CN109458158A - A kind of quarrying apparatus and method for coal bed gas horizontal well - Google Patents

A kind of quarrying apparatus and method for coal bed gas horizontal well Download PDF

Info

Publication number
CN109458158A
CN109458158A CN201811634606.5A CN201811634606A CN109458158A CN 109458158 A CN109458158 A CN 109458158A CN 201811634606 A CN201811634606 A CN 201811634606A CN 109458158 A CN109458158 A CN 109458158A
Authority
CN
China
Prior art keywords
ball seat
shell
casing
obturating plug
liquid outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811634606.5A
Other languages
Chinese (zh)
Inventor
游靖
孙崇磊
张京辉
杜志刚
郭利
杨金庆
李雷祥
刘萌
李建伟
王少明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dezhou Zhong Kai Petroleum Technology Co Ltd
Petrochina Huabei Oilfield Co
Engineering and Technology Research Institute of Petrochina Huabei Oilfield Co
Original Assignee
Dezhou Zhong Kai Petroleum Technology Co Ltd
Engineering and Technology Research Institute of Petrochina Huabei Oilfield Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dezhou Zhong Kai Petroleum Technology Co Ltd, Engineering and Technology Research Institute of Petrochina Huabei Oilfield Co filed Critical Dezhou Zhong Kai Petroleum Technology Co Ltd
Priority to CN201811634606.5A priority Critical patent/CN109458158A/en
Publication of CN109458158A publication Critical patent/CN109458158A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/08Screens or liners
    • E21B43/086Screens with preformed openings, e.g. slotted liners

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to coal-bed gas exploitation field, especially a kind of quarrying apparatus and method for coal bed gas horizontal well, including screen casing, the horizontal well position of the screen insertion to coal seam;Casing, described sleeve pipe are connected with screen casing, tripping in straight well fragment position;Connection component, the connection component connects the screen casing and casing, the connection component include packing device and salvageable contents, and the packing device is connected with shell, and the shell is connected through attachment device with casing;The packing device after expanding with the borehole wall for abutting against.Present invention tripping in screen casing into the horizontal well in coal seam in complete well, coal bed gas is collected by screen casing, interference stratum tripping in casing more than coal seam, while sealing is carried out to casing and borehole wall annular space band in a manner of well cementation, with prevent intrusively layer cbm development is interfered;Not only the natural completion of straight well section may be implemented, but also can guarantee the lossless operation in horizontal segment coal seam, fully met the needs of coal bed gas Efficient Development.

Description

A kind of quarrying apparatus and method for coal bed gas horizontal well
Technical field
The present invention relates to coal-bed gas exploitation field, especially a kind of quarrying apparatus and method for coal bed gas horizontal well.
Background technique
Coal bed gas refers to that matrix of coal particle surface or part are adsorbed in coal seam is free in coal hole or is dissolved in coal Hydrocarbon gas in layer water, ingredient belong to the associated minerals resource of coal based on methane, belong to Unconventional gas, be nearly one Cleaning, high-grade energy and the industrial chemicals to emerge in the world for 20 years.The development and utilization of coal bed gas can generate huge economy Benefit has become important national strategy resource.
The exploitation of coal bed gas generally uses drilling well acquisition method, cements the well after drilling, existing cementing technology It is the tripping in casing in the open hole well being drilled, configured cement slurry is injected into the annular space of wellbore and casing, to water Firm cement sheath is formed after mud time is solidifying, casing is fixed, the main function of casing cementing is to insulate oil, gas and water layer, The ground mutual channelling of inter-layer fluid is prevented, to protect production layer;Severe leakage layer, high pressure zone or other easy collapsings etc. can also be insulated Bad ground with supporting sleeve and prevents corrosion of the underground fluid to casing.
Nearly 2 years, start to develop coal bed gas using horizontal well technology, cbm development can be greatly improved in horizontal well technology Effect.Horizontal well development technology mainly includes drilling technology, completion technique and production technology etc..Wherein completion technique is linking Drilling well and production engineering and relatively independent engineering, be after the drilling well, including completion tubular column design, lower completion tubular column, One systematic engineering of business of cementing well construction etc..The superiority and inferiority of the height of completion technique level and complete well construction quality, to coal seam Can gas production, which reach expectation index and the economic benefit of cbm development, conclusive influence.Utilize horizontal well development coal seam The completion technique of gas, is also in the exploratory stage at present, and for containing the coal seam of coal bed gas, geology characteristic is Fractured or hole Property, well cementation pollutes coal seam there are cement slurry, influences coal-bed gas exploitation, is not suitable for cementing the well, and other more than coal seam interference layers It needs to carry out plugging separating, avoids the exploitation for influencing coal bed gas and coal seam.
In view of factors above, a kind of quarrying apparatus and method for coal bed gas horizontal well has been invented.
Summary of the invention
The present invention provides a kind of quarrying apparatus and method for coal bed gas horizontal well, in complete well to the level in coal seam Tripping in screen casing in well collects coal bed gas by screen casing, the interference stratum tripping in casing more than coal seam, while in a manner of well cementation Sealing is carried out to casing and borehole wall annular space band, with prevent intrusively layer cbm development is interfered;Both it may be implemented straight The natural completion of well section, and can guarantee the lossless operation in horizontal segment coal seam, the needs of coal bed gas Efficient Development are fully met, together When meet the easy reliability of site technology operation, improve the safety of operation, it is raw to have reduced well cost and the exploitation in later period Cost is produced, solves problems of the prior art.
Used technical solution is the present invention to solve above-mentioned technical problem: a kind of exploitation for coal bed gas horizontal well Device, comprising:
Screen casing, the horizontal well position of the screen insertion to coal seam;
Casing, described sleeve pipe are connected with screen casing, tripping in straight well fragment position;
Connection component, the connection component connect the screen casing and casing, and the connection component includes packing device and can The contents of salvaging, the packing device are connected with shell, and the shell is connected through attachment device with casing;
The packing device separates the interference stratum for blocking coal seam or more for abutting against after expanding with the borehole wall;
The contents include the first attachment, the second attachment and third attachment, and first attachment makes slurry in casing Into packing device, second attachment makes the slurry in casing enter annular space band, and the third attachment distinguishes contents It is disconnected state with packing device, shell, and closes slurry and enters annular space band position.
Preferably, the packing device includes the central tube being connected with screen casing, and the central tube is connected with packer adapter, It is equipped with admission chamber on packer adapter, expansion glue cylinder is arranged with outside the central tube, slurry is through admission chamber in described sleeve pipe Into position between expansion packing element and central tube, make to abut against after expanding packing element expansion with the borehole wall.
Preferably, first attachment includes the ball seat shell being set on packer adapter inner wall, on ball seat shell Equipped with the inlet being connected with admission chamber, it is arranged with ball seat on ball seat outer casing inner wall, stop collar is equipped on ball seat shell, The ball seat sliding slot being fastened on stop collar is equipped on ball seat, the ball seat is connected with stop collar through the first pin.
Preferably, second attachment includes the opening obturating plug being arranged inside the housing, and obturating plug is equipped on opening obturating plug Sliding slot, the ball seat cover top portion are connected with the obturating plug runner position for opening obturating plug through the second pin, the opening obturating plug It can be moved along obturating plug sliding slot relative to ball seat shell, the ball seat cover top portion is used to limit the moving distance for opening obturating plug, outside Shell is equipped with the first liquid outlet, and the obturating plug of opening is used to closing or opening the first liquid outlet on shell.
Preferably, the third attachment include be arranged inside the housing can fishing socket, it is described can fishing socket and connection dress Pin block through activity clamping between setting is connected, and is connected that can set on fishing socket inner wall through third pin and closing obturating plug, the pass Occlusion seat and pin block abut against, it is described can the bottom of fishing socket be connected with ball seat shell, it is described can the bottom of fishing socket be arranged and exist Position between ball seat shell and shell, it is described open obturating plug top and can fishing socket abut against, it is described open obturating plug lower part It is connected through the second pin with ball seat shell, the second liquid outlet being connected with the first liquid outlet can be equipped on fishing socket;Institute Closed cell can be additionally provided with by stating between fishing socket and shell, the closed cell can follow can fishing socket it is mobile, it is outer for closing The first liquid outlet on shell.
Preferably, the closed cell include be set in shell and can closedown sliding sleeve between fishing socket, in the closing Sliding sleeve is equipped with the third liquid outlet being connected with the first liquid outlet, closing block is inserted in the closedown sliding sleeve, in institute The card slot that closedown sliding sleeve is equipped with the clamping that is connected with closing block is stated, the closing block and outer casing inner wall abut against, the pass Close sliding sleeve can follow can fishing socket it is mobile, release groove is equipped with below closedown sliding sleeve, the closing block is moved in release groove Make can fishing socket and closedown sliding sleeve be detached from, the third liquid outlet in the closedown sliding sleeve is moved to and the intersection dislocation of the first liquid outlet It sets, to close first liquid outlet.
Preferably, the inner diameter > that the inner diameter > of the ball seat opens obturating plug closes the diameter of obturating plug.
Preferably, the attachment device includes the lifting sub that the top connection being connected with shell is connected with top connection, described Obturating plug is closed to be arranged in top connection position.
A kind of recovery method for coal bed gas horizontal well, comprising the following steps:
S1: first by sequential connection screen casing, connection component and casing from bottom to top, and along drilling well successively tripping in screen casing String, connection component and bunch tube connect guide shoe in the bottom of screen casing;
Under S2: Xiang Jingzhong after complete tubing string, the cementing head on ground is connected, connects cementing head and cement according to direct circulation manifold Vehicle transfer pipeline makes the first connecting tube of cementing head be connected with mud channel, makes the second connecting tube of cementing head and the water of outside Slurry transportation pipeline is connected, and turn on pump well-flushing reaches termination of pumping after requirement;
S3: after the lever position placement rack end socket in cementing head, operation lever enters setting head in well with mud, pumps Send setting ball to ball seat position, after setting ball abuts to ball seat position, pump truck increases pressure and setting ball is pushed to squeeze ball seat, cuts The first pin of ball seat and stop collar is connected, is moved down under the impetus of the present blocking of ball seat along ball seat sliding slot, ball seat is detached from ball Inlet on seat shell manages interior mud from inlet and enters admission chamber, and mud is filled with expansion packing element and central tube through admission chamber Between, expansion packing element is filled up, expansion packing element abuts to the borehole wall, completes packing movement;
S4: continue to increase and manage interior mud pressure, cut the second pin after opening obturating plug stress, open obturating plug along obturating plug sliding slot Move down, open obturating plug be detached from can fishing socket the second liquid outlet position, manage in mud through the second liquid outlet, third liquid outlet, the One liquid outlet enters annular space band, cement slurry is conveyed into well by the second connecting tube of cementing head, cement slurry is under pressure Into annular space band;
S5: after cement slurry is full of annular space band, dismantling the upper end cover of cementing head, will close rubber plug and is put into cementing head shell In inner cavity, the bar of cementing head is opened, release closes rubber plug, continues through the first connecting tube pumping mud, will close rubber plug pump It send to shut-off plug seat and sets, increase mud pressure in managing, close after obturating plug is under pressure and cut third pin, close obturating plug and move down Make pin block from can be detached between fishing socket and top connection, close obturating plug push can fishing socket move down, and can the ball that connects of fishing socket Seat shell is also synchronized and is moved down, closedown sliding sleeve follow can fishing socket synchronize and move down, when the pin block of closedown sliding sleeve is moved to release slot position Postpone, pin block and can the card slot of fishing socket be detached from clamped condition, closedown sliding sleeve abuts at the top of packer adapter, closedown sliding sleeve envelope The first liquid outlet on shell is closed, cement injection well cementing operation is completed;
S6: start to salvage contents after waiting the cement slurry sets in annular space band, connected in drill string lower end and salvage work The fishing rod insertion of tool, fishing tool can above mention drill string after lockking fishing socket, take inside out of by fishing tool in fishing socket Attachment;
S7: construction terminates, and has realized well.
Preferably, releasing spear is selected to salvage the contents.
The beneficial effect of the present invention using the above structure is, in complete well into the horizontal well in coal seam tripping in screen casing, pass through Screen casing collection coal bed gas, the interference stratum tripping in casing more than coal seam, while to casing and borehole wall annular space in a manner of well cementation Band carry out sealing, with prevent intrusively layer cbm development is interfered;Not only the natural completion of straight well section may be implemented, but also The lossless operation that can guarantee horizontal segment coal seam, has fully met the needs of coal bed gas Efficient Development, while meeting site technology The easy reliability of operation, improves the safety of operation, has reduced the exploitation production cost in well cost and later period.
Detailed description of the invention
Fig. 1 is complete well construction first state structural schematic diagram of the invention.
Fig. 2 is complete well construction the second status architecture schematic diagram of the invention.
Fig. 3 is the structural schematic diagram of connection component of the invention.
Fig. 4 is the structural schematic diagram of cementing head of the invention.
Fig. 5 is the structural schematic diagram of closing rubber plug of the invention.
In figure, 1, screen casing;2, casing;3, connection component;4, shell;401, the first liquid outlet;5, annular space band;6, center Pipe;7, packer adapter;701, admission chamber;8, packing element is expanded;9, ball seat shell;901, inlet;902, ball seat sliding slot;10, Ball seat;11, stop collar;12, the first pin;13, obturating plug is opened;1301, obturating plug sliding slot;14, the second pin;It 15, can fishing socket; 1501, the second liquid outlet;16, pin block;17, third pin;18, obturating plug is closed;19, closedown sliding sleeve;1901, third liquid outlet; 20, block is closed;21, release groove;22, top connection;23, lifting sub;24, guide shoe;25, cementing head;2501, the first connection Pipe;2502, the second connecting tube;2503, lever;26, rubber plug is closed;27, fishing tool.
Specific embodiment
In order to clarify the technical characteristics of the invention, below by specific embodiment, and its attached drawing is combined, to this hair It is bright to be described in detail.
As shown in Figs. 1-5, a kind of quarrying apparatus for coal bed gas horizontal well, comprising:
Screen casing 1, the horizontal well position of 1 tripping in of screen casing to coal seam;
Casing 2, described sleeve pipe 2 are connected with screen casing 1, tripping in straight well fragment position;
Connection component 3, the connection component 3 connect the screen casing 1 and casing 2, and the connection component 3 includes packing device With salvageable contents, the packing device is connected with shell 4, and the shell 4 is connected through attachment device with casing 2;
The packing device separates the interference stratum for blocking coal seam or more for abutting against after expanding with the borehole wall;
The contents include the first attachment, the second attachment and third attachment, and first attachment makes slurry in casing 2 Into packing device, second attachment makes the slurry in casing 2 enter annular space band 5, and the third attachment makes contents point Not and packing device, shell 4 are disconnected state, and close slurry and enter 5 position of annular space band.
The packing device includes the central tube 6 being connected with screen casing 1, and the central tube 6 is connected with packer adapter 7, Packer adapter 7 be equipped with admission chamber 701, expansion glue cylinder 8 is arranged with outside the central tube 6, in described sleeve pipe 2 slurry pass through into Sap cavity 701 enters position between expansion packing element 8 and central tube 6, makes to abut against after expanding the expansion of packing element 8 with the borehole wall.
First attachment includes the ball seat shell 9 being set on 7 inner wall of packer adapter, is equipped on ball seat shell 9 The inlet 901 being connected with admission chamber 701 is arranged with ball seat 10 on 9 inner wall of ball seat shell, is equipped on ball seat shell 9 Stop collar 11 is equipped with the ball seat sliding slot 902 that is fastened on stop collar 11, the ball seat 10 and stop collar 11 through the on ball seat 10 One pin 12 is connected.
Second attachment includes the opening obturating plug 13 being set in inside shell 4, and it is sliding that obturating plug is equipped on opening obturating plug 13 Slot 1301,9 top of ball seat shell are connected with 1,301 second pin of position 14 of obturating plug sliding slot for opening obturating plug 13, institute Stating opening obturating plug 13 can move along obturating plug sliding slot 1301 relative to ball seat shell 9, for limiting opening plug at the top of the ball seat shell 9 The moving distance of seat 13 is equipped with the first liquid outlet 401 on shell 4, and the opening obturating plug 13 is for closing or opening shell 4 The first liquid outlet 401.
The third attachment include be set in inside shell 4 can fishing socket 15, it is described can fishing socket 15 and attachment device Between the pin block 16 through activity clamping be connected, be connected that can set on 15 inner wall of fishing socket through third pin 17 and closing obturating plug 18, The closing obturating plug 18 and pin block 16 abut against, it is described can the bottom of fishing socket 15 be connected with ball seat shell 9, it is described can fishing socket 15 bottom is arranged between ball seat shell 9 and shell 4 position, the top for opening obturating plug 13 and can fishing socket 15 offset It connects, second pin of lower part 14 for opening obturating plug 13 is connected with ball seat shell 9, can be equipped with to go out with first on fishing socket 15 The second liquid outlet 1501 that liquid mouth 401 is connected;It can be additionally provided with closed cell between fishing socket 15 and shell 4 described, it is described Closed cell can follow can fishing socket 15 it is mobile, the first liquid outlet 401 on closure 4.
The closed cell include be set in shell 4 and can closedown sliding sleeve 19 between fishing socket 15, slided in the closing Set 19 is equipped with the third liquid outlet 1901 being connected with the first liquid outlet 401, is inserted with closing in the closedown sliding sleeve 19 Block 20 is equipped with the card slot for the clamping that is connected with closing block 20, the closing block 20 and shell 4 in the closedown sliding sleeve 19 Inner wall abuts against, the closedown sliding sleeve 19 can follow can fishing socket 15 it is mobile, release groove 21, institute are equipped with below closedown sliding sleeve 19 State close block 20 be moved in release groove 21 make can fishing socket 15 and closedown sliding sleeve 19 be detached from, the in the closedown sliding sleeve 19 Three liquid outlets 1901 be moved to 401 crossing position of the first liquid outlet, to close first liquid outlet 401.
In order to guarantee going on smoothly for constructing operation, the inner diameter > of the ball seat 10 opens the inner diameter of obturating plug 13 The diameter of > closing obturating plug 18.So that the setting ball of investment is passed through closing obturating plug 18 and is opened obturating plug 13 and abuts to ball seat 10 It sets, makes mud pressure in pipe be increased to open the second pin 14 that obturating plug 13 cuts its connection when certain pressure value, make investment Closing 18 position of obturating plug can be abutted to by closing rubber plug.
It is connected for convenience with casing 2, the attachment device includes the top connection 22 and top connection 22 being connected with shell 4 Connected lifting sub 23, the closing obturating plug 18 are arranged in 22 position of top connection.
A kind of recovery method for coal bed gas horizontal well, comprising the following steps:
S1: first by sequential connection screen casing 1, connection component 3 and casing 2 from bottom to top, and successively tripping in is sieved along drilling well Pipe string, connection component 3 and bunch tube connect guide shoe 24 in the bottom of screen casing 1;
Under S2: Xiang Jingzhong after complete tubing string, the cementing head 25 on ground is connected, connects 25 He of cementing head according to direct circulation manifold 26 transfer pipeline of cementing truck makes the first connecting tube 2501 of cementing head 25 be connected with mud channel, connects the second of cementing head 25 Adapter tube 2502 is connected with external cement slurry transfer pipeline, and turn on pump well-flushing reaches termination of pumping after requirement;
S3: after the 2503 position placement rack end socket of lever in cementing head 25, operation lever 2503 makes setting head with mud Into in well, setting ball is pumped to 10 position of ball seat, after setting ball abuts to 10 position of ball seat, it is setting that pump truck increases pressure promotion Ball squeezes ball seat 10, cuts the first pin 12 of connection ball seat 10 and stop collar 11, and ball seat 10 is present under the impetus of blocking Moved down along ball seat sliding slot 902, ball seat 10 be detached from ball seat shell 9 on inlet 901, manage in mud from inlet 901 enter into Sap cavity 701, mud are filled between expansion packing element 8 and central tube 6 through admission chamber 701, and expansion packing element 8 is filled up, and expansion packing element 8 supports It is connected to the borehole wall, completes packing movement;
S4: continue to increase and manage interior mud pressure, cut the second pin 14 after opening 13 stress of obturating plug, open obturating plug 13 along plug Seat sliding slot 1301 move down, open obturating plug 13 be detached from can fishing socket 15 1501 position of the second liquid outlet, manage in mud go out through second Liquid mouth 1501, third liquid outlet 1901, the first liquid outlet 401 enter annular space band 5, pass through the second connecting tube 2502 of cementing head 25 Xiang Jingzhong conveys cement slurry, and cement slurry enters annular space band 5 under pressure;
S5: after cement slurry is full of annular space band 5, dismantling the upper end cover of cementing head 25, will close rubber plug 26 and is put into cementing head In the inner cavity of shell, the bar 2503 of cementing head 25 is opened, rubber plug 26 is closed in release, continues through the pumping of the first connecting tube 2501 Mud will close rubber plug 26 and be pumped to closing 18 position of obturating plug, and increase mud pressure in managing, and close after obturating plug 18 is under pressure and cut Disconnected third pin 17, closing obturating plug 18 and moving down makes pin block 16 from that can be detached between fishing socket 15 and top connection 22, closes obturating plug 18 Push can fishing socket 15 move down, with can fishing socket 15 connect ball seat shell 9 also synchronize move down, closedown sliding sleeve 19, which follows, to salvage Cylinder 15 is synchronized and is moved down, after the pin block 16 of closedown sliding sleeve 19 is moved to 21 position of release groove, pin block 16 and can fishing socket 15 card Slot is detached from clamped condition, and closedown sliding sleeve 19 abuts to 7 top of packer adapter, and first on 19 closure 4 of closedown sliding sleeve goes out Liquid mouth 401 completes cement injection well cementing operation;
S6: start to salvage contents after waiting the cement slurry sets in annular space band 5, connected in drill string lower end and salvage work Tool 27, the insertion of the fishing rod of fishing tool 27 can above mention drill string after lockking fishing socket 15, pass through fishing tool in fishing socket 15 27 take contents out of;
S7: construction terminates, and has realized well.
Releasing spear is selected to salvage the contents.The releasing spear belongs to the prior art, can be direct Commercial product is selected, is easy to use.
Above-mentioned specific embodiment cannot function as limiting the scope of the invention, for the technology people of the art For member, any alternate modification or transformation made to embodiment of the present invention are fallen within the scope of protection of the present invention.
Place is not described in detail by the present invention, is the well-known technique of those skilled in the art of the present technique.

Claims (10)

1. a kind of quarrying apparatus for coal bed gas horizontal well characterized by comprising
Screen casing, the horizontal well position of the screen insertion to coal seam;
Casing, described sleeve pipe are connected with screen casing, tripping in straight well fragment position;
Connection component, the connection component connect the screen casing and casing, and the connection component includes packing device and can salvage Contents, the packing device is connected with shell, and the shell is connected through attachment device with casing;
The packing device separates the interference stratum for blocking coal seam or more for abutting against after expanding with the borehole wall;
The contents include the first attachment, the second attachment and third attachment, and first attachment enters slurry in casing Packing device, second attachment make the slurry in casing enter annular space band, and the third attachment makes contents respectively and seals It is disconnected state every device, shell, and closes slurry and enters annular space band position.
2. a kind of quarrying apparatus for coal bed gas horizontal well according to claim 1, which is characterized in that the packing dress The central tube including being connected with screen casing is set, the central tube is connected with packer adapter, admission chamber is equipped on packer adapter, Expansion glue cylinder is arranged with outside the central tube, slurry enters the meta position of expansion packing element and central tube through admission chamber in described sleeve pipe It sets, makes to abut against after expanding packing element expansion with the borehole wall.
3. a kind of quarrying apparatus for coal bed gas horizontal well according to claim 2, which is characterized in that described first is attached Part includes the ball seat shell being set on packer adapter inner wall, and the feed liquor being connected with admission chamber is equipped on ball seat shell Mouthful, it is arranged with ball seat on ball seat outer casing inner wall, stop collar is equipped on ball seat shell, is equipped on ball seat and is fastened on stop collar On ball seat sliding slot, the ball seat is connected with stop collar through the first pin.
4. a kind of quarrying apparatus for coal bed gas horizontal well according to claim 3, which is characterized in that described second is attached Part includes the opening obturating plug being arranged inside the housing, and obturating plug sliding slot, the ball seat cover top portion and institute are equipped on opening obturating plug The obturating plug runner position for stating opening obturating plug is connected through the second pin, and the opening obturating plug can be moved along obturating plug sliding slot with respect to ball seat shell Dynamic, the ball seat cover top portion is used to limit the moving distance for opening obturating plug, is equipped with the first liquid outlet, the opening on the shell Obturating plug is used to closing or opening the first liquid outlet on shell.
5. a kind of quarrying apparatus for coal bed gas horizontal well according to claim 4, which is characterized in that the third is attached Part include be arranged inside the housing can fishing socket, it is described can between fishing socket and attachment device through activity clamping pin block phase Even, be connected through third pin and closing obturating plug can set on fishing socket inner wall, the closing obturating plug and pin block abut against, it is described can The bottom of fishing socket is connected with ball seat shell, it is described can fishing socket bottom be arranged between ball seat shell and shell position, institute State open obturating plug top and can fishing socket abut against, it is described open obturating plug the second pin of lower part be connected with ball seat shell, The second liquid outlet being connected with the first liquid outlet can be equipped on fishing socket;It can be additionally provided between fishing socket and shell described Closed cell, the closed cell can follow can fishing socket it is mobile, the first liquid outlet on closure.
6. a kind of quarrying apparatus for coal bed gas horizontal well according to claim 5, which is characterized in that the closing is single Member include be set in shell and can closedown sliding sleeve between fishing socket, be equipped in the closedown sliding sleeve and be connected with the first liquid outlet Logical third liquid outlet, is inserted with closing block in the closedown sliding sleeve, is equipped with and closes block in the closedown sliding sleeve Be connected the card slot of clamping, and the closings block and outer casing inner wall abut against, the closedown sliding sleeve can follow can fishing socket move, Be equipped with release groove below closedown sliding sleeve, the closings block be moved in release groove make can fishing socket and closedown sliding sleeve disengaging, institute State the third liquid outlet in closedown sliding sleeve be moved to the first liquid outlet crossing position, to close first liquid outlet.
7. a kind of quarrying apparatus for coal bed gas horizontal well according to claim 6, which is characterized in that the ball seat The inner diameter > that inner diameter > opens obturating plug closes the diameter of obturating plug.
8. a kind of quarrying apparatus for coal bed gas horizontal well according to any one of claims 1 to 7, which is characterized in that The attachment device includes the lifting sub that the top connection being connected with shell is connected with top connection, and the closing obturating plug setting exists Top connection position.
9. based on a kind of recovery method for coal bed gas horizontal well according to any one of claims 8, which is characterized in that including following step It is rapid:
S1: first by sequential connection screen casing, connection component and casing from bottom to top, and along drilling well successively tripping in screen casing string, even Connected components and bunch tube connect guide shoe in the bottom of screen casing;
Under S2: Xiang Jingzhong after complete tubing string, the cementing head on ground is connected, cementing head is connected according to direct circulation manifold and cementing truck is defeated Pipeline is sent, the first connecting tube of cementing head is made to be connected with mud channel, makes the second connecting tube of cementing head and the cement slurry of outside Transfer pipeline is connected, and turn on pump well-flushing reaches termination of pumping after requirement;
S3: after the lever position placement rack end socket in cementing head, operation lever enters setting head in well with mud, pumps seat Blocking is to ball seat position, and after setting ball abuts to ball seat position, pump truck increases pressure and setting ball is pushed to squeeze ball seat, cuts connection First pin of ball seat and stop collar, ball seat be present blocking impetus under moved down along ball seat sliding slot, ball seat be detached from ball seat outside Inlet on shell manages interior mud from inlet and enters admission chamber, and mud is filled between expansion packing element and central tube through admission chamber, Expansion packing element is filled up, expansion packing element abuts to the borehole wall, completes packing movement;
S4: continue to increase and manage interior mud pressure, cut the second pin after opening obturating plug stress, open obturating plug under obturating plug sliding slot Move, open obturating plug be detached from can fishing socket the second liquid outlet position, manage in mud through the second liquid outlet, third liquid outlet, first Liquid outlet enters annular space band, conveys cement slurry into well by the second connecting tube of cementing head, cement slurry under pressure into Enter annular space band;
S5: after cement slurry is full of annular space band, dismantling the upper end cover of cementing head, and closing rubber plug is put into the inner cavity of cementing head shell In, the bar of cementing head is opened, release closes rubber plug, continues through the first connecting tube pumping mud, will close rubber plug and is pumped to Shut-off plug seat is set, and mud pressure in managing is increased, and is closed after obturating plug is under pressure and is cut third pin, and closing obturating plug and moving down makes pin Block from can be detached between fishing socket and top connection, close obturating plug push can fishing socket move down, and can be outside the ball seat that connects of fishing socket Shell is also synchronized and is moved down, closedown sliding sleeve follow can fishing socket synchronize and move down, after the pin block of closedown sliding sleeve is moved to release groove location, Pin block and can the card slot of fishing socket be detached from clamped condition, closedown sliding sleeve abuts at the top of packer adapter, and closedown sliding sleeve closing is outer The first liquid outlet on shell completes cement injection well cementing operation;
S6: starting to salvage contents after waiting the cement slurry sets in annular space band, connects fishing tool in drill string lower end, beats The fishing rod insertion of fishing combined tool can above mention drill string after lockking fishing socket, take contents out of by fishing tool in fishing socket;
S7: construction terminates, and has realized well.
10. based on a kind of recovery method for coal bed gas horizontal well as claimed in claim 9, which is characterized in that selection can move back Formula fishing spear salvages the contents.
CN201811634606.5A 2018-12-29 2018-12-29 A kind of quarrying apparatus and method for coal bed gas horizontal well Pending CN109458158A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811634606.5A CN109458158A (en) 2018-12-29 2018-12-29 A kind of quarrying apparatus and method for coal bed gas horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811634606.5A CN109458158A (en) 2018-12-29 2018-12-29 A kind of quarrying apparatus and method for coal bed gas horizontal well

Publications (1)

Publication Number Publication Date
CN109458158A true CN109458158A (en) 2019-03-12

Family

ID=65615672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811634606.5A Pending CN109458158A (en) 2018-12-29 2018-12-29 A kind of quarrying apparatus and method for coal bed gas horizontal well

Country Status (1)

Country Link
CN (1) CN109458158A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112593894A (en) * 2020-12-24 2021-04-02 山西晋城无烟煤矿业集团有限责任公司 Multi-purpose multi-stage discontinuous well cementation method for preventing pollution of production layer

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020166665A1 (en) * 2000-03-30 2002-11-14 Baker Hughes Incorporated Zero drill completion and production system
US20110284229A1 (en) * 2010-05-21 2011-11-24 1473706 Alberta Ltd. System, method and apparatus for fracture of wells having a liner
CN102787824A (en) * 2011-05-18 2012-11-21 中国石油化工集团公司 Tool and method for injecting cement into top of horizontal well screen pipe without drilling and plugging
CN103089194A (en) * 2011-10-31 2013-05-08 中国石油化工股份有限公司 Method for completing well by cementing top of expandable screen
CN104121001A (en) * 2014-07-31 2014-10-29 于世江 Drilling-free cement injecting device for horizontal well
CN104343413A (en) * 2013-08-09 2015-02-11 胜利油田胜机石油装备有限公司 Top well cementation method and device for self-communicated double-process screen pipe
CN205858311U (en) * 2016-06-14 2017-01-04 中国石油化工股份有限公司 A kind of bore hole staged fracturing completion tubular column
CN207795145U (en) * 2017-12-25 2018-08-31 中国石油天然气股份有限公司 A kind of coal bed gas horizontal well cementing tool
CN209413891U (en) * 2018-12-29 2019-09-20 德州众凯石油科技有限公司 A kind of quarrying apparatus for coal bed gas horizontal well

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020166665A1 (en) * 2000-03-30 2002-11-14 Baker Hughes Incorporated Zero drill completion and production system
US20110284229A1 (en) * 2010-05-21 2011-11-24 1473706 Alberta Ltd. System, method and apparatus for fracture of wells having a liner
CN102787824A (en) * 2011-05-18 2012-11-21 中国石油化工集团公司 Tool and method for injecting cement into top of horizontal well screen pipe without drilling and plugging
CN103089194A (en) * 2011-10-31 2013-05-08 中国石油化工股份有限公司 Method for completing well by cementing top of expandable screen
CN104343413A (en) * 2013-08-09 2015-02-11 胜利油田胜机石油装备有限公司 Top well cementation method and device for self-communicated double-process screen pipe
CN104121001A (en) * 2014-07-31 2014-10-29 于世江 Drilling-free cement injecting device for horizontal well
CN205858311U (en) * 2016-06-14 2017-01-04 中国石油化工股份有限公司 A kind of bore hole staged fracturing completion tubular column
CN207795145U (en) * 2017-12-25 2018-08-31 中国石油天然气股份有限公司 A kind of coal bed gas horizontal well cementing tool
CN209413891U (en) * 2018-12-29 2019-09-20 德州众凯石油科技有限公司 A kind of quarrying apparatus for coal bed gas horizontal well

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112593894A (en) * 2020-12-24 2021-04-02 山西晋城无烟煤矿业集团有限责任公司 Multi-purpose multi-stage discontinuous well cementation method for preventing pollution of production layer

Similar Documents

Publication Publication Date Title
CN101624904B (en) Open hole completion well sand resistant pipe string of sidetracking branch well and inserting type acid cleaning filling inner pipe string thereof
CN201165866Y (en) Horizontal well division and combination extracting pipe column
CN103015955A (en) Open-hole horizontal well multi-cluster sliding sleeve staged fracturing string and fracturing method thereof
CN109653722A (en) A kind of mash gas extraction device and method of coal seam hydraulic slotted liner technique and the linkage of lower screen casing
CN201705219U (en) Lateral drilling gravel pack completion string
CN205063929U (en) Colliery is sealed in pit and is pressed integration segmentation hydraulic fracturing device
CN111911225B (en) Drilling and water injection integrated device and method for coal seam
CN109372474B (en) A kind of coal bed gas and sandstone gas are the same as well flow string and recovery method
CN110295879A (en) A kind of staged fracturing horizontal well in segments period note adopts dual string
CN201486538U (en) Sand prevention pipe string used for open-hole well completion of side-drilled multilateral well and plug-in type acid cleaning filling inner pipe string thereof
CN102562004A (en) One-trip tubing string separate-injection coproduction method for thick oil thermal recovery well
CN104806196A (en) Casing floating system for horizontal well
CN209413891U (en) A kind of quarrying apparatus for coal bed gas horizontal well
CN205605156U (en) Workover device is pressed in oil gas field area
CN202325378U (en) Down-hole isolation device
CN109458158A (en) A kind of quarrying apparatus and method for coal bed gas horizontal well
CN111810106B (en) Three-inch half-slim hole sidetrack horizontal well efficient staged fracturing method
CN209163779U (en) A kind of hydraulic packing linker
CN101701513A (en) Drilling-plug free tubular column with sand control and well cementation for open-hole horizontal well
CN204082100U (en) Large span long well section partition-type flow string
CN201196059Y (en) Oil well cementing system
CN208456570U (en) A kind of extracting device of oil
CN214944177U (en) CO (carbon monoxide)2Oil well driving non-killing oil production pipe column
CN108979583A (en) A kind of sidetracked hole layer and section cementing unit and application method
CN202348215U (en) Cement-injection leaking stoppage separation balancer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination