 or set including external storage It is standby.The memory 31 is for other programs and data needed for storing the computer program and the terminal.It is described to deposit Reservoir 31 can be also used for temporarily storing the data that has exported or will export.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by different Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completing The all or part of function of description.Each functional unit in embodiment, module can integrate in one processing unit, can also To be that each unit physically exists alone, can also be integrated in one unit with two or more units, it is above-mentioned integrated Unit both can take the form of hardware realization, can also realize in the form of software functional units.In addition, each function list Member, the specific name of module are also only for convenience of distinguishing each other, the protection scope being not intended to limit this application.Above system The specific work process of middle unit, module, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal and method can pass through Other modes are realized.For example, device/terminal embodiment described above is only schematical, for example, the module or The division of unit, only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units Or component can be combined or can be integrated into another system, or some features can be ignored or not executed.Another point, institute Display or the mutual coupling or direct-coupling or communication connection discussed can be through some interfaces, device or unit INDIRECT COUPLING or communication connection can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated module/unit be realized in the form of SFU software functional unit and as independent product sale or In use, can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-mentioned implementation All or part of the process in example method, can also instruct relevant hardware to complete, the meter by computer program Calculation machine program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that on The step of stating each embodiment of the method.Wherein, the computer program includes computer program code, the computer program generation Code can be source code form, object identification code form, executable file or certain intermediate forms etc..The computer-readable medium It may include: any entity or device, recording medium, USB flash disk, mobile hard disk, magnetic that can carry the computer program code Dish, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that described The content that computer-readable medium includes can carry out increasing appropriate according to the requirement made laws in jurisdiction with patent practice Subtract, such as in certain jurisdictions, according to legislation and patent practice, computer-readable medium do not include be electric carrier signal and Telecommunication signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all It is included within protection scope of the present invention.

Claims (10)

1. a kind of management method of electric energy meter, which is characterized in that the management method includes:
Failure predication is carried out to electric energy meter;
It is based on failure predication as a result, to the electric energy meter carry out health assessment;
Based on health assessment as a result, determining the management strategy of the electric energy meter.
2. the management method of electric energy meter according to claim 1, which is characterized in that described to carry out failure predication to electric energy meter Include:
Obtain the characteristic when electric energy meter is in different life stages;
Fusion treatment is carried out to the characteristic, obtains the feature vector for characterizing the electric energy meter;
Described eigenvector is inputted into trained fault prediction model in advance, obtains the fault rate of the electric energy meter.
3. the management method of electric energy meter according to claim 2, which is characterized in that input described eigenvector described Before preparatory trained fault prediction model further include:
Obtain the fault message for tearing back electric energy meter open;
Tear back characteristic when electric energy meter is in different life stages described in acquisition open;
Using it is described tear open back electric energy meter in different life stages when characteristic and fault message composition training set;
The fault prediction model for being in advance based on the building of XGBOOST algorithm is trained using the training set, is trained Fault prediction model.
4. the management method of electric energy meter according to claim 3, which is characterized in that described to obtain the failure for tearing back electric energy meter open Information includes:
It obtains and tears back electric energy meter picture library open as training sample set with mark and label, wherein the label is used to indicate Tear back the fault message of electric energy meter open, it is described to be noted for indicating to tear back the abort situation on the picture of electric energy meter open;
The electric energy meter appearance fault identification model pre-established is trained using the training sample set, is obtained trained Electric energy meter appearance fault identification model, wherein the electric energy meter appearance fault identification model is the volume based on Fast-Rcnn algorithm Product neural network;
The image information to be identified for tearing back electric energy meter open is obtained, by trained electric energy meter appearance described in described image information input Fault identification model obtains the fault message to be identified for tearing back electric energy meter open.
5. the management method of electric energy meter according to claim 3, which is characterized in that the difference life stage includes factory Stage and operation phase, the characteristic include the calibrating information and component when the electric energy meter is in the factory stage Information, the electric energy meter are in weather information, electrical work information and abnormal events information when the operation phase.
6. the management method of electric energy meter according to any one of claims 1 to 5, which is characterized in that described pre- based on failure Survey as a result, to the electric energy meter carry out health assessment include:
The result of the failure predication of the electric energy meter is inputted into preset Topsis health assessment model, obtains the electric energy meter Health assessment score.
7. the management method of electric energy meter according to claim 6, which is characterized in that it is described based on health assessment as a result, The management strategy for determining the electric energy meter includes:
Electric energy meter to the health assessment score lower than the first preset value carries out batch replacement;
First preset value is not less than to the health assessment score, and, the electric energy meter lower than the second preset value carries out emphasis Monitoring.
8. a kind of managing device of electric energy meter, which is characterized in that the managing device includes:
Failure predication unit, for carrying out failure predication to electric energy meter;
Health assessment unit, for based on failure predication unit progress failure predication as a result, to electric energy meter progress health Evaluation;
Management strategy determination unit, for based on health assessment unit carry out health assessment as a result, determining the electric energy meter Management strategy.
9. a kind of terminal, including memory, processor and storage can be run in the memory and on the processor Computer program, which is characterized in that the processor is realized when executing the computer program as claim 1 to 7 is any The step of management method of the item electric energy meter.
10. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists In realizing the management method of electric energy meter as described in any one of claim 1 to 7 when the computer program is executed by processor Step.
CN201811441537.6A 2018-11-29 2018-11-29 A kind of management method of electric energy meter, managing device and terminal Pending CN109523190A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811441537.6A CN109523190A (en) 2018-11-29 2018-11-29 A kind of management method of electric energy meter, managing device and terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811441537.6A CN109523190A (en) 2018-11-29 2018-11-29 A kind of management method of electric energy meter, managing device and terminal

Publications (1)

Publication Number Publication Date
CN109523190A true CN109523190A (en) 2019-03-26

Family

ID=65794621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811441537.6A Pending CN109523190A (en) 2018-11-29 2018-11-29 A kind of management method of electric energy meter, managing device and terminal

Country Status (1)

Country Link
CN (1) CN109523190A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110210632A (en) * 2019-05-31 2019-09-06 国网河北省电力有限公司沧州供电分公司 Failure emergency processing method, device and terminal based on ubiquitous electric power Internet of Things
CN110765797A (en) * 2019-10-14 2020-02-07 国网河北省电力有限公司 Portable intelligent terminal with electric energy meter overall process management and control function
CN110888101A (en) * 2019-12-05 2020-03-17 新奥数能科技有限公司 Electric energy meter abnormity diagnosis method and device
CN110956091A (en) * 2019-11-05 2020-04-03 广州供电局有限公司 Electric energy meter identification method and device, computer equipment and storage medium
CN111102123A (en) * 2019-12-13 2020-05-05 国家电网有限公司 Automatic control method for auxiliary engine system of pumped storage power station
CN111612322A (en) * 2020-05-14 2020-09-01 国网河北省电力有限公司电力科学研究院 Intelligent electric energy meter quality early warning method
CN111738573A (en) * 2020-06-09 2020-10-02 国网河北省电力有限公司营销服务中心 Health evaluation method based on electric energy meter full life cycle data
CN112036725A (en) * 2020-08-24 2020-12-04 国网河北省电力有限公司营销服务中心 Electric energy meter fault identification method
CN113449258A (en) * 2021-05-28 2021-09-28 国网河北省电力有限公司营销服务中心 Quality evaluation method and device for intelligent electric meter, terminal equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106203875A (en) * 2016-07-19 2016-12-07 广西电网有限责任公司电力科学研究院 A kind of model for power equipment health state evaluation
CN107832867A (en) * 2017-10-10 2018-03-23 北京交通大学 A kind of railway equipment based on failure predication technology is health management system arranged
CN107967485A (en) * 2017-11-16 2018-04-27 国网冀北电力有限公司电力科学研究院 Electro-metering equipment fault analysis method and device
CN108072858A (en) * 2017-12-25 2018-05-25 深圳市航天泰瑞捷电子有限公司 Electric energy meter method for quality control, system and terminal device
CN108320043A (en) * 2017-12-19 2018-07-24 江苏瑞中数据股份有限公司 A kind of distribution network equipment state diagnosis prediction method based on electric power big data

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106203875A (en) * 2016-07-19 2016-12-07 广西电网有限责任公司电力科学研究院 A kind of model for power equipment health state evaluation
CN107832867A (en) * 2017-10-10 2018-03-23 北京交通大学 A kind of railway equipment based on failure predication technology is health management system arranged
CN107967485A (en) * 2017-11-16 2018-04-27 国网冀北电力有限公司电力科学研究院 Electro-metering equipment fault analysis method and device
CN108320043A (en) * 2017-12-19 2018-07-24 江苏瑞中数据股份有限公司 A kind of distribution network equipment state diagnosis prediction method based on electric power big data
CN108072858A (en) * 2017-12-25 2018-05-25 深圳市航天泰瑞捷电子有限公司 Electric energy meter method for quality control, system and terminal device

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110210632A (en) * 2019-05-31 2019-09-06 国网河北省电力有限公司沧州供电分公司 Failure emergency processing method, device and terminal based on ubiquitous electric power Internet of Things
CN110765797A (en) * 2019-10-14 2020-02-07 国网河北省电力有限公司 Portable intelligent terminal with electric energy meter overall process management and control function
CN110956091A (en) * 2019-11-05 2020-04-03 广州供电局有限公司 Electric energy meter identification method and device, computer equipment and storage medium
CN110956091B (en) * 2019-11-05 2022-07-01 广东电网有限责任公司广州供电局 Electric energy meter identification method and device, computer equipment and storage medium
CN110888101A (en) * 2019-12-05 2020-03-17 新奥数能科技有限公司 Electric energy meter abnormity diagnosis method and device
CN110888101B (en) * 2019-12-05 2022-11-22 新奥数能科技有限公司 Method and device for diagnosing abnormity of electric energy meter
CN111102123B (en) * 2019-12-13 2022-01-25 国家电网有限公司 Automatic control method for auxiliary engine system of pumped storage power station
CN111102123A (en) * 2019-12-13 2020-05-05 国家电网有限公司 Automatic control method for auxiliary engine system of pumped storage power station
CN111612322A (en) * 2020-05-14 2020-09-01 国网河北省电力有限公司电力科学研究院 Intelligent electric energy meter quality early warning method
CN111738573A (en) * 2020-06-09 2020-10-02 国网河北省电力有限公司营销服务中心 Health evaluation method based on electric energy meter full life cycle data
CN112036725A (en) * 2020-08-24 2020-12-04 国网河北省电力有限公司营销服务中心 Electric energy meter fault identification method
CN112036725B (en) * 2020-08-24 2024-04-30 国网河北省电力有限公司营销服务中心 Fault identification method for electric energy meter
CN113449258A (en) * 2021-05-28 2021-09-28 国网河北省电力有限公司营销服务中心 Quality evaluation method and device for intelligent electric meter, terminal equipment and storage medium
CN113449258B (en) * 2021-05-28 2022-12-27 国网河北省电力有限公司营销服务中心 Quality evaluation method and device for intelligent electric meter, terminal equipment and storage medium

Similar Documents

Publication Publication Date Title
CN109523190A (en) A kind of management method of electric energy meter, managing device and terminal
Tu et al. Big data issues in smart grid–A review
Esenogho et al. Integrating artificial intelligence Internet of Things and 5G for next-generation smartgrid: A survey of trends challenges and prospect
Zidi et al. Theft detection dataset for benchmarking and machine learning based classification in a smart grid environment
Hong et al. Probabilistic electric load forecasting: A tutorial review
Slama Prosumer in smart grids based on intelligent edge computing: A review on Artificial Intelligence Scheduling Techniques
US20220115867A1 (en) Advanced power distribution platform
US9134353B2 (en) Comfort-driven optimization of electric grid utilization
CN108353034A (en) Framework for data center's infrastructure monitoring
US10379146B2 (en) Detecting non-technical losses in electrical networks based on multi-layered statistical techniques from smart meter data
CN113918139A (en) Identifying non-technical losses using machine learning
US20190228353A1 (en) Competition-based tool for anomaly detection of business process time series in it environments
Satapathy An analysis for service quality enhancement in electricity utility sector of India by SEM
Pham et al. Deep learning for intelligent demand response and smart grids: A comprehensive survey
Bessa Future trends for big data application in power systems
CN114596693A (en) Method, system, medium, and program product for energy monitoring and management
Hampton et al. A review of current analytical methods, modelling tools and development frameworks applicable for future retail electricity market design
CN109685344A (en) A kind of power equipment O&M strategy determines method, apparatus and storage medium
Khosrojerdi et al. Integrating artificial intelligence and analytics in smart grids: a systematic literature review
Oprea et al. An Edge-Fog-Cloud computing architecture for IoT and smart metering data
Vinjamuri et al. Efficient energy management system using Internet of things with FORDF technique for distribution system
Khan et al. Power grid stability analysis using pipeline machine
Eto et al. Demand response as a system reliability resource
Olar et al. The Design and Applications of Dashboards Used in Electrical and Power Systems
Mbuya Short-term forecast techniques for energy management systems in microgrid applications

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210929

Address after: 050021 No. 238 South Sports street, Hebei, Shijiazhuang

Applicant after: STATE GRID HEBEI ELECTRIC POWER Research Institute

Applicant after: Marketing service center of State Grid Hebei Electric Power Co.,Ltd.

Applicant after: STATE GRID CORPORATION OF CHINA

Applicant after: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.

Address before: 050011 no.238, TIYU South Street, Yuhua District, Shijiazhuang City, Hebei Province

Applicant before: STATE GRID HEBEI ELECTRIC POWER Research Institute

Applicant before: STATE GRID CORPORATION OF CHINA

Applicant before: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190326